Loading...
HomeMy WebLinkAboutSB-989 2022CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION Installation Repair 6 Month 36 Month CERS ID Test Date Facility Name Facility Address City ZIP Code Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date Manufacturer and Test Equipment Training Certifications Expiration Date Test Procedures Used Components Tested I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by Manufacturer Industry Standard Professional Engineer Test Type Pressure Vacuum Hydrostatic Test Equipment Used: Tank ID Tank Manufacturer Tank Capacity Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail Test Method Developed by Manufacturer Industry Standard Professional Engineer Test Type Pressure Vacuum Hydrostatic Test Equipment Used: Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by Manufacturer Industry Standard Professional Engineer Test Type Pressure Vacuum Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results Pass Fail Pass Fail Pass Fail Pass Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST