Loading...
HomeMy WebLinkAbout6402 Ashe Road Final ELD 2020 UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:61-21771 Tanknology 7-Eleven #38628 11000 N. MoPac Expressway #500 Austin, TX 78759 6402 Ashe Rd. Bakersfield, CA 93313 November 11, 2020 ® Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Test Certification Post Installation Enhanced Leak Detection (ELD) 61-21771 7-Eleven #38628 November 11, 2020 6402 Ashe Rd.Sergio L. Nunez Bakersfield, CA 93313 Post Installation ELD Test Results 87 Octane Primary Containment System PASS 91 Octane Primary Containment System PASS Diesel Primary Containment System PASS 11/12/2020 Date 11/11/2020 Date This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Final Test Date:IOTA Technicians: Site Information Installation Contractor Information Facility:Customer Name/CA Contractor's License #: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Contact:Phone/Email: CUPA Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS Tank 3 12,000 Diesel DW Fiberglass Xerxes Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 42 70 419.83 87 TS PASS S2 42 70 419.83 87 FS PASS S3 42 70 419.83 91 TS PASS S4 42 70 419.83 91 FS PASS S5 42 70 419.83 DSL TS PASS S6 42 70 419.83 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 38 32 28 147.39 OPW PASS UDC2 38 32 28 147.39 OPW PASS UDC3 38 32 28 147.39 OPW PASS UDC4 38 32 28 147.39 OPW PASS UDC5 38 32 28 147.39 OPW PASS UDC6 38 32 28 147.39 OPW PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 24 22 32 73.14 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL NOV DW Fiberglass 2 225 PASS 91 PL NOV DW Fiberglass 2 255 PASS DSL PL NOV DW Fiberglass 2 145 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 Vent NOV DW Fiberglass 2 90 PASS 91 Vent NOV DW Fiberglass 2 115 PASS DSL Vent NOV DW Fiberglass 2 145 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 275 PASS Reviewed By Date IOTA Tech Signature Date Final ELD Test Project Worksheet 11/11/2020 7-Eleven #38628 DiMaggio Maintenance Inc. Sergio L. Nunez kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us PIPING TANKS 6402 Ashe Rd.PO Box 1637 Carlsbad, CA 92018 COMPONENTS IN CONTAINMENT Kern Scott Willett Bakersfield FD; Howard Wines; Kris Karns 760-277-2117/scott@dimaggiomaintenance.com Leak Logs / Repair Bakersfield, CA 93313 11/11/2020 CA License No. 11/12/2020 06-1727 Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services PASS 91 Vent PASS 11/12/2020 Date DSL PL PASS 11/11/2020 Date VR PASS DSL Vent PASS 87 Vent 87 PL PASS 91 PL PASS COMPONENTS RESULTS Piping Secondary Communication Confirmation 6402 Ashe Rd.Sergio L. Nunez Bakersfield, CA 93313 Secondary Flow Communication Test Certification 61-21771 7-Eleven #38628 November 11, 2020 CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.