SPECIAL MEETING OF THE BUDGET AND FINANCE COMMITTEE
of the City Council - City of Bakersfield
Monday, February 28, 2022
12:00 p.m.
City Hall North
1600 Truxtun Avenue, Bakersfield, CA 93301
First Floor, Conference Room A
AGENDA
1. ROLL CALL
2. ADOPT DECEMBER 7, 2021, AGENDA SUMMARY REPORTS
3. PUBLIC STATEMENTS
4. NEW BUSINESS
A. Committee Discussion and Recommendations Regarding FY 2022-23
CDBG, HOME, ESG Action Plan –Saldana/McKeegan
B. Committee Discussion and Recommendations Regarding Wastewater
Rate Study Results: Equity and Phased-in Rate Increase – Strakaluse
C. Committee Discussion and Recommendations Regarding Solid Waste Rate
Study and Phase I Rate Increase – Strakaluse
D. Committee Discussion and Recommendation Regarding Adoption of the
2022 Committee Meeting Schedule – Carrier
5. COMMITTEE COMMENTS
6. ADJOURNMENT
Staff: Committee Members:
Christian Clegg, City Manager Councilmember, Andrae Gonzales – Chair
Councilmember, Ken Weir
Councilmember, Eric Arias
SPECIAL MEETING OF THE BUDGET AND FINANCE COMMITTEE
of the City Council - City of Bakersfield
Tuesday, December 7, 2021
12:00 p.m.
City Hall South
1501 Truxtun Avenue, Bakersfield, CA 93301
First Floor, Caucus Room
AGENDA SUMMARY REPORT
The meeting was called to order at 12:01 p.m.
1. ROLL CALL
Committee members present: Councilmember Andrae Gonzales
Councilmember Ken Weir
Committee member absent: Councilmember Eric Arias
Staff present: Christian Clegg, City Manager
Anthony Valdez, Assistant to the City Manager
Brianna Carrier, Assistant to the City Manager
Crystal Rubio, Administrative Analyst III
Juan Heredia, Administrative Analyst III
Joshua Rudnick, Deputy City Attorney
Randy McKeegan, Finance Director
Additional Attendees: Members of the Public
2. ADOPT FEBRUARY 23, 2021 AGENDA SUMMARY REPORT
The Reported was adopted as submitted.
DRAFT
AGENDA SUMMARY REPORT
Budget and Finance Committee Meeting
Tuesday, December 7, 2021, Agenda
Page 2
3. PUBLIC STATEMENTS
There were no public statements.
4. NEW BUSINESS
A. Long Range Fiscal Model Project Update – Huot/McKeegan
City Manager Clegg and Finance Director McKeegan provided an
overview of the long-range fiscal model project and introduced
Management Partners Special Advisor Bob Leland who provided a
PowerPoint presentation on the Long-range Forecast and Fiscal Model
planning tool to assist the city in forecasting major issues such as sales tax,
fiscal capacity, recessions, and pensions.
City Manager Clegg stated that the planning tool will be used to assess
long-term impacts and provides the ability to strategically plan for the
future. Finance Director McKeegan added that the planning tool will
provide the capabilities to project market sensitivity changes in revenue
performance and impacts associated with them 10 and 20 years into the
future.
Committee member Weir shared the trends and impacts he has witness in
the past that impact the city’s outlook. He stated sales tax and pension
costs see high revenue years that are then followed by very low revenue
years. Mr. Leland responded that the fiscal structure tool uses the most
recent figures of impacts to determine and review different scenarios. City
Manager Clegg added that the planning tool provides Finance staff the
capability to produce multiple projection scenarios with a single data set
at one time.
Committee Chair Gonzales inquired about the assumptions used to
forecast the scenarios of sales tax revenue and Public Safety and Vital
Services (PSVS). Mr. Leland referred to the 10-year forecast summary
discussed during the presentation.
Committee Chair Gonzales inquired about how the planning tool will be
used to demonstrate the budgeting capacity of PSVS funding for staffing
and projects. City Manager Clegg stated the forecast model tool will be
referred to extensively during the mid-year and budgeting process.
Committee Chair Gonzales thanked Mr. Leland of Management Partners
and staff for the informative presentation.
Committee member Weir made a motion to receive and file the report. The
motion was approved with Committee member Arias absent.
5. COMMITTEE COMMENTS
DRAFT
AGENDA SUMMARY REPORT
Budget and Finance Committee Meeting
Tuesday, December 7, 2021, Agenda
Page 2
There were no comments made.
6. ADJOURNMENT
The meeting was adjourned at 1:08 p.m.
DRAFT
MEMORANDUM
DATE: February 15, 2022
TO: Budget & Finance Committee
FROM: Paul Saldaña, Economic and Community Development Director
SUBJECT: Annual Action Plan process for FY 2022-23 HUD Applications (CDBG, ESG, HOME, HOPWA)
Background: The United States Department of Housing and Urban Development (HUD) has designated the City of
Bakersfield as an Entitlement City. Therefore, HUD provides annual funding to improve low-income
neighborhoods throughout the City pursuant to the federal programs noted below. As is the case each year, HUD
had not yet released the entitlement amount for FY 2022-23 as of the preparation of this Memo. However, there
is an expectation that Congress will maintain previous year funding levels for all programs. The table below shows
the anticipated HUD funds for all projects using last year’s entitlement as the current projection.
Federal Program Previous FY21-22 Allocation
Community Development Block Grant (CDBG) $3,968,097*
Home Investment Partnership (HOME) $1,585,955*
Emergency Solutions Grant (ESG) $329,429
Housing Opportunities for Persons with AIDS (HOPWA) $709,181
Total $6,592,662
*Includes an additional $8,000 in program income for CDBG and $80,000 for HOME
Applications Received: Each year, the City issues a Notice of Funding Ability (NOFA) for the annual entitlement
funds listed in the table above. The deadline for the submission of CDBG, HOME, and ESG applications for FY 2022-
23 funding was December 23, 2021. The requested projects are intended to improve the quality of life and
infrastructure for low-income persons and neighborhoods in the City of Bakersfield. This year the City received 9
applications from non-profit and private entities totaling $738,117, and 14 applications from City Departments
totaling $4,944,000. The total request for all grants, from both City and Non-City applicants, was $5,682,117, and
the application details are listed in Attachment C.
Recommendation: Pursuant to federal requirements, staff conducted a comprehensive review and evaluation of
all applications for funding. Staff has prepared the attached Memorandum and recommended budget for
consideration by the Budget and Finance Committee. Staff anticipates that the FY 2022-23 HUD Action Plan will
be considered by the City Council on May 4, 2022. This is the third funding year of the Consolidated Plan 2020-
2025.
Therefore, staff recommends that the Budget and Finance committee recommend that the City Council vote to
fund allocations for the CDBG, HOME, ESG and HOPWA funds are listed in Attachments A and B.
Attachments:
A. FY 22/23 Recommended CDBG Budget
B. FY 22/23 Recommended ESG/HOME/HOPWA Budget
C. Overview of Applications Received (Reference)
Description FY 22-23
Requested
FY 22-23
Actual
FY 21-22
Last Year Ward
CDBG Entitlement 3,960,097 3,960,097 3,960,097
Program Income (Projected for FY 22-23) 8,000 8,000 8,000
Total Available Resources 3,968,097 3,968,097 3,968,097 ‐
Administration (not to exceed 20% or $792,019) 792,019 792,019 792,019
Section 108 Loan Payment on $4.1M 323,920 323,920 316,424
Section 108 Loan Payment on $800K 60,419 60,419 58,776
Total Admin and Debt Payment 1,176,358 1,176,358 1,167,219
Total Resources minus Admin and Debt Payments 2,791,739 2,791,739 2,800,878
Fair Housing Program Services 100,000 100,000 100,000 All
Bakersfield Senior Center Support Services 90,000 90,000 90,000 1
New San Cai 81,670 All
Total Public Service Projects 271,670 190,000 190,000
Home Access Rehabilitation 50,000 51,739 50,000 All
Jewett Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 350,000 - 2
Ohio Drive Area Curb, Gutter, Sidewalk and ADA 350,000 350,000 - 1
Benton Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 350,000 398,167 7
Oleander Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 350,000 398,167 2
Madison Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 350,000 398,167 1
Alta Vista Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 - - 2
Union & East Truxtun Area: Curb, Gutter, Sidewalk, Drainage, Accessibility Imprv. 350,000 398,167 2
Wilson Road Pedestrian Improvments 239,000 - 1
Sunset Area Lighting Upgrade 730,000 - - 2
Union Brundage Phase 8 Area Curb, Gutter Sidewalk and ADA Imprv. 518,210 1
Saunders Park Sump Basin Wall Rehabilitation 400,000 400,000 2
Saunders Park Sports Pavillion Fence Improvements 400,000 400,000 2
Jefferson Park Aquatic Facility Fence Improvements 300,000 2
Beale Avenue Median Lanscape Rehabilitation 350,000 2
McMurtrey Aquatic Center Imprv. 150,000 2
Jefferson Park Imprv. 250,000 2
Bakersfield Senior Center Building Demolition 25,000 1
Mercy House BLNC Art and Murals 25,000 1
Total Public Facilities 4,919,000 2,601,739 2,610,878
Total Requests for Public Services + Projects 5,190,670 2,791,739 2,800,878
Total Available Resources Remaining (2,398,931) (0) (0)
RECOMMENDED CDBG BUDGET FY 2022-23
RESOURCES
ADMINISTRATION AND DEBT SERVICE
PUBLIC SERVICES (MAX. 15% or $594,014)
PUBLIC FACILITIES
RECOMMENDED HOME BUDGET FY 2022-23
HOME Entitlement 1,505,955$ 1,505,955$ 1,505,955$
Program Income (Projected for FY 22/23) 80,000$ 80,000$ 80,000$
Previous Year Entitlement 1,809,720$
Total Available Resources 1,585,955$ 1,585,955$ 3,395,675$
Administration (not to exceed 10%) 150,596$ 150,596$ 150,596$
Total Resources minus Admin 1,435,360$ 1,435,360$ 3,245,080$
CHDO Set Aside (15%)225,893$ 225,893$ 225,893$
Acquisition/Construction/Rehabilitation/Downpayment -$ 1,209,466$ 119,186$
VCCDC Downpayment Assistance Program -$ 250,000$
Pacific Southwest Community Development Corp/Chelsea* -$ 1,000,000$
Cesar Chavez Foundation/HACK Renaissance at Baker Street -$ 1,650,000$
Total (All Requests) -$ 1,435,359$ 3,245,079$
Total Available Resources Remaining 1,435,360$ 0$ 0$
RECOMMENDED ESG BUDGET FY 2022-23
ESG Entitlement (Projected for FY 22/23) 329,429$ 329,429$ 329,429$
Administration (not to exceed 7.5%) 24,707$ 24,707$ 24,707$
Total Resources minus Admin 304,722$ 304,722$ 304,722$
Flood Ministries - Street Outreach* 25,056$ 25,000$ 24,477$
Bakersfield Homeless Center - Shelter* 180,000$ 70,000$ 70,000$
Bakersfield Homeless Center - Rapid Rehousing & Prevention* 121,891$ 107,222$ 108,245$
The Mission at Kern County - Shelter* 97,500$ 70,000$ 70,000$
Alliance Against Family Violence - Shelter 42,000$ 32,500$ 32,000$
Total (All Requests) 466,447$ 304,722$ 304,722$
Total Available Resources Remaining (161,725)$ (0)$ (0)$
RECOMMENDED HOPWA BUDGET FY 2022-23
HOPWA Entitlement (Projected for FY 22/23) 709,181$ 709,181$ 709,181$
Administration (not to exceed 3%) 21,275$ 21,275$ 21,275$
Total Resources minus Admin 687,906$ 687,906$ 687,906$
Kern County Public Health 687,906$ 687,906$ 687,906$
Total (All Requests) 687,906$ 687,906$ 687,906$
Total Available Resources Remaining (0)$ (0)$ (0)$
PROJECTS
Description FY 22-23
Requested
FY 22-23
Actual
FY 21-22
Last Year
RESOURCES
ADMINISTRATION AND DEBT SERVICE
Description FY 22-23
Requested
FY 22-23
Actual
FY 21-22
Last Year
RESOURCES
RESOURCES
ADMINISTRATION AND DEBT SERVICE
HOPWA SPONSOR/PROVIDER
ADMINISTRATION
PROJECTS
Description FY 22-23
Requested
FY 22-23
Actual
FY 21-22
Last Year
12:00 p.m.3:30 pm Closed Session 5:15 p.m. Public Session
Redistricting Hearing: 02/23
Budget Hearing: 06/01, Budget Adoption: 06/15
12:00 p.m.
S M T W TH F S S M T W TH F S S M T W TH F S
31 1 1 2 3 4 5 1 2 3 4 5
2 3 4 5 6 7 8 6 7 8 9 10 11 12 6 7 8 9 10 11 12
9 10 11 12 13 14 15 13 14 15 16 17 18 19 13 14 15 16 17 18 19
16 17 18 19 20 21 22 20 21 22 23 24 25 26 20 21 22 23 24 25 26
23 24 25 26 27 28 29 27 28 27 28 29 30 31
30 31
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 7 1 2 3 4
3 4 5 6 7 8 9 8 9 10 11 12 13 14 5 6 7 8 9 10 11
10 11 12 13 14 15 16 15 16 17 18 19 20 21 12 13 14 15 16 17 18
17 18 19 20 21 22 23 22 23 24 25 26 27 28 19 20 21 22 23 24 25
24 25 26 27 28 29 30 29 30 31 26 27 28 29 30
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 1 2 3
3 4 5 6 7 8 9 7 8 9 10 11 12 13 4 5 6 7 8 9 10
10 11 12 13 14 15 16 14 15 16 17 18 19 20 11 12 13 14 15 16 17
17 18 19 20 21 22 23 21 22 23 24 25 26 27 18 19 20 21 22 23 24
24 25 26 27 28 29 30 28 29 30 31 25 26 27 28 29 30
31
S M T W TH F S S M T W TH F S S M T W TH F S
1 1 2 3 4 5 1 2 3
2 3 4 5 6 7 8 6 7 8 9 10 11 12 4 5 6 7 8 9 10
9 10 11 12 13 14 15 13 14 15 16 17 18 19 11 12 13 14 15 16 17
16 17 18 19 20 21 22 20 21 22 23 24 25 26 18 19 20 21 22 23 24
23 24 25 26 27 28 29 27 28 29 30 25 26 27 28 29 30 31
30 31
League of California Cities Mayors and Council Members Executive Forum - 2022 Date Yet To Be Determined
League of California Cities Annual Conference - September 7-9, 2022
OCTOBER NOVEMBER DECEMBER
JANUARY FEBRUARY MARCH
APRIL MAY JUNE
Budget & Finance Committee Calendar
January 2022 Through December 2022
All meetings will be held at City Hall North, First Floor, Conference Room A
DRAFT
Budget & Finance Committee City Council Meetings
Budget Departmental Workshop Holidays - City Hall Closed
JULY AUGUST SEPTEMBER
Last updated: 12/28/2021 12:47 PM
Documents from meeting
Budget & Finance
Committee
2-28-2022
2022-23 HUD BUDGET
& ACTION PLAN
Budget and Finance Committee –February 28, 2022
ANTICIPATED RESOURCES
2022-23 Action Plan
CDBG:
$3,968,097
TOTAL
HOME:
TOTAL
HOPWA:
Admin:
$792,019
(Section 108
$384,339)
Projects:
$2,791,739
HOME:
$1,585,955
Admin:
$150,595
Projects:
$1,435,360
ESG:
$329,429
Admin:
$24,707
Projects:
$304,722
HOPWA:
$709,181
Admin:
$21,275
Projects:
$687,906
2020-2025 CONSOLIDATED
PLAN GOALS
•Increase and preserve affordable housing for low-
and-moderate income households
•Prevent and reduce homelessness.
•Improve public infrastructure and facilities to
promote safe and vibrant communities.
•Foster community and economic development.
•Enhance facilities and services for the non-homeless
special needs population.
2022-23 ACTION PLAN
Recommended CDBG Budget
1,750,000
800,000
190,000
51,739
Curb, Gutter, Sidewalk,
ADA
Park Improvements
Public Services
Home ADA Improvements
CURB, GUTTER, SIDEWALK
& ADA IMPROVEMENTS
•Jewett Avenue Area: $350,000 (W2)
•Ohio Drive Area: $350,000 (W1)
•Benton Area: $350,000 (W7)
•Oleander Area: $350,000 (W2)
•Madison Area: $350,000 (W2)
Jewett Project Area -$350,000
34th Street to 28th Street
K Street to Q Street
Ohio Drive Project Area -$350,000
Southeast end of Ohio Drive
Ohio drive; Milham Drive and
Tollhouse Drive
Benton Project Area -$350,000
Ming Avenue to Planz Road
South H Street to Hughes Lane
Oleander Project Area -$350,000
H Street to A Street California
Ave to Roosevelt Street
Madison Project Area -$350,000
Madison St. to Cottonwood Rd.
between Casa Loma Dr. and
Brook St.
Saunders Park -$400,000
Sump Basin Wall/Fence Rehabilitation
Saunders Park -$400,000
Sports Pavilion Fence Improvements
Home ADA Improvements -$51,739
•City-Run Program
•Low-income
•$3,500 Grants
•Goal: 15 Households
•$50,000
Public Services -$190,000
•Bakersfield Senior Center
Support Services -$90,000
•GBLA Fair Housing:
$100,000
2022-23 ACTION PLAN
Recommended HOME Budget
225,893
1,209,467
CHDO Set-Aside
New Construction
2022-23 ACTION PLAN
Recommended ESG Budget
Rapid Rehousing /
Prevention
Homeless Outreach
Shelter Operations
172,500
25,000
107,222
2022-23 ACTION PLAN
Recommended ESG Budget
•Flood Outreach -$25,000
•BHC Shelter -$70,000
•Mission Shelter -$70,000
•AAFVSA Shelter -$32,500
•BHC RRH & Prevention: $107,222
ANTICIPATED TIMELINE
2022-23 Action Plan
HOME
•Budget & Finance Committee Meeting February 28, 2022
•Draft Action Plan Complete March 11, 2022
•Action Plan Public Notice Period April 1-May 4, 2022
•Community Meetings April 21,2022
•Public Hearing before City Council May 4, 2022
•Action Plan due to HUD May 15, 2022
QUESTIONS?
Budget and Finance Committee –February 28, 2022
Budget and Finance Committee Meeting
February 28, 2022
CITY OF BAKERSFIELD
SEWER RATE STUDY
PRESENTATION OUTLINE
Introduction
Rate-Making Objectives & Considerations
Rate Study Process
Revenue requirement
Cost -of-service analysis
Rate Design
Next Steps
RATE-MAKING OBJECTIVES & CONSIDERATIONS
1.Provide revenue sufficiency and financial stability to fund the
projected capital and operations and maintenance (O&M) costs of the
City’s enterprise
2.Meet the City’s wastewater reserve fund targets
3.Rate payer equity
Each Customer class pays their proportionate share of expenses
Each Customer, within each class, pays their proportionate share of expenses via
consumption and service capacity
4.Customers understand and accept rates
5.Balance rate increases with future capital funding approach
RATE BACKGROUND
Residential customers pay a fixed annual charge
Commercial customers pay an annual fixed charge plus a
monthly sewer surcharge to account for actual flow that
exceeds the assumed water use included in their
respective fixed charge
RECENT RATE AND CONNECTION FEE HISTORY
Last rate increase to Single Family occurred July 1, 2016.
Rates changed from $210 to $215.
Connection fees for Single Family increased from $4,000
per connection to $5,000 per connection. This changed
occurred over 5 years from 2017 through 2021.
RATE STUDY PROCESS
STEP 1: Revenue requirement projections
Determines how much revenue is needed annually from rates
STEP 2: Cost of service allocations
Determines how much of the revenue should come from fixed and variable
charges and from each customer class
Allocations are proportionate to the cost of providing service
STEP 3: Rate design
Fixed service charge, sewer surcharge, Industrial User rates
Balance rate-making objectives
REVENUE REQUIREMENT PROJECTIONS
KEY ASSUMPTIONS -CAPITAL
Average
annual
capital need
= $9 million
Projected
FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 Total
1 Sewer Repairs Var Loc $1,594,100 $600,000 $600,000 $600,000 $3,394,100
2 Centrifuge Rehab Plt3 $165,920 $80,000 $245,920
3 Repl 6 Sldge Recirc Pumps $412,097 $412,097
4 Rev Program Study Update $95,040 $95,040
5 Repl Vfd Influent Pumps $220,000 $60,000 $280,000
6 Rehab/Repl Unfluent Pumps $991,180 $120,000 $1,111,180
7 Primary Clarif 1-4 Rehab $1,328,000 $1,300,000 $2,628,000
8 Replace Flare $156,180 $156,180
9 Repl Primary Sludge Pumps $155,565 $155,565
10 Polymer Pump Replacement $123,296 $123,296
11 Aeration Basin Rehab $499,380 $499,380
12 Wwtp Misc Improvements $820,694 $600,000 $600,000 $600,000 $2,620,694
13 Sewer Lift & Strm Pump Sta $1,694,150 $1,000,000 $1,000,000 $1,000,000 $4,694,150
14 Sewer Lift Rehab-Bank St $1,228,000 $1,228,000
15 Swrlftrhb-Sandra/Meredith $1,166,000 $1,166,000
16 Swrlftrhb-Ming/Grnd Lakes $1,132,000 $1,132,000
17 Swrlftrhb-Eucalyptus $1,193,000 $1,193,000
18 Swrlftrhb-Taft Hwy/S H St $1,228,000 $1,228,000
19 Rehab Effluent Pump Stat $0 $500,000 $500,000
20 Demo Old Headworks Bldg $250,000 $250,000
21 Knudsen Drive Storm Drain $300,000 $300,000
22 Swrcln:Bv And Mccutchen $139,205 $139,205
KEY ASSUMPTIONS -CAPITAL
Average
annual
capital need
= $9 million
Projected
FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 Total
23 Storm Lift - Taslisman $415,730 $415,730
24 Wwtp Energy Upgrade $150,000 $150,000
25 Wwtp# 3 Arterial Roads $209,772 $209,772
26 Portalogic Syst. Upgrade $60,000 $60,000
27 Chem Dosing Syst Rehab $350,000 $350,000
28 Daf Rehab $500,000 $500,000
29 Hvac Units Repl $450,000 $450,000
30 Plc Upgrade $750,000 $750,000
31 Tertiary Expansion Wwtp 3 $100,000 $100,000
32 Return Act Sludge Pump $94,300 $94,300
33 Solids Train Upgrade $250,205 $250,205
34 Rehab Grit Clarrifiers $59,200 $59,200
35 Maint Bldg Repair And Remod $425,000 $425,000
36 Misc Storm Drain Improv $200,000 $200,000
37 Digester Engineer Study $208,000 $208,000
38 Digester Gas Reuse Altern $171,735 $171,735
39 Maintenance Mgmt Software $11,955 $11,955
40 Misc Projects $2,000,000 $2,200,000 $4,533,455 $6,733,455 $15,466,909
41 Total CIP - PAYGo $13,100,704 $8,869,000 $7,988,000 $6,733,455 $6,733,455
42 Inflationary Index 1.000 1.021 1.043 1.066 1.089
43 Total Inflated CIP - PAYGo $13,100,704 $9,059,186 $8,334,261 $7,175,984 $7,329,865
44 average annual $9,000,000
5-YEAR RATE INCREASE SUMMARY
Projected year-end
fund balances are
greater than the Target
Reserve Balance
Maintain debt coverage
ratio
Fiscal Year:FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26
Overall Revenue Increases 0.0%0.0%CPI CPI CPI
Cumulative Increase 0.0%0.0%CPI CPI CPI
Avg Annual PAYGo
Capital Spending per Capital Improvement Plan $13,100,704 $9,059,186 $8,334,261 $7,175,984 $7,329,865 $9,000,000
Projected Connection Fee Revenue $7,600,000 $7,000,000 $6,500,000 $6,500,000 $6,500,000
Debt coverage ratio (1.25 minimum)1.79 1.74 1.65 1.63 1.61
COST-OF-SERVICE BY CUSTOMER CLASS –FY 2022-23
Overall revenue increase is not necessary for FY 2022-23
However, the cost-of-service study indicates a re-balancing between customer classes is
warranted
RATE DESIGN: ANNUAL FIXED SERVICE CHARGE (PER SFDE)
Single family rates increase from
$215.00 annual charge to $220.27
annual charge
$5.27 increase to annual charge
Equivalent to a $0.44 increase per
month
A combination of changes in single
family water use patterns, strength
characteristics, and costs contribute
to the increase
Flow: 250 gpd to 220 gpd
BOD: 250 mg/L to 240 mg/L
TSS: 250 mg/L to 280 mg/L
Cost per SFDE Acct Flow BOD TSS
Single Family 1 220 240 280
Characteristics gpd mg/l mg/l
Annualize 1 107 161 188
hcf/yr lbs/yr lbs/yr
Unit Costs $24.99 $1.43 $0.15 $0.09
Total
Annual Cost per SFDE $24.99 $153.84 $24.34 $17.09 $220.27
RATE COMPARISON –SINGLE FAMILY
RATE DESIGN: COMMERCIAL (CURRENT)
Fixed charge on the Tax Roll
varies by Customer Type (24+
different commercial Customer
Types)
Surcharge for water use which
exceeds their respective
minimum varies among 24+
Customer Types
User Group Units SFDE/Unit
Schools Average Daily Attendance 0.04
Hospital Bed 0.60
Churches Parcel 1.00
Rest Home Parcel 1.50
Small Store or Office Store or Office 1.00
Combination Store & Restaurant Parcel 1.75
Large Store Store 1.50
Big Box Store Store 1.50
Markets Store 1.50
Shopping Center w/ Dining Business 1.00
Office Bldg.Building 0.60
Mortuary Parcel 1.50
Food or Beverage Restaurant 1.50
Recreational Business 1.50
Medical Lab Business 1.50
Car Wash Business 1.50
Service Shop Business 1.50
Petroleum Business 1.50
Sales Business 1.50
Nurseries Business 1.00
Hotel-Motels, RV Parks Room or Space 0.300
Hotel-Motels, RV Parks - w/ rest.Room or Space 0.300
Mobile Home Park Dwelling Unit 0.75
Light & Heavy Industry Business 1.50
Timber & Produce Plant Business 1.50
Food Processing Business 1.50
Storage-Warehouse Business 1.50
OS - Commercial/Industrial Business 1.50
Laundromat Machine 0.60
User Group Surcharge
Schools none
Hospital $1.50
Churches $1.57
Nursing Home $1.60
Small Store $1.57
Combination Store & Residence $1.60
Large Store $1.57
Markets (Grocery Store)$2.62
Shopping Center w/ Dining (unit)$2.17
Office Bldg.$1.50
Mortuary $2.62
Food or Beverage $2.69
Recreational $1.68
Medical Lab $1.59
Car Wash $1.44
Service Shop $1.68
Petroleum $1.68
Sales $1.50
Nurseries $1.59
Hotel-Motels, RV Parks none
Light & Heavy Industry $1.60
Timber & Produce Plant $1.60
Food Processing $1.60
Storage-Warehouse $1.68
OS - Commercial/Industrial $1.57
Big Box Store none
Hotel-Motels, RV Parks (w/ restaurant)$2.20
Laundromat none
RATE DESIGN: COMMERCIAL FIXED CHARGES (PROPOSED)
Simplify rate structure
Fixed charges the same
regardless of Customer Type
Differences in sewered water
use among customers is
captured in the commercial
surcharge
Current Proposed
Customer Type SFDE/Unit SFDE/Unit Notes:
Schools 0.05 1.00 current = per ADA; proposed = per school
Hospital 0.60 1.00 current = per bed; proposed = per hospital
Churches 1.00 1.00
Rest Home 1.50 1.00
Small Store or Office 1.00 1.00
Combination Store & Res 1.75 1.00
Large Store 1.50 1.00
Big Box Store 1.50 1.00
Markets 1.50 1.00
Shopping Center w/ Dining 1.00 1.00
Office Bldg.1.50 1.00
Mortuary 1.50 1.00
Food or Beverage (Restaurant)1.50 1.00
Recreational 1.50 1.00
Medical Lab 1.50 1.00
Car Wash 1.50 1.00
Service Shop 1.50 1.00
Petroleum 1.50 1.00
Sales 1.50 1.00
Nurseries 1.00 1.00
Hotel-Motels, RV Parks 0.30 1.00 current = per room/space; proposed = per business
Hotel-Motels, RV Parks - w/ restaurant 0.30 1.00 current = per room/space; proposed = per business
Light & Heavy Industry 1.50 1.00
Timber & Produce Plant 1.50 1.00
Food Processing 1.50 1.00
Storage-Warehouse 1.50 1.00
OS - Commercial/Industrial 1.50 1.00
Laundromat 1.50 1.00
RATE DESIGN: COMMERCIAL SEWER SURCHARGE (PROPOSED)
Propose reducing commercial
customer classes to four –low,
medium, medium high, and high
strength customers
Include all commercial customer
classes (i.e., schools, laundromats,
big box stores, and hotels/motels
without restaurants)
These customer classes were not
previously subject to the flow-based
surcharge
Sewer Connection Fees
Single-Family Residential $5,000.00 per dwelling unit
Commercial $227.00 per fixture unit
Flow BOD TSS
Industrial $1.18 $800.00 $254.00
per gpd per lb/day per lb/day
PROPOSED CONNECTION FEES (CURRENT AND PROPOSED)
RCN RCNLD
City's Sewer System Assets
Plant 2 & 3 Assets $890,215,891 $550,677,088
5-Year Future CIP $45,000,000 $45,000,000
Cash Reserves $35,800,000 $35,800,000
System Value $971,015,891 $631,477,088
Current EDUs 151,746 151,746
Connection Fee per EDU $6,398.93 $4,161.40
RCN RCNLD
Connection Fee per EDU $6,398.93 $4,161.40
Fixture Units per EDU 25 25
Connection Fee per Fixture Unit $255.96 $166.46
Flow BOD TSS
Total System Allocation 85.4%9.1%5.5%
Total Value: $631,477,088
Total System Assets $539,462,109 $57,575,420 $34,439,560
Total Loadings 16,289,299 24,404,605 28,472,039
Unit Costs $33.12 $2.36 $1.21
Units HCF/yr lb/yr lb/yr
Proposed Unit Cost Conn Fee $16.16 $861.11 $441.50
Units $/gpd $/lb/day $/lb/day
Single
Family -
Proposed
Commercial
-Proposed
Industrial –
Proposed
(assumes
RCN)
Changes in connection fees are not subject to Proposition 218 procedural requirements
Periodic update of fees are good practice, in order to reflect increase value of system which benefits growth
QUESTIONS/COMMENTS
NEXT STEPS
Update model / Recommended increase based on
feedback
March 16 Council Meeting
Request authorization to mail Proposition 218 notices to ratepayers for
change in sewer rates
June –Rate adjustments presented to City Council
Barring a successful protest (50% + 1), Council may adopt proposed rates
included in the Proposition 218 notice
July 1, 2022-Adopted rates enacted for FY 2022-23
Budget and Finance Committee Meeting
February 28, 2022
CITY OF BAKERSFIELD
SOLID WASTE RATE STUDY
PRESENTATION OUTLINE
Introduction
Rate-Making Objectives & Considerations
Rate Study Process
Preliminary Results
Q & A
Next Steps
RATE-MAKING OBJECTIVES & CONSIDERATIONS
1.Provide revenue sufficiency and financial stability to fund the
projected capital and operations and maintenance (O&M) costs of the
City’s solid waste enterprise
2.Maintain a reasonable reserve balance
Cash-flow while waiting for tax roll revenue from the County
Extraordinary costs
Allows “smoothing-in” of necessary rate increases
3.Five -year planning period
SERVICES PROVIDED
Solid Waste Division is responsible for:
Providing collection of solid waste, recyclable materials, and
organic materials from residents and businesses
Through City-operated routes or through contracted third parties (e.g.,
Kern Refuse)
Operating the Mt. Vernon Green Waste Recycling, Materials
Recycling Facility, and Composting Facility
Street sweeping
Operating the curbside bulky pickup program
Operating the curbside motor oil recycling program
RATES / SERVICES –RESIDENTIAL
Single-Family Current Annual Charge = $234.00
Last rate adjustment = +5%, $11.00 per year (eff. July 1, 2021)
Multi-Family Current Annual Charge = $210.54 per dwelling unit
Last rate adjustment = +5%, $10.03 per year per unit (eff. July 1, 2021)
Base Services included in annual charge:
Weekly Solid Waste Collection
Weekly Organics collection
Every-Other-Week Recycling Collection
Curbside pickup of two bulky items (e.g., Major appliance, mattress, sofa, water heater) per quarter
(for single-family and multi-family customer with 4 dwelling units or less)
Curbside pickup of motor oil and oil filter
Processing material at Materials Recycling Facility
RATES / SERVICES –COMMERCIAL
Separate solid waste, recycling, and organics containers
Charged separately for each container
As of 1/1/2022, businesses must subscribe to all three containers (SB 1383)
Solid waste container sizes ranging from small cart to 6 cubic yard bins
Frequency of collection ranges from 1 to 6 times per week
Last rate adjustment = +5% (eff. July 1, 2021)
REVENUE REQUIREMENT (EXPENSES)
~$70 million revenue requirement
(FY 2022-23)
~9% increase from FY 2021-22
~2.7% annual increases
(FY 2023-24 through FY 2026-27)
~$15 million in non-collection rate
revenue (e.g., CalTrans/Kern Cog,
County share of Mt. Vernon
operations, BARC revenue)
Need $55 million from rate
revenue or use of reserves to cover
costs
Current revenue at Current rates =
~$49 million
KEY ASSUMPTIONS
Financial plan started with City’s Council-approved FY 2021-22 budget)
Budget
FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27
1 General Inflation Budgeted 5.00%3.00%3.00%3.00%3.00%
2 Salary and Benefits Budgeted 3.00%3.00%3.00%3.00%3.00%
3 Operating Budget - Admin Budgeted 5.00%3.00%3.00%3.00%3.00%
4 Operating Budget - Street Cleaning Budgeted 5.00%3.00%3.00%3.00%3.00%
5 Operating Budget - Residential Budgeted 6.50%4.00%3.00%3.00%3.00%
6 Operating Budget - Commercial Budgeted 6.50%4.00%3.00%3.00%3.00%
7 Operating Budget - GreenWaste Budgeted 5.00%3.00%3.00%3.00%3.00%
8 Operating Budget - Landfill Budgeted 5.00%3.00%3.00%3.00%3.00%
9 Operating Budget - Curbside Budgeted 5.00%3.00%3.00%3.00%3.00%
10 Intergovernmental Budgeted 1.75%1.75%1.75%1.75%1.75%
11 Cal Trans and Kern Cog Payment Budgeted 0.00%0.00%0.00%0.00%0.00%
12 Other Revenue Budgeted -2.00%-2.00%-2.00%-2.00%-2.00%
13 Interest on Fund Balance 0.30%0.30%0.30%0.30%0.30%0.30%
14 New Programs Increase - Various Budgeted 3.00%3.00%3.00%3.00%3.00%
15 MRF Operating Costs Budgeted 3.00%3.00%3.00%3.00%3.00%
16 Workers Comp Premiums Budgeted 39.00%5.00%5.00%5.00%5.00%
17 Liability Premiums Budgeted 104.00%5.00%5.00%5.00%5.00%
18 Kern Refuse Compensation Budgeted 7.50%3.50%3.50%3.50%3.50%
19 Account Growth - Residential Budgeted 1,200 1,200 1,200 1,200 1,200
20 Commercial Org Self-haul Tip Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
ProjectedApplied annual inflation/cost
adjustment factors for five-year
planning period
(FY 2022-23 through FY 2026-27)
New Positions
One new Residential driver (in FY 2021-22
approved budget)
Administrative Analyst (in FY 2021-22
approved budget)
SB1383 Compliance Inspector (City Council Approval in March)
Three new Commercial drivers (one in FY 2021-22 approved budget, one each added to FY 2023-24 and FY 2025-26)
Inter-fund fleet charge increase for new route vehicles
KEY ASSUMPTIONS –CAPITAL IMPROVEMENTS
PROJECT CODE PROJECT NAME FY22/23 FY23/24 FY24/25 FY25/26 FY26/27
1 NEW CIP SECURITY FENCING AND LIGHTING 125,000$ 125,000$ 125,000$
2 NEW CIP TRANSFER STATION DESIGN ESTIMATE 100,000$
3 NEW CIP EXTEND ELECTRICAL INFRASTRUCTURE 100,000$ 100,000$ 100,000$
4 NEW CIP CONVEYOR SYSTEM DESIGN ESTIMATE 50,000$
5 NEW CIP AUTOMATION, MOBILE STACKER 200,000$
6 NEW CIP BALED MATERIAL COVERS 125,000$
7 NEW CIP LINE UPGRADE 1,000,000$
8 NEW CIP CONCRETE DOWN DRAINS 25,000$ 25,000$
9 NEW CIP MISC DESIGN SERVICES 50,000$ 50,000$ 50,000$ 50,000$ 50,000$
10 P0K237 TRANSFER STATION 60,000$
11 P0K227 COMPOST SCREENING RESIDUE 100,000$
12 P1K300 PAINT, CEILING, TILE, CARPET ADMIN BUILDING 30,000$
13 P8K213 GREENWASTE PAVEMENT REPAIR 50,000$
14 P9K200 COMPOST AUTOMATION PROJECT 250,000$ 250,000$ 250,000$
1,780,000$ 910,000$ 525,000$ 175,000$ 50,000$ TOTALS
5-YEAR REVENUE RATE INCREASE SUMMARY –OPTION #1
Add to reserves each year to reach
minimum and total targets as soon as
reasonable
Minimum Target = Operating
Reserves = 3 mos. of Tax Roll revenue
+ 1.5 mos. of monthly bill revenue
Target Reserve Target = Operating
Reserves PLUS one-year average
annual capital
1 Fiscal year FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27
2 Eff. Date 7/1/2022 7/1/2023 7/1/2024 7/1/2025 7/1/2026
3 Overall Rate Revenue Increase 13.0%6.0%2.5%2.0%2.5%
4
5 Single Family Rate (per year)$234.00 $264.42 $280.29 $287.29 $293.04 $300.36
6 Annual Increase $30.42 $15.87 $7.01 $5.75 $7.33
7 Monthly Increase $2.54 $1.32 $0.58 $0.48 $0.61
$0.0
$2.0
$4.0
$6.0
$8.0
$10.0
$12.0
$14.0
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27
Rev Adj. +/-13.0%6.0%2.5%2.0%2.5%
Re
s
e
r
v
e
s
B
a
l
a
n
c
e
(
M
i
l
l
i
o
n
s
)
Projected Year-End Unrestricted Cash Balance
Total Balance with Rate Increases
Total Balance w/o Rate Increases
Minimum Reserve Target
Total Reserve Target
5-YEAR REVENUE RATE INCREASE SUMMARY –OPTION #2
Use reserves to smooth-in rate
increase
Pros: Monthly increase never
exceeds $2/month for Single-
Family Customers
Cons: Dipping further below
operating reserve target, and for a
longer period, may result in cash-
flow issues during periods of high
inflation or unexpected
costs/emergencies
1 Fiscal year FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27
2 Eff. Date 7/1/2022 7/1/2023 7/1/2024 7/1/2025 7/1/2026
3 Overall Rate Revenue Increase 9.0%9.0%4.0%3.0%2.5%
4
5 Single Family Rate (per year)$234.00 $255.06 $278.02 $289.14 $297.81 $305.26
6 Annual Increase $21.06 $22.96 $11.12 $8.67 $7.45
7 Monthly Increase $1.76 $1.91 $0.93 $0.72 $0.62
$0.0
$2.0
$4.0
$6.0
$8.0
$10.0
$12.0
$14.0
FY 2020-21 FY 2021-22 FY 2022-23 FY 2023-24 FY 2024-25 FY 2025-26 FY 2026-27
Rev Adj. +/-9.0%9.0%4.0%3.0%2.5%
Re
s
e
r
v
e
s
B
a
l
a
n
c
e
(
M
i
l
l
i
o
n
s
)
Projected Year-End Unrestricted Cash Balance
Total Balance with Rate Increases
Total Balance w/o Rate Increases
Minimum Reserve Target
Total Reserve Target
QUESTIONS/COMMENTS
NEXT STEPS
Update model / Recommended Increase based on
feedback
March 16 Council Meeting
Request authorization to mail Proposition 218 notices to ratepayers
June –Rate Adjustments Presented to City Council
Barring a successful protest (50% + 1), Council may adopt maximum rates
included in the Proposition 218 notice
July 1, 2022-Adopted rates enacted for 2022
July 2022 –Begin Phase II to address SB 1383 and
commercial rate re-structure
12:00 p.m.3:30 pm Closed Session 5:15 p.m. Public Session
Redistricting Hearing: 02/23
Budget Hearing: 06/01, Budget Adoption: 06/15
12:00 p.m.
S M T W TH F S S M T W TH F S S M T W TH F S
31 1 1 2 3 4 5 1 2 3 4 5
2 3 4 5 6 7 8 6 7 8 9 10 11 12 6 7 8 9 10 11 12
9 10 11 12 13 14 15 13 14 15 16 17 18 19 13 14 15 16 17 18 19
16 17 18 19 20 21 22 20 21 22 23 24 25 26 20 21 22 23 24 25 26
23 24 25 26 27 28 29 27 28 27 28 29 30 31
30 31
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 7 1 2 3 4
3 4 5 6 7 8 9 8 9 10 11 12 13 14 5 6 7 8 9 10 11
10 11 12 13 14 15 16 15 16 17 18 19 20 21 12 13 14 15 16 17 18
17 18 19 20 21 22 23 22 23 24 25 26 27 28 19 20 21 22 23 24 25
24 25 26 27 28 29 30 29 30 31 26 27 28 29 30
S M T W TH F S S M T W TH F S S M T W TH F S
1 2 1 2 3 4 5 6 1 2 3
3 4 5 6 7 8 9 7 8 9 10 11 12 13 4 5 6 7 8 9 10
10 11 12 13 14 15 16 14 15 16 17 18 19 20 11 12 13 14 15 16 17
17 18 19 20 21 22 23 21 22 23 24 25 26 27 18 19 20 21 22 23 24
24 25 26 27 28 29 30 28 29 30 31 25 26 27 28 29 30
31
S M T W TH F S S M T W TH F S S M T W TH F S
1 1 2 3 4 5 1 2 3
2 3 4 5 6 7 8 6 7 8 9 10 11 12 4 5 6 7 8 9 10
9 10 11 12 13 14 15 13 14 15 16 17 18 19 11 12 13 14 15 16 17
16 17 18 19 20 21 22 20 21 22 23 24 25 26 18 19 20 21 22 23 24
23 24 25 26 27 28 29 27 28 29 30 25 26 27 28 29 30 31
30 31
League of California Cities Mayors and Council Members Executive Forum - 2022 Date Yet To Be Determined
League of California Cities Annual Conference - September 7-9, 2022
Budget Departmental Workshop Holidays - City Hall Closed
JULY AUGUST SEPTEMBER
Budget & Finance Committee Calendar
January 2022 Through December 2022
All meetings will be held at City Hall North, First Floor, Conference Room A