HomeMy WebLinkAboutRES NO 137-2022RESOLUTION NO.13 7 0 2 ®2 2
RESOLUTION DISPENSING WITH BIDDING UNDER
SECTION 3.20.060(D)(5) OF THE BAKERSFIELD
MUNICIPAL CODE RELATING TO DESIGN/BUILD
CONSTRUCTION PROCUREMENT PROCESS FOR
THE REPLACEMENT OF THE BOILER AT THE CITY
HALL SOUTH ANNEX FACILITY.
WHEREAS, the boiler for the City Hall South Annex facility needs to be
replaced; and
WHEREAS, the use of design/build methodologies has been shown to be
an effective method of reducing construction costs; and
WHEREAS, the use of design/build joins the construction and design of a
project under one single legal entity thereby reducing conflicts; and
WHEREAS, the City Council believes the use of design/build is appropriate
for certain unique projects where specialized design or construction methods
are necessary or special design expertise must be employed; and
WHEREAS, the City Council believes the public and the procurement
process can be adequately protected through the use of a fair competitive
process for choosing a design/build entity which best serves the interests of the
City.
NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield
as follows:
l . The above recitals are true and correct and incorporated herein by
reference.
2. The boiler replacement for the City Hall South Annex facility is
appropriate for design/build because of the specialized nature of
the design and construction of the project.
3. The boiler replacement for the City Hall South Annex facility justifies
exception to the bidding process and the City Council hereby
determines that the work, supplies equipment and material can
best be obtained through the design/build construction
procurement process.
4. Upon adoption of this Resolution, the Public Works Director is
authorized to proceed with the design/build procurement process,
as set forth in the Bakersfield Municipal Code Section 3.20.060(D) (5), �AKF9
os�
- Page 1 of 2 Pages - m
�_
`50RIGInAI �'
for the boiler replacement for the City Hall South Annex facility
project.
5. The Public Works Director shall recommend a design/build entity
that combines appropriately licensed contracting, architectural
and engineering services, as needed, into one legal entity.
6. The Public Works Director shall invite no less than three appropriate
design/build entities to participate in the selection process.
7. The Public Works Director shall, in a timely manner, bring the
contract for award of the project to the City Council for approval
with a report setting forth the reasons the award is recommended
to the chosen design/build entity.
HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
AUG 3 12022 , by the following vote:
AYES: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, "', GRAY, PARLIER
NOES: COUNCIL MEMBER
ABSTAIN: COUNCIL MEMBER
SE COUNCIL MEMBER_PVPAVh2:X
dtl'v'�A- J--) �ngw
JULIE DRIMAKIi,MAWC
City Clerk and Ex Officio Clerk of the
APPROVED AUG 3 12022 Council of the City of Bakersfield
By
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
By
SHUA H. RUDNICK
Deputy City Attorney
- Page 2 of 2 Pages -
G�AK�c
o �P
L
�_ m
9ORIGINAL�