Loading...
HomeMy WebLinkAbout2022-04-24 FMCAppendix VI Underground Storage Tank Monitoring System Certification Form CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification, ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single- Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank, VPH = Vacuum/Pressure/Hydrostatic Page 1 of 6 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month 1. FACILITY INFORMATION CERS ID Certification Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Certification Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST I hereby certify that the monitoring system is operational in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting documentation is attached; and all information contained herein is accurate. Service Technician Signature Date Total # of Pages 10132177 4/28/22 Jaco #9933 Fastrip 4800 Fairfax Road Bakersfield 93306 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Payton Phillips 1073967 9482312 1-15-24 Veedor Root C27796 7-29-22 4/28/22 6 Underground Storage Tank Monitoring System Certification Form Page 2 of 6 5. MONITORING SYSTEM AND PROGRAMMING A separate Monitoring System Certification Form must be prepared for each control panel. Make of Monitoring System Control Panel Model of Monitoring System Control Panel Software Version Installed Attach the post-certification reports if the monitoring system is capable of generating either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆ Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆ Are the audible and visual alarms operational? ܆܆܆܆ All sensors have been: 1) visually inspected for wiring kinks, breaks and residual buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆ Are all sensors installed to detect a release at the earliest opportunity in the secondary containment? ܆܆܆܆܆܆ The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆ Was the monitoring control panel’s backup battery visually inspected, functionally tested, and confirmed operational? ܆܆܆܆܆܆ Does the flow of fuel stop at the dispenser if a release is detected in the under- dispenser containment? ܆܆܆܆܆܆ Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆ Does the turbine automatically shut down if the piping secondary containment monitoring system detects a release? Which sensors initiate positive shut down? (Check all that apply) ܆ Sump ܆ UDC ܆܆܆܆܆܆ If monitoring system alarms are relayed to a remote monitoring center, is all communication equipment operational? ܆܆܆܆܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 Veedor Root TLS-350 335.00 Underground Storage Tank Monitoring System Certification Form Page 3 of 6 6. SENSOR TESTING RESULTS List only sensors tested on date of this certification. List “Sensor ID” as labeled in system programming. Additional copies of this page may be attached to accommodate all sensors tested. Sensor ID Sensor Model Component(s) Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 L1 409 Reg 87 Ann L2 208 Reg 87 STP Sump L3 208 Reg 87 Fill L4 208 Super 91 STP L5 409 Super 91 Ann L6 208 Super 91 Fill L7 409 Diesel Ann L8 208 Diesel STP Sump L9 208 Diesel Fill L10 208 1-2 UDC L11 208 3-4 UDC L12 208 5-6 UDC L13 208 7-8 UDC L14 208 11-12 UDC L15 208 Vent BOX Underground Storage Tank Monitoring System Certification Form Page 4 of 6 7. LINE LEAK DETECTOR TESTING ܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) Simulated release rate verified: (Check all that apply.) ܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆ For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ܆܆ ܆܆ ܆܆ For mechanical LLDs, does the LLD restrict the flow through the pipe when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆ For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ܆܆ ܆܆ ܆܆ Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆ Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆ LLD ID LLD Model Lines Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 LLD- 1 FX1V 87 Unleaded LLD 2-FX1V 91 Premium LLD-3 FX1D Diesel Underground Storage Tank Monitoring System Certification Form Page 5 of 6 8. IN-TANK GAUGING TESTING ܆܆ Check this box if tank gauging is used only for inventory control. ܆܆ Check this box if NO tank gauging equipment is installed. (Do not complete this section if either box is checked.) Yes No NA All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆ Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆ Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆ Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆ Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆ Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆ Probe ID Probe Model Tanks Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ 9. COMMENTS Describe all answers marked “No” or “Fail” and proposed remedy. List all monitoring equipment either replaced or repaired. ܆܆ Underground Storage Tank Monitoring System Certification Form Page 6 of 6 10. MONITORING SITE PLAN Date site plan was prepared: If a site plan has been prepared that shows all required information, you may include it, rather than this page, with your Monitoring System Certification Form. The site plan must show the general layout of tanks and identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include a legend for all symbols depicted. Could not find site map LEGEND L1 87 ANNULAR L2 87 STP L3 87 FILL L4 91 STP L5 97 ANNULAR L6 97 FILL L7 DSL ANNULAR L8 DSL STP L9 DSL FILL L10 UDC 1 - 2 L11 UDC 3 - 4 L12 UDC 5 - 6 L13 UDC 7 - 8 L14 UDC 9 - 10 L15 UDC 11 - 12 L16 VENT BOX 87 GAS 3/2 INCH DBL WALLED PIPE 91 GAS 3/2 INCH DBL WALLED PIPE DIESEL 3/2 INCH DBL WALLED PIPE VAPOR RETURN 3 AND 2 INCH SINGLE WALL PIPE VAPOR VENT 3/2 INCH DOUBLE WALLED PIPE PRODUCT SPILL CONTAINER VAPOR SPILL CONTAINER ANNULAR EMERGENCY SHUT-OFF OVERFILL ALARM FIRE EXTINGUISHER HEALY CAS EVACUATION MEETING POINT UST ELECTRICAL PANEL AUTOMATIC TANK GAUGE AIR AND WATER DISPENSER HAZWASTE DRUM A H P V EXISTING BUILDING FSTPL8AL712,000 GALLONDIESELFVSTPL412,000 GALLONPREMIUMFV STPL212,000 GALLON87 UNLEADEDAL5AL1L9L6L321L10CATCHBASIN NO PARKING NO PARKINGNO PARKING43L11 6 5 L12 87 L13109L141211 L1 5 L16HDUMPSTER PRICE SIGN CATCHBASIN N FAIRFAX RD. PROPERTY LINE AUBURN ST.PROPERTY LINE SCALE: SITE MAP C1 VICINITY MAP PROJECT DATA 3/32"=1'-0" INCHES012 SHEET SIZE 22 X 34 4800 FAIRFAX RD. BAKERSFIELD, CA 93306 PROJECT OWNER: FASTRIP OIL COMPANY PO. BOX 82515 BAKERSFIELD, CA 93380 CONTACT: SITE PLOT PLAN FOR: CERS ID 10132177 FACILITY ID 15-021-103469 FASTRIP #9933 4800 FAIRFAX RD. BAKERSFIELD, CA 93306 04/24/17 REV.FAIRFAX RD.AUBURN ST. Appendix VIII Underground Storage Tank Spill Container Testing Report Form CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council Page 1 of 2 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month 1. FACILITY INFORMATION CERS ID Test Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. TEST PROCEDURE INFORMATION Test Procedures Used Components Tested 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST I hereby certify that each spill container was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 10132177 4/28/22 Jaco #9933 Fastrip 4800 Fairfax Road Bakersfield 93306 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Payton Phillips 1073967 9482312 1-15-24 OPW 0187328 10-1-22 Hydrostatic Lake Test OPW Spill Buckets 4/28/22 2 Underground Storage Tank Spill Container Testing Report Form Additional copies of this page may be attached. Page 2 of 2 6. SPILL CONTAINER DETAILS Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Tank ID Spill Container Manufacturer: Method of Cathodic Protection ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other Is the spill container minimum capacity five gallons excluding riser volume? ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* Method to keep spill container empty ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other Spill Container Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Tank ID Spill Container Manufacturer: Method of Cathodic Protection ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other Is the spill container minimum capacity five gallons excluding riser volume? ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* Method to keep spill container empty ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other Spill Container Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail 1 8. COMMENTS Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy. * Mark here if: Spill containers do not have a minimum capacity of five gallons and require replacement. T1 Unleaded OPW T2 Premium OPW T3 Diesel OPW