HomeMy WebLinkAbout7-11 #41516 Bakersfield Final ELD (2)11/15/2021 UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:61-23340
Tanknology
7-Eleven #41516
11000 N. MoPac Expressway #500
Austin, TX 78759
20 S. H St.
Bakersfield, CA 93304
September 10, 2021
®
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Test Certification
Post Installation Enhanced Leak Detection (ELD)
61-23340
7-Eleven #41516 September 10, 2021
20 S. H St.Sergio L. Nunez
Bakersfield, CA 93304
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
9/13/2021
Date
9/10/2021
Date
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Final Test Date:IOTA Technicians:
Site Information CGRS Project No :61-23340 Installation Contractor Information
Facility:Customer Name:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 12,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 42 60 359.86 87 TS PASS
S2 42 60 359.86 87 FS PASS
S3 42 60 359.86 91 TS PASS
S4 42 60 359.86 91 FS PASS
S5 42 60 359.86 DSL TS PASS
S6 42 60 359.86 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 38 28 32 147.39 OPW PASS
UDC2 38 28 32 147.39 OPW PASS
UDC3 38 28 32 147.39 OPW PASS
UDC4 38 28 32 147.39 OPW PASS
UDC5 38 28 32 147.39 OPW PASS
UDC6 38 28 32 147.39 OPW PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 32 73.14 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 300 PASS
91 PL NOV DW Fiberglass 2 305 PASS
DSL PL NOV DW Fiberglass 2 220 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 80 PASS
91 Vent NOV DW Fiberglass 2 60 PASS
DSL Vent NOV DW Fiberglass 2 35 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 305 PASS
Reviewed By Date IOTA Tech Signature Date
Final ELD Test Project Worksheet
9/10/2021
7-Eleven #41516 RD Builders
Sergio L. Nunez
kkarns@bakersfieldfire.us; hwines@bakersfieldfire.us; USTResults@bakersfieldfire.us
PIPING
TANKS
20 S. H St.4583 E. Eisenhower Circle
Anaheim, CA 92807
COMPONENTS IN CONTAINMENT
Kern Gary Redfern
Bakersfield FD; Howard Wines; Kris Karns 714-497-5812/gredfern@rdbuilders.com
Leak Logs / Repair
Bakersfield, CA 93304
9/10/2021
CA License No.
9/13/2021 06-1727
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
PASS
91 Vent PASS
9/13/2021
Date
DSL PL PASS
9/10/2021
Date
VR PASS
DSL Vent PASS
87 Vent
87 PL PASS
91 PL PASS
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
20 S. H St.Sergio L. Nunez
Bakersfield, CA 93304
Secondary Flow Communication Test Certification
61-23340
7-Eleven #41516 September 10, 2021
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.