Loading...
HomeMy WebLinkAboutRES NO 084-2022RESOLUTION NO. 0 8 4- 2 0 2 2 A RESOLUTION DISPENSING WITH BIDDING UNDER SECTION 3.20.060 OF THE BAKERSFIELD MUNICIPAL CODE RELATING TO DESIGN/BUILD (FOR THE GUARDRAIL SYSTEM AT PANORAMA DRIVE) WHEREAS, the use of design/build methodologies has been shown to be an effective method of reducing construction costs; and WHEREAS, the use of design/build joins the construction and design of a project under one single legal entity thereby reducing conflicts; and WHEREAS, the City Council believes the use of design/build is appropriate for certain unique projects where specialized design or construction methods are necessary or special design expertise must be employed; and WHEREAS, the City Council believes the public and the procurement process can be adequately protected through the use of a fair competitive process for choosing a design/build entity which best serves the interests of the City. NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows: 1. The above recitals are true and correct and incorporated herein by reference. 2. The Guardrail System for Panorama Drive is appropriate for design/build because of the specialized nature of the design or construction or because specialized expertise must be employed. 3. The Guardrail System for Panorama Drive justifies exception to the bidding process and the City Council hereby determines that the work, supplies equipment and material can best be obtained through the design/build construction procurement process. 4. Upon adoption of this Resolution, the Public Works Director is authorized to proceed with the design/build procurement process, as set forth in the Bakersfield Municipal Code Section 3.20.060D, et al, for the Guardrail System at Panorama Drive. 8pKF9 5. The Public Works Director shall recommend a design/build entity sm - Page 1 of 3 Pages - ` 0RIGINAL� that combines appropriately licensed contracting, architectural and engineering services, as needed, into one legal entity. 6. The Public Works Director shall invite no less than three appropriate design/build entities to participate in the selection process. The Public Works Director shall, in a timely manner, bring the contract for award of the project to the City Council for approval with a report setting forth the reasons the award is recommended to the chosen design/build entity. HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council i N 0 7Z t?20 jity of Bakersfield at a regular meeting thereof held on 11, by the following vote: ✓ v v ✓ ✓ YE COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GkAV, PANkIER NOES: COUNCIL MEMBER COUNCIL MEMBER eSE COUNCIL MEMBER ++\lon 144a Julie Drimakis, MMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED JUN 01 2022 By Karen Goh Mayor APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney - Page 2 & 3 Pages - "ORIGINALS JOSHUA H. RUDNICK Deputy City Attorney - Page 3 of 3 Pages -