HomeMy WebLinkAboutFMC 2022Appendix VI
Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION Installation Repair 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3.TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4.CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
13
Underground Storage Tank
Monitoring System Certification Form
Page 2 of 6
5.MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; Monitoring System Set-up Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications?
Secondary containment systems are free of damage, debris, or liquid?
Are the audible and visual alarms operational?
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational?
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment?
The monitoring system set-up was reviewed, and proper settings confirmed?
Was the monitoring control panel’s backup battery visually inspected, functionally
tested, and confirmed operational?
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment?
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected?
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) Sump UDC
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational?
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank
Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank
Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
3 GPH 0.1 GPH 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated?
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected?
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected?
For electronic LLDs, does the turbine automatically shut off when a release is
detected?
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected?
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test?
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks?
Were all items on the equipment manufacturer’s maintenance checklist completed?
Were all LLDs confirmed operational within regulatory requirements?
LLD ID LLD Model Lines Monitored Pass Fail
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank
Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
Check this box if tank gauging is used only for inventory control.
Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults?
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational?
Was accuracy of system’s product level readings tested?
Was accuracy of system’s water level readings tested?
Were all probes reinstalled properly?
Were all items on the equipment manufacturer’s maintenance checklist completed?
Probe ID Probe Model Tanks Monitored Pass Fail
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
Monitoring System Certification
UST Monitoring Site Plan Site Address: 1601 Truxtun Avenue, Bakersfield, CA. 93301
□ .'TL� -J,!;·�
ovEC?.'-',\\. (:,"�-..:>-
:e:'{13qo-� �
1\'lif\lvl�r .:'.>,:i;-Sp r.
.' .' ;" ...... . ... 7q�·;5c, -· z.;;,� · :J,..,'I\ p · -;,�n,}o.,. ·�r)(\-/ .. t..,,,� u�. O.ctca"'-'.I ... <! r. Date map was drawn: 06/30/2022Instructions If you already have a diagram that shows all required information, you may include it, rather than this page, with your Monitoring System Ce11ification. On your site plan, show the general layout of tanks and piping. Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). In the space provided, note the date th.is Site Plan was prepared. UN-036-4/4
Page 4 of 4
www.unMocs.org Re\'. 01/17/08
Appendix VIII Underground Storage Tank Spill Container Testing Report Form
CERS = California Environmental Reporting System, ID = Identification, ICC = International Code
Council
Page 1 of 2
TYPE OF ACTION ☐ Installation ☐ Repair ☐ 12 Month
1. FACILITY INFORMATION
CERS ID
Test Date
Facility Name
Facility Address
City
ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Test
Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number
ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. TEST PROCEDURE INFORMATION
Test Procedures Used Components Tested
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that each spill container was tested in accordance with California Code of
Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
Total # of Pages
Underground Storage Tank Spill Container Testing Report Form
Additional copies of this page may be attached.
Page 2 of 2
6. SPILL CONTAINER DETAILS
Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer
Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
☐ Yes
☐ No*
☐ Yes
☐ No*
☐ Yes
☐ No*
☐ Yes
☐ No*
Method to keep spill container
empty
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
Spill Container Test Results ☐ Pass
☐ Fail
☐ Pass
☐ Fail
☐ Pass
☐ Fail
☐ Pass
☐ Fail
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
☐ Nonmetallic
☐ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
☐ Yes
☐ No*
☐ Yes
☐ No*
☐ Yes
☐ No*
☐ Yes
☐ No*
Method to keep spill container
empty
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
☐ Drain
☐ Pump
☐ Other
Spill Container Test Results ☐ Pass
☐ Fail
☐ Pass
☐ Fail
☐ Pass
☐ Fail
☐ Pass
☐ Fail
1 8. COMMENTS
Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy.
* Mark here if:
Spill containers do not have a minimum capacity of five gallons and require replacement.
SPILL BUCKET TESTING INFORMATION
Test Method Used:
Test Equipment Used: Equipment Resolution:
Identify Spill Bucket (By Tank Number, Stored Product, etc.) 1 2 3 4
Bucket Installation Type:
Bucket Diameter:
Bucket Depth:
Wait time between applying vacuum/water and start of test:
Test Start Time (TI):
Initial Reading (RI):
Test End Time (TF):
Final Reading (RF):
Test Duration (TF – TI):
Change in Reading (RF - RI):
Pass/Fail Threshold or
Criteria:
Test Result:
CVE
Cal- Valley Equipment
3500 Gilmore Ave.
Bakersfield CA 93308
661 -327-9341 FAX# 661 -325-2529
VAPORLESS MANUFACTURING, INC.
LDT-890 Leak Detector Test Record
Technician Date
Pass / Fail
Product
Manufacturer
Leak rate
Operating pressure
Line pressure (pump off)
Facility Address
Bleed back (pump off)
Step through time to full flow
Stays in leak search position
E.. ETEI"1_SETUP
JUN 38, :0!2 E:ti_:r
SYSTEI,] UI.]1 TS
SYSTEI'I LAI']GUAi.;E
EI,ICL I EH
SYBTEII DarTE T I l'1E FORI{ATl'loN ltr YYtJt/ HH:l.ll"l:EB
BXFD CITY POLIIJE DEP
I bO l TRUI.ITUI,,I AVE
EA}iEREF ] ELT], (:A93i]O 1
661 -826-!BBS
EHIFT
SHIFT
SHIFT
SHIFT
cor'lr'luNitrATI I'ls lEIUI _
PORT SETTI NGS:
FULL \IUL
84. 1 INCH i/ L56.1 It,]L-H ,/OL
28, LJ I I'ICH V(JL
I N_TANI( SETUP
T i : UI,IL - B?
PRDDUCT COTIE
THERi"IAL LTOEFF
TAN}i DI AT,]ETEE
TANH PROF t LE
1
.0rlLrE?0112.13.I PTS
l4?83
11?61
EBOB:5 09
l:r0t" 't EOAR!r
EAUTJ RATE
PiiR I TY
STOF EIT
TIATA LENGTH
I t Fi(:t'l0tr )
2q 00
ODDt ETOP7 DATfl
FLll*T EIEE: 4.LL Il'1.
HHTEE l'IAENlllG : 3'l]
HI(]H UJHTER LII"IIT: 5'I
1lf,lE ITIIIE :
T] I]E :'tiHE 4
T,I SHELED
TI I EHELED
D IEAELE[T
D I SAELED
TFiT l,lEEtrEIr [iPll
TST IIEEITEI I,,lEl,l
RS-EBI gEf,UR I T'r'
CODE : D I EAELET)DIAL TVPE : TONEANSUERON:lRINfJ
MODEI.I SETUP STR I I']G :
D I AL TONE I I'ITERVAL : 32
RECEIVER SETL]P :
NONE
I.]A:{ OE LITEEL VOL
OUEFFILL LI T1I T
HIGH !'EODULIT
T]ELIVERY LII.lIT
LOI,I PROTIUCT
LE*H ALTTRI,I LI I'1I T
SUDIEI.] LOEE LII'1IT :
TANX TILT :
PROBE OFFSET :
14?8:
lE%
1 {0n jglti
I :1lrl4llr,
0
1l
99
:-r !
D.oLl
0. LtD
THlll: PER
I) I SAELETT
TAI,IH Af,,]II
I] ] SAELED
L I I,lE EE EI{HELE |IETHOD
},HES LII,IE TEET
L]NE PEE
D I SAELED
L I I.IE ANN
T] I SAELET]
TET I,]EEIEII 1"]FI1
T5T I'IEETTET] LJRI{
PR I NT TC VOLUI,IES
EI{AELED
TE|"IP COl.lPENSrrTlOll
VALUE (I]EG F ): 6I].I:I
ET ICI{ HEIGHT OFFSET
D ISAELED
H_PROTOCOL T]ATA FOEI"]HT
HE I EHT
DAVLIGHT SAVI I,,]'.; T I f.,]E
E I,{ABLED
START DATEAPR I,]EEX 1 9UI,,1STAFT T I I,IE3:00 flt,l
END TIATEOCT I'EEX b SUN
END T IT,IE
2 : tto At"l
RE-DI RE[)T LSCAL PRI I'I OUT
DI SABLED
EURO PFOTICNL PEEF I X
S
SYSTEI.I SE(]UF I TY[oDE:0000t:i[
.-:USTOI'] ALARI.'I Lfi EELFJ
D I SAELED
AUTO TT I AL T I I'lE SETUP :
NONE
ES-T32 EI,ID OF I"IESSAGE
DI SAELED
tulo_Li*! ALARr'1_sEruP
E I FHOI,I I,1AI.1] FI)LI]EIT TANHSTB: NOI'IE
LtNE I.1ANI FOLDEIT TANKE
TS: tiONE
LEA}I I'1IN PEEIOITII:
:
LEAI{ l'll I'1 Hl'll'lLIHL :
PERIODIT:r TEST TYPE
STANTIARO
ANNUAL TEST FAIL
ALARI'] D I SHELED
PEEIO!IC TEST FAIL
ALAEI,] g I S*ELEI]
GROSS TEST FAI L
ALARI,I tJ I SAELED
AIiI.I TEST AVERA'J i NG : OFF
PEE TEST AVERA(JI I'IG: OFF
TAI'I}: TEST I,IOT I FY : OFF
Tl,lH TET E I PH{ltl EREA}: :OfF
DELI VEEY DELAY : I I"1I I\]
PUI"IP THREEHOLTI : l O. OO%
_11;
D
,1",
U
LEAl{_rESrlErlo!,_-_
TEST ON I)HTE : ALL TAI.IX
r"10v 10. 2003
BTART TIf'IE : TIISiTELED
TEST RATE :0.28 GAL. HE
DUEATIT}N : 2 HOURS
TST EARLY ST P:DI SABLEI)
LE*}i TEST REPOET FORI"IAT
NORI.lAL
UUTPIJT RELI1Y SETUP
R I : REI'I{)TE HLERl,l GHRH(_;E
TYPE :
STHNDHRI)
I!i]RI']ALLY OPEI,I
I II-TAN}i AL*KI"]ET 1 :LEfiI1 HLBRHT l:HIaiH IJHTER HL.iRI"lT I :OVEFFILL HLAEt"lT I : LOI,j PRODUCT ALITPI.IT I :SUDDEN LOSS ALARI'IT 1:HIGH PRODUI)T *LHRIIT 1 :PROEE UUT
: HIGH NATER LNAFNIT.]G
: DEL I VERY I.IEEDED:llAX PROtiUr:lT ALAEl,l:GFOSS TEST FAIL
Lr 6u r D_sEr,rsoR-slrlP _ _ _
L I:PIF'ING SUI.1P SEI.]|JOR
TRI-ETATE (SI I,t{.iLE FLOAT}
L]ATEGOEI/ : OTHER SENSORFJ
L ? : AIINULAR gPACE FJEI"ISORTRI.STATE (SI NGLE FLOAT )
CATEGORV : OTHEE EEI']SOES
T
T
T
T
LIOUI D EEI']Fi0F pLI,lFi
HLL :FLIEL ALITRI.IALL :SENSOE O.]T i.1LAFI"IALL :EHORT HLIIRI'I
ALL : Ii]ATER AL*8I.1
ALL : LiJATER OUT ALARl"l
ALL : HIIIH LISUIIT HLARI'I
ALL :LOI,,I LIAUIL HLARI"I
ALL :LIOUITI I,JARII I NG
R 3 :FUEL LEA].:
STAI,JT)ARD
I,.INRTI*LLY CLIJSED
L]OUID SEI'IEOF ALI.1S
ALL : FUEL I.ILARI'I
ALL:EENEOR OUT AL*EI'I*LL : SH+ET Ht-ARi'I
E 4 :OUTS I DE iiLARI.l
TYT,E:
ST*ITIiRD
r'toRtlALLY O!,Et,l
I I,I-T*I.]K ALARI,]E
ALL : LEAH ALI+RI"IALL:HIGH UTiTER HLHEl"l
ALL:OVERFI LL HLHRI'IiiLL I LOL,J F'RODULTT rlLARl"l
HLL :FJUDI]EN LI]ES ALAFI.IT 1:HIGH PE{]I,U'.]T ALARI'IALL:FFOEE OUT
r.iLL:HIGH l,lATER LiARNI l,lLjALL:DELIVERY NEEDETIT I :flAX F'RODIJL::T ALHRl"lT I :GEOSS TEST FfiIL
L I8U I D SEI'ISOF IILI']D-
ALL :FUEL ALARI"]
ALL:EENEoE oUT ALnEI,l
ALL:SHORT ALHRt"l
IILL :I.]ATER ALHRI.IiiLL:UATER OUT fil.aEl.lALL:HIGH LI6UItT ALAEI']ALL:LOh LIOUID HLARI"]
TLL: L I6UI D I,IARI,JI I"](]
f,B[3l^j![.155"1?r0H LE'/EL
soFrr,JHRE;-ji;:!4_ I DD_ELXEH I rJ,r _ DJ.l l.lu. t?,15
I{O SOFTL^JiiRE r,ra)rrlrr FSTETEH FEATUR'ii.--
Ii[,ili' \,, ] i;ili,,f ,"IiB'=
ALARI.I HISTOFY REPOFT
----- EYETEil gLAFr"t -----
PAPEE NUTAPF 6, t022 E: !6
PRI NTEE EFEOFAPR 6, 202.J E : 2E
EATTEFY IF OFF
NOV 10, PO[3 B:02 *LAFI,I HIETOFI",' REFNRT
.''.- SENSNR ALARI.I -_L 1:! IFll\lc SUI1P sEf'lsllFl
OTHER EEI,]ENRB
EEI,]SOH OUT ILARI,]
FUEL ALARI,IFEB 4. Et_rt1 9:[B
EENEOE flUT ALITFI']FEE 13, 1020 L0:18
xrix*lEl,lLrxari
AL.TEI'] HIETORY EEPONT
---- I I'l-TAI,tX AL Rr.1 -----
T 1 : UNL_ST
SETUP DATA I'IARN I NG
JAN l9.2DlS 9:30
OVERF I LL ALARI'1
FEE I3, ?DEO 1O:12JUN 9, 2trE4 l3:04
APR IE, EOO4 ?:07
LOH PEOIIUCT ALARI,]
JAN 19, ?018 9:30
H I IJH PRODUIJT ALARI']
DEC 17, 20?t 14:31Nov 29, 2021 10:26
FEE I3, ?OzE IO:1P
PEOEE OUT
FEE 13,2020 I [:09JUL 5, e0t9 20:!9JUL 5, 201 9 ?0:28
LOU TEI.1P IiJARN I IIGFEE 13, E0?tl 10:10JIJL 5, 201 I 20 : 27NOV 5, 2812 9:28
ALAEI.I HISTORV REPORT
-___- BENSOE ALAR[,] _---_
L 2 : AIINULAR SPACE EEI,JSOR
OTHEF SENSOES
SENSOE OUT ALAET1FEE 4, 20Et 9:29
FUEL ALARI'IFEE 4,2021 9: E9
FUEL ALARI4FEB 4, 2021 E:35
*tx**EI,l[r)i*l'x;i
xxlitxEl',lI)1,{ix;{
XtX*r(El,ltl:ri}rx