Loading...
HomeMy WebLinkAboutRES NO 002-2022RESOLUTION NO_ 00 2 - 2 02 2 RESOLUTION OF THE CITY OF BAKERSFIELD ADOPTING THE ARVIN/EDISON CANAL CROSSING PLANNED MAJOR THORUGHFARE AREA AND MAKING FINDINGS RELATIVE THERETO. WHEREAS, by Resolution of Intention No_ 2121, adopted E>ecember 15, 2021, a public hearing was called for January 5, 2022, at the hour of 5:15 pm in the Council chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, regarding the establishment of the ARVIN/EE:)ISON CANAL CROSSING PLANNED MAJOR THORUGHFARE AREA; and. WHEREAS, notice of such hearing has been given to all affected property owners as such are shown on the latest equalized assessment roll; and, WHEREAS, such hearing has been duly and regularly held, and all persons interested have been given an opportunity to appear and be heard. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1 _ The foregoing recitals are true and correct and incorporated herein by reference. 2_ The Arvin/Edison canal crossing bridge district has been identified in the circulation element of the 2010 General Plan_ 3. The Arvin/Edison Madison canal crossing bridge district is in addition to existing major thoroughfares serving the area. 4. No majority protest as to the formation of the Arvin/Edison canal crossing bridge district exists. 5_ The Council hereby finds that, as to the Arvin/Edison canal crossing District, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 6. The Arvin/Edison canal crossing bridge district is hereby adopted_ `�CRlGINAI � HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on by the following vote: AYES: COUNCILMEMBER: ARIAS, GGNv4 -ES, WEIR, SMITH, FREEItlN, GRAY, PARLIER NOES: COUNCILMEMBER: ABSTAIN: COUNCILMEMBER: ABSENT: COUNCILMEMBER: ^ ^ MAN �� Dmmme�� J LIE DRIMIKIS, MMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: ��& M JAN 0 5 2022 KAREN GOH, Mayor CITY OF BAKERSFIELD APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By: VIRIDIANA GALLARDO-KING Deputy City Attorney Attachments: Exhibit "A" Cost Estimate Exhibit "B" Fee Schedule Exhibit "C" Map of Improvements Exhibit "D" Map of Benefit Area S:\PROJECTS\Bridge District\Arvin Edison Madison\5_Resolution Establishing (002).doc > m f- r `50RlGINAt° EXHIBIT "A" Arvin Edison -Major Bridge and Thoroughfare District District improvements encompass both City and County property. Improvements include widening of a canal crossing and public street at Madison Street. The cost of the improvemets encompass a one square mile centered at the crossing. Only undeveloped parcels are included in the District. The total acreage of each parcel included, even if only part of the parcel is in the 1 mile service area. The improvements are described below. ARVIN/EDISON BRIDGE DISTRICT Item Description Approximate Unit Price Total MADISON STREET 1. 6" Curb and Gutter 180 In. ft. $ 35.00 $ 6,300.00 2. 4" Concrete Sidewalk 510 sq. ft. 7.00 $ 3,570.00 3. Commercial Driveway 780 sq. ft. 11.00 8,580.00 4. 6' Chain -Link Fence 320 ln.ft. 75.00 24,000.00 5. 14' Double Wide Gates 4 ea. 3,600.00 14,400.00 Sub Total $ 56,850.00 BRIDGE: 1. Abutments and Walls 180 cu. yd. $ 1,000.00 $ 180,000.00 2. Diaphragms 25 cu. yd. 1,000.00 25,000.00 3. Deck Slab 90 cu. yd. 1,400.00 126,000.00 4. Approach Slabs 30 cu. yd. 1,000.00 30,000.00 5. Bridge Railing 35 ln.ft. 100.00 3,500.00 6. Wingwalls and Footings 25 cu. yd. 1,000.00 25,000.00 7. Chain -Link Railing (Type 7) 152 In. ft. 75.00 11,400.00 8. Concrete Barrier 155 ln.ft. 200.00 31,000.00 9. 16 - Precast Prestressed 16 ea. 30,000.00 480,000.00 Concrete Dbl. Tee Deck Units Sub Total $ 911,900.00 QK, inc. Page 1 Ik�aKF9 o s.� > m � r 9/13/2021 ORIGINA DEMO: 1. Channel Lining 2. Existing Bridge SUMMARY: MADISON STREET BRIDGE DEMO 122 sq. ft. 603 In ft. 38.00 4,636.00 48.00 28,944.00 Sub Total $ 33,580.00 $ 56,850.00 $ 911,900.00 $ 33,580.00 Sub Total $ 1,002,330.00 Engineering $ 15,000.00 SUB TOTAL $ 1,017,330.00 20% Contingency $203,466 TOTAL $ 1,220,796.00 RTIF Credit per Resolution No. 084-09 item E400 $ 611,249.00 TOTAL $ 609,547.00 v?ROF ESS��N GO���� L C 824851 m CN11. OF CALW QK Inc. Page 2 s � r 9/13/2024'CRIGINO EXHIBIT "B" ARVIN-EDISON BRIDGE DISTRICT FEE SCHEDULE PROJECT COST PER ENGINEER'S ESTIMATE...................................................$1,220,796 RTIFCREDIT.................................................................................................. 611,2 49 REVISEDPROJECT COST................................................................................... 6 905 , 47 BRIDGE DISTRICT AREA...........................................................................188.28 ACRES PROJECT COST PER ACRE.......................................................................... $3,238/ACRE PARCEL ACRES COS_ T PER ACRE_ 518-030-03 18.84 $3,238 518-030-27 7.68 $3,238 518-030-15 14.04 $3,238 518-030-25 24.27 $3,238 518-030-08 2.0 $3,238 518-040-18 42.91 a portion $3,238 518-040-11 22.32 $3,238 518-030-31 10.53 $3,238 518-030-12 20.63 $3,238 518-040-15 10.67 $3,238 518-040-17 14.39 $3,238 Notes: 1. The fee shall apply to all properties within the Bridge district boundaries, regardless of zoning. 2. Starting January 1, 2022, fee will be based on inflation factor of 3% annually. O��aKF9.� s � r 'ORIGINAL TRACT NO. 6611 NNRF PoGT-p-YMY �NnwECURB CUilER,�______ 'S FA, X MADISON STREET X NTMf LURE. CUTT[A, ( AND SOEWA11f .NRE PoCNT-p-wAT� 14Z N TRACT NO. 6397 MWECI ND.: IEOIDO.aQ aRAwM m: "I DVa n:a suLE: Im To xTAlc $HCEI N0: 1D�1 H Y � g R 7 rp' Tif� JttNCAL b d � � I NBTALL WMNNC 9a1 p K PRwOVOED TO AGE 0 S T iE/x STORAGE OWES) OAIE$) ee' MW!-EdSpY NTME GWAL Rgll-p-WAY TRACT NO. 6712 �NTRB: RRNi-p-WAY CUTTER. NO SDEWAUt N1URE iN�C 5�0 wA�iK �NNRE RlplT-p-WAV I TRACT NO. 6712 EXHIBIT "C" BRIDGE DISTRICT MADISON STREET - ARVIN EDISON CANAL CONSTRUCTION PLAN BASED UPON APPROVED BRIDGE RM CROSSPLAN BY PORTER AND ASSOC14TM CURRENT AN STANDARDS TO BE USED AT TIME OF CONSTRUCTION BRIDGE DESIGN TO COMPLY WITH CBC STANDARDS AT TIME OF CONSTRUCTION ALONG WITH UP TO DATE CONCRETE AND STEEL SPECIFICATIONS. m r • nwu MD — PER GO.B. sn. IT-1 .. 11 !"[ CpTNMA— 90ERIAUt PFA C0.B. STD. 11. m BCMFN O=l- Axa BROCE, ACR055 MtlTCW.A0.Y Nna. m ' _ Daueu "" ""' PER CO. sn . . 0" u1HS`DRvao'SGn ME NOT REaNRED. m CONS —CT R,,.P TO I.—C CANAL ROAD] PER O[iM ® ,p m ' xOx dNNUxR -CE P C.O.B. STD. 0-12. RED'wON SGn ME xp, REWMEO. ® CdREC! aARRM rMUxa TO wNCwNL ME, BWPS R,nwq PER OETM m E]rsTRw e°vSM.Ti"�i f°KK eiTviu"x caw EBina p1PCE. ® PA.aTwr ro BE B1 .— CaSAUCTEO R,Tx ,a,cwr nAcr S. ® 5[C Sxffn x-9 ra BRO¢ R4xA OCTM9 AIm SPECxN:AnaB io we ® nxa —CE TD R— ® NSlKL CdwORb,L Ob,FwAv OM C.O.B 9m. ],E . M—E. By OETAO® ® BE Mnc« aPrnATpNs Nn.x Mwx-Cana wwr-p-wAx T. TBD rmN mE uYn NNCATEo - TOIgMr EASENID+r. ® BFIAw BO SiTw o �_OSE 00 EaoLLTu cs: ui OUTwnwlv�uxS. SEE SHEET x. p TiE C T OF —1 m OE eRmaE a EACH 510L SOBO fKRORNN W.S.. STL 3x0 Rl: (abt) BIB-360D BMERSEELD G 8JOD9 WWM.aIN:.COY esiw RT auw Rwwr, c IERLao® u: YawYem �cgaKF9s ` 0RIGINAL COUNTY OF KERN I CRY HUE14OFRW I �II EAST PAA NE W i I TRACT 6712 BRIDGE OISTRKT APN 40.56 ACRES I BOUNDARY 518-OM-15 APN 518-030-03 m I � CENTRAL CANAL � i ID CRY OF BAKERSFIEL0 COUNTY OF KERN ARVIN - EDISON CANAL NAOSON STREET CROSSING y1 APN 20.63 cc. BRIDGE DISTRICT S �' CENTRAL CANAL BOUNDARY \ APN 518-030-25 \ BRIDGE DISTRICT 24.27 w. R BOUNDARY APN 518-030-31 \ ^ 10.53 g 2 D x. 3 EAST BERKSHIRE ROAD COUNTY OF KERN � BOUNDARY � �(�► BRIDGE DISTRICT APN 518-040-78 BOUNDARY ' APN 42.91 m. 11 22.32 ac. c LS t 7 TENTATNE TRACT NO. 6755 APN APN 518-040-17 514.39 10.67 a15 0 (Diar EAST HOSKING AVENUE J eMECr NO.: WMN f:XM 0100.02 EXHIBIT "D" ��aKF9s CA/QC BY: CP BRIDGE DISTRICT �< o SCAET AB 510 MADISON STREET - ARVIN EDISON CANAL 5060 CALIFORNU AVE., STE. 220 TEL (661) 616-2800 S.- � a � LIMITS OF IMPROVEMENTS 6"`E"�`D 9 9309 "'�'"ormom1 vQ�l!C�INAL 0 07NF01f BI NYID ,"16f. IC LIMVIN"® IbF "b1�