0"331 REFINERY AVENUE B AKE R' --'F I E LD CA 93308
0URAD1N'k0_T..1 PERMIT 2("�-40000017
DRAWING INDEX
QWG. NUMBER REV. DRAWING TITLE. CAD FILE NO.
352 7 1 -91 -0-27 - D-4035 I TITLE SHEET, DRAWING INDEX & VICINITY MAP CIVIL 35271 -91 -Q -27-D-4035
35271 -91 -A -62-D-4036 1 SITE LOCATION PLAN 35271 -91 -A -62-D-4036
35271 -91 -Q -31-D-4037 1 CONSTRUCTION NOTES - EARTHWORK 35271-1)1-0-31-D-4037
35271-91-0-95-D-4038 1 GRADING PLAN 35271-91-Q-95-D-4038MS
35271-91-0-95-D-4039 1 OVER -EXCAVATION PLAN 35271-91-Q-95-D-4038MS
35271 -91 -Q -95-D-4040 1 DRAINAGE PLAN 35271-91-Q-95-D-4038MS
35271-91-0-95-D-4041 1 GRADING & EXCAVATION SECTIONS 35271-91-0-95-D-403eMS
35271 -9i -Q -80-D-4042 1 EROSION CONTROL PLAN 35271-91-0-95-D-4038MS
35271 -91 -Q -44-D-4043 1 TRENCH LINE DRAIN DETAILS 35271 -91 -Q -44-D-4043
35271 -91 -K -48-D-4044 i FIRE PLAN 35271 -91 -K -48-D-4044
AREA MAP
SCALE : NONE
PROPERTY / PROJECT INFORMATION
ZONING: "M-2" GENERAL MANUFACTURING
USE CODE: 3030 — VACANT M-3
ASSESSORS PARCEL NUMBER: 332-280-17
DISTURBED AREA: 0.35 ACRES
EXCAVATION QUANTITY: 190 CUBIC YDS.
FILL QUANTITY: 115 CUBIC YDS.
PROPOSED HOURS OF CONSTRUCTION: 7:00 AM — 5:00 PM
PROPOSED CONSTRUCTION START DATE: T.B.D.
PROPOSED CONSTRUCTION COMPLETION DATE: T. B. D.
PROPOSED CONSTRUCTION DURATION: T. B. D.
ANTICIPATED CONSTRUCTION EQUIPMENT: (1) — WHEEL LOADER (CAT. 966C OR EQUIV.)
(1) — SOIL COMPACTOR (CAT. 815B OR EQUIV.)
(1) — WATER TRUCK (3000 GAL. MIN.)
The GRADING PILAN as on thilis drawing is t,erebV appircw'd,
sub:cctto any indica-v->d craddl Approval by the Potlic
wolrks Departmeni. and Blaii;dirig Department indicates approval only 'a o
to desl;,n critena used andcontol to City Staindards, Codes and
Oroinances. Engineer for the subdivider or developer shall beespon-
siblefor accuracyof calculations for this plan and shall submit acel
"as -graded" plan after compietIun of the grading.
C, I )(bt
Department
GRADING C0RRECTI0V,,-.#5e
�_l 1-_
Reviewed By: 3 A -Ill JAf�ff
n See Attached Sheet(s)
[]As Noted On Plans
F1HCP Fees and/or En Clearance
El Bearings and Dist ces
Engineer Stam , nd Sign
[]Submit 2 Prel' inary Soils Reports
Address o lans
lSitePlan eview Number on Plans
L'Permit umber on Plaris
17
L_� Not ite Utilities Approval
[IR ining Wall& Walls Over 6'
uire Separate Permit
ther
PERMIT INFORMATION
GRADING PERMIT NO.:
22-40000017
BUILDING PERMIT NO.:
22-1086
9/2022
REV I DATE I M.O.C. No.
BAKERSFIELD RENEWABLE FUELS, LLC
BAKERSFIELD REFINERY
6451 ROSEDALE HWY
BAKERSFIELD, CALIFORNIA 93308
DIRECTOR OF OPERATIONS: M. A. DENNIS
MOBILE: 661 —426-4738
OFFICE: 661 —742-7624
RE -ISSUED FOR PERM IT/CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR
ENGINEER
PARSONS
9600 MING AVE., SUITE 310
BAKERSFIELD, CALIFORNIA 93311
JOHN F. HANNA, P.E.
MOBILE: 661 —448-6807
JOHN. HANNA@PARSONS. COM
A W�ft
VIUIINI I T MAr
SCALE : NONE
KERN COUNTY, CA.
GEOTECHNICAL ENGINEER
BSK
700 22ND STREET
BAKERSFIELD, CALIFORNIA 93301
PH: 661 —327-0671
FAX: 661 —324-4218
NOTE:
1
9600 Ming Ave, Suite 310
Bakersfield CA. 9331:1
-Iful
DWR
JFH
AA
04
%'A
CC
ILI
Lu
;7
Office: 661-699-1:100
DWR
JFH
AA
09
0
q — U[
( 0
�
9>
M
M
>
En
>
,
.
City Records No.
VIUIINI I T MAr
SCALE : NONE
KERN COUNTY, CA.
GEOTECHNICAL ENGINEER
BSK
700 22ND STREET
BAKERSFIELD, CALIFORNIA 93301
PH: 661 —327-0671
FAX: 661 —324-4218
NOTE:
,�?'OFES,S/ P =�
F. M
HA
nil
C 71506
ER 12n1l
PROJECT SITE IS LOCATED WITHIN AREA OF
POTENTIAL H2S GAS CONCENTRATIONS. ALL
PERSONNEL; CONTRACTORS AND VISITORS,
MUST BE EQUIPPED WITH AN APPROPRIATE
MONITORING DEVICE.
F� A V �_I F) �:_Nl F --\A/ A F:�I F__ F__H �71 Q ACAD FILE No.
6451 Rosedale Highway, Bakersfield, CA. 93308 1
TITLE SHEET, DRAWING INDEX & VICINITY MAP
LOADING RACK — PROPANE, BUTANE, NAPHTHA
SCALE PROJECT TITLE Pi
NONE BAKERSFIELD RENEWABLE FUELS
UNIT NO. AREA NO. I FUNCTION OR EQUIP. NO. DWG. TYPE I SIZE I DRAWING SERIAL NO. SHEET,
35271 91 Q 1 27 D 4035 1 1
r"
mono
z
LE 0 LA
�OJECT NO.
q,
-Iful
C,
.,z
'. ,
xlllllllllll�
04
%'A
CC
ILI
Lu
;7
Uj
JU
09
0
,�?'OFES,S/ P =�
F. M
HA
nil
C 71506
ER 12n1l
PROJECT SITE IS LOCATED WITHIN AREA OF
POTENTIAL H2S GAS CONCENTRATIONS. ALL
PERSONNEL; CONTRACTORS AND VISITORS,
MUST BE EQUIPPED WITH AN APPROPRIATE
MONITORING DEVICE.
F� A V �_I F) �:_Nl F --\A/ A F:�I F__ F__H �71 Q ACAD FILE No.
6451 Rosedale Highway, Bakersfield, CA. 93308 1
TITLE SHEET, DRAWING INDEX & VICINITY MAP
LOADING RACK — PROPANE, BUTANE, NAPHTHA
SCALE PROJECT TITLE Pi
NONE BAKERSFIELD RENEWABLE FUELS
UNIT NO. AREA NO. I FUNCTION OR EQUIP. NO. DWG. TYPE I SIZE I DRAWING SERIAL NO. SHEET,
35271 91 Q 1 27 D 4035 1 1
r"
mono
z
LE 0 LA
�OJECT NO.
q,
Full
HAGEMAN RD
19
I
LEGEND:
17
Will
32
Al
16 15
HAG- 1 14
TTR I,
NOR -
21
4
T30S/R27E
MIMG AVE
GRAPHIC SCALE
2000 0 1000 2000 4000
IN FEET
1 inch = 2000ft.
SECTION LINE
MID-SECTION LINE
PROPERTY BOUNDARY FOR APN 332-280-17
DATUM POINT
m
I
2 3
ROSEDALE HWY
I
MWO AVE
NOTES:
1. CONTROL POINT DATUM IS TAKEN AT COLUMN LINES 8 AND
8000 B WITH COORDINATES N. 535'-01/2", W. 918'-4".
2. BASELINE ELEV. IS 100'-0"
GRAPHIC SCALE
100 0 50 100 200 400
IN FEET
1 inch = 100 ft.
F.
C= C 71506
Exp 12/31/-4-5
0
SURVEY CONTROL SCHEDULE
COORDINATE
NAD 83 CALIFORNIA
STATE PLANE
ZONE 5 COORDINATES
LOCAL TRANSLATION (PLANT
COORDINATES)
REMARKS
CONFIRMATION
NORTHING
EASTING
ELEVATION
NORTHING
EASTING
ELEVATION
CP -524
2323629.542
6241069.006
397.190
29.822
-273.341
105.578
MAG & TIN IN CURB
CP -201
2324145.882
6240690.748
392.723
539.999
-659.905
101.111
1 " IP & PLUG
CP -202
2324144.438
6240430.358
390.967
534.347
920.247
99.354
CHISELED "X" IN CONC.
F.
C= C 71506
Exp 12/31/-4-5
0
SITE PREPARATION AND GRADING PLAN FOR BKRF
1. ESTIMATED CONSTRUCTION QUANTITIES:
EXCAVATION (CUT) 190 CU. YDS.
FILL 115 CU. YDS.
TOTAL AREA DISTURBED — 0.35 ACS.
A. EARTHWORK QUANTITIES SHOWN FOR PERMIT PURPOSES ONLY
B. CONTRACTOR SHALL CALCULATE THE EARTHWORK QUANTITIES TO THEIR SATISFACTION PRIOR
TO START OF CONSTRUCTION OR BIDDING. CONSOLIDATION, LOSSES DUE TO CLEARING
OPERATIONS, UTILITY TRENCHES, SUB—GRADE STABILIZATION, OR FACTORS FOR GRADING
MEANS AND METHODS ARE NOT INCLUDED AND EARTHWORK QUANTITIES MAY VARY
ACCORDING TO THESE FACTORS.
2. EQUIPMENT,... -SERVICES AND MATERIALS BY
CONTRACTOR
CONTRACTOR SHALL PROVIDE ALL LABOR, EQUIPMENT, MATERIALS AND SUPERVISION NECESSARY
TO PERFORM THE WORK SHOWN ON THE PLAN WHICH WILL INCLUDE BUT NOT BE LIMITED TO
THE FOLLOWING:
A. EXCAVATION, BACKFILL AND COMPACTION;
B. WATER FOR MOISTURE CONDITIONING AND DUST CONTROL;
C. MEASURES NECESSARY TO PREVENT EROSION AND PONDING;
D. ALL SURVEYING ASSOCIATED WITH THIS WORK;
3. EQUIPMENT, SERVICES AND MATERIAL PROVIDED BY
COMPANY
A. MATERIAL FOR USE AS ENGINEERED FILL;
B. ALL SOIL TESTING.
4. CODES AND STANDARDS
CONTRACTOR SHALL PERFORM AND COMPLETE CONSTRUCTION IN COMPLIANCE WITH ALL
APPLICABLE LOCAL, STATE AND FEDERAL CODES, LAWS, ORDINANCES AND REGULATIONS.
A. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
• D— 1557 MOISTU RE— DENSITY RELATIONSHIP OF SOIL AND SOIL—AGGREGATE MIXTURES USING
A 10—LB. HAMMER AND 18—INCH DROP.
• D— 1556 DENSITY OF SOIL IN PLACE BY SAND—CONE METHOD.
• D-2937 DENSITY OF SOIL IN PLACE BY THE DRIVE CYLINDER METHOD.
• D-6938 DENSITY OF SOIL AND SOIL—AGGREGATE MIXTURES IN PLACE BY NUCLEAR
METHOD.
B. 2019 CALIFORNIA BUILDING CODE.
C. "GEOTECHNICAL INVESTIGATION" PREPARED BY BSK ASSOCIATES, DATED JULY 21, 2021.
THE GEOTECHNICAL INVESTIGATION (PROJECT: G21 -220-10B), ALL REQUIREMENTS AND
RECOMMENDATIONS THEREIN, SHALL BE CONSIDERED PART OF THE CONTRACT DOCUMENTS.
5. GENERAL PROVISIONS REQUIRED OF CONTRACTOR
A. CITY OF BAKERSFIELD REQUIREMENTS
• PRIOR TO START OF ANY PHASE OF CONSTRUCTION INSPECTION SECTION SHALL BE GIVEN
AT LEAST 24 HOUR NOTICE. THE SECTION MAY BE NOTIFIED AT (661) 326-3049.
• COMPACTION TEST NOTE — COMPACTION TESTS SHALL BE THE RESPONSIBLY OF THE
DEVOLOPER/ SUBDIVIDER/CONTRACTOR. THE NUMBER AND LOCATION OF REQUIRED TESTS
SHALL BE DETERMINED BY THE CITY ENGINEER.
• AN OPEN STREET PERMIT SHALL BE OBTAINED FROM THE CITY OF BAKERSFIELD PUBLIC
WORKS DEPARTMENT FOR ANY WORK PERFORMED WITHIN EXISTING ACCEPTED STREET RIGHT
OF WAY. UNLESS SECURED BY AN IMPROVEMENT AGREEMENT, APPROVED INSURANCE AND
SECURITY BASED ON AN APPROVED ENGINEER'S ESTIMATE FOR THE WORK PERFORMED
WITHIN THE RIGHT OF WAY SHALL BE POSTED PRIOR TO ISSUANCE OF THE PERMIT.
• MAXIMUM SLOPE RATIO FROM BACK OF SIDEWALK TO FACE OF WALL OR STRUCTURE SHALL
BE 4:1, EXCEPT FOR TWO FEET BEHIND THE SIDEWALK WHERE THE MAXIMUM SLOPE SHALL
BE 2%. ALTERNATIVELY, THE CITY ENGINEER MAY APPROVE CURBING BEHIND THE SIDEWALK
OR OTHER METHOD TO PREVENT EROSION ONTO THE SIDEWWALK.
• ANY ITEMS IN THE PUBLIC RIGHT—OF—WAY THAT ARE DAMAGED OR DO NOT MEET CURRENT
STANDARDS SET BY PUBLIC WORKS WILL REQUIRE REPAIRING AND/OR UPGRADIING AS PER
CITY ENGINEER.
• UNDERGROUND SERVICE ALERT SHALL BE CONTACTED TWO (2) WORKING DAYS PRIOR TO
CONSTRUCTION. (811)
• ANY PUBLIC FACILITIES IN THE STREET RIGHT—OF—WAY WITHIN THE PROPERTY FRONTAGE
WHICH ARE SUBSTANDARD OR DAMAGED WILL REQUIRE RECONSTRUCTION OR REPAIR AS
DETERMINED BY THE CITY ENGINEER.
• IF THE PROJECT IS SUBJECT TO PROVISIONS OF THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDES), A "NOTICE OF INTENT" (NOI) TO COMPLY WITH THE TERMS OF
THE GENERAL PERMIT TO DISCHARGE STORM WATER ASSOCIATED WITH THE CONSTRUCTION
ACTIVITY (SWRCB ORDER NO. 2009-009—DWQ AS AMENDED BY ORDER 2010-0014—DWO
AND ORDER 2012-0006—DWQ) MUST BE FILLED WITH STATE WATER RESOURCES CONTROL
BOARD IN SACRAMENTO BEFORE THE BEGINING OF ANY CONSTRUCTION ACTIVITY. COMPLIANCE
WITH THE GENERAL PERMIT REQUIRES THAT A STORM WATER POLLUTION PREVENTION PLAN
(SWPP) BE PREPARED, CONTINOUSLY CARRIED OUT, AND ALWAYS BE AVAILABLE FOR PUBLIC
INSPECTION DURING NORMAL CONSTRUCTION HOURS.
B. PROTECTION OF EXISTING FACILITIES
• EXISTING COMPANY FACILITIES SHALL BE PROTECTED. IF DAMAGED BY CONTRACTOR,
FACILITIES SHALL BE REPAIRED AND/OR RESTORED AT CONTRACTOR'S EXPENSE.
• COMPANY RESERVES THE RIGHT TO ENTER THE SITE TO MAKE ANY REPAIRS OR
ALTERATIONS TO EXISTING EQUIPMENT.
• EXTREME CARE SHOULD BE EXERCISED WHEN EXCAVATING AT THIS SITE. UNDERGROUND
UTILITIES ENCOUNTERED DURING EXCAVATION SHALL BE BROUGHT TO THE ATTENTION OF
COMPANY REPRESENTATIVE. THESE ITEMS SHALL NOT BE DISTURBED UNTIL INSTRUCTION IS
RECEIVED FROM COMPANY REPRESENTATIVE.
C. SAFETY
• CONTRACTOR SHALL PROVIDE PROTECTIVE EQUIPMENT AND ENSURE THAT THIS EQUIPMENT IS
PROPERLY USED WHEN REQUIRED FOR THE SAFETY OF HIS EMPLOYEES. HARD HATS, SAFETY
SHOES, AND SAFETY GLASSES WITH SIDE SHIELDS SHALL BE WORN AT ALL TIMES ON THE
CONSTRUCTION SITE.
• WORK WILL BE PERFORMED ACCORDING TO THE TERMS AND CONDITIONS OF THE CONTRACT
AND APPLICABLE STATE AND FEDERAL REGULATIONS.
• EXTREME CARE MUST BE EXERCISED WHEN OPERATING ANY EQUIPMENT NEAR OVERHEAD
POWER LINES. CONTRACTOR MUST NOT ALLOW ANY EQUIPMENT OR PERSONNEL TO CONTACT
ANY OVERHEAD LINE.
• EXCAVATING MUST BE ACCOMPLISHED SO AS TO AVOID ALL UNDERGROUND UTILITIES AND 7.
LINES.
• THE SIZE, NUMBER, LOCATION AND DEPTH OF ANY BURIED UTILITIES SHOWN ON THE PLAN
ARE BASED ON THE BEST INFORMATION AVAILABLE; HOWEVER, EXTREME CARE SHOULD BE
TAKEN DURING EXCAVATION SINCE LOCATION AND DEPTH ALLOWANCES MAY NOT BE SHOWN
ON THE SOURCE PLANS FOR THIS DRAWING.
• NO PERSON SHALL ENTER ANY EXCAVATION UNLESS PROTECTED FROM CAVE—INS IN
ACCORDANCE WITH THE REQUIREMENTS OF "CFR 29 (OSHA), PART 1926.652 (REQUIREMENTS
FOR PROTECTIVE SYSTEMS)" AND "CCR TITLE 8 (CALOSHA) SECTION 1541.1 (REQUIREMENTS
FOR PROTECTIVE SYSTEMS)". DESIGN OF THE PROTECTIVE SYSTEM SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
• IN EXCAVATION AREAS IMMEDIATELY ADJACENT TO EXISTING FOUNDATIONS WHERE VERTICAL
CUT SIDE SLOPES ARE REQUIRED, EXCAVATION WIDTH SHALL NOT EXCEED 7'. THESE AREAS
SHALL BE BACKFILLED AS SOON AS POSSIBLE TO MINIMIZE EXPOSURE OF THE EXISTING
FOUNDATION(S). IF THESE AREAS ARE LEFT UNATTENDED AT ANY POINT DURING THE
EXCAVATION OR BACKFILL, THE AREA SHALL BE CORDONED OFF WITH CAUTION TAPE AND
BARRICADES TO PREVENT UNAUTHORIZED ACCESS.
D. INJURIES
• CONTRACTOR SHALL IMMEDIATELY NOTIFY COMPANY REPRESENTATIVES OF ANY INJURY
OCCURRING ON COMPANY PROPERTY. A WRITTEN REPORT CONCERNING THE INJURY SHALL
BE PROVIDED TO COMPANY WITHIN 24 HOURS OF OCCURRENCE OF INJURY.
• CONTRACTOR SHALL PROVIDE ALL FIRST AID AND EMERGENCY TREATMENT, AMBULANCE,
HOSPITAL SERVICES, ETC. FOR ANY INJURY OCCURRING TO HIS EMPLOYEES ON COMPANY
PROPERTY.
E. PERSONNEL FACILITIES
CONTRACTOR SHALL PROVIDE ALL FACILITIES REQUIRED FOR HIS PERSONNEL. THESE INCLUDE
PORTABLE TOILETS, DRINKING WATER,CLEAN—UP FACILITIES, ETC.
F. GRADES, LINES, LEVELS AND BENCHMARK REFERENCES
• SITE BENCHMARKS ARE PROVIDED TO THE CONTRACTOR. CONTRACTOR WILL BE RESPONSIBLE
FOR PROPER ELEVATIONS AND LOCATIONS OF THE WORK AS REFERENCED TO THE
BENCHMARKS.
• CONTRACTOR SHALL LAYOUT ALL WORK, ESTABLISH MARKERS, STAKES, ETC. AND BE
RESPONSIBLE FOR THEIR ACCURACY. COMPANY MAY CHOOSE TO USE AN INDEPENDENT
SURVEYOR TO CHECK CONTRACTOR'S WORK.
G. COMPANY OPERATION OF EXISTING FACILITIES
• COMPANY INTENDS TO OPERATE EXISTING EQUIPMENT AND FACILITIES IN THE VICINITY OF
THE CONSTRUCTION SITE DURING CONSTRUCTION. CONTRACTOR SHALL COORDINATE HIS WORK
WITH COMPANY FIELD OPERATIONS THROUGH COMPANY REPRESENTATIVE.
• CONTRACTOR WILL COORDINATE AND FULLY COOPERATE WITH ANY TESTING AGENCY TO
ENSURE ALL TESTS ARE COMPLETED AND DOCUMENTED IN A TIMELY AND EFFICIENT MANNER.
6. GRADING AND EXCAVATION - CIVIL
A, GENERAL GRADING
• ELEVATIONS PRESENTED ON THE DRAWINGS INDICATE FINAL GRADE ELEVATIONS. FINAL
GRADED SURFACE SHALL BE SLOPED UNIFORMLY BETWEEN SUCH POINTS AND NATURAL
GRADE.
• TOLERANCES FROM FINAL GRADE SHALL BE +-0.1 FOOT. IN NO CASE HOWEVER SHOULD
FINAL GRADE ALLOW PONDING OR DRAINAGE NOT INDICATED ON THE PLANS.
• ALL DEBRIS, VEGETATION, ROCK AND LUMPS GREATER THAN 3 INCHES IN ITS LARGEST
DIMENSION AND OTHER OBJECTIONABLE MATERIAL SHALL BE COLLECTED, PILED AND
DISPOSED OF BY THE CONTRACTOR SO AS TO LEAVE THE AREAS THAT HAVE BEEN CLEARED
WITH A NEAT AND FINISHED APPEARANCE.
B. GRADING INSPECTION
• PROFESSIONAL INSPECTION OF GRADING OPERATIONS SHALL BE PROVIDED BY THE CIVIL
ENGINEER OR SOILS ENGINEER.
• CIVIL ENGINEER SHALL INSPECT SITE AT COMPLETION OF ALL GRADING ACTIVITIES.
• GRADING OPERATIONS FOR WHICH A PERMIT IS REQUIRED SHALL BE SUBJECT TO INSPECTION
BY THE GRADING OFFICIAL.
• BUILDING PADS SHALL HAVE A DRAINAGE GRADIENT OF 2 PERCENT TOWARD APPROVED
DRAINAGE FACILITIES,UNLESS WAIVED BY THE GRADING OFFICIAL.
C. EXCAVATIONS
• ALL EXCAVATIONS SHALL BE PERFORMED IN A MANNER TO ASSURE DRAINAGE DURING THE
COURSE OF THE WORK. FLOODED EXCAVATIONS SHALL BE DEWATERED AND ALL MUCK
REMOVED BEFORE PROCEEDING WITH THE WORK.
• AFTER EXCAVATION, SCARIFY THE ENTIRE AREA EXPOSED AS PER SOILS REPORT, MOISTURE
CONDITION AND RECOMPACT AS ENGINEERED FILL AND PROOF ROLLED PRIOR TO
COMPACTING NEW FILL.
• OVER—EXCAVATE EXISTING SOIL IN LOCATIONS WHERE UNSUITABLE MATERIAL EXISTS AS
DIRECTED BY THE COMPANY REPRESENTATIVE AND SOIL ENGINEER. BACKFILL WITH
ENGINEERED FILL COMPACTED TO A MINIMUM 90% OF MAXIMUM DRY DENSITY AT +2% OF
OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D-1557.
• SOILS ENGINEER SHALL INSPECT THE BOTTOM OF EXCAVATION PRIOR TO PLACEMENT
OF BACKFILL. FINAL DEPTH OF EXCAVATION TO BE DETERMINED BY SOILS ENGINEER. CIVIL
ENGINEER SHALL INSPECT SITE AT COMPLETION OF ALL GRADING ACTIVITIES.
• PERMEABLE ENGINEERED FILL FOR THE INFILTRATION AREAS SHALL MEET THE PERMEABLE
INFILTRATION RATES OF THE PERMEABLE LAYER SHOWN IN THE GEOTECHNICAL REPORT.
FI LLS
A. PREPARATION OF GROUND
FILL SLOPES SHALL NOT BE CONSTRUCTED ON NATURAL SLOPES STEEPER THAN 1 UNIT
VERTICAL IN 2 UNITS HORIZONTAL (50% SLOPE). THE GROUND SURFACE SHALL BE
PREPARED TO RECEIVE FILL BY REMOVING VEGETATION, NON—COMPLYING FILL, TOPSOIL AND
OTHER UNSUITABLE MATERIALS SCARIFYING TO PROVIDE A BOND WITH THE NEW FILL AND,
WHERE SLOPES ARE STEEPER THAN 1 UNIT VERTICAL IN 5 UNITS HORIZONTAL (20% SLOPE)
AND THE HEIGHT IS GREATER THAN 5 FEET, BY BENCHING INTO SOUND BEDROCK OR OTHER
COMPETENT MATERIAL AS DETERMINED BY THE SOILS ENGINEER. THE BENCH UNDER THE
TOE OF A FILL ON A SLOPE STEEPER THAN I UNIT VERTICAL IN 5 UNITS HORIZONTAL (20%
SLOPE) SHALL BE AT LEAST 10 FEET WIDE. THE AREA BEYOND THE TOE OF FILL SHALL BE
SLOPED FOR SHEET OVERFLOW OR A PAVED DRAIN SHALL BE PROVIDED. WHEN FILL IS TO
BE PLACED OVER A CUT, THE BENCH UNDER THE TOE OF FILL SHALL BE AT LEAST 10
FEET WIDE BUT THE CUT SHALL BE MADE BEFORE PLACING THE FILL AND ACCEPTANCE BY
THE SOILS ENGINEER OR ENGINEERING GEOLOGIST OR BOTH AS A SUITABLE FOUNDATION
FOR FILL.
B. FILL MATERIAL & PLACEMENT
o FILL MATERIAL SHOULD BE FREE FROM ORGANIC MATTER OR OTHER DELETERIOUS
'SUBSTANCES AND SHOULD NOT CONTAIN ROCKS OR LUMPS OVER 4 INCHES IN GREATEST
DIMENSION. NO MORE THAN 50 PERCENT OF THE FILL MATERIAL SHOULD PASS THE NO.
there200 SIEVE AND THE MATERIAL SHOULD HAVE A LOW EXPANSION POTENTIAL. AS
EVIDENCED BY A PLASTICITY INDEX OF 15 OR LESS OR EXPANSION INDEX OF 20 OR LESS.
IMPORT SOIL SHOULD BE NON—EXPANSIVE IN ACCORDANCE WITH CALIFORNIA BUILDING CODE
(CBC) SECTION 1803A.5.3 AND SHOULD HAVE LOW POTENTIAL FOR CORROSIVITY AND HIGH
RESISTIVITY. THE PH, CHLORIDE CONTENT, AND SULFATE CONTENT OF THE FILL MATERIALS
SHOULD NOT BE DELETERIOUS TO THE MATERIALS USED TO CONSTRUCT THE FOUNDATION
SYSTEM AND OTHER IMPROVEMENTS (I.E., CONCRETE OR STEEL). CLASS 2 AGGREGATE BASE
MAY BE UTILIZED FOR CONSTRUCTION OF ACCESS ROADS OR PADS AND SHOULD CONFORM
TO THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION (CALTRANS) "STANDARD
SPECIFICATIONS" SECTION 26-1.02B. FILL SHOULD BE MOISTURE CONDITIONED AND
COMPACTED BETWEEN 0 AND 3 PERCENT ABOVE THE OPTIMUM MOISTURE CONTENTS IN
LAYERS THAT DO NOT EXCEED 8—INCH LOOSE LIFTS FOR HEAVY EQUIPMENT
COMPACTION.EACH LIFT OF FILL SHOULD BE COMPACTED TO A MINIMUM OF 90 PERCENT
RELATIVE COMPACTION UNLESS OTHERWISE SPECIFIED. RELATIVE COMPACTION IS DEFINED AS
THE RATIO (IN PERCENT) OF THE INPLACE DRY DENSITY TO THE MAXIMUM DRY DENSITY
DETERMINED USING THE LATEST VERSION OF ASTM D1557 AS THE COMPACTION STANDARD.
CLASS 2 AGGREGATE BASE SHOULD BE COMPACTED TO A MINIMUM RELATIVE COMPACTION
OF 95 PERCENT.
• ALL IMPORTED FILL MATERIAL SHALL BE APPROVED BY THE SOIL ENGINEER PRIOR TO
PLACEMENT AT THE SITE.
• DETRIMENTAL AMOUNTS OF ORGANIC MATERIAL SHALL NOT BE PERMITTED IN FILLS. EXCEPT
AS PERMITTED BY THE GRADING OFFICIAL, NO ROCK OR SIMILAR IRREDUCIBLE MATERIAL WITH
A MAXIMUM DIMENSION GREATER THAN 4 INCHES SHALL BE BURIED OR PLACED IN FILLS.
• PLACE FILL SOIL IN CONTINUOUS HORIZONTAL LOOSE LIFTS THAT DO NOT EXCEED 8 INCHES
FOR HEAVY EQUIPMENT COMPACTION AND 4 INCH IN THICKNESS LOOSE LIFTS FOR HAND
HELD EQUIPMENT COMPACTION. DO NOT PLACE FILL UNTIL REMOVAL OF UNSUITABLE
MATERIAL HAS BEEN INSPECTED AND APPROVED BY THE SOIL ENGINEER.
C. COMPACTION
• FILL SHALL BE COMPACTED TO A MINIMUM 90% OF MAXIMUM DRY DENSITY AS DETERMINED
BY ASTM D-1557. MOISTURE CONTENT OF COMPACTED FILL SHALL BE 0 AND 3% ABOVE
OPTIMUM MOISTURE CONTENT AS DETERMINED BY ASTM D-1557.
• SOIL USED FOR COMPACTED FILL SHALL CONTAIN NO ROCK OR HARD LUMPS GREATER THAN
4 INCHES IN ITS LARGEST DIMENSION. NO ORGANIC, PERISHABLE, SPONGY OR OTHER
IMPROPER MATERIAL SHALL BE USED IN FILLING.
• THE SOILS BENEATH FOUNDATIONS SHALL CONSIST OF ENGINEERED FILL COMPACTED TO
MINIMUM 90% OF MAXIMUM DENSITY BASED ON ASTM D-1557.
• COMPACTION OF THE ENGINEERED PERMEABLE FILL SHALL NOT EXCEED THE REQUIREMENTS
NEEDED TO MAINTAIN PERMEABILITY.
D. SLOPES
THE SLOPE OF FILL SURFACES SHALL BE NO STEEPER THAN IS SAFE FOR THE INTENDED
USE. FILL SLOPES SHALL BE NO STEEPER THAN I UNIT VERTICAL IN 2 UNITS HORIZONTAL
(50% SLOPE).
WHERE EXISTING SLOPES ARE STEEPER THAN 5 HORIZONTAL:l VERTICAL AND THE HEIGHT IS
GREATER THAN 5 FEET, THE SURFACE SHALL BE PREPARED FOR FILL BY BENCHING INTO
COMPETENT MATERIAL AS DETERMINED BY THE SOILS ENGINEER.
8. DRAINAGE AND TERRACING
A. UNLESS OTHERWISE INDICATED ON THE APPROVED GRADING PLAN, DRAINAGE FACILITIES AND
TERRACING SHALL CONFORM TO THE PROVISIONS OF THIS SECTION FOR CUT OR FILL
SLOPES STEEPER THAN 1 UNIT VERTICAL IN 3 UNITS HORIZONTAL (33.3% SLOPE).
B. TERRACES AT LEAST 6 FEET IN WIDTH SHALL BE ESTABLISHED AT NOT MORE THAN
30—FOOT VERTICAL INTERVALS ON ALL CUT OR FILL SLOPES TO CONTROL SURFACE
DRAINAGE AND DEBRIS EXCEPT THAT WHERE ONLY ONE TERRACE IS REQUIRED, IT SHALL
BE AT MID—HEIGHT. FOR CUT OR FILL SLOPES GREATER THAN 60 FEET AND UP TO 120
FEET IN VERTICAL HEIGHT, ONE TERRACE AT APPROXIMATELY MID—HEIGHT SHALL BE 12
FEET IN WIDTH.
9. EROSION, DUST, AND RUNOFF CONTROL
A. EROSION CONTROL MEASURES
• THE FACES OF CUT AND FILL SLOPES SHALL BE PREPARED AND MAINTAINED TO CONTROL
AGAINST EROSION. THIS CONTROL MAY CONSIST OF EFFECTIVE PLANTING. THE PROTECTION
FOR THE SLOPES SHALL BE INSTALLED AS SOON AS PRACTICABLE AND PRIOR TO CALLING
FOR FINAL APPROVAL. WHERE CUT SLOPES ARE NOT SUBJECT TO EROSION DUE TO THE
EROSION —RESISTANT CHARACTER OF THE MATERIALS, SUCH PROTECTION MAY BE OMITTED.
• WHERE REQUIRED, CONTRACTOR SHALL PROVIDE SUFFICIENT EROSION CONTROL MEASURES
INCLUDING, BUT NOT LIMITED TO, INSTALLATION OF ENERGY DISSIPATING RIP—RAP, SILT
FENCING AND/OR HAY BALES.
B. DUST CONTROL MEASURES
CONTRACTOR SHALL IMPLEMENT DUST CONTROL MEASURES, WHICH CONSIST OF WATER
SPRAYING ALL GRADED AREAS AND ROADWAYS TO ALLEVIATE OR PREVENT DUST NUISANCE.
B. RUNOFF CONTROL MEASURES
ALL STORMWATER TO BE RETAINED ON SITE DURING CONSTRUCTION. IMPLEMENT RUNOFF
CONTROL AS INDICATED ON PLANS AND IN ACCORDANCE WITH LA COUNTY GRADING
ORDINANCE.
0
ry
m
Ln
DRAWING LIMITS
C
pq �4_
0
—Ln
Ln
DRAWING LIMITS
EXISTING
CONTAINMENT
97.00
POWER
EXISTING OVERHEAD POWER
1� "
EARTHWORK VOLUMES:
TOTAL CUT (CU. YDS.)
190
TOTAL FILL* (CU. YDS.)
115
NET (CU. YDS.) CUT
75
INCLUDES SHRINKAGE, EXPANSION
& COMPACTION. THE INDICATED VOLUMES ARE
BASED ON THE OVER -EXCAVATION REQUIREMENTS
SET BY THE SOILS REPORT, ACTUAL VOLUMES
MAY VARY DUE TO THE EXISTING UNDERGROUND
STRUCTURES.
CONTROL POINT
SCHEDULE
wx
CP#
NORTHING
EASTING
ELEV
DESCRIPTION
101
-276,
64
383,
29
99,
19
FS -
FDN
CNR
102
-276,
64
504,
54
99.
11)
FS -
FDN
CNR
103
-286,
64
504.
54
9 9 �
19
FS -
FDN
CNR
104
-286.
64
383,
29
99�
19
FS -
FDN
CNR
105
-255�
32
373,
54
9 8,
97
FS -
PAD
CNR
106
-255,
64
565,
12
99.
34
FS -
PAD
CNR
107
-307.
64
533.
64
99,
00
FS -
PAD
CNR
108
-307,
53
373�
54
99,
40
FS -
PAD
CNR
CP 106 O�- V)
F-
0
UNDERGROUND FIRE
WATER & POT WATER
LINES
(D e
(CP 107- LIGHT
COORDINATES LISTED ARE IN THE ESTABLISHED PLANT COORDINATE
SYSTEM.
? s, oll�l
DFc_'s'qlo "
F. H'q
CID
w C71506
EXP 12/31/a3
c
.LEGEND:
CONCRETE PAVIII
ASHALT PAVING
CONTROL POINT
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL CEOMATICS, INC. THEIR FILENAME- 21-199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = l' -O"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
10' 0 5' 10' 20'
IN FEET
i"=io'-o"
40'
cn
II--
<
Q:� 1 35271-91 -Q-95-D-4040
0
j_
/Y\
99.00
EXISTING FENCE LINE
98,00
CD
-j-
0
0)
cl�
Ln
ro
DRAWING LIMITS
0�_
DRAWING LIMITS
I Ili v V L_ I
POLE
EXISTING
CONTAINMENT
97�00
0�_
n,,-
— EXISTING OVERHEAD POWER
06 -
O�-
EXISTING FENCE LI E
UNDERGROUND FIRE
WATER & POT WATER
LINES
LIGHT
0
(ID
EXISTING
CONCRETE
SLAB
EARTHWORK VOLUMES:
TOTAL CUT (CU. YDS.)
190
TOTAL FILL* (CU. YDS.)
115
NET (CU. YDS.) CUT
75
INCLUDES SHRINKAGE, EXPANSION
& COMPACTION. THE INDICATED VOLUMES ARE
BASED ON THE OVER -EXCAVATION REQUIREMENTS
SET BY THE SOILS REPORT, ACTUAL VOLUMES
MAY VARY DUE TO THE EXISTING UNDERGROUND
STRUCTURES.
CONTROL POINT SCHEDULE xx
CP#
NORTHING
EASTING
ELEV
DESCRIPTION
201
-273, 64
3el. 29
96, 70
EXC - NW CNR
202
-273, 64
507, 54
96. 70
EXC - NE CNR
203
-289, 64
507. 54
9 6. 7 0
EXC - SE CNR
204
-289.64
381, 29
9& 70
EXC - SW CNR
COORDINATES LISTED ARE IN THE ESTABLISHED PLANT COORDINATE
SYSTEM.
FES&
F.
U.
C 71506 m
X
EXP 12611slo
$ * j
LEGEND:
CONTROL POINT
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL GEOMATICS, INC. THEIR FILENAME- 21 -199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = l' -O"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
lo' 0 5' 10' 20'
IN FEET
i"=io'-o"
me
7\
x
POWER
POLE
06 -
LIGHT
/I/
DRAWING LIMITS
LIGHT
LLJ
0 0�_ 100.00— FW
MONITOR
7- EXISTING OVERHEAD POWER 0
F
MW
0
N
0
06- 99.00
0
-98.00-
L Ll "Z EXISTING -\-96.00-
CONTAINMENT
CD
V)
I-
61
ry
n
(9 /
X
REFINERY
ACCESS
GATE
0
0�- 97.
Q)
9T
LIGHT
UNDERGROUND
1 0"o C.S.
DRAIN LINE EXISTING OVERHEAD POWER
DET. 3
CATCH BASIN
SEE DWG, 35271-91-Q-44-4043
DET. I
TENCH DRAT -N
SEE DWG, 35271-91-0-44-4043
To/
I-oll 06-
72'-0"
TRUCK LANE 1E TRENCH DRAIN - \\\\�'�TR E �NC H DRA�l EXISTING
4 :;� — _�N CONCRETE
99.00- 2'- 0
cr 2 SLAB
cl CATCH BASIN
SKIDS
�9 ODORIZER _Yl 01- 71-Y102 �9'@
72'-0" 48" -0"
TRUCK LANE 2- TRENCH DRAIN TRENCH DRAIN\
LIGHT
�2- 0"� UNDE RGROUND FIRE POWER
L "H CATCH BASIN WATER & POT WATER POLE
IG�HT f NEW FIRE -EXISTING CURB
WATER MONI OR LINES
T
-_99 � �DE T\�/.l�_' -
I I I cl
.00
X
-98.00-
I TENCH DRAIN EXISTING FENCE LINE
EXISTING FENCE LINE.— SEE DWCi,35271-91-Q-44-4043
Ll ) � /___
I V
�6
Lo
X
POWER
POWER 0 POLE
POLE
DRAWING LIMITS
I
j
0
CK
LEGEND:
FLOW DIRECTION
TRENCH DRAIN
,�,�kQFESS! OA,
F.
co
ci
'u M!l
w C 71506
EXP 121r3ll
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL GEOMATICS, INC. THEIR FILENAME- 21 -199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = l' -O"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
20' 0 10' 20' 40'
IN FEET
1"=20'-O"
mil
110
108
106
104
102
100
98
96
94
92
PROPOSED PROPANE/BUTANE
/— PROPOSED PROPANE/NAPHTHA
0+00 0+10 0+20 0+30 0+40 0+50
110
108
106
104
102
100
98
96
94
92
0+60 0+70 0+80 0+90 1+00 1+10
EXISTING
-- -
SEE DWG. 35271-91-0-95-D-4038 & 4039
HORZ.SCALE, 1' =10'
VERT, SCALE, 1' =5'
1+20 1+30 1+40 1+50 1+60
F— PROPOSED PROPANE/BUTANE
FENCE _
i r\U� r\ LUHULrC JFIUMN FUr\ I r\Vl r\ L_ /-\ ivvv�
_REFERENCE ONLY - REFERENCE ONLY
I KUUK LUAULN SHUWIN
- REFERENCE ONLY
r UK
1 e
HDRAIN
FTENC�
WG,35271-91-Q-44-4041
I
F.G. @ FDN.
EL: 99.19
- - o -
F.G. @ FDN. FINISHED - -- EXISTING
--EL: 99.19' SURFACE _T CONCRETE
�lrlrlrI
- - 1.3% -0.1% I
2.0%
ILI 111
F.G. @ FDN.
I -EL: 99.19'
-
SLOPE 2H:1 V
-
-- -}
- —' OVER -EXCAVATION
LIMITS, SEE NOTES 2 TO 5
EXISTING
GRADE
0+00 0+10 0+20 0+30 0+40 0+50
110
108
106
104
102
100
98
96
94
92
0+60 0+70 0+80 0+90 1+00 1+10
EXISTING
-- -
SEE DWG. 35271-91-0-95-D-4038 & 4039
HORZ.SCALE, 1' =10'
VERT, SCALE, 1' =5'
1+20 1+30 1+40 1+50 1+60
F— PROPOSED PROPANE/BUTANE
FENCE _
PROPOSED
PIPE RACK -
I KUUK LUAULN SHUWIN
- REFERENCE ONLY
r UK
1 e
HDRAIN
FTENC�
WG,35271-91-Q-44-4041
-
_
I
DET, 1 _
TENCH DRAIN
SEE DWG, 35271-91-Q-44-4041
ILI 111
F.G. @ FDN.
I -EL: 99.19'
-
EXISTING
EXISTING
GRADE
1.0%
GRADE
SLOPE 2H:1 V
_ —
OVER -EXCAVATION
LIMITS, SEE NOTES
2 TO 5
i
0+00 0+10 0+20 0+30 0+40 0+50
108 -- - EXISTING
FENCE ___--
106-
` PROPOSED DET, 3
104 PIPE RACK
- -- --- CATCH BASIN
" --- SEE DWG,35271-91-0-44-4041
�g uv5�
EXISTING FINISHED
GRADE -
SURFACE
71
1001
96-
00 0+10 0+20 0+30 0+40 0+50 0+60 0+70
w■mmomma-.i
0+60 0+70
SEE DWG, 35271-91-0-95-D-4038 & 4039
HORZ. SCALE: 1'=10'
VERT. SCALES 1'=5'
-DET, 3-
-CATCH
--CATCH BASIN
-SEE DWG, 35271-91-0-44-4041
10" o C.S.
DRAIN PIPE
--- -----
----}---- - - - - - -
110
108
106
104
102
100
98
96
94
92
0+80 0+90 0+97
EXISTING
GRADE
0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50
SEC, C
LOOKING WEST
SEE DWG. 35271-91-0-95-D-4040
HORZ, SCALE; 1'=10'
VERT. SCALE. 1'=5'
1+70
110
108
106
104
SLAB
100
98
96
94
92
1 +Rn i -4-an ?-inn ?+i n 9+74A??
PROPOSED PROPANE/BL
TRUCK LOADER & FOUL
SHOWN FOR REFERENCE
w Or-
oW
QLu
w
Q�W
� o
cn
X�
W W
�oLd
=
J U
W =
m3:
NOTES:
1. ALL FILL PLACED SHALL BE PLACED AS ENGINEERED
FILL COMPACTED TO A MINIMUM RELATIVE COMPACTION
OF 90% OF ASTM D-1557 WITHIN 2% TO 4% ABOVE
OPTIMUM MOISTURE CONTENT.
2. SCARIFY AND COMPACT 6" DEEP AT BOTTOM OF
EXCAVATION. COMPACT TO 90% OF ASTM D-1557 AT
2% ABOVE OPTIMUM MOISTURE CONTENT.
3. EXISTING SITE DATA REVEALS THAT THERE ARE SEVERAL
UNDERGROUND EXISTING CONCRETE FOUNDATIONS AND
PADS ROUGHLY AT AN ELEVATIONOF 8 INCHES BELOW
FINISH GRADE. CONTRACTOR SHALL PERFORM SOME
POTHOLE DRILLING TO IDENTIFY THE EXTENT OF THESE
EXISTING STRUCTURES THAT MAY BE ENCOUNTERED
DURING EXCAVATION OF THE PROPOSED AREA. THE
DASHED LINES INDICATED ON PLAN ARE AN
APPROXIMATE OUTLINE OF THESE EXISTING
STRUCTURES.
4. BASED UPON THE FIELD EXPLORATION, EXISTING
STRUCTURES WITHIN THE PROPOSED AREA AND TO A
MINIMUM HORIZONTAL EXTEND OF 3 FEET ALL AROUND
THE PERIMETER WILL NEED TO BE REMOVED AND
COMPLETELY CLEARED AS NEEDED BELOW FINISH
SURFACE TO ACCOMMODATE THE PLACEMENT OF THE
NEW FOUNDATIONS.
5. WHERE NEW FOUNDATION IS RESTING PARTIALLY ON
EXISTING FOUNDATION AND PARTIALLY ON
SOIL/ENGINEERED FILL, THE ENGINEERED FILL SHOULD
BE COMPACTED TO 95% OF ASTM D1557 TO REDUCE
DIFFERENTIAL SETTLEMENT. ALL EXCAVATIONS AND
SUBGRADE SHALL BE OBSERVED BY THE GEOTECHNICAL
ENGINEER PRIOR TO PLACEMENT FOR FOUNDATION OR
BACKFILL.
SCALE: N.T.S. SCARIFY AND COMPACT
AT BOTTOM OF EXCAVATION,
SEE NOTES 2 THROUGH 5, THIS DWG.
— 110
-,108
106
1104 LEGEND:
102 CONCRETE PAVING
100
EXISTING —� ASPHALT PAVING
SUMP (98
_ 96 ENGINEERED FILL
1+60 1+65
��QROFESSI
F.9
Ix C 71506 m
*`F12131123�*
\i 1
7 r71
ti
,\ \ TC -2
-------------
_-� REFINERY
ACCESS
GATE
TC -2
DRAWING LIMITS _
H,
`I
SCALE
100.00
/� .99.00
\ 98.00...-
►T1 EXISTING
L 0 CONTAINMENT
_97.00
REFINERY
ACCESS
GATE
✓ (3 (g (D / LIGHT / (s` F <^ — — -SE-1-
E-9 — —
'E–g – – -E–g– – – � a
I
EXISTING OVERHEAD POWER
EXISTING OVERHEAD POWER /// O�-
WM-1
` ---------- — _` —_—WM-2
TL
� LIGHT
_-��� �' �,
WM-5
f •71 —Y1 01 - --
---y
SE–
LIGHT
�I -.98.00
— EXISTING FENCE LINE
EC -2 j
LAo
X
EXISTING / / W W
�� CONCRETE (n WM–H V)
SLAB
Wm -9 I
0�
L
/ Z-11
-SE-1---LIGHTSE-1 �`' ��— - SE -1
EXISTING FENCE LINE S
EC-2-
DRAWING
C-2-
DRAWING LIMITS
TC -1
LIGHT
LEGEND:
CALIFORNIA STORM WATER QUALITY ASSOCIATION
EC -2
PRESERVATION OF EXISTING VEGETATION
EC -9
i
r
EC -10
VELOCITY DISSIPATOR DEVICES
EC -11
SLOPE DRAINS
SE -1
SILT FENCE
SE -3
SEDIMENT TRAPS
SE -4
CHECK DAMS
SE -5
FIBER ROLLS
SE -9
STRAW BALE BARRIER
TC -1
STABILIZED CONSTRUCTION ENTRANCE/EXIT
TC -2
STABILIZED CONSTRUCTION ROADWAY
WM-1
MATERIAL DELIVERY AND STORAGE
WM-3
STOCKPILE MANAGEMENT
WM-5
SOLID WASTE MANAGEMENT
WM-8
CONCRETE WASTE MANAGEMENT
WM-9
SANITARY/SEPTIC WASTE MANAGEMENT
EC -1
SCHEDULING
WE -1
WIND EROSION CONTROL
NS -1
WATER CONSERVATION PRACTICES
NS -3
PAVING AN'D GRINDING OPERATIONS
NS -8
VEHICLE AND EQUIPMENT CLEANING
NS -9
VEHICLE AND EQUIPMENT FUELING
REFINERY
ACCESS
GATE
✓ (3 (g (D / LIGHT / (s` F <^ — — -SE-1-
E-9 — —
'E–g – – -E–g– – – � a
I
EXISTING OVERHEAD POWER
EXISTING OVERHEAD POWER /// O�-
WM-1
` ---------- — _` —_—WM-2
TL
� LIGHT
_-��� �' �,
WM-5
f •71 —Y1 01 - --
---y
SE–
LIGHT
�I -.98.00
— EXISTING FENCE LINE
EC -2 j
LAo
X
EXISTING / / W W
�� CONCRETE (n WM–H V)
SLAB
Wm -9 I
0�
L
/ Z-11
-SE-1---LIGHTSE-1 �`' ��— - SE -1
EXISTING FENCE LINE S
EC-2-
DRAWING
C-2-
DRAWING LIMITS
TC -1
LIGHT
LEGEND:
CALIFORNIA STORM WATER QUALITY ASSOCIATION
EC -2
PRESERVATION OF EXISTING VEGETATION
EC -9
EARTH DIKE AND DRAINAGE SWALES
EC -10
VELOCITY DISSIPATOR DEVICES
EC -11
SLOPE DRAINS
SE -1
SILT FENCE
SE -3
SEDIMENT TRAPS
SE -4
CHECK DAMS
SE -5
FIBER ROLLS
SE -9
STRAW BALE BARRIER
TC -1
STABILIZED CONSTRUCTION ENTRANCE/EXIT
TC -2
STABILIZED CONSTRUCTION ROADWAY
WM-1
MATERIAL DELIVERY AND STORAGE
WM-3
STOCKPILE MANAGEMENT
WM-5
SOLID WASTE MANAGEMENT
WM-8
CONCRETE WASTE MANAGEMENT
WM-9
SANITARY/SEPTIC WASTE MANAGEMENT
EC -1
SCHEDULING
WE -1
WIND EROSION CONTROL
NS -1
WATER CONSERVATION PRACTICES
NS -3
PAVING AN'D GRINDING OPERATIONS
NS -8
VEHICLE AND EQUIPMENT CLEANING
NS -9
VEHICLE AND EQUIPMENT FUELING
NS -10
VEHICLE AND EQUIPMENT MAINTENANCE
NS -12
CONCRETE CURING
NS -13
CONCRETE FINISHING
WM-2
MATERIAL USE
WM-4
SPILL PREVENTION AND CONTROL
WM-6
HAZARDOUS WASTE MANAGEMENT
WM-7
CONTAMINATED SOIL MANAGEMENT
NOTES:
1. BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED TO
CONTROL EROSION.
2. VEGETATION REMOVAL SHALL NOT PRECEDE SUBSEQUENT
GRADING BY MORE THAN 15 DAYS.
3. ALL DISTURBED SURFACES SHALL BE PREPARED AND
MAINTAINED TO CONTROL EROSION.
4. EROSION CONTROL MEASURES SHALL BE IN PLACE AT THE END
OF EACH WORKDAY.
5. MANY ASPECTS OF THE CONSTRUCTION SEQUENCING ARE YET
TO BE DETERMINED. AS SUCH, THE CONTRACTOR IS
RESPONSIBLE FOR IMPLEMENTING THE PROPER BMP'S FOR ALL
SEQUENCES.
QjypFESS,101
q
co��i� �N F. NA4r��F,ynz
C
Lu C 71506
*� EV 12311z3 J*,
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL GEOMATICS, INC. THEIR FILENAME- 21 -199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = 1'-0"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
30' 0 15' 30' 60'
( IN FEET )
1"=30'–O"
120
A a
THIS DWG. °
°
FRAME AND
GRATE LENGTH
VAR
1'-4" TO 2'-0"
a d ° d G
a d dd
n 4 d d°
CONCRETE
BACKFILL
� 4 d
a - d d ° ° d u ° °
G
Ga d
c G d ° ° ° d 1 a
° 4° d
d G ° d
°
6
0
In
T '1 7) r�r nnA--r—
VARIABLE LENGTH
PRECAST SECTION
` L < d d
d Q
PAVEMENT
SURFACE
DET. 1
GRATED TRENCH DRAIN
SEE DWG, 35271 -91—Q -95—D-4038
SCALE: N, T. S.
:INV V/ -\r
CROSS SLOPE ��N G.
° d
G ° d
nd °
d
° d
a
a
°
d `
° G
6 1/4" MAX
5" TO 5 1/4"
of VAR
4" TO 4 1/4 -
VAR
/4VAR 1/16"
TO 3/16"
W
I-
0
z
w
w
b0
d a >
a4 °
° d
6 MIN
4 °
d ° °
d CI
a d CONCRETE a
8ACKFILLa d
°
(SEE'NOTE 8.) d d
O d
° CO
Q
° d d
°
SEC. A
SCALE: NONE
(SEE NOTE 1)
FG
° G °
G
a 4
a
° d °
d °
°
d °
pd d
°d °4
d ° d
1 m MIN °
a d d
° 4
d ° 44 ° STEEL ANCHORING
ROD
d ° °
4 ° d ° d
° d G° d
G
6"d MIN,,
4 °
°
° d d° d ° da ` TRENCH WALL
d °
° 4 °
PRECAST
° 4 g POLYMER
°
° CONCRETE
G d °
GRATED LINE
DRAIN SECTION
SEC, B
PRECAST GRATED TRENCH DRAIN WITH NON—INTEGRAL FRAME
SCALE: NONE
(SEE NOTE 6)
GRATED LINE DRAIN SECTIONS
VAR
1'-4" f_0_2' — 0
DUCTILE IRON FRAME
C
THIS C
X
05/05/2022
DATE
O
O
O
O
O
O
O
0
O
O
0
O
O
O
TRENCH LINE DRAIN DETAILS
LOADING RACK — PROPANE, BUTANE, NAPHTHA
O
0
O
O
0
O
O
0
O
O
O
0
O
0
REV
UNIT NO.
35271
AREA NO.
91
FUNCTION OR EQUIP. NO.
Q
DWG. TYPE
44
SIZE
D
DRAWING SERIAL NO.
4043
SHEET
1
REV.
1
City Records No.
O
O
O
O
O
O
O
O
O
0
0
O
O
0
0
O
0
0
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
O
STEEL ANCHORING ROD
DET, 2
GRATED TRENCH DRAIN FRAME & GRATE
SEE DWG. 35271 -91—Q -95—D-4038
SCALE: N, T, S.
SCALE: NONE � v w UIV-, 1v LIIVL
(SEE NOTE 1) TO SUMP
GRATE — PERFORATED,
CLASS C, GALVANIZED
STEEL (GRATE PATTERN
SHOWN IS FOR
PRESENTATION ONLY)
10"w KNOCK01'T^�
10"0 DRAIN L
24"
DET. 3
CATCH BASIN 750
SEE DWG. 35271 -91—Q -95—D-4038
SCALE: N, T. S,
NOTES:
1. PRECAST POLYMER CONCRETE DRAIN SECTIONS,
0.6 PERCENT PRE—SLOPED WITH GRADUATED
DEPTHS FROM 4 1/16" TO 11 7/8".
1. NOMINAL DIMENSIONS SHOWN. ALLOWABLE
TOLERANCE t2%.
2. FOR PVC TO CMP INLET CONNECTION, FIELD JOINT
SEALED WITH A PLIABLE MIXTURE OF SAND,
PORTLAND CEMENT AND EMULSIFIED ASPHALT
(MIXTURE OF 1 PART PORTLAND CEMENT, 3-5
PARTS SAND AND 1 1/2 PART SSI EMULSIFIED
ASPHALT).
3. WITHIN DESIGNATED PEDESTRIAN PATHS OF TRAVEL,
THE MAXIMUM GRATE OPENING IN THE DIRECTION
OF PEDESTRIAN TRAFFIC SHALL BE 1/2".
4. GRATE PATTERNS MAY VARY FROM DETAIL SHOWN.
5. STEEL ANCHORING RODS NOT USED WHEN FRAME
IS INTEGRAL WITH POLYMER CONCRETE GRATED
LINE DRAIN SECTION.
6. 3/16" MAXIMUM GAP BETWEEN ADJACENT
GRATINGS.
7. PCC BACKFILL — POUR NEAT AGAINST COMPACTED
SUBGRADE.
8. POLYCAST 600 PRE SLOPED GRATED LINE DRAIN
OR EQUIVALENT (WWW.POLYCASTDRAIN.COM)
4" KNOCKOUT
EACH SIDE
6 1/4"
SEC, D
SCALE: NONE
(SEE NOTE 1)
0
05/05/2022
DATE
M.O.C. No.
RE—ISSUED FOR PERMIT/CONSTRUCTION
ISSUED FOR CONSTRUCTION
ISSUED FOR
DWR
DWR
o
JFH
JFH
Y
�
AA
AA
�j
a
;3 PARSONS
9600 Ming Ave, Suite 310
Bakersfield CA. 93311
Office: 661-699-1100
BAKERSFIELD RENEWABLE FUELS
6451 Rosedale Highway, Bakersfield, CA. 93308
ACAD FILE No.
zn�
TRENCH LINE DRAIN DETAILS
LOADING RACK — PROPANE, BUTANE, NAPHTHA
Al
SCALE
1" 2 0'
PROJECT TITLE
B A K E R S F I E L_ D RENEWABLE FUELS
PROJECT N0.
WA -4003-2C
A04/19/2022
V -Il
REV
UNIT NO.
35271
AREA NO.
91
FUNCTION OR EQUIP. NO.
Q
DWG. TYPE
44
SIZE
D
DRAWING SERIAL NO.
4043
SHEET
1
REV.
1
City Records No.
DRAWING LIMITS
..1 7
w
CONTROL
I ,
I� SCALE
I _
T EXISTING
JGHT (FW MONITOR
--
,�\ 4 V EXISTING fes,. ,�oRR,r -- �,,. �'\
_ `
WIND SOCK - FW N
MONITO f
_ /'
�u
c
I �y
ELEC RACK/MCC
Al
- — --- EXISTING
f
CONTAINMENT;' � J
Z
__-.r__ ._._..P. _mow
- --:._ ��,_�. � ��. ���. � LIGHT
LJ
�uICTINIr nPAIKI I INIF /-- EXISTING OVERHEAD POWER
LEGEND:
x
FIRST AID
4040
EYE WASH
<D"
FIRE MONITOR (EXISTING)
jFIRE
EXTINGUISHER
ACAD FILE No.
FIRE HOSE
FIRE HYDRANT (EXISTING)
0
os/os/2o22RE—ISSUED
ROUTE OF EVACUATION
DWR
H2S MONITOR
AA
FIRE DETECTOR (FIRE EYE)
SCALE
1"=20'
PROJECT TITLE
B A K E R S M E E D RENEWABLE FUELS
PROJECT N0.
WA -4003-20
04/19/2022
�+r
DWR
r
AA
0 �
REV
DATE
M.O.C. No.
ISSUED FOR
M
= m
U
>
m
UNIT NO.
35271
AREA NO.
91
FUNCTION OR EQUIP. NO.
K
DWG. TYPE
48
_
DRAWING SERIAL NO.
4044
SHEET
1
REV.
1
City
Cit Records No.
REFINERY
ACCESS
i
..1 7
w
CONTROL
I ,
I� SCALE
I _
T EXISTING
JGHT (FW MONITOR
--
,�\ 4 V EXISTING fes,. ,�oRR,r -- �,,. �'\
_ `
WIND SOCK - FW N
MONITO f
_ /'
�u
c
I �y
ELEC RACK/MCC
Al
- — --- EXISTING
f
CONTAINMENT;' � J
Z
__-.r__ ._._..P. _mow
- --:._ ��,_�. � ��. ���. � LIGHT
LJ
�uICTINIr nPAIKI I INIF /-- EXISTING OVERHEAD POWER
MATERIAL LIST:
1. BUTANE
2.PROPOANE
3. NAPTHA
Q Sq/ .
GO�k,
CC C 71506 T
EXP 12131/�3 P
Cl
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL GEOMATICS, INC. THEIR FILENAME— 21-199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = 1'-0"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
30' 0 15' 30' 60'
( IN FEET )
1"=30'-0"
120
D
LEGEND:
FIRST AID
4040
EYE WASH
<D"
FIRE MONITOR (EXISTING)
jFIRE
EXTINGUISHER
ACAD FILE No.
FIRE HOSE
FIRE HYDRANT (EXISTING)
0
os/os/2o22RE—ISSUED
ROUTE OF EVACUATION
DWR
H2S MONITOR
AA
FIRE DETECTOR (FIRE EYE)
MATERIAL LIST:
1. BUTANE
2.PROPOANE
3. NAPTHA
Q Sq/ .
GO�k,
CC C 71506 T
EXP 12131/�3 P
Cl
NOTE TO SURVEYOR:
AFTER SETTING UP ON THE NGS MONUMENT IN THIS AREA
PLEASE CHECK THE COORDINATES IN THE COORDINATE
CONFIRMATION SCHEDULE. IF THE COORDINATES CANNOT BE
CONFIRMED, PLEASE CONTACT PARSONS IMMEDIATELY.
NOTE:
THIS PLAN GENERATED FROM DRONE SCANS AS PROVIDED BY
GLOBAL GEOMATICS, INC. THEIR FILENAME— 21-199 LOADING
RACK.RCP, DATED 08/10/21. THIS SURVEY WAS COLLECTED IN
THE ESTABLISHED LOCAL PLANT COORDINATE SYSTEM.
EXISTING CONTOUR INTERVAL = 1'-0"
DESIGN GRADE CONTOUR INTERVAL = 0'-6"
GRAPHIC SCALE
30' 0 15' 30' 60'
( IN FEET )
1"=30'-0"
120
D
R■ NS
9600 Ming Ave, Suite 310
Bakersfield CA. 93311
Office: 661-699-1100
BAKERSFIELD RENEWABLE FUELS
6451 Rosedale Highway, Bakersfield, CA. 93308
ACAD FILE No.
FIRE PLAN
LOADING RACK — PROPANE, BUTANE, NAPHTHA
0
os/os/2o22RE—ISSUED
FOR PERMIT/CONSTRUCTION
DWR
JFH
AA
SCALE
1"=20'
PROJECT TITLE
B A K E R S M E E D RENEWABLE FUELS
PROJECT N0.
WA -4003-20
04/19/2022
ISSUED FOR CONSTRUCTION
DWR
JFH
AA
0 �
REV
DATE
M.O.C. No.
ISSUED FOR
3
m
�
= m
U
>
m
UNIT NO.
35271
AREA NO.
91
FUNCTION OR EQUIP. NO.
K
DWG. TYPE
48
SIZE
D
DRAWING SERIAL NO.
4044
SHEET
1
REV.
1