Loading...
HomeMy WebLinkAbout McCutchen PS Inflow Installation2022.05 McCutchen PS Inflow East of Mc Cutchen Rd & Gosford Rd MH in EB lane, north of lift station X Install Date: 5/27/2022 Access:System Type: StormSanitary Map Technology Flow Meter Meter Depth: 327" MH Coordinates: 35.281587, -119.090576 Slow to moderate hydraulics with varying degree of backwater conditions due to proximity of PS Avg Velocity Avg Measured Level Multiplier 0.6 fps 47.5"0.8 Gas O2 H2S CO LEL 20.9 0 0 0 Notes No laterals; monitored downstream line as it provided best hydraulics during inspection. Traffic Safety Used arrow board, cones & signs in accord w/site-specific CA MUTCD TC requirements. Land Use Residential Commercial Industrial Trunk X South Manhole Depth 60" 393" Round 60"/60" Good Concrete None observed Controlled by PS 0.4 2-D 66.1" 6.1" Downstream Flow Heading Sensor Direction Sensor Dist. to Crown Sensor Offset Velocity Profile Data Velocity Profile Taken Silt Manhole Material Pipe Condition Pipe Shape Inner Pipe Size (In/Out) Monitored Pipe Size McIntosh & Associates Bakersfield, CA 93313 MH # 3 Site Report Confidential Proprietary Information 6/26/2022 Sewer Plan 2022.05 McCutchen PS Inflow East of Mc Cutchen Rd & Gosford Rd Bakersfield, CA 93313 Meter Site Document Manhole Before Install Installed Site Installation Process Monitored Manhole Temporary Flow Study McIntosh & Associates 2022.05 McCutchen PS Inflow Utility Systems, Science and Software Santa Ana, CA 92705 601 N. Parkcenter Dr, Suite 209 Meter Start Date From 5/27/2022 Meter Stop Date To 6/21/2022 Velocity (fps)Level (in)Flow (mgd) Average 0.615 47.393 6.236 Maximum 1.560 60.570 12.541 Minimum 0.250 17.620 2.130 Pipe Size 60.000 Estimated Capacity (mgd)Not Calculated Capacity Used Not Calculated Sensor Type Hach - Flodar El Cajon, CA 92021 9314 Bond Av, Suite A