HomeMy WebLinkAboutRES NO 057-2022RESOLUTION NO. 0 5 7_ 2 0 2 2
RESOLUTION OF THE BAKERSFIELD CITY COUNCIL APPROVING AN
AMENDMENT TO THE LAND USE MAP DESIGNATION OF THE
METROPOLITAN BAKERSFIELD GENERAL PLAN FROM OC (OFFICE
COMMERCIAL) TO HMR (HIGH MEDIUM DENSITY RESIDENTIAL) ON
11.22 ACRES, LOCATED AT 9700 AND 9850 CAMINO MEDIA
(GPA/ZC NO. 21-0302).
WHEREAS, McIntosh & Associates is requesting: (1) an amendment to the land
use map designation of the Metropolitan Bakersfield General Plan from OC (Office
Commercial) to HMR (High Medium Density Residential); and (2) an amendment to Title
17 of the Bakersfield Municipal Code to change the Zone District from C-O (Professional
and Administrative Office) to R-2/PUD (Limited Multiple Family Dwelling/Planned Unit
Development) on 11.22 acres located at 9700 and 9850 Camino Media (the "Project");
and
WHEREAS, the Planning Commission held a public hearing on March 10, 2022 and
accepted public testimony both in support and opposition. At that meeting, the
applicant revised the request to include the more restrictive R-2/PUD (Limited Multiple
Family Dwelling/Planned Unit Development) zoning; and
WHEREAS, the Planning Commission approved Resolution No. 26-22, which
recommended that the City Council approve the Project; and
WHEREAS, the Clerk of the City Council set Wednesday, April 20, 2022 at 5:15 p.m.
in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the
time and place for a public hearing before the City Council to consider the approval of
the amendment as required by Government Code Section 65355, and notice of the
public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal
Code; and
WHEREAS, during the hearing, the City Council considered all facts, testimony,
and evidence concerning the staff report, and the Planning Commission's deliberation,
and action.
NOW, THEREFORE, BE IT RESOLVED by the Bakersfield City Council as follows:
1. The above recitals, incorporated herein, are true and correct.
2. The Planning Commission's findings as contained in its Resolution No. 26-22 are
hereby adopted.
3. The Project is hereby approved subject to the conditions of approval in
Exhibit A and located on the map as shown in Exhibit B, both of which are
incorporated herein.
4. The Project approved herein is hereby made part of the 1st amendment to
the Land Use Element of the Metropolitan Bakersfield General Plan for
calendar year 2022 in accordance with Government Code Section 65358
(b).
--------- 000--------KF9n
u�
Page 1 of 2
'ORIGINA! c
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the
Council of the City of Bakersfield at a regular meeting held on the 20th day of April
2022, by the following vote:
_ '-, I,- *-I W�- I,- r�
<AYES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, FREEVM, GRAY, PARLIER
N ES: COUNCILMEMBER:
ABSTAIN: COUNCILMEMBER:
COUNCILMEMBER: VW(Y)O-r1
JULIE DRIMAKIS, MMC
CITY CLERK and Ex Officio Clerk of
the Council of the City of Bakersfield
APPROVED: APR 2 O 2022
By A&Aont�
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By:
VIRIDIANA G LL RDO-KING T
Deputy City Attorney
Exhibits: A Conditions of Approval
General Plan Amendment Map
Page 2 of 2 o�p PKF9`s'c
EXHIBIT "A"
CONDITIONS OF APPROVAL
GENERAL PLAN AMENDMENT/ZONE CHANGE NO.21-0302
PUBLIC WORKS
Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the GPA/ZC area, the developer must
submit the following for review and approval by the City Engineer:
a. Fully executed dedication for Camino Media to collector standards for the full
frontage of the GPA/ZC area, unless otherwise approved by the City Engineer.
Dedications must include sufficient widths for expanded intersections and additional
areas for landscaping as directed by the City Engineer.
b. Comprehensive drainage study of the entire drainage area. For a private
development, under normal conditions a private development shall provide its own
retention basin for its own storm water. Since there is an existing public sump
adjacent to this private development, the storm water from the private development
will be allowed to be collected in the existing public sump provided: A sump
maintenance district shall be formed by the developer, and the existing sump is
properly sized to collect the volume of additional storm water from the private
development.
c. Sewer study, which will assure that appropriate sewer service will be provided to the
entirety of the GPA/ZC area. The developer will be responsible for the initial extension
of the sewer line to serve the GPA/ZC area. This sewer line may be sized to serve a
much larger area than the project area as directed by the City Engineer. The
developer may also form a planned sewer area to provide a mechanism for the
reimbursement of oversizing costs to the developer. Pay sewer capacity mitigation
fees equal to $350 per dwelling unit above the number of units allowed per acres
under the current land use.
2. Prior to the recording of any final map or issuance of any certificates of occupancy for
development within the GPA/ZC area, whichever is earlier, the developer must (a)
construct all infrastructure, both public and private, within the boundary of the GPA/ZC
area, including, but not limited to, any and all boundary streets to the centerline of the
street as required by the City Engineer and (b) construct, and acquire any necessary right-
of-way to construct, any off -site infrastructure required to support development of the
GPA/ZC as determined by the City Engineer. Phasing of the construction of the required
infrastructure may be allowed by the City Engineer. Per City Council Resolution 035-13,
any development within the GPA/ZC area must comply with the City's "complete streets"
policy.
3. Prior to the City's approval of any construction plans associated with any development
project, subdivision, or minor land division within the GPA/ZC area, the developer must
take all actions necessary to add the GPA/ZC area to the Consolidated Maintenance
District ("CMD") and pay all fees for inclusion in the CMD or, if the development is already
o`a�K�9s
o
vpRIGINAL
GPA RC No. 21-0302
Conditions of Approval
Page 2
within the CMD, update the maintenance district documents as provided in Bakersfield
Municipal Code section 13.04.021 or as otherwise required by the City Engineer.
4. Install traffic signal interconnect conduit and pull rope for the frontage in all arterials and
collectors.
5. Prior to the City's issuance of any building permits for construction within the GPA/ZC area, or
an earlier time established through conditions of a subsequent City -approved subsequent
development project, subdivision, or minor land division within the GPA/ZC area, the developer
must pay all development fees for the GPA/ZC area including, but not limited to, the adopted
regional traffic impact fee, local mitigation fees, any major bridge and thoroughfare district
fees, and any planned sewer and drainage area fees.
CITY ATTORNEY
In consideration by the City of Bakersfield for land use entitlements, including but not limited
to related environmental approvals related to or arising from this project, the applicant,
and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend,
and hold harmless the City of Bakersfield, its officers, agents, employees, departments,
commissioners and boards ("City" herein) against any and all liability, claims, actions, causes
of action or demands whatsoever against them, or any of them, before administrative or
judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions
of this application, including without limitation any CEQA approval or any related
development approvals or conditions whether imposed by the City, or not, except for CITY's
sole active negligence or willful misconduct.
This indemnification condition does not prevent the Applicant from challenging any
decision by the City related to this project and the obligations of this condition apply
regardless of whether any other permits or entitlements are issued.
The City will promptly notify Applicant of any such claim, action or proceeding, falling under
this condition within thirty (30) days of actually receiving such claim. The City, in its sole
discretion, shall be allowed to choose the attorney or outside law firm to defend the City at
the sole cost and expense of the Applicant and the City is not obligated to use any law firm
or attorney chosen by another entity or party.
o``gAKF9s
� r
`ORIGINAL
GPA/ZC 21-0302 LMR
EXHIBIT " B" �ES�E0.CT S= Mercy
PSouth
Southwest
U
CITY OF BAKERSFIELD LMR N �� CSU'
LMR BBE3IFUBDAVE
W LPA
LIVIR
.'V �ATTLEBORO.AV( OS-P s. c
OC tp10:\ LR WINDSOR PARK a NOWELL DR ,
DOR(HESTEAST=e� OC
as
LR � 17 LR I3 CD
Ronald Reagan LR LOUGHTON AVE
Elementary I^ LR
Schgo11LR W a LR
LR/PS JX/D{�C
MERSHAM HILCDR
31 FROM: OC
LR c t `3
LR LR TO: HMR
LR c� /WITHIN.Bf7GNTSp�
LR N �I h LR
NARPENDENAVE_,/ s OC
LR —�?-W
o \CAAIINQMEDIA�
DEE0.PEAK /
OS-P (ems` LR
OA'f DEER PEAK ��S��ISBUBYDB_ 3
PARK 5Z LR �� o
"f�1rj� c ASC01(BOSSING SI �-= a LR i OC
LR +Eo1�W LR m R LR
3
W LR
\ Vap C,P CHIFYOR 2
y LR m° 9OC
LR A L i LR i Lit W OC o
SONGBIRD T oUXBs DGE O a
_LNJ EXSHAM DR =
LR c
ee
i ec
MING AVE MING AVE
LR
v�sGAl'VO o LR
o VALLEY-FOREST_CT
LR s),_, LRAMAR z
_ LR
Vf L LMR OS-P " o
3` r= OS-P �V `= LR
�HAWORT.IN MESA OAK.OR
owe LR
LR
:FORD CT R 0 SEVEN OAKS GOLF C HMR �r_,d
LR 4'F BCOUNTRY CLUBLR
Kp�a,--.J
? OS-P LR i i
I y Q OS-P P HMR o z
r
HMR o`W0.w
W�\�EpAK
HR
LR
LEGEND
DON (GENERAL PLAN
"I'll, LAND USE)
S PS = PS PS
z RR Rural Residential
g o 2.5 gross acres/dwelling unit
iS WAY ER Estate Residential
= I dwelling unit/net nice
a SR Suburban Residential
SA dwelling units/net acre
KROLL WAY SR/LR
S PS PS PS County: 5 A dwelling units/net acre
City: 5 7.26 dwelling units/net acre
It Low Density Residential
STUDENT WAY 5 7.26 dwelling units/net acre
LAIR low Medium Density Residential
> A but 5 10 dwelling units/net acre
HMR High Medium Density Residential
California Sate >7.26 units but
S PS University PS PS 517.42 dwelling units/net acre
Bakersfield HIT High Density Residential
>17.42 units but
572.6 dwelling units/net acre
HC Highway Commercial
ROWDYLN GC General Commercial
MC Major Commercial
OC Office Commercial
S PS PS PS MU( Mixed Use Commercial
LI light Industrial
SI Service Industrial
NI Heavy Industrial
z P Public Facilities
Z) PS Public/Private Schools
Q PT Public Transportation Corridors
P-SW Solid Waste facilities
5 PS PS PS OS Open Spore
OS-P Parks and Recreation
OS-S Slopes exceeding 30%
R-IA Resource -
(AMINO MEDIA Intensive Agriculture
20 acre minimum parcel size
GC OC R-EAResource-
Extensive Agriculture
LIBERTY PARK DR 20 acre minimum parcel size
80 acre min (Williamson Act)
OC R-MP Resource -
GC Minerals d Petroleum
5 acre minimum parcel size
o OC UER Urban Estate Residential
Western Rosedale Plan
0.5 acre net minimum parcel size
WM West Ming Specific Plan
MING AVE
LR o
T OAK (T GAS(ONY (T`� - a
(v LR BE IU AIDoNLMR A
an LR !.r : LR ^-Yi m FAIRFIEI •
WANDEAING_OAK DR ? = N DR gAKERSFIELD
a VERSAIELES_DR
LR a VE0.5AllEESDp��c��— 1
Y OAK_CT� a LR = LR =o: 1 LR
i
� (NARTRESIN
LR Feet
MfAD.OW,LEAF(T � LR Lp`\eES 1 I
LR T SEARANT Cl� 0 400 $00
-�� H(IGHOAKDRJM'C() 2021_09_08gpazc
r /1 -171�i