Loading...
HomeMy WebLinkAboutORD NO 5065ORDINANCE NO. 5 0 6'S AN ORDINANCE OF THE BAKERSFIELD CITY COUNCIL APPROVING AN AMENDMENT TO TITLE 17 OF THE BAKERSFIELD MUNICIPAL CODE TO CHANGE THE ZONE DISTRICT LOCATED WEST AND SOUTH OF THE INTERSECTION OF SOUTH HEATH ROAD AND STOCKDALE RANCH DRIVE IN SOUTHWEST BAKERSFIELD (ZC NO. 21-0084) WHEREAS, Bolthouse Properties, LLC filed an application with the City of Bakersfield Development Services Department requesting to change the zone district from OS (Open Space) to RE (Recreation) on approximately 28 acres and to change the zone district from R-2 (Limited Multiple Family) to R-2/CH ((Limited Multiple Family Church Combining) on approximately 6 acres located west and south of the intersection of South Heath Road and Stockdale Ranch Drive (the "Project"); and WHEREAS, the City Council certified an Environmental Impact Report for General Plan Amendment/Zone Change No. 09-0263 which encompasses the subject property (Resolution No. 078-10); and WHEREAS, CEQA Guidelines Section 15164 allows an addendum to a previously certified environmental document to be prepared if some changes or additions are necessary but none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent document have occurred; and WHEREAS, the Planning Commission held a public hearing on August 19, 2021 and approved Resolution No. 38-21, which recommended that the City Council approve the Project; and WHEREAS, the Clerk of the City Council set Wednesday, October 6, 2021 at 5:15 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for the City Council to consider the Project; and WHEREAS, the City Council considered all facts, testimony, and evidence concerning the Project, including the staff report, and the Planning Commission's deliberation and action. SECTION 1. NOW, THEREFORE, BE IT ORDAINED by the Bakersfield City Council as follows: 1. The above recitals, incorporated herein, are true and correct. 2. The Project is consistent with the Metropolitan Bakersfield General Plan. 3. The Planning Commission's findings as contained in its Resolution No. 38-21 are hereby adopted. Page 1 of 3 �gAKFq o s� � r 'ORIGINO 4. The Addendum to the Environmental Impact Report for the Project is hereby adopted subject to the mitigation measures in Exhibit "C" for the Project located on the map as shown in Exhibit "A", both of which are incorporated herein. 5. The Project is hereby approved incorporating the change into the official zoning map as described in Bakersfield Municipal Code Section 17.06.020 located on the map as shown in Exhibit "A" and as specifically described in Exhibit B, all of which are incorporated herein. SECTION 2. This ordinance must be posted in accordance with the Bakersfield Municipal Code and will become effective not less than 30 days from and after the date of its passage. ---------000--------- I HEREBY CERTIFY that the foregoing Ordinance was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on October 6, 2021, by the following vote: AYES' NOES: ABSTAIN; BSEN APPROVED: By KAREN GOH Mayor COUNCILMEMBER COUNCILMEMB COUNCILMEMB COUNCILMEMB OCT 0 6 2021 ARIAS, GONZALES, WEIR, S4019 1, FREE , GRAY, PARLIER QZ&t4-Vfqu't 4, V JULIE DRIMAKIS, MMC CITY CLERK,and Ex Officio Clerk of the Council of the City of Bakersfield (Additional signatures on next page) Page 2 of 3 o� v'K' 9P 'ORIGINAL APPROVED AS TO FORM: VIRGINIA BE Deputy City Attorney Exhibits: A Zone Change Map B Legal Description C ' Addendum to Environmental Impact Report Page 3 of 3 0� 0AKF9� �- m � r - ORIGINAL ZC Z1-��84 Z cn BLACK HAWK AVE a s 3 I LEGEND 0 0 Q cn BLACK HAWK AVE Z •�' v+ (ZONE DISTRICTS) EXHIBIT "All _ _1211- Cd W �17 2 m �••� R-1 One Family Dwelling ~ •• ••�•• 6,000 sq.ft. min lot size CITY OF BAKERSFIELD WR -1 R-1 R-1.4.5 One Family Dwelling 2 LEGACY CT 1 4,500 sq.ft. min lot size E Estate W 1 10,000 sq.ft. min lot size W1••�••� p R -S Residential Suburban 2� Ro p 24,000 sq.ft./dwelling unit t••.••.m W R-54 ) Residential Suburban 1 g CT R_1 1, 2.5, 5 or 10 min lot size ANELLIRA CT C-2 T — R-2 Limited Multiple Family Dwelling • 4,500 sq.ft. min lot size (single family) 1 p 6,000 sq.ft. min lot size (multifamily) • ��. tV 2,500 sq.ft. lot area/dwelling unit —...... .... .—..—..—..— ..... ... �..�..� �= ti�..�..�.�..�..�••�o O n R-3 Multiple Family Dwelling •� .• 6,000 sq.ft. min lot size STOC—KDALE-HWY G 1,250 sq.ft. lot area/dwelling unit n ALDRIDG R-4 High Density Multiple Family Dwelling y6,000 sq.ft. min lot size FROM: R-2 C-2 y rARE1 600 sq.ft. lot area/dwelling unit TO: R-2/CH 1 o I R -H Residential Holding -1 Q CHATSWOR 20 acre min lot size R-3 R_1 C-01P.C.D. R_2 �DONOS,T.IA S� 'AVE' A Agriculture R-2 R_1 m�p R-1 y 6,000 sq.ft. min ]at size RE, , 1 W. 0 A -20A Agriculture FROM: OS NT,ERIA.DR�� 2 R -1W 20 acre min lot size STOCKDALE RANCH DR ¢ > POD Planned Unit Development TO: RE TT Travel Trailer Park �SANTA.CLARA MH Mobilehome R-1 W._CT NORTHAMPTON WE C -O Professional and Administrative Office LL j a BROOK CT R-1 C•1 Neighborhood Commercial R-1 R_1 = 9 ¢ aCOL�_ C-2 Regional Commercial R-1 �� Z EZ ��`, C -C Commercial Center R -1R•1 QW) C -B Central Business PCD Planned Commercial Development ART- SvCc! VEN1 M-1 Light Manufacturing ON_GT p M-2 General Manufacturing 0; N "S U R-1 Y R-1 M-3 Heavy Industrial R-1 R-1 R-1 R_1 R-1 Og�\wgT R_1 P Automobile Parking =0 FRE.ORDSITF 'V I HANNA RE Recreation CN 9 \ W�0 Z Qt!Y 1 ChCPHosurch iverlayy 9 �U�Z)W = OS Open Space TFC R-1 U � � w U � R-1 HOSPHospitalOverlay W N 2 ` C7 AD Architectural Design Overlay •_••_.._.•_.._.•_..—.._.._••_••_.._.•_.._.. -1 R-1 y BARQ R-1 w a R-1 ELLAJANE'1IIIAY FP -P Floodplain Primary •.••.••.••.••.••.••�••�••�— U FP -S Floodplain Secondary = AA Airport Approach 0 , DI Drilling Island 1 PE Petroleum Extraction Combining SC Senior Citizen Overlay NO Hillside Development Combining WM- West Ming Specific Plan FP -S FP -S. FP -S FP -S 1 � 1 BAKERSFIELD j FP -S1 0GITV0 ! FP -S FP -S/ Feet 37 %I FP -S FP -S I I Z �fi 0 400 800 ZC210084 EXHIBIT "B" PROPOSED ZONE CHANGE.21-00$4 LEGAL. DESCRIPTION RE (FRONS OS), BEING A PORTION OF LOT 2 OF LOT LINE' ADJUSTMENT No.. 20-031$ AS EVIDENCED BY CERTIFICATE OF COMPLIANCE RECORDED ON APRIL 1, 2021 AS DOCUMENT No. 221060662 OF OFFICIAL RECORDS IN THE OFFICE OF THE KERN COUNTY'RECORDER, AND A PORTION OF -THE PARCEL, DESCRIBED IN GRANT DEED' FROM. BOLTHOUSE LAND COMPANY, LLC, TO CITY OF BAKERSFIELD -RECORDED ON NOVEMBER 16, 2018 AS. DOCUMENT No. 0218151156 OF OFFICIAL RECORDS IN. THE; OFFICE OF THE KERN COUNTY RECORDER; ALSO BEING PORTIONS. OF THE NORTHEAST QUARTER OF -SECTION 4 AND THE NORTHWEST QUARTER OF SECTION 3, TOWNSHIP 30 SOUTH, RANGE 26 EAST; MOUNT DIABLO. BASE AND MERIDIAN, IN THE 'CI Y OF BAKERSFIELD, :COUNTY OF KERN; STATE OF CALIFORNIA, MORE PARTICULARITY DESCRIBED AS FOLLOWS: COMMENCING AT THE. NORTHEAST CORNER OF SAID SECTION 4, SAID NORTHEAST CORNER ALSO BEING THE CENTERLINE INTERSECTION OF STOCKDALE HIGHWAY AND SOUTH HEATH ROAD AS SHOWN ON SAID LOT LINE ADJUSTMENT No. 24-0318; THENCE SOUTH 00°2015" WEST, ALONG THE CENTERLINE. OF SOUTH HEATH ROAD, A DISTANCE OF 341.62 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 1500.00 FEET;. THENCE SOUTHERLY ALONG SAID CURVED CENTERLINE OF SOUTH HEATH ROAD, THROUGH A CENTRAL ANGLE OF '09-52'04-, AN ARC LENGTH OF 258.34 FEET;. THENCE CONTINUING ALONG F� THE CENTERLINE OSOUTH HEATH ROAD, SOUTH.10°12'20" WEST, A DISTANCE OF -530:08 FEET TO THE. CENTERLINE'INTERSECTION OF SOUTH HEATH ROAD. AND STOCKDALE RANCHDRIVE, SAID CENTERLINE OF STOCKDALE RANCH DRIVE BEING A NON -TANGENT CURVE, CONCAVE SOUTHERLY, HAVING A RADIUS OF 1500.00 FEET, A RADIAL TO- WHICH POINT ON. CURVE BEARS NORTH 1001220" EAST; SAID POINT ALSO BEING THE- POINT OF BEGINNING, THENCE ALONG THE FOLLOWING SIX (6) COURSES: 1) DEPARTING THE CENTERLINE OF .SOUTH HEATH - ROAD, EASTERLY ALONG SAID CURVED CENTERLINE OF STOCKDALE RANCH DRIVE, THROUGH A CENTRAL ANGLE OF 15030'57"1 AN ARC- LENGTH OF 406.20 FEET TO THE CENTERLINE INTERSECTION OF STOCKDALE RANCH DRIVE AND THE, WESTSIDE PARKWAY, SAID CENTERLINE OF THE WESTSIDE PARKWAY BEING A CURVE, CONCAVE NORTHWESTERLY, HAVING A RADIUS OF 5000.00 FEET, A RADIAL TO WHliCH POINT ON CURVE -BEARS SOUTH 4102020" EAST; THENCE 2) DEPARTING THE CENTERLINE OF STOCKDALE RANCH DRIVE, SOUTHWESTERLY ALONG SAID CURVED CENTERLINE OF THE WESTSIDE PARKWAY, THROUGH A CENTRAL ANGLE. OF 17028'45'; AN ARC LENGTH OF 1525.34 FEET; THENCE 3.) DEPARTING THE CENTERLINE OF THE WESTSIDE PARKWAY, NORTH 46001'35" WEST,. ADISTANCE OF 1349:96 FEET TO THE SOUTHERLY RIGHT-OF-WAY -OF STOCKDALE RANCH DRIVE AS.SHOWN ON SAID LOT LINE.ADJUSTMENT No. 19-0149; THENCE 4) DEPARTING THE SOUTHERLY RIGHT-OF-WAY OF STOCKDALE RANCH DRIVE, NORTH 00°.32'15" EAST, A DISTANCE OF 45.00 FEET TO THE CENTERLINE OF STOCKDALE RANCH DRIVE AS SHOWN ON SAID LOT LINE ADJUSTMENT No. 19-0149; THENCE 5) SOUTH 84°2745" -EAST, ALONG- THE .CENTERLINE OF STOCKDALE RANCH DRIVE, A DISTANCE OF 1614.30 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE SOUTHERLY, HAVING A RADIUS -OF 1500.00 FEET; THENCE Page X oft t: m ORIGINAL PROPOSED ZONE CHANGE 21-0084 - LEGAL DESCRIPTION 6) EASTERLY ALONG SAID CURVED CENTERLINE OF STOCKDALE RANCH DRIVE, THROUGH A CENTRAL ANGLE OF 09040'04"1 AN ARC LENGTH OF 253.10 FEET TO THE CENTERLINE INTERSECTION OF STOCKDALE RANCH DRIVE AND SOUTH HEATH ROAD, SAID INTERSECTION BEING THE POINT OF BEGINNING. CONTAINING 28.42 GROSS ACRES, (22.58 NET ACRES), MORE OR LESS. R-2/CH (FROM R-2) BEING LOT 1 OF LOT LINE ADJUSTMENT No. 20-0318 AS EVIDENCED BY CERTIFICATE OF COMPLIANCE RECORDED ON APRIL 1, 2021 AS DOCUMENT No. 221060662 OF OFFICIAL RECORDS IN THE OFFICE OF THE KERN COUNTY RECORDER; ALSO BEING A PORTION OF THE NORTHEAST QUARTER OF SECTION 4, TOWNSHIP 30 SOUTH, RANGE 26 EAST, MOUNT DIABLO BASE AND MERIDIAN IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA, MORE PARTICULARLY DESCRIBED AS FOLLOWS: COMMENCING AT THE NORTHEAST CORNER OF SAID SECTION 4, SAID NORTHEAST CORNER ALSO BEING THE CENTERLINE INTERSECTION OF STOCKDALE HIGHWAY AND SOUTH HEATH ROAD AS SHOWN ON SAID LOT LINE ADJUSTMENT No. 20-0318; THENCE SOUTH 00020'15" WEST, ALONG THE CENTERLINE OF SOUTH HEATH ROAD, A DISTANCE OF 341.62 FEET TO THE BEGINNING OF A TANGENT CURVE, CONCAVE WESTERLY, HAVING A RADIUS OF 1500.00 FEET; THENCE SOUTHERLY ALONG SAID CURVED CENTERLINE OF SOUTH HEATH ROAD, THROUGH A CENTRAL ANGLE OF 09052'04", AN ARC LENGTH OF 258.34 FEET; THENCE CONTINUING ALONG THE CENTERLINE OF SOUTH HEATH ROAD, SOUTH 10°12'20" WEST, A DISTANCE OF 52.74 FEET TO THE POINT OF BEGINNING; THENCE ALONG THE FOLLOWING FIVE (5) COURSES: 1) CONTINUING ALONG THE CENTERLINE OF SOUTH HEATH ROAD, SOUTH 10°12'20" WEST, A DISTANCE OF 477.34 FEET TO THE CENTERLINE INTERSECTION OF SOUTH HEATH ROAD AND STOCKDALE RANCH DRIVE, SAID CENTERLINE OF STOCKDALE RANCH DRIVE BEING A NON -TANGENT CURVE, CONCAVE SOUTHERLY, HAVING A RADIUS OF 1500.00 FEET, A RADIAL TO WHICH POINT ON CURVE BEARS NORTH 10°12'20" EAST; THENCE 2) DEPARTING THE CENTERLINE OF SOUTH HEATH ROAD, WESTERLY ALONG THE CURVED CENTERLINE OF STOCKDALE RANCH DRIVE, THROUGH A CENTRAL ANGLE OF 09040'04", AN ARC LENGTH OF 253.10; THENCE 3) CONTINUING ALONG THE CENTERLINE OF STOCKDALE RANCH DRIVE, NORTH 89°2745" WEST, A DISTANCE OF 285.39 FEET; THENCE 4) DEPARTING THE CENTERLINE OF STOCKDALE RANCH DRIVE, AT RIGHT ANGLES, NORTH 00032'15" EAST, A DISTANCE OF 449.24 FEET; THENCE 5) SOUTH 89027'52" EAST, A DISTANCE OF 617.46 FEET TO THE CENTERLINE OF SOUTH ' (t HEATH ROAD AND THE POINT OF BEGINNING. CONTAINING 6.015 GROSS ACRES (5.000 NET ACRES), MORE OR LESS. - - - END OF LEGAL DESCRIPTION - - - Page 2 oft O� 0A/(p 1p a- m ORIGINAL LINE TABLE LINE DIRECTION DISTANCE L1 S00'20'15'W 341.62' L2 S10'12'20"W 530.08' L3 N00"32'15"E 45.00' L4 S10'12'20'W 52.74' L5 S10°12'20'W 477.34' L6 N00'32'1 FE 449.24' L7 S89'27'52"E 617.46' III OGITV�p,� :33L c_i v Z ro�3���a V Zk CURVE TABLE CURVE RADIUS LENGTH TANGENT DELTA Cl 1500.00' 258.34' 129.49' 009°52'04" C2 150D.00' 406.20' 204.35' 015°30'57" C3 5000.00' 1525.34' 768.64' 017°28'45" C4 1500.00' 1 253.10' 1 126.85' 009°40'04" am LAND COMPANY 1601 BUTHOUSE DR, STE 200, BAKERSFIELD, CA 93311 Ph; 661.323.4005 • wAv.bolthouseproperties.com RADIALS RADIAL DIRECTION R1 S89'39'46"E R2 S79°47'40"E R3 N1D"12'20"E R4 N25'43'17"E R5 S41 °20'20"E R6 S23"51'36"E R7 N00"32'15"E STOCKDALE RIVER RANCH I DRAWNBY.' K. MacNeill ZONE CHANGE No. 21-0084 DATE: (FROM OS) & R-2/CH (FROM R-2) ZG�2D-0084 0CIT Y G) i I CL HEATH ROAD- STOCKDALE HIGHWAY J — — — -- — �-1-- �- -1---J ---1-- ---�- ---� -- ---------------- N/4 COR. SEC. 4, J1C-2 POC 30/26, MDB&M 1 NE COR. SEC. 4, R-3 PARCEL W LLA 19-0149 30/26, MDB&M RECORDED 08120/2019 AS -- - C-O/PCD Ri DOC. No. 0219103862, O.R. L4REMAINDER NOTE: R-2 v OF PARCEL 1 R2 SEE FOLLOWING PAGE FOR LINE, Z PM 12062 PH 2 CURVE AND RADIAL TABLES. l L7 PM BK 60 LOT 2 LLA 20-0318 R-2/CH (FROM R-2) I LOT 1 LLA 20-0318 2 Q PGS 153-157 RECORDED 04/01/2021 AS 6.015 AC (GROSS) REG, 0410112021, DOC. h >Z O LOT 4 LLA 2Q 0318 DOC. No. 221060662, O.R. 5.000 AC (NET) .� � � No. 2210\6\0662, O.R. O� RECORDED 04/0112021 AS \ �J , lb- I- �ry0� R-1 DOC. No. 221060662, O.R. I ----1328.90'---------- -285.39' C4 I b , 0'L°0 RMDR.OF S8PARCEL2L3 STOCKDALE RANCH DRIVE PM 12232 PM BK 60 PGS 192-200 rr"w(OtiI�Z a�/V� I R-1 �RE (FROM OS) �- aW l 28.42 AC (GROSS) 6 0' �.� �- LOT 3 LLA 20-0318 ti�sQ TRACT 7317 (NET) 22,58 AC NET ,�5Q - 1 AS DOC. No.RECORD2 0060662?0O.R. O��'u^ C � �C', 4�� o PMB 646 �'' QPM_, vij•PGS 152-155 `1 No. 7573 210 -FT WIDE PROPOSED WESTSIDE Exp. 12/31/21PARKWAY ALIGNMENT AS ADOPTED 996 iG�6 G � wZj%� TRACT 7317 BY THE CITY OF BAKERSFIELD O. PHASE 3 CITY COUNCIL BY RESOLUTION No. �. R- iME1 64 9Tf OF CALIF i 138-91 ON JUL Y 17, 1991.�} N PGS 43_45 1 R-1 RKW AY � .� E P �' O.R. PARCEL 6 \ R 1 N -- — — — — i R-1 W�S�S1D - p218151156. PM 12232 /�. L-. i --- — — -- COBFEEPERDOCNo Phi BK 60 E 30C26, MDB&M PGS 192-200 / - - ----------------------------------------------- ------ CROSS VALLEY CANAL KCWA FEE PARCEL PER BK. 5421, PG. 1531, O.R. ------------------------------ SCALE: 1 500 t „ _ STOCK®ALE RIVER RANCH DRAWN BY. K. MacNeill — 500' 250' 0 500' ZONE CHANGE No. 21-0084 TE. 06/02/2021 LAND COMPANY 11601 BOLTHOUSE DR, STE 200, BAKERSFIELD, CA 93311 RE (FROM OS) & R-2/CH (FROM R-2) ACAD 0084-Exhibits.dwg Ph: 661.323.4005 • mm.bolthouseproperties.com rQl3\�o'a� BAKERSFIELD THE SOUND OFbemZAl f 9649 ZONE CHANGE 21-0084 AN ADDENDUM TO THE PREVIOUSLY CERTIFIED ENVIRONMENTAL IMPACT REPORT FOR GPA/ZC 09-0263 August 4, 2021 CEQA Guidelines Section 15164 applies to Zone Change .(ZC) 21-0084. CEQA Guidelines Section 15164 allows an addendum to a previously certified environmental document to be prepared if some changes or additions are necessary but none of the conditions described in CEQA Guidelines Section 15162 calling for the preparation of a subsequent document have occurred. The City of Bakersfield certified an Environmental Impact Report (EIR) for General Plan Amendment/ Zone Change (GPA/ZC) 09-0263 and Annexation No. 548 by Resolution No. 078-10. Additionally, the City of Bakersfield adopted a Mitigated Negative Declaration (MND) for GPA/ZC 18-0318 by Resolution No. 013-19 which based environmental analysis on the analysis conducted for GPA/ZC 09-0263. Thus, the EIR for GPA/ZC 09-0263 and Annexation No. 548, is hereby amended by this Addendum for ZC 21-0084 as described below. LOCATION: West and south of the intersection of South Heath Road and Stockdale Ranch Drive in southwest Bakersfield; also, being portions of the NE/4 of Section 4 and the NW/4 of Section 3, T30S, R26E, MDB&M. More specifically, Lots 1 and 2 of Lot Line Adjustment (LLA) 20-0318 and Assessor's Parcel Number (APN) 534-011-23. BACKGROUND: The EIR for GPA/ZC 09-0263 and Annexation No. 548 was certified by the City of Bakersfield on June 30, 2010 by Resolution No. 078-10. The EIR included mitigation for the following categories: Land Use, Agriculture, Public Health and Safety, Aesthetics, Traffic/Circulation, Noise, Air Quality, Cultural Resources, Public Services and Utilities, Geologic and Seismic Hazards, Hydrology and Water Quality, and Mineral Resources. The MND for GPA/ZC 18-0318 was adopted by the City of Bakersfield on January 23, 2019 by Resolution No. 013-19. The MND did not include any additional mitigation measures for the project beyond the mitigation required for the previously entitled GPA/ZC 09-0263 as the environmental effects of GPA/ZC 09-0263 were analyzed/mitigated to the greatest extent practicable in the associated certified EIR. GPA/ZC 18-0318 was therefore subjected to the Mitigation Monitoring and Reporting Program (MMRP) outlined in the certified EIR for GPA/ZC 09-0263. The current proposal requests to allow a Zone Change from Open Space (OS) to RE (Recreation) on approximately 28 acres and a Zone Change from R-2 (Limited Multiple Family) to R-2/CH (Limited Multiple Family Church Combining) on approximately 6 acres. For purposes of this Addendum, the request for a change from OS to RE on 28.4 acres will be referred to as the southern portion and the request for a change from R-2 to R-2/CH will be referred to as the northem portion of the current project area. o�gAKF9�� > m ►- r `ORIGINAL CHANGES IN PROJECTS AND IMPACTS: The previous environmental analysis conducted in the certified EIR for GPA/ZC 09-0263, on the southern portion of the current project area (Lot 2 of LLA 20-0318 and APN 534-011-23) reserved the site for "future development" of a community park to serve the surrounding neighborhoods. It was assumed, for analysis purposes, that the community park could potentially include tall recreational sports lighting on sports playing fields, community centers, aquatic facilities, group / family picnic facilities, children's play areas, various playing courts (tennis, basketball, volleyball, arena games, and skateboarding) with sports lighting, walking/jogging courses, off-street parking, security lighting, and other associated improvements. The initial environmental analysis conducted in the certified EIR for GPA/ZC 09-0263, on the northem portion of the current project area (Lot 1 of LLA 20-0318) reserved the site for "future development" of a regional commercial corridor. Subsequent environmental analysis conducted in the adopted MND for GPA/ZC 18-0318 reserved the site for "future development" of limited multi -family residential units. The subsequent environmental analysis conducted in the MND for GPA/ZC 18-0318 was based on the analysis conducted for GPA/ZC 09-0263 as the request for GPA/ZC 18-0318 was to allow a "swap" in location of previously entitled uses through GPA/ZC 09-0263. As existing, the southern portion of the project area is currently zoned OS, and the northern portion of the project area is currently zoned R-2. As mentioned above, the current proposal is a request to allow a zone change from OS to RE on the southern portion, and to allow a zone change from R-2 to R-2/CH on the northem portion. Specifically, the request includes: Southern Portion: Community park amenities to include tall recreational sports lighting on sports playing fields, community centers, aquatic facilities, group / family picnic facilities, children's play areas, various playing courts (tennis, basketball, volleyball, arena games, and skateboarding) with sports lighting, walking/jogging courses, off-street parking, security lighting, and other associated improvements on the southern portion of the project area; and Northern Portion: Addition of a church with the ability to request future permitting of a private school facility. An updated technical memo for traffic (Ruettgers & Schuler 2021), which compared the trip generation for the approved project (GPA/ZC 09-0263) to a combination of existing and proposed conditions, was prepared for the current request. Per the technical memo, the existing and proposed conditions of the current request would decrease the daily trip generation from what was originally approved in the certified EIR. The traffic memo indicated that trip generation stemming from the current request would not increase the trip generation from what was originally approved for GPA/ZC 09-0263, therefore no further analysis is required. Copies of the updated memo, certified EIR for GPA/ZC 09-0263, and adopted MND for GPA/ZC 18-0318 are on file with the Development Services Department and are available upon request. It was determined that the proposed project would not result in any new significant environmental impacts. All mitigation measures from GPA/ZC 09-0263 have been appended to this Addendum and have been revised to reflect current standards. Please see the attached Mitigation Measures for reference. These changes are considered minor technical changes per CEQA Section 15164. There are no substantial changes with respect to the circumstances under which the ZC is undertaken that require major revisions to the previous EIR due to the involvement of new environmental effects. Likewise, there is no new information of substantial importance that results in new significant effects. o``gAKF,Q� s � m OORIGINO FINDING: The previous EIR for GPA/ZC 09-0263, as amended by this Addendum and the completed technical memo may be used to fill the environmental review requirements for the proposed ZC 21-0084. It has been determined that the request would not result in significant impacts to any environmental subject areas requiring analysis under CEQA, and no additional mitigation is required. Because the changes to the project meet the conditions for the application of CEQA Guidelines Section 15164, preparation of a subsequent or supplemental EIR is not required. Erica S. Hong Printed name Attachments: Mitigation Measures Mitigation Monitoring and Reporting Program Traffic Memo (Ruettgers & Schuler 2021) August 31, 2021 Date o``gAKF9� r 'ORIGINAL Mitigation Measures ZC 21-0084 GPA/ZC 09-0263 (Resolution 078-10) Biological Impact Mitigation Measures 1. Prior to ground disturbance, the developer shall have a qualified biologist survey the location for species covered under the Metropolitan Bakersfield Habitat Conservation Plan incidental take permit for urban development (Tipton kangaroo rat, San Joaquin kit fox, San Joaquin antelope squirrel, & Bakersfield cactus) and comply with the mitigation measures of the permit. Survey protocol shall be that recommended by the California Department of Fish and Wildlife. Developer shall be subject to additional mitigation measures recommended by the qualified biologist. A copy of the survey shall be provided to the Community Development Department and wildlife agencies no more than 30 days prior to ground disturbance. The current MBHCP expires on February 28, 2022. To ensure take of covered species does not occur after the expiration date, fees must be paid no later than August 31, 2021 and all covered activities must be completed by the MBHCP expiration date of February 28, 2022. As determined by the City, only projects ready to be issued an urban development permit, grading plan approval, or building permit will be eligible to pay fees under the current MBHCP. Early payment or pre -payment of MBHCP fees shall not be allowed. The ability of the City to issue urban development permits is governed by the terms of the MBHCP. Urban development permits issued after the 2022 expiration date may be subject to a new or revised Habitat Conservation Plan, if approved, or be required to comply directly with requests of the U.S. Fish & Wildlife Service (USFWS) and the California Department of Fish and Wildlife (CDFW). Mitigation measure. 2. The burrowing owl is a migratory bird species protected by international treaty under the Migratory Bird Treaty Act (MBTA) of 1918 (16 U.S.C. 703-711). The MBTA makes it unlawful to take, possess, buy, sell, purchase, or barter any migratory bird listed in 50 C.F.R. Part 10, including feathers or other parts, nests, eggs, or products, except as allowed by implementing regulations (50 C.F.R. 21). Sections 3503, 3503.5, and 3800 of the California Department of Fish and Game Code prohibit the take, possession, or destruction of birds, their nests or eggs. To avoid violation of the take provisions of these laws generally requires that project -related disturbance at active nesting territories be reduced or eliminated during critical phases of the nesting cycle (March 1 - August 15, annually). Disturbance that causes nest abandonment and/or loss of reproductive effort (e.g., killing or abandonment of eggs or young) may be considered "taking" and is potentially punishable by fines and/or imprisonment. a. To avoid impacts to burrowing owl, prior to ground disturbance, a focused survey shall be submitted to California Department of Fish and Wildlife (CDFW) by the Project applicant of a subdivision or site plan review, following the survey methodology developed by the California Burrowing Owl Consortium (CBOC, 1993). A copy of the survey shall also be submitted to the City of Bakersfield, Planning Division. b. If the survey results the presence of burrowing owl nests, prior to grading; including staging, clearing, and grubbing, surveys for active nests shall be conducted by a qualified wildlife biologist no more than 30 days prior to the start of the of the Project commencing and that the surveys be conducted in a sufficient area around the work site to identify any nests that are present and to determine their status. A sufficient area means any nest within an area that could potentially be affected by the Project. In addition to direct impacts, such as nest destruction, nests might be affected by noise, vibration, odors, and movement of workers or equipment. If the Project applicant identifies active nests, the CDFW shall be notified and recommended protocols for mitigation shall be followed and a copy submitted to City of Bakersfield, Planning Division. m c. If any ground disturbing activities will occur during the burrowing owl nesting season (approximately February 1 through August 31), and potential burrowing owl burrows are present Within the Project footprint, implementation of avoidance measures are warranted. In the event that burrowing owls are found, the applicant must follow CDFW protocol for mitigation and comply with the provisions of the Migratory Bird Treaty Act of 1918 (16 U.S.C. 703-711). If the Project applicant proposes to evict burrowing owls that may be present, the CDFW recommends passive relocation during the non -breeding season. Mitigation measure. p�,q,AK4�'-c� > m OORIGINAL • Cffy� OF BAKERSFIELd Stockdalle Ranch GPA/ZC 09-0"3 / Annexdffon No. 548 SCH No. 2009071066 MItTgation MotiffoFfNI.Table 'Stodkdale"Rairidh GPA/,ZC 09-4263 fAnnexatiom Nd: 546 FVerilfcalidn of Compliance 'Stimmary of Medsu're Implemenliallon -Ing eaatiOa I! Phase Monitoring Phase Enforcing Agency rc —M " Measure 1, Dole I Remarks &I - LAND- USE AND RELEVANT PLANNING OGIT Y 0 FINAL El MARCH 2010 2 lb r_01 -3o ' 13-3 --------- 1. Program -Refer to 'friligalion measures 'in -Sedtion -5.4,. Prior to issuance of dgradih g: Pre P_ -construction; -construction: Cifyof Bakersfield NIM 5:1-1 AEUkETiCS,'UGHT AND GLARE, t6cU66' 5.5,, . 'NOISE;, or b4illding!piermit for -urban DevelopmentI . Services, TRAFFIC AND CIRCULATION, Section 5.6. development, or support Deportment�'Plann ng I and Section 5.7. AIR-QUALITY. facilities gap. lilies ds contempl6t6d:10 Division. acreage . of, dgri,dulturd lands, on a'one­f&one 'the Froject, Whichever occurs OGIT Y 0 FINAL El MARCH 2010 2 lb r_01 -3o ' 13-3 --------- 1. Program .Prior t6,issuance of, orgtodingor,btfild[n permit,for.' Prior to issuance of dgradih g: Pre P_ -construction; -construction: Cifyof Bakersfield ddy6lopmen, I or. -support facTiffidi as or b4illding!piermit for -urban DevelopmentI . Services, contemplated in the Project. whicheve''r-occur's development, or support Deportment�'Plann ng I last, the oppricant shall mitigate -the.: loss of n'ef ass facilities gap. lilies ds contempl6t6d:10 Division. acreage . of, dgri,dulturd lands, on a'one­f&one 'the Froject, Whichever occurs basis, by selecting one or more of the Items, last. 'described below.'Net acreage is to be calculated based on the exclusion of existing roods, s. lands within 1he.proposed Westside Parkway'afignmerit, proposed Nord Road arleriat -alignment., and. proposed West BeUdy alignmen . L and related areas.. as. such alignments may be from time to -developed finne amended- and areas already structures. The 6pplicant shall I subm . it. written MM 52 1 V qn-A c -a n of the applicant's camp -lionce with. this rnitiga(Ign measure to the Planning, Director's. 3*01151dr-tiah, Compliance, with - this cbndition may be -phased as the project Is developed. The net acreage of,agriculturdl [arid to.,be mitigated shall be equal to the amount of land being develdped ,phase aseach. Is developed: a) Funding andtor ,purchoie of agricultural, -cbrise6iotibri.easements: such easements shah be accepted or pUechosed.,_ and -monitored and enforced by a land trust, of - another Op pi pro note entity. Funds may be, .used for easement purchases,. .ongoing nabino monitoring on " d dnfor6emenl, Ironsuctfibn costs: i3nd(easbnoble"administrative cosli;. OGIT Y 0 FINAL El MARCH 2010 2 lb r_01 -3o ' 13-3 --------- 1. Program CITY OF BAKERSFIELD Stockdale Ranch GPA/W 09-0263/ Annexation No. 54B SCH No: 2009071 DAB MIChgction Monitoring Table, Continued Stockdale Ranch' 0PA/M09-0263-/ Annexation No: 548 . Mitigation Measure. 5ummary.ot Measure --b) Implemenh�lion Pha;e - MonNoring Phase Enforcing Agency VerfficaHon of Compliance i niffals Date Remarks-. Contribution of agricultural land or equivalent: funding to an .organimotion that• provides for the preservation of farmland in California., Rinds.may be used for.'purchases; ongoing' monitoring .and" enforce'rriedi, transaction . casts; and eeasonidble administrative costs. -c) Purchase. of credits from `,an' •estabrished- agricultural farmland mitigation bank. approved by applicable . governmental authority,. d) During the life of the project, if the City of `Bakersfield or other •responsible agenc-I adopts an agricultural land mitigation program. that provides- equal or more. effective mitigation than. measures listed above, the applicant may choose to participate in that alternate pfogiorn to mitigate loss of agricultural. land impacts. prior. 'to participation in the alternate program, the applicant shall obtain .written approval from the City'. of Bakersfield agreeing 10 the participation; and the appricarit shall submit written- verification of. "compliance with the : :alternate program of the same time described above in the first poragraph. Agriculturof land used for miligolion shall be of at least equal agricultural classification as the land being converted or be capable of being developed as such; that is, mitigation land shall be classified or developed as Prime Farmland, Farmland of Statewide lmportanci3_ etc.; (6s established by the' .boliforhio Department of Conservation in the Farmland • Mapping. and Monitoring Program); the 'mitigation acreage beln ' -at least ecluivalent,in classification .to, the G17 YJail Y 0":c 0 Q , NAL EIR.RMARCH 2010 v fin' 4731'x`' ral3��c' 13-4 of 34 Program 'CITY OF BAKERSFIELD N Stlockdd 16 Ranch X 1E A Rm S E L D GPA/ZC 09-0263 / Annexation n a. 549 SCH No. 100907106& W1t;gq%Dn Monitoring Table,, Co6fifitied Stbdkddlelahch _G?A/ZC 09-42431AIR'nexalon No. '548, Mitigation Measure Summary of Measure' plem ritallion.Phate Monffddhg Phase Enteircing Agenc Vedfictill -.011CoMptlance 1niffals Date I Remarks __Y converted land, at being :capable61. producing tfie' sdmd..dr equi4olent crops as the land being converted: Completion of the selected rriltigaflowmeasur6i or with 1h ' e Planning. piripcii) - approval, a, combination Of, ther-selected mitigation measures, sures:, ca ' n* be -on qUb ' HI'Mg dgdcu.IfurqI,.Ia6d'vq.I11hih the San . Joaquin Valley(SanJoaquin; Stahisla. , m Merced'Fresno'Mbdbrd,K ings., Tulare. Kem,. or -SanJoaquin outside the-Valley Wit -vwrJtI6fi' n. evidencethat the. -same or equival6ht crops,-cdn- tie produced on the orifination land; Prior to subdivision.approvali If the adjoining Prior -to subdivision dopi-oval. Pre -ConstKiiMion.. City of Bakersfield properties.ope still in agricultural uses.ohd have not Development -Services received en fillemefits for development, then prior De partmen! Planning to Issuance of certificates of use and occ Uponcy, . Division. the Project Applicant shall record .o covenant on all lots Within 3W ,feet' of agricultural uses. The covenant shdil provide notice that each resident is. moving-intp:dn afed:1.6caled close to agricultural,; gricultural, lapds or, Mthinpjrldulfural landi, and they may, be subject to inconveniences or discomfort 'arising' from agricultural op6ralions. Such discomfort or MM 52-3 Inconveniences may include, but are not limited to noise, odors, dust, smok6; insects, operatlon.of machinery during any 24-ho'ue peddd, aft-T61V .perafidil, si&age and disposal 61 manure, and the; appliPotion by spraying or other -means •of agricultuial chemicals, such as pesticides and. .fertilizers. One or more of the inconveniences dekAbed'above may occur even in the case of an agricultural operation, which is in cohformbrice. vAth. existing. laws and �regulations and locally C -2. 011RIW. accepted customs and, standbr& 0i Y C) 0r,IT Y 0,, 2010- 13-5 M1111gallibn Monitoring Program ;S _F_i7V _L6 tNitigction Moniforing.Tgble, ,Continued sfo'CW66, k6iritc` 6% GP,A/ZC�09;-0263l/,Ahhejidtidn'"Nci:;548.. CffY.0 IF BAKERSFIEM Sfockdale /Aifh9xdlIbh'No.I48 S.CKNO. 21XIII071666111 re :Measure Surniumv of Measure •- -Pdor to Asuan"ce',of,"gradin'g, permits;. the Proledl. Am '19merit6fion Pii6ii - 1`6&161=4666 of grading, 406m) Phase i -Pro-70ofisthudtio n orcn E 11 -11' AgificV City of Bakers d, of,Co mollance- InHidis date i Mmirfaiki Apl5licdht:�tibil',d6hd66i's�oil'c'horact zation.-and, pe, h qeVeloprn6rit S&VIces sampling+ol, tiny, obiervdd. stained soil 'yAlitA, the- De6crrent.Planning � s6dPrpit�tkiie3s'iie&ded.t6,det&llielhe. ; bN1 ion;,Bdkdrsr§td.qy presen.ce-or bpsenqe.of . hazardous rhatedufs. ,i) Fire D6p_artment; c6n6e6li-6tions, of "materals'ore..dLVtec- ie bov—b Rdg_lqrd. I W6 6i �ualltv",140Ku":,evels-cunn0 -d,'c demolition or Clf6hio; construction:ction, activities -the"IdiloWing m! igqton-1 -1 -Control,goord DepI-niotToxic' ftie6dU(ek ihdil include:: SulJsl`dnces:Cohtrol;. 'C-606 Exn'drididispotalotdoprftillted.off-site nlci Deportment of Water R6iources.. Iddity, MM'S.3-la, -O"t& fid6tryient; or ,i, 6t her rneoiy'rpsus appropriate. Prior 16 IsWbnce of •grajdIng'permits, the Project: Applicant Obil rediediate', all corilldmincited..soils IoAhe; :sotisfadfion of - the. Ldcal Unified PrOgrgm Agprtqy(the0*6.:6 f - Environmental -S(irVIcesf � ' lakeisfibld City,flie Deporlm'4nq in -conjunction' with, the State: Regional Water" Qualify C&Itiol' Bo&d. tho' California DeOarlm.ent, of, - Toidc S66s'tcinces. Conlic and/or thd . Calif6mla" --Deoartment of Water Resources: P6dr,jdissuance , of °ljrdclinq p6rmils,-d1l''stbined Prior to issudric6ol"grading"; re-consiruc on;, r, City 6f,.BakersWd t6ncrete/6splialt pods - shall 6e', removed. -,dhdI pdrrnffs`:,_ Dedelopment Services disposed' of of .an appropriate perrnitted"fadility-­ r r . :Department-, Otorini, mg j*e", j 66noved, ex0bied $6 its, shall: be, visually 'observed, bfvil6n; MM SJAb to: confirm the ,vieseh6&/cbse6c e of staining (on indication of contamination migration into the sp6surf6c'el� li'6bsL-evcid.'•st&ined's6il's'�sh , 61 :be. tcftipted to Identify a �-p13 _ ropfidte. 46rnbdiol 9 OGJ Y qc, -0 2i FINAL EIVP 33P z ''+�1305. r-msoe m MM401116n M Program CITY OF BAKERSFIELD' 5t6ckdafe'Ranc6 GPA/Zc 09-026.31 Annexation No. 548 -SCH 11110.266007i668 Mitigation .Monitoring Toble-,Continued' 'StotkdaM-Ranch •GPA/ZC 09-0263,/ Annexation!wm 548 MIHgaHon ;brrurof Measure mpemenaonPhase tse Enforcing Agency Yeifflcaflon of Com ManceMeasure tnffiufs "._ -Dater "Remarks _ Prior. to issuonce of grading permits, oil sumps and Marto issuance of grading _ Pre -construction. City of Bakersfield sfockpled soil shall 'be removed 'from the permits.. Departmeent Services proposed Project siie:and property dtsposediof.at Department; Planning an approved facility. All sumps and soils -shall be Division. MM5.3=1csampled and tested for hazardous, materials. ?he :areas.beneoth and around the rerrroved matericiis shall- be .visually inspected: Any stained soils: observed underneath the removefd materials sfiall ; ibe sampled pursuant to Mitigation Measure 5.3- 1a. - Prior; W issuance of grading permits, the 'Project Prior to issuance of grading Pre -construction. City of Bakersfield Applicant sfiall remove., and' properly dispose of ownus, Development Senlces the on-site debris, consisting of drums,.containe.rs, _ Department, Planning stained: supplies 'and equipment and : Division. MM 5:3-1d miscellaneous debris, at an approved landfill faciQty. The areas beneath and around the removed debris shall be visually inspected.. Any stained soils observed undernealh fhe debris shall be sampled, pursuant to Mitigation Measure 5.3 i o^. Prior '.to ,Issuance of the grading permtls. Prior to issp nce of.gradi�g Pre -construction: lCity ofBakersfield aboveground chemical, or fuel 'storage tanks, permits. Development Services (ASTs)'shall be removed and properly disposed of Department, Planning at a licensed tank destruction facility. Once Division: removed: a visual inspection of the areas beneath and around the removed ASTs shall be performed. Any stainedsails observed beneath the ASTs shall MM 53-1 e be .sampled. If concentrations of materials 'are, detected obove regulatory cleanup levels• during sampring activities, the mitigalton mea_ sure shall include - 4 Excavation and disposal ata permitled,pft-site .fdolity;: ■ ,on-site treatrrientt or au%T Y p C. CITY p� z > c?a : YNAj v 77313 `—Ol3\�S Monfloring Program CRY OF BAKERSFIELD 'Stackdqle Ranch GPAjZC 09-6263 / Annexation No.,548 SCH No. 2009071068 'MhlotiHon.M6hRotlhg,TObfe,Coiitinued, GPA/ZC 00.063 / Annexation No. 548, .min gaffon Measure Surnmarrof Meaiiirre Impiern, enfdffon Phose. Monitoring Phase Enforcing Agency Veirlflc�dfldlri' of Cbm'Ptionce Ddte:l Remarks - 4 -Otheiftieai.urL-s.cudopropriate. Prior to subdivision approval, the dovMhole def(flis Prior -to subdNislon apprqvaI_- ft—cbnstruction. city ol�Bakersfield .0 f abandoned Wells shdII be reviewed by,DOGGR Development Services gi e rs- 66 n e - Written verification fromthe DOGGO Department, Planning - MM 53-1 f shall be provided to indicate that the wells: have Diviision;.Divisloin of Oil, been properly abandoned or fedbond6ned. It Gds. and Geothermal necessary, pursuant to current DOGGR regulations Resources: and requirements. All future drilling; production, and construction Prior to issuance of mbuildl.n() 'Pre-constructloh. -CityofBakersfield 'activities shall Clio b6 subject't -0 the following fire permit. Development'services and safety lrejylatio'ns . recjuked� I by- the City of Departmer ' it; Planning Bakersfield- Fire Department: Division; City of e No. structures ihall'bd �bufll within 1001edt of Bakersfield Fire• any .011,well unless the well has been properly Department, Offi. ce of abandoned perUniform Fire Code 7904.3.2.3.. 'Prevention Services; a Prior to the Issuance of a building permif, - for Division at OiL.Gm,,and structures located v'Athih MCI feet of an 611:wdl, Geothermal Resources. MM 5.3-10 the Pr6ject Applicant shall prov1d6 a: lettdi,of cerfification from the EiOGGR to ihe'CltV of Bakersfield Fire Department.. Office of Prevention Services indicating that previousfy;! dbandon.ed-welis have been reabdridoned to current DOGGR.standards. a Prior, to issuance of a. buildingperffiti the. location of any well is tabe'V6 7surve . located, d, dtL and marked by cvkensed cIVII en!gllneerov' land surveYor- A map shall be furnished to thel 0GITYO,, 30"Q, z AL EIRtb >"145 ,-(713k Zulu 131-Z of 34* Program CIT Y p,,C, M d3 G) P, r—Ol30 CITY OF BAKERSFIELD Stockdole Ranch GPA/ZC 09-0263 /Annexation No. 548 SCH No: 2009071068 Mitigation Monibring Table;Continued Stockdale Ranch ,GPA/ZG 09-0263 /Annexation No., 548 MHIg6tio1111 Measure Summcry.of Measure Implementaflon Phase_ Moriitorin Phase 9 Enforcin A enc g g. Y Verification of Corti � lienee IniKais Date- Remarks ' Cityof-Bakersfield Fire Department; Office of ..- .. - Prevention Services showing'the location and measurements of anyt Well in .relation to any ` exiAngand proposed structures per Bakersfield ' Municipal Code 15'.66.080 B; • The Project Applicant :shall notify the property owner of the; structure (residence) of the existing abandoned oil well on their lot through the deed; or other' legal documents per Bakersfield Municipal Code 15.66.080 B. 'Theexisting irrigation wells currently ,producing Prior to the approval of each Pre -construction 1 City of Bakersfield water on the proposed -Project site shall not be individual tentative tract Throughout the duration ; Development Services. Utli ked to'provide water for human consumption: map, of on-site construction Deportrrlent, planning Prion to the approval of each individual tentative activities. Division; Coiifomio tract -mop, the irrigation wells within that phase Department of Water MM 53A that will not be utilized to supply water for future Resources; Kern County landscaping, on going agricultural opetafions, or Environmental Health other non -consumptive purposes shall be: ServlcesDeparlment. .destroyed per.. California Department of.Water' Resources and Keir Couniy Environmental Health Services De artirient standards. ' 1 Pridr lu issuance :of a grading permit. the Project' Prior to issuance of a grading. TtiroughouYthe grading Ctry of Bakersfield Contractor shall obtain information on. the permit- and construction Developtrieni Services location of underground pipelines :and any process. Department. Planning information regarding. safety concerns of the Pacific Gas and DivEle* pipelines. Dunn radio ocfivittei. Pacific..Gas 9' grading Ori: Electric Company. MM 5.3- 11 and Electric Company (PG&E) or any other utility company operating pipelines traversing the boundaries or within the boundariesof, the proposed Project site shall be notified of the construction aetivity within the corresponding easerile;l. - If -during, soil reriloval, evidence of petroleum During toil removal. Throughout the grading City of Bakersfield MM 5.3-26 products .oppears to;cantinue'beloW the ground process: . bevelopmenfServices surface. Sampling. shall - be - ertormed to De ortmenb Plannin4 I Y ' (j"C; Lulu 13-9 521 MBigation Monitoring Program • CITY OF BAKERSFIELD Stockdale Ranch dww,09-0263 /, Annexation No: 548 SCH No. 2009071068 M1tTgationAonttoring T0ble; Continued Stockda e- lanch GPA/M 09-02"1 Annexation No; 546 Miligattgn Measure '.Summary of'Measu�e, Implementation Phase. MonNo�ing Phase EMorcing Agency Vertiication of Com dance Infflals. _ .Date.. Remarks . charactefte•.the extent .of �contamination and Division; - 'Id6nft oporoofte remedial measures. If unknown wastes or suspect materials are Throughout the grading and Throughout the grading: City of Bakersfield -discovered during cbmtrucfion by the contractor,, construction process. and constr :tloh Development Services . which .he/sfie believes may involve, hazardous process. Deportment. Planning w0e/nmater.164, the contractor shall: Division.. • Immediately stop work.in the vicinity.'•of the' suspected contamihont;irernoving workers and: the public from the area;. MIA 5.3-2b • .Notify. the Project engineer • of the Tmpleme6fing agency; Secure, the � areas as directed by the Project engineer, and a Notify the implementing agency's hazardous waste/materials coordinator. If, during grading and - construction, poteritial' ' Throughout-ihe_grading'and' Throughout the grading Ply Of Bakersfield Unknown buried hazardous.materials are found., construcffonprocess: and construction Development Services and/or uniddhiltied , materials are discovered in process. Department, Planning the prescribed - soil testing, health and, safety. Division;. Kern County procedures shall be Implemented immediately by Department of the Contractor. Procedures shall include, 'cif a Environmental Health minimum: emergency medical treatment, Services, City of evacuation. of the .site and/ar threatened area. Bakersfield fire MM'S,3-2c and notification action. Nolificalk shall. be determined by the ,oppropriale agency, iNhtch De d p rtment.,Spn Air Joaquin .Volley may, inaude but not be limited .to the foilaWing Pollution Control District; agencies: Kern County Department of Regional Water Quality Environrimenial Health ,Services, City of Bakersfield Control Board. Fire Department, San Joaquin Valley Air Pollulion Control District: and; the Regional Water .Qualify : Control Board. Evacuation 'and' determination regarding the type of contamination encountered and best course of action would be determined V%1 T U" 0rITYp11� i) rt7131�e'a ..-M 13-10 of 34 Monitoring Program OGITY o CITY OF BAKERSFIEID S#ockdate Ranch GPA/ZC 09-02631 Annexation No: 54rs • SCH No. 2009071068. Mitigation Monitoring Table, Continued St+Sckdale-Ranch GPA/ZC' 09=0263 JAnnexation No. 548 Miligatlon' Measure Summary of Mecsure:: - by:- -the "ranking officipl ' -and � any required ': linplementatlon Phase Monitoring Phase. - li nlorcing Agency = --- Verinca"66 of Com " Bance Initials.- : Date - : Remarks . remediation .measures;. shall be• �iririplemehted. Work shall stop•immediafely if'any unknown soil or :other", hozordous, materials concerns arise during, any part of the•festingi •gtod(hj,,,6n'd coristr icfion : actlVlfies o'n•the ro osed Pro est site:" -. ' " _ lVo' jy PG&E pipeline .a fUptured :during grading,: ` Throughout the grading and Throughoutthe grading City -16f Bakersfield " PG&E shall ;tie noiifed a1-(BOO)743-5660 ond'911 construe_ tionproses"s. and �onstruction, Development Services (Kern County Emergency:Services) shall be 66-fled.,process.- Deparimenf,•Plbnning The Pipeline Development Policies .of the ..City bi Division; Pacific Gos'and Bakersfield Five Department are as follows: Electrid�Cgni'r1y:,City io No habitable. portion of -a structure may be of Bakersfield Fre' built "within '50 feet, of 1 o> gas mai"rt;, :or' Deparfnietit, Office.dU Iransmissionline, or•refined,fiquid.product line f?reventionServices. with 36 inches.of cover; • No, structure may be built within 40 feet 'of a, hazardous fiquids ptpellne- bearing- .refined Wit product, h ,48 inches or more of coven No habitable "portion- of "a. structure may.'be MM S.3 2d build "within. 36 .fee{' of ; o ;crude •oil . pipeline uperuting al 20 percerd'ar greater of its design • strength; 6, Prior to .ar concurrently With the- filing of a final, reap,_ a covenant shall be recorded on alt lots of this tract; or portion (herefore. which "are within :250 feet "ot any gas irdnsmission lines: The covenant. shall acknowledge' proitimity, of pipeline easement to said ,property' and describe the:name;.type and dimension of the pipefne. 'Prior }o 'recordation, ihe. Project Applicant shall 'submit, and obtain approval of covenant wording with the City.Atlomey, City of Bakersfield Fre Department's Office- of Prevenlion.Service, and. the Ci .en inee.' 13-1) of Program CITY OF BAKERSFIELD Sfockdale Ranch •GPA/ZC 094263/ Annexaflon.No. 548 SCH No. 2009071068 Mitigation Monitoring Table% Contin_ ued Stockddle Ranch GPAAC 09-.0263:%Annexation No. 548 Mtilgation , Measure Summary of•Measure Im lementation`Phase R Monftorin Phase 9 Enforc(n Agency 9 Verification ollZori(lance .Inifl6ls Date. Remarks If .transite :pipe is located, on the site during - Throughout the grading and Throughout the grading. City of Bakersfield consiruction!activiiies, the San Joaquin Valley. Ahconstructionprocess: and construction Development Services Pollution Control District . (SJVAPCD) shall be. process. Department, Planning MM 5,3-2e contacted for proper .disposal procedures and Division; San Joaquin. requirements: _Transife pipe shall then be removed VdlleyAir•Pollution and! .propeiiy disposed. per the SJVAPCD�Control Disw I. uidelines. _ - MM 5.3-3 Impiement*Mitigation Measures 5.3-1f and 53-1 above:- . Prior to -.any on -'life:. construction ociivities, soils' Priorto�anyon=site Pre-constiuclion. City'oteokersfteld shall be .sampled and•:analyzed by a licensed construction activitiesDevelopment Services engineer or geologist, approved -by the Director Deportment, Vicinning of Pieve_ niton Services.. to determine the level of Division] City of residue for pesticides, herbicides, chemicals,. and Bakersfield Fire associated metals. If residue is found tobe ierithin Department. Office of acceptable amounts per the Environmental Prevention Services; Protection Agency (EPA) and Department of Department of Toxic MM 5.3-4 Toxic Substances Control (DTSC) standords, then Substances Control. grading. and construction may begin. _ If the residue is .found to be greater than acceptable level limits, all contominoted soils .exceeding the. ',-and/or acceptable limits shall be remediaiied property' disposed of per DiSC requirements. An appropriate verification closure letter from OTSC shall be.obtained and submitted to the City of Bakersfield! Prior .to issupnce 'of grading permits, any removal Prior to issuance -of -grading Pre:construction / City of Bakersfield. or relocation- of transformers shall be conducted permits> Throughout ihe.duration Development Services under.the,purview of the local utility purveyor (i,e., of on-site construction Department, Planning Pacific Gas and Electric Company [PG&E)) to •activities. Division; Pacific Gas and MM 5.3-60 identify proper handling• procedures regarding Electric Company. potential polychlorinated biphenyls (PCBs): It stained soils are observed underlying any of the pole -mounted "electrical transformers, it shall'be sam led and tested for theior6s6nce of PCBs. MM 5.3-6b Prior to the 'issuance. of proding, and build in Priorto the issuance of. Pre-consfrirction / Ci of Bakersfield . GIT V 0 0GITVpX LD' - -- - - - :13 LE�LbMARCH 2010 3l Ola\3c'a 12 Program diTY OF'BAKERSFIELD Oockdul6 Ranch GPAAC 09-0263 / AnnexaHori No. 548 . SCtI•-No, 2oa9o�iloaa Mitigation •MonHoring fable;, Contlnued: Stockdale•Ranch GPA/ZC. Og9 .o26.3./'Annexcitlo-n: No'. 548 Measure. ;" _ sum mary'of Measure .Imptemenfallon Phase- 46n0ddng Ph0se Enfordrig" Agency , ..V.eriNcafion of.cbrn lldr, - _ _ Inf cils:. Date ::Remarks . plan for each development Development Services provide .the location of -on-site .tempor'ary permits, if necessary; PCB -affected soil :shall Abe • gradingand building permits: ' Throughout the duration ; Development Services' - properly disposed per Federal, State, and, local . ofon_site'construction Department, Planning. proposed Project site. ,Appropriate screening laws; Testing and %djsposal shall . meet the pclivitfeS. ` Drvrsion; City of (e.g.: -temporary,opaque fencing '[Tor feet, in regulations of. the City of Bakersfield tyre Bakersfield'ffre. pepartmenf, Ofrce of Prevention ,Services.If such Deparfinent,'Office of PCB soil testing End disposal are . required; ::a 13inti6wservices-, . verification` etosure letter shall- be :obtained.`from% 1he'City, of. Bakersfield Ffre D_ epartment' Office. of Prevention Services. MM 5 3 10a Refer lu 4pi lien" 5.7 :AIR .QllAL'IT`(, regarding fu hive dust mitigation measures: - Pursuanf to -the ,Son 'Joaquin 'Valley- Air Pollution Pre -construction / Throughout, Pre -construction J City of Bakersfield Control Dufrict {SJVAPCD)Regulation VIII Fugitive the duratton'of on-site Throughout the duration Development services :eM,a Prohibitions; all areas with bare.s.60 exposed construction activities: of on site construction Department Plan nin"g' as a result of the , propokid Project's earthwork ! activities: Division; San Joaquin MM 5,3=10b activities shgll,be,londscaped .dt ,the eodiest time Valley Air Pollution possible or stabilized by watering., when winds Control District. exceed 20 mile's,per hour (mph) in: ord6nto reduce tris p 16, ibl rnhalofion• of, spores causing Vailej+ .Fever. Prior`to,development, the, Project Developershall Prior to: development.' Pre construction:/" City of Bakersfield construct • � & sik-foot-High; chain-link .fence; or. Throughout the duration Development Seniices equ'ivalcnt •barrier as determined by the -advisory, of on -she construction Department; Prpnning MM 5;3=t agency, between any subdivision'and the; right of- , .:activities. Divisions City of, way line of any irrigation can' v�idhin"or adjacent . Bakersfield to the subdivision, as specified in City of 6akersireld Development 5ery'ices subdivision and Engineering Design " Manual .. Deparfinenf'Building. Standard 5=10.. ---- - - -.Division," With . submittal- of 'a grading, plan for each ' With subs ittalof a grading . Pre-constructi6n; 'City of Bakersfield dedeiopment phase, the Project Applicant shalt . plan for each development Development Services provide .the location of -on-site .tempor'ary phase. Deparfrnent; Pla1 i MMSA-Ta construction equipriient -staging _areas mfithin ahs Div)sion: proposed Project site. ,Appropriate screening (e.g.: -temporary,opaque fencing '[Tor feet, in _hetdht shall_ be '-used ;to .buffer views _.of ti� \ Y Oic UGIT Y p� M G) v. z r_,T,0o 3-13° of 34 Mltlgaflon MonBoring Program PITY OF BAKERSFIELD Stockdole Ranch GPA/iC-W02,&3-/ Annexaflon,No. - 548 SCH No: 2009071068 Mitlodflon M6nftdflhg Table,. Cont1hued. Stibckdate"RanCh. GPA/W 0960263 1 'Ann-exaffon No. 5413 MNigationSummary of Measure lriftf3lem entallon Phase Monitoring Phase 11 Enforc - Ing Agency Verfntdffo of Compliance. Initials 'Date. •Rernaft- Measure . . . . __ - __ , . � 1 - - P __ _­ -1 - I construction ejuipment. rriatericili, where feaslble: SidgTngi locations shall be indicated on final grading plans,and be reviewed ond dpprovpd. by thip. City. Planning -Deportment. All construction activities. shdil, be consiiienl:,will, the,13akersfield Municipal Codo rkjylrements-:and-,cond1tons of abDraival: With s6liryfittoil of a gftiding p6milt a0p!lcoti6h,. the With subm1ttalqfaIgrqq!hg. Pre -construction. City' ofBakersfield . Project', Applicant shall provid6:a construction . - . permit application, Services safety lighting pion.. All lighting would be located Department. Planning and ol[rhed awdy'korn adjacent residential areas Division. MM5A-lb and roadways _and 'would uld consist.,of Minimal. wattage necessary to said � ,to the .- Me ..,.- safety - - � construction site.. All construction lighting' -shall be consistent with the'Bakershe4d Municipat'tiod'te reo0irementi and conditions 61 approval. With - submittal of a development pion for With submittal 61 a, Pre -construction. City of Bakersfield commercial areas and: consistent with,the "City's developrmeht pldmf6r Develobment Services MM 5:4-2a design review by,the Planning Director, all public design commercial areas. De - signage thro'u ho6l; 1 4 proposed sholl be _h Division: .designed to 'have consistency in Ulure type, Jefferina.colors, symb6ls, and logos. With submittal of a tentative tract map' and Nth submittal of a tentative Pre-donstruckin. City of Bakersfield consistent with the City's design review by the tract map. Developryient'Seivices ,planning Director, re to , the building design of the DelJortrinehf, Planning MM 5.4-215 proposed Project shall incorporate characteristics to enhance the chdrOcter of, thle existing surrounding community through the use of natural 'building materials and earthtone-colors. as well as landsddbin.q. With submittal of a tentative tract- map and With submittal of a tentative Premcohsfruclion, City of Bakersfield consistent with the 'Cily) - d.esign review by the.. tract map. Development Services MM 5.4-k Punning pp shall. �V nning Director. the Project Alidont, erify . '-p(poartrrie'rit, Planning That alt laridscaping, both tornmercial1r6ritage Division. .and street landscaping;,are in accordance with the MBGP and. Bakersfield Municipal Code... ,This.., 0,r 1T Y 0A, 3,QVI V OA, ;5 ONAL Elt4' .7130� 13=14 of U -Monitoring Program CITY OF RAKER01ELD Sfockdale Ranch D A A• E R. S -F 1.- E L'- D GPA/ZC 09-02631Aenekaflon No:,548 ;CH No. 2009071068 Mitigation Monitoring Tdble, Conflfi!ued, Sfockddle Ronch GPA/ZC 09,0263 / Annexofion No. 548. goffon Measure. - - Summary of Measure - .Imple_ mentation flhote MonRoring Phase Enforcing Agency YeriflcoHon of'Com fiance InEHais Date I Remarks -below.- _ _ should follortiCity requirements per Chapter�.17.61 Any. roadwoy . segment improvements on Prior to and/ or.during Prior to and/ or during City of Bakersfield of the.Zonin_ Code. Sfockdole Highway between Enos Lane and construction. construction. 'DeveloprrientSer ices During the, installation of lighting ,standards the During the installation of Pre -construction / Eity of Bake►3field Department, Planning Project Appfcant shall ensure that any exterior, lighting standards. Throughout the duration Development Services Division. lighting ;does not spill overonto-the adjacent uses. of on site construction Department, Planning MM 5:4-3 All exterii or fight fixtures; ncluding :'street lighting, activities:. Division. sholl•tid shieided oi'directed gway,1rom-adoInInb 'the Ph'o3e IV RTIF Program. " uses,pursuant to all applicable lighting standards• MM '5.&4b Implement Mitigation Measures 5.5-6a and 5;"b. and requirements of the Bakersfield+.Municipal Prior to the issuance -of building permits, the Project Prior to the issuance•of Prior to. and/ or during City of Bakersfield Code and Zoning Code. Applicant shall participate in the City's' RTIF building permits. construction, Development Services 1V MM 5.5 3 Refer - to•'Mitfgatiom Measures '5.5-6a .and :5- 56b, -below.- _ Any. roadwoy . segment improvements on Prior to and/ or.during Prior to and/ or during City of Bakersfield Sfockdole Highway between Enos Lane and construction. construction. 'DeveloprrientSer ices Superior Road shall include railroad crossing -safety' Department, Planning MM 5.5-4a measures -such as proper warning signals; lights; Division. striping, median separation; and ,parking ieslrictioris, as outlined in the CPUC guidelines ohd 'the Ph'o3e IV RTIF Program. " MM '5.&4b Implement Mitigation Measures 5.5-6a and 5;"b. Prior to the issuance -of building permits, the Project Prior to the issuance•of Prior to. and/ or during City of Bakersfield Applicant shall participate in the City's' RTIF building permits. construction, Development Services Program. The Project Appticanf shall submit Department, Planning MM 5.5 da. funding calculations for all improvements Division. associated •with the. RTiF Program pursuant to Tobies '6 and .8 of. the proposed Project's Trpoic lmpacf" Study (McIntosh and ' Associates, 3e 'tember 2009, A 6ncrix 15.4 fora rovdi. For impacted intersections subject to fair -share Prior f the issuance of Pre -construction. City of Bakersfield improvements (refer to Table 6, from. September building perrriits. Development Services MM 5.5-6b 20D9'Trafirc-impact Study (refer to Appendix 15.41) Department, Plannin p- g and•-,rood_&"way s ent improvements, prior to the. DiJisioh: issudnce of building permits, the Project Applicant snail parflcite in the im rovement0e u'red on C,.iYO 0GIT V q� PR G) y_INAL EIe MARCID 2010 z rt7131�o'a 13-15 of 34 Mitlgatian Monfforing Program 0r,ITYO z r Or 00 sAaRtFliko -ifockaa'6, kdnch dOA/Z11; 09r0263) -AhOdixo6on No. 548 • ;CH No 200907.1068. Mfffigafi6n Monitoring Table,Continued St6ckdaW Kdn'ch Gpivx . C '094263 Anh6xafion . Nd.;' 548 Mitigation Measure M�1v of Measure, ure, a pro rdta; fair=shdre basis, as "indicatedthe fm ILndnidfldn FhO56 monlloing Phase Erirclngftenyq al ofcoriflance :"Initials-. date :Remarks CA LI#%IeC '-,Recomm6nrde-dimprq?6mdnts*and Table S.&6. 1001frits. and cionstry-effor) P6velopM'en! 4ervicei. ARCH 2010 13-16 ffifflfgation M6111torinjil Prograrn Prior- to issuance 'of, grading, permits,. the, Project- prior f6,ijs6 -anceofgrading Through6ut-the grading, :q1ty 6 tpokerstield Contractor sfiall-pr6vide evidence acceptable to 1001frits. and cionstry-effor) P6velopM'en! 4ervicei. 11he Clty-Planning proPess:. Depqd,ivient;,Oldnning MM construction eq-dip-r-Lnt;' fixed or mobile, le,,bper6ted equipment; i. within , 1,()PO 1661 :.of'.6 dWellirfg Jurilt s.hdll.,b6, .equipped . with property operating , and mdiht I d dide and'(2) constrUcilontactiVilles shall be limited, to the qes�14ndled daytime' h6urs as specified by the Cityjot Bakersfield (qU&enfly 6:00 _AM to 0-00 PIA -on weekdays and 8:00 AM and 9:06 P.M. on weekends).. Ro 6onstruction4s allowed. 60,F bddidl holidays. These 'restrictions apply, to, all tricks, 46hicIds, and equipment, that.,ore, making or involved, with material deliveries, loading or transfer of materials,eijulipmofil seirvide, and maintenance,. of any devices for or Within 'the P.[dpoi6aProject's construction .site. During construction, -- stationary,, 'construction ,° -:During construction. 7hroujhout theOty -of Bakersfi6ld equipment: -shall be placed,such that e - r6ifted construction process: bevelopmerii terv'lc'es MM 6k1b. noise is directed : 'away from noise-sensifive, DepUrtmenti'Buildinb, receptors; to, ttit- iatisfadtion of the Builcirpq OffiCial. Prior to QOOFOvoll of the propbsed, Project plans "Priorto opprovalof .11hpPreacon0ruOQW/ t -of CiBcjk_ fie y ers, 10. ,and spOqlficaiions, by the �. City BOIldihq Proli),Osed,projecj, . Thr6ughQuI'fh& d6rdtion . PeveloOment SerWce's. jDeportment, the Project Contractor shall ­_ I - -.7 site of on I c_, Department: Building MM &6-1 q incorporate.- feasible muffling: features into all *6celvili- t6. blvislon., construction vehicles and equipment - and into 6660rUcI169 i.viblh6ds, and shall maintain all. construerlorivehig(es and equipment' in efficlent 6rqling condition, ARCH 2010 13-16 ffifflfgation M6111torinjil Prograrn • M!qsjdffonkM6hItbd6g,f1' ;Continued; ab 0 ockddletahch GPA/IC 09.-6263-j-.Anndxcffon N . m.,548 GPA/IC 09-0263 CITY dlFBAKER SFIELD- Pockdalle'Ranch F-Anhexallfdn No. 548 MIN901119h Measure Sumindry of Measure lemenidtion Phase Implementation. 'McnNi6rinj Phase. EnfcWc Ing A66nc' y VerIfi&dff6' of COM011ance Ifiliffift Date I'Remarks Prior to approval Of the proposed -Project 'plans, Prior to dpOroVal:of the Pre-consirLictiian, QV of Bakersfield and ipecifications, the City 'Building, by pr6liosed PrplecL the duration Develd'' - ' -s dej3'arIlrhenf,;st6apMng, and construction Vehicle at on -site construction n 'pinehfService Departr6en 1, Building; staging areas shall be located. cis -far away -'as, cictivitlei. prdcti6al - from nolse!s6hsilive- receptors during construction activities;. V- 6�1 Y 0 OGITY Ox - FD MARCH 20.10 7 - -13zI7 of MINgatibn Monitoring Program CITY OF BAKERSFIELD Stockdale Ranch B AK.E R S F t,,EL D GPA/IC 09.0263_ / Arinexaflon No. 548 ��' SCH No.'2009071068 Mitigation Monitoring Table, Continued Stockdalelanch, GPA/ZC 09426'j] Annexation No. 548 M e6iura Measure Summary ofMeasure Implementation Phase Monitoring Phase Enfoicing Agency. Verffication, of. Com Mance initials . Dote Remarks. - After, the :precise grading ,arid plot plans have, .After the precise ijroding.aiTd Pre=construction: City of Bakersfield. bee. developed and prior to issuance of building plot plans have been Development Services permits, a site-specific acousfical`bnalysis thall be developed and priort, Department,Planning conducted by. a qualified, acoustical enginee_ r to, issuance of buildingpermIts. Division. determine .if existing homes located ,along the north• side,.of Stockdale- HTghway .(between Nord Avenue and South Claudia Autumn Drive( are located wifhln' the 65 dB.tNEL contour for "2035, Wilti•Projeci'! conditions (247 feet from the.denter of the roadwayb and If such homes ore not protected by an effective sound wall:. Construction or replacement of sound walls shall' be implemented to achieve an exterior noise .exposure of'65 dB CNR or less of the 66mes.- MM 5.6-2 The site-specific acoustical analysis shall be the responsibiliy of the Project Developer., and shall include, measures to mointalh the 20 dS reduction between -exterior and interior noise levels. If the homes lot_ aced 'northof Stockdole. Highway. (between Nord; Avenue , and' South Claudia Autumn Drive(. are vvifhln ;the 65•dB •contour and eMerior noise cannot _ be feduced to 45 "dB or below by use of a sound wall, then interior noise reduction measures shall be used. Interior noise reduction can be, achieved by providing'wtndo i facing Stockdole Highway with assemblies having, a minimum Ioborotory-tested sound .transmission class (STO.rdfin of:35._ . Atter '1he precise grading ,and 'plot plans hove Affer the precise grading and: Pre-consfruclion. City of Bakersfield been developed and prior to the issuance of plot plans have been Development Services building permits, a site-spedific acoustical analysis developed and prior to. Department, Planning MM 5.6`3o shall tie • conducted by, a qualified acoustical issuance of building permits: Division. engineer to determine the final height and locationof any sound walls that would be required alond Slockdole Hi hwd . II is estimated. that �v11 Y •per 0GITYp = MARCH 2010 Z 13=i8 of Program fa• �CIT,V dF BAKERSFIELD. liockdale Ranch' GPAAC 09=0263 /Annexation No:,548: - � ;SCN No,:'200907106B: MifigcHon;Monitoring Table;; Continued nai StockdQle ;Ke GFA/IC.09-0263../'A-nniWition No: 548, Mlligation Mcasure: Summa of Measure:- -` Im lemeMation Phase; p MonHorin Phase 9_ Enforctri A enc 9 g Y Vertflcation ot:cc m' Mance- - :InfH61s, bate.- =Remarks eight foot 'high sdund walls.'would .be required' - along 5tockdale Highway:. to`feduce lrafTc'rioise tgvels; ta.below;the City's.65 66 CNEivrill ,standgi rd: ' �Tte. final •design: of sound walls ;ieouire a, detdiled._ gcoustical .andysls­ttiot takes. •ir%to:' considerailon sites Tactors inGudingr. ` ,00fiq building,'setbacks acid the. ,relatnie elevdtibm of thearaffic noise source,. sound wall.:and receiver... The.acdustical anotysis shalPbe the. iesponsibility;ofr' .the Pio ect.Develo r.- _ AfteP the. precise gradirig;and plot: pions, hove' After thepreclse grodngaDd. Pre constriction: Clfy:of Bakersfield been developed ,and prior,-fo the issuance ,of.: plot plans have been DevelopmentServiees: ,building; pemlrts, o site-specific acoustical anolysis. deY416p6d dad prior to ttie . Department P.iaiining :shall beconducted- by .a qualifietl! acoustical` issuance• of t5u_ldtng peimil5;. Division. engineer o determine the finaR•,height. bnd location'oUgr y_sbUhd walS,that would be required , along V f0gh Avenue: Should'sound Walls. not be MM 5.6-3i; feasible ar reasonable for Wegis Avehue' (a collectorroadwdy); lhp'- appropriates terlor;noise: reduction. meosures. shall _be used °to, .achieve` compliance ;with .the.City's 46 dB. CNEL interior' noTse.level:standard: ,Such niedsures moy;include: ,providing .air conditions or •mechanical Jenfilaiion systems so thatr windows Arid doors may:rembin :closed for noise reduction • ur bses. ' 0GITY Qc.lm _ y � � x 4 ,MARCH a 34 CITY -OF BAKERSFIELD Stockdalw Ranch GPA/ZC 09-0243 /Annexation No. 548' SCH No. 2009071068, Mitigation Monitoring Table,, Continued Stockdale Ranch GPA'/IC.09'.0263./.Annexation No;.548 MNIgaHoti Measure Summary• of Measure. As a condition of_' approval, when. site-specific Amplemerrtaflon•Phase As b condition of approval. Monttoring phase Pre -construction. Enforcing Agency City of Bakersfield Verfflcation of Corn dance. Initials Oats . Remarks commercial use .are .proposed that have the Development Services potential to -cause significant noise impacts. due to * Department, •PIOnning the noture of the ' business. ,or the. • houis •of Division; operation, .on acoustical analysis shall � be - MM 5:6-4 conducted -to the satisfaction of the City Planning Department, that 'quant1­1ifies �propoied,, Project- ' related noise :levels ,and , recommends ,iniligafion- . mebsures to achieve corimptibnce vnth the. -City's. .noise slandards for stationary noise.,sources (refer to Table 5.6-2;.in EIRJ, In order to protect KCWA's full use and operations As part of the tentative tract Pre -construction.. Cify of Bakersfield of their -existing facilities, ds pari of the tentafive ;process.Develoti'mentServices tract process, future residents and 'tenants Department, Planning adjacent to the Pioneer Project -and Cross valley Division; KCWA. Conal shall be notified via recorded.deed• notices or real estate disclosure statements, chat .the following nuisances may occur, during fool iV operating and maintenance:noise, aesthetic impairments •including lmpdirment of •pdvacy; , blowing dust, and/or smoke._ In an , attempt: to reduce complaints land unwarranted MM 5.6-5a investigations undertaken by KCWA, and to assist in, the long-term protection of the adjacent water facilities, the foilovAng disclosure shall be given via recorded deed notices or real estate disclosure statements as part of any frontier of properties within the.proposed Project site: Your real property is adjacent to or in the vicinity of property used for water delivery and/or groundwater: recharge and recovery operations. You may be subject td inconveniences, annoyances, ar, discorntrids orking. from and, associated CITY 0 V Y p� 3 z AL E1R .QARCH 20 13-20 oGITV 0 r-0i30S, CITY OF BAKERSFIELD Stackdate Ranch GPA/ZC 09-0263/ Annexaflon No: 548 4CH'No_2009071068 `Mitigation Monitoringacbie...Confinued Stockdale'Rcnch . GPA/ZC M-026$':/ Annexation No. 548 Miflgallon Summery of Measure Im ,leetentaflon Phase t? . Moniloring Phase. Enforcin 'A en 9 9, �y Veriflcaflon of Com Rance -.In - -iNats -. Dote - 'Rema rks.- - .Measure = with such operdTons -on a 24. -hour- basis: = - Development Services Said discomforts-may:include, buf`shalfnot MM -5.7-1 Agreement wiih.' the Son Joaquin Volley Air 'of on-site constriction Departmeni; Planning be limited to, noise, aesthetic impairme-nis Pollution Conlrol District to reduce ROG,. NO;, and activities. Division: SJ PCD. including impokrnent of privacy; blowing, PMioim acts io zero.. .... - dust and/or smoke: ------------ Prior to grading plan .approval; the Prcjecf Prior tograding plan Pre -construction / City of Bakersfield Prior to the issuance :of binding permits if noise- P660 the issuance of Pie -construction City.of t3akersfield Throughout the duration 'Development Services. sensitive uses are .proposed for construction building permits:Development of Bakersfield Planning 'Department, that, they Services of on site construction Department; Planning .adjacent to the KCWA pumping,. station, a will/have met all, air quollty' .control meosures Department, Planning activities. ' Division; SJVAPCQ. detailed. acoustical analysis .shall be performed. required by the SJVAPCD. Division; KCWA. tfiaf quantifies the noise levels: produced .by :the , MM '5:7-6a' Refer to Mili dtion'Measure 5.7-2, above: MM 5.&5b pumping station (by •actual noise measurements) The Project Appfcant_shali adhere to the terms of Prior to the Issuanceat Pre -construction/. City,of Bakersfield and takes into. consideration site-speciFic'.factors, UM 5.7-6b the 2006; Voluntary Emissions Reductlons` building permits. Throughout the duration. Development Services including building, setbacks :and ?fie. reldfive Agreement., which includes reductionmeasuresof on-site construction Department; Planning elevations 6rthe equipmer)t, hofs& source; sound . that will reduce Greenhouse.Gas Emissions.. activities: Division:-SJVAPCM _ wail and receiver. The acoustical"' lysis shall be; the reto'onsibility of the Pro ect Develo ` r. MM 5:6-6 Refer to Mitigation Measures 5.6-1 a through 5A -Sc, above. MM B -la ^ Refer to ihe::.mili alion measures. rovided 'in �C,rtl Y Off. 2010 13-21 .of 34 Program The Project' Applicant shall adhere to.ttie terms of: prior to the issuance of `1Pre-construction_/ City;of Bakersfield - the 2006 Voluntary ° Eriiissions Reductions'' building permits.. Throughout the durafion,, Development Services MM -5.7-1 Agreement wiih.' the Son Joaquin Volley Air 'of on-site constriction Departmeni; Planning Pollution Conlrol District to reduce ROG,. NO;, and activities. Division: SJ PCD. PMioim acts io zero.. Prior to grading plan .approval; the Prcjecf Prior tograding plan Pre -construction / City of Bakersfield 'Applicant shall submit documentation to the -City, ':approval. Throughout the duration 'Development Services. MM 5:72 of Bakersfield Planning 'Department, that, they of on site construction Department; Planning will/have met all, air quollty' .control meosures activities. ' Division; SJVAPCQ. required by the SJVAPCD. MM '5:7-6a' Refer to Mili dtion'Measure 5.7-2, above: The Project Appfcant_shali adhere to the terms of Prior to the Issuanceat Pre -construction/. City,of Bakersfield UM 5.7-6b the 2006; Voluntary Emissions Reductlons` building permits. Throughout the duration. Development Services Agreement., which includes reductionmeasuresof on-site construction Department; Planning :. that will reduce Greenhouse.Gas Emissions.. activities: Division:-SJVAPCM _ - MM B -la ^ Refer to ihe::.mili alion measures. rovided 'in �C,rtl Y Off. 2010 13-21 .of 34 Program OGITY 0 G Z CITY OF. BAKERSFIELD- -Sbckdate Ranch dwk 69-0263 /,Annekaffon'No. 348 e w• k E R: s F .i 'e -n.. SCH 46.2009071068 Mifiigotion Mo nitddna4ab16Xo_ ntinued S#ockdoW Rdnch :GPA/XC 09=0263 / Annexation No:'548 MIHgallofl Summary of-Measure - -IrrfplemeMdRon Phase Montf6dfig Phase - -- Enforcing Agency ; MidacdHon of Com licence ._ i:InI fats Date :.Remarks Measure::: = - _ -- 'Section 5:7; AIR'OUACITIf-. - MM 5 8 i b Refer,fo•mitigation.'Irrieasures provided in'Section 5A NOISE - .06666 grading 'and;. construction; the PrbjecF During grading and; Throtighout the duration' City of Bakersfield j Contractor shall,ensure.all.traih and food waste u., construction. of'on sde construction Development Services MM 5:8 is disposed, of in closed corilainers.'and regularly: :actiVifies:. .006rtmenf :Planning removed from, ihe'proposed Project site during Division.. construction: Absolulery no dglibe_rafe feasting of wildlife shall tie allowed.. Prior :to .drading, the Project •Appticdnt shop pay, -Prior to_ grading. Pre-constructlon: 'Cify'of Bakersfield' the habitat ,,mitigation- fee 'in.idccordance with, DeVelopmentServices section 1548.030-P!, the C(ty of Bakersfield Qeparlment, Planning Munrcpot Code and the•MBHCP.: If the MBHCP Is. Division; V$fWS CDFG. ' not, &t4brided :past the eapiidlion' dote of `2014. then during the fine whenino oppricable MBHCP Is in place,'. the Project Applicant shall comply wilh,i such mitigation measures as; shall be required; by tris U.S, Fish End Wildlife Service (USFWS) and 4he., ,.CaliforniaDep artment' of Fsh and: Game (CDFO) _ including, but not, limited, to, the following . a), Fund, and/or,pur0dse, :the appropriate number -of credits in a mitigation bank or. MM5.8=4a_ conservation'progrom for the San Joaquin kit fox; which Js approved by the applicable regulatory oversight agency '(Le., USFWS.or CDFG)? b) Contribute ,the -appropriate, funding to, an orgarilizaliion, which is approved .by the appropriate regulatory oveisight agency (Le:, USFWS, GDFG). 'thatprovides: for the, prmervalion..oV olt•site- San . Joaquin , klF fox', hohitat.. Funds may be used for purchases, ongoing monitoring and enforcement, •transaction . "'costs,- and reasonoblk. administrative costs. .-.I--;C) -. -,;e _ C:ontribute.the.a ro -ate fundin ,and fallow . MARCH 13=22 of 34 MitigaRon Monitoring QGITY O� � v z D 1-07130 CRY OF 6AKERSFIELD Stockdale Ranch GPA/ZC 09-0263 / Annexcffon No. 548 SCH No.2009071066 MWOcition Monitodng Table,• Continued: Stockdale Ranch GPA/ZC 09-0263:/;Annexation No. 548 MlHgatlon . Meosure. Summary of Measure - - ' Implerirentatlon Phew: - MonBcrlog Phase - ---- - • Enforcln A enc 9 -..9 .. Y VerlrR;affon omlie Ilancde� n bs a �ema appropriate, the -appropriate regulatory oversioht'agency' - - - (i.e.; USFWS. guidelines,- including obtaining.the requiredpermits, to enable the. relocation : of any ,San Joaquin kit fox identified on-site. d) during, the, life of the ,project;. -if a, H&I' odopfed by the City of 'Bakersfietd,, or other responsible agency, that provides equal or more effective mitigation. than measures' listed above: the Project Applicaht':rrioy ` choose to participate in that alternate, progrom,to mitigate loss of San Joaquin kit fox' habitaf'impacts; Prior -to participotioh in the altemote•program, the Project Applicant shall obidin written approval from the appropriate regulatory oversight agency (Le.." USFWS,' CDFG) agreeing to the participation; and the Project 'Applicant- shall submit written verification of compliance to the City of 'Bakersfield with the alternate program of the some'tirnb described above in the first paragroph. Corn lotion of the selected mitigation measure, or With the Planning Director's approval, 'a• combination of the selected mitigation. measures, can be ch 'qualifying Son Joaquin kit fox habttat landwithin kern County. G1I Y O;� - MARCH.2010. 13-23 of 34 MonRoring Program OCITV01, � d G) v !� rO131:0'a • IMitigatid.n. Monito ing Table;, Continued VoOdale Ranch GPA/1'C 09=0263./-Annexati6n.No. 548'. CITY OF BAKERSFIELD StockdoleRanch GPAAC M0263 % Annexation No. 548 . SCH No. 20090710613 MHIgation� Summary otMe'asure. ImPlementallon'Phose -:- - ' 'Monitoring Phd�e - 'Entorcing.Agency. .VeriHcaHon cf:Com' Ilrapce- InlNcls. Date .. Remarks Measure _ - Within 36 days 'of 'initloC ground -disturbance, "Withih,30daysof,initial Pie -construction:/" City of Bakersfield preconstruction clearance surveys shall ,,be ground disturbance /.P&to. Throughout tt a duiaflon Development 5eniices. ' conducted by o qualified blologisvin accordance , approval ata grading of on, site coristructiori Departmeni,'Planning'. ; With the provisions of: the MBHCP:. Any -potential,. permit.. activities. Division; USfWS, CDFG:, inactive or active kit. fok dens Identified -'.6s. , ;unavoidable, be: monitored, excavated and backfilled . in `accordance -with- the MM 5.04b xecommendblions of''.. rise: MBHCP .and all° ,guidelines, protocols; arid, o1heF provisions +ot the ' CM. USFWS, Federal, Endangered Species Ae and. Cdlifoinia iEndangered :Species ,Act: Survey vAridows torthe'Sari Joaquin kit fox con'occur:at anytime throughout the: year., The surveyshall be - submitted to the City of Bakersfield .Planning ' Departrperit', prior to opproVal 6fo- grading peimit: Prior: to earth disturbance phases of construction, P66rlo,earth disturbance Pre -construction'/ City -of Bakersfield ail construction' personnel shall be, framed in ' phases of construclidri. Throughout fhe cfurdflon. Development Services sensitive species identification and avoidance of on-site construction• , D`epaHmer t, Planning techniques and be.instructed i, be on the lookout activities: Division., ` MM 5.8 4c `tor kit fox dens during earth; disturbance: Proof of tialning ;shall be submitted, to- the. City' ,of Bakersfield Planning department. Any evidence, such as, dens, observed 16t any lime: during construction, shalt be � promptly reported to the feviewin a 'encies.forres'otuflon.- - During, construction, all ,pipes, cplverti or similar During construction Throughout the duration,Cityof Bakersfield structures, with a'dianielgr blJour inches or Qreate� of on-sife,conslruction Development sen+ices 'shail be kept capped to prevent -entry .of the'0 activities. Department; Planning MM 5.&4d, fox.' If not.capped or ;otherwise ,covered, ftie pivi5ioh, openings shall be inspected twice daily in .the morning andpe fining and prior to burial or closure, to ensure , no kit foxes or _other . wildlife, become entra Owed or buned,in i es.. MM 51&;56 Prior to grading, the Project Appliconf, shall pay Prior to grading. Pre -construction. City. of Bakersrield the h6bilfat milli dlion fee' in accordance w'�tli _ . `Develo "meat Services. 9 1MAC EIR .e MARCH 2010' " 13-24 of 34 MNigation MonNoring Program MY' Of BAKERSIFIELP Stockdalle Ranch GPA/ZC 09.4263 Annexation No. 548 SCH'No. 2009071066 M1119aflon Monvotho Tabl6;, Continued "Stockd011e'lafth ,.PPA/ZC 09.0263 /4nhexaHon No.' 548" Measure 'Summary, of Mddsdirie ImplerneintaHonThaw Moriffating Phase EnIl6idng,Agency 1 Vedficatlon ol'Compllane6� ZZ—" Ifiliffalls Datei'l' Remaft section --.15.781030 -6f' the, City _ 'of Bakersfield- - Department, -Planning Municipdi,Cdde and the MBHCP. If the MBHCF it DiAtion' USFW& CDFG; not - 'extended past the, expiration date of .2014, then -d6ring. the. time when no' applicable MBHCP is In plmce, the Project _ som _ I�, Wi Applicant. 'hll coij ffi such riiitigati6h,r7iedsures,ot-shall •6e'fd _Ulr&dby, the; Fish drid,wilaft6i Se,Nl,c:e'(USFWS):ohd. the' California Department mencl-*Mhand Gam& (CD including, but not limited to; thelollowing:. al 'Fund; a Adjor piuichcisp, the approIpflate ' number of, credits in -a -mItibdtI66 bank or; conservation rvation program'for sensitive and nesting 'birds; which is approved by the. oopffcoble regulot.ory. oversight a6ency USFWS or CDFGj. b) Contribute the appropriate funding to an, organization, which is approved by the qppropfic ' itf� regulatory ov&rsight.ag6ney (1.6:, USFWS-,. CDFG), that piovidet Ir for the pre * df on of .off-site hablidi't& sensitive s ry I and ,nesting birds., Funds rrfoy,'bd,used for purchases,. ongoing , monitoring and .enforcement, transaction costs, and, reasonable admirfistrative costs.. C) Contribute the appropriate funding and. follow the appropr1ple regulatory gulatoty oversight agency (i.e.,- U,SFWSi CDFG) guliellnes.. Including -obtaining I the required permits, " io enable the relocation of any sensitive or- nbsti'g,birds identified onmsite'. d) During, the'litt of "_the pr9ject, it a HCF.Js adopted by,the City of ,Bakersfield, or, other respopsible'agency; that provides 6qual,or , more -effective mi ligation than,. measures I fisted above, the' Project Xoplicant mayl 0GITYOW 4P 13-25 of 34, MINgaIllon Monitoring Program -CffY. OF BAKERSFIE11.6' Sfotkda116- Ranch, GPA/ZC 09-0263 /An -exb1fori No. 548 SCH No. 2009071665 Mftqtjon Mqnftiing Table,- Continued Ranch a WAIMWO2631 Ann6kation No. 548' M1111901110h Measure turn mdry C.KM.easutdi .11MIOIL . arnfifilaffon-Phase : Moliff6dn' g Phase; Erdoming AgOOOV v6mca"on of conipliam e 1161111als Date'llternafici choosey toparticipate . t alternate, ink -that - - -, Ihou .:prograrnjo miii-qU atL - loss of tat-IrnPa6ts to. sensitive or nesting birds: Prior to participation 'alternate in. 'the program.. the• Prolec,t, Applicant, sh6il bbloln wriffen approval from, the appropriate fegulat ory bVerslght.d' _9epcy (I.e. - 'USFWS, 1P.MG.) •-ogre-6ifig - to - the :participation; and. the Project' Applicant shall' -subrnif N��tfen','verificarlon, of compliance to 41�e:. .City , of. to kertfibld -with- the alternate pr vogrdm 61 the tdrne, iim'edesciibed dbo've in the first pqpqidph,' &,.Or CoMplefi6n of the -selectei(lffiilfgapph'me'OL!M , with th e _,Pjonnin6_pro - 'Dire6t6r!s,, op V va), a combination of the selected Mitigation rneusuresiw• can be dn,qualifying sensitive :and nesting bird habitat land within Kern C'D'uril[V: dc P Dt to the commencement of. grading aelivilles, Comm Tdarjo'lhe encerhent 'Pre construction: City of Bakersfield, the Vroject Appl16dnt,sh6II retain a qualified r -Of gfroding dctivifies.Deve 'lop ment Services biologist to Verify the, Oioseinc& ciabsence.6f any . - D eportnient,'01annina• r- 6nl� 0:'evii.301y entifi6d•'pi6fected - species- which blvi?t6n: UtFWS.._tDFG. am not addressed in theUsHm if encountered, MM 5.W5b, the USFWS:urid:CDFG shull be notified of pre4lovsly unreported ;protected species.. Any take of protected r9teq . - _ wildlife shplibe teport6d.immedialely to the CDFG, and USFWS-. No. - activities shall occur until lnddfebtd1,`idk6 •664ho-rza, tIo n. has been obtained from the CDFG and USFWS. :S646h .'dovs prior to, the onset of constniction, sevehdaYS priorto Pre construction, IF 6 City . 5oketsfibld. octi0ifies, during •the raptor nestin g season of construction activities Developrrlenl Services (February 1, to June'30)., a qVoU116 0 bldfogists all e during rbotorneitiho Department, Planning- MM.5.8�5c survey su within '500, feet of 'the. proposed . Project's 'for season I to Jun Divirion CDFG. impact the presence of any, active five rapior 30), nests (common or specialstatus). Any nest st found duahg survey effoils shall: be mappedon the construction, plans. If no active nests are'Found.; no GITYO 0 2 _ -7- 33 di—P, G) 3;1 z > 1-0131-1c. 13-26 of Cliff OF BAKERSFIELD • Stockdble Ranch GPA/ZC 09-02631 Annexation No. 548 SCH No. 2009071068 Mitigation Monfforing Tcbid, Continued Stockdale Ranch GPA/ZC-09;M63 /Annexation No. 548 Mtifgatlon �4umm r ary of Measure Implementation Phase Monitoring Ptiuse Enforcing Agency Verification of;Com . Rance ' Measure Infffafs`,.: Date :Remarks: _ 'further mitigation would be required.. •Results of the s0rveys stroll be provided to the CDFG: If nesting activity is present at -any raptor nest site; tri limits shall be. established •within a 500 foot buffer -66und any occupied'' nest, unless, othorwiso determin6dby a qualified.-biofogist and 2) access and surveying shall be restricted -within 300 feet of any occupied nest; unless -otherwise determined, by a qualified.biologist, Any.encroachrnenUinto, the buffer area around the known nest shall only, be allowed if the biologist _determines that the pioposed, activity irvill . not disturb the, ;nest. occupdnts. Construction con ;proceed when the qualified bfologisf� has determined that fledglings have left the nest. II an active nest is. observed during the non -nesting season, the nest site shall be monitored by a qualified biologist, ,dnd when the raptor is away . from the.nest, the biologist will flush any raptor to -open, space areas, A' qualified'biologist•, -:or construction personnel under the direction of 'the ,qualified biologist, will theniemove the nest site so ra tors cannot return to a nest. .The Project -Applicant --shall -conduct pre- .Prior to. ground•disturbance. Pre=construction. City of Bakersfield :construction_ surveys.prior to ground disturbance to Development Services ensure that no'burrowing'oWs.:are present. on-site . Department; Planning and toensure avoidance 'of' direct lake of Division; MFG. accidental entrapment of buiravring owls. If nests MM 5.8 54 are encountered, the use of agency -approved buffer ,zones, shall be implemented and Full avoidance of nest shall occur unfil the young have fledged.. Additionally, the fallowing measures, taken from ;the Staff Report on Buigowing Owl tilifigafion (CDFG 1995), shall be followed in •order to minimae impacts, feserve hablfat. and reduce UGITYpo or,%SYD a v— Z a of 34 Mfflgaflon Monfforing Program .CpIT Y pF CffY OF BAKERSFIELD. ,Stockdale Ranch GPA/ZC 09-0263 Annexation No.. 548 SCH No. 2009071068 MiltiallomMoviltating Toole;, C6iifinued, 'Sfockdaletiinchi- GPA/ZC � 09!-0263./ Annexalldh No. 548 ,MftI allon .4, - Summary of Measure Implementation Phase Monitoring Phase. Enforcing Agency Verlillication of Com ptiance Inuldli— .Date .:Remarks . Measure potentl6l,impcicts to burrowi.ng owls to_ ,a'level,bf less th-cri significant. * 'OdCupidd­buiT6ws -shall not be disturbed. (February 11 gh during the nesting season (Febrtjbr thibUg August31) unless. a . qualified biologist approiefR& by the C DI'd :Veflfibs, thrdu'h' noninvasive methods thatelth6r.1'(1) the birds have . not:begUn egg -,laying and incubation; :or (;) thot-juvenfles frorb the odcupled. burrows are foraging independently depe ' . nde-nly -and are' capable of. inde -pendent Survival. * It owls must be moved away.. from .the disturbance area. passive . relocation fethniq I ues as de.tcribed in the Sfaff Report "on Burrow'ing Owl Mitigalion should be used rather than trapping. At least one or more weeks Will be necessary to actorriplish'ihis and alloW the owls to acclimate too-altemalive burroWs. Prior to initial ground diisturbaoc&, ;it is Prior to initial ground Pre-constr0:11ion; Cltyqf'Bak.eaield' recommended that 6,"lollgote!' session relative to clisturbaO66. Development Services MM'5.8-50. all onviyonmentol Fedef0.l.,Stdte,*!ond* local laws for Department, Planning, all Construction personnel be conducted by •a, Division. dudrified biolouist. Any evidence, such,as burrows or potential ;;;Ffor Fre7consllruction,/'Througho5it Pre-cohstructbn CIN of'Bakersfield nests, observed at any time during :construction,. the duration 61 on-sile. Throughout,the duration Development Services MM 5.8-5 shall- be promptly reported to. the reviewing construction activities. of on-silie construction Qepqrtm6nI, Planning aaencies for resolution. activities. Division., MM'5.8-7a_ 'Implement. Milligotion Measure 5B -.1c, above. Lighting shall be shaded or shielded and directed, With the submittal of a PreLc6risiruclibri.- City of Bakersfield dawn from adjacent agricultural and tentative tract map, Development Services MM 5.6-7b 1 1 -6 re,0364 open. space areas to minimize Inc-' Department Planning predation preddliori - of species that' may b 0 using the Division. ddJbL open space and .agricultural fields. Refer 11c. Section 5.4, AESTHETICS, LIGHT AND 6\i Y ok- 0 13L2.8 of 34 Mitigation Program G IT Y 0., • Mitigatl6h Monnolling 1001e;. Cchfinue,d 'Stodkdafelafich GPA . � /ZC 09-02631 Annexation No. 548 CITY OF.BAKERSFIELD Stockdalle Ranch GPA/ZC.09-0263 / AFtnexallibn No. 548 'SCH No. 2009071068 mingolidw .: of Measure _. - - - I .- _ 1 1mplementallbit Phase _ - .­ I Monfiddrg.phose , Entoldpig AgenoyMeasure, Co p(lancesumnay -Verificationof 'Date 'l-ftinarks: - rfticl-I GLARE, regarding. light, .spill over, and glare m1ficlatich me'asu-res- .,5.9 CULTURAL RESOURCES . During, ekcavotioh and gr9d(ng if During excavation and Pre-i:onstruction I City of Bakersfield ordhaeolojicol,resobrdes. are discovered on-site: itel grading activities. throughout Lthe duration Development i oprnerit Services, - - . Developer/Contractoractivities., the ProjectDeveldoer/Contfactoshall ,stop all . of on-Isite.,consirvCH66' . .0epartment.Pkinning 1 work and shall re lain a qualified. archaeologist !16 activities. evaluate ih6 significance of fhq_,ffhcfirigand mms.9-16 aporOpflolb course of action. Salvage operation. r0*6ni66fi pursuant 'to Secilbii .15064.5 of the, StateCE6A Guidelines shall be. fol-l'awed and the I treatment of di scovereld Native American remains' shall'6omply with State codes and regulations of the Native American Heritage Commission'. If human remains are discovered as a result 61 the Throughout the duration of Throughout the duration City of Bakersfield proposed Project during development, all activity on -0e construction octlyffies, of on-site construction Develoom6rit Services -shall cease immediately, the Project activities. Department, Planning Developer/Cdntractor shot) notify the Kern County:, 'Division; Kern County Coroner's Office immediately under state law., and Coroner's Office; Native MM 534 b a qualified 6rdhaeologisi and Native Arnedcan I Arnerican Heritage monitor s-holl.be co ntacted. Should: the Coroner .'be.Native Commission. d6te"rmine the human remains to American, the NuIlve American Heritage Commission shall be contacted pursuant to, Public, Resources Code 45097.98. If; during grading, paleontological resources are, During excavation and re m6rfito d during City of Bakersfield discovered, the Project Develop&r/Contiactor grading qctivilies on-site. excavation and d Develodment Services shall stop work - - 911 wo and a qualified paleontologist grading activities on Depqrtmeht. Planning be retained to evaluate )fie significance of Ale, Division. MM 6J-� 4he finding and the, appropriate course of action. The qualified paleontologist shall then be retained to examine earthwork spoils generated from construction activities. 5.10 PUBLIC SERVICES7AND.U711.91ES'_ --f—City MM 5:10 la J With submittal 61 each final .tract -map, the With subrnitt6l of each final, Pre -construction- of Bakersfield proposed developmentshall besevieWed by the tract map. :1 -Development Services r .;%.V Y Ok - MARCH 20 13-29 of 34 MINgallon Monitoring Program -CITY OF-BAKERSFIELD • Stockdole4anich X4 GPA/ZC 09-0263 Annexation No. 548. SCH No. 2009071068 Mitigation M606FIng Tabled Confinue.d Stockdahe. Ranch GPA/ZC 09-0263JAMbxation No. 548, OT Y OC.. 0 GITYp� G) z EM of 34 mitigation Mantloring'Frogram Summaiyof Miiiasiure. Implementation Phone Manitafling Phdse Enforcing Agency Veiiineaffon of Com fiance. Initials. Datel Rdinairks �City of Bakersfield:" Fire Department to. ensure Department, Plonriing beppftent -requirement for •access fre f16w, Division' City ot, hydrants, or other fire and life safety reqUiTements Bakersfield Fire :are adequately addresse& Department. ReferAo SectionS.S. -TRAFFIC AND CIRCULATION, MM5.10-115 for short term construction mitt fl6ii6nmeasures- , -'Refer,to, S60ion' 5.5. -TRAFFIC: AND CIRCULATION, -MM 5.10-2 for short-term constfucl lbrf Mftlgaiionmeasures:. The 'Project Applicant sholl, b6'required t6'pdy Pdot to Issuance of a building Pre-.0nsttuiction. City of Bakersfield Irripoct-based school, fees at the statutory. rate in permill. Development Servicei MM 5.10-3 effect, of lime'. of issuance of building permits, Deportment, Planning in -accordance -ditcbrddhc:6 With Education -Code § I 7620,and Division., Government Code 65995:. Prior 1d' recordation -ofa final map(s), the. Prior 16 finalrecordation of a. Prewconstruction. City of Bakersfield subdivider sholldeollcale land and and/ae pay in-fiew final mop(s). Development Services 'tees for parkland, dedication to the NoWpf the Department,Plonrfing River Re6rdation'and Fork District, i . n compliance DlvNori; North of the Willi do_'ve__MmbnI Code I Section 66477 (Quimby 'River Reciebffon and 'Act). iiakersfidild-Mu'nicipal Code § I'5.'80-(bosed on Pork District. a,parklarkd dedication requirement- of 2.5,-,a . cres per lbob populail6n), and- North of the River MM194a ( I NOR) Recreation and Park District policies and standards. if 'the. number of dwelling units, increases or decreases upon recordafion.oll. a final .rnap(s),* ther.park,land requirement Will change accordingly. Refer to Bok&S1fJ01dM . uni . cippil Code. .. Sheet 15.86 and the Planning lnfarmag6n regarding itdlculatfon and payment of In-ile6 fees. The NOR Recreation and Part Distritt shall provide a certificate stating that this medsure'is satisfied.. --- Prior to - recordation of the first final 'mcip, the, Prior to recordation at the first Fre-construclion. City of Ba-keriFeld subdivider shot[ providd Written proof/verification - final ;no,p- Development Services -MM 5A0-44 frbm,North 61 the River (NOR). 0ecredtion.6fid Pork Deparimerit, Planning District'llhat the proposed Project s ' ite Who ' s been Division; North of the included. - within the! NOR Park Maintenance River Recreation and OT Y OC.. 0 GITYp� G) z EM of 34 mitigation Mantloring'Frogram • CITY OF BAKERSFIELD Stockdale Ranch 6• AA E R_S F' I E L U GPA/ZC 09-0263 / Annexallon No. 548 SCH No. 2009071068 Mitigatlon Monitoring Table, Continued{ Stocktlale Ranch GPA%ZC 09-0263 / Annexation. No. 548 MiHgcflon- Summary of Measure lmplemenlat(on Phase. Monfforing Phase Enforcing Agency Vedliccfion of Com liance Initials Date .Remarks Measure District. Said verification shall be submitted`to the Park Distritt.- City of gakersfield.Plannin Director: Prior to, proposed Project development; the Prior to Project development: Pre -construction. City of Bakersfield Water Project Applicant shall coordinate with the City of Resources Department. MM 5,10-5 Bakersfield Water -Resources. Department in regards to a wi11 serve letter indicating its intention. to,serve'os the water utility, for providing"Water• service:to,the proposed Project. Prior to issuance 6f•any building permit, the Project Prior to issuance of -any Pre-constructlon. City. of Bakersrield Public Applicant. shall submit, for review,. a Construction building permit. Works Department. and Demolition Recycling Plan to the KCWMD. The Recycring Plan. shall include ;o plan to separate MM 5.10-7a recyclable/reusable construction debris_ The Plan shall include the method 'the proposed Project Contractor will use 'to 'haul recyclable materials and shall include the method and location. of material disposal. Prior to issuance of any building permit; the Pioject Prior to issuance of.any Pre -construction. City of Bakersfield MM 5,10 76 Applicant shall provide universal waste collection building permit. Development Services to the proposed Project site along'Wth potential Department, Planning mandatoryco►lection for curbside recycling. Division: Prior .to approval of a •tenlaflve tract map, the Prior to approval of a Pre -construction. City of Bakersfield Project Applicant shall coordinate.with PG&E staff, tentative tract map., Development Services early in the planning stages to ensure that Department, Planning MM il"o 'adequate facilities are incorporated in the Division. proposed Project as soon as possible. In addition, the'Project:Applicant. shall coordinate with PG&E staff prior to consiructlon regarding any potential service of facility issues. All main lines adjacent to the roadways shall be Prior: to recordation, of each Prior to recordation of City of Bakersfield MM 5,10 8b brought to -the ultimate width prior to recordation phase. each phase Development Services of each phase. In addition, ulility.easements shall Department,'BUildng be readily available_ Division_ G%T Y• pp aGITY O M < G) z MARCH 201 13-31 Of 34 MM&Hon MonNodrig Program CITY OF BAKERSFIELD • Stockdold Ranch GPA/ ZC MOM Annekallon No. 548 SCH No. 2009671068 Mitida'H-on-Mo.rfito.dno..Tobli--#- Continued Sfodkdald Ranch GPA/ZC- 09-0263 1 Annexaffion, No. 5413 MNigallon Measue :Sunnay of Measure Implementation Phuse .,M06ing Phase, Enforcing Agency cy Medftaffon of Com(lance InIffols - 'Date! Remarks Prior'to issuance of -grading permits, a.Storm Water v- I the Prior 16 dpoido. of , aAeintcitivei'tract rindp, Prior to approval of a Prior toapprovalof-0 Ci of Bakersfield MM 5.1 Z 1 Ian 1(SW0P),WhIch includes. Pollution Prevention Plan Project Aopric ant shall coordinate with PG&E staff tentative tract map. tentative tract mop. Developmeht.Servides erosion .control measures In order to. comply with early 'in the . planning Mages to ensure that Individual tentative Departn'3ent; Building Department" Planning the National Pollution Discharge Elimination System adequate facilities are incorporated Jn the Division. Division. MM 5.11=1b I (1413DES) requiremenh of the Federal Cledn-Waler proposed Project as soon as possibid. In addition,. Act, shall be obtained. Temporary; c6hitruelion- the Project '-_App!icant.,shcill coordinate wilhTGM idlaied and permanent erosion control measures, sthff,pfl6f.,1.o bdristruction',regarding dny'potential. may . include ,but not be limited to the use of service,otlocifity Issues. --- -�I� A MM'5.11=1a Refer to Mitigbfion Measures. In 511 AIR' QUALITY. Prior to'submittal of, prior to iubmittal, at 7 7CjtV of Bakersfield Public - Prior'to issuance of -grading permits, a.Storm Water Prior to Issuance of grading Pre-cobstruction, .-.City of,Bakcirsfield MM 5.1 Z 1 Ian 1(SW0P),WhIch includes. Pollution Prevention Plan permits, each phase or Development Services erosion .control measures In order to. comply with tract-map. Individual tentative Departn'3ent; Building the National Pollution Discharge Elimination System Division. MM 5.11=1b I (1413DES) requiremenh of the Federal Cledn-Waler Act, shall be obtained. Temporary; c6hitruelion- idlaied and permanent erosion control measures, may . include ,but not be limited to the use of sdndbd' hyd" s" ing;landscaping;and/or soil stabililiers..' Engineering design for,all- future, structures shall bd Prior to submittal of a finial Prior to submittal of a rsf .'Cilypf Sake ield based on the that the proposed map, final map.- pevel'opment Services ,probabilityI Project Will be *subjected to strong ground motion, Ddportrildnt, Building during the lifetime of development. Future ftjed, Division. MM 5.1 F-3 'development plans shall. be subject to the Bakersfield Municipal :Code and shall include standards that address seismic design parameters: Selsriiicground shaking shall be incorporated into design and construction in accordance With the , CK're4uliements and site-speclific des[ qn.' L in SIT Y49 0 0,11 7 � F1 z 13:.-32 of 34 Mittgation Phot to submittal 'of impiovembnt plans for,,e . ach Prior to'submittal of, prior to iubmittal, at 7 7CjtV of Bakersfield Public - phase or, individual tentative tractOnap; -the Improvernentplanifor e6ch- . Improvement` lans for Works Department; MM 5.1 Z 1 sholl.orovide a drainage- Project A plic nt- study In. p , a phasebr individual fdht alive , each phase or conformance with City of Bakersfield - ddslnn tract-map. Individual tentative SIT Y49 0 0,11 7 � F1 z 13:.-32 of 34 Mittgation d&b# BAORSiF1ELD stockd - W Ranch dpA/ZC-04-0263 / AnnezaHon No. 3416, s w ,IK E R 5' F l 'E `�' D• WH -Nb. 2007071068 Mitigf5iion'.Moniforing Ttabie;Continued . Slockdale Rcdnch. GRA/Zc 0q-10263 / •Annexaiflon N6.548 Mitigation of itAeasure 1mplementallon Phase Monitoring Phase Enfordng Agency Veriflcallon of Corn Dance Measure .burriniary = _- - - <lpltials- Date, ,: Remarks . guidelines; which shall include, l5ut'nof be limned tract map_ to the aoliowirig 'requirements: Fufureon-site roadways shall -be designed to pecommodate adequaie flow capacity; . Appropriate. • minimum: star ' in. pipe •size diameter shall 'be specified" by the. .City ' Engineer; and; i Sfnnndrgin:low• velocity limitations shall b' specified by the City Engineer'.. - Prior to approvo{ of Individual .development: . Prior toapproval of individual ' ._ .. Prior to a,pptoval oi' �Clty of Bakersfield public � ' - projects by the birector'of Public.Works or•'hls/her deve_ lopment projects. individual development Works:Department.. deslgnee, the Project Appijcdni shailconfirm !hat.• projects. the, proposedProjecf'plans..stipulate that prior to, 2 3 MM 5.1a issuance of.'any grading permits, 'Ihe Project' Applicant shall file a Notice 61' Intent (NQI) dnd' pay the appropriate fees, pursuant• to the. NODES, 1 program: Prior to grading plan approval. the Project'' Prior to grading plan Prior to grading.plan City of Bokersfeld Pu6Gc Contactors shall incorporate stormwaier pollution oppr6val: opprovat, Works Department! control measures info 6 Storm. Water Pollution Prevention, Plan '(SWPPP);. Best Management Practicer• (BMPs) - ihdll be''Jrnptemented; . and. MK5:12-3b: ev'�derSce that proper, clearances: have" beem obtained :through the State. Water- Resources Control Boord'' (SWRCB), including coverag&. undei the Notional.Ppilutoni Discharge. Elimination System (NODES). statewide General Stormwalei Permit for Constiuction'ActTvities. _ to.fract recordation; the'Proje-ct Applicant of-, Prior to ir6ct recordatlon, 'Prior to trdcf CiI'y of eakersfield'Pubflc future:prajecls shall prevent..any'otP site' impacts' recordation: Works Deportment: MM 6.123c during the construction phrase. Erosion control .p6or measures -and temporarybasins for desiMillon ' and detention'Shall, be `in lace, as approved b - - _!',',T,Y pc� - OGIT Y pF ,_o 33G)x G) v `z . z !:�6 F111,f9L7YM ARCH 2010 tof 34' LJTV Of BAKERSFIEW Stdckddle Ranch GPA/ZC 09-0263 1, Annexation No. 548 I A K E it .S IF, I E -u -.n SCH No. 2009071068 MWIOqUon MdModrigiTableXonflhued stockiidie*6lqh G PA/ZC 0.0263- / Annexation No- 548, MINgotl6n Iummo ry of measure lintatlon Phase ImplemL 'Monoodrig Phase, Inforcing,Aggincy VI&IFIC of-Cbmptlance InIffaft, I'Date, 1, Remarks Measure MM 5:14=3a ImiDlenient WitigcirionMeasures SZ-.Itond.5.,3=-In. the Director of Rublic Works. The basinsand'' - Prior fo c6ndriiLtion. dlbabandoned_oll,wells-shall, Prior to C.OnS.trucfi6n;, Pre construction: 'L-ity0frBakersfield btosio'n:control ,measures shall be shoWn-'6nd be located and ; e-xpos6d for 'inspection and specified :-h the grading plans and shall be P lbakag e testing.. Proof of . proper constricted to jh6 salisfb6fioh of the Director Of Department. Planning MM 5.14-3b ,abandonment shall be obtained fto*'M' DOGGR' Said proof, shall Public wq*s prior to the,'slarl',of anyoffier'gr6ding. Division; Division of Oil, t t6e.� be submitted. 0 Planning, Director prior to bas;:dnd Geothermal 5A4; MINERAL MOURL;= - MM 5:14=3a ImiDlenient WitigcirionMeasures SZ-.Itond.5.,3=-In. Prior fo c6ndriiLtion. dlbabandoned_oll,wells-shall, Prior to C.OnS.trucfi6n;, Pre construction: 'L-ity0frBakersfield be located and ; e-xpos6d for 'inspection and Development Services lbakag e testing.. Proof of . proper Department. Planning MM 5.14-3b ,abandonment shall be obtained fto*'M' DOGGR' Said proof, shall Division; Division of Oil, t t6e.� be submitted. 0 Planning, Director prior to bas;:dnd Geothermal i6ccirddlian of final mC12s;' Resources... Abandorfed 'oil wells shall be surveyed. and accuic )tely plotted on all future maps related to MM 5,14-3c the proposed Project :with d fern -foot no -build . radius. A legible copy. of a map showing. final Prolect defign shall be submitted 16 the DOGGR.- Prior 'io� tract recofdafion,',DOGGR shall - I*-' :led, to obtain 'Ifif6rmiatio'n .on 'the contacted, reauirements for and approval -to: perform MM 5,14-3d temedldl plugging operations if any other abandoned -or unrecorded wellt are uncovered.or darns ed durinq excavation of gradinn. - "prior to, ,tract recordation, the - onLft,obondoned 'examined' oil'well,- KCLG #1. shag' be for MM 5:14-3e cont6minaled,sojils. if such soils exist, the soilwill be leealed, in 'place with best ovailobl& technology. or ca ed in: lace. ,mo:/S:/GPA/GPA 2n9 2010/09-0263.Sloc.kdale Ranch/Res_Ord./Exhlbit D_Miligotion Monitoring Pi.ogram GITYO _11 � GkI Y OA; z d) > ,Gig\ 201 13-34 of 34 Monitoring Program 1800 30th Street, Snite 360 Br-enficld, California 93301' Phone (661) 327-19651" Fax (661) 37-.19,93 1 �1llic I " 101 DI June 10, 2021 454-16 Electronic. Mail Brad'DeBranch Bolthouse Properties,, LLC 11601 Bolihouse Drive, Suite 200 Bakersfield, CA 93311 REF: Trip Generation'Evaluation for Proposed Zone Change-(ZC) for Stockdale Ranch Dear Mr. DeBranch: .This letter is in response to your, request for a trip generation analysis for a proposed Zone change at the above referenced, location. The zone change includes. two separate uses. Following is.a summary of the proposed change: 22' acre park -site. Existing zoning is OS -P. Proposed -zoning is RE. The revised zoning will allow for: organized sports events on four separate fields on approximately 14 acres. The remaining 8 acres will, operate as a typical neighborhood park. 5 acre church .site. Existing zoning is R-2. Proposed zoning is R=2 with a Church Overlay. Te.church building will be. approximately 14,500 square feet in.size: The'site will also include a private elementary school associated with the church. It is anticipated that the school will serve approximately 60 students. The trip generation analysis will assess whether. there will be potential traffic impacts due to the proposed .ZC. A comparison of the approved trip .generation �fiom the Traffic Impact Study for Stockdale,­Ranch, prepared by Mcintosh & Associates, June 2009, Revised September 2009 to the trip .generation with the proposed zone change uses willbe prepared. According to City of Bakersfield traffic study requirements, the threshold for requiring'a traffic study, due to potential traffic impacts is .if the proposed revised zoning would increase vehicle trips by more than 50 trips in the PM peak hour. Trip Generation Evaluation A calculation of the trip generation for the existing and proposed conditions was prepared and is shown in Tables 1 and. 2. It is noted that. the approved trip generation was calculated using the Institute°,OFTransportation Engineers (ITE) Trip Generation, 9th Edition. In order to compare to the proposed zone change use; the, trip. generation for the approved uses was -calculated using the current' I Wh Edition. It is noted that the 10t1 Edition gives a smaller trip -generation and is therefore more conservative and will give a more accurate comparison. The approved trip generation is shown in Table 1. O��AK�9c1' 90RIGINAL� Mr. DeBranch June 10, 2021 Table 1 Approved Trip Generation 454-1.6 General .InfotmaIion Daily Trips AM Peak Hour Trips PM Pcak- Hour Trips ITE Dvelopmcrit Variable Rine ADT Rate In Out Rule In Out Code Type 9osplit/ 96 split/ 4o split/ 96 Split/ Trips Trips Trips Trips 210 single -Family ddachW 1455 eq 12,212 eq 25% 755a eq 63% 37% Housing Dwelling Units 259 778 837 491 220 Multifamily Housing 2128 cq 16,047 eq 2396 77% eq 6390 37°,o (Low Rise) 1XVIling Units 200 671 566 332 710 General Office Building 665:2 eq 6,668 eq 86% 1495 eq 1690 8496 1000 sq ft GFA 561 91 110 579 820 Shopping Center 276:5 eq 12.005 eq 6290 38% cq. 4896 5290 1000 s ft GLA IBO 110 553 600 Total 46.932 1200 1;650 2.067 2.002 As: Stockdale.Ranch has been developed, the number of dwelling units. that have been recorded has been less than what was approved. The proposed trip generation is shown in Table 2 reflects the current number of recorded lots .and approved projects (multi -family), and the maximum density of units that are still available to develop. The retail and office land uses remain the same. For the proposed zone change ITE codes were used to calculate the anticipated trip generation. For the 14 acre park site with proposed organized sports fields, ITE code 460 (Soccer Complex) was used. Although this may not be all soccer fields, the trips generated appear to reflect the trips that would be expected for other sports (baseball, softbafl, football, etc.). and are therefore representative of whichever sport field is ultimately built. o�gAKF,ps rn r— 'ORIGINO Mr..DeBranch June 10; 2021 Table 2 Proposed Trip Generation 454-16 General Information Daily Trips AM -Ped. Hour Trips" P%I P4rik Hour Trips ITE Mwelopment Variable Rate ADT Rate In Out Rate In Out Code Type Proposed . %Split/ 46Splitl 34,125 9u Split/ 90 Splid Difference -12,807 -651 Trips Trips Trips Trips 210 Single -Family detached 1497 eq 12;536 cq 2590 759"a eq 63% 37^.0 Housing MtIliris Units 1 1 267 801 860 505 220 hlultil'amily Housing 31'2 eq 2,318 eq 234o 779'6 eq 63% 3740 (Low IRise) [hvellina Units 32 108 102 60 411 Public Park 8 eq 94 0.02 59% 419'6 eq 55% 4546 Acres 0 0 13 10 460 Soccer Complex 4 71.33 285 0,99 619'6 39% eq. 669; 34% Fields 2 2 60 31 560 Church 14:5 eq 106 eq 5040 4096 eq 45% 55% 1000 sq It GFA 3 2 4 5 520 Elementary School 60 1.89 .113 0.67 54% 46% 0.34 45% 5590 Church School Students 22 18 9 11 710 General OtTice Building 665:2 eq 6,668 eq 86% 14% eq 169'6 8440 1000 s R,CIFA 561 1 91 1 110 579 820 Shopping Center 276.5 eq 12,OD5 eq 6290 1 389'6 ey 48% 52% 1000 sq 11 GLA 180 110 554 600 Total 34,125 1067 1,132 1 1,712 1,801 Table 3 below shows. the difference in the approved trip generation and the proposed trip generation.due to the'proposed zone change. Table 3 Trip Generation Comparison > m � r— OORIGINAL Toml-Traffic Scenario . ADT ANM-PHm Approved 46,932 2350 Table I Proposed Table 2 34,125 2199 Difference -12,807 -651 > m � r— OORIGINAL Mr. DeBranch'. June 10, 2021. Sumnrizo 454-16 As shown .in Table 3, the trip generation for the proposed zoning, with the: modified number of dwelling units is lower than the originally approved trip generation volumes: The threshold for requiring a traffic study is an increase of 50 trips -in the peak hour: Due. to the, proposed volume of trips being' less .than, approved, the proposed zone change -is assumed to :have a less than significant traffic impact. Please_ contact me should you have any questions. Very truly yours, Ian'J..ParkstW' rtOX581ss RCE.#58155 Exp. 8,40.22 4. �gAKF9 m r OORIGINO AFFIDAVIT OF POSTING DOCUMENTS STATE OF CALIFORNIA) ) ss. County of Kern ) JULIE DRIMAKIS, being duly sworn, deposes and says: That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield; and that on the 8th day of October, 2021 she posted on the Bulletin Board at City Hall, a full, true and correct copy of the following: Ordinance No. 5065, passed by the Bakersfield City Council at a meeting held on the 6T" day of October, 2021 and entitled: AN ORDINANCE OF THE BAKERSFIELD CITY COUNCIL APPROVING AN AMENDMENT TO TITLE 17 OF THE BAKERSFIELD MUNICIPAL CODE TO CHANGE THE ZONE DISTRICT LOCATED WEST AND SOUTH OF THE INTERSECTION OF SOUTH HEATH ROAD AND STOCKDALE RANCH DRIVE IN SOUTHWEST BAKERSFIELD (ZC NO. 21-0084) JULIE DRIMAKIS, MMC City Clerk and Ex Officio of the Council of the City of Bakersfield By:00�7� DE TY_City Clerk SADOCUMENT\FORMSWOP.ORD.wpd