Loading...
HomeMy WebLinkAboutSB989 2022 resultsTransmittal Date:11/15/2022 To:Kris Karns 1500 Truxtun Ave 1st Floor Bakersfield, CA 93301 Send Via:Email Re:Circle K Store #2708605 5600 AUBURN ST BAKERSFIELD, CA 93306 The following test report(s) are included: - SCT-3 yr Please do not hesitate to call me at (949) 460-5200 if you have any questions or concerns regarding this work. Project Coordinator Zac Kavanaugh 10023802 10/25/2022 Circle K Store #2708605 5600 AUBURN ST BAKERSFIELD 93306 Belshire Environmental (949) 460-5200 25971 Towne Centre Drive, Foothill Ranch, CA 92610 Moises Burciaga 808313 9940317 02/20/2023 See Attached 10/25/2022 PEI - RP1200/Manufacturer PEI - RP1200/Manufacturer Tanks Piping PEI - RP1200 Containment Sumps 87 - T1 89 - T2 91 - T3 Vacuum Pump & Gauges Owens Corning Owens Corning Owens Corning 10000 10000 10000 09:00am 09:00am 09:00am -10 -10 -10 10:00am 10:00am 10:00am -10 -10 -10 0 0 0 No Loss in Vacuum No Loss in Vacuum No Loss in Vacuum 91 - Product 87 Main - Product 89 - Product AO Smith AO Smith AO Smith 09:15am 09:15am 09:15am 5 5 5 10:15am 10:15am 10:15am 5 5 5 0 0 0 No Pressure Change No Pressure Change No Pressure Change Pass Pass Pass Pass Pass Pass Pressurized Nitrogen & Gauges 91 Aux - Turbine 89 - Turbine 87 Main - Turbine 1/2 - UDC Total Containment Total Containment Total Containment OPW 45"45"45"30" 22"22"22"16" 09:25am 09:25am 09:25am 10:35am 3.9505 5.9132 6.3546 5.2514 09:40am 09:40am 09:40am 10:50am 3.9493 5.9120 6.3551 5.2511 -0.0012 -0.0012 0.0005 -0.0003 0.002 0.002 0.002 0.002 3/4 - UDC OPW 10" 16" 10:35am 5.1819 10:50am 5.1833 0.0014 0.002 Incon Sump Test System Pass Pass Pass Pass Pass Component Comment A B C D E F G H I J K L M 1 2 3 4 5 6 7 8 9 10 11 12 13 **NOTE: ALL PIPING LOCATIONS ARE ESTIMATED & SCALING IS APPROXIMATE** BUSINESS NAME:Circle K #2708605 SITE ADDRESS: 5600 Auburn Street MAP DATE:2/15/17 CITY:Bakersfield ZIP:93306 AGENCY FACILITY #:SURVEY BY:DRAWN BY:ZK NLEGEND E S L HCAS FIRE EXTINGUISHER MC BRFL CL MSDS W MW MO EM CASHIER FIRE HYDRANT DISPENSER SHUTOFF GAS PUMPEMERGENCY SHUT OFF WATER EMERGENCY EXIT BATH ROOM MOTOR OIL FLAMMABLE LIQUID MSDS &EMERGENCY PLAN FIRST AIDTANK MONITOR EVACUATIONAREA MONITORINGWELL MOTOR COOLANT COMBUSTIBLELIQUID ELECTRICAL PANEL A ABSORBENT FENCE TRASH BIN TELEPHONE PPE CO2 CYLINDER SOLID WASTE DRUM LIQUID WASTE DRUM STORM DRAINOVERFILL ALARM CO 2 VENT RISERS SENSOR DISPENSERUST TRANSFORMER VENT RISERS withVENT SUMP/VENT BOX CLEAN AIRSEPARATOR SEWER/FLOOR DRAINTB VST or NATURAL GAS SHUTOFFGNNITROGEN Auburn St Fairfax RdStore 1/2 3/4 89 87 DrivewayDriveway 91 Last First Training Date Expiration Burciaga Moises Bravo Systems 02/12/2021 02/12/2024 Burciaga Moises CNI Manufacturing - EVR System Installation 09/15/2022 09/15/2024 Burciaga Moises Containment Solutions Tank and DW Sump Installation 02/12/2021 02/12/2023 Burciaga Moises Emco Wheaton Phase I and Phase II EVR 10/12/2021 10/12/2023 Burciaga Moises Franklin DC400 Dispensing Cutoff (formerly Beaudre 07/25/2022 07/25/2024 Burciaga Moises Franklin Flexible Connectors (Formerly Flex-ing)07/25/2022 07/25/2024 Burciaga Moises Franklin Fueling Defender Spill Buckets 06/28/2021 06/28/2023 Burciaga Moises Franklin Fueling Overfill Prevention 06/28/2021 06/28/2023 Burciaga Moises Franklin Fueling Phase I - VR-101 (Formerly Phil Tite) 12/03/2021 12/03/2023 Burciaga Moises Franklin Submersible Pumps/Forecourt Specialist 06/30/2021 06/30/2023 Burciaga Moises Franklin XP Series Piping (fomerly APT)07/25/2022 07/25/2024 Burciaga Moises Healy Systems, Inc. Stage II Vapor Recovery 06/27/2022 06/27/2024 Burciaga Moises Hose Master Installer Training 02/12/2021 02/12/2023 Burciaga Moises ICC California UST Service Technician 02/20/2021 02/20/2023 Burciaga Moises Icon Containment Solutions Certified Installer 02/18/2021 02/18/2023 Burciaga Moises INCON Level 1 - FMS Installation (EVO)06/28/2022 06/28/2024 Burciaga Moises INCON Level 2 - FMS Programming 07/25/2022 07/25/2024 Burciaga Moises INCON Level 4 - Franklin Sump Test System 09/10/2021 09/10/2023 Burciaga Moises Jomar Valves & Fittings 03/25/2021 03/25/2024 Burciaga Moises Modern Welding Tank Installation 06/21/2022 06/21/2025 Burciaga Moises Morrison Brothers VR-402 (Phase I EVR for ASTs)08/30/2022 08/30/2023 Burciaga Moises NOV FiberGlass Systems Piping (Formerly AO Smith) 11/04/2022 11/04/2025 Burciaga Moises OPW EVR Phase I - AST 05/04/2021 05/04/2023 Burciaga Moises OPW EVR Phase I - UST 05/04/2021 05/04/2023 Burciaga Moises OPW Fueling Containment Systems - FlexWorks 12/01/2021 12/01/2023 Burciaga Moises PEI RP1200 Testing/Verification of UST Equipment 06/30/2021 Burciaga Moises Red Jacket MLLD Training Course 08/04/2022 08/04/2024 Burciaga Moises Red Jacket Product 08/05/2022 08/05/2024 Burciaga Moises Ronan Authorized Service Contractor 07/29/2022 07/29/2024 Burciaga Moises Vaporless LDT-890 Leak Detector Tester 09/02/2022 09/02/2024 Burciaga Moises Vaporless Mechanical LLD Installer 09/02/2022 09/02/2024 Burciaga Moises Veeder Root Level 2/3/4 11/11/2021 11/11/2023 Burciaga Moises Veeder Root Level I 11/09/2021 Burciaga Moises VST - Hanging Hardware Installation 06/28/2022 06/28/2024 Burciaga Moises Western Fiberglass Cuff Boot Training 08/10/2022 08/10/2024 Burciaga Moises Xerxes UST Installation Training Seminar 06/30/2021 06/30/2024 Training Certificates