HomeMy WebLinkAboutFMC 2022Appendix VI
Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
10155971 8/11/2022
Jaco #7773 Fastrip #31
3501 Mt. Vernon Avenue Bakersfield 93306
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Aaron Perrigo
1073967
8485827 8/8/2024
Veeder Root B47853 7/31/2024
OPW 0148613 8/21/2024
8/11/2022 6
Underground Storage Tank
Monitoring System Certification Form
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆
Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆
Are the audible and visual alarms operational? ܆܆܆܆
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment? ܆܆܆܆܆܆
The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆
Was the monitoring control panel’s backup battery visually inspected, functionally
tested, and confirmed operational? ܆܆܆܆܆܆
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) ܆ Sump ܆ UDC
܆܆܆܆܆܆
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational? ܆܆܆܆܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Veeder Root TLS-350 336.02
Underground Storage Tank
Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
L1 420 Unl Ann
L2 420 Dsl Ann
L3 Not used
L4 208 Unl STP
L5 208 Dsl STP
L6 208 Prem STP
L7 420 Prem Ann
L8 Not used
L9 208 Disp 1-2
L10 208 Disp 3-4
L11 208 Disp 5-6
L12 208 Disp 7-8
L13 208 Trans Sump
Underground Storage Tank
Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected? ܆܆ ܆܆ ܆܆
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off when a release is
detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆
LLD ID LLD Model Lines Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
T1 FX1V Unl
T2 FX1DV Dsl
T3 FX1V Prem
Underground Storage Tank
Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
܆܆ Check this box if tank gauging is used only for inventory control.
܆܆ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆
Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆
Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆
Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Probe ID Probe Model Tanks Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
܆܆
Underground Storage Tank
Monitoring System Certification Form
Page 6 of 6
10. MONITORING SITE PLAN
Date site plan was prepared:
If a site plan has been prepared that shows all required information, you may include it, rather than this page,
with your Monitoring System Certification Form. The site plan must show the general layout of tanks and
identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include
a legend for all symbols depicted.
PARK
I
N
G
175'
EXIS
T
I
N
G
B
U
I
L
D
I
N
G
NO
PR
I
C
E
S
I
G
N
MOUNT VERNON AVE.
UN
I
V
E
R
S
I
T
Y
A
V
E
.
CATCHBASIN
N
94.
2
'
50'
1
1
7
.
5
'
180'
H
STPL4
AL1
V
F
L11
G
W
PROPERTY LINE
PRO
P
E
R
T
Y
L
I
N
E
L12
L9L10
DUM
P
S
T
E
R
L13
12,000 GALLONDIESEL 12,000 GALLONPREMIUM
40' S
T
O
R
A
G
E
C
O
N
T
A
I
N
E
R
40' S
T
O
R
A
G
E
C
O
N
T
A
I
N
E
R
STPL5
AL2
V
F
STPL6
AL3
V
F
12,000 GALLON87 UNL
LEGEND
L1 87 ANNULAR
L2 DSL ANNULAR
L3 91 ANNULAR
L4 87 STP
L5 DSL STP
L6 91 STP
L9 UDC 1 - 2
L10 UDC 3 - 4
L11 UDC 5 - 6
L12 UDC 7 - 8
L13 TRANS SUMP
87 GAS 3/2 INCH DBL WALLED PIPE
91 GAS 3/2 INCH DBL WALLED PIPE
DIESEL 3/2 INCH DBL WALLED PIPE
VAPOR RETURN 3 AND 2 INCH SINGLE WALL PIPE
VAPOR VENT 2 INCH SINGLE WALLED PIPE
PRODUCT SPILL CONTAINER
VAPOR SPILL CONTAINER
ANNULAR
EMERGENCY SHUT-OFF
OVERFILL ALARM
FIRE EXTINGUISHER
GAS METER SHUT-OFF
WATER METER SHUT-SHUT OFF
HEALY CAS
EVACUATION MEETING POINT
CIRCUIT BREAKER
UST ELECTRICAL PANEL
AUTOMATIC TANK GAUGE
AIR AND WATER DISPENSER
HAZWASTE DRUM
W
G
A
H
P
V
SITE MAP SITE PLAN
C1
TAB:SITE PLAN
1"=10'-0"
INCHES012
SHEET SIZE 22 X 34
DATE REVISIONS
DATE:
DRAWN BY:
CHECKED:
APPROVED:
RAC FASTRIP - 7-773 CADFILE:
SHEET NO.7773-MSP
A.P.N.:382-020-16-00-8
SCALE:
FASTRIP FOOD STORECONVENIENCE MARKET FOR:
BAKERSFIELD, CALIFORNIA 93306
JAMIESON HILL
3501 MT VERNON AVE.
3101 STATE RDBAKERSFIELD, CA 93308
PROJECT OWNER:
DRAWING:
CD
10/13/2020
3501 MT VERNON AVE.BAKERSFIELD, CA 93306
M
T
V
E
R
N
O
N
A
V
E
.
UNIVERSITY AVE.
PROJECT OWNER:
JAMIESON HILL
PO. BOX 82515
BAKERSFIELD, CA 93380
CONTACT:
SITE PLOT PLAN FOR:
FACILITY ID 15-021-003018
CERS ID 10155971
FASTRIP #7773
3501 MT VERNON AVE.
BAKERSFIELD, CA 93306
10/13/2020 REV.
VICINITY MAP
PROJECT DATA
APPENDIX C-10
SH
E
A
R
V
A
L
V
E
O
P
E
R
A
T
I
O
N
I
N
S
P
E
C
T
I
O
N
)D
F
L
O
L
W
\
1
D
P
H
2Z
Q
H
U
$G
G
U
H
V
V
$G
G
U
H
V
V
&L
W
\
6
W
D
W
H
=
L
S
&
R
G
H
&L
W
\
6
W
D
W
H
=
L
S
&
R
G
H
)D
F
L
O
L
W
\
,
'
3K
R
Q
H
7H
V
W
L
Q
J
&
R
P
S
D
Q
\
3K
R
Q
H
7K
L
V
G
D
W
D
V
K
H
H
W
L
V
I
R
U
L
Q
V
S
H
F
W
L
Q
J
V
K
H
D
U
Y
D
O
Y
H
V
O
R
F
D
W
H
G
L
Q
V
L
G
H
G
LV
S
H
Q
V
H
U
V
6
H
H
3
(
,
5
3
6
H
F
W
L
R
Q
I
R
U
W
K
H
L
Q
V
S
H
F
W
L
R
Q
S
U
R
F
H
G
XU
H
3U
R
G
X
F
W
*
U
D
G
H
'L
V
S
H
Q
V
H
U
,
'
6K
H
D
U
9
D
O
Y
H
7
\
S
H
3
U
R
G
X
F
W
9
D
S
R
U
,
V
W
K
H
V
K
H
D
U
Y
D
O
Y
H
U
L
J
L
G
O
\
DQ
F
K
R
U
H
G
W
R
W
K
H
G
L
V
S
H
Q
V
H
U
E
R
[
IU
D
P
H
R
U
G
L
V
S
H
Q
V
H
U
L
V
O
D
Q
G
"
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<HV1R <HV1R
,
V
W
K
H
V
K
H
D
U
V
H
F
W
L
R
Q
S
R
V
L
WL
R
Q
H
G
E
H
W
Z
H
H
Q
ó
L
Q
F
K
D
E
R
Y
H
RU
E
H
O
R
Z
W
K
H
W
R
S
V
X
U
I
D
F
H
R
I
W
K
H
GL
V
S
H
Q
V
H
U
L
V
O
D
Q
G
"
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<
H
V
1
R
<HV1R <HV1R
,
V
W
K
H
O
H
Y
H
U
D
U
P
I
U
H
H
W
R
P
R
Y
H
"
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<HV1R 1$<HV1R 1$
'
R
H
V
W
K
H
O
H
Y
H
U
D
U
P
V
Q
D
S
V
K
X
W
WK
H
S
R
S
S
H
W
Y
D
O
Y
H
"
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<HV1R 1$<HV1R 1$
&
D
Q
D
Q
\
S
U
R
G
X
F
W
E
H
G
L
V
S
H
Q
V
H
G
ZK
H
Q
W
K
H
S
U
R
G
X
F
W
V
K
H
D
U
Y
D
O
Y
H
L
V
FO
R
V
H
G
"
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<
H
V
1
R
1
$
<HV1R 1$<HV1R 1$
$
´
1
R
µ
W
R
/
L
Q
H
V
R
U
D
´
<
H
V
µ
I
R
U
/
L
Q
H
L
Q
G
L
F
D
W
H
V
D
W
H
V
W
I
D
L
O
XU
H
Te
s
t
R
e
s
u
l
t
s
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3
D
V
V
)
D
L
O
3DVV)DLO3DVV)DLO
Co
m
m
e
n
t
s
:
7H
V
W
H
U
·
V
1
D PH
BB
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
7H
V
W
H
U
·
V
6
L
J
Q
D
W
X
U
H
BB
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
1Z
H
V
W
F
R
/
/
&
Ja
c
o
#
7
7
7
3
F
a
s
t
r
i
p
#
3
1
35
0
1
M
t
.
V
e
r
n
o
n
A
v
e
n
u
e
Ba
k
e
r
s
f
i
e
l
d
10
1
5
5
9
7
1
3-
4
7-
8
MP
D
MP
D
MP
D
MP
D
1-
2
5-
6
Pr
o
d
u
c
t
Pr
o
d
u
c
t
Pr
o
d
u
c
t
Pr
o
d
u
c
t
Aa
r
o
n
P
e
r
r
i
g
o
Appendix VIII
Underground Storage Tank
Spill Container Testing Report Form
CERS = California Environmental Reporting System, ID = Identification, ICC = International Code
Council
Page 1 of 2
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID
Test Date
Facility Name
Facility Address
City
ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Test
Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number
ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. TEST PROCEDURE INFORMATION
Test Procedures Used Components Tested
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that each spill container was tested in accordance with California Code of
Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
Total # of Pages
10155971 8/11/2022
Jaco #7773 Fastrip #31
3501 Mt. Vernon Avenue Bakersfield 93306
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Aaron Perrigo
1073967
8485827 8/8/2024
OPW 0148613 8/21/2024
Lake Test All 3 fill spill buckets
8/11/2022 2
Underground Storage Tank
Spill Container Testing Report Form
Additional copies of this page may be attached.
Page 2 of 2
6. SPILL CONTAINER DETAILS
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
1 8. COMMENTS
Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy.
* Mark here if:
Spill containers do not have a minimum capacity of five gallons and require replacement.
Unl
OPW
Prem
OPW
Dsl
OPW
Jaco 7773 Setup
Responses Received:
200
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
AUG 11, 2022 9:11 AM
TANK PRODUCT GALLONS INCHES WATER DEG F ULLAGE
1 UNLEADED 8594 74.40 0.0 82.6 3468
2 DIESEL 7499 66.18 1.0 90.0 4563
3 PREMIUM 7982 69.76 0.0 90.2 4080
I90500
AUG 11, 2022 9:11 AM
SOFTWARE REVISION LEVEL
VERSION 336.02
SOFTWARE# 346336-100-C
CREATED - 21.02.13.11.53
S-MODULE# 330160-004-a
SYSTEM FEATURES:
PERIODIC IN-TANK TESTS
ANNUAL IN-TANK TESTS
ISD/APM
I50500
AUG 11, 2022 9:11 AM
SYSTEM TYPE AND LANGUAGE FLAG
SYSTEM UNITS
U.S.
SYSTEM LANGUAGE
ENGLISH
SYSTEM DATE/TIME FORMAT
MON DD YYYY HH:MM:SS xM
I50201
AUG 11, 2022 9:11 AM
SHIFT TIME 1 : DISABLED
I50202
AUG 11, 2022 9:11 AM
SHIFT TIME 2 : DISABLED
I50203
AUG 11, 2022 9:11 AM
SHIFT TIME 3 : DISABLED
I50204
AUG 11, 2022 9:11 AM
SHIFT TIME 4 : DISABLED
I54600
AUG 11, 2022 9:11 AM
TANK PER TST NEEDED WRN: DISABLED
I54900
AUG 11, 2022 9:11 AM
TANK ANN TST NEEDED WRN: DISABLED
I55300
AUG 11, 2022 9:11 AM
LINE RE-ENABLE METHOD
PASS LINE TEST
I55600
AUG 11, 2022 9:11 AM
LINE PER TST NEEDED WRN: DISABLED
I55900
AUG 11, 2022 9:11 AM
LINE ANN TST NEEDED WRN: DISABLED
I50D00
AUG 11, 2022 9:11 AM
PRINT TC VOLUMES
ENABLED
I50E00
AUG 11, 2022 9:11 AM
TEMP COMPENSATION
VALUE (DEG F ): 60.0
I60B00
AUG 11, 2022 9:11 AM
STICK HEIGHT OFFSET ENABLE STATUS
DISABLED
I51400
AUG 11, 2022 9:11 AM
H-PROTOCOL DATA FORMAT
HEIGHT
I51A01
AUG 11, 2022 9:11 AM
DAYLIGHT SAVING TIME
ENABLED ON
I51B00
AUG 11, 2022 9:11 AM
DAYLIGHT SAVING TIME
START DATE MAR WEEK 2 SUN 2:00 AM
END DATE NOV WEEK 1 SUN 2:00 AM
I51600
AUG 11, 2022 9:11 AM
RE-DIRECT LOCAL PRINTOUT
DISABLED
I50400
AUG 11, 2022 9:11 AM
232 SECURITY CODE
PORT SECURITY CODE STATUS
1 000000 DISABLED
2 000000 DISABLED
3 000000 DISABLED
4 000000 DISABLED
5 000000 DISABLED
6 000000 DISABLED
I21900
AUG 11, 2022 9:11 AM
TANK CHART SECURITY
DISABLED
I5BD00
AUG 11, 2022 9:11 AM
CUSTOM ALARM LABELS
DISABLED
I56000
AUG 11, 2022 9:11 AM
MASS/DENSITY
DISABLED
I88101
AUG 11, 2022 9:11 AM
PORT SETTINGS:
COMM BOARD : 1 (EDIM )
RS-232 SECURITY
CODE : DISABLED
I88102
AUG 11, 2022 9:11 AM
PORT SETTINGS:
COMM BOARD : 2 (RS-232)
BAUD RATE : 9600
PARITY : NONE
STOP BIT : 1 STOP
DATA LENGTH: 8 DATA
RS-232 SECURITY
CODE : DISABLED
I88103
AUG 11, 2022 9:11 AM
PORT SETTINGS:
COMM BOARD : 3 (RS-232)
BAUD RATE : 9600
PARITY : NONE
STOP BIT : 1 STOP
DATA LENGTH: 8 DATA
RS-232 SECURITY
CODE : DISABLED
I88104
AUG 11, 2022 9:11 AM
I88105
AUG 11, 2022 9:11 AM
I88106
AUG 11, 2022 9:11 AM
I52000
AUG 11, 2022 9:11 AM
RECEIVER AUTO DIAL TYPE & START TIME
RCVR LOCATION LABEL DIAL TYPE START TIME
1 ON DATE OCT 12, 2017 DISABLED
2 ON DATE OCT 12, 2017 DISABLED
3 ON DATE OCT 12, 2017 DISABLED
4 ON DATE OCT 12, 2017 DISABLED
5 ON DATE OCT 12, 2017 DISABLED
6 ON DATE OCT 12, 2017 DISABLED
7 ON DATE OCT 12, 2017 DISABLED
8 ON DATE OCT 12, 2017 DISABLED
I60100
AUG 11, 2022 9:11 AM
TANK CONFIGURATION
DEVICE LABEL CONFIGURED
1 UNLEADED ON
2 DIESEL ON
3 PREMIUM ON
4 OFF
I60200
AUG 11, 2022 9:11 AM
TANK PRODUCT LABEL
TANK PRODUCT LABEL
1 UNLEADED
2 DIESEL
3 PREMIUM
4
I60300
AUG 11, 2022 9:11 AM
TANK PRODUCT CODE
TANK PRODUCT LABEL
1 UNLEADED 1
2 DIESEL 2
3 PREMIUM 3
4 4
I60900
AUG 11, 2022 9:11 AM
TANK THERMAL COEFFICIENT
TANK PRODUCT LABEL
1 UNLEADED 0.000700
2 DIESEL 0.000450
3 PREMIUM 0.000700
4 0.000000
I60700
AUG 11, 2022 9:11 AM
TANK DIAMETER
TANK PRODUCT LABEL INCHES
1 UNLEADED 111.00
2 DIESEL 111.00
3 PREMIUM 111.00
4 0.00
I60A00
AUG 11, 2022 9:11 AM
TANK FULL VOLUME
TANK PRODUCT LABEL TANK PROFILE GALLONS 1 UNLEADED
1 PT 12062 2 DIESEL 1 PT 12062 3 PREMIUM
1 PT 12062 4 1 PT 0
I60400
AUG 11, 2022 9:11 AM
TANK FULL VOLUME
TANK PRODUCT LABEL GALLONS
1 UNLEADED 12062
2 DIESEL 12062
3 PREMIUM 12062
4 0
I60500
AUG 11, 2022 9:11 AM
TANK 4 POINT VOLUMES
TANK PRODUCT LABEL GALLONS
1 UNLEADED 12062 0 0 0
2 DIESEL 12062 0 0 0
3 PREMIUM 12062 0 0 0
4 0 0 0 0
I60600
AUG 11, 2022 9:11 AM
TANK 20 POINT VOLUMES
TANK PRODUCT LABEL GALLONS
1 UNLEADED 12062 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
2 DIESEL 12062 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
3 PREMIUM 12062 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
4 0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
I61500
AUG 11, 2022 9:11 AM
TANK PRODUCT LABEL METER DATA
1 UNLEADED NO
2 DIESEL NO
3 PREMIUM NO
4 NO
I62F00
AUG 11, 2022 9:11 AM
MAG PROBE FLOAT SIZE
TANK PRODUCT LABEL FLOAT SIZE:
1 UNLEADED 4.0 IN.
2 DIESEL 4.0 IN.
3 PREMIUM 4.0 IN.
I62700
AUG 11, 2022 9:11 AM
TANK HIGH WATER WARNING LIMIT
TANK PRODUCT LABEL INCHES
1 UNLEADED 2.0
2 DIESEL 2.0
3 PREMIUM 2.0
I64200
AUG 11, 2022 9:11 AM
WATER ALARM FILTER
TANK PRODUCT LABEL
1 UNLEADED LOW
2 DIESEL LOW
3 PREMIUM LOW
I62400
AUG 11, 2022 9:11 AM
TANK HIGH WATER LEVEL LIMIT
TANK PRODUCT LABEL INCHES
1 UNLEADED 3.0
2 DIESEL 3.0
3 PREMIUM 3.0
I62800
AUG 11, 2022 9:11 AM
TANK MAXIMUM VOLUME LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 12062
2 DIESEL 12062
3 PREMIUM 12062
4 0
I62300
AUG 11, 2022 9:11 AM
TANK OVERFILL LEVEL LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 10856
2 DIESEL 10856
3 PREMIUM 10856
4 0
I62200
AUG 11, 2022 9:11 AM
TANK HIGH PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 11459
2 DIESEL 11459
3 PREMIUM 11459
4 0
I62900
AUG 11, 2022 9:11 AM
TANK DELIVERY REQUIRED LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 1809
2 DIESEL 1809
3 PREMIUM 1809
4 0
I62100
AUG 11, 2022 9:11 AM
TANK LOW PRODUCT LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 500
2 DIESEL 500
3 PREMIUM 500
4 0
I62600
AUG 11, 2022 9:11 AM
TANK LEAK ALARM LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 99
2 DIESEL 99
3 PREMIUM 99
4 99
I62500
AUG 11, 2022 9:11 AM
TANK SUDDEN LOSS LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 99
2 DIESEL 99
3 PREMIUM 99
4 99
I60800
AUG 11, 2022 9:11 AM
TANK TILT
TANK PRODUCT LABEL INCHES
1 UNLEADED 0.00
2 DIESEL 0.00
3 PREMIUM 0.00
4 0.00
I60B00
AUG 11, 2022 9:11 AM
STICK HEIGHT OFFSET ENABLE STATUS
DISABLED
I60C00
AUG 11, 2022 9:11 AM
TANK STICK HEIGHT OFFSET
TANK PRODUCT LABEL INCHES
1 UNLEADED 0.00
2 DIESEL 0.00
3 PREMIUM 0.00
4 0.00
I61200
AUG 11, 2022 9:11 AM
TANK MANIFOLDED PARTNERS
TANK PRODUCT LABEL SIPHON MANIFOLDED TANKS LINE MANIFOLDED TANKS
1 UNLEADED NONE NONE
2 DIESEL NONE NONE
3 PREMIUM NONE NONE
4 NONE NONE
I63600
AUG 11, 2022 9:11 AM
PERIODIC LEAK TEST MIN VOLUME
TANK PRODUCT LABEL GALLONS
1 UNLEADED 120
2 DIESEL 120
3 PREMIUM 120
4 0
I62A00
AUG 11, 2022 9:11 AM
ANNUAL LEAK TEST MIN VOLUME
TANK PRODUCT LABEL GALLONS
1 UNLEADED 120
2 DIESEL 120
3 PREMIUM 120
4 0
I62C00
AUG 11, 2022 9:11 AM
TANK PERIODIC TEST TYPE
TANK PRODUCT LABEL PERIODIC TEST TYPE
1 UNLEADED STANDARD
2 DIESEL STANDARD
3 PREMIUM STANDARD
4 STANDARD
I62D00
AUG 11, 2022 9:11 AM
TANK LEAK TEST FAIL ALARMS
TANK PRODUCT LABEL
1 UNLEADED GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED
ANNUAL TEST FAIL ALARM DISABLED
2 DIESEL GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED
ANNUAL TEST FAIL ALARM DISABLED
3 PREMIUM GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED
ANNUAL TEST FAIL ALARM DISABLED
4 GROSS TEST FAIL ALARM DISABLED
PERIODIC TEST FAIL ALARM DISABLED
ANNUAL TEST FAIL ALARM DISABLED
I63100
AUG 11, 2022 9:11 AM
TANK LEAK TEST AVERAGING
TANK PRODUCT LABEL ANNUAL PERIODIC
1 UNLEADED OFF OFF
2 DIESEL OFF OFF
3 PREMIUM OFF OFF
4 OFF OFF
I63000
AUG 11, 2022 9:11 AM
IN-TANK LEAK TEST NOTIFY
TANK PRODUCT LABEL TANK TEST NOTIFY:
1 UNLEADED OFF
2 DIESEL OFF
3 PREMIUM OFF
4 OFF
I63200
AUG 11, 2022 9:11 AM
TANK TEST SIPHON BREAK
TANK PRODUCT LABEL SIPHON BREAK
1 UNLEADED OFF
2 DIESEL OFF
3 PREMIUM OFF
4 OFF
I61000
AUG 11, 2022 9:11 AM
TANK DELIVERY DELAY
TANK PRODUCT LABEL
1 UNLEADED 1
2 DIESEL 1
3 PREMIUM 1
4 1
I63A00
AUG 11, 2022 9:11 AM
LOW LEVEL PUMP THRESHOLD FOR SEQUENTIAL LINE MANIFOLD
TANK PRODUCT LABEL PUMP THRESHOLD
1 UNLEADED 10.00%
2 DIESEL 10.00%
3 PREMIUM 10.00%
4 10.00%
I61100
AUG 11, 2022 9:11 AM
LEAK TEST METHOD
- - - - - - - - - - - -
TEST ON DATE : ALL TANK
MAR 22, 2011
START TIME : DISABLED
TEST RATE :0.20 GAL/HR
DURATION : 2 HOURS
TST EARLY STOP:DISABLED
I61300
AUG 11, 2022 9:11 AM
CSLD PROBABLITY OF DETECTION
I61400
AUG 11, 2022 9:11 AM
CSLD CLIMATE FACTOR
I61600
AUG 11, 2022 9:11 AM
TANK PRODUCT LABEL CAL UPDATE
1 UNLEADED IMMEDIATE
2 DIESEL IMMEDIATE
3 PREMIUM IMMEDIATE
4 IMMEDIATE
I61A00
AUG 11, 2022 9:11 AM
IN-TANK LEAK TEST EARLY STOP
TANK PRODUCT LABEL TST EARLY STOP:
1 UNLEADED DISABLED
2 DIESEL DISABLED
3 PREMIUM DISABLED
4 DISABLED
I61B00
AUG 11, 2022 9:11 AM
IN-TANK LEAK GROSS TEST AUTO-CONFIRM
I61C00
AUG 11, 2022 9:11 AM
CSLD REPORT ONLY
I62B00
AUG 11, 2022 9:11 AM
TANK LAST ANNUAL TEST
TANK PRODUCT LABEL DATE
1 UNLEADED ??? 0, 0
2 DIESEL ??? 0, 0
3 PREMIUM ??? 0, 0
4 ??? 0, 0
I63300
AUG 11, 2022 9:11 AM
LEAK TEST REPORT FORMAT: NORMAL
I63400
AUG 11, 2022 9:11 AM
RECONCILIATION WARNING LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 0
2 DIESEL 0
3 PREMIUM 0
4 0
I63500
AUG 11, 2022 9:11 AM
RECONCILIATION ALARM LIMIT
TANK PRODUCT LABEL GALLONS
1 UNLEADED 1
2 DIESEL 1
3 PREMIUM 1
4 1
I63900
AUG 11, 2022 9:11 AM
ACCU CHART END SHAPE FACTOR
TANK PRODUCT LABEL
1 UNLEADED
END FACTOR: NONE
2 DIESEL
END FACTOR: NONE
3 PREMIUM
END FACTOR: NONE
4
END FACTOR: NONE
I78000
AUG 11, 2022 9:11 AM
I77700
AUG 11, 2022 9:11 AM
I77800
AUG 11, 2022 9:11 AM
I78C00
AUG 11, 2022 9:11 AM
I78300
AUG 11, 2022 9:11 AM
I78F00
AUG 11, 2022 9:11 AM
I78700
AUG 11, 2022 9:11 AM
I70200
AUG 11, 2022 9:11 AM
LIQUID LABEL
DEVICE LABEL
1 UNL ANN
2 DSL ANN
3 PNL ANM
4 UNL STP
5 DSL STP
6 PNL STP
7 PNL ANN
8
9 DISP 1-2
10 DISP 3-4
11 DISP 5-6
12 DISP 7-8
13 TRANS SUNP
14
15
16
I70300
AUG 11, 2022 9:11 AM
LIQUID TYPE
SENSOR LOCATION TYPE
1 UNL ANN TRI-STATE (SINGLE FLOAT)
2 DSL ANN TRI-STATE (SINGLE FLOAT)
3 PNL ANM TRI-STATE (SINGLE FLOAT)
4 UNL STP TRI-STATE (SINGLE FLOAT)
5 DSL STP TRI-STATE (SINGLE FLOAT)
6 PNL STP TRI-STATE (SINGLE FLOAT)
7 PNL ANN TRI-STATE (SINGLE FLOAT)
8 TRI-STATE (SINGLE FLOAT)
9 DISP 1-2 TRI-STATE (SINGLE FLOAT)
10 DISP 3-4 TRI-STATE (SINGLE FLOAT)
11 DISP 5-6 TRI-STATE (SINGLE FLOAT)
12 DISP 7-8 TRI-STATE (SINGLE FLOAT)
13 TRANS SUNP TRI-STATE (SINGLE FLOAT)
14 TRI-STATE (SINGLE FLOAT)
15 TRI-STATE (SINGLE FLOAT)
16 TRI-STATE (SINGLE FLOAT)
I70400
AUG 11, 2022 9:11 AM
LIQUID CATEGORY
SENSOR LOCATION CATEGORY
1 UNL ANN ANNULAR SPACE
2 DSL ANN ANNULAR SPACE
3 PNL ANM ANNULAR SPACE
4 UNL STP STP SUMP
5 DSL STP STP SUMP
6 PNL STP STP SUMP
7 PNL ANN ANNULAR SPACE
8 OTHER SENSORS
9 DISP 1-2 DISPENSER PAN
10 DISP 3-4 DISPENSER PAN
11 DISP 5-6 DISPENSER PAN
12 DISP 7-8 DISPENSER PAN
13 TRANS SUNP PIPING SUMP
14 OTHER SENSORS
15 OTHER SENSORS
16 OTHER SENSORS
I74200
AUG 11, 2022 9:11 AM
I74300
AUG 11, 2022 9:11 AM
I74400
AUG 11, 2022 9:11 AM
I74700
AUG 11, 2022 9:11 AM
I74800
AUG 11, 2022 9:11 AM
I74900
AUG 11, 2022 9:11 AM
I7BC00
AUG 11, 2022 9:11 AM
I80200
AUG 11, 2022 9:11 AM
I80300
AUG 11, 2022 9:11 AM
I80400
AUG 11, 2022 9:12 AM
I80700
AUG 11, 2022 9:12 AM
RELAY LABEL
DEVICE LABEL
1 UNL
2 PNL
3 DSL
4 OVERFILL ALARM
I80900
AUG 11, 2022 9:12 AM
RELAY ORIENTATION
RELAY DESIGNATION ORIENTATION
1 UNL NORMALLY OPEN
2 PNL NORMALLY OPEN
3 DSL NORMALLY CLOSED
4 OVERFILL ALARM NORMALLY OPEN
I80B00
AUG 11, 2022 9:12 AM
RELAY TANK ASSIGNMENT
RELAY DESIGNATION TANK
1 UNL 1
2 PNL 3
3 DSL 2
4 OVERFILL ALARM NONE
I80A00
AUG 11, 2022 9:12 AM
RELAY TYPE
RELAY DESIGNATION TYPE
1 UNL PUMP CONTROL OUTPUT
2 PNL PUMP CONTROL OUTPUT
3 DSL STANDARD
4 OVERFILL ALARM STANDARD
I80C00
AUG 11, 2022 9:12 AM
I80800
AUG 11, 2022 9:12 AM
RELAY SETUP REPORT
R 1:UNL
TYPE:
PUMP CONTROL OUTPUT
TANK #: 1
LIQUID SENSOR ALMS
L 4:FUEL ALARM
L 9:FUEL ALARM
L10:FUEL ALARM
L11:FUEL ALARM
L12:FUEL ALARM
L13:FUEL ALARM
L 4:SENSOR OUT ALARM
L 9:SENSOR OUT ALARM
L10:SENSOR OUT ALARM
L11:SENSOR OUT ALARM
L12:SENSOR OUT ALARM
L13:SENSOR OUT ALARM
L 4:SHORT ALARM
L 9:SHORT ALARM
L10:SHORT ALARM
L11:SHORT ALARM
L12:SHORT ALARM
L13:SHORT ALARM
ISD SITE ALARMS
ISD GROSS PRES FAIL
ISD DEGRD PRES FAIL
ISD VAPOR LEAK FAIL
ISD VP PRES FAIL
ISD VP STATUS FAIL
ISD HOSE ALARMS
ALL:GROSS COLLECT FAIL
ALL:DEGRD COLLECT FAIL
ALL:FLOW COLLECT FAIL
R 2:PNL
TYPE:
PUMP CONTROL OUTPUT
TANK #: 3
LIQUID SENSOR ALMS
L 6:FUEL ALARM
L 9:FUEL ALARM
L10:FUEL ALARM
L11:FUEL ALARM
L12:FUEL ALARM
L13:FUEL ALARM
L 6:SENSOR OUT ALARM
L 9:SENSOR OUT ALARM
L10:SENSOR OUT ALARM
L11:SENSOR OUT ALARM
L12:SENSOR OUT ALARM
L13:SENSOR OUT ALARM
L 6:SHORT ALARM
L 9:SHORT ALARM
L10:SHORT ALARM
L11:SHORT ALARM
L12:SHORT ALARM
L13:SHORT ALARM
ISD SITE ALARMS
ISD GROSS PRES FAIL
ISD DEGRD PRES FAIL
ISD VAPOR LEAK FAIL
ISD VP PRES FAIL
ISD VP STATUS FAIL
ISD HOSE ALARMS
ALL:GROSS COLLECT FAIL
ALL:DEGRD COLLECT FAIL
ALL:FLOW COLLECT FAIL
R 3:DSL
TYPE:
STANDARD
NORMALLY CLOSED
TANK #: 2
LIQUID SENSOR ALMS
L 5:FUEL ALARM
L10:FUEL ALARM
L11:FUEL ALARM
L12:FUEL ALARM
L13:FUEL ALARM
L 5:SENSOR OUT ALARM
L10:SENSOR OUT ALARM
L12:SENSOR OUT ALARM
L13:SENSOR OUT ALARM
L 5:SHORT ALARM
L10:SHORT ALARM
L12:SHORT ALARM
L13:SHORT ALARM
R 4:OVERFILL ALARM
TYPE:
STANDARD
NORMALLY OPEN
TANK #: NONE
IN-TANK ALARMS
ALL:OVERFILL ALARM
ALL:HIGH PRODUCT ALARM
ALL:MAX PRODUCT ALARM
I79000
AUG 11, 2022 9:12 AM
EDIM:1 VR:349634-003-C TD:06.05.11.11.15
I79100
AUG 11, 2022 9:12 AM
I72300
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
SMARTSENSOR ASSIGNMENT
DEVICE LABEL CATEGORY
01 PS 1-2 VAPOR PRESSURE
02 FM 1-2 AIR FLOW METER
03 FM 3-4 AIR FLOW METER
04 FM 5-6 AIR FLOW METER
05 FM 7-8 AIR FLOW METER
06 UNKNOWN
07 UNKNOWN
08 UNKNOWN
09 UNKNOWN
10 UNKNOWN
11 UNKNOWN
12 UNKNOWN
13 UNKNOWN
14 UNKNOWN
15 UNKNOWN
16 UNKNOWN
17 UNKNOWN
18 UNKNOWN
19 UNKNOWN
20 UNKNOWN
21 UNKNOWN
22 UNKNOWN
23 UNKNOWN
24 UNKNOWN
25 UNKNOWN
26 UNKNOWN
27 UNKNOWN
28 UNKNOWN
29 UNKNOWN
30 UNKNOWN
31 UNKNOWN
32 UNKNOWN
33 UNKNOWN
34 UNKNOWN
35 UNKNOWN
36 UNKNOWN
37 UNKNOWN
38 UNKNOWN
39 UNKNOWN
40 UNKNOWN
IV4E00
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
EVR/ISD SETUP
TYPE: VACUUM ASSIST
VACUUM ASSIST TYPE: HEALY VAC
IV4F00
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
NOZZLE A/L RANGE
A/L RATIO: 0.95 - 1.15
IV4000
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
VAPOR PROCESSOR TYPE
NONE
IV4700
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
ASSESSMENT TIME
START TIME: 10:00 AM
TIME DELAY MINUTES: 1
IV5200
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
ACCEPT HIGH ORVR: YES
IV4A00
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
ISD HOSE TABLE
HOSE FP FP AFM REL HOSE
ID ID LABEL ID ID LABEL
01 01 01 01 02 BLEND3
02 02 02 01 02 BLEND3
03 03 03 02 02 BLEND3
04 04 04 02 02 BLEND3
05 05 05 03 02 BLEND3
06 06 06 03 02 BLEND3
07 07 07 04 02 BLEND3
08 08 08 04 02 BLEND3
IV4B00
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
PRODUCT/HOSE MAP TABLE
FP AFID M1/H1 M2/H2 M3/H3 M4/H4
01 01 02/01 03/01 09/01 xx/xx
02 01 02/02 03/02 09/02 xx/xx
03 02 02/03 03/03 09/03 xx/xx
04 02 02/04 03/04 09/04 xx/xx
05 03 02/05 03/05 09/05 xx/xx
06 03 02/06 03/06 09/06 xx/xx
07 04 02/07 03/07 09/07 xx/xx
08 04 02/08 03/08 09/08 xx/xx
IV4900
AUG 11, 2022 9:12 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
LABEL TABLE
ID LABEL
01 UNASSIGNED
02 BLEND3
03 REGULAR
04 MID GRADE
05 PREMIUM
06 GOLD
07 BRONZE
08 SILVER
09 BLEND2
10 BLEND4
IV1000
AUG 11, 2022 9:12 AM
ISD VERSION: 01.07
Jaco 7773 Alarm History
Responses Received:
I10200
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
SYSTEM CONFIGURATION
SLOT BOARD TYPE POWER ON RESET CURRENT
1 7SMARTSENSOR BD 508304 506890
2 INTERSTITIAL BD 202003 201403
3 4 PROBE / G.T. 161879 161431
4 INTERSTITIAL BD 201406 200991
5 UNUSED 9470693 9480171
6 UNUSED 9460594 9476923
7 UNUSED 9461650 9472467
8 UNUSED 9454301 9472687
9 STP SENSE BOARD 33193 33141
10 RELAY BOARD 15036 15073
11 UNUSED 9466281 9481764
12 UNUSED 9456335 9476716
13 UNUSED 9456049 9476847
14 UNUSED 9458492 9471843
15 UNUSED 9456225 9478296
16 UNUSED 9461198 9479393
COMM 1 ELEC DISP INT. 101303 101125
COMM 2 RS232 SERIAL BD 14926 14918
COMM 3 RS232 SERIAL BD 14970 14985
COMM 4 UNUSED 9460648 9481501
COMM 5 UNUSED 9455037 9475333
COMM 6 UNUSED 9460406 9471382
I90200
AUG 11, 2022 9:14 AM
SOFTWARE REVISION LEVEL
VERSION 336.02
SOFTWARE# 346336-100-C
CREATED - 21.02.13.11.53
S-MODULE# 330160-004-a
SYSTEM FEATURES:
PERIODIC IN-TANK TESTS
ANNUAL IN-TANK TESTS
ISD/APM
I11100
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIME
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 8-07-22 12:11AM
T 1 TANK UNLEADED OVERFILL ALARM ALARM 8-07-22 12:07AM
L 5 STP SUMP DSL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 6 STP SUMP PNL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 7 ANNULAR PNL ANN SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 2 ANNULAR DSL ANN SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 4 STP SUMP UNL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L12 DISP PAN DISP 7-8 SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L11 DISP PAN DISP 5-6 SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L10 DISP PAN DISP 3-4 SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 9 DISP PAN DISP 1-2 SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L13 PIPE TRANS SUNP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 7 ANNULAR PNL ANN SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 2 ANNULAR DSL ANN SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 4 STP SUMP UNL STP SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 6 STP SUMP PNL STP SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 5 STP SUMP DSL STP SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L10 DISP PAN DISP 3-4 SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L 9 DISP PAN DISP 1-2 SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L13 PIPE TRANS SUNP SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L12 DISP PAN DISP 7-8 SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L11 DISP PAN DISP 5-6 SENSOR OUT ALARM ALARM 8-03-22 9:48AM
L11 DISP PAN DISP 5-6 FUEL ALARM CLEAR 8-03-22 9:43AM
L11 DISP PAN DISP 5-6 FUEL ALARM ALARM 8-03-22 9:43AM
L12 DISP PAN DISP 7-8 FUEL ALARM CLEAR 8-03-22 9:42AM
L12 DISP PAN DISP 7-8 FUEL ALARM ALARM 8-03-22 9:42AM
L10 DISP PAN DISP 3-4 FUEL ALARM CLEAR 8-03-22 9:42AM
L10 DISP PAN DISP 3-4 FUEL ALARM ALARM 8-03-22 9:41AM
L 9 DISP PAN DISP 1-2 FUEL ALARM CLEAR 8-03-22 9:41AM
L 9 DISP PAN DISP 1-2 FUEL ALARM ALARM 8-03-22 9:41AM
L13 PIPE TRANS SUNP FUEL ALARM CLEAR 8-03-22 9:39AM
L13 PIPE TRANS SUNP FUEL ALARM ALARM 8-03-22 9:39AM
L 7 ANNULAR PNL ANN FUEL ALARM CLEAR 8-03-22 9:39AM
L 7 ANNULAR PNL ANN FUEL ALARM ALARM 8-03-22 9:38AM
L 2 ANNULAR DSL ANN FUEL ALARM CLEAR 8-03-22 9:38AM
L 2 ANNULAR DSL ANN FUEL ALARM ALARM 8-03-22 9:38AM
L 1 ANNULAR UNL ANN FUEL ALARM CLEAR 8-03-22 9:38AM
L 1 ANNULAR UNL ANN FUEL ALARM ALARM 8-03-22 9:37AM
L 4 STP SUMP UNL STP FUEL ALARM CLEAR 8-03-22 9:37AM
L 4 STP SUMP UNL STP FUEL ALARM ALARM 8-03-22 9:37AM
L 5 STP SUMP DSL STP FUEL ALARM CLEAR 8-03-22 9:36AM
L 5 STP SUMP DSL STP FUEL ALARM ALARM 8-03-22 9:36AM
L 6 STP SUMP PNL STP FUEL ALARM CLEAR 8-03-22 9:35AM
L 6 STP SUMP PNL STP FUEL ALARM ALARM 8-03-22 9:35AM
E 1 OTHER COMMUNICATION ALARM CLEAR 8-01-22 11:05PM
E 1 OTHER COMMUNICATION ALARM ALARM 8-01-22 10:56PM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM CLEAR 7-14-22 7:27AM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM ALARM 7-12-22 2:55PM
I11200
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
NON-PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIME
h 8 OTHER FP8: BLEND3 DEGRD COLLECT WARN CLEAR 8-03-22 9:26AM
h 7 OTHER FP7: BLEND3 DEGRD COLLECT WARN CLEAR 8-03-22 9:26AM
h 7 OTHER FP7: BLEND3 DEGRD COLLECT WARN ALARM 7-28-22 10:02AM
h 8 OTHER FP8: BLEND3 DEGRD COLLECT WARN ALARM 7-27-22 10:02AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-23-22 12:34PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-23-22 11:51AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-20-22 1:40PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-20-22 11:27AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-18-22 1:27PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-18-22 11:58AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-15-22 10:05AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-15-22 8:24AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-14-22 2:40AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-13-22 11:19PM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-13-22 12:56AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-13-22 12:01AM
I20600
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
TANK ALARM HISTORY
TANK 1 UNLEADED
OVERFILL ALARM AUG 7, 2022 12:07 AM
DELIVERY NEEDED JUL 23, 2022 11:51 AM
JUL 20, 2022 11:27 AM
JUL 18, 2022 11:58 AM
TANK 2 DIESEL
TANK 3 PREMIUM
TANK 5
TANK 6
TANK 7
TANK 8
TANK 9
TANK 10
TANK 11
TANK 12
TANK 13
TANK 14
TANK 15
TANK 16
I38200
AUG 11, 2022 9:14 AM
I30200
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 UNL ANN
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:37 AM FUEL ALARM
JUL 12, 2022 2:55 PM SENSOR OUT ALARM
2 DSL ANN
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:38 AM FUEL ALARM
JUL 12, 2022 11:28 AM SENSOR OUT ALARM
4 UNL STP
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:37 AM FUEL ALARM
JUL 12, 2022 11:28 AM SENSOR OUT ALARM
5 DSL STP
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:36 AM FUEL ALARM
JUL 12, 2022 11:28 AM SENSOR OUT ALARM
6 PNL STP
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:35 AM FUEL ALARM
JUL 12, 2022 11:28 AM SENSOR OUT ALARM
7 PNL ANN
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:38 AM FUEL ALARM
JUL 12, 2022 11:28 AM FUEL ALARM
9 DISP 1-2
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:41 AM FUEL ALARM
JUL 12, 2022 11:27 AM SENSOR OUT ALARM
10 DISP 3-4
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:41 AM FUEL ALARM
JUL 12, 2022 11:27 AM SENSOR OUT ALARM
11 DISP 5-6
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:43 AM FUEL ALARM
JUL 12, 2022 11:27 AM SENSOR OUT ALARM
12 DISP 7-8
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:42 AM FUEL ALARM
JUL 12, 2022 11:27 AM SENSOR OUT ALARM
13 TRANS SUNP
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:39 AM FUEL ALARM
JUL 12, 2022 11:27 AM SENSOR OUT ALARM
I31600
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
SMART SENSOR ALARM HISTORY REPORT
SENSOR LOCATION
1 PS 1-2
2 FM 1-2
3 FM 3-4
4 FM 5-6
5 FM 7-8
I40200
AUG 11, 2022 9:14 AM
I40300
AUG 11, 2022 9:14 AM
I34200
AUG 11, 2022 9:14 AM
I34700
AUG 11, 2022 9:14 AM
IV0100
AUG 11, 2022 9:14 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
ISD ALARM STATUS REPORT
EVR TYPE: VACUUM ASSIST
ISD TYPE: 01.07
VAPOR PROCESSOR TYPE: NONE
OVERALL STATUS :PASS EVR VAPOR COLLECTION :PASS
EVR VAPOR CONTAINMENT :PASS
ISD MONITOR UP-TIME :100%
EVR/ISD PASS TIME :100%
WARNING ALARMS
DATE TIME DESCRIPTION READING VALUE
22-08-02 10:02:29 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-08-02 10:02:29 A/L RATIO DEGRADATION FP 7 BLEND3 0.71
22-08-01 10:02:33 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-08-01 10:02:33 A/L RATIO DEGRADATION FP 7 BLEND3 0.70
22-07-31 10:02:26 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-07-31 10:02:26 A/L RATIO DEGRADATION FP 7 BLEND3 0.68
22-07-30 10:02:37 A/L RATIO DEGRADATION FP 8 BLEND3 0.69
22-07-30 10:02:37 A/L RATIO DEGRADATION FP 7 BLEND3 0.67
22-07-29 10:02:53 A/L RATIO DEGRADATION FP 8 BLEND3 0.74
22-07-29 10:02:53 A/L RATIO DEGRADATION FP 7 BLEND3 0.66
FAILURE ALARMS
DATE TIME DESCRIPTION READING VALUE
22-07-08 10:01:30 A/L RATIO GROSS BLOCKAGE FP 8 BLEND3 BLKD
22-07-08 10:01:30 A/L RATIO GROSS BLOCKAGE FP 7 BLEND3 BLKD
21-04-14 10:02:04 A/L RATIO GROSS BLOCKAGE FP 5 BLEND3 BLKD
20-10-19 10:02:47 A/L RATIO GROSS BLOCKAGE FP 6 BLEND3 BLKD
20-10-19 10:02:47 A/L RATIO GROSS BLOCKAGE FP 5 BLEND3 BLKD
19-03-20 10:01:25 VAPOR CONTAINMENT LEAKAGE GROSS FAIL
19-02-07 10:02:18 A/L RATIO GROSS BLOCKAGE FP 2 BLEND3 BLKD
19-02-07 10:02:18 A/L RATIO GROSS BLOCKAGE FP 1 BLEND3 BLKD
18-07-09 10:02:32 A/L RATIO GROSS BLOCKAGE FP 2 BLEND3 BLKD
18-07-09 10:02:32 A/L RATIO GROSS BLOCKAGE FP 1 BLEND3 BLKD
SHUTDOWN & MISCELLANEOUS EVENTS
DATE TIME DESCRIPTION ACTION/NAME
22-08-04 10:03:23 READINESS ISD:PP EVR:PP ISD & EVR READY
22-08-03 10:02:33 READINESS ISD:PP EVR:NP EVR READINESS PENDING
22-08-03 09:52:11 READINESS ISD:PP EVR:NN EVR READINESS PENDING
22-08-03 09:52:11 ISD STARTUP
22-08-03 09:51:57 ISD SHUTDOWN
22-08-03 09:26:01 COLLECTION TEST HH08 GRADE TEST MANUALLY CLEARED
22-08-03 09:26:00 COLLECTION TEST HH07 GRADE TEST MANUALLY CLEARED
22-07-18 10:01:51 READINESS ISD:PP EVR:PP ISD & EVR READY
22-07-17 10:02:56 READINESS ISD:PP EVR:PN EVR READINESS PENDING
22-07-16 10:02:09 READINESS ISD:PP EVR:PN EVR READINESS PENDING
Jaco 7773 Alarm History After
Responses Received:
I10200
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
SYSTEM CONFIGURATION
SLOT BOARD TYPE POWER ON RESET CURRENT
1 7SMARTSENSOR BD 508304 507969
2 INTERSTITIAL BD 202003 201865
3 4 PROBE / G.T. 161879 161687
4 INTERSTITIAL BD 201406 201223
5 UNUSED 9470693 9521211
6 UNUSED 9460594 9520266
7 UNUSED 9461650 9512487
8 UNUSED 9454301 9518486
9 STP SENSE BOARD 33193 33222
10 RELAY BOARD 15036 15087
11 UNUSED 9466281 9524519
12 UNUSED 9456335 9521091
13 UNUSED 9456049 9521244
14 UNUSED 9458492 9513245
15 UNUSED 9456225 9512937
16 UNUSED 9461198 9521266
COMM 1 ELEC DISP INT. 101303 101243
COMM 2 RS232 SERIAL BD 14926 14955
COMM 3 RS232 SERIAL BD 14970 15021
COMM 4 UNUSED 9460648 9525618
COMM 5 UNUSED 9455037 9514432
COMM 6 UNUSED 9460406 9519508
I90200
AUG 11, 2022 11:09 AM
SOFTWARE REVISION LEVEL
VERSION 336.02
SOFTWARE# 346336-100-C
CREATED - 21.02.13.11.53
S-MODULE# 330160-004-a
SYSTEM FEATURES:
PERIODIC IN-TANK TESTS
ANNUAL IN-TANK TESTS
ISD/APM
I11100
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIME
L 2 ANNULAR DSL ANN SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 4 STP SUMP UNL STP SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 6 STP SUMP PNL STP SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 7 ANNULAR PNL ANN SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 5 STP SUMP DSL STP SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L10 DISP PAN DISP 3-4 SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L12 DISP PAN DISP 7-8 SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L11 DISP PAN DISP 5-6 SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L 9 DISP PAN DISP 1-2 SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L13 PIPE TRANS SUNP SENSOR OUT ALARM CLEAR 8-11-22 9:42AM
L12 DISP PAN DISP 7-8 SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L11 DISP PAN DISP 5-6 SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L10 DISP PAN DISP 3-4 SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 7 ANNULAR PNL ANN SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L13 PIPE TRANS SUNP SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 6 STP SUMP PNL STP SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 9 DISP PAN DISP 1-2 SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 5 STP SUMP DSL STP SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 4 STP SUMP UNL STP SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 2 ANNULAR DSL ANN SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L 1 ANNULAR UNL ANN SENSOR OUT ALARM ALARM 8-11-22 9:41AM
L11 DISP PAN DISP 5-6 FUEL ALARM CLEAR 8-11-22 9:39AM
L11 DISP PAN DISP 5-6 FUEL ALARM ALARM 8-11-22 9:39AM
L12 DISP PAN DISP 7-8 FUEL ALARM CLEAR 8-11-22 9:39AM
L12 DISP PAN DISP 7-8 FUEL ALARM ALARM 8-11-22 9:38AM
L10 DISP PAN DISP 3-4 FUEL ALARM CLEAR 8-11-22 9:38AM
L10 DISP PAN DISP 3-4 FUEL ALARM ALARM 8-11-22 9:38AM
L 9 DISP PAN DISP 1-2 FUEL ALARM CLEAR 8-11-22 9:37AM
L 9 DISP PAN DISP 1-2 FUEL ALARM ALARM 8-11-22 9:37AM
L13 PIPE TRANS SUNP FUEL ALARM CLEAR 8-11-22 9:36AM
L13 PIPE TRANS SUNP FUEL ALARM ALARM 8-11-22 9:35AM
L 1 ANNULAR UNL ANN FUEL ALARM CLEAR 8-11-22 9:34AM
L 1 ANNULAR UNL ANN FUEL ALARM ALARM 8-11-22 9:34AM
L 2 ANNULAR DSL ANN FUEL ALARM CLEAR 8-11-22 9:34AM
L 2 ANNULAR DSL ANN FUEL ALARM ALARM 8-11-22 9:34AM
L 6 STP SUMP PNL STP FUEL ALARM CLEAR 8-11-22 9:32AM
L 6 STP SUMP PNL STP FUEL ALARM ALARM 8-11-22 9:31AM
L 5 STP SUMP DSL STP FUEL ALARM CLEAR 8-11-22 9:31AM
L 5 STP SUMP DSL STP FUEL ALARM ALARM 8-11-22 9:31AM
L 4 STP SUMP UNL STP FUEL ALARM CLEAR 8-11-22 9:30AM
L 4 STP SUMP UNL STP FUEL ALARM ALARM 8-11-22 9:30AM
T 1 TANK UNLEADED OVERFILL ALARM CLEAR 8-07-22 12:11AM
T 1 TANK UNLEADED OVERFILL ALARM ALARM 8-07-22 12:07AM
L 5 STP SUMP DSL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 6 STP SUMP PNL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 7 ANNULAR PNL ANN SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 2 ANNULAR DSL ANN SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L 4 STP SUMP UNL STP SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
L12 DISP PAN DISP 7-8 SENSOR OUT ALARM CLEAR 8-03-22 9:49AM
I11200
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
NON-PRIORITY ALARM HISTORY
ID CATEGORY DESCRIPTION ALARM TYPE STATE DATE TIME
h 8 OTHER FP8: BLEND3 DEGRD COLLECT WARN CLEAR 8-03-22 9:26AM
h 7 OTHER FP7: BLEND3 DEGRD COLLECT WARN CLEAR 8-03-22 9:26AM
h 7 OTHER FP7: BLEND3 DEGRD COLLECT WARN ALARM 7-28-22 10:02AM
h 8 OTHER FP8: BLEND3 DEGRD COLLECT WARN ALARM 7-27-22 10:02AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-23-22 12:34PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-23-22 11:51AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-20-22 1:40PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-20-22 11:27AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-18-22 1:27PM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-18-22 11:58AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-15-22 10:05AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-15-22 8:24AM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-14-22 2:40AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-13-22 11:19PM
T 1 TANK UNLEADED DELIVERY NEEDED CLEAR 7-13-22 12:56AM
T 1 TANK UNLEADED DELIVERY NEEDED ALARM 7-13-22 12:01AM
I20600
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
TANK ALARM HISTORY
TANK 1 UNLEADED
OVERFILL ALARM AUG 7, 2022 12:07 AM
DELIVERY NEEDED JUL 23, 2022 11:51 AM
JUL 20, 2022 11:27 AM
JUL 18, 2022 11:58 AM
TANK 2 DIESEL
TANK 3 PREMIUM
TANK 5
TANK 6
TANK 7
TANK 8
TANK 9
TANK 10
TANK 11
TANK 12
TANK 13
TANK 14
TANK 15
TANK 16
I38200
AUG 11, 2022 11:09 AM
I30200
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
LIQUID ALARM HISTORY REPORT
SENSOR LOCATION
1 UNL ANN
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:34 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
2 DSL ANN
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:34 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
4 UNL STP
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:30 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
5 DSL STP
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:31 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
6 PNL STP
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:31 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
7 PNL ANN
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
AUG 3, 2022 9:38 AM FUEL ALARM
9 DISP 1-2
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:37 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
10 DISP 3-4
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:38 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
11 DISP 5-6
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:39 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
12 DISP 7-8
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:38 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
13 TRANS SUNP
AUG 11, 2022 9:41 AM SENSOR OUT ALARM
AUG 11, 2022 9:35 AM FUEL ALARM
AUG 3, 2022 9:48 AM SENSOR OUT ALARM
I31600
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
SMART SENSOR ALARM HISTORY REPORT
SENSOR LOCATION
1 PS 1-2
2 FM 1-2
3 FM 3-4
4 FM 5-6
5 FM 7-8
I40200
AUG 11, 2022 11:09 AM
I40300
AUG 11, 2022 11:09 AM
I34200
AUG 11, 2022 11:09 AM
I34700
AUG 11, 2022 11:09 AM
IV0100
AUG 11, 2022 11:09 AM
FASTRIP 773
3501 MT VERNON
BAKERSFIELD CA
ISD ALARM STATUS REPORT
EVR TYPE: VACUUM ASSIST
ISD TYPE: 01.07
VAPOR PROCESSOR TYPE: NONE
OVERALL STATUS :PASS EVR VAPOR COLLECTION :PASS
EVR VAPOR CONTAINMENT :PASS
ISD MONITOR UP-TIME : 99%
EVR/ISD PASS TIME :100%
WARNING ALARMS
DATE TIME DESCRIPTION READING VALUE
22-08-02 10:02:29 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-08-02 10:02:29 A/L RATIO DEGRADATION FP 7 BLEND3 0.71
22-08-01 10:02:33 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-08-01 10:02:33 A/L RATIO DEGRADATION FP 7 BLEND3 0.70
22-07-31 10:02:26 A/L RATIO DEGRADATION FP 8 BLEND3 0.67
22-07-31 10:02:26 A/L RATIO DEGRADATION FP 7 BLEND3 0.68
22-07-30 10:02:37 A/L RATIO DEGRADATION FP 8 BLEND3 0.69
22-07-30 10:02:37 A/L RATIO DEGRADATION FP 7 BLEND3 0.67
22-07-29 10:02:53 A/L RATIO DEGRADATION FP 8 BLEND3 0.74
22-07-29 10:02:53 A/L RATIO DEGRADATION FP 7 BLEND3 0.66
FAILURE ALARMS
DATE TIME DESCRIPTION READING VALUE
22-07-08 10:01:30 A/L RATIO GROSS BLOCKAGE FP 8 BLEND3 BLKD
22-07-08 10:01:30 A/L RATIO GROSS BLOCKAGE FP 7 BLEND3 BLKD
21-04-14 10:02:04 A/L RATIO GROSS BLOCKAGE FP 5 BLEND3 BLKD
20-10-19 10:02:47 A/L RATIO GROSS BLOCKAGE FP 6 BLEND3 BLKD
20-10-19 10:02:47 A/L RATIO GROSS BLOCKAGE FP 5 BLEND3 BLKD
19-03-20 10:01:25 VAPOR CONTAINMENT LEAKAGE GROSS FAIL
19-02-07 10:02:18 A/L RATIO GROSS BLOCKAGE FP 2 BLEND3 BLKD
19-02-07 10:02:18 A/L RATIO GROSS BLOCKAGE FP 1 BLEND3 BLKD
18-07-09 10:02:32 A/L RATIO GROSS BLOCKAGE FP 2 BLEND3 BLKD
18-07-09 10:02:32 A/L RATIO GROSS BLOCKAGE FP 1 BLEND3 BLKD
SHUTDOWN & MISCELLANEOUS EVENTS
DATE TIME DESCRIPTION ACTION/NAME
22-08-11 10:02:20 READINESS ISD:PP EVR:PP ISD & EVR READY
22-08-11 09:40:47 READINESS ISD:PP EVR:NN EVR READINESS PENDING
22-08-11 09:40:47 ISD STARTUP
22-08-11 09:40:27 ISD SHUTDOWN
22-08-04 10:03:23 READINESS ISD:PP EVR:PP ISD & EVR READY
22-08-03 10:02:33 READINESS ISD:PP EVR:NP EVR READINESS PENDING
22-08-03 09:52:11 READINESS ISD:PP EVR:NN EVR READINESS PENDING
22-08-03 09:52:11 ISD STARTUP
22-08-03 09:51:57 ISD SHUTDOWN
22-08-03 09:26:01 COLLECTION TEST HH08 GRADE TEST MANUALLY CLEARED