Loading...
HomeMy WebLinkAboutCUPA REPORT2021_10_13BAKERSFIELD FIRE DEPARTMENT Underground Storage Tank Program Prevention Services Division 2101 H Street DW Inspection Re Bakersfield, CA 93301 Permission to 1nspect:PALA'Q--' a,.-A-���hone: 661-326-3979 Fax: 661-852-2171 Business Name: CIRCLE K STORE 2708605 Date: 10/13/2021 Address Name: 5600 AUBURN ST BAKERSFIELD, CA 93306 15-021-003380 / CAL00027851 0 Inspector Name: Peter Armagost #8856813 Inspection Type: Routine Report : Final NVO - No Violation Observed OUT = Out of Compliance NA = Not Applicable UD = Undetermined COS . Corrected On Site RPT - Repeat Violation 0' ;o Violation' ,� o araM'Keaui ement SOC C ent omm s Cl) N 0 =Y 0 a. zx 0Z�' ❑> File Review Facility Tank Information 2030021 Facility has a valid Permit Tank 1 -10000 -DW -REG to Operate from the F-1 M F-1 M None Tank 2- 10000 -DW -PRM CUPA - 23 CCR 16 2712(1); Tank 3- 10000 -DW -PRM HSC 6.7 25284 2010010 UST Operating Permit Application for Facility information and Tank information N M F-1 M 1-1 F-1 None submitted/maintained - 23 CCR 16 2711; HSC 6.7 25286(a) 2010001 Current BOE number submitted to the CUPA M F-1 F1 1-1 1-1 F-1 None and/or CERS -HSC 6.7 25286(g) 2030011 UST compliance statement and/or Designated Operator N F-1 F-1 F-1 F-1 F-1 None current certification submitted - 23 CCR 16 2715(a), 2715(b) 2030046 A complete and accurate response plan has been submitted, approved and N � n F-1 n n None maintained - 23 CCR 16 2632, 2634(e), 2641(h), 2712 ()1 2030041 A complete and accurate plot plan has been submitted, approved and Minor maintained - 23 CCR 16 2632(o)(1)(C), 2711(a)(8) 2010006 Owner/Operator has not made false statements or representation on any n F-1 n M F-1 None required document -HSC 6.725299 2010003 Owner/Operator has a DO and/or informed the CUPA of any change (s) None within 30 days - 23 CCR 76 2715(a) 0... Violation 'R t SOC a 6, P equir men:. _01 Comments 01 A 0; ;- L o 0' Testing 2030002 Owner/Operator has tested and certified leak F] F-1 D R R None detection equipment annually - 23 CCR 16 2638 2030048 Secondary containment testing conducted every 36 months in accordance None with requirements - 23 CCR 16 2637 2030055 Spill buckets have been tested annually as R F] R R R None required -HSC 6.7 25284.2 2010009 Secondary containment test results submitted to the CUPA within 30 days R F1 R F] None after the test - 23 CCR 16 2637(e) 2030064 CUPA was poperly notified within the prescribed number of None hours prior to testing - 23 CCR 16 2637(o, 2638(e), 2643(g), 2644.1(a)(4) Install/Repair 2060009 Permits obtained to install, replace, repair, or None modify part of the UST system - 23 CCR 16 2712 UST System Observation General Monitoring 2030003 Leak detection system maintains continuous RD monitoring that activates None R an audible and visual Yes alarm - 23 CCR 16 2632, 2634, 2636, 2666 2030016 The annular space of the tank, piping and sumps are continuously RD monitored and activates R None F1 the alarm - 23 CCR 16 Yes 2631(g), 2632(c)(2)(A)&(8), 2633(c), 2636M 2030017 Product piping outside the UDC is fail-safe and shuts down the pump or None restricts flow - 23 CCR 16 2636( 0(5) 2030018 Turbine sump monitor activates an audible and RD visual alarm or stops the M F-1 El F-1 F-1 ❑ None F-1 flow of at the dispenser - Yes 23 CCR 16 2636 (0(1) Underground Storage Tank Program - DW Inspection Report v 2.0 S K VAAtl6h Pe6dram A6' aW ireme 0 ©tC Comments 4) - Cn O W Z 2030019 Monitoring system in the UDCs activates an audible and visual alarm HnJ M 1-1 1-1 F-1 M None or stops the flow at the UDC -23 CCR 16 2636zr%(l) (r) 2030043 Leak detection equipment properly programmed or RD properly operated - 23 N F-1 F-1 M M M None R CCR 16 26321 2634) 2636) Yes 2666 2060005 System constructed with a monitoring system capable of detecting entry None into secondary containment -HSC 6.7 25291(p) 2060014 Correct leak detection equipment installed for RD the type of system None R present - 23 CCR 16 26381, Yes HSC 6.7 25290. 1, 25290.21 25291 2060015 Sensor located in the RD proper position/location - R R None F] 23 CCR 16 2630(d), 2641(a) Yes 2030062 Facility is in compliance with not tampering with or RD disabling leak detection None ❑ devices or alarms -HSC Yes 6.7 25299(a)(9) 2060022 System constructed with a monitoring system capable of detecting entry M F-1 F-1 F-1 R R None into secondary containment -HSC 6.7 25290.2(d) 2030034 Tag/sticker on affixed monitoring equipment being certified, repaired, [Z R None or replaced - 23 CCR 16 2638(o VPH Monitoring VPH 2030065 Interstitial monitoring of the annular spaces of the RD UST is properly None ❑ maintained -HSC 6.7 Yes 25290.1 (e) 2060023 System constructed with a monitoring system capable of detecting entry into secondary R F1 N R 1:1 R None containment -HSC 6.7 25290.1(d) Underground Storage Tank Program - DW Inspection Report v 2.0 violation - "' Requirement - .., Program 0 SOC Commen s No o � Lm 0- Z Z � Line Leak Detector 2060012 Line leak detector installed on pressurized RD piping system -HSC 6.7 r-1 F1 M F� F� None ❑F� 25290. 1 (h), 25290.2(c), 2 529 1 (Itc), 25292(e), Yes 2636(o W/n I 2030026 Line leak detectors detect a 3 gph leak and/or RD audible and visual alarm F-1 F-1 N F-1 F-1 F-1 None F-1 function properly - 23 CCR 16 2636(0(6), Yes 2666(c) 2030027 Turbine shuts down when a leak is detected or RD when line leak detector is ❑ F] 0 F-1 F1 F1 None F-1 disconnected - 23 CCR 16 Yes 2666(c 2030025 Pressurized piping able to detect a 3.0 gph leak RD within an hour, and F-1 F-1 H � F-1 F] None R restricts the flow or Yes alarms - 23 CCR 16 2636 (0(2) Secondary Containment 2060010 UST storing a hazardous RD substance has secondary Z F-1 F-1 � � F-1 None F-1 containment -HSC 6.7 Yes 25292 Underground Storage Tank Program - DW Inspection Report v 2.0 Overfill 2030035 UST system is operated to prevent unauthorized RP release, including spills 1:1 ❑ F-1 F-1 M None M and overfills -HSC 6.7 Yes 25292.1 (a) 2030036 Overfill prevention system has not been overridden RP and meets overfill 1-1 F-1 F] F-1 F-1 None ❑ requirements - 23 CCR 16 Yes 2635(b)(2), 2665 Underground Storage Tank Program - DW Inspection Report v 2.0 0 remen, gra m�'. eaufi�'a ion Pro SOC 'Comments, 0 No� 0 0 On Site Records Certifications 2030023 Required designated operators or contractors maintain a proper and 1-1 F-1 F-1 ❑ F-1 None current ICC certification - 23 CCR 16 2715 2030024 Service technician installer, and/ or employee maintain a 0 F-1 F-1 F1 R R None proper license - 23 CCR 162715 2030031 Employee or contractor obtained and maintained proper manufacturer R F] R R None certification - 23 CCR 16 2715 2010007 Submit/maintain current Certificate of Financial Responsibility/mechanism of financial assurance -None � � � � � ❑ 23 CCR 16 2711; 23 CCR 18 2808.111 2809-2809.2)* HSC 6.7 25292.2; HSC 6.75 25299.30-25299.34 Designated Operator 2010004 Copies of DO inspections for last 12 months and list of trained employees None maintained - 23 CCR 16 2715 2030013 Designated operator properly conducted the monthly inspection and None the reports are complete - 23 CCR 16 2715 2030010 DO notified operator of any condition observed during the monthly None inspection that may require action - 23 CCR 16 2 715 (tl) 2030012 DO employee training performed, current for at least one employee on None site, and a log kept - 23 CCR 16 2715(c)(6), 2715(o Underground Storage Tank Program - DW Inspection Report v 2.0 g 2030001 Leak detection alarm Permit Condition/Approval 2030039 Compliance with all operating permit conditions - 23 CCR 16 2712; HSC 6.7 25299 2030059 UST system maintained in accordance with exclusion/exemption status - HSC 6.7 25281.6, 25283.5 2030014 Owner/Operator received approval and has implemented a training program at an unstaffed facility - 23 CCR 16 2715 (0(2) 2030015 Facility exhibited that the method used to monitor the tank meets the monitoring methods in 2643(f) - 23 CCR 16 2643 General Operating Requirements logs, maintenance and F -I F -I 1-1 F -I F -I None RD 1-1 M records of appropriate N � n � n n None n None M follow-up actions F -I 1-1 F -I F -I None Yes maintained - 23 CCR 16 26321 2634, 2712(b) Maintenance/Tests 2010008 Monitoring, maintenance, repairs, linings, and RD upgrade records None n maintained for the proper Yes time period - 23 CCR 16 2712(b) Documentation 2030033 Failure to maintain on site an approved monitoring None plan - 23 CCR 16 2632, 2634, 2711) 2712(1) 2030037 Written agreement between the tank owner and tank operator to monitor the tank system F -I F -I ❑ F -I F -I None is maintained - 23 CCR 16 2620(b); HSC 6.7 25284(a)(3) 2030061 Suspected or actual unauthorized release RD reported in appropriate None ❑ time frame -HSC 6.7 Yes 29294,29295 Permit Condition/Approval 2030039 Compliance with all operating permit conditions - 23 CCR 16 2712; HSC 6.7 25299 2030059 UST system maintained in accordance with exclusion/exemption status - HSC 6.7 25281.6, 25283.5 2030014 Owner/Operator received approval and has implemented a training program at an unstaffed facility - 23 CCR 16 2715 (0(2) 2030015 Facility exhibited that the method used to monitor the tank meets the monitoring methods in 2643(f) - 23 CCR 16 2643 General Operating Requirements Underground Storage Tank Program - DW Inspection Report M F -I F -I 1-1 F -I F -I None ❑ 1-1 M M ❑ None 1:1 F -I Z F -I F -I F -I None M F -I F -I 1-1 F -I F -I None Underground Storage Tank Program - DW Inspection Report 2030045 Red Tag information is legible and has not been tampered with - 23 CCR 16 2777.1 (g) 2030044 Facility did not allow for deposit of petroleum into a UST that has a red tag affixed to the fill - 23 CCR 16 2717.1 Install/Repair 2060024 UST system is made of or lined with materials that are compatible with the substance stored - 23 CCR 16 2631.1 2060021 Striker plate installed and positioned correctly - 23 CCR 16 2631(c), 2662(d)_ F-1 F-1 H F-1 ❑ F-1 None ❑ F] M F-1 D F1 None M F-1 ❑ F] ❑ F-1 None D F-1 F-1 F-1 ❑ None ❑There were no violations noted for this inspection. Y]This report shall serve as a "NOTICE TO COMPLY" for Minor Violations, and a "NOTICE OF VIOLATION" for Major violations. You are, hereby, ordered to correct the above noted violations within 30 days, or according to correction summaries provided. Formal enforcement and/or penalty assessment may be initiated for any violations noted, and for those noUcorrected in a timely manner. (NOTE: If this is a preliminary report, a final report will follow.) Inspectors Signature: Date: Inspector: Enter # of Violations: RD: RP: Check one box for facility Significant Operational Status (SOC) to be reported to SWRCB and US EPA: F-1 SOC with both Release Detection and Release Detection (Facility has no Release Prevention and no Release Prevention Violations) ❑ Not in SOC (Facility has both Release Prevention and Release Detection Violations) ❑SOC with Release Detection only (Facility has no Release Detection violations but one or more Release Prevention violations) FISOC with Release Prevention only (Facility has no Release Prevention violations but one or more Release Detection violations) Underground Storage Tank Program - DW Inspection Report v 2.0