HomeMy WebLinkAboutRES NO 203-2021RESOLUTION NO_ 9 A Z- a 0 21 -
RESOLUTION DETERMINING THAT THE GREASE
STORAGE TANK REQUIRED FOR
COMMERCIAL GREASE STORAGE LOCATED
AT WASTEWATER TREATMENT PLANT NO_ 2
CANNOT BE REASONABLY I>BTAINED
THROUGH THE USUAL BIDDING PROCEDURES
BECAUSE OF THE NECESSITY TO INTEGRATE
WITH EXISTING EQUIPMENT AND
AUTHORIZING THE FINANCE DIRECTOR TO
DISPENSE WITH BIDDING THEREFOR, NOT TO
EXCEED $75,000_
WHEREAS, the Wastewater C)Msion operates and maintains two grease receiving
stations that receive grease from permitted commercial haulers; and
WHEREAS, each station hos one grease storage tank that is used to store grease
and maintain grease at a required temperature: and
WHEREAS_ the existing grease storage tank located at Wastewater Treatment Plant
No_ 2 (Plant 2) has experienced critical failure and is in need of replacement: and
WHEREAS, the existing grease storage tank at Plant 2 manufactured by Poly
Processing Company; and
WHEREAS, Core -Rasion Products is the sole representative for Poly Processing
Company storage tanks, os stated in the letter, attached hereto os Exhibit A and
incorporated by reference herein; and
WHEREAS, Core -Rasion Products has submitted o quote for o like for like
replacement of the grease storage tank, attached hereto as Exhibit B and incorporated
by reference herein; and
WHEREAS, the Public Works Director recommends the Council find the purchase of
the grease storage tank at Plant 2 con only be reasonably obtained from Core -Rasion
Products, because of the need to integrate with existing equipment and infrastructure,
and recommend the Council dispense with bidding requirements, in coccordance with
subsection E)_2 of Section 3.20.060 of the Bakersfield Municipal Code_
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield os
follows:
1 _ The above recitals ore true and correct and incorporated herein by reference_
2- Based on the facts included in the above recitals, the purchase of the required
grease storage tank can only be reasonably obtained from Core -Rasion
OA KFS
S:\Plant 2\Contracts\Core-Rasion Products\Council Meeting 11-3-202'1\Resolution.docx �F ��
Page 1 of 2 - !
`�ORIGINAA
Products, because of the need to integrate with existing equipment and
infrastructure.
3. The expenditure of funds for the required grease storage tank shall not exceed
Seventy -Five Thousand Dollars ($75,000).
4. The Finance Director is authorized to dispense with bidding in accordance with
Section 3.20.060 of the Bakersfield Municipal Code.
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the
Council of the City of Bakersfield at a regular meeting thereof held on
NOV 3 2021 by the following vote:
�^ Z V✓ ✓ W___COUNCILMEMBER ARIAS, GONZALES, W IR,xjMTrFI`, FREEMAN, GRAY, PARLIER
S: COUNCILMEMBER
ABSTAIN: COUNCILMEMBER
COUNCILMEMBER %KrtNrl
JUME DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
NOV - 12021
APPROVED:
By:
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
6By: G��
J SHUA RUDNICK
D puty City Attorney II
S:\Plant 2\Contracts\Core-Rosion Products\Council Meeting 11-3-2021\Resolution.docx
Page 2 of 2
T
> m
'ORIGINP2
14k/
Core-Rosion
PRODUCTS
October 13, 2021
Husain Ali
City of Bakersfield
1700 East Planz Road
Bakersfield, CA 93307
661-326-3213
hali@bakersfieldcitv.us
Reference: Sole Source Letter
To Whom It May Concern:
a
This letter is to advise that Core-Rosion Products is the exclusive representatives for Poly Processing
Company for tanks being supplied in the city of Bakersfield and the quoted tank is a direct in-kind
replacement.
I look forward to working with you on your project. Please call when I can provide you with any additional
or more detailed information.
Sincerely,
A fu&.44
Aaron Ireland, Account Manager
Core-Rosion Products
irelanda@core-rosion.com
3300 E. 19`h Street I Signal Hill, CA 90755 1 855.998.7345 1 www. www.core-rosion.com
A, K4
'ORIGINA,!_"
V4 0
1
Core-Rosion
PRODUCTS
Tuesday, October 05, 2021
Husain Ali
City of Bakersfield
1700 East Planz Road
Bakersfield, CA 93307
661-326-3213 FAX
hali(aD-bakersfieldcity.us
Reference: 12,150 Gallon Replacment FOG Tank
Quotation #8PP151 Q1
Dear Husain:
As per your recent request, I am pleased to submit for your review and evaluation the following
proposal to supply a replacment FOG tank.
I truly appreciate this opportunity to quote to your tank requirements and look forward to working with
you on this project. Please call when I can provide you with any additional or more detailed
information.
Sincerely,
AmLw- WA44
Aaron Ireland, Account Manager
Core-Rosion Products
irelanda(aD-core-rosion.com
3300 E. 19"' Street — Signal Hill, CA 90755 — 562-986-5238 — www.core-rosion.com
o"�AK6hLIP,
in
'ORIGINO
Husain Ali
City of Bakersfield
Quotation #8PP151Q1
October 5, 2021
Page 2
12,150 GALLON REPLACEMENT FOG TANK
Tank Saecifications
AACRP12150SW
12'-0" x 17'-0"
HDXLPE
FOG
1.35
100°F
Poly Processing Co.
12,150 Gallons
Flat Bottom Dome T
White
24" with Safe Surci,
100°F
Stockton, CA
%..onneciivns
Function
Size Connection Material Gasket Hardware Location Miscellaneous
Fill
6"
Flange
PVC
EPDM
--
Top
Outlet (4)
6"
Flange
SS
EPDM
316SS
Sidewall
w/ Flexible
Connection
Mixing Pipe
6"
Flange
PVC
EPDM
--
TDC
Level
Sensor
4"
Flange
PVC
EPDM
--
Top
Vent
8"
n/a
HDPE
n/a
GRP
Top
Accessories
• 24" FRP Side Manway Assembly
Temperature Maintenance System
• 60°F temerature maintenance system with 2" polyurethane foam insulation with acrylic sealer
Pricing
• Tank and Accessories as Detailed Above $53,926
• Estimated Freight to Jobsite $3,100
Options
• Outdoor Seismic Restraint System $2,500
• Wet Stamped Seismic Design Calculations $1,200
• FRP Ladder w/ Mounting Bracket $2,745
NOTES & EXCEPTIONS
• A new ladder and seismic restraint system have been quoted as options in case existing ones will
not be reused.
3300 E. 19" Street —Signal Hill, CA 90755 — 562-986-5238 — www.core-rosion.com
` 0RIGINAIa
Husain Ali
City of Bakersfield
Quotation #8PP151Q1
October 5, 2021
Page 3
TERMS & CONDITIONS
Drawings 7 — 10 days ARO
Shipment 8 - 12 weeks ARAD (based on current shop loading)
Manufacturer's Linked in quotation
Warranty
FOB Point
Factory
Prices Effective
30 days
Freight
Not included unless otherwise indicated
Sales Tax
Not included unless otherwise indicated
Sales Tax
Will be billed at the rate in effect at the time of shipment
Sales Tax
Will be charged unless a resale card is on file (CA shipments
Freight Billing
Terms
Delayed Shipment
Damaged Freight
Crating / Special
Handling
Credit Card Payment
Off -Loading /
Installation
Lateral Restraint
System
Anchor Bolts
Missing Parts
Ladder Design
Vessel Dimensions
Seismic Angle Clips
Disclosure
Cancellation Charges
Preliminary Notice
only)
To be by purchaser specified at time of order placement
25% with order, balance net 20 days after shipment - OAC
Invoice due N20 at time of readiness to ship — storage fees may
apply
Must be noted on the freight bill to establish liability
Will be invoiced at cost + 10% handling fee
Visa / MC / Amex accepted + 3% convenience fee added
By others
Wet stamped calculations are required to verify regulations
conformance
Not included unless otherwise indicated
Claims must be made within 30 days of delivery
Ladder height is based on footings at tank floor level
Stated dimensions are the OD of the shell and height of dome
Distance from tank shell must comply with drawings provided
Items not specifically identified within proposal are not included
25% Deposit / 50% After Submittals / 100% After Approval
Standard procedure when equipment is purchased for resale
ORDERING INSTRUCTIONS
Core-Rosion Products
3300 E. 19th Street
Signal Hill, CA 90755
(562) 986-5238 FAX 986-5246
Attention: Aaron Ireland
irelanda core-rosion.com
3300 E. 19'h Street — Signal Hill, CA 90755 — 562-986-5238 — www.core-rosion.com
s
'ORIGIN