Loading...
HomeMy WebLinkAboutOPI 2021 Appendix IX Underground Storage Tank Overfill Prevention Equipment Inspection Report Form CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, OPE = Overfill Prevention Equipment Page 1 of 2 TYPE OF ACTION ☐ Installation ☐ Repair ☒ 36 Month 1. FACILITY INFORMATION CERS ID 10022869 Inspection Date 10/13/2021 Facility Name Circle k Facility Address 5634 Stine rd City Bakersfield ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Inspection B&T SERVICE STATION CONTRACTORS Phone (805)929-8944 Mailing Address 630 S. FRONTAGE RD NIPOMO Service Technician Performing Inspection RICK BINGER Contractor/Tank Tester License Number 902034 ICC Number 8452629 Expiration Date 03/30/2023 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date OPW 1192309 07/02/2023 4. INSPECTION PROCEDURES INFORMATION Inspection Procedures Used Components Inspected RP1200 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING INSPECTION I hereby certify that the OPE was inspected in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.2; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 10/13/2021 Total # of Pages Underground Storage Tank Overfill Prevention Equipment Inspection Report Additional copies of this page may be attached. Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) Page 2 of 2 6. OVERFILL PREVENTION EQUIPMENT DETAILS Tank ID (one OPE per column) TANK 1 87 TANK 2 91 Are both vent and tank riser piping secondarily contained? ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No OPE Model OPW OPW What is the OPE response when activated? (Check all that apply.) ☒ Shut off Flow ☐Restricts Flow ☐ Audible Alarm ☐ Visual Alarm ☒ Shut off Flow ☐Restricts Flow ☐ Audible Alarm ☐ Visual Alarm ☐ Shut off Flow ☐Restricts Flow ☐ Audible Alarm ☐ Visual Alarm ☐ Shut off Flow ☐Restricts Flow ☐ Audible Alarm ☐ Visual Alarm Are flow restrictors installed on vent piping that may interfere with the OPE operation? ☒ Yes* ☐ No ☐ Yes* ☐ No ☐ Yes* ☐ No ☐ Yes* ☐ No At what level in the tank is the OPE set to activate? (Inches from bottom of tank) 100 103 What is the percent capacity of the tank at which the OPE activates? 95% 95% Is the OPE in proper operating condition to respond when the stored substance reaches the designated regulatory level? ☒ Yes ☐ No ☒ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No 7. SUMMARY OF TESTING RESULTS OPE Inspection Results ☒ Pass ☐ Fail ☒ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail 1 8. COMMENTS Describe all results marked “Fail” and each proposed remedy. * Mark here if: ☐ Flow restrictors interfere with overfill prevention and equipment repairs required.