Loading...
HomeMy WebLinkAbout1.2-7372REVIEWED BY. Ze)2 o A A A A A A 0 FIAW I a 0 V 101TJ -2 sm A :1 ;041b 9 10 &311119016 CIO BENCHMARK USED: TOP OF CONCRETE MONUMENT IN A LAMPHOLE 54' WEST OF THE CENTERLINE INTERSECTION EET (PER PARCEL MAP 12100 PHASE 1 MONUMENT OF WHITE LANE AND WINDERMERE STR ELEVATION MAP) ELEVATION= 353.03 (U.S.G.S DATUM) BASIS OF BEARINGS: THE BEARING OF N 00*56'51" E ALONG THE CENTERLINE OF SOUTH ALLEN ROAD AS SHOWN ON PARCEL MAP 12100, RECORDED DECEMBER 30, 2014 IN BOOK 59 OF PARCEL MAPS AT PAGE 178, WAS USED AS THE BASIS OF BEARINGS SHOWN HEREON. LEGAL DESCRIPTION. BEING A DIVISION OF LOTS 1 THRU 4 OF PARCEL MERGER NO. 20-0084 PER CERTIFICATE OF MERGER RECORDED AUGUST 26, 2020 AS DOCUMENT NO. 220117531 O.R., ALSO BEING A PORTION OF THE NORTHWEST QUARTER OF SECTION 13, TOWNSHIP 30 SOUTH, RANGE 26 EAST, M.D.B.&M. IN THE CITY OF BAKERSFIELD, COUNTY OF KERN, STATE OF CALIFORNIA. VICINITY MAP NO SCALE jL AIL An mom ALL PHASES SHALL BE CONSTRUCTED AT THE SAME TIME-, SHEET No.INDEX TOP OF MANHOLE ELEVATION TITLE SHEET TOP OF CLEANOUT ELEVATION STANDARD NOTES PIPE INVERT ELEVATION STANDARD DETAILS L tTE,-6223 "1-7" j 1 11 1 00 CN C-4 C"4j L_' STOCKDALE LA'o I I ".'CD =fii:�::_6001 "C" HIGH �a� cl�) POLYVINYL CHLORIDE SOUTH ALLEN ROAD APPROXIMATE LENGTHS, CONTRACTOR (36+41 — 44+50) SHALL VERIFY ALL LENGTHS PRIOR TO SCHOOL BIDDING THIS PROJECT (44+50 - 54+50) REINFORCED CONCRETE PIPE WHIE LANE LOT 1 PM No. (D MUIRLANDS PARKWAY EDGE OF PAVEMENT (22+06 — 30+43) LLA No. 11861 EA (35+00 — 37+00) TRACT 7372 PHASES 1 & 2 C14 -Id' 12-0351 a < 0 0 EA (FUTURE) 0 LOT 1 2 EA TIE-IN(S) PROJECT EA LLA No. LCT:R:: L86 EA 2 SITE In r__ 13 - 0 17 6 1 EA 3 4 4 C) m < ::i EA ;5 '' EA 0 MUIR[ 0 EA cn E EA 0 00 0 r-0 C) LOT 4 PM 20-0084 OF PG&E SUB R-6 F6 1 EA 0 0 EA STATION LF 0 LF 1, 303 LF 1,303 LF 0 0 0 EA DRI LOT 1 < q-__5_1:3:::5: z 1 V) LLANO. '--, '5 m VTPM u.j m 13-0179 Lu 11838 uj n It Z: VTPM 11838 L01 4 LLA No. E 12-0133 aft BOLTHOUSE__----� r WEST MING SPECIFIC PLAN AREA VICINITY MAP NO SCALE jL AIL An mom ALL PHASES SHALL BE CONSTRUCTED AT THE SAME TIME-, SHEET No.INDEX TOP OF MANHOLE ELEVATION TITLE SHEET TOP OF CLEANOUT ELEVATION STANDARD NOTES PIPE INVERT ELEVATION STANDARD DETAILS (EAST, SOUTH, NORTH, WEST) TEMPORARY SUMP PLANS POLYVINYL CHLORIDE SOUTH ALLEN ROAD APPROXIMATE LENGTHS, CONTRACTOR (36+41 — 44+50) SHALL VERIFY ALL LENGTHS PRIOR TO SOUTH ALLEN ROAD BIDDING THIS PROJECT (44+50 - 54+50) REINFORCED CONCRETE PIPE SOUTH ALLEN ROAD RUBBER CASKET JOINT (54+50 — 62+82) (D MUIRLANDS PARKWAY EDGE OF PAVEMENT (22+06 — 30+43) SEWER MANHOLE MUIRLANDS PARKWAY EA (35+00 — 37+00) EA PATHWAY COURT TMH- TOP OF MANHOLE ELEVATION TCO— TOP OF CLEANOUT ELEVATION INV.— PIPE INVERT ELEVATION (E,S,N,W)- (EAST, SOUTH, NORTH, WEST) P.V.C._ POLYVINYL CHLORIDE 12" SEWER MAIN APPROXIMATE LENGTHS, CONTRACTOR LF SHALL VERIFY ALL LENGTHS PRIOR TO LF BIDDING THIS PROJECT R.C.P.- REINFORCED CONCRETE PIPE R.G.J.— RUBBER CASKET JOINT CB- CATCH -BASIN EP- EDGE OF PAVEMENT MATERIALS LIST ESTIMATED QUANTITIES FOR PLAN CHECK AND INSPECTION FEE CALCULATIONS NOT TO BE USED FOR BIDDING PURPOSES. SEWER PHASE 1 PHASE 2 18" SEWER MAIN 0 LF 0 LF 12" SEWER MAIN 0 LF 0 LF 10" SEWER MAIN 0 LF 0 LF 8" SEWER MAIN 813 LF 477 LF SEWER MANHOLE 6 EA 1 EA SEWER DROP MANHOLE 0 EA 0 EA SEWER CLEANOUT (TEMPORARY) 0 EA 2 EA TIE-IN(S) 1 EA 0 EA i 42" R.C.P. STORM DRAIN 36" R.C.P. STORM DRAIN 30" R.C.P. STORM DRAIN 24" R.C.P. STORM DRAIN 18" R.C.P. STORM DRAIN TYPE A" CATCH BASINS STORM DRAIN MANHOLE OUTLET STRUCTURE CHRISTY DRAIN BOX (TEMPORARY) CHAIN—LINK FENCE CHAIN-LINK GATE PHASE 3 TOTAL 67 LF 67 LF 400 LF 400 LF 1,234 LF 1,234 LF 354 LF 1,644 LF 5 EA 12 EA 1 EA 1 EA 3 EA 5 EA 1 EA 2 EA 83 LF 0 LF 0 LF 83 LF 241 LF 0 LF 0 LF 241 LF 570 LF 0 LF 69 LF 639 LF 0 LF 414 LF 745 LF 1,159 LF 152 LF 79 LF 99 LF 330 LF 0 EA 1 EA 1 EA 2 EA 4 EA 1 EA 3 EA 8 EA 1 EA 0 EA 0 EA 1 EA 0 EA 1 EA 1 EA 2 EA 0 LF 0 LF 1, 303 LF 1,303 LF 0 EA 0 EA 1 EA 1 EA TCO#5 SS#6 TCO#4_/�_ SS#5 < _T An L —I- 0 COURT V) �D #4 All CORNELIA WAY s r— — F_ T CB#2 TRACT 7347-1 TRACT 7,372 ry M.B. 63, PG. 117 -7- PHASES 1 & 2 (FUTURE) 10 < 0 L SS#4 SS#3 11 SD#2 SS#2 TCG#3--/ PHASE 3 PHASE 2 ss#1 TCO#1 TCB#1 L <:_3: Q� ------ 0 < 1 ly -7 SD#3 I r�_ — — _� n 0 s �uj SUMP < cy- Im m m s S_ < SS#12 r SS#8 < r SS#7 L SS#1 1 I- ___x - 7 S D 6 _SD# u s - 1- 7 u UIRLANDS SS#9 �tSD#5 SD#8 DRILL SITE (NOT A PART) --TCO#2 CB#1 LSD#1 I LOT 4 ss#1 0 P.M. 20-0084 KEY MAP LEGEND SHEET INDEX NUMBER 0 SS#1 2 SEWER MANHOLE W/NUMBER 0 TCO#1 TEMPORARY SEWER CLEANOUT W/ NUMBER 0 SD#6 STORM DRAIN MANHOLE W/NUMBER fq CB#1 2 CATCH BASIN W/NUMBER 0 TCB#1 TEMPORARY CHRISTY CATCH BASIN W/ NUMBER PROPOSED SEWER MAIN PROPOSED STORM DRAIN EXISTING SEWER MANHOLE EXISTING SEWER CLEANOUT S-- EXISTING SEWER MAIN —SD-- EXISTING STORM DRAIN SCALE: 1'=200" -0 LL U. LL 0 EL- C5 0 w 0 cn 0 LU �_ M a =:4 C-) CL Z ui 0 ui < z 0) UJ CO Z [Lf �-z LLJ UJ cn W Lu < – W Q) co z I— �_ 0 ui 0 a. 0 =:) = u -- F- �L- z o z CL<Z mzww=o w m: < z u)- 0 W on cl);= xcl)mwz(n>F- < U) LL r 0 1— 0 — 0 z --i U) z ui w x < 0 w w W = 3: -i 05 m 2 z m � w �– z cf) w < w :r 0 < W (1) L -L m 0) 2 W ME co ;::; 0 u- gxw=)Z-1--0 3: < --j ZO W wa.009w wwO < 0 x m F_ r Zr- Lu z 0 z m E < - PME z._w3:0xz0'" W <XO L)<Mcw _w �c 0 z)- -) U) w W W (1) (6 CIO z 0 zzcr-mmz 03;w 0-00va-50EL i� x — — W _L W uj uj,-- > 0 S2 VJ =: (n X Lu LLJ cf) M i2j F- cn 0 cj) - 0 uj �--razwa -m gu-F-Z-x CI)F- 0 0 �: < 3�: w 0 z 25;� - z a g w Lq oz > w < P 0 0 <--- =050w w <w a- c6cL 0 CL CI) I— U) z 0 a. Z0ujww XOZ< 0xZxm0w0<x – a. Z CL I— w > a co F_ 0 moozzo < Z Z Lu < 0 U_ 0 Lu I— z ui < 0 w Fn LLJ P Z 0 Z a CL LLJ Z Z E L'u < LLJ!Y 0 w 0 0 w u - a. M w < -*, 0 w ?n M 0 CO uj D x (-) 0 Z E' CI) 0 w X Z UJLUW- Z _j 0 n U. x M m < _j W 0 0 CL C:) �- < c6x _j W LLJ 0 m < 0 > _j 0wwxDZ<<00 z0T2Dw= Ww ZF- >0 <0� .5; 1 0 cl) Lu 0 W W Lu < LL z a = Lu 0 co W�-www '_ UJ < 0 uj > CO �- M > -LuLLZ—c0—<(0 ca CQ 0 CD =) Z Z X W UJ 0 UJ Z _j ! 0 * ca < W _j uj CL �_ w UJ u ui (f) >_ C/) m U) X: w z F_ a 0- �_ Q 0 ir_ < ui 3:: V� 0 Lj UJ _j Ld 5 5: 0 _3 V) –i z < 5; > F_ (_) L.LJ W < -r Lu z z w w m F-) CK >- M LJ 0j:: z z u.j -i Z -r 0 0 0 m a- < F- F= zm owun -::)o V)--%LLJ 0<w 0 M M 0 = F- 0 LL. ww >_ Z U i LJ Li :3 Fx 0 u- 0 uj Z :mwozouma >- Z V) (-D LAJ Z MOO<ZZM W Z — C-1 < V) = LLJ LJ Cr F- :D _j m UJ 0 < < < 0 m 0- V) Lli LU Lj Z > 5: uj m W-1<0 WV)F- < m Lu -,,- ow W�-50 LLJ Z Z F - <F -0000 Lu W UJ 3: >- 0 U cr_ P_ MZO ZWF- 0 < owo� ZU_F-WW<0M 0 0 V) F-'� - _1% z F- F- (n LLi 0 LAJ 0 (n < wwmwtnw 0 wowwwOm LL_ M Z X — 0 0 LLJ < 0 0 LLJ =: Z c3r Z < F- CL - -0 U) F- t-% LLJ V) V) W 0C W V) 0 z 00 OWZ< �_ �-- a < z < Z cr- _j m '-, Q- 0 - Z Lim Uj uj U) < ui z < z ozv) w < M ui 0 Z cy) L0 (0 C/) 5 p w z 0 t--- uj > (0 U - U) W z U) uj W ce) 06 Z w q [)� 0 U) N Z .. (y) w (1) w (0 C) 0 0 CL L 'Nv 0) U) 0 0 V) LLj > 0 0 Li Q 0.38 ci: 0 uj cr Q_ . < cr I ujF-:RM000W (n 0 -wzu< ui V) m _j < < CC, u- _1 0 �- w w F--00<MWMQ UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA DIAL TOLL FREE 1-8004224133 AT LEAST TWO DAYS BEFORE YOU DIG ? X11 0-1 m Oki: oil] zi 11*02 z 0 V) r4-) I-, 0) 3: _0 I--, co c E 0 co 0 40 40 40 ry LLJ C14 LL z F- w 0 o- 15� w w z (9 z w F- 0 _1 Z M 5.� ca W w Q� U- () w 0 x Q. 0 u- a > w 'Nv 0) U) 0 0 V) LLj > 0 0 Li Q 0.38 ci: 0 uj cr Q_ . < cr I ujF-:RM000W (n 0 -wzu< ui V) m _j < < CC, u- _1 0 �- w w F--00<MWMQ UNDERGROUND SERVICE ALERT OF SOUTHERN CALIFORNIA DIAL TOLL FREE 1-8004224133 AT LEAST TWO DAYS BEFORE YOU DIG ? X11 0-1 m Oki: oil] zi 11*02 z 0 V) r4-) I-, 0) 3: _0 I--, co c E 0 co 0 40 40 40 DATE 10/14/2020 PA JOB No. 3151 H 41 SHEET E a) > 0 0- E z 0 Y., > 1 X. I I I DATE 10/14/2020 PA JOB No. 3151 H 41 SHEET E a) > 0 0- E GENERAL NOTES 1. ALL CONSTRUCTION SHALL CONFORM TO THIS PLAN, THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION, THE CALIFORNIA BUILDING CODE, CITY OF BAKERSFIELD ORDINANCE, LATEST EDITION, AND STANDARDS PERTAINING THERETO AND THE GEOTECHNICAL INVESTIGATION PREPARED BY SOILS ENGINEERING, INC. DATED AUGUST 21, 2020, AND ANY ADDENDUM THERETO. THESE DOCUMENTS SHALL MAKE A PART HEREOF. THE CONTRACTOR SHALL OBTAIN A COMPLETE COPY OF EACH. 2. ALL CONSTRUCTION WITHIN THE CITY RIGHT-OF-WAY OR CITY EASEMENTS SHALL BE IN ACCORDANCE WITH THE PROPOSED CITY OF BAKERSFIELD STANDARDS AND STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION. THESE STANDARDS, DRAWINGS AND DETAILS SHALL BE CONSIDERED A PART OF THESE PLANS AND THE CONTRACTOR SHALL OBTAIN A COPY FOR HIS USE. 3. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS BEFORE START OF CONSTRUCTION. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK TO BE PERFORMED IN THE EXISTING, ACCEPTED STREET RIGHT-OF-WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN THE STREET RIGHT-OF-WAY SHALL BE POSTED PRIOR TO ISSUANCE OF A PERMIT. 4. 24 HOUR NOTICE: PRIOR TO THE START OF ANY PHASE OF CONSTRUCTION, THE CITY CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN AT LEAST 24 HOURS NOTICE. THE SECTION MAY BE NOTIFIED AT (661) 326-3049. 5. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS, DATA AND MEASUREMENTS AT THE BUILDING SITE PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS ON THESE DRAWINGS SHALL HAVE PRECEDENCE OVER SCALED DIMENSIONS. PORTER & ASSOCIATES, INC. MUST BE NOTIFIED OF ANY VARIATIONS FROM THE DIMENSIONS AND CONDITIONS SHOWN BY THESE DRAWINGS. 6. EXISTING UTILITY AND UNDERGROUND LINES HAVE BEEN SHOWN ON THIS PLAN ACCORDING TO AVAILABLE RECORDS. THE ENGINEER IS NOT RESPONSIBLE FOR POSSIBLE ERRORS OR OMISSIONS. THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF THE LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO BEGINNING OF ANY WORK. UNDERGROUND SERVICE ALERT (U.S.A.: 811) SHALL BE CONTACTED AT LEAST TWO WORKING DAYS PRIOR TO ANY CONSTRUCTION OR EXCAVATION. 7. ANY EXISTING IMPROVEMENTS OR UTILITIES THAT ARE REMOVED, DAMAGED OR UNDERCUT BY THE CONTRACTOR'S OPERATIONS SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S EXPENSE, AS DIRECTED BY THE ENGINEER AND APPROVED BY THE GOVERNING AUTHORITY. 8. IF A PROBLEM OR CONFLICT SHOULD ARISE DURING THE COURSE OF THE PROJECT, IT IS THE RESPONSIBILITY OF THE OWNER OR THE CONTRACTOR TO NOTIFY THE ENGINEER IMMEDIATELY PRIOR TO ANY FURTHER WORK. 9. THE CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, TOOLS, EQUIPMENT AND SUPERVISION NECESSARY FOR A COMPLETE AND FUNCTIONAL PRODUCT. 10. ALL WORK WHICH IS DEFECTIVE IN ITS CONSTRUCTION OR DEFICIENT IN ANY OF THE REQUIREMENTS OF THESE DRAWINGS AND SPECIFICATIONS SHALL BE REMEDIED, OR REMOVED AND REPLACED BY THE CONTRACTOR IN AN ACCEPTABLE MANNER, AND NO COMPENSATION WILL BE ALLOWED FOR SUCH CORRECTION. 11. IN THE EVENT CONSTRUCTION STAKING BASED ON THE CONSULTANT'S PLANS, DRAWINGS OR OTHER DOCUMENTS IS ACCOMPLISHED BY ANYONE OTHER THAN THE CONSULTANT, THE OWNER OR CONTRACTOR SHALL NOTIFY THE BUILDING OFFICIAL IN WRITING AS TO THE CHANGE OF ENGINEER IN RESPONSIBLE CHARGE. 12. THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING EROSION, SEDIMENTATION & DUST CONTROL PLAN AND STORM WATER POLLUTION PREVENTION PLAN IMPLEMENTATION AND THE SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. 13. IF THE CONTRACTOR IS IN DOUBT AS TO THE MEANING OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS OR FINDS DISCREPANCIES IN OR OMISSIONS FROM THE DRAWINGS, HE SHALL SUBMIT A WRITTEN REQUEST FOR AN INTERPRETATION OR A CORRECTION THEREOF, PRIOR TO FILING HIS BID PRICE FOR THE PROJECT. 14. PORTER & ASSOCIATES, INC. WILL NOT BE RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ANY AND ALL CHANGES TO THESE PLANS MUST BE APPROVED IN WRITING BY PORTER & ASSOCIATES, INC. 15. AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT OF WAY. UNLESS SECURED BY A SUBDIVISION AGREEMENT, SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED WITHIN RIGHT OF WAY AND INSURANCE AS REQUIRED SHALL BE PROVIDED PRIOR TO ISSUANCE OF A PERMIT. 16. NO CITY INSPECTIONS WILL BE GIVEN FOR THE WORK IN THIS AREA UNTIL A SUBDIVISION PERMIT WITH APPROPRIATE SECURITY AND INSURANCE HAS BEEN OBTAINED. 17. ANY WORK CONNECTING TO EXISTING PUBLIC FACILITIES FROM PRIVATE PROPERTY WILL REQUIRE AN ENGINEER'S ESTIMATE FOR THE WORK IN THE EXISTING PUBLIC RIGHT-OF-WAY TO ESTABLISH THE NECESSARY DEPOSIT FOR A STREET PERMIT. (FOR TRACTS WITH PRIVATE STREETS, PARCEL MAP IMPROVEMENTS, OR PUBLIC TRACTS WITHOUT RECORDED MAPS). 18. ANY ITEMS IN PUBLIC RIGHT-OF-WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADING AS PER CITY ENGINEER. 19. NORMAL STAKING AND MARKING OF THE PROJECT WILL BE SUPPLIED ONLY ONCE. ALL RESTAKING OR REMARKING SHALL BE AT THE EXPENSE OF THE CONTRACTOR. 20. SEE WATER AND STREET IMPROVEMENT PLANS FOR OTHER IMPROVEMENTS THAT ARE PART OF THIS PROJECT. Q013 SEWER SPECIFICATION5 1. ALL MATERIALS INSTALLATION SHALL CONFORM TO DIVISION 2 OF THE PROPOSED CITY OF BAKERSFIELD SUBDIVISION AND ENGINEERING DESIGN MANUAL AND WITH THE RECOMMENDATIONS OF THE MANUFACTURER. 2. ALL PIPE AND FITTINGS SHALL BE MARKED OR STAMPED NTH THE TRADE BRAND NAME OF THE MANUFACTURER, AND STRENGTH OR CLASS OF PIPE. 3. POLY VINYL CHLORIDE PIPE (PVC) 3a. MATERIALS: PIPE AND FITTINGS FOR PIPES LESS THAN 18" IN DIAMETER SHALL MEET THE REQUIREMENTS OF ASTM SPECIFICATION D3034 FOR SDR 35. PIPE AND FITTINGS BETWEEN 18" AND 48" IN DIAMETER SHALL MEET THE REQUIREMENTS OF ASTM SPECIFICATIONI F679 FOR PS 46. PIPE AND FITTINGS SHALL BE HOMOGENEOUS THROUGHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS OR OTHER INJURIOUS DEFECTS. FITTINGS SHALL BE INJECTION MOLDED AND SHALL BE INSTALLED IN LINE ON NEW PIPELINES; CUT -IN FITTINGS ARE NOT PERMITTED. .3b. JOINTS: USE ONLY ELASTOMERIC GASKET JOINTS. THE ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. WHERE PVC PIPE CONNECTS TO VCP, USE COUPLINGS APPROVED BY THE CITY OF BAKERSFIELD. 3c. INSTALLATION: PIPE AND FITTINGS SHOULD BE INSTALLED IN ACCORDANCE WITH ASTM D2321. ONLY CLASS I OR 11 EMBEDMENT MATERIALS WILL BE CONSIDERED SUITABLE FOR BEDDING AND HAUNCHING. ONLY CLASS I OR 11 EMBEDMENT MATERIALS WILL BE ALLOWED IN THE REMAINDER OF THE PIPE ZONE. 4. FOR CURVED PIPE: IDENTIFICATION TAPE DESIGNED FOR USE ON SEWERS SHALL BE PLACED ON TOP OF SEWER MAIN ALONG ITS ENTIRE LENGTH. IDENTIFICATION TAPE SHALL ALSO BE PLACED ON SEWER LATERALS EXTENDING FROM SEWER MAIN TO RIGHT-OF-WAY LINE. 5. SURFACE MARKERS FOR SEWER LATERALS SHALL BE INSTALLED AT THE PROPERTY LINE PER PROPOSED C.O.B. STD. DWG. SW -1, UNLESS OTHERWISE NOTED ON PLANS. 6. WYE -FITTINGS SHALL BE INJECTION MOLDED IN-LINE AND SHALL BE USED FOR ALL LATERAL CONNECTIONS AND SHALL BE ROTATED A MINIMUM OF 23* AND A MAXIMUM OF 45* ABOVE THE HORIZONTAL PLANE RUNNING THROUGH THE CENTERLINE OF THE MAIN. WYE FITTINGS ONLY SHALL BE USED FOR VCP. ALL SEWER STUBS SHALL BE CLOSED WITH A STANDARD PLASTIC PLUG (SOLVENT WELDED). 7. ALL LATERALS SHALL EXTEND TO A MINIMUM OF FOUR FEET BEYOND THE PROPERTY LINE AND SHALL BE 4" IN DIAMETER EXCEPT AS NOTED ON PLANS. 8. THE MANHOLES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROPOSED C.O.B. STD. DWGS. SW -2, SW -3, SW -4, AND SW -6 AND SECTION 70-1.02H AND 71-1.07 OF THE STANDARD SPECIFICATIONS OF THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION, LATEST EDITION. 9. THE CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROPOSED C.O.B. STD. DWGS. SW -5 AND SW -6. 10. SYSTEM TESTING: INSTALLED PIPE SHALL BE CLEANED AND TESTED IN ACCORDANCE WITH DIVISION 2.3 OF THE PROPOSED CITY OF BAKERSFIELD SUBDIVISION AND ENGINEERING DESIGN MANUAL AND WITH THE RECOMMENDATIONS OF THE MANUFACTURER AND ACCEPTABLE TO THE CITY OF BAKERSFIELD. 24 HOURS NOTICE WILL BE REQUIRED FOR TEST AND INSPECTION. 11. CONTRACTOR SHALL STAMP AND "S" INTO CURB FACE OVER EACH SEWER LATERAL. 12. PRIOR TO FINAL ACCEPTANCE OF THE SEWER SYSTEM, ALL MAIN LINES SHALL BE INSPECTED WITH VIDEO EQUIPMENT DESIGNED FOR THIS PURPOSE AND AS APPROVED BY THE CITY ENGINEER. THE TELEVISION CAMERA SHALL HAVE THE CAPABILITY OF ROTATING 3600, IN ORDER TO VIEW AND RECORD THE TOP AND SIDES OF THE PIPE, AS REQUIRED. THE VIDEO INSPECTIONS SHALL BE WITNESSED BY THE CITY'S CONSTRUCTION INSPECTOR, WHO WILL ALSO IN111AL AND DATE THE "CHAIN OF CUSTODY" FORM. THE SUBDIVIDER SHALL IMMEDIATELY NOTIFY CITY OF ANY PIPE LOCATIONS REVEALED TO BE NOT IN COMPLIANCE WITH THE SPECIFICATIONS. A RECORDED VIDEO CASSETTE, THE COMPLETED "CHAIN OF CUSTODY" FORM AND A WRITTEN LOG (WHICH INCLUDES THE STATIONING, BASED ON THE STATIONING OF THE APPROVED PLANS, OF ALL CONNECTED LATERALS) OF THE INSPECTION SHALL BE PROVIDED FOR VIEWING AND SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO ACCEPTANCE. AFTER ACCEPTANCE OF THE SYSTEM, THE VIDEO CASSETTE, FORMS AND LOGS SHALL BECOME THE PROPERTY OF THE CITY. C013 SJOEM DRAIN NOTES 1. UNLESS OTHERWISE SPECIFIED ON THESE PLANS, THE STORM DRAIN PIPE SHALL BE THE FOLLOWING: A. REINFORCED CONCRETE PIPE (R.C.P): REINFORCED CONCRETE PIPE SHALL BE CLASS III (ASTM C76) AND SHALL CONFORM TO THE REQUIREMENTS OF SECTION 65 OF THE CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS. (SEE GENERAL NOTE 2) B. JOINTS SHALL BE RUBBER GASKETED IN CONFORMANCE WITH THE PROVISIONS OF SECTION 65-1.06 OF THE STANDARD SPECIFICATIONS. C. CONCRETE PIPE SHALL BE LAID IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 65 OF THE STANDARD SPECIFICATIONS. (SEE GENERAL NOTE 2) D. IN ADDITION TO THE ABOVE REQUIREMENTS, ALL RUBBER GASKETED JOINT RINGS SHALL BE CHECKED WITH A GAUGE ALL THE WAY AROUND THE PIPE AFTER THE JOINT HAS BEEN ASSEMBLED TO DETERMINE THAT THE RING HAS BEEN PROPERLY LOCATED AND SEATED. IMPROPERLY MADE JOINTS SHALL BE PULLED APART AND SATISFACTORILY REMADE. COB TRENCHING NOTES 1. TRENCHING SHALL MEET THE REQUIREMENTS OF CAL -OSHA TRENCHING ORDERS AND THE CONTRACTOR SHALL COMPLY WITH SECTION 6422 OF THE LABOR CODE. 2. ANY TRENCHING TO BE CONDUCTED WITHIN CITY RIGHT-OF-WAY SHALL BE BACKFILLED AND COMPACTED PER THE PROPOSED C.O.B. STD. DING. ST -12. 3. ALL EXISTING PAVING AND SURFACING REMOVED, DAMAGED OR UNDERCUT SHALL BE REPLACED IN ACCORDANCE WITH THE PROPOSED C.O.B. STD. DWG. ST -11. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEWATERING ALL TRENCHES. IF TRENCHES OR PIPING BECOME DAMAGED DUE TO WATER INFILTRATION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REPAIR THE TRENCH AND PIPING TO THE SATISFACTION OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE. 5. FLOODING OR WATERJETTING SHALL NOT BE USED FOR BACKFILL COMPACTION. 6. CLASS I BEDDING AND EMBANKMENT IS REQUIRED FOR ALL PLASTIC SEWER PIPE WITHIN THE PIPE ZONE. CLASS I BACKFILL IS NOT REQUIRED IF PIPE SLOPE EXCEEDS 1%. 7. COMPACTION TESTS SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. THE NUMBER AND LOCATION OF REQUIRED TESTS SHALL BE DETERMINED BY THE CITY ENGINEER. THE COST OF RETESTING DUE TO FAILED COMPACTION TESTS WILL BE BACKCHARGED TO THE CONTRACTOR. NOTE TO CQNTRACTO-R ALL MANHOLES AND CLEANOUTS WITHIN TRACT, INCLUDING EXISTING MANHOLES, SHALL BE ADJUSTED TO FINISH GRADE IN ACCORDANCE WITH THE PROPOSED CITY OF BAKERSFIELD STANDARDS. EXISTING MANHOLES MAY REQUIRE REMOVAL OF EXISTING CONE, AND REMOVAL OR "CHANGE OUT" OF BARREL RINGS. CIIY STANDARD PLATES 1. THE FOLLOWING PROPOSED CITY OF BAKERSFIELD SUBDIVISION AND ENGINEERING DESIGN MANUAL STANDARD DRAWINGS SHALL BE CONSIDERED A PART OF THESE PLANS. (CONTRACTOR TO OBTAIN LATEST EDITION THEREOF FROM THE CITY OF BAKERSFIELD PUBLIC WORKS WEBSITE.) 1 . THE CORED HOLE SHALL BE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHALL BE DESIGNED TO CUT A HOLE WITH MINIMUM DAMAGE TO THE REINFORCING STEEL, PIPE OR PLASTIC LINER. 2. PRIOR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, THE PLASTIC LINER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTION LINE SHALL BE SEALED TO THE PVC BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX 1A SEALANT OR AN APPROVED EQUAL. 3. THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGGLY TO THE OUTSIDE WALL OF THE CONNECTION. 4. THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS PER THE PLAS11C LINER MANUFACTURER'S RECOMMENDATION. 5. THE CONNECTION LINE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO IT IS FLUSH WITH THE INSIDE WALL OF THE RCP. 6. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN EQUAL APPROVED BY THE CITY ENGINEER. CONSTRUCTION NOTES, (SUMP DETAIL F-11 PROPOSED TEMPORARY CHAIN-LINK FENCE M PROPOSED 14' WIDE TEMPORARY CHAIN-LINK DOUBLE GATE I M CONSTRUCT D50 8" RIP -RAP F4_1 CONSTRUCT OUTLET STRUCTURE PER C.O.B. STD. DWG. D-10. F-5-1 TEMPORARY DRAINAGE EASEMENT TO BE DEDICATED TO THE CITY OF BAKERSFIELD PER DOCUMENT NO. 220148562. NOTE: SUMP TO BE CONSTRUCTED PER COB STANDARDS D-11, D-12, AND D-13. cl� > > 351.60_---x 7 '5 x 43 NG < ,4\ 40 48 r'b\ 15 -to > ------- I r C'4 L0 LL_ cyv// Ld V) < --4 '357.5 LJJ V) < Cii k\ CL 'A 0_ A A PRIVATE SUMP r) B:) V Lli F- DATA BOTTOM OF BASIN=336.30 v, ui I F ­ w HIGH WATER ELEVATION= 344.30 1 CID I Zell Lo I U*) I I < >A VOLUME REQUIRED=10.69 AC. FT. I I - 11 -�d VOLUME PROVIDED=11.10 AC. FT. 0� 0djo In SIDE SLOPES 2:1 MAX (U.N.O.) uj > ry _v_ J 2:1 k. w :D :D < F- LL_ J')' 1-2 _n I I -r-u 0� I I I 1 1 -:� t too _b i a- 43 t, ill I I x 351.391 10 too G,,x C3 1 _j N I V) 4 < 1-41, Lo- u) LLJ 197.60 7 ----- ------- -------- ------- 4 - H WM----t V Lo, 4 - TO z �D 248.26' E OF SLOPE 51: 51.2 FG ---------------- x x FG_ c::D 6b. 5 3. �r -------- ------------------- -F _F_G - - - - - - -TOP OF SLOPE_ FG 5LO. 4 FS D 351.o MUIRLANDS P A R K WAY TEMPORARY CHAIN LINK FENCE x z 12' MIN. m- FUTURE TRACT 7372 ACCESS ROAD PHASES 1 & 2 DRAINAGE BASIN DETAIL UV SCALE: 1"=40' __j 0 - TEMPORARY CHAIN LINK FENCE z 12' MIN. ACCESS ROAD c:' w STEPHAN J. DeBRANCH TRAIL __j Q_ TEMPORARY CHAIN z LINK FENCE b - I 12' MIN. ACCESS ROAD 2' 2.5' d 0 CITY STD. No. DESCRIPTION Sw- i SEWER LATERAL F- 0 �- �U- SW -2 MANHOLE U) SW -2A MANHOLE STANDARD NOTES Z Lu W W Lij W m F/) z T MW zw cj) u- SW -3 MANHOLE DROP CONNECTIONS ui c'? SW -4 MANHOLE SIZING CHART d 0 < 0 F=-!� 8w SW -5 SEWER CLEANOUT x 0 q- < SW -6 FRAMES AND COVERS FOR MANHOLES AND CLEANOUTS SW -7 LATERAL CONNECTION TO EXISTING SEWER MAIN w co < SW -8 PIPE BORE WITH CASING 0 0 3: < cwo _wj 0 cz, 8< SW -9 SEWER LATERAL REPAIR (0 N SW -10 DRY SEWER HOUSE CONNECTION 0 aw. cae F=- ui 0> LrU " z cz0 01 OZ D-1 INTENSITY VS. DURATION CURVES (0 0 0 D-2 RATIONAL METHOD URBAN RUNOFF COEFFICIENTS o) Ui =1 < w IT D -3 CHANNEL PROTECTION D-4 CHANNEL PROTECTION z Q� u- <<03: 0 U) D-5 NATURAL CHANNELS L D-6 CONSTRUCTED CHANNELS 0�;WF-51002W D Z Z m ui 0 z _j cri § OW D-7 BANK DETAILS FOR CONSTRUCTED CHANNELS F] D-8 BANK DETAIL FOR LINED CONSTRUCTED CHANNELS D-9 DRAINAGE BASIN w D-10 DRAINAGE BASIN OUTLET STRUCTURE D-1 1 TEMPORARY DRAINAGE BASIN W D-12 CHAIN-LINK FENCE C.) D-13 CHAIN-LINK GATES D-14 CATCH BASIN, TYPE "A" LL D-15 CATCH BASIN, TYPE "A-1" D-16 JUNCTION BOX D-17 GUTTER DEPRESSIONS 0- D-18 PIPE SADDLE DETAIL D-19 CONCRETE PIPE COLLAR TRANSITION FROM P.V.C. TO R.C.P. D-20 SIDEWALK UNDERDRAIN ST -1 1 PAVEMENT PATCHES ST -12 TRENCH BACKFILL AND COMPACTION REQUIREMENTS 1 . THE CORED HOLE SHALL BE APPROXIMATELY 3 INCHES GREATER THAN THE OUTSIDE DIAMETER OF THE CONNECTING LINE. THE CORED HOLE SHALL BE DESIGNED TO CUT A HOLE WITH MINIMUM DAMAGE TO THE REINFORCING STEEL, PIPE OR PLASTIC LINER. 2. PRIOR TO THE INSTALLATION OF THE PVC BOOT ON THE CONNECTION, THE PLASTIC LINER AROUND THE PIPE AT THE CORED HOLE SHALL BE CLEANED PER THE PLASTIC LINER MANUFACTURER'S RECOMMENDATION. THE END OF THE CONNECTION LINE SHALL BE SEALED TO THE PVC BOOT WITH SIKA 449/203 PRIMER AND SIKA FLEX 1A SEALANT OR AN APPROVED EQUAL. 3. THE PVC BOOT SHALL BE ORDERED SO IT WILL FIT SNUGGLY TO THE OUTSIDE WALL OF THE CONNECTION. 4. THE PVC BOOT AND WELD STRIPS SHALL BE INSTALLED AND TESTED FOR HOLIDAYS PER THE PLAS11C LINER MANUFACTURER'S RECOMMENDATION. 5. THE CONNECTION LINE SHALL BE CENTERED IN THE CORED HOLE AND PLACED SO IT IS FLUSH WITH THE INSIDE WALL OF THE RCP. 6. THE PVC BOOT WELD STRIPS SHALL BE MANUFACTURED BY AMERON, INC. OR AN EQUAL APPROVED BY THE CITY ENGINEER. CONSTRUCTION NOTES, (SUMP DETAIL F-11 PROPOSED TEMPORARY CHAIN-LINK FENCE M PROPOSED 14' WIDE TEMPORARY CHAIN-LINK DOUBLE GATE I M CONSTRUCT D50 8" RIP -RAP F4_1 CONSTRUCT OUTLET STRUCTURE PER C.O.B. STD. DWG. D-10. F-5-1 TEMPORARY DRAINAGE EASEMENT TO BE DEDICATED TO THE CITY OF BAKERSFIELD PER DOCUMENT NO. 220148562. NOTE: SUMP TO BE CONSTRUCTED PER COB STANDARDS D-11, D-12, AND D-13. cl� > > 351.60_---x 7 '5 x 43 NG < ,4\ 40 48 r'b\ 15 -to > ------- I r C'4 L0 LL_ cyv// Ld V) < --4 '357.5 LJJ V) < Cii k\ CL 'A 0_ A A PRIVATE SUMP r) B:) V Lli F- DATA BOTTOM OF BASIN=336.30 v, ui I F ­ w HIGH WATER ELEVATION= 344.30 1 CID I Zell Lo I U*) I I < >A VOLUME REQUIRED=10.69 AC. FT. I I - 11 -�d VOLUME PROVIDED=11.10 AC. FT. 0� 0djo In SIDE SLOPES 2:1 MAX (U.N.O.) uj > ry _v_ J 2:1 k. w :D :D < F- LL_ J')' 1-2 _n I I -r-u 0� I I I 1 1 -:� t too _b i a- 43 t, ill I I x 351.391 10 too G,,x C3 1 _j N I V) 4 < 1-41, Lo- u) LLJ 197.60 7 ----- ------- -------- ------- 4 - H WM----t V Lo, 4 - TO z �D 248.26' E OF SLOPE 51: 51.2 FG ---------------- x x FG_ c::D 6b. 5 3. �r -------- ------------------- -F _F_G - - - - - - -TOP OF SLOPE_ FG 5LO. 4 FS D 351.o MUIRLANDS P A R K WAY TEMPORARY CHAIN LINK FENCE x z 12' MIN. m- FUTURE TRACT 7372 ACCESS ROAD PHASES 1 & 2 DRAINAGE BASIN DETAIL UV SCALE: 1"=40' __j 0 - TEMPORARY CHAIN LINK FENCE z 12' MIN. ACCESS ROAD c:' w STEPHAN J. DeBRANCH TRAIL __j Q_ TEMPORARY CHAIN z LINK FENCE b - I 12' MIN. ACCESS ROAD 2' 2.5' d 0 a w U- UL z w wo z 0 F- 0 �- �U- CID FD- W w U) Z CFI- < W FW 8Z )Cjr F- 5 0 ui Z Lu W W Lij W m F/) z T MW zw cj) u- z 0 -wr 0, cw.) Fo- F- Cf) 22 F, = ui c'? 8::> 0 L, F- W<iy Is 2 z 0 w 3i 0 > c) C.0 d 0 < 0 F=-!� 8w 40 9 :Ft w § 2 2 Z' <X0 -LL�00Pmow x 0 q- < L.L W 0 W z a z 01 'z w co < c6 < Ow �w- Mw z W (0 W ce) 0 0 3: < cwo _wj 0 cz, 8< 06 z a) c) L_ 4-A W < F- 0 <aw�pw<W=060 (0 N c6a- w z a cL z 0 cr- 0 z < LL LLJ < 0 Zz Z " cy) w Lu (1) 0 aw. cae F=- ui 0> LrU " z cz0 01 OZ 04 (0 0 W F=-: ZLJJ<OLL U- F- (0 0 0 (.)ZO,F-ffiZZZ U J 0 w U, - a wrLm<ww><HwFnm0 04 0 o) Ui =1 < w IT CL < 6m ww > w w z Q� u- <<03: 0 U) ->W<U-z� E wa� p w ffi wm Lq g m L w '1� a 2 zw > 0 D t�C:D,) 0�;WF-51002W D Z Z m ui 0 z _j cri § OW < it w c) �_ w w w z U) >- co m:r U) m 0 i z -1 F- �- 5 0- �- 0 0 W < m P, LO \11, 0 cn cn > 0 W_ 0 br- 0 J% ^ vi 00 Z ; F - w 0 C) 0 < n D U) W w 0 0 z 06 cf) 0 L. 0 Lu CD v J z < w 0 r% 0 Ld r vi V) I or� I Ld cn LAMAR DRIVE OR U-) MUIRLANDS PARKWAY _0 4//V ri E 0 c 0 (n z 0 w L.Li CL LL F_ 0 w w CL z z W w F- 5 W r) C.) W > Lu w ) LL w 0 < U- 0- 0 P, LO \11, 0 cn cn > 0 W_ 0 br- 0 J% ^ vi 00 Z ; F - w 0 C) 0 < n D U) W w 0 0 z 06 cf) 0 L. 0 Lu CD v J z < w 0 r% 0 Ld r vi V) I or� I Ld cn LAMAR DRIVE OR U-) MUIRLANDS PARKWAY _0 4//V ri E 0 c 0 (n z 0 w DATE 10/14/2020 cn PA JOB No. 3151 H U) 41 T c Q) SHEET E 0 Ln COB RECORDS No. OF 7 SHEETS CONSTRUC110N NO 0 INSTALL SEWER MANHOLE Q INSTALL SEWER CLEANOUT 339.41 INSTALL SEWER CI_ 0 INSTALL STORM DRAIN _j C5 INSTALL STORM DRAIN MANHOLE 350 INSTALL TYPE "A" CATCH—BASIN _0 PROPOSED STREET RIGHT—OF—WAY LO PROPOSED STREET CENTERLINE ----XS---- EXISTING SEWER 6 U-) EXISTING STORM DRAIN — -zZ- EXISTING EDGE OF PAVEMENT SID STORM DRAIN STATION SS SANITARY SEWER STATION 36 I— ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 8" UNLESS OTHERNSE NOTED. ALL SEWER LATERAL STA110NING IS AT POINT OF CONNECTION NTH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AN D A 4.5' MIN. — 7' MAX. OF COVER AT THE PROPERTY LINE. NOTE 91 A VERIFY EXISTING LOCATION AND ELEVATION IN FIELD PRIOR TO CONSTRUCTION AND N01IFY ENGINEER IF THERE ARE ANY DISCREPANCIES. NOTE "B": CONSTRUCT CHRISTY U-21 CATCH BASIN WITH U21—HT TRAFFIC RATED GRATE AND INSTALL STORM DRAIN INLET PROTECTION PER DETAIL SE -10 AS SHOWN ON SHEET 3 (FUTURE TYPE "A" CATCH BASIN LOCATION). FUTURE DEVELOPMENT (BY SEPARATE PLANS) CO C'� U,-) 00 + to _ r -i -ft LO _j -'_� I I Z ; V_ Fn < r M Ir - 00 —7— r__ 0 0 Z C� 339.41 00 1 CI_ 0 >_ 0 0000 rIV, F_ :d- "4- _j C5 06 06 1 -ti- 114- 350 < < _0 STORM DRAIN @ 1.50% LO + + 0 I­� STORM rA DRAIN SECTION 6 U-) 0 __j U_ n a_ 0)0 __j I I I Ulm :z> n U-1 Uj F-- ZD 0 24.5"� C) + 03 1._: 0 < Cn LO -7�7 Z < < 0 TOP OF GRATE= 0 CN < 00 347.8 r_ C� EL CHRISTY CATCH BASIN—,,.., TO BE REMOVED WITH FUTURE CONSTRUCTION OF TYPE "A" CATCH BASIN. 18" INV= 340.01 CONSTRUCT 78.6± L.F. 18" CL -3 RCP w/RGJ STORM DRAIN @ 0.13% 18" INV W= 339.91 CONSTRUCT 20.5± L.F. 24" CL -3 RCP w/RGJ STORM DRAIN @ 1.50% PLUG END FOR :1//2 ;IFUTURE EXTENSION INV= 340.16 24" INV E—W= SEE NOTE $)B$l pp, FUTURE FLOWLINE (PROPOSED SWALE, SEE STREET PLANS) Ln - 0C 7 /7 7 -7/= 7/_ 7/— 7 PROPOSED E.P. (SEE STREET PLANS) 42 43 3 7— 3 8— 39 40 N00'56'51 "E + --------- 4_ \36+41.21 Loll _T -------- r___ PROPOSED MEDIAN (SEE STREET PLANS) PROPOSED FLOWLINE (SEE STREET PLANS) FUTURE DEVELOPMENT (BY SEPARATE PLANS) 0 —7— 2 4 1 N V 339.85 0 Z V) 77 339.41 CONSTRUCT 29.6± L.F. CI_ 0 Lq r1r) Lc) (o _j C5 24" CL -3 RCP w/RGJ 350 Z (0 LO < (0 L0 + _0 STORM DRAIN @ 1.50% LO + + 0 I­� STORM rA DRAIN SECTION 6 U-) �-:D W _j ry 0)0 N.T.S. Ulm _j 0 0 U) C:) r-, rY C:) F - C) + >_ 1._: 0 < Cn LO -7�7 Z < < 0 < 0 CN < 00 C) ry C� LLJ r_ C� EL Ui 3.. U') V) C:) CL -3 RCP w/RGJ STORM DRAIN @ 0.10% M, W CN I- U.1 + U) c L6 LO V_ ui -J:D q- ki dip -TA L. nfiritLb rz- 'rc> 0 V) r A V) U + SEE NOTE $)B$l pp, FUTURE FLOWLINE (PROPOSED SWALE, SEE STREET PLANS) Ln - 0C 7 /7 7 -7/= 7/_ 7/— 7 PROPOSED E.P. (SEE STREET PLANS) 42 43 3 7— 3 8— 39 40 N00'56'51 "E + --------- 4_ \36+41.21 Loll _T -------- r___ PROPOSED MEDIAN (SEE STREET PLANS) PROPOSED FLOWLINE (SEE STREET PLANS) FUTURE DEVELOPMENT (BY SEPARATE PLANS) 0 —7— F- 0 Z V) 77 Z uj 00 44Z 00 _j LO (-) n (-) C< CI_ 0 Lq r1r) Lc) (o L.LJ Csl C-4 350 Z (0 LO < (0 L0 + _0 C'� C� + V :2 Lo Lo LO + + :D W ',q- (75 (A 6 U-) "No I 00 0 0 ry U� �_ T- (00 + _71 C'4 0 --7-----7/=0 LO —7— + INSTALL 400± L.F. ............................................................................................. APPROIYIMA /T DESIGN GRADE - ABOVE - SEWER AND STORY DRAIN r 44 8" PVC SEWER @ 0.25% Z lJj F- -0 350 0 Uj Uj Z �- :D Woe UJ :D W UJ __j 6 U-) C5 U-) ................................................................................................................... 8 INV E—W= STREET RIGHT—OF—WAY PER DOCUMENT No. 220146270, O.R. L- ----- 0 20 40 80 HORIZONTAL: 1"=40' VERTICAL: 1"=4' 0 C"! Wd SU2- U_ U_ Z ztiz C, 58 0�_ W 0 (0 0 �Z- QV)- UZj 0 0 W n W T x WWW"'WWWZ<M'W Z C:) 0 _r 0 !;' C10 F- :2 �= 0 =) 3: U>- 0' C10 V) 41 Z 0'- 'ZI R ZW LO 24.5' LU X: C'o of W> C 0 (0 W co x< WZ Z Cl- WF- U) fn M 5 W Z Z —jr- Uj W 0 LU - >- m-_ C\1 Uj'__ 0 5 qE F_ UJ 3: 0 W, <x 6 LU F_ I_ U) Z> 3: 0 ��_ < W cy� _050WOL > Cr S Z '0- 0 W 3: 0 F- 6 Z 'Z, Uj o a) CONSTRUCT PIPE q__ SADDLE PER C.O.B. 8" INV= 00 Z< >m- ow 06 in 8 INV= 10 W 342.67 Z M ow OW- uaj CZO C�n OW Z3: OW U) 1-/-342.An STD. DTL. D-18 (D W 0 0 -5 0 a- U) Z UU3 E >_ UT 110, 13 Fn T Wx WW 0 T E 'W �R- E z-- 2 R < W M C'J 0.85 If INSTALL 125.7± L.F. �2 0 Z Luu) A 0 0 Uj W _;- (0 INSTALL 49± 1 _F_ Z (zo P- OZ$ W (D cy) 8" INV N= 8" PVC SEWER MAIN 00 < Z (D CD 8" PVC SEWER E �_ Z a g (wo ul of 21 — " r�� 342.13 @ 0.35% Z w a 0 65 MAIN @ 0.35% STORM, DRAIN < wuj- 0P_- W<- L' Wr <0 i37- 00 Ow C-4 a- wo a co L' c) Z 0 ' W 0 2- Z CY) 24 INV= ww L < LU 8" INV E—W= 339.3± X- 1Z im_ WO U>1 00 < Uj 'r- 342.23 CZO '0' (0 00 'm Z0 wo Z LL C.0 W C:) Ell'-9PE<0<2 -) C) �- Z U) (/) ( tl;""\ SEWER SECTION Z Z 8 1W U>j (8 OW ow 0 W L'L 04 N. T. S. 0- < W U5 0 < W Z W C-) t CWL M CL X_ Z F- 2 5 a LWL <03: — W 0 Cr 0� W> Uw- 0Z �_ owwwwa'jps wo LL- Z '�'; cc/) U)- < C/5 MW0WZ_j 0*CQ <wda.wzo af ,- Uj C/5 >- (1) M T 0 i D a- F_ 0 a Qw� Z< 2 354 ............................................................................................................................... LU 0 UJI W U_ .............................................. INSTALL 400± L.F. ............................................................................................. APPROIYIMA /T DESIGN GRADE - ABOVE - SEWER AND STORY DRAIN r X/ - 8" PVC SEWER @ 0.25% -0 z4fp: F- -0 350 0 Uj 11 0 7' —C�� Uj Z �- :D Woe UJ :D W UJ __j 6 U-) C5 U-) ................................................................................................................... 8 INV E—W= C) (n U) Z: __J 0 I- 0 V) ':� Z 0 C) + + .................................................................................................................. 0 CN 0 Z < 0 < 339.91 - . 24" INV N—E*= I ...... ............................................................ .339.41 . . . < < ............................................................................................................................................................................................. r_ C� ry V) C) V) C:) CL -3 RCP w/RGJ STORM DRAIN @ 0.10% U-) V) c L6 LO V_ ui 0 C5 0 C5 + + T_ , + - + C14 C14 V) U + U') + V) V) V) 0 C"! Wd SU2- U_ U_ Z ztiz C, 58 0�_ W 0 (0 0 �Z- QV)- UZj 0 0 W n W T x WWW"'WWWZ<M'W Z C:) 0 _r 0 !;' C10 F- :2 �= 0 =) 3: U>- 0' C10 V) 41 Z 0'- 'ZI R ZW LO 24.5' LU X: C'o of W> C 0 (0 W co x< WZ Z Cl- WF- U) fn M 5 W Z Z —jr- Uj W 0 LU - >- m-_ C\1 Uj'__ 0 5 qE F_ UJ 3: 0 W, <x 6 LU F_ I_ U) Z> 3: 0 ��_ < W cy� _050WOL > Cr S Z '0- 0 W 3: 0 F- 6 Z 'Z, Uj o a) CONSTRUCT PIPE q__ SADDLE PER C.O.B. 8" INV= 00 Z< >m- ow 06 in 8 INV= 10 W 342.67 Z M ow OW- uaj CZO C�n OW Z3: OW U) 1-/-342.An STD. DTL. D-18 (D W 0 0 -5 0 a- U) Z UU3 E >_ UT 110, 13 Fn T Wx WW 0 T E 'W �R- E z-- 2 R < W M C'J 0.85 If INSTALL 125.7± L.F. �2 0 Z Luu) A 0 0 Uj W _;- (0 INSTALL 49± 1 _F_ Z (zo P- OZ$ W (D cy) 8" INV N= 8" PVC SEWER MAIN 00 < Z (D CD 8" PVC SEWER E �_ Z a g (wo ul of 21 — " r�� 342.13 @ 0.35% Z w a 0 65 MAIN @ 0.35% STORM, DRAIN < wuj- 0P_- W<- L' Wr <0 i37- 00 Ow C-4 a- wo a co L' c) Z 0 ' W 0 2- Z CY) 24 INV= ww L < LU 8" INV E—W= 339.3± X- 1Z im_ WO U>1 00 < Uj 'r- 342.23 CZO '0' (0 00 'm Z0 wo Z LL C.0 W C:) Ell'-9PE<0<2 -) C) �- Z U) (/) ( tl;""\ SEWER SECTION Z Z 8 1W U>j (8 OW ow 0 W L'L 04 N. T. S. 0- < W U5 0 < W Z W C-) t CWL M CL X_ Z F- 2 5 a LWL <03: — W 0 Cr 0� W> Uw- 0Z �_ owwwwa'jps wo LL- Z '�'; cc/) U)- < C/5 MW0WZ_j 0*CQ <wda.wzo af ,- Uj C/5 >- (1) M T 0 i D a- F_ 0 a Qw� Z< 2 354 ............................................................................................................................... LU 0 UJI W U_ .............................................. .............. 354 ............................................................................................. APPROIYIMA /T DESIGN GRADE - ABOVE - SEWER AND STORY DRAIN r X/ - 350 ---------------------------- C. V, ----------------- 350 ........ ....... .... .. .... - ----------------------------- .......... - ---- -- ---------------- ......... ............................... ------ .............. ................................ 346' .............................................................................................................................................................................. ...................... ....................................................................... .......................................... .. .............. .............. 34-6 .............. ................................................................................................................... 8 INV E—W= .................................... ... 13 .............. 342* .... ....... 342.23 ............................................. 01 ................ ............ ..... . ................. 42 . ............... 3_ .................................................................................................................. ............ 18"' INV W= .......................................................... . 338* .................................................... 339.91 - . 24" INV N—E*= I ...... ............................................................ .339.41 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..... 338 ............................................................................................................................................................................................. INSTALL 452.8± L.F. 24 A 334* ..................................................................................................... I ....................................................................................... CL -3 RCP w/RGJ STORM DRAIN @ 0.10% y 334 36+00 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 Storm Drain Inlet Protection SE -10 ---Stabilize area and grade uniformly around perimeter Geozextile Blanket 3 Min 1..1 slope Drain inlet Note: Remove sediment 4 before reaching - --------------- one-third full. Section A- -A -SilL fence Per SE -01 6" MIN — 12" MAX Concentra�ed Rock filter(use if flow flow is concentrated) X -X - x ge o r - - - - - - - - - - - - - - - - sediment trap A __�Drain inlet x xl A flow Sheet x Blanket Silt fence Per SE -01 L------------- ------------------- x _x_ X_ - - - - __X --J Q) Picn 0 DI PROTECTION TYPE 2 NOT TO SCALE Notes 1. For use in cleared and grubbed and in graded areas. 2. Shape basin so �hat longest inflow area faces longest length of trap. 3. For concentrated flows, shape basin in 2:1 ratio wi-ch Ieng-ch oriented towards direction of flow. November 2009 California Stormwater BMP Handbook Construction www.casqa.org 8 of 10 we] SIR V Vflov.,001 6 V) L0 C) 0 41 (10 C) Q ';\�AEER LO W > W COW, C'> Vj U-) Z1 Vj <1 015 m17: Vj (j) LU 0 UJI W U_ u_ W W Z Z W ) 0 W x Z l-_ u- W > W (Y < Q ';\�AEER LO W > W COW, C'> Vj U-) Z1 Vj <1 015 m17: Vj (j) Z 0 W DATE 10/14/2020 PA JOB No. 3151 H 4� SHEET 0 0 E OF 7 SHEETS CONSTRU00N NOTES 0 INSTALL SEWER MANHOLE 0 INSTALL SEWER CLEANOUT (n Z 0 INSTALL SEWER bcoo Oz INSTALL STORM DRAIN 0 INSTALL STORM DRAIN MANHOLE , * 0 INSTALL TYPE "A" CATCH -BASIN FUTURE PROPOSED STREET RIGHT-OF-WAY %ztlo 04 cq cno� PROPOSED STREET CENTERLINE ----XS---- EXIS11NG SEWER t-� EXISTING STORM DRAIN �v LLj EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 8" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNEC11ON NTH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AND A 4.5' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. N 0 TE " A'$: VERIFY EXISTING LOCATION AND ELEVATION IN FIELD PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IF THERE ARE ANY DISCREPANCIES. NOTE $$Btj': CONSTRUCT CHRISTY U-21 CATCH BASIN WITH U21 -HT TRAFFIC RATED GRATE AND INSTALL STORM DRAIN INLET PROTECTION PER DETAIL SE -10 AS SHOWN ON SHEET 3 (FUTURE TYPE "A" CATCH BASIN LOCATION). F- C'4 f) uJ _J 0 cn 0 c) z = '_.: 0 Z 4 0 < MUIRLANDS PARKWAY r- 0 Of FUTURE 0 uj FUTURE) ui T_ DEVELOPMENT + uJ +'�o co to -'4- (BY SEPARATE PLANS) CO V) 7 7 -117- LO (0 +"-,I - ^-Zi- 1 14 ui 45 z CD Lo F_ < CD ob FUTURE DEVELOPMENT (BY SEPARATE PLANS) 04 1 n a 45+85.28 'lw_m PG&E GAS NOTES - CALL 811 (1-800-2227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL NON-UTILTIES BEFORE YOU DIG, GRADE OR EXCAVATE. ANY UNDERGROUND STRUCTURE SHALL MAINTAIN A MINIMUM OF 7 FT. (WITH 3 FT. OF UNDISTURBED SOIL) HORIZONTAL SEPARATION AND 24" OF VERTICAL SEPARATION, OR 12" WITH SPECIAL APPROVAL, FROM THE EXISTING 34" PACIFIC GAS & ELECTRIC TRANSMISSION LINE. ADDITIONALLY, NO LESS THAN 601p OF COVER IS TO BE OVER THE TRANSMISSION LINE AT ANY TIME. AT NO TIME SHALL POWER DRIVEN OR POWER OPERATED EQUIPMENT BE USED DIRECTLY OVER THE TRANSMISSION LINE, OR WITHIN 2 FT. FROM THE EDGE OF THE PIPE. EQUIPMENT SHALL NOT REMAIN STATIONARY OVER THE PIPELINE. A PG&E TRANSMISSION PERSONNEL SHALL BE ON STANDBY WHEN CONSTRUCTION IS TO TAKE PLACE WITHIN 10 FT. OF THE EXISTING TRANSMISSION LINE. I 11 �_ po 11 :D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 �_ It :D . . . . . . . . . . (n Z 0 Ld bcoo Oz 0 0 U-) 0 b 0 C) M , * 0 uJ �_j C14 V_ 0 vt FUTURE 0 z 4 o < %ztlo 04 cq cno� x DEVELOPMENT t-� It- PO + �v LLj (BY SEPARATE PLANS) C6 ED 00"If 3., -4- + LJJ + 00 00..q- cn a_ + C:) cn CD LO Irt (10 0-- C'4 LO co U_ Ll- 346 t10 Ln FUTURE FLOWLINE (PROPOSED) SWALE, SEE STREET PLANS) NOO*56'51"E PROPOSED E.P. (SEE STREET PLANS) 46 47 48 49 50 NOO-56'51"E 5' CD ull '��PROPOSED MEDIAN (SEE STREET EL �NS c) PROPOSED FLOWLINE (SEE STREET P LANS)-\ - - - - - - - - - - - - - - - - 30' I A MUIRLANDS PARKWAY (SEE SHEET 6) 11 ZD 11 :D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . pry cr_ . . . . . . . . . . . . . . . . . . (n Z 0 cn :." 0 pe) 0 0 U-) 0 Z#z '.4 uJ �_j C14 V_ 0 vt ui -.i 0 Lc) '1_0 "'4: r ui z C) -r z Lo + CD + L0 0) Of 0 + 0.4- + F- LL (D 0) a_ 4-(/) cf) .14- V) (10 FUTURE TRACT 7372-2 (BY SEPARATE PLANS) PHASES 2 & 3 C%4 F- -7' L/) En- ry < = m CHRISTY CATCH BASIN TO BE REMOVED WITH FUTURE CONSTRUCTION OF TYPE if A" CATCH BASIN. 18" INV= 342.12 CONSTRUCT 74± L.F. 18" CL -3 RCP w/RGJ STORM DRAIN @ 3.39% 339.61 24" INV S= 339.11 18" INV= 339.98 -CONSTRUCT 25.0± L.F. 18" CL -3 RCP w/RGJ STORM DRAIN @ 1.50% S E W E�R 10" INV= A STORM DRAIN SECTION (0 >- (N 339.8± N. I.Z). 11 F- LO 0) �4k i_2' - V) jy_ ne L.Li 0 + mv) 0u) 0 00 C'4 0 < C�z . LO M Z 00 >_ < a -f < 0 < r"� C6 ui n 0 00 -q- -q- LLJ LJ 1+ U) + F- +.-d- (N Nt L0 U-) -i Z) L0 0 V) SEE NOTE 0113" 7 _1A 4 N01*39' 9"E 11 In -00 7/_ 7 7 7-7--/,7-7 __7/_ __7 7/t+ 7 -7- to LO U-) 52 -54- Lij uJ ui - �z C) 7' Lli L.1i oc V) F- < 7T 1:2 LQI c< CN STREET RI HT- F -W Y PER 11 :D 11 :�-#-- U- w U- % 2!3 z 0 i>z a- <z zo op w 0�0= f2 u- i- W 6 zo �w- ow�:Og;<'30R Eu T 8 u - z 9 <W!� S 6 z 0 12 d- 0 0 uj <Omw�=!�rggm? F- F - Z a cz F 0 �E&V�E%82<>mow C6 uuil �W'e Iwo ow c/J cfj M Z 0 z 6900'%26q8wm 55 w Lu Lii cl) 0 a ww >z- L>Lj co, Z �g I=s � 00 ? lw- 2 6 LWL Ui LL �=Z§W.02E-mj 0 0 3: < i>_za9wwul02* < P 0 0 z 0 a LU LL W Zo 02 627';'wwT0w0< �wm6m-'Er-W08226 (-) T 0 uj �- F< (uj < 0 LL' 0 w >_ 0z z <_.'OTutlm�TF w I 00� �- zic ow W> 2 p 20OT6azj:�2@ LL' L 9 < >1 LL"- Oz ul 0 0 w R wo� ul W-�aRww>wmps > z 0 55:5 U) 0 >_ (1) �_ Fn 0 mm0823K6<wmw < cr -j --. I uJ 0 CL > Lu Lu IL) 0 L.Li Z (/) >- cl) m m D w m 0 flu Z F- F- 0 CL �- 0 0 W < I m C) Zi c) (y) cy) 0) u') (0 U) c) wz 0 h-_ C'4 ui cy� 0 D 0 (1) a) x tr- < od cn LL U) 0 U z ) . cc < w m C --,J W ,.;- (0 OZ$W (D Cy) Z q ry C14 Z cy) Lli w (-4 Q0 C) (0 a N 0 CL L C) n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C) n . . . . . . . . . . . . . . . . . . 0) r- CL LL C) 00 >- ry 0 CL Nt (6 vi Zt -.4- . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . < < . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z w z I w Of 0 ui 0� w 0 F- LL CN 0 a_ w (L I -1 _j a. 0-- C'4 U_ LL_ LU U_ Ll- 346 t10 �; Lu 24 5 V) n, n 06 �--:D 0 UJ 0 oul C) 0 TOP OF GRATE= _0 .. .................................................. 344.9 ......................................... ..................................... ......... CHRISTY CATCH BASIN TO BE REMOVED WITH FUTURE CONSTRUCTION OF TYPE if A" CATCH BASIN. 18" INV= 342.12 CONSTRUCT 74± L.F. 18" CL -3 RCP w/RGJ STORM DRAIN @ 3.39% 339.61 24" INV S= 339.11 18" INV= 339.98 -CONSTRUCT 25.0± L.F. 18" CL -3 RCP w/RGJ STORM DRAIN @ 1.50% S E W E�R 10" INV= A STORM DRAIN SECTION (0 >- (N 339.8± N. I.Z). 11 F- LO 0) �4k i_2' - V) jy_ ne L.Li 0 + mv) 0u) 0 00 C'4 0 < C�z . LO M Z 00 >_ < a -f < 0 < r"� C6 ui n 0 00 -q- -q- LLJ LJ 1+ U) + F- +.-d- (N Nt L0 U-) -i Z) L0 0 V) SEE NOTE 0113" 7 _1A 4 N01*39' 9"E 11 In -00 7/_ 7 7 7-7--/,7-7 __7/_ __7 7/t+ 7 -7- to LO U-) 52 -54- Lij uJ ui - �z C) 7' Lli L.1i oc V) F- < 7T 1:2 LQI c< CN STREET RI HT- F -W Y PER 11 :D 11 :�-#-- U- w U- % 2!3 z 0 i>z a- <z zo op w 0�0= f2 u- i- W 6 zo �w- ow�:Og;<'30R Eu T 8 u - z 9 <W!� S 6 z 0 12 d- 0 0 uj <Omw�=!�rggm? F- F - Z a cz F 0 �E&V�E%82<>mow C6 uuil �W'e Iwo ow c/J cfj M Z 0 z 6900'%26q8wm 55 w Lu Lii cl) 0 a ww >z- L>Lj co, Z �g I=s � 00 ? lw- 2 6 LWL Ui LL �=Z§W.02E-mj 0 0 3: < i>_za9wwul02* < P 0 0 z 0 a LU LL W Zo 02 627';'wwT0w0< �wm6m-'Er-W08226 (-) T 0 uj �- F< (uj < 0 LL' 0 w >_ 0z z <_.'OTutlm�TF w I 00� �- zic ow W> 2 p 20OT6azj:�2@ LL' L 9 < >1 LL"- Oz ul 0 0 w R wo� ul W-�aRww>wmps > z 0 55:5 U) 0 >_ (1) �_ Fn 0 mm0823K6<wmw < cr -j --. I uJ 0 CL > Lu Lu IL) 0 L.Li Z (/) >- cl) m m D w m 0 flu Z F- F- 0 CL �- 0 0 W < I m C) Zi c) (y) cy) 0) u') (0 U) c) wz 0 h-_ C'4 ui cy� 0 D 0 (1) a) x tr- < od cn LL U) 0 U z ) . cc < w m C --,J W ,.;- (0 OZ$W (D Cy) Z q ry C14 Z cy) Lli w (-4 Q0 C) (0 a N 0 CL L oZ 0 cn a. IAJ > 0 w C) cxi z DOCUMENT No. 220146270, O.R.1 ry ry (j z 0, 1 m - w obo 0 0 :4:1z C) _j Q_ Lc) C) 00(-) 0 FUTURE 1 4 ui r �0 C14 10 1 0 0 0 0 TRACT 7372-2 _r '?A100. 0 4m Q0 71 00 9u (BY SEPARATE PLANS) n+</ n + -C:> Q 0 C-4 M "- " Lo Lr) (0 LO * 00 + 6 + n 0 L-0 V) V) Lr) U_ l<Z_ C) U-) L0 4� C) z L 0 c) c) 0 20 40 80 < Lo %zl� HORIZONTAL: 1"=40' + A'Z�3 VERTICAL: 1"=4' Nt C-7 41- (D INSTALL 400± L.F. INSTALL 216.8± L.F. INSTALL 216.9± L.F. INSTALL 400.0± L.F. INSTALL 400.0± L.F < 8" PVC SEWER @ 0.25% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19%_-Aw- 0 0 ui 11 0 ui 11 C-4 F- C-4 n -.4- 0 z LO 14- Ui '­_C� Z -P0. Z_ Z*I:z 41:z 4< 0� < C) -07' -D F C5 -i _j 0 w u -i __j w u -i U -i cr- ry W Fj U -i cr- cr ui F- :2 1 0 U-) L0 cr_ _J cr_ V) cr_ Lli _j 0 +"T- ^:) + -r -j � F- 1 . �_ -i - �_ I - �__ -1 0 z bwo 0 v) 0 C) V) 0 - (,()0 0 0 V) 0 X V) C) V) + 0 4- 0 C:) -t C) 0 C (f) 0 -t �- - .q- �- Lo z m c) z 7- 0 Lc)zm C).;7 -r LO'_*__1 _r Lij< (::�Z_r (OL00 <_ < 40z , * 0 z ll� 0 z 4 C) Z 0 z 40z 0 r'0 0 z L0 �_ c'J 0 < '.4- c) < 4 o < < -H < < < 04 < LAJ 0 V) U) :2 ll.� m- r- tr_ :2 v 0) C) o 04 04 r_� 0 r- V) 0 p- c� w r, ry n + ZD r- ry 0 0 Lci C� Lri LLJ '414: U� (n 06 LLJ 6 6 ui vi o6 uJ pe) lr-* .14- L6 c) LcJ , 3: 3:: ': (D V) U-) C) 00 q. vi u') ui 00"d- 3:: ci L0 L0 c) + + LLJ + Lij c) + �t + V) cr_ + LJ 0 + + +(0 + �O U) + 0c) V) +0) + C:) v) + C-4 V) Q_ +..q- V) + T) 06 (.0--d- co -'d- 00--q- d) -d- 0 Lc) 04 V) Lo Lr) 0 0C) 0 V) V) -t to LO L0 L0 0 - 0 V) 0 (n V) V) V) V) V) (n U) 354 .. ........................... ...................................................... ...................................................................................................................... ................ 354 0) 3: 0 X U) \X X/ Xv 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......... . ................................................................................................................... ................ a - A PPROXIUA Tf - Df -SIGN GRADE A 80 VE _0 go c v i 5f WER AAID STORU DRA)9V 0 350 -- ------------------ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ry ui CL LL 0 0 CL w w z 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z w z I w . . . . . . . . . . . . . . . . co ui 0� w 0 F- LL > w U- w (L I 346 ....... a. oZ 0 cn a. IAJ > 0 w C) cxi z DOCUMENT No. 220146270, O.R.1 ry ry (j z 0, 1 m - w obo 0 0 :4:1z C) _j Q_ Lc) C) 00(-) 0 FUTURE 1 4 ui r �0 C14 10 1 0 0 0 0 TRACT 7372-2 _r '?A100. 0 4m Q0 71 00 9u (BY SEPARATE PLANS) n+</ n + -C:> Q 0 C-4 M "- " Lo Lr) (0 LO * 00 + 6 + n 0 L-0 V) V) Lr) U_ l<Z_ C) U-) L0 4� C) z L 0 c) c) 0 20 40 80 < Lo %zl� HORIZONTAL: 1"=40' + A'Z�3 VERTICAL: 1"=4' Nt C-7 41- (D INSTALL 400± L.F. INSTALL 216.8± L.F. INSTALL 216.9± L.F. INSTALL 400.0± L.F. INSTALL 400.0± L.F < 8" PVC SEWER @ 0.25% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19% 10" PVC SEWER @ 0.19%_-Aw- 0 0 ui 11 0 ui 11 C-4 F- C-4 n -.4- 0 z LO 14- Ui '­_C� Z -P0. Z_ Z*I:z 41:z 4< 0� < C) -07' -D F C5 -i _j 0 w u -i __j w u -i U -i cr- ry W Fj U -i cr- cr ui F- :2 1 0 U-) L0 cr_ _J cr_ V) cr_ Lli _j 0 +"T- ^:) + -r -j � F- 1 . �_ -i - �_ I - �__ -1 0 z bwo 0 v) 0 C) V) 0 - (,()0 0 0 V) 0 X V) C) V) + 0 4- 0 C:) -t C) 0 C (f) 0 -t �- - .q- �- Lo z m c) z 7- 0 Lc)zm C).;7 -r LO'_*__1 _r Lij< (::�Z_r (OL00 <_ < 40z , * 0 z ll� 0 z 4 C) Z 0 z 40z 0 r'0 0 z L0 �_ c'J 0 < '.4- c) < 4 o < < -H < < < 04 < LAJ 0 V) U) :2 ll.� m- r- tr_ :2 v 0) C) o 04 04 r_� 0 r- V) 0 p- c� w r, ry n + ZD r- ry 0 0 Lci C� Lri LLJ '414: U� (n 06 LLJ 6 6 ui vi o6 uJ pe) lr-* .14- L6 c) LcJ , 3: 3:: ': (D V) U-) C) 00 q. vi u') ui 00"d- 3:: ci L0 L0 c) + + LLJ + Lij c) + �t + V) cr_ + LJ 0 + + +(0 + �O U) + 0c) V) +0) + C:) v) + C-4 V) Q_ +..q- V) + T) 06 (.0--d- co -'d- 00--q- d) -d- 0 Lc) 04 V) Lo Lr) 0 0C) 0 V) V) -t to LO L0 L0 0 - 0 V) 0 (n V) V) V) V) V) (n U) 354 .. ........................... ...................................................... ...................................................................................................................... ................ 354 0) 3: 0 X U) \X X/ Xv 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ......... . ................................................................................................................... ................ a - A PPROXIUA Tf - Df -SIGN GRADE A 80 VE _0 go c v i 5f WER AAID STORU DRA)9V 0 350 -- ------------------ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n 0 tK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . co 346 ....... ................... . . ....................... .............. - - - - - - - - - - ..................................................... ............................ - - - - - - - -- - - - - 346 t10 ..................................... ......... ................ _0 .. .................................................. ........................ ........................................... ......................................... ..................................... ......... ................ 8 INV S= 342* . . . . . . . . . . . 341.12 8" INV E -W 10" IN -V N -S_ . . . 341:12 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10" N -.S.= CL 342 34*0.58 . . . . . . -INV. ............................................ ..................................... ......... ................ 340.17 . . . . . . . . . . . . . . . . . . . . . . . 24". INV S- 1C, [NV -N=. . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . 338.95 '340.99 18". INV E_. W= JOP OF PIPE=. 1 -S= 30" fNV E=' 24" INV- S= 338.0± 3,38 . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . 339.61 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 33.9.41 . . . . . . . . . . . . . \24') INV'N-= �47 JN.V'N.-S 338 DATE 338,45 33911 10/14/2020 338.75- co 338.45 EXTREME* CAUTION WHEN PA JOB No. 3151 H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ��WORKING AROUND EXISTING 34 HIGH PRESSURE GAS I * * SHEET MAIN. CONTRACTOR SHALL CONTACT PACIFIC GAS & E INSTALL 444.5± L.F. 24 INSTALL 300.0± L.F. 24 INSTALL 356.0± L.F. 24 -ELECTRIC COMPANY PRIOR TO START OF CONSTRUCTION. > ---Av-' CL -3 RCP w/RGJ STORM DRAIN @ 0.10%- 10 334 * . . . . . . . . . . . . . . . . . . . . . . . . . . . . CL -3 RCP w/RGJ STORM DRAIN @ 0.10% CL -3 RCP w/RGJ STORM DRAIN @ 0.10% .......................................... ........................................................................................ 334 E 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 Ln t2 - SEWER AND STORM DRAIN PROFILE OF 7 SHEETS COB RECORDS No. z 0 Lu 30" fNV E=' 24" INV- S= 338.0± 3,38 . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . 339.61 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . 33.9.41 . . . . . . . . . . . . . \24') INV'N-= �47 JN.V'N.-S 338 DATE 338,45 33911 10/14/2020 338.75- co 338.45 EXTREME* CAUTION WHEN PA JOB No. 3151 H . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ��WORKING AROUND EXISTING 34 HIGH PRESSURE GAS I * * SHEET MAIN. CONTRACTOR SHALL CONTACT PACIFIC GAS & E INSTALL 444.5± L.F. 24 INSTALL 300.0± L.F. 24 INSTALL 356.0± L.F. 24 -ELECTRIC COMPANY PRIOR TO START OF CONSTRUCTION. > ---Av-' CL -3 RCP w/RGJ STORM DRAIN @ 0.10%- 10 334 * . . . . . . . . . . . . . . . . . . . . . . . . . . . . CL -3 RCP w/RGJ STORM DRAIN @ 0.10% CL -3 RCP w/RGJ STORM DRAIN @ 0.10% .......................................... ........................................................................................ 334 E 45+00 46+00 47+00 48+00 49+00 50+00 51+00 52+00 53+00 54+00 55+00 Ln t2 - SEWER AND STORM DRAIN PROFILE OF 7 SHEETS COB RECORDS No. CONSTRUCTION NOTES 0 INSTALL SEWER MANHOLE 0 INSTALL SEWER CLEANOUT z INSTALL SEWER (y) Ce) z ;2� ffil<zw�-Ow%W=2� wwm > INSTALL STORM DRAIN W LL I— zslwljRsR!32&m 0 INSTALL STORM DRAIN MANHOLE ral INSTALL TYPE "A" CATCH -BASIN ui cy� PROPOSED STREET RIGHT-OF-WAY 0 w 0- 2 T � 2 0 'z- PROPOSED STREET CENTERLINE E ­�ffi2 8<z �30w ----XS---- EXISTING SEWER 06 (0) LL 0 ("D EXISTING STORM DRAIN z _�e U) C3 wz<�U>wo,�mwZ22 EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 8" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNECTION WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AND A 4.5' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. NOTE $$A'$: VERIFY EXISTING LOCATION AND ELEVATION IN FIELD PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IF THERE ARE ANY DISCREPANCIES. NOTE "B": CONSTRUCT CHRISTY U-21 CATCH BASIN WITH U21 -HT TRAFFIC RATED GRATE AND INSTALL STORM DRAIN INLET PROTECTION PER DETAIL SE -10 AS SHOWN ON SHEET 3 (FUTURE TYPE "A" CATCH BASIN LOCATION). FUTURE DEVELOPMENT (BY SEPARATE PLANS) 0 L 0 7/-L-- + LO LO 1`5 1 5— Lj uJ :z I C/) I W -r Lli L L INSTALL 400.0± L.F. 10" PVC SEWER @ 0.19% FUTURE I TRACT 7372-2 S)l l(BY SEPARATE PLAN I 14- F— %miklm INSTALL 48± L.F. _T� 8" PVC SEWER MAIN @ 0.35% 8 1$ INV W= 338.78 �N KWO 9110 1 011,01 (.0 41 10 )1 INV S= 338. 12 10 INV N= 338. t*`A� SEWER SECTION �,_V N.T.S. b I KV F I KIUH I —U� —VVAY FJF K DOCUMENT No. 220146270, O.R. 9- Lo I I ml MiNelAll 01 INSTALL 400.0± L.F. LO 0 x Q_ 37.6'± ------------ I— I— — — 18" INV= 12" INV S= -/-- 332. 1�;9 VK7W) INSTALL 66.7± L.F. L'_ %,,7 18" PVC SEWER MAIN @ 0.09 o EX 15" SEWER STUB. CONTRACTOR SHALL REMOVE AND REPLACE WITH 18" SEWER STUB. REPAIR PVC LINED MANHOLE IN ACCORDANCE WITH C.O.B. STANDARDS. -T- WHITE LANE (FUTURE) RAISE EX. MANHOLE TO GRADE xs xs xs —/7- —7//— -H 7 < X — GAS 0 F:Z 613 — 77 -7/F 64 w 11-N J/ , I , I — 4- z \62�82.41 ------------ ------------------ M ------------------------------- - i _j V) Ick x Ld 34± F- 0 CD_ ------------------- -- EX 42 SEWER E 42" X T 0. A A ' LE; 2 �N E= AT 0.0377, --------------- ( 0 ;0) 331.23 'IV WHITE LANE (BY SEPARATE PLANS) 12" PVC SEWER @ 0.15% -i V) -H 57< In Ui LAJ-- _j < ot m Z < 0 :2 z CL Lij oui cr- V) m a orf LLJ V) F_ 0 20 40 80 HORIZONTAL: 1"=40' VERTICAL: 1"=4' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GRADE '354 354* ..... d . ........................................................ ............ ...... .......... + ABOVf f WER MAIN U") LO- ----------------------------- ........ ........................................... ..................................................................................................... ....................................... '350 -7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350* ........ ................. ..................................................................... ............................................................................... 346* ... ... ..................................................................... .......................................................................... ...................................... 346 ........ ..................................................................... ............................................................................ ....................... 342' ....... ......... ....................................................................... I ................................................................ 342 .............................................................. ...................................................... ..................................... ............................................... 338'...' ... ....... ....... .............. .................... .............................. .......... . ...................................... 338 <0 ........................................................................ EX 42" SEWER cl MAIN A'T* 0*.*03*7'%* 334'.... * ..................................................................................................................................................... ... 334 cx* 15y) TO 8E R INV W-* Emb D. ......................................................................................................................................... ................. ...... 3,33..0,3 ..... ...................... 00 EX 42" INV N -E 330* ... ....... ......... * 30 ................................................ ........................................... .......... (3,31.23) .......................... 3-- 0 .......................................................................................................................................................... I .......................................... 55+00 56+00 57+00 58+00 59+00 60+00 61+00 62+00 63+00 64+00 SEWER MAIN PROFILE 6 n ry L0 W E 0 cl) U-U - KO 9 Lij z zw z w LLJ ao- (y) Ce) z ;2� ffil<zw�-Ow%W=2� wwm > fr% 0) u') C.0 U) W LL I— zslwljRsR!32&m 5 W E w W;E "o r" ui cy� z S z w 0 w 0- 2 T � 2 0 'z- C.0 E ­�ffi2 8<z �30w 0 U) a) X tr- < dH W W 06 (0) LL 0 ("D CWL 26>-w0w22Tww z _�e U) C3 wz<�U>wo,�mwZ22 ce rn N gFx,222506% LU .;- c.0 W LL a 0 § <Z Wo W a) ce) 06 z a) C) a;- z L� z — L_ r,� o 6- a- Uzi UWJ < Z2 or C-4 Z co uj Lu W WO -wr 0 w Lu >0<w 1 0 0 cz, czl) 0 V F—C'4 (0 , <TM-z,0w<2uw- i-zt mz u;EL6wz22 C) cl� 0 @:�-,aw>8w0eRmwt CL M a) 0 N r - fn w =) 1 �<- C<) C-) c, uj 0z L. L W -wr 0. z 00:! L>U- 0 0- _j z 0 w > U- w 3,-<z8x>2-�00lz w ) 9 1 0 ,, ()� W> < u- z 2wifn mw L z > 0 8 U) U) ( wz 0 w �; ui -, Z!) Ft w CD W 0 W Z _5 CD < < w -j .. i W 0 F - w w C) 0 w z (n)- (f) :rmDofm0;0wz= CL F- 0 a- 1:- 0 C w < 2 o- 6 n ry L0 W E 0 cl) ,2\XAEER to 1!�- 0 a- > 0 0 w 0 cw 038 V < 00 00 + C) (0 C) 0 0 + u L0 U) F� 06 0 D 0 vi cf) Lij z 0 W )Iiji U- w w 0 W 0 z Z w z w 0 w > Lu w ) u- w cr_ 0 w < 0� < LL CL a o- ,2\XAEER to 1!�- 0 a- > 0 0 w 0 cw 038 V < 00 00 + C) (0 C) 0 0 + u L0 U) F� 06 0 D 0 vi cf) z 0 W 5; w DATE 10/14/2020 PA JOB No. 3151 H W SHEET E 0 E I-, r OF 7 SHEETS C r% ONSTRUCTION NOTES 0 INSTALL SEWER MANHOLE INSTALL SEWER CLEANOUT INSTALL SEWER LO INSTALL STORM DRAIN F_ INSTALL STORM DRAIN MANHOLE > w INSTALL TYPE "A" CATCH—BASIN V) PROPOSED STREET RIGHT—OF—WAY PROPOSED STREET CENTERLINE ----XS---- EXISTING SEWER C D EXISTING STORM DRAIN — -6�j z1L — EXISTING EDGE OF PAVEMENT SD STORM DRAIN STATION SS SANITARY SEWER STATION 0( 0 Flej 0 C14 10 '51-A L L_ f v rem s 51PULA9 Tc� Or -,T -Ai 1 PROPOSED STREET RIGHT—OF—WAY—� PER DOCUMENT No. 220146270, O.R. PHASE 3 PHASE 2 ALL PLAN MEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 8" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNEC11ON WITH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOWLINE AN D A 4.5' MIN. — 7' MAX. OF COVER AT THE PROPERTY LINE. ts NOTE A. VERIFY EXISTING LOCATION AND ELEVATION IN FIELD PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IF THERE ARE ANY DISCREPANCIES. NOTE "B": CONSTRUCT CHRISTY U-21 CATCH BASIN WITH HEAVY DUTY GRATE AND INSTALL STORM DRAIN INLET PROTECTION PER DETAIL SE -10 AS SHOWN ON SHEET 3 (FUTURE TYPE "A" CATCH BASIN LOCATION). C> co 00 CD to LLJ I 0 r UVIN,)IrNUUI OJ.JM: L.F. 42" CL -3 RCP w/RGJ STORM DRAIN @ 0.10% SUMP SEE DETAIL ON SHEET2 CONSTRUCT D5# 8" RIP—RAP PHASE 1 M U I RLAN DS PARKWAY LARIMAR DRIVE (BY SEPARATE PLANS) d Q U_ LU LL U- �0_ ZW Wo z w j LL z ;2� U, x<z5;6Emw=wg, w 0 = W z 2 � �_ 'OLL, ro 066 �_ 0 w C.) ZWT3% 0 W W : j 2 W 0 T: S Z) z CaLl Oz mw z 0, 3w Owe <z wo 0 -5 0 a - Lw Z w W >-:w u Z>O22TwxW < OW 0 W Z ILL- 0 Wm 2O§<3,-wm2 -j 9 �- 6 a g ww Lq W 0 W < r 0 CO-) Ow <Wwp<ww,w ,- 0 a /) , w 9 ,- u- cul 0- Ow L < ZZ MW ix_ >w on w< w z W wo K;;W�-ffiwzz- L u- wm<ww�o< COWL m '(s) w F0 � 0 C5 W =5 I I— W < LZU Cwl co w LL WUJ 13: z > 0 0 w 0 < C WI,6= " 0 j W F U 2 W z 8 a -- Z_ _r 6: _53 Lij W W LL W 3: z 0 U) Iz 9< 3:c�>�<LLZ- WO a cr_ F- WO WW w MW L� W < LL ow m > >: 0) W 0 M 0 Z z ca LLJ 0 0 W Z 0 < cr _J W U ; " CL F- Lli W W z cl) >- U) m In 0 W Z =) F- 0 a. 0 cr_ < 2 PROPOSED STREET RIGHT—OF—WAY PER DOCUMENT No. 220146270, O.R. b z C) 00 c1r) L0 (0 M 0 0 *c LLJ z L_ 0 F— >- �L-_ w -iE > (-) w (0 (1) X 0 < od U) LL U z ) cu m C,4 W (.0 016 UJ cf) Z w q z .4, Ce) ui UJI cf) (0 C) 0 CL L V) < r R w LO _j < CL F_ a. 0, > w V) /03M C D CN uj U- 0 W W n Z (D m Z W z W 0 W > Lij Lli n F- LL Lu ry 0 < w w U- a.,Q, V) < r R Z LO _j < CL V) ui a. 0, > w V) /03M C D vi -PROPOSED STREET RIGHT—OF—WAY PER DOCUMENT No. 220146270, O.R. + 30+28.46 (117.00' RT)= D 31+11.60 END STORM DRAIN LL (D L 0 20 40 80 UnDl7f)KI All llv�An' INSTALL 72.8± L.F. INSTALL 334.9± L.F. # 8" PVC SEWER @ 0.25% 8" PVC SEWER @ 0.35% VERTICAL: 1 "=4' _�) 0 0 11 C-4 11 F- F- r- 11 F- U-) 4k ry F-- F- F- F- lo-) C5 -i ry LJ ry Lli ry LLJ -J rv� LLJ v F- 1 F- F- F- (0 F- r- F- 00 Z: U) 0 C) U) :4k lr� z4z: 0 U) c) 8 (3 _b 0 C) b U) b U) F- ZD F- C\j c� Cq F--: Z 0z M 0z M -i Lli _j LLJ ry =) LLJ Ww Lli OZ (=;o z goo Z a Z cif w ry 0 0( 0 - F- _j F- -J F- -1 06 w F- C,4 (-) < < 0 C) (/) 0 0 0 0 M (0 U) ^b V) c):2 :D 0z C)z 00 z 0 :D V" (0 Nt 00 60Z 60Z (6c) z 5- _j — cc � ,q: w (000 "q- ro w 00— z F- U-) LJ 00 .0 n . L.Li C) 0 < C,40 < JL0 r- p I CL I 0 .0 3: (6 T_ _� 0) CN V) Lo CB 3:: 6 n (10 0 c) 6, (A :m N -lo, '"5; Z:7� 3: 0) z (0 + UJI n + LLJ + (c) (0 < < + 0 V) 0 + V) (0 Lf) (0 Lo (,o ,t +64 + Lb + Lb r,� L0 * (0 0 c) 0 04 CN C14 L0 04 0 0 -4-, -4- z N 04 LOC -4 Ln to 06 c,0 m17 04 V) X/ V) U-) + + C14 + o6 Uj V) +r, + m + q 04 0 0) 04 C) to +(0 vi n (D% * 352 ..................... ............................................ ........................... ................................. m .......................... 0 ro= .352 APPROWYA 7F DE$IGN OR49C VZ_ V) V) 0 ----------------------------- 5f WER AND. STORY DRAIN N . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ------ - - - - - - - - - - - - - - . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V) - I � vi ------------------- -41 ------------------------------------- --------- ----- ------------------------------- ----- col , YPI, ........................ ........................................ . ... .. ......... ................................................ ...... .......................... ........................................................ .................................................................................. ......................... ................ Ln 344 ...... ......... ..................................................... . .... .............................................................. ................... ......................... ................ 344 . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . __. — -- - - - - - - T fNV -N�� . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . n 1111Z 342-40 — '0, — PLUG END FOR FUTURE EXTENSION CONSTRUCT PIPE 340' . . . . . . . . . ... \ . . . SADDLE PER - C.,0.13. ........................ ............................... ............................................... ...................................................................... E z STD. DTR.- D-18 0 0 Ff) U) 8" INV N -W= NV S= > 24 1 �J_— S 3*6" INV _0 UJI . . . . . . . . . . . . . . . . . . . . . . . . . P�0�11NV � . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 339.16 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337.42. . . . . . . . . . . . . . . . . " * , , , ;? \% �_O' I RV 1 10- L 338:95 * * * , I I 3C INV W= \30" INV E=- 30" INV'W—S 30" INV S—NW= 338.27 24" INV N= 338.45 36" *INV E_* '337.92* 3.38.09 338.22 10/14/2020 338.16 338.45 42" INV N_ JDATE ,336* . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 337.66 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . _:�j . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 336 u) I PA JOB No. 3151 H 336.92. V) 93 4_1 INSTALL 50.2± L.F. 30 c: P . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . CL -3- RC * P. v�/RGJ STORM DRAIN @ 0.10% 0 INSTALL 285.3± L.F. 30 INSTALL 241.4± L.F.*36 INSTALL 173.0± L: F. 3 0". *INSTALL 130.8± L.F. *30" E j 332 . . . . . . . . . . . . . . . . . . . . . . . . . I . . . . . . . . . . . . . . . . . . . . . . . . . CIL—.,_� RdP. w/R�J. STO�M DRAN, @ .0.10% . . . . . . . . . . . . . . . . I . . . . . . . . . . . . —3 - R*CP w/'GJ - ST * R -M - DRA'IN @ . . . . . . . . . . . . . . . . .. TORM 'DRAIN 6-0,10%* - - -RCP w/RGJ STORM. D,RA'IN 0*. 10.7. CL R 0 0.10%. CL - 3 RCP- w/RGJ S CL: . . . . . . . . . . . . . . ... 21+00 22+00 23+00 24+00 25+00 26+00 27+00 28+00 29+00 30+00 31+00 Ln PO I—, SEWER AND STORM DRAIN PROFILE COB RECORDS No. CONSTRUCTION NOTES 0 INSTALL SEWER MANHOLE 0 INSTALL SEWER CLEANOUT CD INSTALL SEWER z CN 0 INSTALL STORM DRAIN 0 INSTALL STORM DRAIN MANHOLE C5 0 INSTALL TYPE "A" CATCH -BASIN V_ PROPOSED STREET RIGHT-OF-WAY (C) + PROPOSED STREET CENTERLINE ----XS---- EXISTING SEWER C:> 0 v-- V) EXISTING STORM DRAIN 0 EXISTING EDGE OF PAVEMENT SID STORM DRAIN STATION ALL PLAN VIEW STATIONING IS BASED ON CENTERLINE DATA UNLESS OTHERWISE NOTED. ALL SEWER LATERALS ARE 8" UNLESS OTHERWISE NOTED. ALL SEWER LATERAL STATIONING IS AT POINT OF CONNECTION NTH SEWER MAIN. ALL SEWER LATERALS ARE TO HAVE A MINIMUM OF 2.5' OF COVER AT GUTTER FLOwLINE AND A 4.5' MIN. - 7' MAX. OF COVER AT THE PROPERTY LINE. NOTE "A": VERIFY EXISTING LOCATION AND ELEVATION IN FIELD PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IF THERE ARE ANY DISCREPANCIES. NOTE "B": CONSTRUCT CHRISTY U-21 CATCH BASIN WITH HEAVY DUTY GRATE AND INSTALL STORM DRAIN INLET PROTECTION PER DETAIL SE -10 AS SHOWN ON SHEET 3 (FUTURE TYPE "A" CATCH BASIN LOCATION). PG&E GAS NOTES. - CALL 811 (1-800-2227-2600) A MINIMUM OF 2 BUSINESS DAYS (NOT INCLUDING INITIAL DAY OF CONTACT) IN ADVANCE FOR THE MARKING OF UNDERGROUND UTILITIES, INCLUDING ALL NON-UTILTIES BEFORE YOU DIG, GRADE OR EXCAVATE. ANY UNDERGROUND STRUCTURE SHALL MAINTAIN A MINIMUM OF 7 FT. (WITH 3 FT. OF UNDISTURBED SOIL) HORIZONTAL SEPARATION AND 24" OF VERTICAL SEPARATION, OR 12" WITH SPECIAL APPROVAL, FROM THE EXISTING 34" PACIFIC GAS & ELECTRIC TRANSMISSION LINE. ADDITIONALLY, NO LESS THAN 60)) OF COVER IS TO BE OVER THE TRANSMISSION LINE AT ANY TIME. AT NO TIME SHALL POWER DRIVEN OR POWER OPERATED EQUIPMENT BE USED DIRECTLY OVER THE TRANSMISSION LINE, OR WITHIN 2 FT. FROM THE EDGE OF THE PIPE. EQUIPMENT SHALL NOT REMAIN STATIONARY OVER THE PIPELINE. A PG&E TRANSMISSION PERSONNEL SHALL BE ON STANDBY WHEN CONSTRUCTION IS TO TAKE PLACE WITHIN 10 FT. OF THE EXISTING TRANSMISSION LINE. SANITARY SEWER ST TION 115 Nk\ I t\ jkW 4�1 6) 1 k PIPELINE 50' WIDE PIPELINE 50' WID 35+75.44 (19.00' LT)= SETBAC�1\1 SETBACK SS 35+75.44 CONSTRUCT SEWER MANHOLE #9 50' WIDE PG&E EASEMENT PER- ------------------ DOCUMENT No. 0203148941, O.Ri ------------------ 1-1-711 STREET RIGHT-OF-WAY PER P.M. 12100, P.M. BK 59 PG 178, O.R. SS 35+11.44 BGN SEWER MAIN fill PLUG END 106 SS 39+67.20 CONSTRUCT SEWER MANHOLE #12 t42.6*0 FUTURE TRACT 7372-1 < /// / -48'45" V41 * 0) xz (BY SEPARATE PLANS) // / A/ FUTURE 0 /-Z- s SS 40+76.077REMOV7E DEVELOPMENT r7 �l EXISTING SEWER CLEANOUT (BY SEPARATE PLANS) NOTE: THIS SEWER IS PRIVATE A) ------------------------------------- 36+76.03 �19.00' LT�= SS 36+77. 0 CONST UCTI S33*24'1 4"W SEWER MANHOLE #10 SS 38+74.96 CONSTRUCT SEWER MANHOLE #11' X U) 04 I + DRILL SITE -48'- -0- 54' -19 f_ -J-29'- 29 f 33X-1 3 25'-r (NOT A PART) 20' 9' 9' - 20" 00 F PHASE 1 0 20 40 80 HORIZONTAL: 1"=40' PRIVATE VERTICAL: 1"=4' 91 "36 0___ CN ,- U-) rl) p6 Z f�e) + CL b in 0 C:) 7� 7- ��071 0 < 04 nn ry C56 n to + + C) C) U) wasall ry - ui 00 0 r) r- CD F- U_ 9 z CN 0 OM to 0 UO- 1w-- C5 0 0') V_ 0 (C) + �_ W 5 0 LL S z _0 0i c) m C:> 0 v-- V) F- z .3:61 wz 3: 0 az 0 0 ad LL U) ry n' 0 (1) z _�e c/) L'i C) UJ C:) 0 C'4 C3 C) 2 -<j 6 ZX )W OW < W LF- 8) 23 0 65 Oro o U) N < FM- OW- 400- 2 ffi 2 LL ZZ 0 Uj < 0 On� Fa-: , 9 aw " 8 (zj) 0 w S00*11 7'43") MUIRLANDS PARKWAY 0 (SEE SHEET 6) CD F- U_ 9 z CN 0 OM to 0 UO- 1w-- C5 0 z w => V_ = 0 F-F- F- U) (C) + �_ W 5 0 LL S z _0 0i c) 0z LLI a Lu C:> 0 v-- V) �m I 911111111111 mm - L0 liz: ui _j 0 z (A 0 Z Z F- LLJ LLJ 75 LAJ ::D ty 0 F-0 V) m 11 F- e- �,(_) F- U) 0 X-) * 00 40 0110 00 41z Ld _j 0 r z LLJ 3:: LLJ V) 11 z Ld ry 0 00 LJJ V) (m C�o 0 . -7, 00 LLJ r- +0-) C:) 00 C) STORM DRAIN & SEWER TABLE LINE BEARING Ll NOO*39'0,3"W L2 N09*52'38"W N V_ M cf) PLUG END FOR 18" INV= 8 ' I N V FUTURE EXTENSION 338M0 8 L"N 8 1 V S= INV S= INSTALL 10± L.F. 338.67 0 8" PVC SEWER MAIN @ 0.25% 8" INV N= 8 $1 V W 33 . INV W= 338.57 338.67 rA_"\ SEWER SEC11ON \�I=j N.T.S. FUTURE TRACT 7372-2 (BY SEPARATE PLANS) 00 C�L 00 z: tn z LOO Z 00 LLJ 00 C:) 0 r- + On CL V_ (n 11-0 1 7=01� z Niiim. I INSTALL 64.0± L.F. 8" PVC SEWER - INSTALL 102.5± L.F. INSTALL 197.1± L.F. INSTALL 92.2± L.F. INSTALL 108.9± L.F. 0 20 40 @ 0.25% 8" PVC SEWER @ 0.50% 8" PVC SEWER @ 0.50% 8" PVC SEWER @ PVC SEWER @ 0.25% HORIZONTAL: 1"=4C z r*) -H 0 11 �- 0) �_ V_ �_ C14 VERTICAL: i =4' <�-_ -.0- z e ---u �,� ON- 0 T-- ui z Z) o6 T '--J- 0 (0 X w cr-- 0 + OV) cn U) 0 V) 0 < V) Z 0z -r ozo ui bi PO :�-c Oio z 7- m z 7- _j 0 < ajo 71 0 z 0 z 0 m < 0 < C) C�o ME ry INSTALL 20.5± L.F. INSTALL 27.6± L.F. (n Of c:> (6 w I$ < "'4: L6 0� ry 0� c� r�l 3: 8" PVC SEWER @ 0.35%- 8 PVC SEWER @ 0.35% m 0 r- -4- V_ + U-) r-, ui UJ r-� + uJ + 3.1 r-, (0 V) +LO V) + uJ + + UJ co 0) M u') n co + n V) V) Z co cn U") U") �*z < f) F- z ry of Ld -J W ui -j A, Lli -i M Lij ry LJ V) 0 -J - F- -J V) 0 C:) V) 0 V) 0 -pe) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . in z -r c) 7. rr) z -r 00 LLJ n 1-:2 ry -i 50z Lcio P60 z .3:: _j '7 ry -i 0 n ( "It' LLJ CL ��o cl- �_ -­, -) < V) C) (3) Lo V) c) npo w moo w ............... ..................................... ....... ......................................... ........... 354 z LLJ APPROXIMA 7F DESIGN ORADf C) C3 L'i C3 C3 35 00 ui 0077 m ui 3:5 U.) Lo co to ro uj ABOVE Sf4ff MAIN uJ + + ui ---------- + ++ V) V) +0 + -------------------------------------------- + C5 C)o LO Cl T_ v- v- v- v- %_ v--0 o6 C) c) C:) n C) (0 X. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . RISER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . o6 rl- 0 K V) V) 00 V) V) + 0 + PER.DETAL + r -.-I . 3. y _j L__ r k, 7� .0) . . . . . . . . . . . . . . �45 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . V) ABOVE -------- --------------- /T Df S N GRA Df c� Si_*ER AND STORMDRAIN N c s ER A I STALL MP RI ER P DET IL 350* .... 350 0 4� V) ...................... . ........... . 350* ............... ........................................................... ....................................... ............. .................... . ... ..... ............ 346" ....... * ................ .......................................................................................... ............. 346 '346 346* ................... ... . ...... .................................... ................................................. . .......................... PLUG END FOR 0 . . . . . . . . . . . . . . . . . . . . 342" ....... .............. ........................................................ ..................... 342 '8" fNv' 'I r=R`E ' �XTEINSION . . . . . . . . . . . . . 342.31 0 PLUG END FOR 18" \8" INV= .... FUTURE EXTENSION 342 N-* S=* 8" INV N= . . . . . . . . 1.2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 342.57 . . . . . EX. -8" -SEWER MAIN 339-16 PLUG END FOR 342.40 lb N 8 INV NW=7- INV N=� AT 0.25% --PLUG END FOR T FUTURE EXTENSION 338. 340.09 .339.99 &15 1. - . - ... - _. - D . .. OP OF 3 //- FUTURE EXTEN-SION C9 . . . . . . . . . . . . . . . . . . . . . . . . . . -339.5± . . . . . . . . '338 [4--.0 .0 N. T R. A. C -T .0 R. 8HAILC O�E'WkEf�/I� 'CAUTION *WHEN WbkKiNJG*A�R00N*D.' 18 I -N V= 30" INV 36"- INV E= EXISTING 34' HIGH PRESSURE GAS MAIN: CONTRACTOR - SHALL- CON TACT 338- . . .339.34 . . . . . 33BJ 6 . . . . . . . . 339.28 337,166 . . . . . . . . . . . . . . . . . . PACIFIC GAS* & ELECTR.IC. COMPANY. PRIOR. T.O. START. OF. CONSTRUCTION .. . . . . . . . . . . . . . . . . . . 00 91.8± L.F. 1*8" ........ ... ..... ... ... . ... .... ........... C. . . . . . . . . . . . . CL -*3 RCP w/RGJ - INSTAtL 60.5± L.F. - cp, W/�G� I 35+00 36+00 37+00 38+00 39+00 40+00 40+00 -18" CL' 3 R DRAIN* @ 0.20% SEWER PROFILE NOTE: REMOVE EXISTING CLEANOUT AND VERIFY EXISTING 10+00 STORM DRAIN @ 0.20% 11+00 LOCATION AND ELEVATION IN FIELD, PRIOR TO CONSTRUCTION AND NOTIFY ENGINEER IF THERE ARE ANY DISCREPANCIES. SEWER AND STORM DRAIN PROFILE ifill-masilitimm wu_ U- U- 6i wu- CD F- U_ 9 cy) co OM 0-) U-) (0 W UO- 1w-- 6 0 w z w => z �0 cq = 0 F-F- F- U) w c'? �_ W 5 0 LL S z _0 > -r- 0z LLI a Lu F- z .3:61 wz 3: 0 az 0 urui ww ULL C/i (� ga zm 00 ad LL U) zlzl0w0l_Tw6203�:w m 0 (1) z _�e c/) cf) z C� Z< W, W 'z 2 2 m 100 C'4 T OW FW- !��-Fazm5ogwm W (0 Z gF- 06 W (1) Ce) Z a) q 2 -<j 6 ZX )W OW < W LF- 8) 23 0 65 Oro o U) N < FM- OW- 400- 2 ffi 2 LL ZZ 0 Uj < z cy) UJI w On� Fa-: , 9 aw " 8 (zj) 0 w 04 wz z<,w, < g wLj- LL mw Z w w 0 C) C) z s:Ra>wu,w0,66u,_ CL 2 w 55 2 0 (N 0 S C/) w o Z 0 S2 L.5 w CL 0 0- a �- 15 w > LwL w 7 w owpwwwwluw w W.:�aRw�!W-mjps w <2 uw) > Z_ 55 >- �- 0 0 al 5 E CD co 0 0 Z Z Z w _j w W 0 < w ­1�1 a. ww0owz 0>-C/) TM (1) x = 0 w Z =) 1 I- F- F5 Ia. 0 fo w < M U- ifill-masilitimm R to 0 cn a. w c_ rn >. v 0 0 + 00 C) 1 0 C) C) 0 z cq + U-) C;D C) 0< 0 QJ -i z U) �06 UJI z "17 cn 6i z 0 C14 w CL LL F_ c� 6� .0 w w CL z j >- Z w z I 15 w > w 7 F- u- w ry 0 U- R to 0 cn a. w c_ rn >. v 0 0 + 00 C) 1 0 C) C) 0 z cq + U-) C;D C) 0< 0 QJ -i z U) �06 UJI z "17 cn D E 10/14/2020 PA JOB No. 3151 H 4_1 c: 0 SHEET E 0 1. 0- E OF 7 SHEETS z 0 w D E 10/14/2020 PA JOB No. 3151 H 4_1 c: 0 SHEET E 0 1. 0- E OF 7 SHEETS