Loading...
HomeMy WebLinkAbout2021 SB989 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10125802 Test Date 10/6/2021 Facility Name Samco (White Lane) Facility Address 3300 WHITE LN City Bakersfield ZIP Code 93309 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/9/2023 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/9/2023 INCON STS 10/5/2023 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 10/6/2021 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 6. TANK SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Annular Test Setup Tank ID 87 91 Tank Manufacturer Unknown Unknown Tank Capacity 12,000 12,000 Test Start Time 07:45 08:10 Initial Reading -10.00 InHg -10.00 InHg Test End Time 08:45 09:10 Final Reading -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Line Secondary Test Setup Pipe Run ID 87 91 Pipe Manufacturer Unknown Unknown Test Start Time 08:00 08:35 Initial Reading 5.0 PSI 5.0 PSI Test End Time 09:00 09:35 Final Reading 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 7. PIPE SECONDARY CONTAINMENT TEST 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID 87 STP 87 Fill 91 STP 91 Fill Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 61 61 61 61 Sump Bottom to Top of Highest Pipe Penetration (inches) 34 40 34 40 Test Start Time 09:38 11:14 09:38 10:47 Initial Reading 5.4495 4.4015 5.0289 2.7204 Test End Time 09:53 11:29 09:53 11:02 Final Reading 5.4505 4.4012 5.0295 2.7196 Change in Reading 0.0010 0.0003 0.0006 0.0008 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID Disp 1/2 Disp 3/4 Disp 5/6 Disp 7/8 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 42 42 42 42 Sump Bottom to Top of Highest Pipe Penetration (inches) 22 22 22 22 Test Start Time 13:55 12:57 13:55 12:57 Initial Reading 3.2917 6.3912 3.4573 4.9555 Test End Time 14:10 13:13 14:10 13:13 Final Reading 3.2916 6.3895 3.4568 4.9461 Change in Reading 0.0001 0.0017 0.0005 0.0094 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail Additional copies of this page may be attached. Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID Disp 9/10 Disp 11/12 Sump Manufacturer Unknown Unknown Sump Depth (inches) 42 42 Sump Bottom to Top of Highest Pipe Penetration (inches) 22 22 Test Start Time 12:01 12:01 Initial Reading 5.3296 4.0085 Test End Time 12:17 12:17 Final Reading 5.3231 4.0080 Change in Reading 0.0065 0.0005 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 Disp 7/8 and 9/10 failed, must be repaired and retested. 9. COMMENTS