HomeMy WebLinkAbout2021-2 SB989Transmittal
Date:09/22/2021
To:Kris Karns
1500 Truxtun Ave
1st Floor
Bakersfield, CA 93301
Send Via:Email
Re:Circle K Store #2708606
1030 OAK ST
BAKERSFIELD, CA 93304
The following test report(s) are included:
- Secondary Containment Test
Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work.
Project Coordinator
Zac Kavanaugh
10023799 09/14/2021
Circle K Store #2708606
1030 OAK ST BAKERSFIELD 93304
Belshire Environmental (949) 460-5200
25971 Towne Centre Drive, Foothill Ranch, CA 92610
Sean Garcia
808313
8898137 02/20/2023
See Attached
09/14/2021
PEI - RP1200/Manufacturer
PEI - RP1200/Manufacturer
Tanks
Piping
PEI - RP1200 Containment Sumps
87 Main - T1 89 - T2 91 - T3
Vacuum Pump & Gauges
Containment Solutions Containment Solutions Containment Solutions
10000 10000 10000
08:30am 08:30am 08:30am
-10 -10 -10
09:30am 09:30am 09:30am
-10 -10 -10
0 0 0
No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum
87 Main - Product 89 - Product 91 - Product
AO Smith AO Smith AO Smith
08:15am 08:15am 08:15am
5 5 5
09:15am 09:15am 09:15am
5 5 5
0 0 0
No Pressure Change No Pressure Change No Pressure Change
Pass Pass Pass
Pass Pass Pass
Pressurized Nitrogen & Gauges
87 Main - Turbine 89 - Turbine 91 - Turbine 87 Main - Fill
Total Containment Total Containment Total Containment Total Containment
69 69 69 65
22 22 22 N/A
10:08am 10:49am 10:49am 09:30am
4.4877 4.2203 4.2166 4.0145
10:23am 11:05am 11:05am 09:45am
4.4888 4.2201 4.2166 4.0139
0.0011 -0.0002 0.0000 -0.0006
0.002 0.002 0.002 0.002
89 - Fill 91 - Fill 1/2 - UDC 3/4 - UDC
Total Containment Total Containment Bravo Bravo
65 65 10 10
N/A N/A 0 0
09:30am 12:17pm 11:11am 11:30am
5.3523 3.2593 1.0903 1.1359
09:45am 12:33am 11:26am 11:45am
5.3511 3.2084 1.0910 1.1354
-0.0012 -0.0509 0.0007 -0.0005
0.002 0.002 0.002 0.002
Incon Sump Test System
Pass Pass Pass Pass
Pass Fail Pass Pass
Incon Sump Test System
Component Comment
91 - Fill Failed due to bad electrical penetration.
A B C D E F G H I J K L M
1
2
3
4
5
6
7
8
9
10
11
12
13
BUSINESS NAME:Circle K Store #2708606
SITE ADDRESS:1030 OAK St.
MAP DATE:12/3/15
CITY:Bakersfield ZIP:93304
AGENCY FACILITY #:SURVEY BY:DRAWN BY:ZK
N
LEGEND
E
S
L
HCAS
FIRE EXTINGUISHER
MC
BRFL
CL
MSDS
W
MW
MO
EM
CASHIER
FIRE HYDRANT
DISPENSER
SHUTOFF
GAS PUMPEMERGENCYSHUT OFF
WATER
EMERGENCY EXIT
BATH ROOM
MOTOR OIL
FLAMMABLE LIQUID MSDS &
EMERGENCY PLAN
FIRST AIDTANK MONITOR
EVACUATION
AREA
MONITORINGWELL
MOTOR COOLANT
COMBUSTIBLELIQUID
ELECTRICAL PANEL
A ABSORBENT
FENCE
TRASH BIN
TELEPHONE
PPE
CO2 CYLINDER
SOLID WASTE DRUM
LIQUID WASTE DRUM
STORM DRAINOVERFILL ALARM CO2
VENT RISERS
SENSOR DISPENSERUST TRANSFORMER VENT RISERSwithVENT SUMP/VENT BOX
CLEAN AIRSEPARATOR
SEWER/FLOOR DRAINTB
VST
or
NATURAL GAS SHUTOFFGNNITROGEN
**NOTE: ALL PIPING LOCATIONS ARE ESTIMATED & SCALING IS APPROXIMATE**
Store
3/4
1/2
Oa
k
S
t
.
Park Way
87
89
91
Enter/Exit
En
t
e
r
/
E
x
i
t
Last First Training Date Expiration
Garcia Sean Bravo Systems 02/12/2021 02/12/2024
Garcia Sean CNI Manufacturing - EVR System Installation 02/12/2021 02/12/2023
Garcia Sean Containment Solutions Tank and DW Sump
Installation
02/12/2021 02/12/2023
Garcia Sean Franklin DC400 Dispensing Cutoff (formerly Beaudre 03/08/2021 03/08/2023
Garcia Sean Franklin Fueling Defender Spill Buckets 03/08/2021 03/08/2023
Garcia Sean Franklin Fueling Overfill Prevention 03/08/2021 03/08/2023
Garcia Sean Franklin Submersible Pumps/Forecourt Specialist 05/04/2021 05/04/2023
Garcia Sean Franklin XP Series Piping (fomerly APT)05/04/2021 05/04/2023
Garcia Sean Hose Master Installer Training 02/12/2021 02/12/2023
Garcia Sean ICC California UST Service Technician 02/20/2021 02/20/2023
Garcia Sean Icon Containment Solutions Certified Installer 02/12/2021 02/12/2023
Garcia Sean INCON Level 1 - FMS Installation (EVO)03/08/2021 03/08/2023
Garcia Sean INCON Level 2 - FMS Programming 03/08/2021 03/08/2023
Garcia Sean INCON Level 4 - Franklin Sump Test System 03/08/2021 03/08/2023
Garcia Sean Jomar Valves & Fittings 03/25/2021 03/25/2024
Garcia Sean Modern Welding Tank Installation 03/25/2021 03/25/2024
Garcia Sean NOV FiberGlass Systems Piping (Formerly AO
Smith)
04/02/2021 04/02/2024
Garcia Sean OPW EVR Phase I - AST 06/03/2021 06/03/2023
Garcia Sean OPW EVR Phase I - UST 06/03/2021 06/03/2023
Garcia Sean PEI RP1200 Testing/Verification of UST Equipment 09/14/2018
Garcia Sean Veeder Root Level 2/3/4 05/19/2021 05/19/2023
Garcia Sean Veeder Root Level I 03/09/2021
Garcia Sean Xerxes UST Installation Training Seminar 03/24/2021 03/24/2024
Training Certificates