HomeMy WebLinkAboutRES NO 039-2022RESOLUTION NO. O 3 9- 2 O 2 2
RESOLUTION OF THE BAKERSFIELD CITY COUNCIL APPROVING AN
AMENDMENT TO THE LAND USE MAP DESIGNATION OF THE
METROPOLITAN BAKERSFIELD GENERAL PLAN, LOCATED AT THE
SOUTHEAST CORNER OF HAGEMAN ROAD AND LANDCO DRIVE
(GPA/ZC NO. 21-0284).
WHEREAS, McIntosh & Associates is requesting an amendment to the land use map
designation of the Metropolitan Bakersfield General Plan from HI (Heavy Industrial) to SI
(Service Industrial) and an amendment to Title 17 of the Bakersfield Municipal Code to
change the Zone District from M-3 (Heavy Industrial) to M-2 (General Manufacturing) on 79.84
acres located at the southeast corner of Hageman Road and Landco Drive (the "Project");
and
WHEREAS, the Planning Commission held a public hearing on December 2, 2021, and
approved Resolution No. 57-21, which recommended that the City Council approve the
Project; and
WHEREAS, the City Council held a public hearing on January 19, 2022, and approved
a continuance of the project to be held at the next meeting on February 2, 2022; and
WHEREAS, the Clerk of the City Council set Wednesday, February 2, 2022 at 5:15 p.m.
in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time
and place for a public hearing before the City Council to consider the approval of the
amendment as required by Government Code Section 65355, and notice of the public
hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and
WHEREAS, during the hearing, the City Council considered all facts, testimony, and
evidence concerning the staff report, and the Planning Commission's deliberation, and
action.
NOW, THEREFORE, BE IT RESOLVED by the Bakersfield City Council as follows:
1. The above recitals, incorporated herein, are true and correct.
2. The Planning Commission's findings as contained in its Resolution No. 57-21 are
hereby adopted.
3. The Project is hereby approved subject to the conditions of approval in Exhibit A
and located on the map as shown in Exhibit B, both of which are incorporated
herein.
4. The Project approved herein is hereby made part of the 1st amendment to the
Land Use Element of the Metropolitan Bakersfield General Plan for calendar year
2022 in accordance with Government Code Section 65358 (b).
--------- 000--------
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the�aKF
9�,
0�
Page 1 of 2
` 0R!0INAI
Council of the City of Bakersfield at a regular meeting held on the 2nd day of February 2022,
by the following vote:
AYE
COUNCILMEMBER:
S:
COUNCILMEMBER:
ABSTAIN:
COUNCILMEMBER:
ABSENT:
COUNCILMEMBER:
ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, PARLIER
J LIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: FEB 0 2 2022
By .1A��U41
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO, CITY ATTORNEY
-
VIRIDIANA LLARDO-KING
Deputy City Attorney
Exhibits: A Conditions of Approval
B General Plan Amendment Map
Page 2 of 2
m
`ORIGINAL'
CONDITIONS OF APPROVAL
GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 21-0284
PUBLIC WORKS
1. Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the ZC area, the developer must submit
the following for review and approval by the City Engineer:
C. Fully executed dedication for Landco Drive to collector standards for the full
frontage of the GPA/ZC area, unless otherwise approved by the City Engineer, if
not already dedicated. Dedications must include sufficient widths for expanded
intersections and additional areas for landscaping as directed by the City Engineer.
b. Comprehensive drainage study of the ZC area is to be submitted for approval by
the City of Bakersfield Public Works Department Subdivision section. The drainage
including the frontage for the ZC area is to be retained onsite and shall be privately
maintained. Flowage and drainage easements, as needed, are to be provided
prior to the recording of any final map or issuance of any certificates of occupancy
for development within the GPA area, whichever is earlier.
c. Sewer study: The GPA/ZC area is within the North of the River Sanitary District No. 1.
Sewer service in this area must conform to the NORDS's adopted Sewer Study, and
construction of sewer lines shall be per NORSD's requirements. All trench backfill
and paving within the public right of way shall require an Open Street Permit and
be per the City of Bakersfield.
2. Prior to the recording of any final map or issuance of any certificates of occupancy for
development within the GPA/ZC area, whichever is earlier, the developer must (a)
construct all infrastructure, both public and private, within the boundary of the GPA/ZC
area, including, but not limited to, any and all boundary streets to the centerline of the
street as required by the City Engineer and (b) construct, and acquire any necessary
right-of-way to construct, any off -site infrastructure required to support development of
the GPA/ZC as determined by the City Engineer. Phasing of the construction of the
required infrastructure may be allowed by the City Engineer. Per City Council Resolution
035-13, any development within the GPA/ZC area must comply with the City's
"complete streets" policy.
3. Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the GPA/ZC area, the developer must
take all actions necessary to add the GPA/ZC area to the Consolidated Maintenance
District ("CMD") and pay all fees for inclusion in the CMD or, if the development is
already within the CMD, update the maintenance district documents as provided in
Bakersfield Municipal Code section 13.04.021 or as otherwise required by the City
Engineer.
4. Prior to the City's issuance of any building permits for construction within the GPA/ZC
area, or an earlier time established through conditions of a subsequent City -approved
subsequent development project, subdivision, or minor land division within the GPA/ZC
area, the developer must pay all development fees for the GPA/ZC area including, bout���9�
'ORIGINAL®
GPA /ZC No. 21-0284
Conditions of Approval
Page 2
not limited to, the adopted regional traffic impact fee, local mitigation fees, and any
planned sewer and drainage area fees.
5. The project location is within the benefit area boundary of the Hageman Major Bridge
and Thoroughfare District (027-02). The project is subject to fees associated with this
district.
b. A traffic analysis comparing peak hour traffic generation of the existing allowable uses
with the proposed allowable uses shall be submitted. A full traffic study is not required if
this analysis shows that the increase in peak hour trip generation due to the new uses do
not exceed 50 trips.
CITY ATTORNEY
7. In consideration by the City of Bakersfield for land use entitlements, including but not
limited to related environmental approvals related to or arising from this project, the
applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to
indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents,
employees, departments, commissioners and boards ("City" herein) against any and all
liability, claims, actions, causes of action or demands whatsoever against them, or any
of them, before administrative or judicial tribunals of any kind whatsoever, in any way
arising from, the terms and provisions of this application, including without limitation any
CEQA approval or any related development approvals or conditions whether imposed
by the City, or not, except for CITY's sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action or proceeding, falling
under this condition within thirty (30) days of actually receiving such claim. The City, in its
sole discretion, shall be allowed to choose the attorney or outside law firm to defend the
City at the sole cost and expense of the Applicant and the City is not obligated to use
any law firm or attorney chosen by another entity or party.
o�`OAK��u
'ORIGINt f
• v
LEGEND
GPA/ZC 21-0284
y
�
(GENERAL
G
1
LANDAUSE)AN
e . t 51
51
SI
♦ `
RR Rural Residential
z
LI
SI ♦ ,. .g!
4rfo,
2.5 gross acres/dwelling unit
zl
+"--
♦♦ `•
ER EstateAesidential
CITY OF BAKERSFIELD
=
o
'
♦
I dwelling unit/not airs
/
a=ec
SR Suburban Residential
54 dwelling units/net acre
RENEVENTO (I v� L
1
'—r
♦
♦ ♦
♦
SR/LR
1
♦♦
S1
♦ ♦
County: 5 4 dwelling units/net acre
G
e
U SI
SI
SI
••` `
SI
City: 5 7.26 dwelling units/net acre
#e
1
••
LR Low Density Residential
,••;
,
, COIF
6 dwelling
VENElull — • ,��
!
of
LIAR Low Medium Density Residential
•
/1
> 4 but 5 10 dwelling units/net acre
HMR High Medium Density Residential
GC
S
2 �qG�
>7.26 units but
dwelling
Q��O
9Q,�
517.42 units/net acre
SI
ESE QV
sf
HR High Density Residential
••s
>17.42 units but
i ,�
!
�•
— — — ATIAS CT-
— — — -# HI
577.6 dwelling units/nal acre
•
♦ �i•
H( Highway Commercial
G( General Commercial
♦
\'O~ s
SI
SI
•� HI
1
1 ♦ `•.
I �••
M( Major Commercial
OC Office Commercial
Qp♦a
1fGp7
Use Commercial
~
MU( Mixed
SI
��
/
♦
LI lighl Industrial
�•
1
'`
SI Service Industrial
FROM: HI
1
HI Heavy Industrial
TO: SI
"
AAMOOR
AVE
J
P Public Facilities
PS Public/PrivateSchools
••,
1
1
I
••�
1
PT Public Transportation Corridors
51
SI
°
Y
P-SW Solid Waste Facilities
•
e
1
OS Open Space
1
OS-P Parks and Recreation
0
I
H
1
OS-S Slopes exceeding 30%
•� H I
1
R-IA Resource -
:�
Intensive Agriculture
�•�
1
20 acre minimum parcel size
HI
R-EA Resource
51 51
SI
FOSTER
-AVE
Extensive Agriculture
1
20 acre minimum parcel size
•
�•//
-- /
80 acre min (Williamson Act)
HI
_
R-MP Resource -
••�j
/
HI
-
HI
HI
Minerals S Petroleum
•�
1
5 acre minimum parcel size
�pI
UER Urban Estate Residential
Qr
Western Rosedale Plan
51
SI
51
0.5 acre net minimum parcel size
'•�'
/
WM West Ming Specific Plan
I
�
.�..�• HI
HI HI
HI
HI
•
CA lYC
Ell {
(`�Hy�:�.e�••
BAKERSFIELD
clTyHl HI
HI
HI HI
HI
HI
`'
0 O
HI
-0
s7 y
Feet
0 300 600
/`
°
2021_10_079pazc