Loading...
HomeMy WebLinkAboutMcCutchen Outflow Installation2022.05 McCutchen Outflow East of Mc Cutchen Rd & Gosford Rd MH on north shoulder of road, north of lift station X Install Date: 5/27/2022 Access:System Type: StormSanitary Map Technology Flow Meter Meter Depth: 66" MH Coordinates: 35.281693, -119.090229 Moderate open channel hydraulics Avg Velocity Avg Measured Level Multiplier O2 H2S CO LEL 20.9 0 0 0 Notes No laterals; monitored upstream line as it provided best hydraulics during inspection. Traffic Safety Used cones to delineate work zone. Land Use Residential Commercial Industrial Trunk X East Manhole Depth 60" 141" Round 60"/60" Good Concrete None observed Passed 0.4 2-D 74.5" 14.5" Upstream Flow Heading Sensor Direction Sensor Dist. to Crown Sensor Offset Velocity Profile Data Velocity Profile Taken Silt Manhole Material Pipe Condition Pipe Shape Inner Pipe Size (In/Out) Monitored Pipe Size McIntosh & Associates Bakersfield, CA 93313 MH # unknown Site Report Confidential Proprietary Information 6/26/2022 Sewer Plan 2.5 fps 15.5" 1.0 Gas 2022.05 McCutchen Outflow East of Mc Cutchen Rd & Gosford Rd Bakersfield, CA 93313 Meter Site Document Manhole Before Install Installed Site Installation Process Monitored Manhole Temporary Flow Study McIntosh & Associates 2022.05 McCutchen Outflow Utility Systems, Science and Software Santa Ana, CA 92705 601 N. Parkcenter Dr, Suite 209 Meter Start Date From 5/27/2022 Meter Stop Date To 6/21/2022 El Cajon, CA 92021 9314 Bond Av, Suite A Velocity (fps) Level (in) Flow (mgd) Average 2.538 15.507 6.343 Maximum 4.670 64.940 17.392 Minimum 0.330 8.140 2.501 Pipe Size 60.000 Estimated Capacity (mgd) Not Calculated Capacity Used Not Calculated Sensor Type Hach - Flodar