Loading...
HomeMy WebLinkAbout12.5-183 As-BuiltsVarVar SW FL 29'-40' Var FL SW 3'-24' FLATTER 4:1 OR R/WVar 6'8' 1 B CURB Exist 8 8 HP 3' CITY CURB TYPE "B" 5 OG R/W EP Exist "OAK-1" LINE 1' (2%-4.6%) Var 2%-4.6% Var (2%-4.6%) Var (TYPE CL-6) CHAIN LINK FENCE 3:1 OR FLATTER OG 33.7'-38.3' 48.5'-85.9' 72' SAWCUT AND CONFORM SEE GRADING PLANS 14' ACCESS ROAD 2%1.5%1.5% "OAK-2" LINE CURB Exist OGOG R/W SW 6'24'15' Var & JOIN SAWCUT Var 3'-12' 8' SW FL FL 8 1 TYPE "B" CITY CURB 1' LIP Exist B 5 Ret CURB Var 20.8'-21.2' 1.5% TYPICAL CROSS SECTIONS NO SCALEOAK STREET X-2 Sta "OAK-2" 11+13.80 TO 12+87 Sta "OAK-1" 259+50 TO 262+61.87 3 Sta "OAK-1" 259+50 TO 262+61.87 Sta "OAK-1" 257+80 TO 262+61.67 REVISION DATE DESCRIPTION 1 10/28/19 REVISED OAK ST DESIGN 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FL TYPE" "M" CITY CURB LINE "WBL" 6' ETW ETW 8 TYPE "B" CITY CURB 2%2% 2 2B 6' FLATTER 3:1 OR MBGR Exist ES HP 5'5' SW FL FL 2.7' 0.7'- 10.5' LINE "EBL" 38.5' 3'-5' Med Var Var C OG 10 TYPE" "M" CITY CURB CB (TYPE 60S AND 60SC) Var 10.9' 2.3'- 48' 1 1.5% 2' 60MS FL 5' LINE "EB2" LINE "WB2" ETW ETW ES ETW ETW 8 TYPE "B" CITY CURB 7 2%2% 2 1B 6' OG FLATTER 3:1 OR2% EP EP ES LINE "KR1" 4'4'2' 5%5% 6 (SEE STRUCTURES PLANS) RW No. 314 6'-16' Var6'4' SW Pkwy 2.1' 42' 2.4'-12' Var 1' 49' OG Var Med 10.8' 2.7'- 10 TYPE" "M" CITY CURB TYPE" "M" CITY CURB C 18' 2 1.5% 6 6' ETW ES CB (TYPE 60MS) HP EP 2'4' LINE "KR1" EP HP 2'4' OG FLATTER 3:1 OR2%5% 2' 5% 6:1 FLATTER 2.5:1 OR X-3 TYPICAL CROSS SECTIONS NO SCALE 24TH STREET WESTBOUND EASTBOUND Sta "WBL" 312+81.68 TO 313+69.36 WESTBOUND EASTBOUND Sta "WBL" 313+69.36 TO "WB2" 316+88.21 Sta "EBL" 312+52.47 TO 313+52.77 Sta "EBL" 313+52.77 TO "EB2" Sta 316+87.26 4 1 1 1 REVISION DATE DESCRIPTION 1 06/27/19 REMOVED RW No. 314 2 08/16/19 2 ADDED SWALE AT TOE OF SLOPE CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "EB2" LINE"WB2" LINE FL 48' ETW Var ETWETW 24'48' ETWFL 6' 2%2% B 2 8 8 1 TYPE "B" CITY CURB TYPE "M" CITY CURB TYPE"B" CITY CURB ES R/W Pkwy 0-12' Var No. 1 SOUND WALL FL Lt Rt FL Lt FL FL Rt Var SW 6'-10' Var -4' 1.4' Var SW 6'-10' Med 5.1'-13.1' Var 1'-4.3' Var Pkwy 0'-4' Var 6'-18' R/W (TYPE CL-6) CHAIN LINK FENCE 10 10 TYPE "M" CITY CURB 14' ACCESS ROAD 2% SEE GRADING PLANS 1.5%1.5% "EB2" LINE"WB2" LINE VarVar36' ETWFL 6' 2% B 1 0-24' CITY CURB TYPE "B" ETW ES Var 0-1' Med 2'-28.5' TYPE A1-6 CURB TYPE "B" CITY CURB FLFL Pkwy ROAD FRONTAGE 20'8' SW 2% 1 CITY CURB TYPE "B" 8 6' FLETW Var 40'-48' ETWES 6' SW R/W OGOG 2% 8 FL Lt Rt FL Lt FL FL Rt 74.7'-96' Var 6 10 10 TYPE "M" CITY CURBTYPE "M" CITY CURB Var 1'-12' Pkwy 0'-4' Var SOUND WALL No. 3 SOUND WALL No. 2 1.5% 1.5% X-4 TYPICAL CROSS SECTIONS NO SCALE 24TH STREET EASTBOUNDWESTBOUND Sta "WB2" 325+65.73 TO 327+98.71 EASTBOUNDWESTBOUND Sta "WB2" 318+23.77 TO 325+65.73 Sta "EB2" 319+02.19 TO 322+34.20 Sta "EB2" 322+34.20 TO 329+77.68 5 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "EB2" LINE"WB2" LINE 6' FL Var ETW 36' ETWFL 6' 2%2% B 1 2 CITY CURB TYPE "B" 36'-40' 8 ESES Var 1'1' ETW ETW Med 15'-28.5' TYPE "B" CITY CURB R/W 6' SW Min 0.3%OG FL Lt Rt FL Lt FL FL Rt HP 3'6' SW FLATTER 4:1 OR8 (BY OTHERS) SOUND WALL Var Pkwy 3'-8' TYPE "M" CITY CURB TYPE "M" CITY CURB 10 10 Var Pkwy 1.5'-76.6' Pkwy 4'-10' Var Var 0'-4' R/W 1.5%1.5% ETW ETW ES 1' 6'36' 2%2% "B" LINE 1' ES 36'6'10' 70.50' R/W Var OG FL 21 D 8 8 CITY CURB TYPE "B" CITY CURB TYPE "B" R/W ETW ETW FL 61.8'-82' OG Pkwy SW 4'6' 10:1 OR FLATTER 6' SW 2%-10% Var FL Lt Rt FL Lt FL FL Rt Var Pkwy 0'-12' (BY OTHERS) SOUND WALL 15' Med Var Pkwy 1.3'-13.4' 10 TYPE "M" CITY CURB TYPE "M" CITY CURB10 1.5%1.5% X-5 TYPICAL CROSS SECTIONS NO SCALE 24TH STREET WESTBOUND Sta "WB2" 327+98.71 TO 331+82.56 EASTBOUND Sta "EB2" 329+77.68 TO 331+97.87 Sta "B" 331+71.96 TO 346+69.47 6 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "24TH" LINE Var ETW 24' ETW FL 6' FLLIMIT GRADING Var OG 8 TYPE "B" CITY CURB 2% B2 Var 1'-4' TYPE "M" CITY CURB 16.4'-22'Med FLATTER 10:1 OR 10'6' SW Var Pkwy 0-6' FL Lt FL Rt 1.5% ETWFL 23' ETW FL 4' R/W R/W OG Var Var B "24TH" LINE 14.1'-14.3' 1.5%-3.3% Var 14.1'-14.3' 1%-2% Var 2 2'2' CITY CURB TYPE "B" TYPE "B" CITY CURB Var 23'-25' 3'-4' Var X-6 TYPICAL CROSS SECTIONS NO SCALE 24TH STREET "24TH" Sta 352+06.69 TO 380+87.15 "24TH" Sta 349+19.98 TO 352+06.69 7 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "24TH" LINE 23' ETWFL ETW FL Var10'4.5' SW 8 TYPE "B" CITY CURB OG 2 D 25.8'-35' 2%2% FLATTER 10:1 OR CITY CURB TYPE "B" 6' 2'2' SW 8 4'-34.7' Var 1.5%1.5% "24TH" LINE 23' ETWFL ETW FL 35'Var 88 TYPE "B" CITY CURB 2 D TYPE "B" CITY CURB FLATTER 4:1 OR 2%2% FLATTER 10:1 OR 4' 6' Ret CURB 2'2' SW 8.8'-10'SW 4.5'-11.3' Var 1.5%1.5% X-7 TYPICAL CROSS SECTIONS NO SCALE 24TH STREET "24TH" Sta 384+38.07 TO 387+39.53 "24TH" Sta 380+79.17 TO 383+63.38 8 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "23RD" LINE 12'Var 6' 24'-46' ETWETWFL FL OG 8 TYPE "B" CITY CURB 1 TYPE "M" CITY CURB 2% Var Var 0-1' Med 5'6' Pkwy SW Lt FL FL Rt R/W Var 0'-6' SOUND WALL No. 4 1.5% "23RD" LINE 12'Var 6' 24'-46' ETWETWFL FL OG 8 TYPE "B" CITY CURB 2 TYPE "M" CITY CURB 2% Var Var 0-1' Med 5'6' Pkwy SW Lt FL FL Rt R/W Var 0'-6' SOUND WALL No. 4 1.5% "23RD" LINE 12'Var 6' 24'-46' ETWETWFL FL OG 8 TYPE "B" CITY CURB 1 TYPE "M" CITY CURB 2% Var Var 0-1' Med 5'6' Pkwy SW Lt FL FL Rt R/W Var 0'-6' SOUND WALL No. 4 1.5% X-8 TYPICAL CROSS SECTIONS NO SCALE 23RD STREET "23RD" Sta 344+98.43 TO 345+15 "23RD" Sta 345+15 TO 347+77.15 "23RD" Sta 347+77.15 TO 348+87.26 9 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "23RD" LINE 24'4'6' ETW ETW FLFL 8 OG D 2 TYPE "B" CITY CURB TYPE "B" CITY CURB 24' 0-2% Var 2% Var R/W R/W SW/Pkwy 7'-13.3' 6' SW 1'-4' Var 10:1 OR FLATTER Var Pkwy 9.9' 4.5'- Lt FL FL Rt 1.5% "23RD" LINE 24'6'4' SW 6'Var ETWFL 8 8 OG 0-2% Var D 1 FLATTER 10:1 OR 2% ETW FL (TYPE A1-6) CURB 6' SW R/W CITY CURB TYPE "B" Pkwy Var 2.9'-9.9' Lt FL FL Rt 12'-24' SOUND WALL No. 8 SOUND WALL No. 5 1.5% 1.5% "23RD" LINE 24'4'6' ETW ETW FLFL 8 OG D 2 TYPE "B" CITY CURB TYPE "B" CITY CURB 24' 0-2% Var 2% Var R/W R/W SW/Pkwy 7'-13.3' 6' SW 1'-4' Var 10:1 OR FLATTER Var Pkwy 9.9' 4.5'- Lt FL FL Rt 1.5% X-9 TYPICAL CROSS SECTIONS NO SCALE 23RD STREET "23RD" Sta 352+99.60 TO 384+98.84 "23RD" Sta 348+87.26 TO 352+00 "23RD" Sta 352+00 TO 352+99.60 10 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "E178" LINE A 12' ETW Var ETW 24' ES Var 4 1.5-2% Var Var BREAK GRADE 3 (Var)OG & JOIN SAWCUT 10' R/W R/W Exist FL 2' Var 14'-18.3'9'-12' Exist CURBExist CURB 13.5'-25.7' "E178" LINE 12' ETW 24' ES 12' ETW Var GORE 0-23' ETW Exist FL Var 1-2% Var 1.8-7% Var A 3 5 4 4 5% FLATTER 2:1 OR (Var) Rd FRONTAGE 23rd St OG & JOIN SAWCUT & JOIN SAWCUT (TYPE E) HMA DIKE 20.7'-21.3' Var 13.7'-22' R/W Exist CURB Var 9'-10' SAWCUT AND CONFORM x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 X-10 TYPICAL CROSS SECTIONS NO SCALE ROUTE 178 "E178" Sta 394+92.77 TO 397+20 "E178" Sta 397+20 TO 398+76.81 11 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 ETW ES 12' "E178" LINE 4 & JOIN SAWCUT OG 2% FLATTER 2:1 OR HP 5% (TYPE E) HMA DIKE R/W Var 80'-93' Var 8'-10' 3' 5% ES ETW ETW ES 10'12' HP "E178" LINE FLATTER 2:1 OR 44 A 3 OG 5-10' Var 12'24' (Var)5%5% HP Rd FRONTAGE 23rd St (TYPE E) HMA DIKE (TYPE E) HMA DIKE Var R/WFL Exist FL TYPE B1-6 CURB 4 1' 1%-2% Var 5 (TYPE CL-6) CHAIN LINE FENCE 2: 1 OR FLATTER4' 23.6' -34' Var 6.3'-32.2' 3' 5% CONFORM SAWCUT AND 3' HP 5% X-11 TYPICAL CROSS SECTIONS NO SCALEROUTE 178 "E178" Sta 402+25 TO 403+43.17 "E178" Sta 398+76.81 TO 402+25 12 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 "W178" LINE ETW Var 24' & JOIN SAWCUT FL 1' ETW Exist (Var)5% TYPE B2-6 CURB 4 A OG 3Exist CURB R/W Var 7.7'-12.5' FL R/W 4' 41.9'-43.8' 0.8%-1% Var FLATTER 10:1 OR 10' ETW ETW ESESHP"W178" LINE 4 A 3 4 & JOIN SAWCUT & JOIN SAWCUT 24' 1' ETW Exist 1' ETW Exist (Var) 5% 2.5-5% Var 3.8-5% Var FLATTER 2:1 OR FLATTER 2:1 OR OG (TYPE E) HMA DIKE SE R/W Var CP 18' MinVar 11'-32' Rd FRONTAGE 24th St 4 Exist CURB Exist CURB (Var) 4.2'-10' Var 9.5'-10' Var 20.5'-24' Var 31.4'-32.6' 0'-21.6' Var 5% HP 3'3' 5% SE 3' MGS ES FLATTER 2:1 OR OG 5% HP 4:1 "W178" LINE Var 10' ES 24' 1' ETW Exist ETW 24' 1' ETW Exist & JOIN SAWCUT FLATTER 2:1 OR 0-5% Var 0-2.5% Var ETW 19.8'-46.8' BREAK GRADE 3-5% Var (Var) OG A 434 Rd FRONTAGE 24th St SE R/W Var 7.8'-9.5' Exist CURB FL SAWCUT AND CONFORM 5% 3' HP 4:1 X-12 TYPICAL CROSS SECTIONS NO SCALEROUTE 178 "W178" Sta 395+67.15 TO 397+50 "W178" Sta 397+50 TO 399+15.96 "W178" Sta 399+15.96 TO 403+75 13 "W178" Sta 400+00 TO 403+75 REVISION DATE DESCRIPTION REVISED ELEVATIONS05/05/201 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxca013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 ETWESHP "W178" LINE 4 & JOIN SAWCUT FLATTER 2:1 OR OG 3.6-5%Var 11.8'-20.5' Var (TYPE E) HMA DIKE R/W Var 100'-110' 1' ETW Exist 8.5'-9.5' Var3' 5% MGS DIKE Exist ES Exist 29.3'-29.6' Var X-13 TYPICAL CROSS SECTIONS NO SCALE ROUTE 178 "W178" Sta 403+75 TO 405+50 14 REVISION DATE DESCRIPTION 05/05/201 ADDED MGS 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>18:5915-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxda001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10K-1 KEY MAP AND LINE INDEX NO SCALEROUTE 178 EB ROUTE 178 24TH St 24TH St 23RD St LINE "WB2" LINE "EB2" LINE"OAK-1" LINE "B" LINE "24TH" LINE "23RD" LINE "E178" LINE "W178" ROUTE 178 WB OAK STLINE "OAK-2" LINE "C" 15 E-31 E-3 E-2 S-1 PD-1 U-1 D-1, D-9 G-1 EC-1 WPC-1 L-1, L-9 E-33 E-5 S-3 PD-3 U-3 D-3, D-11 G-3 EC-3 WPC-3 L-3, L-11 E-32 E-4 S-2 PD-2 U-2 D-2, D-10 G-2 EC-2 WPC-2 L-2, L-10 E-34 E-6 S-4 PD-4 U-4 D-4, D-12 G-4 EC-4 WPC-4 L-4, L-12 E-35 E-7 S-5 PD-5 U-5 D-5, D-13 G-5 EC-5 WPC-5 L-5, L-13 E-8 S-6, S-9 PD-6 U-6 D-6, D-14 G-6 EC-6 WPC-6 L-6, L-14 E-9 S-7 PD-7 U-7 D-7, D-15 G-7 EC-7 WPC-7 L-7, L-15 E-30 E-10 S-8 PD-8 U-8 D-8, D-16 G-8 EC-8 WPC-8 L-8, L-16 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 P DIRT ASPH ASPH ASPHASPHDIRTASPHASPHDIRTCONC CONC ASPH P ASPHASPHCONCASPHASPH P P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4517-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FFFF F FF8 9 1 2 3 3154891234315 310 LAYOUT L-1SEE SHEET L-2MATCH LINE "WB2" Sta 315+50R/W R/W "WBL" 313+69.36 PT= No.#R CURVE DATA T L 1 2 LINE "WB2" SCALE: 1" = 50' RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: 314+63.09 BC "EB2" 0.73' Rt "EBL" +62.10 Beg TAPER 4.73' Rt "EBL" +42.13 Beg BAY TAPER END TAPER END BAY TAPER 56.58' Rt "EBL" +99.71 END BAY TAPER Beg BAY TAPER END TAPER 55.70' Rt "EBL" +89.41 44.78' Lt "WBL" +81.68 3' Med 9.50' Lt "WB2" 313+69.36 6.20' Lt "EB2" 314+63.09 12.00' Lt "EB2" +32.24 44.50' Lt "WBL" +91.68 56.68' Rt "EBL" +52.47 "EBL" 314+63.09 PT= ~ ~ 57.59' Rt "EBL" +00 CONFORM TO RW No. 314 END CB (TYPE 60SC) 2. FOR DEMOLITION PLAN, SEE SHEET L-9. R/W R/W SEE STRUCTURE PLANS (Br. No. 50-0064 R/L) KERN RIVER BRIDGE (SEE CONSTRUCTION DETAIL PLANS) KERN RIVER PARKWAY TRAIL CONNECTION (SEE STRUCTURE PLANS) RW No. 314 SAWCUT AND CONFORM SAWCUT AND CONFORM Beg TAPER Beg CITY CURB TYPE "B" END TAPER 10.50' Rt "WBL" +95.64 Beg CITY CURB TYPE "M" 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND AND INTERSECTION DETAILS, SEE CONSTRUCTION DETAIL PLANS. 66.52' Rt "EBL" +52.77 CONFORM TO Exist Beg Trans CB Beg CB (TYPE 60S) Beg CB (TYPE 60SC) END CB (TYPE 60S) 70.58' Rt "EBL" +87.79 "EB2" LINEBeg TAPER DETAIL PLANS) (SEE CONSTRUCTION TRAIL CONNECTION KERN RIVER PARKWAY BC 313+69.36 "WB2" LEGEND: MINOR CONCRETE (TEXTURED PAVING) ~ ~ ~ AFES (TYPE 12B) ~ 16 42'1 2 REVISION DATE DESCRIPTION 1 05/21/19 ADDED DRIVEWAY 2 06/19/19 REMOVED RW No.314 SEE NOTE 4 2 4. FOR ELECTROLIER DETAILS SEE SHEET C-94a. 60MS) 2 "EBL" +09 SCUPPER Mod Beg CB (TYPE 60MS) 3 11/04/19 3 CONCRETE BARRIER SCUPPER Mod UTILIZED EXISTING 4 10/01/21 AS-BUILT 4 C-94a FOR DETAILS. ROADWAY. SEE SHEET BARRIER. EXTEND 1' INTO BEGIN 0.6' SLAB UNDER 4 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 5. RELOCATE 27 EXISTING BOLLARDS, INCLUDING CHAIN LINK CABLE. 4 SEE NOTE 5 4 24TH St "WBL" LINE "EBL" LINE Kern River1 1050.00'543.94' 2 500.55'966.24' 2 2 54'1,630.00' 1,500.00'66'1 6 6 10 7 P P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCASPH P P P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STP ASPH P PP P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FFCF260 2651234FFFF CCFC 3206789 1 2 3206789 1 21012347 89LAYOUT L-2SEE SHEET L-3MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR / W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET L-16' SW "OAK-2" 14+75.90 EC "OAK-2" 12+54.41 BC 3 1 2 "EB2" 317+86.35= No.#R CURVE DATA T L "WB2" 317+74.47=254.41'SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-10. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: END TAPER 37.09' Rt "OAK-2" +67.78 "WB2" +32.73 94.05' Lt 32.13' Lt "OAK-1" +61.87 6' SW "OAK-1" +91.87 64.00' Lt Beg BAY TAPER 1 54'54'52'R=5.40' Beg TAPER "OAK-1" 256+28.79 PT "OAK-2" 10+00.00 PT 64'24'64' "OAK-1" 265+00 PT 33.89' Rt "OAK-1" +43 33.90' Rt "OAK-1" +93 R=2.55' TYPE "M" CITY CURB TYPE "M" CITY CURB 8' SW 2 5 8' SW R/W 8' SW 5 R/W R/WR/WR/WR/WR/WR/W 24.00' Rt "OAK-2" +64.72 23.83' Rt "OAK-2" +87 24.00' Rt "OAK-2 +82.09 ANGLE Pt 38' 38.32' Rt "OAK-1" +50 38.00' Rt "OAK-1" +45 ANGLE Pt ~~ ~ (OPEN BUS BAY) FARSIDE TURNOUT DESIGN TCE 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT 34' "OAK-1" +04.80 40.00' Rt END CURB TAPER TURNOUT DESIGN MID BLOCK 107.88' Rt "OAK-1" +41 111.62' Rt "EB2" +19 "WB2" +70.75 102.80' Lt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" SAWCUT AND CONFORM 66'(SEE STRUCTURE PLANS) RW No. 314 CONSTRUCTION DETAIL PLANS) TRAIL CONNECTION (SEE KERN RIVER PARKWAY 66.00' Rt "EB2" +87.26 Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" WALL PLANS) SW No. 1 (SEE SOUND SAWCUT AND CONFORM6' SW 10' SW 6' SW 6' SW 6' SW 6' SW (TYPE CL-6) (W=24') CHAIN LINK GATE 64' Rt "EB2" +34.20 SAWCUT AND CONFORM SAWCUT AND CONFORM (TYPE CL-6) (W=24') CHAIN LINK GATE END BAY TAPER END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" 24' Lt "OAK-2" +00 SHOWN, SEE CONSTRUCTION DETAIL PLANS. ~ ~ 1 9 6 31.95' Lt "OAK-1" +24.61 ANGLE POINT 40' 14' ~10' ~~~12' 17 21'+14 42'(TYPE CL-6) Mod Beg CHAIN LINK FENCE 76.33' Rt "EB2" +14.64 ANGLE POINT ANGLE POINT ANGLE POINT ANGLE POINT 58.89' Lt "EB2" +69.05 1 REVISION DATE DESCRIPTION 1 06/03/19 REVISED BACK OF WALK 2 2 06/19/19 REMOVED RW No. 314 ~END CB (TYPE 60MS) 3 09/19/19 REVISED NE CORNER 3 23.75' Rt "OAK-2" +46.72 END TAPER Beg CITY CURB TYPE "B" 28.28' Rt "OAK-2" +00 ANGLE POINT 5 +80 11/04/194 REVISED OAK St Pvmt SECTION Beg UNDERDRAIN "EB2" +96.50 4 4 "EB2" +69 END CB (TYPE 60MS) SCUPPER Mod 4 10/01/215 AS-BUILT ~~~0.2' GRIND AND PAVE5 DUE TO UNSUITABLE ADDITIONAL 6" OF HMA UNDERDRAIN ELIMINATE SIDEWALK 5 5 TRANSITION TO TYPE "B" CURB SEE SHEET C-94a FOR DETAILS EXTEND 1' INTO ROADWAY END 0.6' SLAB UNDER BARRIER 5 5 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 4. RELOCATE 27 EXISTING BOLLARDS, INCLUDING CHAIN LINK CABLE. PER COB DETAIL D-12 W/ CONCRETE MOW STRIP (TYPE CL-6) Mod CHAIN LINK FENCE 5 SEE NOTE 4 5 7 5 "WB2" LINE "EB2" LINE "OAK-1" LINE24TH StOAK St"OAK-2" LINEOLIVE StOAK St1 2 543.94' 500.55'966.24' 1050.00' 3 221.49'111.20' 2 2 2 1 "OAK-1" LINE1,630.00' 1,500.00' 1,000.00' 6 11 11 1 6 10 10 7 7 7 PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P ASPHASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONCCONC ASPHASPHPOOLS POOLPOOL CONCASPHP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOOLASPHASP HMYRTLE STBEECH STCONC CONCCONCCONCCONCCONCASPHCONC ASPH POOLUB UB FC FF FF FF F FFFF F F F F F F 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LAYOUT SEE SHEET L-4MATCH LINE "B" Sta 336+50R/W R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET L-2No.#R CURVE DATA T L "EB2" 324+29.33 EC "EB2" 331+86.23 EC 5 4 1 2 "B" 331+71.96 PT 331+97.87 PT = "EB2" SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-11. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: L-3 ANGLE Pt ANGLE Pt 90.52' Lt "B" +16.22 Beg BAY TAPER "EB2" 329+16.39 BC Beg TAPER 43'54'54'42'24'325+75.41 BC "WB2" 175.03' Lt "WB2" +76.24 150.85' Lt "WB2" +46.42 Beg BAY TAPER 1.00' Lt "EB2" +93.18 END BAY TAPER Med OPENING END CITY "WB2" +48.11 1.00' Rt "WB2" 331+82.56 EC=43'15' Med TYPE "M" CITY CURB 176.09' Rt "EB2" +28.72 123.30' Rt "EB2" +90.58 "EB2" +86.23 40.00' Rt R/W TCE R/W TCE TCE TCE TCE "B" 331+71.96 PT 8.50' Rt 8.50' Lt "B" 331+71.96 PT 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT PLANS) (SEE STRUCTURE BOX CULVERT CARRIER CANAL 222.86' Rt "EB2" +88 "WB2" +08.68 100.20' Lt Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" TYPE "B" END CITY CURB SHOWN, SEE CONSTRUCTION DETAIL PLANS. SAWCUT AND CONFORM 1' Rt "WB2" +95.41 END BAY TAPER 12' Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" 52.00' Rt "EB2" +41.42 WALL PLANS) SW No. 2 (SEE SOUND 24' Rt "WB2" +75.41 (TYPE CL-6) 24' CHAIN LINK GATE (TYPE CL-6) 20' CHAIN LINK GATE CONFORM SAWCUT AND SAWCUT AND CONFORM SAWCUT AND CONFORM CONFORM SAWCUT AND "EB2" +59.36 46.76' Rt 2.00' Lt "EB2" +91.41 Beg CITY Med OPENING WALL PLANS) (SEE SOUND SW No. 3 EC BC END TAPER 16 SAWCUT AND CONFORM (BY OTHERS) SOUND WALL (BY OTHERS) SOUND WALL (BY OTHERS) SOUND WALL 106.33' Lt "B" +08.12 SAWCUT AND CONFORM SAWCUT AND CONFORM 120.32' Lt "B" +81.06 END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" CITY CURB TYPE "M" 95.37' Lt "WB2" +82.33 END CITY CURB TYPE "B" 130.21' Lt "WB2" +96.93 Beg CITY CURB TYPE "B" 2' Med TYPE "M" CITY CURB 20'42' 18 12' Lt "EB2" +83.18 64' Lt "WB2" +85.29 "WB2" 324+19.36 EC 60' Lt "WB2" +17.43 (TYPE CL-6) Mod END CHAIN LINK FENCE 6" Conc SLAB FG BOX CULVERT TOP OF Exist BOTH DIRECTIONS PLACE #5 @ 12" 1' HMA (TYPE A) NO SCALE DETAIL A REVISION DATE DESCRIPTION 07/23/191 ADDED Conc SLAB ABOVE BOX CULVERT 123'SEE DETAIL A Conc SLAB 11'-3"11'-3"CL Var 6"-8" 2 SACK SLURRY 2 10/01/21 AS-BUILT 2 BLOCK RAMP KIT FOX CMU SEE C-5 MINOR CONCRETE DRIVEWAY TO REMAIN CONCRETE (DRIVEWAY) ADDITIONAL MINOR 2 2 TYPE "M" END CITY CURB TYPE "M" Beg CITY CURB 2'25.25' 10' 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 13 12 EXTEND EXISTING WOODEN FENCE STRUCTURAL SECTION. SAWCUT BOTH END TO CONFORM HMA EXISTING CONCRETE SLAB TO REMAIN. 24TH StCarrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "EB2" LINE "WB2" LINE 1 2 4 5 543.94' 500.55' 1050.00' 966.24' 304.04'607.15' 135.13'269.84' 1 1 2 1,630.00' 1,500.00' 4,500.00' 2,000.00' 66 9 6 222.00'111.22'1,420.06'16 7 6 2 1 CITY CURB TYPE "B" 6 66 6 6 6 2 +65+88 PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL F F F F F F FF F F F F F FFF F FF 7 340 345 7 8 9 1 2 3 4 6 4 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LAYOUT L-4SEE SHEET L-5MATCH LINE "24TH" Sta 347+50R/W R/W R/W R/WMATCH LINE "B" Sta 336+50SEE SHEET L-3"24TH" 346+63.45 BC= 7 "23RD" LINE 6 343+61.06 BC "23RD" No.#R CURVE DATA T L "B" 346+69.47 PT 1,481.50' SCALE: 1" = 50' 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 2. FOR DEMOLITION PLAN, SEE SHEET L-12. NOTES: "23RD" 343+49.45 PT= Beg TAPER 18.00' Lt "24TH" +50 15' Med TYPE "M" CITY CURB43'43'86.46' Lt "B" +73.75 32.50' Lt "B" 346+69.47 "24TH" LINE 32.50' Rt "B" 346+69.47 11.62'25'18'3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT 117.39' Lt "B" +27.24 104.52' Lt "B" +62.89 114.07' Lt "B" +09.43 TCE TCE TCE TCE TCE SHOWN, SEE CONSTRUCTION DETAIL PLANS. END CITY CURB TYPE "B" (BY OTHERS) SOUND WALL Beg CITY CURB TYPE "B" (BY OTHERS) SOUND WALL END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" CONFORM SAWCUT AND (BY OTHERS) SOUND WALL END CITY CURB TYPE "B" 102.48' Lt "B" +20.40 (BY OTHERS) SOUND WALL Beg CITY CURB TYPE "B" 110.49' Lt "B" +55.98 SAWCUT AND CONFORM CONFORM SAWCUT AND CONFORM SAWCUT AND SAWCUT AND CONFORM TCE TCE 7.50' Rt "B" +17 7.50' Rt "B" +09 END CITY CURB TYPE "M" Beg CITY CURB TYPE "M" 7.50' Lt "B" +76 7.50' Lt "B" +68 Beg CITY CURB TYPE "M" Mod SAWCUT AND CONFORM 7.50' Rt "B" +76.50 Beg CITY CURB TYPE "M" END CITY CURB TYPE "M" Mod END CITY CURB TYPE "M" Mod SAWCUT AND CONFORM 7.50' Lt "B" +08.50 Beg CITY CURB TYPE "M" Mod END CITY CURB TYPE "M" Ret CURB Ret CURBCURB Ret 19 25'18'REVISION DATE DESCRIPTION 10/01/21 AS-BUILT 43'10'2'25.25' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 1 12 13 12 10'12 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St6 142.09' 7 212.60'408.64' 71.38' 1 2 600.00' 600.00' 6 6 6 6 6 "B" LINE P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONCPOOLCONCASPHASPH PPP PP P P P P P P P P P PP P P P P POOLPOOL CONC CONCCONCASPHASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPH ASPH A S P H ASPHASPH ASPHASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH CONC CONCASPH CONC ASPH ASPH CONCCONCC STASPHD STE ST23RD ST 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FF F F F 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8 LAYOUT L-5SEE SHEET L-6MATCH LINE "24TH" Sta 360+50SEE SHEET L-6MATCH LINE "23RD" Sta 358+50R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET L-4No.#R CURVE DATA T L "23RD" 352+98.39 EC 9 6' SW "23RD" 348+89.70 BC 347+69.70 EC "23RD" 7 8 350+68.06 EC "24TH" 2 6 2 "23RD" 353+46.64 PT "23RD" 356+93.22 PI SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-13. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: Beg TAPER 61.58' Lt "24TH" +85.73 62.69' Lt "24TH" +48.82 END TAPER END TAPER JOIN Exist Pvmt SAWCUT AND 68.07' Lt "24TH" +04.23 68.18' Lt "24TH" +49.14 "24TH" 352+31.40 PT "24TH" 355+78.04 PI "24TH" 359+24.64 PI "24TH" +97.61 43.23' Rt TYPE "B" END CITY CURB "24TH" +05.36 44.32' Rt TYPE "B" Beg CITY CURB "23RD" +20.29 44.15' Lt TYPE "B" END CITY CURB "23RD" +65.83 50.56' Lt "23RD" +18.46 57.13' Rt TYPE "B" Beg CITY CURB "23RD" +73.71 48.31' Lt "23RD" +73.67 43.81' Rt TYPE "B" Beg CITY CURB END CITY CURB TYPE "B" Beg BAY TAPER END BAY TAPER 85.13' Rt "23RD" +71.41 Beg CITY CURB TYPE "B" 123.99' Rt "23RD" +64.80 END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" 66.44' Rt "23RD" +76.77 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN "24TH" +68.06 28.00' Rt 349+25.54 BC "24TH" 18.00' Rt "23RD" +55.47 Beg CITY CURB TYPE "B" Beg CITY CURB TYPE "B" TYPE "B" Beg CITY CURB "24TH" +51.70 41.37' Rt TYPE "B" Beg CITY CURB TYPE "B" Beg CITY CURB 50.55' Rt "23RD" +19.63 TYPE "B" END CITY CURB ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT 12 0. 0 0' 120.00' R/W TCE R/W TCE TCE 118.38' Rt "23RD" +16.33 END CITY CURB TYPE "B" 115.88' Rt "23RD" +96.17 Beg CITY CURB TYPE "B" 28.00' Lt "24TH" +50 TYPE "M" CITY CURB 28.00' Lt "23RD" +78.15 Beg CURB (TYPE A1-6) ~ 28.00' Lt "23RD" +00 Beg CITY CURB TYPE "B" END CURB (TYPE A1-6) "23RD" +78.15 30.00' Lt TYPE "B" Beg CITY CURB (OPEN BUS BAY) FARSIDE TURNOUT DESIGN 94.50' Lt "24TH" +51.83 163.34' 62.71 Lt "24TH" +05.05 SHOWN, SEE CONSTRUCTION DETAIL PLANS. (BY OTHERS) SOUND WALL TCE END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" SAWCUT AND CONFORM END CITY CURB TYPE "B" CITY CURB TYPE "M" 47.06' Lt "24TH" +59.97 END CITY CURB TYPE "B" CONFORM SAWCUT AND SAWCUT AND CONFORM 62.11' Lt "24TH" +97.80 SOUND WALL PLANS) SW No. 4 (SEE TCE 25.00' Rt "24TH" +25.52 SAWCUT AND CONFORM SOUND WALL PLANS) SW No. 5 (SEE SAWCUT AND CONFORM SAWCUT AND CONFORM 59.40' Rt "24TH" +50.80 END CITY CURB TYPE "B" END CITY CURB TYPE "B" SAWCUT AND CONFORM CONFORM SAWCUT AND AND CONFORM SAWCUT CONFORM SAWCUT AND "23RD" +66.23 62.18 Rt CONFORM SAWCUT AND CONFORM SAWCUT AND 96.75' Rt "23RD" +58.34 END CITY CURB TYPE "B" 30.00' Rt "23RD" +75.47 TCE AND CONFORM SAWCUT 52.95' Lt "23RD" +19.38 SOUND WALL PLANS) SW No. 8 (SEE 48.11' Rt "23RD" +72.04 55.58' Rt "23RD" +51.60 TCE 36.42' "23RD" 34.87 BEG CITY CURB TYPE "B" END CITY CURB (TYPE A1-6) 58.80' Rt "23RD" +48.81 Beg CURB (TYPE A1-6) Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" 11 ~ "24TH" 348+05.54 EC END CITY CURB TYPE "B"20'~ 16' 22'28'18'20 9.5' REVISION DATE DESCRIPTION 10/01/21 AS-BUILT NATIVE MATERIAL NATIVE MATERIAL UNSUITABLE SECTION DUE TO ADDITIONAL 1' OF HMA CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 Beg H=8" H=8" END CITY CURB TYPE "B" H=8" Beg CITY CURB TYPE "B" 1 1 1 1 1 PURSUANT TO THE PLANS OVER NATIVE. GRADES 0.66' PCC W/ WIRE MESH EXISTING SIDEWALK GUTTER AND 120 SQFT OF 15 LF OF EXISTING CURB AND REMOVE AND REPLACE APPROX. 24TH St 23RD St "23 RD" LI NEBAY StB StC StD StE StC StDRAKE StENCINA St7 212.60'408.64' 6 71.38'142.09' 8 142.53' 9 212.63'408.69' 71.60'25'1 1 LINE "24TH"18'28'18'28'30'28'600.00' 600.00' 600.00' 600.00'25'6 6 2 2 2 6 6 R=1'+06+157 1 2 ASPHASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP P PP PPPP ASPH ASPH ASPHASPHCONC ASPH ASPH ASPHASPHASPH ASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH P P P P P P P P P P P P PPP PPP P FPP P P P P ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST 23RD ST 25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2 SEE SHEET L-7MATCH LINE "24TH" Sta 374+50SEE SHEET L-7MATCH LINE "23RD" Sta 372+50LAYOUT L-6 R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET L-5MATCH LINE "23RD" Sta 358+50SEE SHEET L-5363.34' 346.53' SCALE: 1" = 50' 52.00' Lt "24TH" +04.91 Beg CITY CURB TYPE "B" "24TH" 362+71.15 PI "24TH" +90.83 44.58' Lt TYPE "B" END CITY CURB "24TH" +37.34 47.11' Lt TYPE "B" END CITY CURB "24TH" 369+64.45 PI "24TH" +03.01 48.74' Rt TYPE "B" Beg CITY CURB "24TH" +90.50 41.92' Rt TYPE "B" END CITY CURB "24TH" +44.60 42.01' Rt TYPE "B" Beg CITY CURB "24TH" +37.62 44.86' Rt TYPE "B" END CITY CURB "24TH" +91.74 36.85' Rt TYPE "B" Beg CITY CURB "24TH" +40.96 52.07' Rt TYPE "B" Beg CITY CURB "24TH" +81.15 52.63' Rt TYPE "B" END CITY CURB "23RD" +71.46 61.04' Rt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB "23RD" +07.85 46.67' Rt "23RD" +49.71 51.97' Lt TYPE "B" END CITY CURB "23RD" 370+79.59 PI "23RD" +06.68 49.46' Rt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB "23RD" +52.36 48.88' Rt "23RD" +05.91 41.97' Lt TYPE "B" END CITY CURB "23RD" 367+33.04 PI "23RD" +60.14 62.38' Rt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB "23RD" +06.07 56.54' Rt "23RD" +59.26 57.38' Rt TYPE "B" END CITY CURB TYPE "B" Beg CITY CURB "23RD" +13.24 50.43' Lt "23RD" +59.08 46.91' Lt TYPE "B" END CITY CURB "24TH" +45.90 37.00' Lt "24TH" +91.70 46.97' Lt TYPE "B" Beg CITY CURB "24TH" +31.05 49.32' Lt 373+10.93 PI "24TH" "23RD" +07.73 56.19' Lt TYPE "B" END CITY CURB "23RD" +71.61 43.41' Lt TYPE "B" Beg CITY CURB "23RD" +60.14 43.23' Lt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB TYPE "B" Beg CITY CURB 2. FOR DEMOLITION PLAN, SEE SHEET L-14. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT TYPE "B" Beg CITY CURB "23RD" +09.44 51.94' Lt R/W TCE TCE TCE TCE TCE TCE R/W 363+86.34 PI "23RD" 366+17.73 PI "24TH" 360+39.75 PI "23RD" "24TH" +37.36 51.98' Lt TCE "24TH" +39.40 51.97' Rt TYPE "B" END CITY CURB SHOWN, SEE CONSTRUCTION DETAIL PLANS. TCE TCE TCE CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND JOIN CONFORM SAWCUT AND CONFORM SAWCUT AND CONFORM SAWCUT AND WALL PLANS) (SEE SOUND SW No. 6 "23RD" +13.73 42.42' Rt TYPE "B" Beg CITY CURB CONFORM SAWCUT AND CONFORM SAWCUT AND "24TH" +91.35 49.27' Lt 21REVISIONDATEDESCRIPTION 10/01/21 AS-BUILT1 SIDEWALK REPLACE REMOVE AND IN PARKWAY GRANITE DECOMPOSED 1 TYPE "B" H=8" Beg CITY CURB SIDEWALK MATCH EXISTING 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 H=8"TYPE "B" Beg CITY CURB H=8" END H=8" Beg H=8" H=8" 24TH St 23RD St "24TH" LINE "23RD" LINE G StH StF StF StG StH StEYE StEYE St2 2 2 2 2 PP A SPH ASPH ASPHASPH TRAILER CONC P P P P ASPHCONCASPH CONC FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPHASPH ASPH CONC CONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP P PP FP P FP ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STK STASPHCHESTER AV25TH ST SEE SHEET L-8"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION L-7 LAYOUT R/W R/W R/W R/W R/W R/W R/W MATCH LINE "24TH" Sta 374+50SEE SHEET L-6MATCH LINE "23RD" Sta 372+50SEE SHEET L-610 11 "W178" 395+67.15 2 363.34' 363.31' No.#R CURVE DATA T L 12 383+09.98 PRC "24TH" SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-15. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: "24TH" +28.75 39.56' Lt "24TH" +31.73 45.90' Rt TYPE "B" END CITY CURB "24TH" +16.87 40.88' Rt TYPE "B" Beg CITY CURB "23RD" +00.16 61.09' Lt "23RD" +85.44 54.08' Lt TYPE "B" Beg CITY CURB "23RD" +00.22 42.27' Rt TYPE "B" END CITY CURB "23RD" +85.47 47.31' Rt TYPE "B" Beg CITY CURB "24TH" +10.19 93.85' Lt "24TH" +64.16 94.02' Lt 39.5'"24TH" +97.50 87.22' Lt 53.44' Lt "W178" +82.30 57.87' Rt "W178" +10.85 65.63' Lt "E178" +20.42 "24TH" +28.80 64.97' Lt 380+73.61 BC "24TH" "24TH" +10.17 47.57' Rt TYPE "B" END CITY CURB "24TH" +64.57 56.12' Rt TYPE "B" Beg CITY CURB "24TH" +50.30 42.11' Rt TYPE "B" END CITY CURB TYPE "B" Beg CITY CURB TYPE "B" Beg CITY CURB "24TH" +09.79 43.47' Rt TYPE "B" END CITY CURB "23RD" +33.13 41.94' Lt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB "23RD" +78.75 52.25' Lt "23RD" +78.73 48.04' Rt TYPE "B" END CITY CURB 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN "24TH" +20.23 39.31' Lt Beg CURB (TYPE A2-6) "24TH" +84.77 58.40' Rt TYPE "B" END CITY CURB Beg CURB (TYPE B2-6) "23RD" 384+98.84 PT= 59.50' Lt "23RD" +71.74 END CITY CURB TYPE "B" 12.00' Lt "E178" 394+92.77 Beg CURB (TYPE A2-6)27'27' "24TH" 387+39.53 PCC= ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT END TAPER TYPE "B" Beg CITY CURB ANGLE Pt TYPE "B" Beg CITY CURB TYPE "B" END CITY CURB Beg CURB (TYPE A2-6) TYPE "B" END CITY CURB END CITY CURB TYPE "B" TCE TCE TCE TCE TCE TCE 48.48' Rt "24TH" +21.24 END CITY CURB TYPE "B" TCE TCE TCE TCE 6' SW TCE TCE 376+74.26 PI "24TH" 374+42.89 PI "23RD" "24TH" +76.12 39.50' Lt TCE R/W R/W TYPE "M" END CITY CURB END BAY TAPER END BAY TAPER "C" +07.39 6.50' Lt "C" +05.54 6.50' Lt "C" +23.38 4.5' Lt "C" +74.89 1.95' Lt TYPE "M" Beg CITY CURB TYPE "M" Beg CITY CURB R=1' "C" 10+00.00 CONFORM SAWCUT AND "C" 13+46.37 376+74.47 PT= "24TH" AND CONFORM SAWCUT SHOWN, SEE CONSTRUCTION DETAIL PLANS. CONFORM SAWCUT AND "C" +74.95 2.42' Lt 2' Med 4.5' CONFORM SAWCUT AND CONFORM SAWCUT AND "24TH" +63 39.50' Lt "24TH" +75.06 53.53' Lt TYPE "B" END CITY CURB "24TH" +68.10 27' Rt AND CONFORM SAWCUT CONFORM SAWCUT AND SAWCUT AND CONFORM "23RD" +24.68 206.53' Lt Beg CITY CURB TYPE "B" 40.94' Lt "23RD" +79.59 AND CONFORM SAWCUT AND CONFORM SAWCUT CONFORM SAWCUT AND 374+43.10 PT= "23RD" 2 64.03' Rt "23RD" +18.26 END CITY CURB TYPE "B" 43.99' Rt "23RD" +32.95 Beg CITY CURB TYPE "B" SAWCUT AND CONFORM "23RD" 381+52.24 PI 55.36' Rt "23RD" +79.47 Beg CITY CURB TYPE "B" "E178" 394+92.77 PTCONFORM SAWCUT AND SAWCUT AND CONFORM SAWCUT AND CONFORM 46.68' Rt "23RD" +71.65 34.08' Rt "E178" +20 2 2 2 "24TH" +78.15 27.20' Lt Beg TAPER CONCRETE IN KIND REPLACE STAMPED CONCRETE IN KIND REPLACE STAMPED 22 +22x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 77 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 REVISION DATE DESCRIPTION 1 05/22/19 REVISED WB LAYOUT 1 1 1 TO CONCRETE CROSSWALK ELIMINATE SECTION CONFORM 2 10/01/21 AS-BUILT EXISTING DRIVEWAY RECONSTRUCT HALF OF 2 2 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 H=8"TYPE "B" END CITY CURB SEE L-7r FOR DETAILS REMOVAL AND REPLACEMENT PERFORM ADDITIONAL SAWCUTTING TYPE "B" Beg CITY CURB H=8" TYPE "B" Beg CITY CURB H=8" 24TH St 23RD St L StK StK StL StM StM StCHESTER AveCHESTER Ave"24TH" LINE "23RD" LINE 10 119.14'236.37' 11 219.83'429.55' 12 28.97'57.91' 762.00' 820.00' 820.00' L IN E"W 178" "E178" LINE"C" LINE FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP P PP FP P FP ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STK STASPHCHESTER AV25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea007r.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 77 8395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 SEE SHEET L-8"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION LAYOUTMATCH LINE "24TH" Sta 374+50SEE SHEET L-6MATCH LINE "23RD" Sta 372+50SEE SHEET L-6SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-15. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT SHOWN, SEE CONSTRUCTION DETAIL PLANS. BC No.#R CURVE DATA T L 16 "24TH" +64.28 70.99' Lt EC "24TH" +36.79 40.33' Lt Beg TAPER "24TH" +03.98 37.93' Lt "24TH" +81.35 27.78' Lt "24TH" +63.71 41.09' Lt END TAPER "24TH" +76.32 59.29' Lt "24TH" +29.51 69.38' Lt "24TH" +38.30 41.84' Lt 17 EC 87.21' Lt "24TH" +97.38 58.37' Lt "W178" +81.20 Beg CURB (TYPE A2-6) EC "24TH" +02.66 20.75' Rt "24TH" +20.81 46.55' Rt TYPE "B" END CITY CURB"24TH" +71.82 21.45' Rt BC EC "24TH" +50.05 21.36' Rt "24TH" +27.65 19.67' Rt BC TYPE "B" Beg CITY CURB "24TH" +10.42 40.32' Rt 18 19 REVISED SHEET L-7 22r BC "24TH" +42.75 39.82' Lt EC 42.30' Lt "24TH" +77.24 "24TH" +90.94 39.97' Lt BC 20 r REVISION DATE DESCRIPTION 0 06/03/19 REVISED WB LAYOUT TYPE "B" Beg CITY CURB "24TH" +56.69 25.73' Rt "24TH" +50.30 42.11' Rt TYPE "B" END CITY CURB 1 10/01/21 AS-BUILT 24TH STREET NE CORNER K STREET AND REPLACE CURB RAMP AT AND SIDEWALK TO REMAIN EXISTING CURB GUTTER TYPE "B" H=8" Beg CITY CURB TYPE "B" H=8" END CITY CURB TYPE "B" H=8" Beg CITY CURB END CITY CURB TYPE "B" H=8" A2-8 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 L IN E"W 178" "E178" LINE 16 766.00'117.77'59.00' 17 765.00'109.69'54.94' 18 19 765.00'119.36'59.80' 765.00'127.49'63.89' 20 765.00'45.39'90.67'CHESTER AveK StL StM StM StL StK StCHESTER Ave23RD St 24TH St "23RD" LINE "24TH" LINE P P ASPHASPHASPHCONC CONCASPH ASPHASPHM STP ASPHA SPH ASPHASPH ASPHP PP P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LAYOUT L-8 R /W R/W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET L-714 15 13 227.02' "W178" 396+25.05 EC "W178" 398+52.08 BC "W178" 402+44.25 PCC "W178" 405+51.12 EC "E178" 405+80.45 PT "E178" 395+55.58 BC "E178" 398+84.10 EC No.#R CURVE DATA T L 12 SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-16. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: 35.97' Lt "W178" +15.96 Beg CURB (TYPE B2-6) Beg TAPER Beg TAPER Beg TAPER Beg TAPER 46.00' Lt "E178" +56 "E178" +53.10 47.70' Lt (TYPE A2-6) END CURB 41.98' Lt "W178" +03.91 END CURB (TYPE A2-6) END CURB (TYPE B2-6) 34.00' Rt "W178" +82.43 40.74' Lt "E178" +00 Beg HMA DIKE (TYPE E) 22.00' Rt "E178" +76.81 END HMA DIKE (TYPE E) 22.00' Rt "E178" +43.17 13.90' Rt "E178" +43.17 12.00' Rt "E178" +84.84 34.00' Lt "W178" +75.98 20.27' Lt "W178" +50 34.00' Lt "W178" +02.71 27.87' Rt "W178" +75 CONFORM TO Exist 4. M St INTERSECTION SHOWN FOR REFERENCE ONLY. SEE 34.00' Rt "W178" +51.27 END TAPER 29.00' Rt "W178" +99.21 END TAPER (TYPE E) END HMA DIKE L-7 FOR INTERSECTION DETAILS. 30.98' Rt "E178" +76.81 Beg CURB (TYPE B1-6) 42.49' Rt "E178" +76.60 ANGLE Pt 45.23' Rt "E178" +93.07 45.91' Lt "E178" +20 29.63' Rt "E178" +00 41.32' Rt "E178" +96.98 38.45' Rt "E178" +52.98 25.72' Rt "E178" +77 Beg CURB (TYPE A2-6) Beg HMA DIKE (TYPE E) END CURB (TYPE B2-6) END CURB (TYPE A2-6) "E178" +65 46.95' Lt (TYPE B2-6) Beg CURB "E178" +15 45.00' Lt ANGLE Pt 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT 15.28' Rt "E178" +53.38 END CURB (TYPE A2-6) SHOWN, SEE CONSTRUCTION DETAIL PLANS. END HMA DIKE (TYPE E) END TAPER SAWCUT AND CONFORM END TAPER CONFORM SAWCUT AND SAWCUT AND CONFORM (TYPE CL-6) END CHAIN LINK FENCE END CURB (TYPE B1-6) (TYPE CL-6) Beg CHAIN LINK FENCE SAWCUT AND CONFORM Beg HMA DIKE (TYPE E) END CURB (TYPE B2-6) CONFORM TO Exist "W178" +82 CONFORM SAWCUT AND + 2 5 23 43.34' Lt "W178" +85.05 11.83' Rt "W178" +99.40 F F FF F F C FC F 395 67 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 REVISION DATE DESCRIPTION 1 03/28/19 REVISED WB LAYOUT 1 2 10/01/21 AS-BUILT AND OVERLAY 0.2' GRIND AA2 ES 1'-0" 1'-4" 4:1 SECTION A-A 399+84. HMA DIKE EAST OF STA 399+84 CONCRETE DIKE BETWEEN STA 398+77 AND 4"R=1" R=1" LEVEL LINE VarLONGITUDINAL BAR ONE (1) #4 FL 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 WB ROUTE 178 EB ROUTE 178 "E178" LINEM StN StO StM StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd LINE "24TH" LINE "23RD" 4 4 14 201.81'392.17' 15 153.63'306.87'2,452.97' 12 28.97'57.91' 13 328.52'166.87' 4 3 4 3 10' 10' 10' 10' 3 6' 1 2'24'24'5' 4 820.00' 760.00' 674.00' 3 3 5"W 178" L IN E+50+20+00 P P ASPHASPHASPHCONC CONC CONCASPH ASPHASPH23RD ST M STP ASPHA SPH ASPHASPH ASPHP PP P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPH ASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 F F FF F F C FC F 395 67 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 LAYOUT L-8 R /W R/W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET L-714 15 227.02' "W178" 396+25.05 EC "W178" 398+52.08 BC "W178" 402+44.25 PCC "W178" 405+51.12 EC No.#R CURVE DATA T L 12 SCALE: 1" = 50' 2. FOR DEMOLITION PLAN, SEE SHEET L-16. RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTES: Beg TAPER 20.27' Lt "W178" +50 34.00' Lt "W178" +02.71 4. M St INTERSECTION SHOWN FOR REFERENCE ONLY. SEE L-7 FOR INTERSECTION DETAILS. 3. FOR DRIVEWAYS, CURB RETURNS, CURB RAMPS, MEDIAN ISLAND, SIDEWALK, AND INTERSECTION DETAILS NOT SHOWN, SEE CONSTRUCTION DETAIL PLANS. END HMA DIKE (TYPE E) END TAPER SAWCUT AND CONFORM CONFORM SAWCUT AND "W178" +99.40 11.83' Rt 41.73' Lt "W178" +85.44 41.85' Lt "W178" +23.57 END CURB (TYPE A2-6) "W178" +08.74 24.00' Rt Beg TAPER 25.90' Rt "W178" +82.74 END CURB (TYPE B2-6)25.89' Rt "W178" +63.53 BC END TAPER 16 37.27' Lt "W178" +13.59 Beg CURB (TYPE B2-6) 35.56' Lt "W178" +76.01 Beg HMA DIKE (TYPE E) END CURB (TYPE B2-6) "W178" +82 CONFORM TO Exist 51.96' Lt "W178" +80.93 END CURB (TYPE B2-6) EC 29.25' Rt "W178" +75 CONFORM TO Exist 29' Rt "W178" +40.47 REVISED SHEET r 23r REVISION DATE DESCRIPTION 0 4/11/19 REVISED WB LAYOUT 29.32' Rt "W178" +86 27.72' Rt "W178" +00 (TYPE SFT) END ANCHOR ASSEMBLY Beg MGS (TYPE 11A LAYOUT) 1 ADDED MGS Alt IN-LINE TERMINAL SYSTEM END MGS (TYPE 11A LAYOUT) VEGETATION Cntl 5/12/20 1 10/01/212 AS-BUILT 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 CONSTRUCT ROCK BLANKET WB ROUTE 178 EB ROUTE 178 "E178" LINEM StN StO StM StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd LINE "24TH" LINE "23RD" 4 14 201.81'392.17' 15 153.63'306.87'2,452.97' 12 28.97'57.91' 13 328.52'166.87' 4 3 4 820.00' 760.00' 674.00' 3 "W 178" L IN E+5048' 10'5' 16 683.00'201.88'392.59' P DIRT ASPH ASPH ASPHASPHDIRTASPHASPHDIRTCONC CONC ASPH P ASPHASPHASPHCONCASPHASPH P P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 8 9 1 2 3 3154891234315 310 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET L-10MATCH LINE "WB2" Sta 315+50R/W R/W L-9 LAYOUT DEMOLITION SCALE: 1" = 50' "WB2" LINE "WBL" +82 "EBL" +49 "EBL" +95 Rem BOLLARD (6 EA) Rem 265' Conc CURB Beg Rem AC DIKE Rem 306' AC DIKE Beg Rem Conc Pvmt Beg Rem Conc CURB Rem 13 CY Conc Pvmt SEE STRUCTURE PLANS (Br. No. 50-0064 R/L) KERN RIVER BRIDGE R/W R/W Beg Rem Conc CURB Beg Rem Conc Pvmt Conc CURB Rem 509' "EB2" LINE Rem 890 SF AC Conc Pvmt Conc SW Rem 22 CY 24 LEGEND: CONCRETE PAVEMENT ASPHALT CONCRETE PAVEMENT BEHIND Prop SW RELOCATE LIGHT BEHIND Prop SW RELOCATE TREES DESCRIPTION REVISED BACK OF WALK DATE 06/03/19 REVISION 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "WBL" LINE "EBL" LINE Kern River ASPH P P P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STPASPHCONC ASPH P PP P P P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3206789 1 2 3206789 1 21012347 892602651234FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: LAYOUT L-10SEE SHEET L-11MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR/WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET L-9DEMOLITION SCALE: 1" = 50' "EB2" +47 "OAK-2" +88 "OAK-2" +00 "EB2" +71"EB2" +31 "OAK-1" +43 Rem BOLLARD (15 EA) Rem 308' Conc CURB Rem BOLLARD (25 EA) Rem 588' Conc CURB Conc SW Rem 5 CY END Rem Conc SW END Rem Conc CURB Conc Dwy Rem 4 CY Conc SW Rem 11 CY Rem 365' Conc CURB Rem 810 SF AC Pvmt Rem 10 CY Conc Gtr Beg Rem Conc SW END Rem Conc CURB Conc SW Rem 7 CY Rem 88' Conc CURB Rem 242 SF AC Pvmt Rem 2 CY Conc Gtr Rem 22' Conc CURB Rem 320' Conc CURB Rem 11 CY Conc Pvmt Rem 200' AC DIKE Beg Rem Conc CURB END Rem AC DIKE Rem 850' Conc CURB Rem 298' Conc CURB Rem 3 CY Conc SW END Rem Conc CURB Rem 4 CY Conc SW Rem 29' Conc CURB Rem 21' AC DIKE Rem 145 SF AC Pvmt Conc CURB Rem 44' Rem 29 CY Conc SW Beg Rem Conc SW Beg Rem Conc CURB Beg Rem Conc SW Beg Rem Conc CURB Rem 15 CY Conc SW Rem 353 SF AC Pvmt AC Pvmt Rem 6,949 SF Rem 1,924 SF AC Pvmt Rem 5 CY Conc SW Rem 243 SF AC Pvmt Rem Ltg & Fdn "OAK-1" +43 FENCE REMOVAL Beg CHAIN LINK AC Pvmt Rem 1,686 SF 25 1,796 1761 1 1 REVISION DATE DESCRIPTION 1 06/03/19 REVISED BACK OF WALK BEHIND Prop SW RELOCATE TREES BEHIND Prop SW RELOCATE LIGHTS BEHIND Prop SW RELOCATE LIGHTS Prop SW TREES BEHIND RELOCATE (4) 2 10/01/21 AS-BUILT EXISTING TWO (2) PALMS CLEAR/GRUB AND REMOVE OF CONCRETE PADS REMOVE REMAINING PORTION 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 EXISTING CURB. REMOVE APPROX. 65 LF "EB2" LINE "OAK-1" LINE24TH StOAK St"OAK-2" LINEOAK St"WB 2 " L INE "OAK-1" LINEOLIVE StLINK FENCE Rem 361' CHAIN LINK FENCE Rem 242' CHAIN PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P ASPHASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONCCONC ASPHASPHPOOLS POOLPOOL CONCASPHP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLUB UB x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 LAYOUT L-11 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET L-10DEMOLITION SCALE: 1" = 50' R/W R/W "WB2" +09 "WB2" +76 "WB2" +46 "WB2" +97 "WB2" +82 "EB2" +91 "WB2" +11 "EB2" +25 "WB2" +35 "WB2" +79 "WB2" +34 "B" +79 "B" +71 "B" +26 "B" +08 "B" +81 "B" +16 Beg Rem Conc SW Beg Rem Conc CURB Rem 17' Conc CURB Rem 122' Conc CURB Rem 9 CY Conc Dwy Beg Rem Conc CURB Conc Dwy Rem 2 CY Conc Dwy Rem 4 CY Beg Rem Conc CURB Conc SW Rem 2 CY Rem 97' Conc CURB Conc SW Rem 1 CY Beg Rem Conc SW Beg Rem Conc CURB Rem 19' Conc CURB Rem 543' Conc CURB Rem 17 CY Conc SW Rem 24' Conc CURB BARRIER (TYPE K) Rem 60' Conc END Rem AC Pvmt END Rem Conc CURB Rem 10 CY Conc SW Rem 297' Conc CURB Rem 13 CY Conc SW Rem 21' Conc CURB Rem 188' Conc CURB Conc CURB Rem 21' Rem 119' AC DIKE Rem 173' Conc CURB Beg Rem AC DIKE END Rem Conc CURB BARRIER (TYPE K) Rem 60' Conc Rem 150' Conc CURB Rem 103' Conc CURB Rem 58' AC DIKE Conc Dwy Rem 2 CY AC Pvmt Rem 47 SF BARRIER (TYPE K) Rem 60' Conc END Rem AC Pvmt END Rem Conc CURB BARRIER (TYPE K) Rem 60' Conc END Rem AC Pvmt END Rem Conc CURB Conc SW Rem 8 CY Conc Gtr Rem 6 CY Conc Gtr Rem 2 CY Beg Rem Conc CURB Beg Rem Conc CURB Beg Rem Conc CURBSEE SHEET L-12MATCH LINE "B" Sta 336+50END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc CURB Rem 7 CY Conc SW Rem 7 CY Conc SW Rem 2 CY Conc Dwy Conc Dwy Rem 7 CY Rem 36 CY Conc Dwy END Rem Conc CURB Beg Rem Conc CURB Conc CURB Rem 260' Conc Dwy Rem 6 CY Rem 7 CY Conc SW Conc CURB Rem 176' Conc CURB Rem 151' Conc CURB Rem 148' Conc CURB Rem 176' Conc CURB Rem 161' Conc CURB Rem 207' Rem 9 CY Conc SW Conc CURB Rem 472' AC Pvmt Rem 223 SF Rem 76' Ret WALL Conc Gtr Rem 2 CY 94.20m Off=309.06' Sta=326+47.54 E=6252958.17 Lon=1192'8.1 N=2326255.03 Lat=3522'48.4 2 CY Conc Dwy Rem "EB2" +88 LINK FENCE Rem 86' CHAIN LINK FENCE Rem 257' CHAIN END Rem CHAIN LINK FENCE "EB2" +97 Beg Rem CHAIN LINK FENCE LINK FENCE Rem 164' CHAIN Rem 142' PROPERTY WALL PROPERTY WALL Rem 122' AC Pvmt Rem 2159 SF Conc CURB Rem 28' Rem CHANNELIZER (10 EA) Rem UNDERDRAIN (2 EA) Rem UNDERDRAIN (2 EA) CHANNELIZER 10 EA) Rem Rem 691 SF AC Pvmt 26 AC Pvmt Rem 580 SF 109 SF AC Pvmt Rem 483 SF REVISION DATE DESCRIPTION 06/12/201 REVISED REMOVAL LIMITS 1 1 1 ENGINEER AS DIRECTED BY THE SIDEWALK TO REMAIN 2 10/01/21 AS-BUILT 2 6 CY TO REMAIN EXISTING CONCRETE 2 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 2 24TH StCarrier Canal"EB2" LINE "WB2" LINE "B" LINEELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: LAYOUT L-12SEE SHEET L-13MATCH LINE "24TH" Sta 347+50R/W R/W R/WMATCH LINE "B" Sta 336+50SEE SHEET L-11LINE "24TH" DEMOLITION SCALE: 1" = 50' LINE "23RD" R/W "B" +18 "B" +72 "B" +64 "B" +20 "B" +10 "B" +66 "B" +27 "B" +63 "B" +74 "B" +56"B" +20"B" +09 Conc SW Rem 7 CY Conc DWY Rem 4 CY Conc Dwy Rem 2 CY Conc CURB Rem 16' Conc SW Rem 16 CY BARRIER (TYPE K) Rem 60' Conc Conc Gtr Rem 2 CY AC Pvmt Rem 50 SF Conc CURB Rem 16' Conc Gtr Rem 2 CY AC Pvmt Rem 54 SF Conc SW Rem 10 CY Conc SW Rem 9 CY Conc Gtr Rem 1 CY BARRIER (TYPE K) Rem 60' Conc Conc Gtr Rem 1 CY 90 SF AC Pvmt Rem Conc CURB Rem 38' Conc SW Rem 2 CY BARRIER (TYPE K) Rem 60' Conc Beg Rem Conc SW Beg Rem Conc CURB Beg Rem Conc CURB Beg Rem Conc CURB Conc CURB Beg Rem Conc CURB Beg Rem Conc DWY Rem 14 CY END Rem Conc CURB END Rem Conc CURB END Rem Conc CURB Conc Dwy Rem 16 CY Conc Dwy Rem 3 CY END Rem Conc CURB END Rem Conc CURB END Rem Conc CURB Beg Rem Conc CURB Conc CURB Rem 485' Conc CURB Rem 467' Conc CURB Rem 491' Conc CURB Rem 285' Conc CURB Rem 147' Conc CURB Rem 147' Conc CURB Rem 151' Conc CURB Rem 151' Conc CURB Rem 149' Conc Dwy Rem 1 CY Conc SW Rem 2 CY Conc CURB Rem 164' Conc CURB Rem 23' 1 CY Conc SW Rem Conc DWY Rem 5 CY 1 CY Conc SW Rem Conc DWY Rem 10 CY Conc DWY Rem 2 CY CHANNELIZER (10 EA) Rem CHANELLIER (10 EA) Rem Rem CHANNELIZER (11 EA) Rem UNDERDRAIN (2 EA) Rem UNDERDRAIN (2 EA) Rem UNDERDRAIN (2 EA) 27 REVISION DATE DESCRIPTION 06/12/201 REVISED REMOVAL LIMITS AC Pvmt Rem 521 SF AC Pvmt Rem 549 SF AC Pvmt Rem 635 SF Conc SW Rem 1 CY 439 1 1 1 1 1 2 2 2 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "B" LINEPINE StPINE StCEDAR StCEDAR StALDER StA St P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONCPOOLCONCASPHASPH CONC PPP P PP P P P P P P P P P PP P P P P POOLPOOL CONC CONCCONCPOOLPOOL ASPH ASPH ASPH ASPHASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPH ASPH A S P H ASPHASPH ASPHASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH CONC CONCASPH CONC ASPH ASPH CONCCONCC STDRAKE STASPHASPHASPHD STE ST23RD ST 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8 LAYOUT L-13 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET L-14MATCH LINE "24TH" Sta 360+50SEE SHEET L-14MATCH LINE "23RD" Sta 358+50R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET L-12DEMOLITION SCALE: 1" = 50' "23RD" +67 "23RD" +71 "23RD" +65 "23RD" +73 "23RD" +13 "23RD" +16 "23RD" +58 "23RD" +76 "23RD" +95 "24TH" +86 "24TH" +49 "23RD" +74 "23RD" +35 "23RD" +19 "23RD" +20 "23RD" +66 Beg Rem Conc SW Beg Rem Conc CURB Conc CURB Rem 164'Rem 28' Conc CURB Rem 27 CY Conc SW Conc CURB Rem 26' Rem 379' Conc CURB Conc CURB Rem 20' Rem 465' Conc CURB Rem 11 CY Conc SW Beg Rem Conc SW Beg Rem Conc CURB Rem 19' Conc CURB END Rem Conc SW Beg Rem Conc SW Beg Rem Conc SW Beg Rem Conc CURB Conc SW END Rem Conc CURB Rem 21' Conc SW Rem 32 CY Conc SW Rem 1 CY Rem 166' Conc CURB Rem 12 CY Conc SW END Rem Conc SW END Rem Conc CURB END Rem Conc SW Rem 321' Conc CURB Beg Rem Conc SW Beg Rem Conc CURB Rem 4 CY Conc Gtr "23RD" +20 "23RD" +74 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +19 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +66Rem 1 CY Conc Gtr Rem 282 SF AC Pvmt Conc CURB Rem 152' Conc SW Rem 3 CY AC Pvmt Rem 224 SF Conc CURB Rem 50' "23RD" +51 "23RD" +05 Beg Rem Conc SW Beg Rem Conc CURB Rem 17' Conc CURB Rem 2 CY Conc Gtr Rem 1 CY Conc Gtr "23RD" +98 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +52 "24TH" +04 "24TH" +49 Beg Rem Conc SW Beg Rem Conc CURB Rem 26' Conc CURB Rem 57' Conc CURB Rem 51' Conc CURB "23RD" +60 "24TH" +05 Beg Rem Conc SW Beg Rem Conc CURB "24TH" +52 Beg Rem Conc SW Beg Rem Conc CURB Rem 28' Conc CURB "24TH" +98 Rem 1 CY Conc Gtr Rem BOLLARD (5 EA) Conc SW Rem 4 CY Conc SW Rem 2 CY Conc Dwy Rem 21 CY Conc CURB Rem 65' Conc CURB Rem 17' Conc SW Rem 5 CY Conc SW Rem 3 CY Conc CURB Rem 52' Conc SW Rem 19 CY Conc SW Rem 5 CY END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Rem 35' Conc CURB Beg Rem Conc CURB END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Conc SW Rem 4 CY Conc SW Rem 4 CY Conc CURB Rem 204' Conc CURB Rem 133' Conc CURB Rem 1012' Conc CURB Rem 157' Rem 157' Conc CURB Conc CURB Rem 109' Conc CURB Rem 205' Rem 14' Conc CURB Conc CURB Rem 13' Conc CURB Rem 1064' Rem 30' Conc CURB Conc CURB Rem 57' Conc CURB Rem 45' Conc CURB Rem 163' Conc CURB Rem 181' Conc CURB Rem 19 Conc CURB Rem 14' Conc SW Rem 9 CY Rem 4 CY Conc SW CY Conc SW Rem 5 CY Conc SW Rem 25 Rem 4 CY Conc SW Rem 3 CY Conc SW 2 CY Conc SW Rem Rem 6 CY Conc SW Rem 2 CY Conc SW Rem 1 CY Conc SW Rem 4 CY Conc SW Rem 5 CY Conc SW 2 CY Conc SW Rem Rem 3 CY Conc SW Conc SW Rem 1 CY Rem 7 CY Conc SW Rem 3 CY Conc SW Conc SW Rem 4 CY 4 CY Conc SW Rem Rem 4 CY Conc Gtr END Rem Conc SW END Rem Conc CURB Conc Dwy Rem 3 CY Beg Rem Conc CURB END Rem Conc CURB AC Pvmt Rem 149 SF AC Pvmt Rem 297 SF AC Pvmt Rem 4,856 SF 28 Rem 10 CY Conc SW Conc SW Rem 12 CY Conc SW Rem 14 CY REVISION DATE DESCRIPTION REVISED DEMOLITION LIMITS01/30/201 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 REMOVE EXIST WALKWAY 2 10/01/21 AS-BUILT 2 24TH St 23RD St "24TH " L INE "23 RD" LI NE E StENCINA StD StDRAKE StC StC StBAY StB St ASPHASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP P PP PPPP ASPH ASPH ASPHASPHCONC ASPH ASPH ASPHASPHASPH ASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH P P P P P P P P P P P P PPP PPP P FPP P P P P ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST 23RD ST 25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea014.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2 SEE SHEET L-15MATCH LINE "24TH" Sta 374+50SEE SHEET L-15MATCH LINE "23RD" Sta 372+50LAYOUT L-14 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET L-13MATCH LINE "23RD" Sta 358+50SEE SHEET L-13DEMOLITION SCALE: 1" = 50' Conc CURB Rem 45' Conc SW Rem 8 CY Conc SW Rem 22 CY "24TH" +37 "24TH" +46 Beg Rem AC Pvmt Beg Rem Conc CURB Conc Gtr Rem 2 CY Conc CURB Rem 14' "24TH" +05 Conc SW Rem 6 CY Conc CURB Rem 53' "24TH" +91 "24TH" +31 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 3 CY Conc CURB Rem 130' "24TH" +91 Conc CURB Rem 167' Rem 1 CY Conc Gtr Rem 285 SF AC Pvmt Conc SW Rem 5 CY Conc SW Rem 12 CY Conc Dwy Rem 5 CY "24TH" +37 "24TH" +92 Beg Rem AC Pvmt Beg Rem Conc CURB Conc CURB Rem 97' Conc Dwy Rem 10 CY Conc CURB Rem 4' Conc SW Rem 10 CY Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 5 CY Conc CURB Rem 39' Conc Dwy Rem 17 CY Conc CURB Rem 48' "24TH" +39 AC Pvmt Rem 27 SF Conc SW Rem 13 CY Conc SW Rem 4 CY Conc Dwy Rem 14 CY Conc Dwy Rem 7 CY AC Pvmt Rem 92 SF "24TH" +03 Conc CURB Rem 35' Conc CURB Rem 42' Conc SW Rem 3 CY Conc CURB Rem 24' Conc CURB Rem 40' Conc Dwy Rem 9 CY AC Pvmt Rem 62 SF Conc Dwy Rem 13 CY Conc CURB Rem 42' Conc CURB Rem 96' Conc SW Rem 10 CY Conc CURB Rem 79' Conc CURB Rem 46' "24TH" +41 Beg Rem Conc SW Beg Rem Conc CURB "24TH" +90 Beg Rem Conc SW Beg Rem Conc CURB "24TH" +45 "24TH" +38 "24TH" +92 Beg Rem Conc SW Beg Rem Conc CURB "24TH" +81 Conc CURB Rem 24' Conc CURB Rem 78' Conc SW Rem 1 CY Conc Gtr Rem 2 CY AC Pvmt Rem 182 SF Conc SW Rem 1 CY Conc CURB Rem 26' Beg Rem Conc SW Beg Rem Conc CURB "23RD" +72 "23RD" +08 Conc SW Rem 5 CY Conc CURB Rem 39' Conc Dwy Rem 15 CY Conc SW Rem 2 CY Conc CURB Rem 34' "23RD" +08 "23RD" +72 Conc SW Rem 7 CY Conc CURB Rem 46' Conc Dwy Rem 12 CY Conc CURB Rem 27' Conc CURB Rem 25' "23RD" +59 Conc SW Rem 7 CY "23RD" +13 "23RD" +60 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +07 Conc SW Rem 5 CY Conc SW Rem 12 CY Conc SW Rem 5 CY Conc SW Rem 3 CY Conc SW Rem 3 CY Conc SW Rem 5 CY Conc SW Rem 16 CY Conc SW Rem 5 CY Conc SW Rem 4 CY Conc SW Rem 6 CY AC Pvmt Rem 575 SF Conc CURB Rem 32' Conc CURB Rem 46' "23RD" +59 AC Pvmt Rem 295 SF Conc CURB Rem 173' Conc CURB Rem 52' Beg Rem Conc SW Beg Rem Conc CURB "23RD" +13 Conc SW Rem 9 CY Conc CURB Rem 65' Conc Dwy Rem 15 CY "23RD" +06 "23RD" +06 Conc CURB Rem 49' "23RD" +52 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +60 Conc SW Rem 4 CY Beg Rem Conc SW Beg Rem Conc CURB "23RD" +09 Conc SW Rem 22 CY "23RD" +50 Conc SW Rem 3 CY Conc Dwy Rem 15 CY Rem 11 CY Conc Dwy END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc CURB END Rem Conc CURB "24TH" +37 END Rem Conc SW END Rem Conc SW END Rem Conc CURB END Rem Conc CURB END Rem Conc CURB Beg Rem Conc CURB END Rem Conc SW END Rem Conc CURB Beg Rem Conc CURB Conc SW Rem 2 CY Conc CURB Rem 39' END Rem Conc SW END Rem Conc CURB Beg Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Beg Rem Conc CURB END Rem Conc CURB Conc CURB Rem 161' Conc CURB Rem 164' Conc CURB Rem 100' Conc CURB Rem 3' Conc CURB Rem 47' Conc CURB Rem 167' Conc CURB Rem 22' Conc CURB Rem 36' Conc CURB Rem 114' Conc CURB Rem 49' Conc CURB Rem 28' Conc CURB Rem 161' Conc CURB Rem 165' Conc CURB Rem 160' Conc CURB Rem 185' Conc CURB Rem 158' Conc CURB Rem 172' Conc CURB Rem 166' Conc SW Rem 3 CY Conc CURB Rem 159' Conc SW Rem 2 CY Conc Dwy Rem 2 CY Conc Dwy Rem 4 CY Conc SW Rem 4 CY Conc Dwy Rem 8 CY AC Pvmt Rem 746 SF AC Pvmt Rem 1321 SF AC Pvmt Rem 240 SF Rem 1756 SF AC Pvmt AC Pvmt Rem 185 SF AC Pvmt Rem 148 SF AC Pvmt Rem 523 SF AC Pvmt Rem 161 SF AC Pvmt Rem 129 SF AC Pvmt Rem 1091 SF AC Pvmt Rem 173 SF Conc SW Rem 21 CY Conc Gtr Rem 1 CY Conc Dwy Rem 9 CY AC Pvmt Rem 202 SF Conc CURB Rem 103' END Rem Conc SW END Rem Conc CURB Conc CURB Rem 37' Conc SW Rem 5 CY Conc Dwy Rem 11 CY AC Pvmt Rem 138 SF END Rem Conc SW END Rem Conc CURB 29 Conc SW Rem 4 CY REVISION DATE DESCRIPTION REVISED DEMOLITION LIMITS01/30/201 1 Conc SW Rem 4 CY 1 Conc SW Rem 6 CY 1 0 CY 0 CY 3 CY 0' 2 10/01/21 AS-BUILT 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St "24TH" LINE "23RD" LINEF StF StG StG StH StH StEYE StEYE St FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP P PP FP P FP ASPH ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STL STK STASPHCHESTER AV25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea015.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 SEE SHEET L-16"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: L-15 LAYOUT R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 374+50SEE SHEET L-14MATCH LINE "23RD" Sta 372+50SEE SHEET L-14DEMOLITION SCALE: 1" = 50'R/WConc SW Rem 6 CY Conc CURB Rem 19' "24TH" +20 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 19 CY Conc CURB Rem 204' "24TH" +64 Beg Rem Conc SW Beg Rem Conc CURB AC Pvmt Rem 897 SF "24TH" +29 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 7 CY "24TH" +29 AC Pvmt Rem 174 SF "24TH" +10 Conc SW Rem 15 CY "24TH" +75 "24TH" +99 Conc Dwy Rem 10 CY Conc CURB Rem 40' Conc SW Rem 2 CY Conc Gtr Rem 1 CY AC Pvmt Rem 119 SF AC Pvmt Rem 136 SF Conc CURB Rem 15' Conc Gtr Rem 1 CY AC Pvmt Rem 166 SF Conc CURB Rem 15' Conc SW Rem 12 CY AC Pvmt Rem 384 SF Conc SW Rem 15 CY Conc SW Rem 14 CY Conc Dwy Rem 8 CY "24TH" +32 "24TH" +17 AC Pvmt Rem 123 SF Conc CURB Rem 34' "24TH" +10 Conc SW Rem 11 CY Conc Dwy Rem 3 CY "24TH" +64 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 27 CY "24TH" +50 "24TH" +10 Beg Rem Conc SW Beg Rem Conc CURB "24TH" +21 Conc CURB Rem 85' Conc CURB Rem 25' AC Pvmt Rem 67 SF Conc CURB Rem 36' Conc CURB Rem 18' AC Pvmt Rem 87 SF Conc Dwy Rem 10 CY Conc CURB Rem 30' Rem 270 SF AC PVMT Rem 167' Conc CURB Conc SW Rem 11 CY Conc CURB Rem 88' Conc Dwy Rem 28 CY Conc CURB Rem 352' Conc CURB Rem 23' Conc SW Rem 3 CY Beg Rem Conc SW Beg Rem Conc CURB "W178" +82 Beg Rem Conc SW Beg Rem Conc CURB "W178" +11 Conc CURB Rem 31' Conc SW Rem 11 CY AC Pvmt Rem 130 SF "23RD" +79 "23RD" +19 AC Pvmt Rem 204 SF Conc CURB Rem 75' "23RD" +85 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 17 CY Conc CURB Rem 32' "23RD" +33 Beg Rem Conc SW Beg Rem Conc CURB Conc Dwy Rem 11 CY "23RD" +79 Beg Rem Conc SW Beg Rem Conc CURB "E178" +20 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 3 CY Conc CURB Rem 30' "23RD" +00 AC Pvmt Rem 105 SF Conc CURB Rem 103' Conc CURB Rem 26' Conc SW Rem 3 CY Conc CURB Rem 33' Conc CURB Rem 31' Conc Dwy Rem 17 CY AC Pvmt Rem 213 SF Conc SW Rem 3 CY AC Pvmt Rem 336 SF "23RD" +72 Conc SW Rem 7 CY Conc CURB Rem 16' Conc SW Rem 6 CY Conc Gtr Rem 1 CY AC Pvmt Rem 224 SF Conc CURB Rem 170' Conc SW Rem 2 CY Conc SW Rem 4 CY Conc Gtr Rem 1 CY "23RD" +00 "23RD" +85 Conc SW Rem 5 CY Conc Dwy Rem 4 CY Conc SW Rem 4 CY Conc CURB Rem 41' "23RD" +80 Beg Rem Conc SW Beg Rem Conc CURB "23RD" +19 "23RD" +79 Conc SW Rem 17 CY Conc CURB Rem 21' "23RD" +33 Beg Rem Conc SW Beg Rem Conc CURB AC Pvmt Rem 166 SF AC Pvmt Rem 135 SF "23RD" +72 END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB AC Pvmt Rem 321 SF AC Pvmt Rem 373 SF "E178" +20 Beg Rem Conc SW Beg Rem Conc CURB Conc SW Rem 2 CY Conc CURB Rem 24' Conc SW Rem 4 CY END Rem Conc CURB END Rem AC Pvmt "C"+75 END Rem Conc CURB Conc CURB Beg Rem END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Conc CURB Rem 32' Conc CURB Rem 11' Conc Pvmt Rem 4 CY END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Conc Gtr Rem 1 CY Conc SW Rem 26 CY Conc CURB Beg Rem END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Conc CURB Rem 31' END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB END Rem Conc SW END Rem Conc CURB Conc CURB Rem 157' Conc CURB Rem 130' Conc CURB Rem 157' Conc CURB Rem 159' Conc CURB Rem 171' Conc CURB Rem 167' Conc CURB Rem 161' Conc CURB Rem 177' Conc CURB Rem 170' Conc CURB Rem 157' Conc CURB Rem 41' Conc CURB Rem 163' Conc CURB Rem 149' Conc CURB Rem 162' Conc CURB Rem 199' Conc SW Rem 1 CY Conc Dwy Rem 7 CY Conc SW Rem 6 CY Rem 3 CY Conc SW Rem 3 CY Conc SW Conc SW Rem 15 CY Conc SW Rem 9 CY Conc Dwy Rem 4 CY Rem 2 CY Conc Gtr AC Pvmt Rem 130 SF AC Pvmt Rem 562 SF Conc AC Pvmt Rem 267 SF Conc SW Rem 3 CY Conc SW Rem 3 CY Conc Dwy Rem 12 CY Conc Dwy Rem 11 CY Conc SW Rem 2 CY Conc SW Rem 11 CY Conc SW Rem 11 CY Conc CURB Rem 46' Conc CURB Rem 86' 30 +76 +11 347' SW 28' 2 27 1 1 1 1 1 REVISION DATE DESCRIPTION 1 04/11/19 REVISED WB LAYOUT 15 2 01/30/20 REVISED DEMOLITION LIMITS 3 10/01/21 AS-BUILT 3 2 25' 0 120' 13 THE ENGINEER DIRECTED BY SIDEWALK AS REMOVE CONCRETE 3 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 2 24TH St 23RD St M St"23RD" LINECHESTER AveK StL StL StK StCHESTER AveM StConc CURB Rem 265'"C" LINE P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPH ASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPH400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 LAYOUT L-16 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R /W R/W R /W R/W MATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET L-15DEMOLITION SCALE: 1" = 50' R/W "W178" +50 "W178" +82 "W178" +75 "E178" +00 "W178" +93 "W178" +63 "E178" +43 "E178" +43 "E178" +66 "E178" +71 "E178" +93 "E178" +65 "E178" +53"E178" +77 Conc CURB Beg Rem Rem 574' DIKE Beg Rem DIKE END Rem Conc CURB Beg Rem AC DIKE END Rem Conc CURB Beg Rem AC DIKE END Rem Conc CURB Rem 607' AC DIKE Conc CURB Rem 167' Conc CURB Rem 69' Conc CURB Rem 8' Rem 449' AC DIKE AC DIKE Rem 479' Conc CURB Rem 224' CL FENCE Rem 223' Conc CURB Rem 80' Beg Rem Conc CURB Beg Rem AC DIKE END Rem Conc CURB END Rem DIKE END Rem AC DIKE "W178" +24 END Rem Conc SW END Rem Conc CURB ~ Conc CURB Beg Rem "E178" +53 Conc CURB END Rem END Rem AC DIKE END Rem AC DIKE END Rem CL FENCE END Rem Conc CURB ~ "E178" +53 Conc CURB END Rem Conc SW Rem 2 CY ~ Beg Rem CL FENCE Beg Rem Conc CURB Rem 26' Conc CURB Rem 2 CY Conc SW Rem 708' Conc CURB Conc CURB Rem 19' AC Pvmt Rem 121 SF Conc SW Rem 1 CY ~ ~ 31 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxea016.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 WB ROUTE 178 EB ROUTE 178N StO St23RD St FRONTAGE Rd O StP StN StQ St24TH St FRONTAGE Rd "E178" LINE"W 178" L IN E x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:3916-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxfb001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 PS-1 NOTE: ALL ELEVATIONS ARE BASED ON NAVD 1988. Vert 1" = 5' SCALE: Horiz 1" = 50' Exc Emb STATION CY TOTAL 410 400 405 405 410 321+00 322+00 323+00 324+00 325+00 326+00 327+00 328+00 329+00 330+00320+00 PROFILE 400 410 405 400 410 405 400 410 405 400 410 405 400 400 405 410 400 405 410 319+00 331+00 332+00 332+00331+00330+00329+00328+00327+00326+00325+00324+00323+00322+00321+00320+00319+00 Lt FL Rt FL "WB2" LINE Lt FL Rt FL "EB2" LINE 32 406.67406.08405.43404.86-2.59% -2.60% -2.28% -2.52% REVISION DATE DESCRIPTION 10/31/191 REVISED 24TH St & OAK St INTERSECTION404.24+031 TO CROWN CONFORM Elev 404.18 BETWEEN STATIONS 319+02 AND 320+25 THIS SHEET TO BE USED FOR OAK AND 24TH SUPERELEVATION ONLY 2 10/01/21 AS-BUILT 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 GRADES AND ELEVATIONS SEE C-6r1 FOR REVISED Elev 405.79+75Elev 405.66+00Elev 405.54+25Elev 405.46+50Elev 405.41+75Elev 405.39+00Elev 405.41+25Elev 405.46+50Elev 405.55+75Elev 405.67+00Elev 405.82+25Elev 405.99+50Elev 406.17+75Elev 406.34+00Elev 406.51+25Elev 406.68+50Elev 406.85+75Elev 407.02+00Elev 407.18+25Elev 407.32+50Elev 407.43+75Elev 407.51+00Elev 407.57+25Elev 407.60+50Elev 407.61+75Elev 407.59+00Elev 407.55+25Elev 407.48+50Elev 407.39+75Elev 407.27+00Elev 407.09+25Elev 406.79+50Elev 406.45+75Elev 406.11+00Elev 405.84+25Elev 405.57+50Elev 405.28+75Elev 404.96+00Elev 404.62+25Elev 404.29+50Elev 403.96+75Elev 403.63+00Elev 403.30+25Elev 402.96+50Elev 402.63+75Elev 402.35+00Elev 402.10+25Elev 401.91+50Elev 401.76+75Elev 401.67+00Elev 401.62+25Elev 401.61+50Elev 401.65Elev 401.72-0.62% -0.48% -0.32% -0.20% -0.08% 0.08% 0.20% 0.36% 0.48% 0.60% 0.68% 0.72% 0.68% 0.68% 0.68% 0.68% 0.68% 0.64% 0.56% 0.44% 0.32% 0.24% 0.12% 0.04% -0.08% -0.16% -0.28% -0.36% -0.48% -0.72% -1.20% -1.36% -1.36% -1.08% -1.08% -1.16% -1.28% -1.36% -1.32% -1.32% -1.32% -1.32% -1.36% -1.32% -1.12% -1.00% -0.76% -0.60% -0.36% -0.20% -0.04% 0.16% 0.21%+82.56"B" LINE CONTROLLED BY +54.09OG OLIVE StBCR ECRBCRECRELM St BCRECRBEECH St BCRMYRTLE St BY "B" LINE CONTROLLED OGECROAK St SHEETS SEE C +50Elev 404.12+75Elev 403.97+00Elev 403.85+25Elev 403.77+50Elev 403.72+75Elev 403.70+00Elev 403.72+25Elev 403.77+50Elev 403.86+75Elev 403.98Elev 404.14Elev 404.84+25Elev 404.99+50Elev 405.16+75Elev 405.33+00Elev 405.49+25Elev 405.63+50Elev 405.74+75Elev 405.82+00Elev 405.88+25Elev 405.91+50Elev 405.92Elev 405.90Elev 405.70+25Elev 405.51+50Elev 405.31+75Elev 405.09+00Elev 404.85+25Elev 404.58+50Elev 404.29Elev 404.07Elev 402.43+25+50+75+00+25+50+75+00+25Elev 400.66-0.76% -0.60% -0.48% -0.32% -0.20% -0.08% 0.08% 0.20% 0.36% 0.48% 0.60% 0.67% 0.68% 0.68% 0.64% 0.56% 0.44% 0.32% 0.24% 0.12% 0.04% -0.08%-0.64% -0.80% -0.88% -0.96% -1.08% -1.16% -1.27%+95.14+67.33Elev 404.32+23.77+50.50+90.83+76.16+02.75+01.49Elev 400.75-0.68% -0.35%Elev 401.09Elev 400.92-0.68% -0.68%Elev 402.20Elev 402.03Elev 401.86Elev 401.63Elev 401.43Elev 401.26-0.68% -0.68% -0.68% -0.90% -0.80% -0.68% OG BY "B" LINE CONTROLLED Elev 405.76+75Elev 405.69+00Elev 405.57+25Elev 405.48+50Elev 405.42+75Elev 405.39+00Elev 405.40+25Elev 405.44+50Elev 405.51+75Elev 405.62+00Elev 405.76+25Elev 405.92+50Elev 406.09+75Elev 406.25+00Elev 406.42+25Elev 406.59+50Elev 406.76+75Elev 406.92+00Elev 407.09+25Elev 407.23+50Elev 407.36+75Elev 407.45+00Elev 407.53+25Elev 407.58+50Elev 407.60+75Elev 407.61+00Elev 407.58+25Elev 407.53+50Elev 407.46+75Elev 407.36+00Elev 407.23+25Elev 407.01+50Elev 406.70+75Elev 406.36+00Elev 406.04+25Elev 405.77+50Elev 405.50+75 Elev 405.19 +86 Elev 404.83 +00Elev 404.67+25Elev 404.37+50Elev 404.07+75Elev 403.77+00Elev 403.47+25Elev 403.17+50Elev 402.87+75Elev 402.58+00Elev 402.30+25Elev 402.04+50Elev 401.86+75Elev 401.72+00Elev 401.64+25Elev 401.57+50Elev 401.52+75Elev 401.47Elev 401.43-0.47% -0.48% -0.36% -0.24% -0.12% 0.04% 0.16% 0.28% 0.44% 0.56% 0.64% 0.68% 0.64% 0.68% 0.68% 0.68% 0.64% 0.68% 0.56% 0.52% 0.36% 0.32% 0.20% 0.08% 0.04% -0.12% -0.20% -0.28% -0.40% -0.52% -0.88% -1.24% -1.36% -1.28% -1.08% -1.08% -1.25% -1.18% -1.20% -1.20% -1.20% -1.20% -1.20% -1.20% -1.16% -1.12% -1.04% -0.72% -0.56% -0.32% -0.28% -0.20% -0.20% -0.17%+59.95+97.87OG BY "B" LINE CONTROLLEDECROAK St SHEETS SEE C Elev 404.33+25+50+75+00+25+50+75+00+25+50Elev 404.62+75Elev 404.84+00Elev 405.15+25Elev 405.36+50Elev 405.53+75Elev 405.69+00Elev 405.86+25Elev 405.94+50Elev 405.98+75Elev 406.01+00Elev 406.08+25Elev 406.13+50Elev 406.15+75Elev 406.16+00Elev 406.13+25Elev 406.08+50Elev 406.01+75Elev 405.91+00Elev 405.78+25Elev 405.56+50Elev 405.26+75Elev 404.93+00Elev 404.61+25Elev 404.36+50Elev 404.10+75Elev 403.80+00Elev 403.52+25Elev 403.22+50Elev 402.93+75Elev 402.64+00Elev 402.35+25Elev 402.07+50Elev 401.78+75Elev 401.51+00Elev 401.25+25Elev 401.01+50Elev 400.84+75Elev 400.71+00Elev 400.64+25Elev 400.58+50Elev 400.53+75Elev 400.48Elev 400.440.88% 1.24% 0.84% 0.68% 0.64% 0.68% 0.32% 0.16% 0.12% 0.28% 0.20% 0.08% 0.04% -0.12% -0.20% -0.28% -0.40% -0.52% -0.88% -1.20% -1.32% -1.28% -1.00% -1.04% -1.20% -1.12% -1.20% -1.16% -1.16% -1.16% -1.12% -1.16% -1.08% -1.04% -0.96% -0.68% -0.52% -0.28% -0.24% -0.20% -0.20% -0.17%+97.87+02.19Elev 404.28Elev 404.23Elev 404.18Elev 404.23Elev 404.28Elev 404.33Elev 404.38Elev 404.43Elev 404.48-0.20% -0.20% -0.20% -0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.56% x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:3916-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxfb002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 PS-2 NOTE: ALL ELEVATIONS ARE BASED ON NAVD 1988. Vert 1" = 5' SCALE: Horiz 1" = 50' Exc Emb STATION CY TOTAL 405 400 400 405 333+00 334+00 335+00 336+00 337+00 338+00 339+00 340+00332+00 PROFILE 405 400 405 400 405 400 405 400 400 405 400 405 331+00 "B" LINE WB Lt FL WB Rt FL EB Lt FL EB Rt FL SEE SHEET PS-3MATCH LINE "A" 340+5033 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SEE C-6r1 AND C-7r1 FOR ELEVATIONS 1 1 BY "WB2" LINE CONTROLLED OGElev 401.72+50.00 PVIElev 402.08+00.00 PVIElev 401.78+50.00 PVIElev 402.480.20%-0.20%0.20%-0.20%+71.96MYRTLE St BY "WB2" LINE CONTROLLED SPRUCE St PINE St OGElev 400.86 ECRElev 401.09+46.21 PVIElev 400.88 ECRElev 401.40 ECR0.20%-0.20%0.20%-0.20%+35.82+50.00 +97.24 +92.88 +50.53 BCRElev 400.89 BCRElev 401.38 -0.20% BY "EB2" LINE CONTROLLED OG+71.96 PVIElev 401.43+00.00 PVIElev 400.77+50.00 PVIElev 401.47-0.20%0.20%-0.20% BY "EB2" LINE CONTROLLED OG+71.96 PVIElev 400.44+00.00 PVIElev 399.78+50.00 PVIElev 400.48-0.20%0.20%-0.20% x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:3916-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxfb003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 PS-3 NOTE: ALL ELEVATIONS ARE BASED ON NAVD 1988. Vert 1" = 5' SCALE: Horiz 1" = 50' Exc Emb STATION CY TOTAL 405 400 400 405 341+00 342+00 343+00 344+00 345+00 346+00 PROFILE 405 400 405 400 405 400 405 400 400 405 400 405 "B" LINE WB Lt FL WB Rt FL EB Lt FL EB Rt FLMATCH LINE "A" 340+50SEE SHEET PS-234 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SEE C-9r1 FOR ELEVATIONS 1 1 "24TH" LINE CONTROLLED BY OG+90.00 PVIElev 401.80+50.00 PVIElev 402.12+40.00 PVIElev 401.740.20%-0.20%0.20%+69.47Elev 401.99CEDAR St ALDER St "24TH" LINE CONTROLLED BY OG Elev 400.91 ECRElev 401.13Elev 400.85 ECRElev 401.010.20%-0.20%0.20%+43.75 +39.39 +50.00 +90.39 +85.95 +69.47 BCR BCRElev 400.85Elev 400.90 "23RD" LINE CONTROLLED BY OG +00.00 PVIElev 400.57+69.47 PVIElev 401.68-0.20%0.30% "23RD" LINE CONTROLLED BY OG +00.00 PVIElev 399.58+69.47 PVIElev 400.69-0.20%0.30% x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:3916-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxfb004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 PS-4 NOTE: ALL ELEVATIONS ARE BASED ON NAVD 1988. Vert 1" = 5' SCALE: Horiz 1" = 50' Exc Emb STATION CY TOTAL 405 395 400 400 405 344+00 345+00 346+00 347+00 348+00 349+00 350+00 351+00 352+00 353+00 PROFILE 395 405 400 405 400 395 353+00352+00351+00350+00349+00348+00347+00346+00 Lt FL Rt FL Lt FL Rt FL "23RD" LINE "24TH" LINE 395 405 400 395 405 400 395 405 400 395 405 400 395 35 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT SEE C-9r2 FOR ELEVATIONS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 1 C St SEE C SHEETSBCRBY "B" LINE CONTROLLED OGElev 401.99+75Elev 402.02+00Elev 402.07+25Elev 402.12+50Elev 402.17+75Elev 402.19+00Elev 402.19+25Elev 402.17+50Elev 402.12+75Elev 402.07+00Elev 402.00+25Elev 401.94+50Elev 401.89+75Elev 401.82+00Elev 401.75+25Elev 401.69+50Elev 401.62+75Elev 401.47+00Elev 401.25+25Elev 401.07+50Elev 400.82+75Elev 400.60+00Elev 400.370.26% 0.20% 0.20% 0.20% 0.08% 0.00% -0.08% -0.20% -0.20% -0.28% -0.24% -0.20% -0.28% -0.28% -0.24% -0.28% -0.60% -0.88% -0.72% -1.00% -0.88% -0.92%+63.45BCRECRBAY St BCRC St SEE C SHEETS OG BY "B" LINE CONTROLLED +63+75Elev 401.03+00Elev 401.08+25Elev 401.13+50Elev 401.18+75Elev 401.19+00Elev 401.18Elev 401.13+20Elev 400.87+50Elev 400.79+75Elev 400.70+00Elev 400.61+25Elev 400.52+50Elev 400.42+75Elev 400.33+00Elev 400.24+25Elev 400.15+50Elev 400.05Elev 399.970.26% 0.20% 0.20% 0.20% 0.04% -0.04% -0.23%-0.27% -0.36% -0.36% -0.36% -0.40% -0.36% -0.36% -0.36% -0.40% -0.33%+21.53+74.25Elev 401.01BY "B" LINE CONTROLLED SEE C SHEETS OG+49Elev 401.68+75Elev 401.79+00Elev 401.90+25Elev 402.00+50Elev 402.09+75Elev 402.16+00Elev 402.19+25Elev 402.22+50Elev 402.25+75Elev 402.29+00Elev 402.33+25Elev 402.31+50Elev 402.23+75Elev 402.10+00Elev 402.03+25Elev 401.94+50Elev 401.80+75Elev 401.60+00Elev 401.00+25Elev 400.79+50Elev 400.61+75Elev 400.42+00Elev 400.25+25Elev 400.11+50Elev 399.99+75Elev 399.88+00Elev 399.80+25Elev 399.71+50Elev 399.67+75Elev 399.64+00Elev 399.66+25Elev 399.61+50Elev 399.55+75Elev 399.47+00Elev 399.38+25Elev 399.30+50Elev 399.17+75Elev 399.09+00Elev 399.030.43% 0.44% 0.40% 0.36% 0.28% 0.12% 0.12% 0.12% 0.16% 0.16% -0.08% -0.32% -0.52% -0.28% -0.36% -0.56% -0.80% -0.84% -0.72% -0.76% -0.68% -0.56% -0.48% -0.44% -0.32% -0.36% -0.16% -0.12% 0.08% -0.20% -0.24% -0.32% -0.36% -0.32% -0.52% -0.32% -0.24% OG BY "B" LINE CONTROLLED D St SEE C SHEETSBCR Elev 400.69+75Elev 400.80+00Elev 400.91+25Elev 401.01+50Elev 401.10+75Elev 401.17+00Elev 401.20+25Elev 401.22+50Elev 401.21+75Elev 401.20+00Elev 401.16+25Elev 401.08+50Elev 400.98+75Elev 400.84+00Elev 400.74+25Elev 400.59+50Elev 400.41+75Elev 400.19+00Elev 399.95+25Elev 399.74+50Elev 399.56+75Elev 399.37+00Elev 399.20+25Elev 399.06+50Elev 398.94+75Elev 398.81+00Elev 398.67+25Elev 398.50+50Elev 398.40+75Elev 398.35+00Elev 398.37+25Elev 398.39+50Elev 398.42+75Elev 398.50+00Elev 398.60+25Elev 398.68+50Elev 398.72+75Elev 398.78Elev 398.840.43% 0.44% 0.40% 0.36% 0.29% 0.11% 0.09% -0.05% -0.04% -0.18% -0.32% -0.39% -0.56% -0.38% -0.61% -0.75% -0.87% -0.95% -0.83% -0.75% -0.74% -0.67% -0.57% -0.48% -0.53% -0.56% -0.68% -0.40% -0.20% 0.08% 0.08% 0.12% 0.32% 0.41% 0.31% 0.16% 0.24% 0.24%+49.45+99.64 P ASPH P PPPASPHASPH ASPH ASPH P P P P PP CONC CONC x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 315 6 7 3 4 315 4 6 7 3 9 1 2 9 1 2310 R/W CONSTRUCTION DETAILS C-1 SCALE: 1" = 20' "WB2 " +6 9 .3 6 2.4 0' Lt "EB2" +63.09 R/W R/W405.49 ES FL 2%2%2%"WBL" +00"WBL" +25"WBL" +50"WB2" +00"WB2" +25"WB2" +50"WB2" +75"WB2" +00"WB2" +25"WB2" +50"WB2" +75"WB2" +00"WB2" +25"WB2" +50"WB2" +75"EB2" +75"EB2" +50"EB2" +25"EB2" +00"E B2" +75 "EB2" +5011.84' Lt "EB2" +25 8.88' Lt " E B2" +00 4.71' Rt "E B L" +50 4.35' Rt " E BL" +25 3.79' Rt "E B L" +00 3.24' Rt "E BL" +75 2.68' Rt "EBL" +50 2.13' Rt "EBL" +25 1.57' Rt "EBL" +00 "WB2" +00 4. 2 9' Lt "EB2" +7 5Var 2%410.43 ES 59.39' Rt "EBL" +00 410.01 ES 63.09' Rt "EBL" +25 405.70 ES "EB2" +25 "EB2" +50 405.36 ES "EB2" +75 "EB2" +00 "EB2" +25 "EB2" +46.72 MATCH Exist (410.62) ES 44.78' Lt "WBL" +81.68 MATCH Exist (410.66) FL 410.59 FL "WBL" +00 "WB2 " +9 1 .4 8 "EB2" +93.88Var44.50' Lt "WBL" +46.52 409.74 FL 44.50' Lt "WBL" +62.52 409.50 FL 10%5'5'5'54.00' Lt "WB2" +76.72 407.88 FL 4' Pkwy 6' SW 4' Pkwy 6' SW 4' Pkwy 6' SW (SEE STRUCTURE PLANS) KERN RIVER BRIDGE 5' SW 2%FL FL FL NOT TO SCALE CL Sta "WBL" 313+54.52 SEE Dwy DETAIL409.62 FLW=10'• Sta +54.52411.65 411.29 41 0 .92 4 1 0 .6 3 410.55 410.18 409.47 409.81 409.13 408.79 408.45 408.13 407.81 407.49 407.17 406.85 406.55 4 0 6 .3 4 406.58 406.75 406.98 407.26 407.54 407.88 408.22 408.56 408.90 4 0 9. 2 4 4 09.40 409.60 409.97 410.34 410.66 410.98 411.23 411.35 49.50' Lt "WBL" +40.14 410.43 54.50' Lt "WBL" +44.45 410.46 5' SW RETURN DETAILS SEE C-2 FOR CURB RETURN DETAILS SEE C-2 FOR CURB "WB2" +91.05 69.00' Lt MATCH Exist (408.50) "WB2" +73.00 74.12' Lt MATCH Exist (407.15) "WB2" +27.96 79.00' Lt MATCH Exist (406.68) "WB2" +85.76 79.00' Lt MATCH Exist (405.21) "WB2" +04.27 99.78' Lt MATCH Exist (403.85) 0.73' Rt "EBL" +39.65 2.27' Lt "EBL" +39.65 3'R/W"WB L" +96 411.71 1.48' Rt "EBL" +95411.4062.00' Lt "WB2" +88.21 52.00' Lt "WB2" +88.21 405.32 "WB2" +38.10 54.00' Lt 405.12 405.29 FL 405.35 FL 405.41 FL 64' Lt "WB2" +09.30 405.97 FL PLANS) (SEE STRUCTURE RW No. 314 ES MATCH Exist (413.26) ES MATCH Exist (412.97) ESMATCH LINESEE BELOW RIGHTDwy TYPE "B-2" Dwy DETAIL "B-2"SEE ABOVE LEFTMATCH LINE65.49' Rt "EBL" +52.77 409.66 ES "EB2" +87.26 405.29 ES FOR TRAIL DETAILS SEE C-71 AND C-72 R=52' "WB2" +.0051 63.32' Lt R=48' "WB2" +46.49 EC 54.67' Lt EC 406.93 FL BC 407.05 FL FOR TRAIL DETAILS SEE C-73 BC 406.09 LEGEND: MINOR CONCRETE (TEXTURED PAVING) 36 Max1.5%"WB2" +33.2854.00' Lt 408.47 FL 409.19 FS 408.77 FS1.5% 4'10'408.10 FL 408.39 FL Dwy DETAIL "B-2" NOT TO SCALE CL Sta "WBL" 314+49.71 68' Lt "WB2" 314+34.12 68' Lt "WB2" 314+65.20 54' Lt "WB2" 314+57.49 54' Lt "WB2" 314+35.15 Dwy TYPE "B-2" SEE Dwy DETAIL408.35 FLW=20'• Sta +46.32408.62 FS 64' Lt "WB2" 314+69.35 409.15 FS +89.41 55.70' Rt "EBL" R=37' R=34' R=60' R=57' 64' Lt "WB2" 314+29.98 2 REVISION DATE DESCRIPTION 1 05/21/19 ADDED DRIVEWAY 2 06/03/19 REVISED BACK OF WALK 3 08/28/19 1 1 1 STATION ES ElevOFFSET 69.55' 70.81' 71.37' 313+75 314+00 314+25 71.92' 66.00' 314+50 314+75 315+00 66.00' 315+25 66.00' 315+50 315+75 316+00 66.00' 66.00' 66.00' 409.33 409.00 408.63 408.26 407.83 407.40 407.00 406.66 406.32 405.98 FOR ES Elev SEE TABLE A TABLE A 3 3 3 ADDED ES ELEVATIONS Var 407.64 407.14 406.39 406.51 406.09 405.55 +00 406.42 +75 406.55+50 406.75 4 4 10/31/19 REVISED 24TH St & OAK St INTERSECTION "EB2" +46 TO CROWN CONFORM 405.52 ES 406.41 "EB2" +93.88 5 5 02/06/20 REVISED GRADES CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 DECOMPOSED GRANITE STRUCTURE SECTION: 6 10/01/21 AS-BUILT 6 "EB2" LINE "WB2" LINE LINE "WBL" LINE "EBL" 24TH StOAK St RIVERKERN "WBL" LINE "EBL" LINE P PPPASPHASPH ASPH P P P P PP 315 6 7 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5117-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga001r.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS R/W R/WLEGEND: MINOR CONCRETE (TEXTURED PAVING) C-1 36 SCALE: 1" = 10' FL R=52'2%R=48' "WB2" +91.05 69.00' Lt MATCH Exist (408.50) FL REVISED SHEET r 406.13 70.50' Lt "WB2"+40.53 64' Lt"WB2"+30.61 405.85 FL REVISION DATE DESCRIPTION 0 06/03/19 REVISED BACK OF WALK 406.55 63.32' Lt "WB2"+00.51 406.09 FL407.05 FL 54' Lt "WB2"+38.10 406.93 FL 54.67' Lt "WB2"+46.49 6' SW 4' PKWY 64' Lt "WB2"+61.94 407.25 407.20 64.26' Lt "WB2" +65.23 69' Lt "WB2" +70.65 (407.35) MATCH Exist R=3' R=19' 79' Lt "WB2" +27.98 (406.68) MATCH Exist 79' Lt "WB2" +45.78 (406.13) MATCH Exist "WB2" +45.77 75.50' Lt 6.5' SW 10' SW 1.5%6.5' SW 75.50' Lt "WB2" +82.70 MATCH Exist (405.39) 99.92' Lt "WB2" +04.39 MATCH Exist (403.98) 74' Lt "WB2" +30.61 405.96 FL 64' Lt "WB2" +09.10 1.5% "WB2"+09.10 70.50' Lt "WB2"+70.70 65.14' Lt 98.33' Lt "WB2" +13.72 MATCH Exist (406.26) 70.50' Lt "WB2" +91.95 403.59 ANGLE POINT 404.84 ANGLE POINT MATCH EXISTING MATCH EXISTING 8'-0" 8'-0" HEIGHT OVER 8' 0" TO 8" TRANSITION Beg Ret CURB 406.49 HEIGHT OVER 8' 0" TO 8" TRANSITION END Ret CURB 1 10/01/21 AS-BUILT 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 GRADE INFORMATION L-2, L-10 FOR SEE SHEET 24TH St "WB2" LINEOAK St PPPASPHASPHASPHASPHASPHASPHASPHPPPPPPPASPHASPHASPHASPHASPHASPHASPHPPPPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018320 678967897 8 10123 320678967897 8 10123 CONSTRUCTION DETAILS C-2 SCALE: 1" = 20' R/W 405.41 FL 404.43 FL 3À/4 404.61 FL À/2 404.79 FL 404.97 FL À/4 5R/W403.71 FL 404.33 FL3À/4 404.18 FL À/2 404.02 FL 403.87 FL À/4 7 À/2 À/4 6 403.57 FL 3À/4 404.13 FL À/2 403.95 FL 403.76 FL À/4 8 L 21.65'37.51' 56.49' 37.32'53.63' 22.19'38.21' R CURVE DATA T 30' 30' 30' 30' No.# 5 6 7 8 R/W 41.21' 401.94 FL 402.81 FL 21.83' Rt "OAK-2" +87 MATCH Exist (402.21) FL +67.78 BCR 37.09' Rt "OAK-2" +23.77 ECR 54.00' Lt "WB2"401.80 FLW=35'• 26.94' Rt +20401.96 FLW=35'• 24.00' Rt +65"OAK-2" +00 28.33' Rt "OAK-2" +75 30.00' Rt "OAK-2" +50 31.66' Rt +50 405.77 +25 405.88 +00 405.98 +75 406.09 +50 406.19 +25 406.30 R/W TYPE 1 CURB RAMP TYPE 1 CURB RAMP 4.5' 5.5' 5.5' 4.5' 6' SW 4' Pkwy 4' Pkwy 6' SW TYPE 3 Mod CURB RAMP OAK St DETAILS SEE C-3 FOR 257 24TH St DETAILS SEE C-1 FOR 316404.10 FL 404.38 FL 404.91 FL 404.37 405.03 54.00' Rt "EB2" +02.19 ECR 64.00' Rt "EB2" +02.19 88.88' Rt "EB2" +81.91 +46.72 BCR 66.00' Rt "EB2" 405.00 405.00 404.91 404.91 "EB2" +56.83 74.51' Rt 403.03 "OAK-2" +13.80 21.28' Rt 404.32 FL 3À/4 403.82 FL +87.87 BCR 64.00' Lt "WB2" +88.21 52.00' Lt "WB2" 405.32Dwy TYPE "B-1"Dwy TYPE "B-1"86.81' Rt "EB2" +73.64 ECR 90.72' Rt "EB2" +74.56 BCR 9.4% "OAK-2" +79.85 44.74' Rt MATCH Exist (405.02) "OAK-2" +46.63 44.74' Rt MATCH Exist (403.00) 24' Lt "OAK-2" +13.96 ECR 403.29 FL MATCH Exist (402.28) FL 5.5' SW 24' Lt "OAK-2" +00 402.22 FL 3.9% "OAK-2" +0034.94' Rt 44.74' Rt "OAK-2" +03.65 44.74' Rt "OAK-2" +37.87 MATCH Exist (402.75) MATCH Exist (402.61) MATCH Exist (402.65) 24' Lt "OAK-2" +75 34' Lt "OAK-2" +85.50 MATCH Exist (402.82) 34' Lt "OAK-2" +50.50 403.40 FL Dwy TYPE "B-1" 403.42 FL W=35' • 24' Rt +68 24' Lt "OAK-2" +50 403.48 FL 24' Lt "OAK-2" +25 403.58 FL 8' +68.50 58' Lt "WB2" TYPE 1 CURB RAMP 95.28' Rt "EB2" +70.21 86.79' Rt "EB2" +65.24 79.32' Rt "EB2" +63.03 & CONFORM SAWCUT & CONFORMN SAWCUT NOTES:R/W1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. PARKING LOT MATCH Exist 404.28 Beg SW TAPER +50 A A 401.72 FL 401.77 FL "OAK-2" +25 32.11' Rt FOR TRAIL DETAILS SEE C-71 AND C-72 PER TABLE PER TABLE BACK OF SW Elev PARKING LOT Exist Ret CURB 1.5% 8' SW TOP OF Ret CURB Elev SW Elev BACK OF CURB Elev TOP OF Ret STATION 10+68.32 10+75.00 11+00.00 11+25.00 11+50.00 11+75.00 12+03.07 12+00.00 404.23 404.07 403.48 402.98 402.60 402.40 402.40 402.41 404.05 404.04 403.69 403.29 402.89 402.70 402.53 402.51 37 PARKING LOT MATCH Exist SECTION A-A NO SCALE REVISION DATE DESCRIPTION 09/10/19 REVISED NE CORNER1 1 1 19'28"21.93'37.87' SHEET C-2r SEE REVISED 407.64 407.49 407.34 407.19 406.67 406.53 406.39 406.25 406.11 407.05 2 10/25/19 REVISED 24TH St & OAK St INTERSECTION 407.51 407.35 407.73 407.53 +75 407.04 407.30 +25 407.38 +00 407.61 +75 407.13 +50 BREAK GRADE 2 +00 406.22 +25 405.92 +50 405.71 +75 405.60 +00 405.41 +25 405.39 +50 405.33 STATION 61.55' 60.36' 58.80' 56.86' 54.54' 404.99 404.86 404.68 404.60 404.46 OFFSET FS Elev 317+00 317+25 317+50 317+75 318+00 SEE TABLE A TABLE A 3 ADD INTERSECTION GRADES 3 3 406.39 405.93 405.90 406.09 02/07/20 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "EB2" LINE"WB2" LINE"OAK-1" LINE "OAK-2" LINE OAK St OAK St 24TH St ASPHASPHASPHPPASPHASPHASPHPPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga002r.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 111213 CONSTRUCTION DETAILSR/WNOTES: R/W R/W 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. C-2 37 403.57 FL "OAK-2" +97.72 35.10'Rt 402.87 FL"OAK-2" +32.64 32.77' Rt 402.13 FL401.77 FL 401.85 FL "OAK-2" +32.15 25.16' Rt "OAK-2" +46.72 23.75' Rt "OAK-2" +91.51 BC 43.53' Rt Dwy TYPE "B-2"402.39 FLW=30'C 33.77' Rt +17.67LDwy TYPE "B-2"401.77 FLW=30'C 27.09' Rt +12.23L"OAK-2" +93.66 49.46' Rt "OAK-2" +02.71 34.76' Rt 402.75 FL "OAK-2" +48.77 EC 41.71' Rt R=3.5' "OAK-2" +45.58 BC 45.94' Rt 402.70 402.61 "OAK-2" +82.49 BC 39.47' Rt 402.40 "OAK-2" +86.21 EC 43.23' Rt 402.45 R=3.5' 402.66 401.73 FL "OAK-2" +37.63 32.43' Rt 402.08 FL "OAK-2" +27.17 25.64' Rt 401.83 FL "OAK-2" +40.13 39.63' Rt 4'VarVarVar 8'10'6.32%1.5%1.5%1.5%6.32%1.5% 1.5% 401.94 FL "OAK-2" +50 31.61' Rt 401.74 FL "OAK-2" +92.30 28.79' Rt "OAK-2" +75 29.94' Rt 403.60 403.63 403.68 REVISED SHEET r r REVISION DATE DESCRIPTION 0 09/19/19 REVISED NE CORNER SCALE: 1" = 10' "OAK-2" +92.31 EC 44.22' Rt 403.64 "OAK-2" +92.36 44.91' Rt "OAK-2" +39.49 30.06' Rt MATCH Exist (402.52) 28.46' Rt "OAK-2" +97.29 401.72 FL 28.28' Rt "OAK-2" +00 "OAK-2" +67.78 BCR 37.09' Rt R=0.75' MATCH Exist (401.91) FL CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 OAK St "OAK-2" LINE PPASPHASPHASPHASPHASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 260789 1 2 3 4 CONSTRUCTION DETAILS C-3 +61.87 32.13' Lt 401.60 FL 401.70 FL 401.91 FL 402.11 FL 402.25 FL R/W SCALE: 1" = 20' R/W R/W R/W +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +25 61.49' Lt +75 47.86' Lt MATCH Exist (402.40) FL +50 +75 +00 +25 +50 +75 +00 +25+25 404.60 +25 404.44 +50 404.29 +75 404.14 +00 403.98 +25 +50 404.75 +00 404.91 +75 405.12 +40.08 MATCH Exist (403.83)2%VarVarVar38.32' Rt "OAK-1" +50 MATCH Exist (402.63) FL 402.11 FL W=22' • Sta +18.15 Dwy TYPE "A" 33.90' Rt "OAK-1" +34.15 402.06 FL 33.89' Rt "OAK-1" +02.15 402.16 FL 33.90' Rt "OAK-1" +93 33.90' Rt "OAK-1" +43 34.62' Rt "OAK-1" +48 403.65 FL 403.50 FL 403.34 FL 403.19 FL 403.03 FL 402.88 FL 402.73 FL 402.63 FL 402.36 FL 402.11 FL 401.87 FL 401.68 FL 401.53 FL 401.48 FL +5056.18' Lt +2534.93' Lt +0040.02' Lt 404.33 FL 404.17 FL 404.02 FL 403.71 FL 403.25 FL 402.91 FL403.40 FL 403.55 FL 403.86 FL LIP MATCH Exist BACK OF CURB MATCH Exist R/W R/W R/WR/W SEE BELOW LEFTMATCH LINE 5' SW 8'+75 +00 +25 +50 +75 +00 +25 +50 +75 +00 RETURN DETAILS SEE C-2 FOR CURB 6'8'RETURN DETAILS SEE C-2 FOR CURB (402.89)(402.74)(402.70)(402.66)(402.59)(402.56)(402.59)(402.61)(402.56)(402.53)MATCH LINE SEE ABOVE RIGHT1'SAWCUT & CONFORM & CONFORM SAWCUT (402.77) NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. SAWCUT & CONFORM MATCH Exist (402.63) FL 40' Lt "OAK-1" +50 MATCH Exist MATCH Exist 64' Lt +91.87 401.49 FL 1' 38 xx405.74 405.14 404.61 404.09 403.60 403.25 402.91 402.66 406.78 406.20 405.39 X X X X X X X (404.07)(404.32)(404.66) (405.01) (405.50)(406.02)(406.44)407.12 +80 (406.44) SAWCUT & CONFORM VarSAWCUT & CONFORM X REVISION DATE DESCRIPTION 1 REVISED 24TH St & OAK St INTERSECTION 1 +25 407.22 2/5/20 407.32 +00 2 10/01/21 AS-BUILT 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 OAK St "OAK-1" LINE OAK St "OAK-1" LINE P P P P P P P P P P P P P P ASPH POOLCONCPOOLASPHASPHASPHASPH ASPH ELM STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 1 2 3 4 320 325 1 2 3 4 CONSTRUCTION DETAILS C-4 SCALE: 1" = 20' No.#R CURVE DATA T L 30'48.94'31.87' 30'47.15'30.03' 9 10 R/ W 54.00' Lt "WB2" +01.49 BCR 404.14 FL R/ W 404.43 FL 3À/4 À/2 404.24 FL À/4 404.33 FL 404.74 FL À/2 404.78 FL 3À/4 404.81 FL TYPE 1 CURB RAMP TYPE 1 CURB RAMP 85.52' Lt "WB2" +33.10 ECR 404.52 FL 94.05' Lt "WB2" +32.73 MATCH Exist (404.59) FL R/WR/W83.74' Lt "WB2" +71.13 BCR 404.71 FL 54.00' Lt "WB2" +26.56 404.84 FL 74.78' Lt "WB2" +38.12 MATCH Exist (405.60) 73.49' Lt "WB2" +54.50 MATCH Exist (405.72) 54.00' Lt "WB2" +37.50 405.92 FL 54.00' Lt "WB2" +72.50 405.90 FL 405.92 FLW=25'• Sta +55405.76 FLW=45'• Sta +55R/W405.84 FL R/W+83.44 54.00' Lt "WB2" 9 10 Dwy TYPE "B-1"Dwy TYPE "B-1"5.5' 4.5' 5.5'5.5' 4.5' 66.00' Lt "WB2" +89.43 6 ' SW 12 ' Pkwy 6' SW 12' Pkwy 66.00' Lt "WB2" +89.04 405.64 FL END SW TAPER Beg SW TAPER +85.29 64.00' Lt "WB2" END SW TAPER 54.00' Rt "EB2" +08.23 58.00' Rt "EB2" +98.01 6' SW "EB2" Rt FL "WB2" Lt FL "EB2" Lt FL "WB2" Rt FL "WB2" Lt FL 1.16' Lt "EB2" +00.00 4.10' Lt "EB2" +25.00 8.69' Lt "EB2" +50.00 11.78' Lt "EB2" +75.00 12.00' Lt "EB2" +00.00 TCE TCE 64.84' Rt' "EB2" +58.45 54.00' Rt' "EB2" +15.46 66.00' Rt' "EB2" +81.27 66.00' Rt' "EB2" +48.02 54.00' Rt' "EB2" +13.83 54.00' Rt' "EB2" +29.33 64.84' Rt' "EB2" +70.83 +13.31 75.45' Lt "WB2" 405.25 +26.39 88.35' Lt "WB2" 405.26 72.00' Lt "WB2" +95.84404.42 MATCH Exist (404.64) FL 102.80' Lt "WB2" +70.75 (404.64) 92.90' Lt "WB2" +77.31 (405.21) 4' Pkwy MATCH Exist 54.00' Lt "WB2" +02.75 ECR 6.42' SW 10' SW (SEE SOUND WALL PLANS) SW No. 1 72' Lt "WB2" +61.01 4' Pkwy6' SW4' Pkwy6' SWTURNOUT DESIGN MID-BLOCK 6' SW +19.36 60.00' Lt "WB2" (SEE SOUND WALL PLANS) SW No. 2 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 101.79' Lt "WB2" +34.30 MATCH Exist (404.69) FL CURB RETURN DETAILS SEE C-6 FOR 406.11 FL END SW TAPER 406.71 Beg SW TAPER 405.58 406.12 Beg SW TAPER 404.40 END SW TAPER 66.00' Lt "WB2" +01.49 404.89 66.00' Lt "EB2" +02.75 BC 404.62 EC 404.70 BC 404.16 EC 404.20 R=50' 54.78' Rt' "EB2" +07.08 BC 405.22 R=50' EC 405.30 FL R=50' R=50' 54.78' Rt' "EB2" +22.21 BC 404.19 BC 404.19 FL 2%À/4 39 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 1 REPLACEMENT THREE (3) WALKWAY PANEL "EB2" LINE "WB2" LINE OLIVE St24TH S tELM ST P P p ASPHASPHELM STASPHASPHPOOL CONCASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 1 2 3 4 325 3 4 CONSTRUCTION DETAILS SCALE: 1" = 20'R/WNo.#R CURVE DATA T L C-5 12 11 42' 35'31.70' T C E 64.00' Rt "EB2" +34.20 97.49' Rt "EB2" +34.11 140.38' Rt "EB2" +28.84 106.97' Rt "EB2" +51.38 144.16' Rt "EB2" +39.24 R=25' 79.51' Rt "EB2" +04.12 +03.67 BC 87.16' Rt "EB2" +31.65 EC 139.49' Rt "EB2" 2' (Typ) 226.56' Rt "EB2" +46.57 230.49' Rt "EB2" +56.41 BC R=10' R=2' +91.11 EC 189.49' Rt "EB2" "EB2" +57.07 192.05' Rt R=35' R=70' 172.08' Rt "EB2" +01.60 183.29' Rt "EB2" +05.42 270.50' Rt "EB2" +87.03 275.59' Rt "EB2" +84.06 266.48' Rt "EB2" +69.62 R/WR/WR/WÀ/2 À/4 176.09' Rt "EB2" +28.72 BC 147.07' Rt "EB2" +19.88 PRC 402.78 FL 123.30' Rt "EB2" +90.58 EC 403.68 FL 404.03 FL 403.08 FL -170.16' 17.03' 77.04' Rt "EB2" +88.33 R=20' NOT TO SCALE 20' EPEPHP FLATTER 4:1 OR 3' 2%5% OGAA5%2%2%R/WR/W W=28' 403.24 FL • 97.49' Rt "EB2" +13.22 R/W 176.46' Rt "EB2" +31.47 MATCH Exist (402.50) FL MATCH Exist (403.45) FL 5' MATCH Exist (403.37) 6 12 11 64.00' Rt "EB2" +25.59 TCE (407.40) ANGLE Pt END HMA Pvmt (405.48) END HMA Pvmt (404.88) (404.65) (406.09) (406.66) END HMA Pvmt 119.69 Rt "EB2" +63.98 (403.95) CROWN 116.35' Rt "EB2" +39.40 79.12' Rt "EB2" +14.89 109.17' Rt "EB2" +99.86 (404.00) (404.87) (404.87) 87.17' Rt "EB2" +65.98 (404.71) 161.94' Rt "EB2" +19.88 (405.72) 5' Dwy TYPE "B-1" Mod FOR DETAILS SEE C-6 R/WR/WR/WR/WR/W 13.3% 100.18' Rt "EB2" +54.91 87.17' Rt "EB2" +91.55 406.03 10' SW 406.23 END TAPER END HMA Pvmt 405.89 END TAPER (SEE STRUCTURE PLANS) Beg CB TYPE 732SW (Mod) END SW (406.91) Beg TAPER MATCH Exist (407.30) MATCH Exist (407.32) MATCH Exist (406.73) MATCH Exist (404.09) MATCH Exist (404.45) MATCH Exist (404.16) +66.05 BC 116.00' Rt "EB2" CONFORM SAWCUT & MATCH Exist (402.70) 106.74' Rt "EB2" +84.35 EC (SEE STRUCTURE PLANS) CARRIER CANAL BOX CULVERT (405.06) END TAPER (404.87) END TAPER 6' SW4' Pkwy 79.73' Rt "EB2" +43.11 BC 405.93 65.42' Rt "EB2" +64.08 EC 405.45 65.42' Rt "EB2" +19.93 405.26 Beg TAPER (SEE STRUCTURE PLANS) END TYPE 732SW (Mod) Beg SW FOR DETAILS) (SEE SOUND WALL PLANS SW No. 2 MATCH Exist (406.75) Beg TAPER (404.74) END TAPER 40 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT STAIR WAY KIT FOX CMU 3À/4 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 SOUND WALL. EXISTING SIDEWALK (RUNNING NORTH/SOUTH) TO SIDEWALK AND BACK OF NEW SIDEWALK. EXTEND MINOR CONCRETE, GRADE BETWEEN EXISTING 1 "EB2" LINE "WB2" LINE 24TH St Carrier Canal20' 1 2'20'ELM StELM St ALLEY30'SECTION A-A2% PP P P P P pASPHCONC ASPHASPHASPHASPHCONC24TH ST ELM STASPHELM STASPHP ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4016-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 UB UB 325 330 6 7 8 9 325 330 6 7 8 9 CONSTRUCTION DETAILS C-6SCALE: 1" = 20' No.#R CURVE DATA T L 26.14'30'43.00' 34.20'51.05'30' 19.99'31.41' 20'16.69'27.81' 50'26.93'49.40' 20'20.01'31.42' 30'27.35'44.35' 30'64.71'68.20' 13 14 15 16 17 18 19 20R/WR/WR/WR/W R/WR/W13 14 15 16 17 19 20 TYPE 1 CURB RAMP 405.55 FL 94.00' Rt "EB2" +31.77 MATCH Exist (402.60) Dwy TYPE "A" 405.05 FL MATCH Exist (402.44) 94.00' Rt "EB2" +51.95 R/WR/W401.48 FL 401.07 FL R/W R/W 65.00' Rt "EB2" +89.85 MATCH Exist (401.31) 65.00' Rt "EB2" +05.98 MATCH Exist (401.19)R/WR/WDwy TYPE "A"401.27 FLW=20'• Sta +98.46R/W TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 3 CURB RAMP TYPE 3 CURB RAMP Dwy TYPE "A" 404.20 FL W=24' • Sta +41.73 405.26 FL 405.42 FL 406.18 FL 76.00' Lt "WB2" +65.73 BCR 405.70 FL 42.00' Lt "WB2" +95.14 ECR 402.87 FL 403.19 FL 92.09' Lt "WB2" +98.67 ECR 403.65 FL 69.33' Lt "WB2" +96.75 ECR 404.07 FL 42.00' Lt "WB2" +67.33 BCR 404.84 FL MATCH Exist (405.16) FL 402.29 FL MATCH Exist (401.73) FL 91.44' Lt "WB2" +68.39 BCR 402.43 FL 405.90 FL MATCH Exist (405.62) FL 405.08 FL 404.92 FL À/2 405.00 FL TCE TCER/W3À/4 À/4 405.65 FL 3À/4 405.73 FL À/2 405.82 FL À/4 403.97 FL À/4 403.76 FL 3À/4 403.86 FL À/2 401.87 FL 3À/4 402.01 FL À/2 402.15 FL À/4 402.09 FL À/2 +90.83 ECR 42.00' Lt "WB2" 401.91 FL 402.26 FL À/4 3À/4 406.06 FL À/4 405.82 FL 3À/4 À/2 405.94 FL 403.07 FL À/4 À/2 403.11 FL 403.15 FL 3À/4 18 R=1' R=2' 22 21 21 68.11'23.26' 22 60'31.34'57.75' 8'R/W+76.16 BCR 54.00' Lt "WB2" 174.80' Lt "WB2" +71.28 BCR 131.74' Lt "WB2" +04.34 BCR 150.85' Lt "WB2" +46.42 ECR 1.00' Lt "EB2" +92.41 BC 404.76 FL 405.08 FL 1. FOR ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. NOTE: SEE NOTE No. 2 2. FOR MEDIAN DETAILS NOT SHOWN, REFER TO CITY STANDARD T-16 ONE-WAY MEDIAN OPENING. 405.17 FL +84.93 EC 17.15' Lt "EB2" 405.40 FL +58.40 ANGLE POINT 12.00' Lt "EB2" 404.17 FL 404.19 FL 3.00' Lt "EB2" +01.41 BC 404.61 FL 3.00' Lt "EB2" +92.41 EC 404.72 FL 6' SW 4.42' Pkwy 54.00' Rt "EB2" +62.31 58.42' Rt "EB2" +99.20 4.42' Pkwy 6' SW 3.75' Pkwy 6' SW 4.42' Pkwy 6' SW 53.09' Rt "EB2" +77.69 401.13 50.00' Lt "WB2" +82.93 44.92' Lt "WB2" +96.96 45.00' Lt "WB2" +43.92 6' SW 8' Pkwy Pkwy 2.92' 6' SW TCE TCE TCE 8' SW 5' SW R=5' R=15' TYPE 6 CURB RAMP 8' SW "WB2" Lt FL R=10' R=10' "EB2" Rt FL "WB2" Rt FL "EB2" Rt FL "EB2" Lt FL "WB2" Rt FL TYPE 3 CURB RAMP 130.21' Lt "WB2" +96.93 24'12' 176.04' Lt "WB2" +52.43 MATCH Exist (406.10) MATCH Exist (406.27) 76.63' Lt "WB2" +29.45 24.00' Rt "WB2" +75.00 407.27 FL 21.76' Rt "WB2" +00.00 407.09 FL 15.55' Rt "WB2" +25.00 406.79 FL 406.45 FL 8.34' Rt "WB2" +50.00 406.11 FL 2.51' Rt "WB2" +75.00 405.84 FL 1.00' Rt "WB2" +00.00 TYPE 3 CURB RAMP +66.44 68.59' Lt "WB2" 402.57 +84.29 56.00' Lt "WB2" 402.98 +90.83 50.00' Lt "WB2" 403.09 166.21' Lt "WB2" +08.98 188.04' Lt "WB2" +11.66 155.91' Lt "WB2" +88.13 ECR +38.69 162.37' Lt "WB2" 5' SW 132.71' Lt "WB2" +73.44 BCR 113.75' Lt "WB2" +80.89 BCR 401.74 FL 1.00' Rt "WB2" +65.32 BC 1.00' Rt "WB2" +34.08 EC 1.95' Rt "WB2" +32.38 PC +08.68 100.20' Lt "WB2" +05.87 ECR 79.89' Lt "WB2" TYPE 6 CURB RAMP MATCH Exist FL (401.60) OTHERS) SOUND WALL (BY (SEE SOUND WALL PLANS) SW No. 3 405.56 MATCH Exist (406.56) MATCH Exist (406.56) MATCH Exist (404.72) MATCH Exist (404.29) (404.20) MATCH Exist 3. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 404.45 FL 151.50' Lt "WB2" +21.19 +78.96 ECR 137' Lt "WB2" PLANS) (SEE SOUND WALL SW No. 2 5'R/W159.54' Lt "WB2" +61.74 146.55' Lt "WB2" +60.92 403.98 FL 405.31 FL W=20' • Sta +45.89 "WB2" +77.17 142.21' Lt SW Trans Beg 10' R=12' R=12'+36"EB2"+28"EB2"176.93' Lt "WB2" +50.58 SEE C-94 FOR ISLAND DETAILS CURB RAMP TYPE 1 EC "WB2" +67.27 128.94' Lt BC "WB2" +62.63 132.56' Lt BC "WB2" +56.75 124.60' Lt EC "WB2" +61.40 120.97' Lt DETAIL A SEE DETAIL A THIS SHEET R=3' R=3' 4' 10 10 406.36 END SW TAPER 405.94 FL Beg SW TAPER 401.40 END SW TAPER401.36 Beg SW TAPER 401.70 END SW TAPER 401.94 Beg SW TAPER SEE C-88 FOR Dwy No. 1 DETAILS +67.75 50.00' Lt "WB2" 54' Rt "EB2" +25.75 BCR 53.48' Rt "EB2" +65.94 ECR 46.03' Rt "EB2" +77.68 BCR 44.58' Rt "EB2" +19.22 ECR 41 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT BE DIRECTED BY THE ENGINEER FOR SIDE ACCESS. WORK SHALL FURNISHED SWING GATE EXISTING). INSTALL OWNER TO MATCH BACK WALL AND CONSTRUCT SIDE WALL (CMU THE ENGINEER AS DIRECTED BY WOODEN FENCE EXTEND EXISTING REVISED ELEVATIONS SEE C-6r FOR CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 1 1 1 1 REVISED ELEVATIONS SEE C-6r2 FOR 24TH StELM StBEECH St"WB2" LINE "EB2" LINE x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-6 SCALE: 1" = 40' r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1MATCH LINE (C-7r1) PP P P P P pASPHCONC ASPHASPHASPHASPHCONC24TH ST ELM STASPHELM STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 UB UB 325 330 6 7 8 9 325 330 6 7 8 9 CONSTRUCTION DETAILS C-6 SCALE: 1" = 20'R/WR/WR/WR/W R/WR/WR/WR/WR/W R/W R/WR/WTCE TCER/WR/W1. FOR ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. NOTE: 2. FOR MEDIAN DETAILS NOT SHOWN, REFER TO CITY STANDARD T-16 ONE-WAY MEDIAN OPENING. TCE TCE TCE 3. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR.R/W+36"EB2"+28"EB2"41 r END C&G DELETE GUTTER Beg C&G 1.93%1.71%1.98%2.44%2.636%2.61%2.52%2.33%404.96FL 406.04BW 405.07FL405.18FL 405.31FL E6252955.88 N2326668.69 405.92FS 406.15BW E6252930.65 N2326666.13 406.03FS 2.0%1.8%2.0%0.427% 406.14FS E6252905.43 N2326663.43 406.26BW 1.0%1.0%1.0%2.5%-R2.86%-R402.52FL-R (401.74) 401.86FL-P (401.96) 402.775-R 402.04-P 402.30-P (402.17) 402.94-R 402.87-P 403.09-R (402.73) 403.01-R 402.58-P (402.45)2.48%-R2.95%-R3.0%-R0.31%0.31%0.66% 1.02% 0.31% 0.31% 0.3%2%6.2%6.2% (401.19) FS FS 401.44 401.51 FS 401.91 FS 401.96 FS 401.97FS (401.61)FS 401.91FS (401.62)FS (401.31) FS FS 401.50 401.59 FS 402.08 FS 402.04 FS 402.11 FS 0.31% 401.51FL-P 401.44FL-R 401.78FL-P 401.36FL-R (401.24) 401.01FL-P 401.28FL-R 400.84FL-P (401.21) 401.25FL-P (401.30) (401.32) 405.365 FL FL 405.42 406.25FS E6252867.40 N2326659.09 1.8% 0.5%1.48% 1.78% Const. CL 2.42% 1.68% 1.45% 1.5%0.98%0.3%0.3%0.3%1.6% 406.01 406.06 406.18 BW 406.06BW 405.53FL 405.59FL 405.62FL HIGH POINT 405.59FL E6252857.57 N2326636.78 405.617FS E6252832.45 N2326636.28 405.99FS N2326635.93 E6252814.17 406.26FS N2326635.79 E6252807.33 406.225FS N2326635.30 E6252782.20 406.10FS E6252814.41 N2326652.47 406.19FS 8. 7 5 %7. 8 7 %0.427% 7.3% 405.93TC 405.43FL 405.458 FL 405.475 FL 405.50FL 406.00TC REVISION DATE DESCRIPTION 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 2 1 1 1 GRIND 0.2' AND PAVE GRIND 0.2' AND PAVE GRIND 0.2' AND PAVE 24TH StELM StBEECH St"WB2" LINE "EB2" LINE PPP P P P P P P P P P PP ASPH ASPH ASPHASPHPOOLCONC CONC POOL CONC CONC CONC CONC CONC CONCCONC CONC ASPHASPHASPHMYRTLE STASPHSPRUCE STP x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4116-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 335 2 3 4 6 7 CONSTRUCTION DETAILS C-7 SCALE: 1" = 20' No.#R CURVE DATA T L 30'44.10'27.12' 30'50.07'33.10' 30'47.42'30.29' 30'47.14'30.02' R/W 400.17 FL 70.50' Rt "B" +17.04 R/WR/WR/WR/W400.08 FL 70.50' Rt "B" +63.58 MATCH Exist (401.01) R/W R/WR/WMATCH Exist (400.91) +78.08 70.50' Rt "B" 400.16 FL Dwy TYPE "A"400.12 FLW=20'• Sta +71.37R/WR/WR/W3À/4 400.69 FL À/2 400.50 FL À/4 400.30 FL 80.79' Lt "B" +80.53 ECR À/4 400.68 FL À/2 400.48 FL 3À/4 400.27 FL 25 26 TYPE 3 CURB RAMP À/4 À/2 3À/4 3À/4 À/2 À/4 +79.90 ECR 69.08' Lt "WB2" TYPE 3 CURB RAMP 23 24 23 24 25 26 400.86 FL Beg SW TAPER 53.41' Lt "B" +47.82 400.89 FL END SW TAPER 53.41' Lt "B" +38.53 400.88 FL Beg SW TAPER 62.50' Lt "B' +82.21 6' SW 2.91' Pkwy 6' SW 12' Pkwy 6' SW 10' Pkwy 6' SW 10' Pkwy 60.50' Rt "B" +00 400.48 60.50' Rt "B" +50 400.63 60.50' Rt "B" +90.84 60.50' Rt "B" +06.7860.50' Rt "B" +35.97 60.50' Rt "B" +00 401.2560.50' Rt "B" +50 400.87 55.50' Rt "B" +64.93 400.75 60.50' Rt "B" +50 400.56 60.50' Rt "B" +00 400.52 R=10' R=12' WB Lt FL EB Rt FL EB Lt FL WB Rt FL WB Lt FL R=10' 1. FOR ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. NOTE: 83.44' Lt "B" +05.96 BCR 50.00' Lt "B" +35.82 ECR 50.00' Lt "B' +46.21 ECR 50.00' Lt "B" +50.53 BCR 5'5'5'5' R=15' R=15' R=15'R=15' 104.51' Rt "B" +20.86 104.62' Rt "B" +76.21 400.80 66.50' Rt "B" +26.26 76.79' Rt "B" +74.63 401.09 401.09 65.50' Rt "B" +79.77 75.20' Rt "WB2" +34.19 85.02' Rt "WB2" +39.06 TYPE 3 CURB RAMP 400.44 FL W=19' • Sta +80.82 Dwy TYPE "B-2" 399.84 FL MATCH Exist SW (400.84) MATCH Exist SW (400.81) MATCH Exist SW (400.84) MATCH Exist SW (400.67) 55.50' Rt "B" +06.91 90.52' Lt "B" +16.22 8.52' Lt "B" +16.21 BCR 6' SW MATCH Exist (400.89) FL 10' SW 400.59 82.89' Lt "B" +70.50 82.84' Lt "B" +75.50 400.51 400.11 FL 5' Pkwy 399.91 FL 66.50' Rt "B" +70.44 400.66 MATCH Exist (400.74) 2. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR 400.90 Beg SW TAPER 401.34 Beg SW TAPER 55.50' RT "B" +52.03 60.50' Rt "B" +06.78 OTHERS) SOUND WALL (BY OTHERS) SOUND WALL (BY TYPE 3 CURB RAMP R/WR/W+50.50 BCR 42.00' Lt "WB2" +36.65 50' Lt "WB2" 399.94 FL 400.13 FLW=40'• Sta +50.50END SW TAPER 400.76 Beg SW TAPER 400.89 Beg SW TAPER Dwy TYPE "A"401.34 END SW TAPER +91.37 ECR 50.50' Rt "B" 401.68 END SW TAPER 401.47 Beg SW TAPER SEE SHEET C-89 FOR Dwy No. 3 DETAILS FOR Dwy No. 2 DETAILS SEE SHEET C-89 400.66 FL END SW TAPER 401.44 END SW TAPER +06.25 BCR 50.50' Rt "B" 400.65 Beg SW TAPER 400.81 END SW TAPER MATCH Exist (400.12) FL 120.32' Lt "B" +81.06 400.71 END SW TAPER 400.58 FL 400.34 FL 400.10 FL 400.13 FL 400.38 FL 400.62 FL 5' "B" +00 60.50' Rt "B" +86.18 60.50' Rt FOR Dwy No. 7 DETAILS SEE SHEET C-93 +46.25 ECR 50.50' Rt "B" 400.11 FL R=12' 50.00' Rt "B" +51.37 BCR 42 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 REVISION DATE DESCRIPTION 10/01/21 As-Builts1 1 1 1 1 1 1 1 1 1 FOR REVISED ELEVATIONS. SEE SHEETS C-7r1, C-7r2, C-7r3, AND C-7r4 1 1 SPRUCE St"B" LINE 24TH St SPRUCE StMYRTLE St"WB2" LINE "EB2" LINE x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SCALE: 1" = 40' C-7 1 CONSTRUCTION DETAILS r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 42r1 MATCH LINE (C-6r1)MATCH LINE (C-9r1) x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SCALE: 1" = 10' C-7 2 CONSTRUCTION DETAILS r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 42r1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SCALE: 1" = 10' C-7 3 CONSTRUCTION DETAILS r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 42r2 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SCALE: 1" = 10' C-7 4 CONSTRUCTION DETAILS r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 42r3 P P P OOL ASPH ASPH CONC CONC ASPHASPHASPHPINE STCEDAR STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4216-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 340 8 9 1 2 3 CONSTRUCTION DETAILS C-8 SCALE: 1" = 20' No.#R CURVE DATA T L 30'47.12'30.00' 30'47.14'30.02' 30'47.08'29.96' 30'47.09'29.97' 27 28 29 30 R/WR/W80.50' Lt "B" +27.24 ECR R/W 3À/4 À/2 401.21 FL À/4 401.30 FL À/4 À/2 401.19 FL 3À/4 401.29 FL R/W3À/4 400.71 FL À/2 400.77 FL À/4 400.84 FL 80.47' Lt "B" +80.47 BCR R/W50.50' Lt "B" +39.39 ECR R/W À/4 400.74 FL À/2 400.80 FL 3À/4 400.85 FL R/W R/W R/WR/WR/WR/WR/WR/W27 28 TYPE 3 CURB RAMP TYPE 3 CURB RAMP TYPE 3 CURB RAMP 29 30 401.38 FL END SW TAPER "B" +61.24 62.50' Lt 6' SW 12' Pkwy 6' SW 6' SW 6' Pkwy 6' SW 10' Pkwy 6' SW 10' Pkwy 6' Pkwy 401.40 FL Beg SW TAPER 400.90 FL END SW TAPER 400.91 FL Beg SW TAPER 56.50' Lt "B" +10.88 56.50' Lt "B" +10.88 50.50' Lt "B" +10.88 60.50' Rt "B" +00 401.08 60.50' Rt "B" +50 400.98 400.98 60.50' Rt "B" +50 401.08 60.50' Rt "B" +00 401.18 60.50' Rt "B" +50 55.50' Rt "B" +98.53 401.37 60.50' Rt "B" +00 401.16 60.50' Rt "B" +00 60.50' Rt "B" +50 401.18 60.50' Rt "B" +50 401.06 60.50' Rt "B" +10.06 WB Lt FL WB Rt FL WB Lt FL WB Lt FL EB Lt FL EB Rt FL NOTE: 1. FOR ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. 50.00' Lt "B" +43.75 BCR50.00' Lt "B" +97.24 BCR 112.00' Lt "B" +19.43 66.50' Rt "B" +72.755' 401.25 80.52' Rt "B" +72.55 66.50' Rt "B" +17.25 401.23 5' 80.35' Rt "B" +17.91 50.00' Lt "B" +92.88 ECR MATCH Exist (400.64) FL 400.73 FL W=14' • Sta +09.40 Dwy TYPE "B-1" TYPE 3 CURB RAMP MATCH Exist SW (401.55) MATCH Exist SW (401.59) 400.68 FL 80.46' Lt "B" +73.75 ECR 86.46' Lt "B" +73.75 MATCH Exist FL (400.65) 400.65 FL MATCH Exist 401.04 FL 2. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 400.15 FL W=17' • Sta +17.29 Dwy TYPE "A" 401.44 84.58' Rt "B" +51.68 401.17 84.45' Rt "B" +57.39 400.67 75.48' Rt "B" +57.35 400.56 75.31' Rt "B" +64.01 401.30 85.12' Rt "B" +32.09 85.22' Rt "B" +25.94 401.28 400.46 75.35' Rt "B" +19.59 401.16 75.37' Rt "B" +25.74 (SEE SHEET C-93 FOR Dwy DETAILS) RESIDENTAIL Dwy No. 9 400.95 FL Dwy No. 6 DETAILS SEE C-90 FOR 401.60 END SW TAPER 400.80 Beg SW TAPER55.50' Rt "B" +54.51 400.67 Beg SW TAPER400.78 END SW TAPER TYPE 4 CURB RAMP 402.04 Beg SW TAPER Dwy NO. 4 DETAILS SEE C-90 FOR 401.99 END SW TAPER Dwy NO. 5 DETAILS SEE C-90 FOR 401.56 Beg SW TAPER 402.43 FL 7.50' Lt "B" +76 7.50' Rt "B" +09 402.40 FL 66.50' Rt "B" +82.47 400.92 Beg SW TAPER 400.80 END SW TAPER 60.50' Rt "B" +75.28 (BY OTHERS) SOUND WALL (BY OTHERS) SOUND WALL 102.52' Lt "B" +62.89 MATCH LINE (401.04) FL 116.39' Lt "B" +27.24 MATCH LINE (401.08) FL 401.08 FL "B" +09 402.43 "B" +25 402.47 "B" +50 402.52 "B" +76 402.47 80.52' Lt "B" +62.88 400.98 FL 402.45 FL 7.50' Lt "B" +68 7.50' Rt "B" +17 402.42 FL BLEND COLOR PROMENADE MINIOR CONCRETE 50.50' Rt "B" +97.87 BCR 50.50' Rt "B" +36.71 ECR R=12' R=10' 400.18 FL 400.11 FL 43 REVISION DATE DESCRIPTION 10/01/21 As-Builts CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 1 1 1 1 1 1 1 FOR REVISED ELEVATIONS. SEE SHEETS C-8r1, C-8r2, C-8r3, AND C-8r4 1PINE St24TH St "B" LINE CEDAR StCEDAR StPINE St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' C-8 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 r 43r1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' C-8 2r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 43r2 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' C-8 3r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 43r3 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' C-8 4r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 43r4 P P POOLPOOL POOL ASPH ASPHASPHASPH ASPHASPHCEDAR STASPHA STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4316-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 4 345 2 3 4 6 7 CONSTRUCTION DETAILS C-9 SCALE: 1" = 20' No.#R CURVE DATA T L 25'39.26'24.99' 30'46.93'29.81' 31 32 R/WR/W R/WR/W3À/4 À/2 À/4 À/4 400.45 FL À/2 400.58 FL 3À/4 400.72 FL R/WR/WR/WR/WR/WR/WR/WR/W MATCH Exist (400.76) Dwy TYPE "A"400.78 FL 43.00' Rt "23RD" +82.51 MATCH Exist (400.66)Dwy TYPE "A"400.85 FLW=10.50'• Sta +87.4743.00' Rt "23RD" +93.82 MATCH Exist (400.79) 400.92 FL R/W TYPE 3 CURB RAMP TYPE 3 CURB RAMP 31 32 MATCH Exist (401.04) 70.50' Rt "B" +74.47399.74 FLW=39'• Sta +54.9772.68' Rt "B" +35.47 80.50' Rt "B" +58.22 72.51' Rt "B" +52.12 Beg CURB (TYPE A1-6) MATCH Exist (401.18) END CURB TRANSITION END CURB (TYPE A1-6) MATCH Exist (400.82) 6' SW 10' Pkwy 6' SW 10' Pkwy 6 ' SW 400.85 FL END SW TAPER 56.50' Lt "B" +54.39 400.85 FL Beg SW TAPER 56.50' Lt "B" +22.83 60.50' Rt "B" +99.87 400.67 60.50' Rt "B" +50 60.50' Rt "B" +00 400.98 401.05 60.50' Rt "B" +50 401.23 60.50' Rt "B" +00 401.30 60.50' Rt "B" +50 R/W22' Rt "23RD" +03.03 20' Rt "23RD" +73.69 R=10' "23RD" Rt FL "23RD" Lt FL "24TH" Lt FL "24TH" Rt FL WB Rt FL WB Lt FL WB Lt FL EB Rt FL EB Lt FL 60.50' Rt "B" +10.06 PROFILE SHEETS. NOTE: 1. FOR ELEVATIONS NOT SHOWN, REFER TO 5'5' 401.04 66.50' Rt "B" +11.26 401.04 80.40' Rt "B" +10.67 400.97 66.50' Rt "B" +66.40 400.71 80.00' Rt "B" +65.71 +85.95 ECR 50.00' Lt "B" 400.34 FL W=14' • Sta +55.93 Dwy TYPE "B-1" 400.40 FL 400.31 FL 6' SW 6' Pkwy 74.90' Lt "B" +20.38 ECR 6' SW 6' Pkwy R=20' 400.63 FL 400.77 FL 400.84 FL50.50' Lt "B" +90.39 400.84 FL 50.50' Lt "B" +94.81 BCR R/W 102.48' Lt "B" +20.40 MATCH Exist (400.92) FL 2. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. OTHERS) SOUND WALL( BY 400.74 FL W=12' • Sta +20.39 Dwy TYPE "B-1" 80.30' Lt "B" +55.95 BCR OTHERS) SOUND WALL (BY 28' Rt "23RD" +55.44 23' Rt "23RD" +72.11 401.34 Beg SW TAPER 400.63 END SW TAPER 55.50' Rt "B" +83.81400.80 Beg SW TAPER 55.50' Rt "B" +26.13 R=12' R=12' (SEE C-92 FOR Dwy DETAILS RESIDENTIAL Dwy No. 7 R=575' 401.51 END SW TAPER 401.36 END SW TAPER 400.43 Beg SW TAPER 400.26 END SW TAPER 401.54 Beg SW TAPER DETAILS CURB RETURN SEE C-8 FOR 401.50 BC 401.70 EC Beg SW TAPER 105.49' Lt "B" +55.98 MATCH Exist (400.38) FL 399.66 FL 50.50' Rt "B" +25.47 BCR 399.84 FL 50.50' Rt "B" +86.30 ECR R=10' 18' Rt "23RD" +71.46 BCR 18' Rt "23RD" +03.48 ECR 44 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 10/01/21 As-Builts 10/01/21 1 1 1 1 1 1 1 1 1 11 1 1 C-9r5 FOR REVISED ELEVATIONS. SEE SHEETS C-9r1, C-9r2, C-9r3, C-9r4 AND CEDAR St24TH St ALDER St"B" LINE "24TH" LINE "23RD" LINE CEDAR StA St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 40' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON C-9 1r 10/01/21 44r1 MATCH LINE (C-7r1)MATCH LINE (C-9r2) x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 40' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON C-9 2r 10/01/21 44r1 MATCH LINE (C-9r1) x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON C-9 3r 10/01/21 44r1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON C-9 4r 10/01/21 44r2 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON C-9 5r 10/01/21 44r3 PP P ASPHASPHASPHASPH ASPHASPHB STASPHC STP P CONC A S P H 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 5 67 8 9 350 8 91 2 3 CONSTRUCTION DETAILS C-10 SCALE: 1" = 20' MATCH Exist (400.34) FL À/2 No.#R CURVE DATA T L 5.5' SW 34 33 FL R/ W R/WR/WR/WR/W R/WR/WR/WDwy TYPE "B-2" 30.00' Lt "23RD" +78.15 401.25 FL 46.00' Lt "23RD" +77.15 EC 135.63' Rt "23RD" +88.70 EC 399.83 FL 46.00' Lt "23RD" +45.97 BC 401.09 FL 30.00' Lt "23RD" +87.26 BC 400.34 FL 117.95' Lt "23RD" +39.90 EC 399.25 FL 400.74 +50 400.82 +25 400.66 +75 400.58 +00 400.90 +00 400.98 +75 401.06 +50 À/4 400.31 FL À/2 399.52 FL 3À/4 399.68 FL À/2 398.72 FL 3À/4 398.99 FL À/4 399.53 FL 401.58 FL 1. FOR ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. NOTE: ~~6' SW 6' SW 6' Pkwy4' Pkwy 6' SW 4' Pkwy 4' Pkwy 6' S W"23RD" +77.03 23.00' Rt 20.92' Rt "23RD" +82.50 31.88' Lt "24TH" +14.28 BC 29.24' Lt "24TH" +21.28 PRC 25.89' Lt "24TH" +14.42 30.00' Lt "24TH" +89.84 22.37' Lt "24TH" +19.98 27.47' Lt "24TH" +68.66 26.69' Lt "24TH" +32.10 34.31' Lt "24TH" +62.25 28.00' Lt "24TH" +74.25 SAWCUT & JOIN 6' SW 6 "23RD" Rt FL "23RD" Lt FL "23RD" Lt FL "24TH" Rt FL "24TH" Lt FL R=30' R=30' TYPE 3 CURB RAMP 32.20' Rt "23RD" +95.11 38.00' Rt "23RD" +51.16 401.96 BC 402.23 EC 402.33 BC 42.14' Lt "23RD" +18.70 TCE R/WTCE 28.00' Rt "23RD" +41.75 401.91 28.00' Rt "23RD" +48.04 401.91 TCE TCE RETURN DETAILS SEE C-12 FOR CURB FOR DETAILS SEE C-11 6' 35a 35e 35b 6' PKWY6' SW401.03 FL À/4 À/2 400.89 FL 3À/4 400.75 FL 400.65 FL À/4 À/2 400.73 FL 3À/4 400.81 FL 28'26'400.58 FL 61.58' Lt "24TH" +85.72 62.69' Lt "24TH" +48.82 MATCH Exist (400.64) FL 94.21' Rt "23RD" +75.33 BC "23RD" +04.89 83.63' Rt MATCH Exist (401.43) 5.5' SW "23RD" +36.15 138.71' Rt MATCH Exist (401.23) 118.10' Rt "23RD" +62.36 EC 400.11 FL 122.93' Rt "23RD" +64.36 MATCH Exist (400.08) FL 126.30 Rt "23RD" +66.42 123.61' Rt "23RD" +72.48 400.09 FL 5.5' SW400.15 FL W=18' • Sta +61.21 400.19 FL 400.21 FL +66.60 90.83' Rt "23RD" 95.54' Rt "23RD" +64.58 PRC BY OTHERS SOUNDWALL 6' Pkwy 5' SW 45.24' Lt "24TH" +89.72 ECR 24.83' Lt "24TH" +17.22 20.75' Lt "24TH" +25.84 EC 401.13 FL PRC 27.76' Lt "24TH" +32.73 EC (SEE SOUNDWALL PLANS) SW No. 4 2. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 35c 35d 401.29 MATCH Exist SW (400.86) 82.02' Rt "23RD" +63.42 MATCH Exist (400.98) FL 399.93 Beg SW TAPER 399.88 END SW TAPER END SW TAPER 22' Lt "23RD" +83.81 401.76 BC 400.87 FL Beg SW TAPER 401.29 Beg SW TAPER 401.41 END SW TAPER 401.25 END SW TAPER 399.97 FL END SW TAPER 400.63 Beg SW TAPER FOR DETAILS SEE C-12 MATCH Exist (400.64) FL (SEE SOUNDWALL PLANS) SW No. 5 45 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 42' 35' -"23R D " L IN E 23R D ST 24TH ST"2 4 TH " L IN EBAY StC StB St55'115.38'123.86' 33 34 35a 35b 625'148.85'74.78' 233°17'29" 17.15'31.89' 171.01' 35c 30.02'234.48'59.71' 35d 31.29'62.34'314' 55'35e 115.38'123.86' P PP PP ASPH ASPHASPH ASPH ASPH ASPHP P PASPH ASPHASPH ASPHASPH A S P H ASPH CONC D ST23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 5 0 9 12 3 4 CONSTRUCTION DETAILS C-11 SCALE: 1" = 20' R/W R /W No.#R CURVE DATA T L 399.79 FL399.86 FLW=20'• Sta +79.736'4'118.38' Rt "23RD" +16.33 398.50 FL 398.54 FL MATCH Exist (398.42) FL MATCH Exist (398.61) FL MATCH Exist SW (399.56) MATCH Exist (398.56) FL 398.71 FL 36 À/2 399.13 FL "23RD" +76.77 66.44' Rt 96.75' Rt "23RD" +58.34 125.72' Rt "23RD" +12.63 113.49' Rt "23RD" +14.25 EC 110.09' Rt "23RD" +05.14 BC 115.88' Rt "23RD" +96.17 (399.23) 37 TYPE 4 CURB RAMP TYPE 5 CURB RAMP TYPE 4 CURB RAMPS (2) 145.79' Lt "23RD" +18.72 MATCH Exist SW (400.06) 158.79' Lt "23RD" +19.35 163.79' Lt "23RD" +02.38 158.79' Lt "23RD" +19.35 Dwy TYPE "A" 399.40 FL W=19' • 173.29' Lt "23RD"+19.37 182.79' Lt "23RD" +02.38 189.78' Lt "23RD" +19.38 197.78' Lt "23RD" +19.39 MATCH Exist (399.42) FL 399.41 FL 202.78' Lt "23RD" +18.76 MATCH Exist SW (400.01) +00 399.59 +75 399.51 +50 399.45 +25 399.41 +00 399.33 +75 399.23 +50 399.15 +25 399.12 +00 399.10 ~ "23RD" +57.70 28.00' Lt ~ +83.88 EC 118.67' Lt "23RD" 145.63' Lt "23RD" +52.36 127.22' Lt "23RD" +62.48 399.72 +60.66 BC 83.63' Lt "23RD" R=40' R=20' 67.81' Lt "23RD" +93.81 101.25' Lt "23RD" +95.92 EC 84.99' Lt "23RD" +83.93 BC "23RD" +01.76 28.00' Lt MATCH Exist 41.05' Lt "23RD" +73.81 399.78 399.80 399.77 399.60 MATCH Exist (399.76) "23RD" +35 30.78' Lt MATCH Exist SW (399.77) 400.18 +88.45 BC "23RD" 58.93' Rt NOTE: DETAILS SEE C-10 FOR R/WR/WR/WR/WR/WR/W R/W R/W R/WR/W6' S WPkwy 3.92' SAWCUT & JOIN & JOIN SAWCUT R=7" "23RD" +11.56 28.00' Lt 18' 400.20 34.00' Lt "23RD" +07.86 399.60 +64.16 31.23' Rt "23RD" Dwy TYPE "B-1"R=11' +00 399.69 399.55 +25 399.43 +50 399.32 +75 399.24 +00 399.15 +25 399.11 +50 399.09 +75 TCE 111.22' Rt "23RD" +98.05 MATCH Exist 118.73' Rt "23RD" +18.20 TYPE 6 CURB RAMP 6' SW6' SW6' PKWY399.34 FL 399.39 FL MATCH Exist (399.39) FL FOR DETAILS SEE SW PLANS SW No. 5 ~ FOR PARKING LOT DETAILS SEE SHEET C-49 1. FOR FLOWLINE ELEVATIONS NOT SHOWN, REFER TO PROFILE SHEETS. 2. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. MATCH Exist MATCH Exist MATCH Exist (399.85) TCE TCE6' SW4' Pkwy MATCH Exist (398.67) MATCH Exist (398.48) FL SEE C-29 FOR DETAILS "23RD" +46.06 40.70' Lt 400.10 BC 117.58' Lt "23RD" +49.19 399.76 EC 110.69' Lt "23RD" +51.99 399.63 BC 399.27 EC 93.85' Lt "23RD" +53.06 399.27 BC R=57' R=14' "23RD" +53.06 93.85' Lt EC 399.96 FL 46 CURB RAMP TYPE 6 398.42 FL REVISION DATE DESCRIPTION 1 5/30/19 REVISED PARKING LOT GRADES 1.5% 1 1 398.71 FL CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 2 3 RD S T"23R D" LI NE 54' 8.01'12.58'8' 53.99'84.81'D St36 37 23RD ST C ST ASPHASPH 24TH ST C STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 No.#R CURVE DATA T L CONSTRUCTION DETAILS C-12 SCALE: 1" = 10'27'±R/W R/W R/W 24C2 24C1 27.20' Lt "24TH" +79.09 ECR +49.48 BCR 56.33' Lt "24TH" 399.97 FL 24C1 24C2 24C3 30'30.00'47.12' 30'28.78'45.88' 30'30.07'47.20' Exist LIP MATCH 400.39 400.41 400.62 400.69 400.66 400.63 400.53 400.53 400.04 FL 400.17 FL400.20 FL400.13 FL400.04 FL 400.14 FLTCE+75 +00 +25 +50 +75 +00 +25 +50 +25 +50 +75 +00 +50 +25 28.00' Lt "24TH" +74.25 BCR TYPE 3 CURB RAMP 399.94 FL +00 399.88 FL +75 24C4 3.00'4.71'3' 400.31 FL 24C3 400.07 FL 58.00' Rt "24TH" +36.09 ECR 24C4 399.83 FL 400.19 FL 27.00' Rt "24TH" +81.89 399.85 FL +04.25 ECR 58.07' Lt "24TH" +28.80 BC 51.19' Lt "24TH" 400.79 R=52' R=2' R=2' R=2' 400.68 ~ 10 20' 28.00' Rt "24TH" +06.69 BCR 30.00' Rt "24TH" +56.69 BCR 27.00' Rt "24TH" +61.69 ECR 51.07' Lt "24TH" +29.78 EC 6' SW 26.94' Lt "24TH" +99.34 28.64' Lt "24TH" +20.79 EC 400.06 28.58' Lt "24TH" +29.23 BC 400.04 R/WR/WR/W+31.19 EC 31.47' Lt "24TH" 400.10 +19.07 BC 31.63' Lt "24TH" 400.09 4'SEE SHEET C-13MATCH LINE "24TH" Sta 354+5025'10 ~ +04.23 68.07' Lt "24TH" MATCH Exist (399.85) FL MATCH Exist (399.67) FL TYPE 3 CURB RAMP MATCH Exist (399.64) FL 68.18' "24TH" +49.19 399.73 399.58 399.64 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: R=11' 27.00' Rt "24TH" +75.69 38.00' Rt "24TH" +64.69 400.38 BC ELEVATIONS INTERSECTION SEE C-50 FOR EC REVISION DATE DESCRIPTION 1 12/31/19 REVISED ELEVATIONS 400.54 400.76 400.85 400.91 400.89 400.85 400.84 400.36 400.31 400.26 400.21 399.99 400.21 400.30 27'±47 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINEC St24TH St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-12 SCALE: 1" = 15' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 r 47r ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 5 6 001-291-04 No.#R CURVE DATA T L 24D1 24D2 24D3 24D4 20'19.99'31.41' 10'9.98'15.69' 10'9.96'15.67' 10'9.95'15.65' 24D1 MATCH Exist (399.71) FL +59.97 ECR 47.06' Lt "24TH" +03.10 BCR 37.19' Lt "24TH" 24D2 25' Rt "24TH" +40.72 BCR 24D3 36.96' Rt "24TH" +50.72 ECR 36.95' Rt "24TH" +05.39 BCR 24D4 27' Rt "24TH" +15.39 ECR CONSTRUCTION DETAILS C-13 SCALE: 1" = 10' MATCH Exist (399.69) FL 400.53 400.44 400.33 400.22 400.38400.34 399.89 FL 399.85 FL 399.83 FL 399.66 FL 400.04 FL 399.95 FL 399.84 FL 399.73 FL27'±R/W R/WR/W R/W Exist LIP MATCH Exist LIP MATCH 43.34' Rt "24TH" +50.74 +15.10 ECR 27.21' Lt "24TH" +50 +75 +00 +25 +50 +75 +00 +25 +25 +50 +50 +25 399.70 FL 399.69 FL 399.56 FL 399.69 FL 399.47 FL TYPE 3 CURB RAMP TYPE 3 CURB RAMP TYPE 3 CURB RAMP 44.32' Rt "24TH" +05.36 49.32' Rt "24TH" +05.96MATCH Exist (399.63) FL MATCH Exist (400.20) MATCH Exist (400.43)R/WR/WR/WR/WMATCH LINE "24TH" Sta 354+50SEE SHEET C-12SEE SHEET C-14MATCH LINE "24TH" Sta 356+50IN PLACE FH PROTECT27'27.07' Lt "24TH" +20.46 59.40' Rt "24TH" +50.80 27.19' Lt "24TH" +38.01 MATCH Exist (399.42) FL MATCH Exist (399.74) FL MATCH Exist (399.79) FL 25'27.00' Rt "24TH" +20.46 399.75 FL 399.38 FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 33.50' Rt "24TH" +27.76 MATCH Exist (400.26) ELEVATIONS INTERSECTION SEE C-51 FOR 48 62.71' Lt "24TH" +05.05 27.07' Lt "24TH" +39.97 BCR 52.06' Lt "24TH" +59.36 REVISION DATE DESCRIPTION REVISED ELEVATIONS112/31/19 1 400.84 400.80 400.78 400.73 400.21 400.16 400.11 400.06 TYPE 5 CURB RAMP 36.98' +05.10 399.69 27.00' 399.69 400.62 400.56 400.00 399.65 399.76 12'MATCH Exist (401.04) 38.75' Rt "24TH" +60.83 MATCH Exist (400.98) 38.75' Rt "24TH" +69.33 +50 +25 6'399.79 399.64 FL 399.64 FL27'CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 D St"24TH" LINE DRAKE St24TH St PP ASPH CONC FP ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga014.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 8 CONSTRUCTION DETAILS C-14 SCALE: 1" = 10' 400.38 399.89 FL 27'±R/W R/W Exist LIP MATCH R/W R/W 400.45 400.52 400.57 400.58 400.59 400.60 400.65 400.71 400.87 399.99 FL 400.04 FL 400.08 FL 400.14 FL 400.15 FL 400.17 FL +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +75 +00 +00 +25 +25 +50 +75 +75 MATCH Exist SW (400.58) 27.71' Rt +26.25 27.00' Rt +31.25 41.25' Rt +44.25 MATCH Exist (400.21) FL 27.00' Rt +71.25 CURB Ret Dwy TYPE "A"41.25' Rt +58.25 MATCH Exist (400.26) FL 27.00' Rt +39.25 400.22 FLW=26'• Sta +51.1327.00' Rt +63.25 CURB Ret 6'4'Dwy TYPE "B-1"7 27.00' Lt +28.66 BC 399.90 FL 400.57 TC 399.92 FL 400.58 TC 29.12' Lt +50 399.97 FL 400.64 TC +50 399.93 FL +75 399.72 FL +00 25'31.85' Lt +75 34.50' Lt +25 +25 +50 399.94 FL 400.23 FL 400.90 TC TYPE 6 CURB RAMP 5.63%SEE SHEET C-15MATCH LINE "24TH" Sta 358+75MATCH LINE "24TH" Sta 356+50SEE SHEET C-13400.13 FL 400.80 TC MATCH Exist (401.05) 41.25' Rt +69.00 MATCH EXIST (400.96) 6.5' SW 400.09 FL 400.76 TC 399.91 FL 399.98 FL 400.13 FL400.12 FL 400.10 FL 400.09 FL Beg SW TAPER MATCH Exist SW (400.53)2%399.82 FL 400.49 TC 400.27 FL 4'R=4.5'Max1.5%1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES:400.11 FLW=14'• Sta +51.2527' Lt +25 MATCH Exist (399.84) FL 39.26' Lt +25 9.5'27.68' Lt +36.88 EC 39.46' Lt +84.73 34.50' Lt +72.81 BCR 34.50' Lt +50 400.08 FL 400.75 TC 400.00 FL 400.67 TC END SW TAPER 400.66 34.20' Lt +96.43 BC 34.50' Lt +01.88 EC R=50' R=50' 41.25' Rt +38 49 REVISION DATE DESCRIPTION REVISED ELEVATIONS112/31/19 1 1 400.56 400.61 400.66 400.72 400.88 401.02 401.15 400.84 400.89 399.97399.92399.87399.93399.87 399.80 FL +00 399.75 FL +50 399.63 FL +75 399.69 FL 399.82 FL 399.85 FL 399.91 FL 399.96 FL 400.01 FL 400.02 FL 400.64 FL 400.17 FL 400.12 FL 12'CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE24TH St ASPHASPH ASPH CONC ASPH ASPHPP x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga015.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3609 1 CONSTRUCTION DETAILS C-15 SCALE: 1" = 10' R/W FL 27'24E1 24E2 24E3 No.#R CURVE DATA T L 10' Exist LIP MATCH 89.50' Lt "24TH" +51.81 MATCH Exist (400.21) FL 24E4 37.03' Lt "24TH" +51.67 BCR 27' Lt "24TH" +61.67 ECR 400.30 FL 27' Rt "24TH" +89.63 BCR 35.02' Rt "24TH" +97.63 ECR 43.23' Rt "24TH" +97.61 MATCH Exist (400.13) FL R/W R/W 41.37' Rt "24TH" +51.70 35.16' Rt "24TH" +51.61 BCR 27' Rt "24TH" +59.60 ECR 24E1 24E2 24E3 24E4 10.03'15.74' 8'8.02'12.59' 8'8.16'12.73' 400.87 400.83 400.92 400.98 401.03 401.08 401.11 401.15 401.19 400.27 FL 400.15 FL 400.23 FL 400.32 FL 400.37 FL 400.42 FL 400.49 FL 400.53 FL +75 +75 +50 +25+75 +50+25+00+75 +25+00+75+50+25+00+75 +75 +00 +25 +50 400.20 FL 27.00' Rt +75 400.43 FL 27.00' Rt +76 400.43 FL 27.00' Rt +41 MATCH Exist (400.63) FL Dwy TYPE "A"27.03' Rt +40.45 400.60 FL 400.21 FL CURB RAMP TYPE 3 TYPE 5 CURB RAMP 400.52 FLW=40'• Sta +08400.19 FL W=20' • Sta +51.758'6' 59.50' Lt "24TH" +51.75 400.18 FL 400.10 FL 62.11' Lt +97.80 ECR 25.11'39.38'25' 3À/4 400.25 FL À/2 400.23 FL À/4 400.22 FL 52.11' Lt +97.84 EC 400.20 FL R/WR/WR/WR/WR/WR/WR/WR/WTYPE 6 Mod CURB RAMP 27' Lt "24TH" +71.50 27' Lt "24TH" +15.50 R=10'R=10' TYPE 6 Mod CURB RAMP R=12'R=12'Dwy TYPE "A"400.45 FLW=18'• Sta +93.5044.36' Lt "24TH" +51.69 46.15' Lt "24TH" +52.44 43.36' Lt "24TH" +49.91 48.23' Rt "24TH" +96.96 MATCH Exist SW (400.70) (400.25) MATCH Exist (400.64) Dwy TYPE "B-2" 50.36' Lt +00.85 MATCH Exist SW (400.67) MATCH Exist SW (400.64) 27'MATCH LINE "24TH" Sta 358+75SEE SHEET C-14SEE SHEET C-16MATCH LINE "24TH" Sta 361+50+50 50.36' Lt +48.71 TYPE 6 CURB RAMP 400.17 FL 27' Lt "24TH" +80.74 400.17 FL 400.16 FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: TYPE 5 CURB RAMP MATCH Exist (400.11) FL 400.29 FL 400.33 FL 400.36 FL 400.27 FL ELEVATIONS INTERSECTION SEE C-52 FOR MATCH Exist (400.39) MATCH Exist (400.44) MATCH Exist (400.26) FL 400.95 400.39 FL 400.12 400.14 REVISION DATE DESCRIPTION REVISED ELEVATIONS1 50 12/31/19 1 1 1 400.25 FL 59.61' Lt +97.81 ECR 400.19 400.21 400.23 34.36' Lt +90.56 400.12 FL 400.21 25.00' Lt +99.97 400.11 2 10/01/21 AS-BUILT 2 400.74 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE E StENCINA St24TH St P P PP PP PP ASPHASPHASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga016.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 24F1 24F2 24F3 No.#R CURVE DATA T L Exist LIP MATCH MATCH Exist (400.73) FL 24F4 51.98' Rt "24TH" +37.36 ECR R/W R/W 24F1 24F2 24F3 24F4 25'39.25'24.98' 25.00'39.27' 24.83'39.10' 14.99'23.55' 401.19 CONSTRUCTION DETAILS C-16 SCALE: 1" = 10'27'MATCH Exist (400.66) FL 27' Lt "24TH" +12.36 BCR 27.04' Rt "24TH" +14.50 BCR MATCH Exist (400.89) FL 51.97' Rt "24TH" +39.40 ECR MATCH Exist (400.55) FL 48.74' Rt "24TH" +03.01 MATCH Exist (400.49) FL 52' Lt "24TH" +04.91 BCR 42.20' Rt "24TH" +03.02 BCR 27.22' Rt "24TH" +18.03 ECR 25' 25' 15' 401.22 401.28 401.36 401.28 401.40 401.48 R/W 400.53 FL 400.56 FL 400.59 FL Exist LIP MATCH TCE +50 +50 +75 +75 +00 +00 +25 +25 +50 +75 400.61 FL 400.64 FL 27'400.82 FL 9'5'3.5' 27.88' Rt +70 MATCH Exist SW (401.35) R/W 42.25' Rt +59.56 27.26' Rt +65 MATCH Exist (400.86)400.77 FLW=31'• Sta +44.505.5'27.23' Rt +24 400.67 FL 27.00' Lt +74.50 400.90 FL 27.00' Lt 29.91 ECR 400.82 FL 27.00' Lt 30.50 400.86 FLW=34'• Sta +52.50TYPE 2 CURB RAMP TYPE 2 CURB RAMP TYPE 1 CURB RAMP Dwy TYPE "B-2"Dwy TYPE "B-2"~ 7 R/WR/WR/WR/W54.75' Rt "24TH" +03.68 9'41.05' Rt "24TH" +20.12 401.60 49.65' Rt "24TH" +28.71 401.39 400.52 FL25'±MATCH LINE "24TH" Sta 361+50SEE SHEET C-15SEE SHEET C-17MATCH LINE "24TH" Sta 363+75MATCH Exist (402.18) MATCH Exist SW (401.01) TYPE 8 Mod CURB RAMP 41.00' Lt +21.17 401.55 400.55 FL 27' Lt "24TH" +71.79 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: PROTECT IN PLACE BUSINESS SIGN AND PLANTER ELEVATIONS INTERSECTION SEE C-53 FOR REVISION DATE DESCRIPTION REVISED ELEVATIONS 401.54 1 400.62 400.62 401.15 12/31/19 1 1 1 51 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE F St24TH St P P PP P ASPH ASPH FP CONC ASPH ASPH 24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga017.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 4 5 CONSTRUCTION DETAILS C-17 SCALE: 1" = 10' R/W R/W R/W R/W 401.48 401.56 401.67 401.73 401.77 401.92 401.98 402.11 Exist LIP MATCH Exist LIP MATCH TCE TCE +75 +00 +25 +50 +75 +00 +25 +50 27.09' Rt +12.41 MATCH Exist (401.13) FL 27.08' Rt +20.41 401.16 FL 46.25' Rt +35.99 MATCH Exist (401.86) 27.02' Rt +69.33 401.31 FL 46.25' Rt +54.11 MATCH Exist (401.92)Dwy TYPE "A"27.12' Lt +63.59 MATCH Exist (401.04) FL 27.74' Lt +75.10 MATCH Exist SW (401.58) 26.72' Rt +92.50 27.79' Rt +42.50 MATCH Exist SW (402.13) MATCH Exist (401.55) FL 46.06' Rt +36.39 MATCH Exist (402.44) 45.75' Rt +96.25 MATCH Exist (402.16)401.48 FLW=35'• Sta +159'5'5'27.00' Lt +93.00 400.93 FL 3.5'5'9'40.50' Lt +71.61 44.50' Lt +58.61 MATCH Exist (401.51)14'27'401.82 401.02 FLW=19.50'• Sta +48.86+37.50 27.07' Rt 401.24 FLW=19'• Sta +44.87Dwy TYPE "B-2"7 ~ 7 ~ 400.97 FL400.95 FLW=28'• Sta +1227.00' Lt +31 MATCH Exist CURB AND GUTTER (L=5') RECONSTRUCT CITY TYPE "B" R/WR/WR/WR/WR=15' TYPE 6 Mod CURB RAMP R=5' 401.40 FLDwy TYPE "B-2"4.49%25' ±MATCH LINE "24TH" Sta 363+75SEE SHEET C-16SEE SHEET C-18MATCH LINE "24TH" Sta 365+50Dwy TYPE "A-C"NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. PROTECT IN PLACE PRIVATE LIGHT POLE BUSINESS SIGN AND REVISION DATE DESCRIPTION REVISED ELEVATIONS 401.54 401.81 401.88 401.92 401.97 402.08 402.18 1 52 12/31/19 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE24TH St P P PP P P PP P ASPH 24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5417-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga018.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 8 CONSTRUCTION DETAILS C-18 SCALE: 1" = 10' R/W R/W R/W R/W No.#R CURVE DATA T L 24G1 24G2 24G3 24G4 10'15.77'10.06' 7.97'12.54' 14.98'23.54' 15.41'23.97' 15' 15' 24G4 24G3 24G2 24G1 27'36.93' Lt "24TH" +90.88 ECR 44.58' Lt "24TH" +90.83 MATCH Exist (401.56) FL Exist LIP MATCH 26.87' Lt "24TH" +80.88 BCR 37.00' Lt "24TH" +45.90 34.98' Lt "24TH" +45.91 BCR 27.00' Lt "24TH" +53.91 ECR 41.92' Rt "24TH" +90.50 ECR MATCH Exist (401.66) FL 26.99' Rt "24TH" +75.45 BCR MATCH Exist (401.72) FL 41.92' Rt "24TH" +59.99 ECR MATCH Exist (401.74) FL 42.01' Rt "24TH" +44.60 BCR MATCH Exist (401.60) FL Exist LIP MATCH Exist LIP MATCH Exist LIP MATCH 8' 402.74402.11 402.27 402.35 402.42 402.49 402.54 402.59 402.67 401.69 FL 401.76 FL 401.88 FL401.83 FL 401.93 FL10'+50 +75 +75 +75 +00 +00 +25 +25 +50 +50 +75 +75 +00 +25 401.52 FL 401.44 FL 401.70 FL 401.63 FL MATCH Exist (402.04) FL 27.00' Lt +78 401.94 FL 41.00' Lt +78 27.13' Lt +03 27.83 Lt +08 MATCH Exist SW (402.57) 41.12' Lt +03 401.99 FLW=15'• Sta +90.504'4'6'27.08' Rt +85.25 MATCH Exist (402.57) FL 27.16' Rt +26.75 MATCH Exist (402.61) FL 27.60' Rt +80.25 MATCH Exist SW (402.57)402.59 FLW=29.50'• Sta +066'4'TYPE 4 CURB RAMP TYPE 5 CURB RAMP TYPE 5 CURB RAMP MATCH Exist (402.70) FL MATCH Exist (402.91) FL Dwy TYPE "B-1"TYPE 8 CURB RAMPR/WR/WR/WR/WR/WR/WR/WR/W4'4'4'5'27.79' Rt "24TH" +66.47 MATCH Exist SW (402.26) 44.66' Rt "24TH" +45.32 MATCH Exist SW (402.22) 46.92' Rt "24TH" +89.81 MATCH Exist SW (402.26) 27.74' Rt "24TH" +73.90 MATCH Exist SW (402.26) 44.91' Lt "24TH" +43.90 MATCH Exist (401.83)MATCH Exist SW (402.20) 49.58' Lt "24TH" +90.00 Dwy TYPE "B-1" ModMATCH LINE "24TH" Sta 365+50SEE SHEET C-17SEE SHEET C-19MATCH LINE "24TH" Sta 368+356.60%25' ±MATCH Exist (402.88) MATCH Exist (402.95) MATCH Exist (401.71) FL END Ret CURB Beg Ret CURB END Ret CURB Beg Ret CURB Beg Ret CURB NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 26.85' Lt "24TH" +50.70 MATCH Exist (401.28) FL TCE Ret CURBRet CURB4'41.25' Rt +30.58 41.25' Rt +83.34 Ret CURB ELEVATIONS INTERSECTION SEE C-54 FOR REVISION DATE DESCRIPTION REVISED ELEVATIONS 402.18 402.39 402.62 1 12/31/19 53 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 AND GRADING INFO. SEE C-18r FOR ELEVATIONS 2 10/01/21 AS-BUILTS 2 "24TH" LINE G St24TH St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-18 SCALE: 1" = 15' r 53r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 P P P P P P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4516-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga019.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3709 CONSTRUCTION DETAILS C-19 SCALE: 1" = 10' R/W R/W No.#R CURVE DATA T L 24H1 24H2 24H3 24H4 20'31.38'19.96' 8.07'12.64' 10.04'15.75' 5.24'8.09' 10' 24H4 24H3 27.16' Lt "24TH" +17.33 BCR 32.35' Rt "24TH" +91.67 BCR 8' Exist LIP MATCH 24H1 24H2 MATCH Exist (402.38) FL 27.23' Rt "24TH" +96.78 ECR MATCH Exist (402.55) FL 36.98' Rt "24TH" +37.65 ECR MATCH Exist (402.30) FL 47.11' Lt "24TH" +37.34 ECR MATCH Exist (402.42) FL 27.11' Lt "24TH" +99.59 ECR 35.18' Lt "24TH" +91.59 BCR 38.07' Lt "24TH" +91.62 26.95' Rt "24TH" +12.72 40.88' Rt "24TH" +37.63 36.85' Rt "24TH" +91.74 27.25' Rt "24TH" +01.28 8' R/W 402.86 402.76 402.87 402.87 402.88 403.20 403.00 TCE TCE +50 +75 +00 +25 +50 +25 +00 402.29 FL 402.26 FL 402.37 FL 402.31 FL 402.50 FL 402.43 FL 27.16' Lt +49 MATCH Exist SW (402.56) 27.85' Lt +44 MATCH Exist (402.06) FL 43.16' Lt +51.22 402.10 FLW=34'• Sta +716'4'43.17' Lt +93.86 27.17' Lt +93 26.98' Rt +47 5'4'6'26.94' Rt +87 41.94' Rt +87.28 8'6'4'27.14' Rt +35.50 34.76' Rt +30.50 MATCH Exist SW (403.04) 45.13' Rt +42.22 MATCH Exist (403.08) Ret CURB Ret CURB 41.99' Rt +41.52 402.23 FL W=28' • Sta +67 TYPE 2 CURB RAMP TYPE 1 CURB RAMP 7 ~ 7 ~ CURB Ret CURB Ret ~ 7 TYPE 8 Mod CURB RAMP CURB RAMP TYPE 8 Mod MATCH Exist SW (402.82) 56.03' Rt "24TH" +36.75 51.09' Rt "24TH" +26.37 41.09' Rt "24TH" +89.18 MATCH Exist (402.56) 43.60' Rt "24TH" +92.43 MATCH Exist SW (402.73) 46.99' Lt "24TH" +91.70 50.65' Lt "24TH" +92.47 MATCH Exist SW (402.90) 402.29 FL402.16 FL 402.14 FL 402.26 FL 5' MATCH Exist (403.17) MATCH Exist SW (403.07) MATCH LINE SEE SHEET C-20 5'8'R/WR/WR/WR/WR/W402.35 FL Dwy TYPE "B-1"Dwy TYPE "B-1"3.72% 39.99' Lt "24TH" +10.66 403.17 403.09MATCH LINE "24TH" Sta 368+35SEE SHEET C-18SEE SHEET C-21MATCH LINE "24TH" Sta 370+50MATCH Exist (403.05) MATCH Exist (403.62) 26.94' Rt "24TH" +27.65 BCR 34.67' Rt "24TH" +06.52 403.16 34.68' Rt "24TH" +10.37 MATCH Exist SW (403.14) 27.78' Rt "24TH" +06.42 MATCH Exist (402.55) FL 35.14' Rt +35.50 403.02 MATCH Exist (402.30) FL BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: 402.30 FL 4'8.5% 402.49 FL +50 +25 402.20 FL 402.14 FL ELEVATIONS INTERSECTION SEE C-55 FOR REVISION DATE DESCRIPTION REVISED ELEVATIONS 403.06 402.87 +00 402.26 FL 1 54 12/31/19 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE H St24TH St ASPH ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4616-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga020.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 MATCH LINE SEE SHEET C-19R/WR/WR/WR/WDwy TYPE "B-1" 403.60 FL W=35' • Sta +71 MATCH Exist (405.17) FL 228.92' Lt "24TH" +36.56 5' 6'8' CONSTRUCTION DETAILS C-20 SCALE: 1" = 10' 5' 173.98' Lt "24TH" +36.61 181.97' Lt "24TH" +31.48 177.98' Lt "24TH" +27.47 404.83 404.83 404.07 FL 126.98' Lt "24TH" +37.15 403.13 FL BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: PROTECT IN PLACE POWER POLE 55 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 H St FPP P ASPH ASPH ASPH CONC x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>15:4616-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxga021.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 1 2 CONSTRUCTION DETAILS C-21 SCALE: 1" = 10' R/W R/W Exist LIP MATCH Exist LIP MATCH27'R/W R/W 402.86 402.73 402.55 402.49 402.57 402.60 402.54 402.47 401.79 FL 401.74 FL 401.69 FL 401.64 FL 402.39 TCE +50 +75 +00 +25 +50 +75 +00 +75 +00 +25 +50 +25 +50 MATCH Exist (402.10) 401.84 FL MATCH Exist (402.09) 401.64 FL Dwy TYPE "A"MATCH Exist (402.20) FL 27.09' Rt +50.50 MATCH Exist (402.09) FL MATCH Exist (402.71)402.35 FLW=35'• Sta +588'4'MATCH Exist (402.63) MATCH Exist (402.64)402.07 FLW=17'• Sta +378'6'3'401.74 FLW=14'• Sta +38ANGLE Pt ANGLE Pt Dwy TYPE "B-2"Dwy TYPE "B-2"7 ~R/WR/WR/WR/W13' SWSW6' SW6'TYPE 4 CURB RAMP R=5'MATCH LINE "24TH" Sta 370+50SEE SHEET C-19SEE SHEET C-22MATCH LINE "24TH" Sta 372+5025' ±8' Pkwy 5' SW MATCH Exist SW (402.65) +85.50 34.86' RT "24TH" 48.00' Lt "24TH" +47.87 27.00' Lt "24TH" +50 27.10' Lt "24TH" +25.99 +80.50 27.08' Rt "24TH" 45.09' Rt "24TH" +77.71 +27.56 43.93' Rt "24TH" 43.99' Rt "24TH" +47.96 41.00' Rt "24TH" +47.96 39.00' Rt "24TH" +51.42 27.03' Rt "24TH" +08.07 MATCH Exist (402.00) FL 26.39' Rt +23.50 402.04 BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: 7 ~ +75 +00 401.95 FL 401.68 FL 48.00' Lt "24TH" +27.83 REVISION DATE DESCRIPTION REVISED ELEVATIONS 402.87 402.75 402.65 402.59 402.63 402.61 +50 402.14 FL 1 56 12/31/19 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE24TH St ASPH ASPH CONC ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga022.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 5 CONSTRUCTION DETAILS C-22 SCALE: 1" = 10' Exist LIP MATCH27'R/W R/W R/W R/W No.#R CURVE DATA T L 24I1 24I2 24I3 24I4 12.57'8.00' 7.98'12.55' 24.88'39.15' 24.90'39.17' 25' 25' 8' 24I2 24I1 24I3 +91.35 ECR 35.00' Lt "24TH" MATCH Exist (401.60) FL +83.35 BCR 27.00' Lt "24TH" 34.99' Lt "24TH" +31.07 BCR 27.00' Lt "24TH" +39.07 ECR 51.85' Rt "24TH" +81.14 ECR MATCH Exist (401.55) FL 26.97' Rt "24TH" +56.14 BCR 52.07' Rt "24TH" +40.96 BCR MATCH Exist (401.60) FL 27.13' Rt "24TH" +65.94 ECR MATCH Exist (401.88) FL 52.63' Rt "24TH" +81.15 8' 402.39 402.35 402.33 402.42 402.44 402.53 402.47 402.45 402.44 401.55 FL 401.64 FL 401.76 FL TCE +75 +50 +75+50 +50 +50 +75 +75 +00 +25 +00 +25 +50 +50 +75 +00 +25 401.70 FL 401.59 FL 401.85 FL 401.56 FL 401.76 FL 402.47 26.97' Rt "24TH" +50 MATCH Exist (401.79) FL MATCH Exist (402.20) MATCH Exist (402.54) 27.00' Lt +96 27.00' Lt +72 401.81 FL Dwy TYPE "A"27.13' Rt +76 401.86 FL 7'3' (PROTECT IN PLACE) BUSINESS SIGN 24I4 MATCH Exist (402.75)401.87 FLW=16'• Sta +91MATCH Exist SW (402.71) MATCH Exist (403.27) MATCH Exist SW (402.47) MATCH Exist SW (402.65) MATCH Exist SW (402.66)401.91 FLW=13'• Sta +86.67(PROTECT IN PLACE) FH 27.10' Rt +06 TYPE 4 CURB RAMP TYPE 5 CURB RAMP TYPE 4 CURB RAMP 401.80 FLW=14'• Sta +84TYPE 8 CURB RAMP Dwy TYPE "B-2"7 ~R/WR/WR/WR/WR/WR/WR/WR/WSW7'R=5' 33' Lt "24TH" +51.77 42.45' Lt "24TH" +36.78 462.27 2'SW6' 6'402.86 402.82 MATCH Exist SW (402.65) MATCH Exist (401.92) FL 7.5%Dwy TYPE "B-2" ModMATCH LINE "24TH" Sta 372+50SEE SHEET C-21SEE SHEET C-23MATCH LINE "24TH" Sta 375+256.20%25' ±27'4'45.50' Lt "24TH" +74.37 45.50' Lt "24TH" +94.68 +58.85 41.14' Rt "24TH" +58.85 44.14' Rt "24TH" 50.57' Rt "24TH" +50.05 +11 33.82' Rt "24TH" 44.08' Rt "24TH" +11 +74.17 27.07' Rt "24TH" +74.17 41.06' Rt 24TH 27.55' Rt "24TH" +04.17 41.18' Rt "24TH" +04.17 +25 40.50' Lt "24TH" +64 27.05' Rt "24TH" +99.17 +41.56 55.54' Rt "24TH" BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: 401.56 FL MATCH Exist (401.90) FLELEVATIONS INTERSECTION SEE C-56 FOR 401.67 FL 401.66 FL 401.70 FL 401.72 FL 401.81 FL 401.86 FL 401.79 FL "B" CURB (H=8") Beg CITY TYPE 7'40.49' Lt "24TH" +03 MATCH Exist (402.61) 33.00' Lt "24TH" +56.48 402.42 402.50 401.84 49.32' Lt "24TH" +31.05 MATCH Exist (401.71) FL +91.35 49.27' Lt "24TH"7'7'57 37.50' Lt "24TH" +79.45 37.50' Lt "24TH" +83.38 401.83 402.00 401.93 401.87 (402.72) REVISION DATE DESCRIPTION 1 01/30/20 REVISED TIE-INS 1 MATCH Exist (402.81) MATCH Exist (402.78) 401.65 FL +61.5 2 2 10/01/21 AS-BUILTS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE EYE St24TH St ASPASPH CONC ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga023.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 3CONSTRUCTION DETAILS C-23 SCALE: 1" = 10' Exist LIP MATCH R/W R/W No.#R CURVE DATA T L 24J1 24J2 24J3 24J4 18.80'11.95' 12.09'18.94' 13.79'22.30' 13.81'22.32' 15' 15' 24J1 24J3 24J4 27.20' Lt "24TH" +32.21 ECR 27.06' Rt "24TH" +16.74 BCR 27.11' Rt "24TH" +31.82 ECR MATCH Exist (401.63) FL 27.11' Rt "24TH" +40.00 R/W R/W MATCH Exist (401.50) FL MATCH Exist (401.73) FL 45.90' Rt "24TH" +31.73 39.31' Lt "24TH" +20.23 BCR 27.00' Lt "24TH" +16.75 BCR MATCH Exist (401.61) FL 38.95' Lt "24TH" +28.75 ECR 42.07' Rt "24TH" +16.82 BCR 12' 12' 401.76 FL 402.44 402.40 402.35 402.34 402.31 TCE +25 +25 +50 +50 +75 +75 +00 +00 +50 401.60 FL 401.64 FL 27.65' Rt +54 MATCH Exist SW (402.48) 42.99' Rt +54 MATCH Exist (402.68)7'7'2' 27.04' Rt +05 401.68 FL 401.77 FLW=34'• Sta +8241.13' Rt +14.44 MATCH Exist (402.58) 43.47' Rt +16.56 TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP +99.27 43.04' Rt 7 ~ TYPE 2 CURB RAMP 401.81 FL 39.56' Lt "24TH" +28.75 Dwy TYPE "B-2" ModR/WR/WR/WR/WMATCH Exist (401.85) FL 27.00' Rt "24TH" +59.15 MATCH Exist SW (402.44) 50.91' Lt "24TH" +28.02 24J2 MATCH Exist SW (402.26) 44.31' Lt "24TH" +20.76 MATCH Exist SW (402.60) 39.85' Lt "24TH" +40.00 MATCH Exist SW (402.18) 47.07' Lt "24TH" +17.46 46.18' Lt "24TH" +15.13 MATCH Exist (401.53) 40.81' Rt "24TH" +31.69 ECR 402.24 FL MATCH Exist (401.93)SEE SHEET C-24MATCH LINE "24TH" Sta 377+50MATCH LINE "24TH" Sta 375+25SEE SHEET C-2225' ±27'402.62 402.576.47% BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: ELEVATIONS INTERSECTION SEE C-57 FOR7'401.73 FL 401.60 FL END CITY TYPE "B" CURB (H=8") 401.67 FL 401.59 FL MATCH Exist (401.82) FLMATCH Exist (402.61) 45.93' Rt "24TH"+39.40 "B" CURB (H=8") CITY TYPE 41.00' Lt "24TH" +08.69 MATCH Exist (401.63) FL 58 MATCH Exist (402.54) TO Exist CONFORM 4.5'Var 1.5%BREAK GRADE "24TH" +81.50 38.50' Lt REVISION DATE DESCRIPTION 1 01/30/20 REVISED TIE-INS 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE CHESTER Ave24TH St ASPH ASPH CONCASPHASPHASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga024.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 8 9 CONSTRUCTION DETAILS C-24 SCALE: 1" = 10' Exist LIP MATCH R/W R/W R/W R/W Exist LIP MATCH 402.31 402.40 402.50 402.62 402.72 402.82 402.96 403.11 403.25 403.37 TCE TCE +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 27.66' Rt +40.50 MATCH Exist SW (402.75) 48.25' Rt +54.29 MATCH Exist (402.62) 27.57' Rt +83.50 26.97' Rt +75.50 MATCH Exist (402.25) FL 27.04' Rt +48.48 MATCH Exist (402.10) FL 48.25' Rt +70.50 MATCH Exist (402.42)Dwy TYPE "A"34.49' Lt +37 MATCH Exist SW (403.29) 27.19' Lt +42 MATCH Exist (402.41) FL 27.23' Lt +71 MATCH Exist (402.57) FL402.49 FLW=13'• Sta +56.506'±7'MATCH Exist SW (403.11) 27.63' Rt +30 43.03' Rt +30 MATCH Exist (403.37) 27.18' Rt +65 MATCH Exist SW (403.32) 27.79' Rt +70 43.20' Rt +70 MATCH Exist (403.56)402.57 FLW=16'• Sta +508'5'3' 27.14' Rt +11 MATCH Exist (401.93) FL 27.15' Rt +75 MATCH Exist (401.78) FL 27.75' Rt +70 MATCH Exist SW (402.39) 42.65' Rt +75.85 MATCH Exist (402.66) MATCH Exist (402.87) 42.64' Rt +16 27.74' Rt +16 MATCH Exist SW (402.69)401.86 FLW=23'• Sta +938'5.5'2' 27.05' Rt +35 MATCH Exist (402.49) FL MATCH Exist (402.64) FL MATCH Exist SW (402.95)402.18 FLW=17'• Sta +627 ~ 7 ~ TCE R=3'R=3' 27.28' Lt +54.26 MATCH Exist (401.99) FL 27.14' Lt +73.75 MATCH Exist (402.05) FLDwy TYPE "A" ModR/WR/WR/WR/WTYPE 5 CURB RAMP TYPE 4 CURB RAMP R=5' 32.17' Lt +44.25 MATCH Exist SW (402.47) 34.68' Lt +83.75 MATCH Exist SW (403.08)14%Dwy TYPE "B-2" ModMATCH LINE "24TH" Sta 377+50SEE SHEET C-23SEE SHEET C-25MATCH LINE "24TH" Sta 379+753.70%5.57%Dwy TYPE "B-2"Dwy TYPE "B-2"BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: MATCH Exist (401.58) FL 27.14' Rt "24TH" +52 402.02 FLW=13.50'• Sta +6459 REVISION DATE DESCRIPTION 10/01/21 AS-BUILT 2. IRRIGATION CROSSOVER SHALL BE 2". ALL IRRIGATION PIPING 3/4". IRRIGATION SHALL RUN BETWEEN HOSE BIB AND TERMINATE IN THE BLOCK OUT. 3. GRADE SHALL BE LEFT 4" LOW IN AREA OF "BLOCK OUT" TO FACILITATE FUTURE CONSTRUCTION BY OTHERS. 2' CONCRETE SIDEWALK BLOCK OUT (2' WIDE) 1 1 IRRIGATION CROSSOVER SEE NOTE 2 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE24TH St P P P ASPH FP CONC x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga025.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-25 SCALE: 1" = 10' R/W R/W R/W R/W No.#R CURVE DATA T L 24K1 24K2 24K3 15'24.13'15.58' 14.95'23.52' 15.09'23.66'15' 24K2 24K3 24K1 27.22' Rt "24TH" +95.16 BCR 27.22' Rt "24TH" +90.00 MATCH Exist (402.63) FL 42.17' Rt "24TH" +10.16 ECR 47.57' Rt "24TH" +10.17 MATCH Exist (402.89) FL 45.31' Lt "24TH" +64.44 BCR R=12' 27.20' Lt "24TH" +87.15 MATCH Exist (402.65) FL 15' 403.37 403.73 403.80 403.88 403.95 404.03 403.65 402.90 FL 403.02 FL 403.09 FL 403.26 FL 404.10 402.97 FL 403.03 FL 403.07 FL 403.05 FL403.07 FL 6'+75 +00 +00 +25 +50 +50 +75 +75 +00 +25 +50 +50 93.85' Lt "24TH" +10.17 MATCH Exist (402.85) FL 402.76 FL 402.86 FL 402.93 FL 402.67 FL 402.85 FL 41.01' Rt +81.09 403.69 ANGLE Pt 46.13' Rt +84.81 403.78 67.87' Rt +90.79 MATCH Exist (403.33) 70.97' Rt +08.88 MATCH Exist (403.34) 403.75 49.66' Rt +28.73 36.95' Rt +93.81 403.06 FL 403.05 FL Dwy TYPE "A"6' MATCH Exist (403.98) 403.15 FL 403.22 FL Dwy TYPE "A"31.76' Lt +25.52 402.97 FL 34.29' Lt +76 MATCH Exist SW (403.59) 40.55' Lt +76 MATCH Exist SW (403.68) TYPE 5 CURB RAMP TYPE 3 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP "24TH" +80.35 ECR 30.30' Lt 403.19 FLW=20'• Sta +18403.06 FLW=15'• Sta +05.64+17.41 41.14' Rt 403.66 ANGLE Pt +23.88 53.19' Rt 101.34' Lt "24TH" +04.66 MATCH Exist SW (403.72) 94.02' Lt "24TH" +62.06 MATCH Exist (403.03) 69.05' Lt "24TH" +10.27 BC 67.06' Lt "24TH" +12.27 EC 402.71 FL 402.73 FL 67.06' Lt "24TH" +25.16 BC 402.96 FL 403.12 FL +37.17 EC 55.07' Lt"24TH" R=3' 403.28 FL 403.26 FL R=2'8.33%MAX~ 7 5.5' MAX 5.5'TCEMAX 2% 3' 402.79 FL W=14' • Sta +10.22 Dwy TYPE "B-2" Mod (PROTECT IN PLACE) FENCE AND GATE CHAIN LINK R/WR/WR/WR/WR/WR/WR/WR/WR=5' OH (E) POLE PROTECT LIGHT POLE PROTECT OH (E) POLE PROTECT R=5' 27.74' Rt +00 29.03' Rt +25 31.74' Rt +50 34.52' Rt +75 43.02' Rt +258' 403.68 "24TH" +85.13 37.96' Lt "24TH" +71.85 51.23' Lt (403.72) 403.595'403.60 33.34' Rt "24TH" +83.90 42.26' Rt "24TH" +75.34 LIGHT POLE PROTECT +99.44 27.61' Lt 402.67 TYPE 5 CURB RAMP "24TH" +95.16 34.15' Rt 403.74 "24TH" +91.28 34.15' Rt MATCH Exist SW (403.71) "24TH" +03.68 47.59' Rt 403.54 MATCH Exist SW (403.47) "24TH" +09.48 52.57' Rt "24TH" +98.78 67.34' Lt 403.92 "24TH" +05.22 66.62' Lt 403.61 SEE SHEET C-26MATCH LINE "24TH" Sta 382+50MATCH LINE "24TH" Sta 379+75SEE SHEET C-2417% 17% R/W 31.77' Lt "24TH" +37.18 ECR 28.77' Lt "24TH" +34.28 BCR 34.27' Lt +03.06 BCR 35.32 Lt +35.50 ECR 52.23' Lt +32.59 51.52' Lt +10.58 MATCH Exist (403.64) +30.16 BCR 41.35 Lt 403.13 FL +08.08 ECR 38.41 Lt 403.15 FL MATCH Exist (402.86) FL 94.02' Lt "24TH" +64.15 MATCH Exist (403.05) FL 56.11' Rt "24TH" +62.57 BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: 42.46' Rt "24TH" +62.43 BCR 403.04 FL 8'ELEVATIONS INTERSECTION SEE C-58 FOR 60 380 1 2 1 402.84 (402.89) 403.50 403.50 402.91 404.10 404.20 404.40 404.45 404.48 404.50 404.55 403.15 403.71 403.61 402.97 402.95 403.64 403.54 403.01REVISION DATE DESCRIPTION 4/11/19 REVISED WB LAYOUT 1 1 SHEET C-25r SEE REVISED 1 27.31' Rt "24TH" +79.17 ECR 2 10/01/21 AS-BUILT 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SEE C-25r2 SHEET PLACE 4" SIDEWALK 2 "24TH" LINE K St24TH St P P P ASPH FP CONC ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 380 1 2 CONSTRUCTION DETAILS SCALE: 1" = 10' 24K1 15'24.13'15.58' MATCH Exist (403.98)R/WR/WOH (E) POLE PROTECT SEE SHEET C-26MATCH LINE "24TH" Sta 382+50MATCH LINE "24TH" Sta 379+75SEE SHEET C-2452.23' Lt +32.59 51.52' Lt +10.58 MATCH Exist (403.64) BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: ELEVATIONS INTERSECTION SEE C-58 FOR R/W R/W R/W R/WR/W R/W R/WR/WNo.#R CURVE DATA T L 95°07'55''16.41'24.91' 70.99' Lt "24TH" +64.28 402.76 FL 402.80 FL BCR TYPE I CURB RAMP ECR 402.88 FL +00 402.93 FL +25 403.01 FL +50 403.08 FL +75 403.15 FL +00 403.22 FL 403.46 FL BCR ECR 403.32 FL BCR 403.23 FL 403.33 FL ECR +50 403.37 FL Dwy TYPE "A"+00 404.10 +25 +50 404.20 404.40 +75 404.45 +00 404.48 +25 404.50 +50 404.55 8'403.27 FLW=20'• Sta +20.37r REVISION DATE DESCRIPTION REVISED WB LAYOUT 4/11/190 24KI 27.78' Lt"24TH"+81.35 40.33' Lt"24TH"+36.79 46.36' Lt"24TH"+31.27 39.93' Lt"24TH"+03.98 42.05' Lt"24TH"+08.76 56.05' Lt "24TH"+64.43 42.59' Lt "24TH"+64.57 8'MATCH Exist (403.03) FL REVISED SHEET 10/01/211 AS-BUILT MATCH EXISTING MATCH EXISTING 1,435 SF 1 C-25 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 60r1 EXISTING ECR/BCR CURB RAMP RADIUS TO MATCH 24TH St "24TH" LINE K St FP CONC ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3809 10.23%25' (5.5%) FS 403.37 FS 403.650.23%1.90% 0.26%(0.22%)18.65' FS 403.61 FL 402.86 0.46%0.28%1.11% 0.21% FS 403.73 FS 403.802.05%1.98%2.30%0.27% FL 402.71 6' 6'4.63' FL 402.70 FL 402.69 FL 402.67 2.50%0.21%0.21%FS 403.412.30%FS 403.25 FS 403.11 PER PLAN 0.56%2.0%27.65'1.0%1.25%23.89'26.46'14.93'1.0%3.0% 2.93%1.0%402.84FL 402.88LIP 402.80FL 402.84LIP FS 403.34 FS 403.38 10% (404.43) 403.68FS 2% FS 403.446.2% 10' TCE FS 403.48~8%NO TOPO ~8%10'1.1%1.10% FS 402.72 FS 402.71 FS 402.70 FS 402.68 7.5%403.24BW 1%403.18FS FS 403.08 2%BW 403.26 FS 403.43 1%2%6.5%FS 403.66 FS 403.49 (404.32) 8" RET 403.99FS 6" RET END RET 403.55FS FS 403.47 (404.18) 8" RET FS 403.38 FS 403.51 (404.04) 8" RET FS 403.32 FS 403.37 FS 403.26 FS 403.31 FS 403.172%(0.8%)0.49% 402.53FL 403.03TC 402.43FL 402.93TC FS 403.06 BW 403.18 2%FS 403.11 FS 403.18 FS 403.23 FS 403.305.74'9%402.44FL 402.48LIP (403.64)(403.69)8%6%(404.21) 8" RET (404.23) 403.72FS BEG 6" RET TCE TCE2% 5'5'6'E6258238.50 N2326545.85 (402.41)FL (403.12)TC W=13', X=3', Y=7' E6258253.00 N2326545.64 402.47FL 402.51LIP 3'3' 402.51FL 402.55LIP7'E6258222.69 N2326559.08 (403.46) END RET E6258232.69 N2326559.43 (403.50) 3" RET E6258241.69 N2326558.80 (403.55) 4" RET 6'E6258264.68 N2326558.47 (403.65)FS BEG 4" RET E6258293.84 N2326558.05 (403.81) 403.24BW 7" RET CURB 0.6'6'7'2.5' E6258296.63 N2326612.05 403.19BW FS 403.07 E6258295.84 N2326558.02 SWK ANGLE PT E6258293.46 N2326566.39 (403.90) 7" RET5'5'5'8.34'6' 5' E6258306.87 N2326559.86 ECR 402.73 FL 0.6'FS 402.23 E6258307.61 N2326610.20 (402.85) FL (403.45)TC JOIN EX.5'6'2.5' FS 403.47 W=16', X=3', Y=5' E6258307.45 N2326599.21 402.82FL 402.86LIP E6258334.60 N2326609.89 (403.95)FS JOIN EX 5'E6258283.33 N2326591.55 (404.25)FS E6258294.23 N2326618.87 (404.12) END 4" RET 6.5'E6258302.73 N2326618.75 (403.72)FS JOIN EX. SWK (1.5%) E6258333.24 N2326516.97 403.50FS 25' 25'K ST24TH ST E6258334.25 N2326586.01 403.70FS E6258361.27 N2326559.16 402.728FL BCR5.2'6'6'4'E6258302.32 N2326549.32 402.70FS 8'4' E6258366.24 N2326547.94 402.69FL FS 403.29 FS 403.30 8.5 %8% 7.5% (403.70) 403.37BW (403.83) 403.38BW 2% E6258361.39 N2326587.56 402.788FL 2% BW (403.65)E6258361.60 N2326609.59 (402.85)FL (403.34)TC END C&G 8' (403.72) 403.44BW E6258369.28 N2326561.57 (403.76) 403.38BW E6258379.53 N2326552.35 (403.60) 403.34BW 2%(403.67)FS 403.52BW 2%8' E6258395.49 N2326545.89 402.86FL E6258419.40 N2326548.89 402.97FL E6258377.55 N2326544.15 ECR 402.66FL 403.37FS (403.71)FS 403.63BW 2%E6258291.65 N2326545.08 BCR 402.67FL E6258291.04 N2326545.09 SWK E6258333.65 N2326544.62 403.22FS E6258210.82 N2326553.25 (403.34)FS FS (403.39) E6258443.13 N2326552.62 PER PLAN 403.02FL BW (403.81) CONSTRUCTION DETAILS SCALE: 1" = 20' rC-25 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 60r2 PP P PPP CONCCONC ASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4817-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga026.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-26 SCALE: 1" = 10' R/W R/W 24L3 24L4 53.49' Lt "24TH" +26.94 BCR 39.50' Lt "24TH" +38.07 ECR R/W 24L2 24L1 53.45' Lt "24TH" +75.04 MATCH Exist (403.43) FL 48.71' Lt "24TH" +74.00 ECR 39.35' Lt "24TH" +63.38 BCR 27.00' Rt "24TH" +38.10 BCR 42.11' Rt "24TH" +50.30 ECR 27.00' Rt "24TH" +30.63 ECR 43.47' Rt "24TH" +09.79 BCR No.#R CURVE DATA T L 24L1 24L2 24L3 24L4 12'15.52'9.06' 14.09'20.77' 15.77'22.09' 16.95'28.12' 12' 20' 12' 404.10 404.18 404.25 404.33 404.40 404.55 403.26 FL 403.32 FL 403.38 FL 403.48 FL 404.64 403.97 FL 403.51 FL 403.58 FL 403.66 FL 403.88 FL R/W +50 +50 +75 +75 +75 +00 +00 +00 +25 +25 +50 +50 +75 +50 +75 +50 403.45 FL 403.52 FL 403.46 FL 403.58 FL 403.70 FL 403.81 FL MATCH Exist (404.52) FL MATCH Exist (403.30) FL 39.50' Lt +44.50 403.62 FL5'5'4'403.68 FLW=24'• Sta +60.7239.50' Lt +76.94 403.73 FL 38.98' Lt +37.73 403.46 FL8.5%6'Var37.41' Lt +00.59 403.38 FL 57.72' Rt +83.02 MATCH Exist (403.47) FL MATCH Exist (403.90) 47.17' Rt +44.49 403.01 FL MATCH Exist (403.73)5'4'6'403.24 FLW=34.50'• Sta +64.77TYPE 1 CURB RAMP TYPE 3 CURB RAMP TYPE 2 CURB RAMP TYPE 1 CURB RAMPDwy TYPE "B- 2 " Mo d Dwy TYPE "B-1"7 ~ 7 ~R/WR/WR/WR/W6' SW 45.23' Rt "24TH" +15.90 404.04 49.12' Rt "24TH" +09.18 53.85' Rt "24TH" +05.72 49.50' Lt "24TH" +41.58 404.29 53.12' Lt "24TH" +38.67 404.20 62.86' Lt "24TH" +40.18 79.78' Lt "24TH" +82.22 R=2'30.56' Rt "24TH" +66.90 27' Rt "24TH" +68.10 403.49 FL 54.84' Lt "24TH" +68.00 (404.25) MATCH Exist SW 10%44.42' Rt "24TH" +48.91 MATCH Exist SW (405.02) 57.90' Rt "24TH" +38.77 (404.78) 27.00' Rt "24TH" +36.80 403.69 FL SEE SHEET C-27MATCH LINE "24TH" Sta 384+80Dwy TYPE "B-2"3.21%MATCH LINE "24TH" Sta 382+50SEE SHEET C-2527' 44.61' Rt "24TH" +29.06 MATCH Exist CURB (404.00) FL 4 0 3. 4 2 FLW=2 8' • St a +1 6. 6 0 49.46' Lt "24TH" +60.51 404.22 49.44' Lt "24TH" +56.56 404.22 404.18 MATCH Exist (403.48) FL 69.38' Lt "24TH" +28.80 MATCH Exist SW (404.15) BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: 71.48' Rt +79.47 61.14' Rt +41.48 ~ CONCRETE IN KIND REPLACE STAMPED MATCH Exist (403.58) MATCH Exist SW (403.90) MATCH Exist (403.44) ELEVATIONS INTERSECTION SEE C-59 FOR 61 3 4 SHEET C-26r SEE REVISED REVISION DATE DESCRIPTION REVISED WB LAYOUT 06/03/191 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 L St"24TH" LINE 24TH St PP P PPP CONC CONCCONC ASPHASPH CONC24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 CONSTRUCTION DETAILS C-26 SCALE: 1" = 10'SEE SHEET C-27MATCH LINE "24TH" Sta 384+80MATCH LINE "24TH" Sta 382+50SEE SHEET C-25BE PROMENADE BLEND COLOR. 1. CONCRETE CURB RAMPS SHALL NOTES: R/W R/W R/WR/WR/WR/WR/W+50 403.37 FL +75 403.42 FL +00 403.47 FL +25 403.52 FL +50 403.58 FLVAR5' 24L1 BCR 403.59 FL ECR 403.47 FL MATCH EXIST (403.47) FL 24L2 TYPE 1 CURB RAMP 7 VAR5'5' 4'403.51 FLW=28' • St a +19.54VAR11%5.5'r REVISED SHEET TYPE 3 CURB RAMP 31.99' Rt "24TH+12.10 403.34 FL 40.32' Rt "24TH"+10.42 MATCH EXIST (403.31) FLDwy TYPE "B-2"Dwy TYPE "B-2"403.65 FLW=24'• St a +61.49No.#R CURVE DATA T L 24L1 24L2 24L3 12' 12' 12' 74°15'08" 98°47'34" 105°24'38" 9.08' 14.00' 15.76' 15.55' 20.69' 22.08' 59.29' Lt "24TH"+76.32 TCE R/W +75 403.75 FL+50 403.53 FL 24L4 ECR 403.40 FL 19.67' Rt "24TH"+27.65 +75 403.77 FL +50 403.53 FL EXIST MATCH 10% ECR 403.44 FL 79.78' Lt "24TH"+82.22 MATCH EXIST (403.58) 61.05' Lt "24TH"+69.41 MATCH EXIST (404.26) MATCH EXIST (404.31) Exist MATCH MATCH EXIST (403.48) FL 55.82' Lt "24TH"+27.33 ECR 403.40 FL 41.09' Lt "24TH"+63.71 50.25' Lt "24TH"+74.34 69.38' Lt "24TH"+29.51 62.59' Lt "24TH"+63.60 61r 404.55 404.61 404.64 404.69 +50 +75 +00 +25 "24TH" +57.05 21.77' Rt "24TH" +56.69 25.73' Rt 404.08 FL "24TH" +75 21.38' Rt 404.15 FL "24TH" +00 21.52' Rt 404.20 FL "24TH" +25 22.20' Rt "24TH" +39.45 22.31' Rt BCR 404.36 FL "24TH" +51.58 37.40' Rt BCR 404.54 FL "24TH" +50.30 42.11' Rt MATCH Exist (404.52) FL "24TH" +59.99 26.70' Rt MATCH Exist (404.30) FL "24TH" +36.71 27.31' Rt MATCH Exist (405.03) 5' TYPE 1 CURB RAMP 24L3 24L4 15'80°38'44"15.00'21.11' CONCRETE IN KIND REPLACE STAMPED 06/03/19 REVISED WB LAYOUT R=2' BC MATCH Exist (404.26) FL EC 404.00 FL 5.89' 5' ModTYPE 2 CURB RAMP 41.84' Lt "24TH"+38.30 12/31/191 1 ELEVATIONS INTERSECTION SEE C-59r FOR REVISION DATE DESCRIPTION 0 REVISED ELEVATIONS +50 404.36 FL +75 404.58 FL 2 07/10/202 ADDED ELEVATIONS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 L St"24TH" LINE PPPP ASPH ASPH FP x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga027.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-27 SCALE: 1" = 10' R/W R/W 404.73 404.81 404.90 404.99 405.08 405.16 404.16 FL 404.21 FL 404.06 FL 404.14 FL 404.23 FL 404.32 FL 404.41 FL 404.49 FL 404.58 FL 405.25 403.81 FL TCE TCE TCE R/WR/W +00 +00 +00 +25 +25 +50 +50 +75 +00 +75 +00 +00 +50 +25 +25 +50 404.08 FL 403.98 FL Dwy TYPE "A"41.79' Lt +35.93 404.23 FL 10%5'10'403.88 FLW=24'• Sta +19.29403.82 FL 403.93 FL 10%5'5'MATCH Exist (406.52) TCE 404.03 FLW = 19'• Sta +65.1927'7 ~Dwy TYPE "B-2" ModR=5'R/WR/W405.32 40.98 Lt +25 5'MATCH LINE "24TH" Sta 384+80SEE SHEET C-26SEE SHEET C-28MATCH LINE "24TH" Sta 386+507 ~ +79.12 ECR 39.51' Lt 404.22 FL 404.11 FL 49.50' "24TH" Lt +20.39 +56.03 ECR 44.49' Lt "24TH" 39.50' Lt "24TH" +03.07 39.50' Lt "24TH" +35.50 39.50' Lt "24TH" +51.28 BCR +42.39 62.25' Lt "24TH" 44.49' Lt "24TH" +74.36 BCR 51.39' Lt "24TH" +33.90 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: MATCH Exist SW (404.56 )10'10'62 5 6 SHEET C-27r SEE REVISED REVISION DATE DESCRIPTION REVISED WB LAYOUT 4/11/191 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE 24TH St PPPP ASPH ASPH FP CONC 24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 5 6 CONSTRUCTION DETAILS C-27 SCALE: 1" = 10'MATCH LINE "24TH" Sta 384+80SEE SHEET C-26SEE SHEET C-28MATCH LINE "24TH" Sta 386+501. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 62 R/W R/WR/WR/W7 "24TH"+42.39 62.25' Lt 51.39' Lt "24TH"33.90 405.17 "24TH"+56.03 52.30' Lt MATCH Exist (404.60) 404.34 FL +25 404.09 FL+00 403.95 FL +00 404.82 +25 404.93 39.63' Lt "24TH"+51.21 BCR 404.22 FL +50 405.03 +75 405.12 +00 405.17 +25 405.23 39.66' Lt "24TH"+79.19 ECR 404.38 FL 404.42 FL +00 R/W R/W 404.99 +02.40 33.38' Rt "24TH"+02.84 MATCH Exist (405.02) 33.63' Rt "24TH"+96.73 MATCH Exist (404.92) +50 404.62 FL +50 404.62 FL +25 404.47 FLDwy TYPE "B-2"REVISED SHEET rW=24'• Sta +19.32REVISION DATE DESCRIPTION REVISED WB LAYOUT 06/03/190 +96.33 404.975.5'+50 405.39+25 404.47 FL +00 404.42 FL +75 404.37 FL +50 404.21 FL +25 404.09 FL+00 403.95 FL 7% 52.32' Lt "24TH"+74.34 MATCH Exist (404.68) 44.64' Lt "24TH"+74.36 10'"24TH"+56.03 44.62' Lt MATCH Exist (406.52) 404.56 FL CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINE A SPH ASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga028.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS C-28 SCALE: 1" = 10' R/W No.#R CURVE DATA T L 24M1 24M2 24M3 24M4 25'39.02'24.75' 11.33'19.41' 12.79'21.18' 6.67'9.28' 15' 15' 24M1 46.34' Lt "24TH" +79.25 BCR MATCH Exist (404.31) FL 42.17' Lt "W178" +95.65 ECR 27.00' Rt "24TH" +03.96 BCR 39.48' Rt "24TH" +19.52 ECR 48.48' Rt "24TH" +21.24 MATCH Exist (404.07) FL MATCH Exist (404.31) FL 40.19' Rt "W178" +05.77 BCR 33.88' Rt "W178" +10.93 ECR 53.44' Lt "W178" +82.30 BCR 24M2 24M3 24M4 5' 405.34 404.67 FL 405.25 404.58 FL TCE R/W +50 +75 +50 +75 404.77 FL 404.28 FL 404.33 FL 404.11 FL 404.45 FL 404.52 FL 45.87' Lt +75.61 404.30 FL404.27 FLW=32'• Sta +55.8210'5'+72.42 65.94' Lt TYPE 1 CURB RAMP TYPE 3 CURB RAMP TYPE 4 CURB RAMPDwy TYPE "B-2" Mod7 ~ 57.87' Rt "W178" +10.85 "W178" +18.10 33.97' Rt 13' 404.58 FL R/ W R /W R/WR/WR/WR/WTYPE 8 Mod CURB RAMP 6 ' SW 27.00' Rt "24TH" +99.67 404.75 FL 32.50' Rt "24TH" +99.64 405.44 69.77' Rt "24TH" +29.10 MATCH Exist (404.34) 66.99' Lt "24TH" +88.43 405.39 57.18' Lt "24TH" +81.38 405.17 56.03' Lt "24TH" +73.62 405.21 96.73' Lt "W178" +71.67 MATCH Exist (404.73)5'64.26' Lt "W178" +86.59 MATCH Exist SW (405.16) MATCH LINE "24TH" Sta 386+50SEE SHEET C-27SEE SHEET C-462.72% RELINQUISHMENT LIMIT OF 41.85' Lt "W178" +23.57 MATCH Exist (404.06) FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: TCE 87.21' Lt "24TH" +97.38 MATCH Exist (404.64) FL MATCH Exist (404.57) FL 74.29' Lt "24TH" +99.14 ECR MATCH Exist (405.31) ELEVATIONS INTERSECTION SEE C-60 FOR 63 67 SHEET C-28r SEE REVISED REVISION DATE DESCRIPTION REVISED WB LAYOUT 4/11/191 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH " L INE M St"W 178" L IN E 24TH St A SPH ASPHASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 67 CONSTRUCTION DETAILS C-28 SCALE: 1" = 10'MATCH LINE "24TH" Sta 386+50SEE SHEET C-27SEE SHEET C-461. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 63 R/WR/W TCE R /WR/WR/WR/WRELINQUISHMENT LIMIT OF 7W=32'• Sta +57.46No.#R CURVE DATA T L 24M1 24M2 24M3 25' 15' 15' 96°15'48" 74°43'04" 80°12'07" 27.89' 11.45' 12.63' 42.00' 19.56' 21.00' 24M4 106°11'49"6.66'9.27'5' REVISED SHEET r REVISION DATE DESCRIPTION REVISED WB LAYOUT 06/26/19 R /W MATCH Exist (404.34) MATCH Exist (404.30) FL 13' MATCH Exist (404.25)FL 24M4 TYPE 1 CURB RAMP 404.42 FL "24TH"+18.10 33.09' Rt 0 24M3 TYPE 3 CURB RAMP +50 404.62 FL +75 404.67 FL 404.39 FL +50 405.44 +75 405.46 +00 +50 404.62 FL 404.67 FL +75 BCR 404.68 FL 53.59' Lt"W178"+82.25 42.17 Lt"W178"+95.64 CURB RAMP TYPE 8 Mod 24M2 6'5' 58.37' Lt "W178"+81.20 MATCH Exist (404.37) FL MATCH Exist (404.73) 96.73' "W178"+71.67 87.21' Lt "24TH" +97.38 MATCH Exist (404.64) FL 404.52 FL ECR 404.55 FL 24M1 TYPE 1 CURB RAMP 79.49' Lt "24TH"+98.43 Dwy TYPE "B-2""24TH"+72.42 65.94' Lt Exist MATCH (405.31)10'6% 6% MATCH Exist (404.06) FL R/W TCE5.5'Var41.85' Lt"W178"+23.57 70.70' Lt "24TH"+99.64 5'26' Rt "W178"+08.70 32.29' Rt"W178"+03.58 46.55' Rt "24TH"+20.81 20.75' Rt "24TH" +02.66 404.52 FL 404.45 FL 404.75 FL 57.87' Rt "W178"+10.85 69.77' Rt "24TH" +29.10 66.33' Lt "24TH"+88.53 42.30' Lt "24TH" +77.24 57.26' Lt "24TH" +81.94 405.27 405.25 55.97' Lt "24TH" +97.53 L404.60 FL CURB RAMP C 1 12/31/19 REVISED ELEVATIONS 1 ELEVATIONS INTERSECTION SEE C-60r FOR 1 BCR 404.32 FL ECR 404.10 FL 404.00 FL "W178"+04.05 41.98' Lt 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH " L INE "W 178" L IN E M St P PP ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga029.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 CONSTRUCTION DETAILS SCALE: 1" = 10' C-29 No.#R CURVE DATA T L 23D1 23D2 23D3 23D4 R/W R/W R/W 23D1 23D2 23D3 23D4 +73.89 BCR 38.65' Lt "23RD" +85.88 ECR 26.98' Lt "23RD" +07.20 BCR 27.87' Lt "23RD" +19.33 ECR 39.83' Lt "23RD" +99.60 BCR 30.00' Rt "23RD" +19.64 ECR 50.17' Rt "23RD" +83.68 ECR 27.24' Rt "23RD" +73.68 BCR 37.22' Rt "23RD" Exist LIP MATCH Exist LIP MATCH30'28'MATCH Exist (399.07) FL +73.67 43.81' Rt "23RD" MATCH Exist (399.13) FL MATCH Exist (399.15) FL +19.38 52.96' Lt "23RD" MATCH Exist (399.17) FL +86.50 27.24' Rt "23RD" 12'18.94' 12' 20' 10' 18.53' 31.63' 15.69'9.98' 20.21' 12.09' 11.68'R/WR/WR/WR/W399.68 399.69 +25 +00 399.07 FL 398.97 FL 399.08 FL 398.94 FL 399.16 FL 399.10 FL TYPE 3 CURB RAMP TYPE 8 CURB RAMP TYPE 8 CURB RAMP TYPE 8 CURB RAMP +86.46 33.87' Lt "23RD" MATCH Exist SW (399.87) +71.87 52.77' Lt "23RD" MATCH Exist (399.37) +74.37 53.31' Lt "23RD" MATCH Exist SW (399.76) +87.15 32.47' Lt "23RD" 399.71 +94.50 34.25' Rt "23RD" 399.80 +99.50 34.26' Rt "23RD" MATCH Exist SW (399.80) +86.50 48.07' Rt "23RD" 399.88 +74.25 50.80' Rt "23RD" MATCH Exist (399.64) +73.65 50.28' Rt "23RD" MATCH Exist (399.09) +78.21 50.87' Rt "23RD" MATCH Exist (399.77) MATCH Exist (399.78) +98.55 34.50' Rt "23RD" 400.00 +12.83 47.95' Rt "23RD" 399.85 +12.31 52.95' Rt "23RD" MATCH Exist SW (399.83) MATCH Exist SW (399.77) +35.00 30.78' Lt "23RD" +00.00 28.00' Lt "23RD" 399.38 +11.56 28.00' Lt "23RD" 399.34 TCE R /W SEE SHEET C-30MATCH LINE "23RD" Sta 354+25MATCH Exist (399.07) FL +73.71 48.31' Lt "23RD" MATCH Exist SW (399.91) +86.32 40.08' Lt "23RD" +09.47 27.08' Lt "23RD" MATCH Exist (399.12) FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 53.10' Rt "23RD" +78.22 398.84 FL ELEVATIONS INTERSECTION SEE C-61 FOR 64 REVISION DATE DESCRIPTION 1 3/18/19 399.87 399.91 REVISED CL ELEVATIONS 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 D St"23RD" LINE23RD St ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga030.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 355 6 CONSTRUCTION DETAILS SCALE: 1" = 10' C-30 R/W R/W R/W R/W Exist LIP MATCH Exist LIP MATCH 399.65 399.64399.68 399.67 399.66 399.63 399.65 399.66 399.68 +25 +50 +75 +00 +25 +50 +75 +00 +25 +25 +00 +75 +50 40.74' Lt +27.50 MATCH Exist (399.47) 35.31' Lt +40.56 399.83 ANGLE Pt 27.02' Lt +42.55 MATCH Exist (399.17) FL 399.19 FL 40.62' Lt +08.50 MATCH Exist (399.57) Dwy TYPE "A"399.24 FL MATCH Exist (399.27) 399.03 FL MATCH Exist (399.05) FL 27.25' Rt +02.91 34.47' Rt +99.92 MATCH Exist SW (399.62)Dwy TYPE "A"399.22 FLW=19'• Sta +18398.99 FLW=15'• Sta +20.42Exist LIP MATCH TYPE 4 CURB RAMP R=5'R/WR/WR/WR/WR=5' R=5' TYPE 4 CURB RAMP 45.50' Rt +12.66 45.50' Rt +30.38 40.50' Rt +29.15 399.25 MATCH Exist (399.44) 40.50' Rt +12.92 399.39 27.05' Lt +92.50 MATCH Exist (399.25) FL MATCH LINE "23RD" Sta 354+25SEE SHEET C-29SEE SHEET C-31MATCH LINE "23RD" Sta 356+2527'±25'±25'±27.03' Lt +32.50 ECR27.04' Lt +03.50 BCR R=5'+08.50 ECR 31.36' Rt +27.50 BCR 32.03' Rt 399.33 FL 399.40 FL 399.22 FL 399.26 FL +07.91 BCR 27.24' Rt +27.98 BCR 32.94' Rt +32.91 ECR 27.18' Rt 33.15' Rt "23RD" +46.07 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: TYPE 6 CURB RAMP 399.48 399.00 FL 398.89 FL 398.97 FL 399.03 FL 398.95 FL 32.24' Rt +12.92 ECR 65 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 399.87 399.84 399.82 399.81 399.82 399.83 399.86 399.88 399.81 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St P P P ASPH ASPH ASPHE STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga031.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 8 9 CONSTRUCTION DETAILS SCALE: 1" = 10' C-31 No.#R CURVE DATA T L 23E1 23E2 23E3 23E4 R/W R/W R/W R/W 399.66 Exist LIP MATCH 23E1 MATCH Exist (398.85) FL +65.83 50.56' Lt "23RD" +20.29 44.15' Lt "23RD" MATCH Exist (398.52) FL 23E2 +32.30 ECR 27.15' Lt "23RD" 23E3 +66.28 ECR 47.09' Rt "23RD" +36.62 ECR 27.01' Rt "23RD" +20.48 BCR 42.98' Rt "23RD" 23E4 +46.28 BCR 27.02' Rt "23RD"R/WR/WR/WR/W15' 12' 20' 16' 15.31' 11.98' 20.07' 16.12' 23.87' 18.83' 31.48' 25.25' 399.68 399.42 399.52 399.56 399.58 399.60 399.71 27'±+25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +75 +00 399.12 FL 398.35 FL 399.07 FL 399.03 FL MATCH Exist (399.31) MATCH Exist (399.57) MATCH Exist (399.16) FL MATCH Exist (399.80)Dwy TYPE "A"6" CURB 398.93 FL 399.13 FL 398.91 FL TYPE 3 CURB RAMP TYPE 3 CURB RAMP TYPE 1 CURB RAMP MATCH Exist (399.05) FL TYPE 7 CURB RAMP R=5' TYPE 6 CURB RAMPR/WR/WR/WR/WMATCH Exist (400.69) +53.55 27.09' Lt "23RD" MATCH Exist SW (399.56) +42.85 37.18' Lt "23RD" +30.35 37.19' Lt "23RD" 399.30 +20.30 BCR 39.13' Lt "23RD" 398.48 FL +30.30 44.69' Lt "23RD" 399.62 +20.93 49.69' Lt "23RD" MATCH Exist SW (399.34) +44.91 33.31' Lt "23RD" +49.90 33.06' Lt "23RD" +59.84 47.93' Lt "23RD" +65.88 ECR 42.14' Lt "23RD" 398.89 FL +68.87 44.06' Lt "23RD" MATCH Exist (399.06) +68.83 50.57' Lt "23RD" MATCH Exist (399.08) +65.09 52.97' Lt "23RD" MATCH Exist SW (399.43) +66.23 62.18' Rt "23RD" MATCH Exist SW (398.90) +51.77 27.79' Rt "23RD" 399.11 FL SEE SHEET C-32MATCH LINE "23RD" Sta 359+00MATCH LINE "23RD" Sta 356+25SEE SHEET C-30TYPE 6 Mod CURB RAMP25'±399.26 FL 399.33 FL 399.07 FL 399.10 FL +51.51 BCR 27.24' Rt +26.61 27.18' Lt "23RD" MATCH Exist (398.93) FL (399.43) TC 57.13' Rt "23RD" +20.46 MATCH Exist (398.91) FL 41.25' Lt "23RD" +43 41.25' Lt "23RD" +56 +97.00 BCR 37.19' "23RD" Lt +46.01 BCR 27.02' Lt "23RD" +80.50 ECR 27.22' Rt "23RD" +88.50 27.22' Rt "23RD" 27.96' Rt "23RD" +93.50 +75.50 BCR 32.22' Rt "23RD" 38.25' Rt "23RD" +75.50 27.02' Lt "23RD" +38.99 +56.50 38.25' Rt "23RD" +56.50 ECR 32.23' Rt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: +50.66 BCR 27.05' Lt "23RD" 398.78 FL 399.06 FLW=19'• Sta +66Dwy TYPE "A"399.15 FLW=41'• Sta +76.5437.02' Lt "23RD" +56 ECR R=10' +50 399.08 FL 399.15 FL 399.21 FL +75 +00 398.90 FL 399.01 FL END CITY TYPE "B" CURB (H=8") 398.87 FL CURB (H=8") CITY TYPE "B" 398.93 FL "B" CURB (H=8") Beg CITY TYPE ELEVATIONS INTERSECTION SEE C-62 FOR 399.03 FL MATCH Exist (399.23) FL MATCH Exist (399.61) MATCH Exist (399.58) MATCH Exist (399.34) ANGLE Pt 399.98 398.88 FL 66 399.81 399.88 399.89 399.90 399.92 399.94 399.96 399.99 REVISION DESCRIPTION 1 03/18/19 REVISED CL ELEVATIONS DATE 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE E St23RD St P P P ASPH ASPH ASPHE STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 8 9 CONSTRUCTION DETAILS SCALE: 1" = 10' C-31 No.#R CURVE DATA T L 23E1 23E2 23E3 23E4 R/W R/W R/W R/W 399.66 Exist LIP MATCH 23E1 MATCH Exist (398.85) FL +65.83 50.56' Lt "23RD" +20.29 44.15' Lt "23RD" MATCH Exist (398.52) FL 23E2 +32.30 ECR 27.15' Lt "23RD" 23E3 +66.28 ECR 47.09' Rt "23RD" +36.62 ECR 27.01' Rt "23RD" +20.48 BCR 42.98' Rt "23RD" 23E4 +46.28 BCR 27.02' Rt "23RD"R/WR/WR/WR/W15' 12' 20' 16' 15.31' 11.98' 20.07' 16.12' 23.87' 18.83' 31.48' 25.25' 399.68 399.42 399.52 399.56 399.58 399.60 399.71 27'±+25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +75 +00 399.12 FL 398.35 FL 399.07 FL 399.03 FL MATCH Exist (399.31) MATCH Exist (399.57) MATCH Exist (399.16) FL MATCH Exist (399.80)Dwy TYPE "A"6" CURB 398.93 FL 399.13 FL 398.91 FL TYPE 3 CURB RAMP TYPE 3 CURB RAMP TYPE 1 CURB RAMP MATCH Exist (399.05) FL TYPE 7 CURB RAMP R=5' TYPE 6 CURB RAMPR/WR/WR/WR/WMATCH Exist (400.69) +53.55 27.09' Lt "23RD" MATCH Exist SW (399.56) +42.85 37.18' Lt "23RD" +30.35 37.19' Lt "23RD" 399.30 +20.30 BCR 39.13' Lt "23RD" 398.48 FL +30.30 44.69' Lt "23RD" 399.62 +20.93 49.69' Lt "23RD" MATCH Exist SW (399.34) +44.91 33.31' Lt "23RD" +49.90 33.06' Lt "23RD" +59.84 47.93' Lt "23RD" +65.88 ECR 42.14' Lt "23RD" 398.89 FL +68.87 44.06' Lt "23RD" MATCH Exist (399.06) +68.83 50.57' Lt "23RD" MATCH Exist (399.08) +65.09 52.97' Lt "23RD" MATCH Exist SW (399.43) +66.23 62.18' Rt "23RD" MATCH Exist SW (398.90) +51.77 27.79' Rt "23RD" 399.11 FL SEE SHEET C-32MATCH LINE "23RD" Sta 359+00MATCH LINE "23RD" Sta 356+25SEE SHEET C-30TYPE 6 Mod CURB RAMP25'±399.26 FL 399.33 FL 399.07 FL 399.10 FL +51.51 BCR 27.24' Rt +26.61 27.18' Lt "23RD" MATCH Exist (398.93) FL (399.43) TC 57.13' Rt "23RD" +20.46 MATCH Exist (398.91) FL 41.25' Lt "23RD" +43 41.25' Lt "23RD" +56 +97.00 BCR 37.19' "23RD" Lt +46.01 BCR 27.02' Lt "23RD" +80.50 ECR 27.22' Rt "23RD" +88.50 27.22' Rt "23RD" 27.96' Rt "23RD" +93.50 +75.50 BCR 32.22' Rt "23RD" 38.25' Rt "23RD" +75.50 27.02' Lt "23RD" +38.99 +56.50 38.25' Rt "23RD" +56.50 ECR 32.23' Rt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: +50.66 BCR 27.05' Lt "23RD" 398.78 FL 399.06 FLW=19'• Sta +66Dwy TYPE "A"399.15 FLW=41'• Sta +76.5437.02' Lt "23RD" +56 ECR R=10' +50 399.08 FL 399.15 FL 399.21 FL +75 +00 398.90 FL 399.01 FL END CITY TYPE "B" CURB (H=8") 398.87 FL CURB (H=8") CITY TYPE "B" 398.93 FL "B" CURB (H=8") Beg CITY TYPE ELEVATIONS INTERSECTION SEE C-62 FOR 399.03 FL MATCH Exist (399.23) FL MATCH Exist (399.61) MATCH Exist (399.58) MATCH Exist (399.34) ANGLE Pt 399.98 398.88 FL 399.81 399.88 399.89 399.90 399.92 399.94 399.96 399.99 REVISION DESCRIPTION 03/18/19 REVISED CL ELEVATIONS DATE 2 06/04/19 398.77 398.89 25.14'16.00' 43.01' +36.51 ECR 27.04' Rt "23RD" 398.96 FL 399.59 TC 398.83 FL 399.55 TC 398.81 FL 399.48 TC 399.61 TC (H=Var) 2 2 2 2 2 2 2 r REVISED SHEET 2 REVISED FL ELEVATIONS C-62r 2 398.89 FL 399.57 TC 66r 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE E St23RD St P P P ASPH ASPH ASPHASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga032.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3609 1 CONSTRUCTION DETAILS SCALE: 1" = 10' C-32 No.#R CURVE DATA T L 23F1 23F2 23F3 23F4 R/W R/W R/W R/W Exist LIP MATCH Exist LIP MATCH 23F1 +82.66 BCR 27.04' Lt "23RD" +07.73 ECR 52.00' Lt "23RD" MATCH Exist (399.50) FL +07.73 56.19' Lt "23RD" +71.61 43.41' Lt "23RD" MATCH Exist (399.45) FL 23F2 +71.62 BCR 42.06' Lt "23RD" +86.59 ECR 27.10' Lt "23RD" MATCH Exist (399.20) FL 23F3 +92.89 BCR 27.22' Rt "23RD" +07.87 ECR 42.29' Rt "23RD" +87.71 27.10' Lt "23RD" 23F4 Exist LIP MATCH MATCH Exist (399.27) FL +87.46 27.21' Rt "23RD" 25' 15' 15' 15' 25.03' 14.94' 15.05' 14.97' 39.30' 23.50' 23.61' 23.53'R/WR/WR/WR/WMATCH Exist (399.29) FL +07.85 46.67' Rt "23RD" 399.71 399.75 399.80 399.83 400.03 400.08 399.52 FL 399.55 FL +00 +25 +50 +75 +25 +00 +25 +00 399.49 FL 399.44 FL 399.21 FL 399.28 FL 399.37 FL 399.59 FL MATCH Exist (399.24) FL TYPE 2 CURB RAMP TYPE 2 CURB RAMP TYPE 2 CURB RAMP TYPE 2 CURB RAMP 399.23 FL R=10' 400.06 400.06 +43.51 56.15' Lt "23RD" MATCH Exist (400.57) MATCH Exist (400.50) +45.79 43'' Lt "23RD" +72.32 48.41' Lt "23RD" MATCH Exist SW (400.00) +93.42 35.98' Rt "23RD" 400.06 +94.51 37.07' Rt "23RD" 400.09 +98.03 40.62' Rt "23RD" 400.18 +99.12 41.71' Rt "23RD" 400.20 +71.46 61.04 Rt "23RD"27'±25'±25'±MATCH LINE "23RD" Sta 359+00SEE SHEET C-31SEE SHEET C-33MATCH LINE "23RD" Sta 361+25MATCH Exist SW (400.14) MATCH Exist SW (399.38) FL +07.03 ECR 27.19' Lt MATCH Exist (399.57) FL 27.20' Lt "23RD" +10 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 399.53 FL 399.51 FL 42.04' Rt "23RD" +71.50 BCR 400.13 400.09 400.11 400.21 400.17 35.24' Rt "23RD" +93.53 34.74' Rt "23RD" +86.8236.79' Rt "23RD" +84.76 40.32' Rt "23RD" +81.22 42.34' Rt "23RD" +79.91 27' Rt "23RD" +06.86 33.18' Rt "23RD" +95.95 27.07' Rt "23RD" +86.51 ECR 40.73' Lt "23RD" +90.46 44.26' Lt "23RD" +94 ELEVATIONS INTERSECTION SEE C-63 FOR 67 399.99 400.01 400.02 400.11 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 400.18 400.16 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE F St23RD St P PP PP P ASPH ASPH 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga033.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 CONSTRUCTION DETAILS SCALE: 1" = 10' C-33 R/W R/W R/W R/W Exist LIP MATCH Exist LIP MATCH 400.10 400.15 400.22400.08 400.09 400.11 400.20 400.21 400.23 399.55 FL 399.57 FL TCE +25 +50 +75 +25 +50 +00 +25 +50 +75 +00 +25 MATCH Exist (399.64) FL MATCH Exist (399.60) FL 399.58 FL 399.45 FL 6'4'399.58 FLW=28'• Sta +76.506'4'MATCH Exist SW (400.19) MATCH Exist (400.46) MATCH Exist SW (400.25) MATCH Exist (399.63) FL 399.66 FLW=20'• Sta +91.6727.18' Rt +07.67 MATCH Exist (399.69) FL MATCH Exist SW (400.31)Dwy TYPE "B-1"Dwy TYPE "B-1"MATCH Exist SW (399.42) FL 7 ~Dwy TYPE "B-1" Mod16.8%4.63'399.62 FLW=16'• Sta +14.508'Conc JOINT MATCH Exist CURB Ret 7 ~ 399.58 FL MATCH Exist SW (400.09) 6'10'R/WR/WR/WR/WR=2' R=5' TYPE 4 CURB RAMP MATCH Exist (400.42) 4.14% RET. CURBMATCH LINE "23RD" Sta 361+25SEE SHEET C-32SEE SHEET C-34MATCH LINE "23RD" Sta 363+25TCE399.48 FL TYPE 4 CURB RAMP FOR DETAILS SEE SW PLANS SW No. 6 399.49 FL +41 BCR 32.06' Lt 400.06 FL (399.83) FL 4'MATCH Exist (400.27) MATCH Exist (400.38) 41.27' Rt "23RD" +21.86 41.27' Rt "23RD" +02.30 27.09' Lt "23RD" +93 +04 BCR 27.08' "23RD" Lt +06 ECR 29.08' Lt "23RD" 27.08' Lt "23RD +15 41.25' Lt "23RD" +15 27.06' Lt "23RD" +54 27.06' Lt "23RD" +46 ECR 27.82' Rt "23RD" +52.50 27.13' Rt "23RD" +57.50 41.27' Rt "23RD" +57.49 27.81' Rt "23RD" +12.67 +97.17 41.27' Rt "23RD" +34.50 27.93' Rt "23RD" +28.50 27.28' Rt "23RD" +75.67 27.09' Rt "23RD" 27.81' Rt "23RD +70.67 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES:4'6.32% 27.06' Lt "23RD" +23.75 399.52 FL 68 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 400.18 400.22 400.26 400.31 400.32 400.33 400.39 400.45 400.49 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St P PP P P P CONC ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga034.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3654 CONSTRUCTION DETAILS SCALE: 1" = 10' C-34 R/W CONSTRUCTION DETAILS SCALE: 1" = 10' No.#R CURVE DATA T L 23G1 23G3 23G2 23G4 R/W R/W R/W 23G1 +43.79 BCR 27.05' Lt "23RD" +59.01 ECR 41.83' Lt "23RD" 23G2 +13.21 BCR 42.28' Lt "23RD" +27.93 ECR 27.22' Lt "23RD" 23G3 +58.99 ECR 38.78' Rt "23RD" 23G4 Exist LIP MATCH +47.02 BCR 27.26' Rt "23RD"R/WR/WR/WR/W15' 12' 15' 12' 23.58' 18.35' 23.34' 18.84' 15.02' 11.51' 14.78' 12.00' 400.23 400.41 400.45 400.50 400.55 400.59 400.62 400.67 399.93 FL 399.97 FL 400.01 FL 400.13 FL TCE +25 +25 +50 +50 +75 +75 +00 +00 +25 +75 +50 +75 399.97 FL 399.66 FL 399.77 FL 399.76 FL MATCH Exist (401.15) MATCH Exist (401.00)Dwy TYPE "A"TYPE 7 CURB RAMP TYPE 1 CURB RAMP +38.08 27.24' Rt "23RD" MATCH Exist (399.74) FL 399.57 FL 46.91' Lt "23RD" +59.08 +13.97 55.43' Lt "23RD"R/WR/WR=5' TYPE 3 CURB RAMP +13.97 55.43' Lt "23RD" MATCH Exist SW (400.72) +10.22 46.69' Lt "23RD" MATCH Exist (400.19) +10.24 50.44' Lt "23RD" MATCH Exist (400.22) +33.08 27.85' Rt "23RD" MATCH Exist SW (400.32) 36 575.00 400.05 FL +2527'6' SW +20.85 42.42' Rt "23RD" MATCH Exist (400.86) MATCH Exist (400.57) FL +28.72 40.29' Rt "23RD" 399.84 399.91 FL +28.71 34.31' Rt "23RD" 399.96 400.08 FL 7' PKWY SEE SHEET C-35MATCH LINE "23RD" Sta 365+75MATCH LINE "23RD" Sta 363+25SEE SHEET C-3325'±MATCH Exist (400.07) FLMATCH Exist SW (399.60) FL +13.73 BCR 42.42' Rt "23RD" +28.71 ECR 27.43' Rt "23RD" 400.20 FL 400.28 FL +59.26 57.38' Rt "23RD" MATCH Exist (399.95) FL MATCH Exist (399.63) FL +48.24 BCR 27.30' Rt "23RD" +71.68 ECR 27.28' Rt "23RD" 47.00' Rt "23RD" +66.75 47.00' Rt "23RD" +53.25 +53.25 ECR 32.30' Rt "23RD" +66.75 BCR 32.16' Rt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 399.41 FL PKWY 7' SW 6' TYPE 1 CURB RAMP 400.09 FLW=13.50'• Sta +60400.10 FL ELEVATIONS INTERSECTION SEE C-64 FOR 69 27.04' Lt "23RD" +48.58 400.49 REVISION DESCRIPTION 1 03/18/19 REVISED CL ELEVATIONS DATE 400.60 400.68 400.67 400.69 400.74 400.79 400.821 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINEG St23RD St P P PP P ASPH ASPH STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga035.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 8 CONSTRUCTION DETAILS SCALE: 1" = 10' C-35 No.#R CURVE DATA T L 23H1 23H2 23H3 23H4 R/W R/W R/W R/W Exist LIP MATCH 23H1 +90.72 BCR 27.04' Lt "23RD" +05.91 ECR 41.97' Lt "23RD" +60.14 43.24' Lt "23RD" MATCH Exist (400.22) FL 23H2 +75.22 ECR 27.11' Lt "23RD" 23H3 +91.16 BCR 27.40' Rt "23RD"+79.94 ECR 27.34' Rt "23RD" 23H4 400.70 400.74 400.77 +86.60 27.09' Lt "23RD" +06.10 ECR 42.44' Rt "23RD" +60.14 BCR 42.13' Lt "23RD" MATCH Exist (400.52) FL +60.14 62.38' Rt "23RD" +60.11 BCR 47.38' Rt "23RD" 15' 20' 15' 15' 15.12' 15.10' 14.98' 18.88' 23.68' 23.66' 23.54' 31.29' 400.67 400.81 400.80 400.68 400.19 FL 399.93 FL 400.29 FL400.25 FL400.21 FL400.17 FL400.13 FL +75 +75 +00 +00 +25 +25 +50 +50 +75 +75 +00 +00 +75 +00 MATCH Exist (400.21) FL 400.17 FL 400.07 FL 400.21 FL 400.39 FL 400.45 FL 400.29 FL +06.07 56.54' Rt "23RD" MATCH Exist (400.44) FL TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP CURB Ret CURB Ret MATCH Exist (400.13) FL MATCH Exist (400.04) FL Dwy TYPE "B-1" Mod4.63'9.38'11.15%400.12 FL 400.06 FL 7" CURB 7" CURB 400.09 FL W=32'• Sta +09400.23 FL W=17'• Sta +43+86.15 34.70' Rt "23RD" 400.89 +90.67 39.69' Rt "23RD" 401.03 +93.31 41.93' Rt "23RD" 401.08 +06.09 47.44' Rt "23RD"R/WR/WR/WR/WMATCH Exist (400.61) +56.43 57.13' Rt "23RD" +60.11 49.39' Rt "23RD" 400.46 FL +73.46 43 Rt "23RD" 401.24 400.98 +78.42 37.54 Rt "23RD" +87.67 27.27' Rt "23RD" 400.26 FL +68.15 43.24' Lt "23RD" +68.16 48.24' Lt "23RD" MATCH Exist SW (400.89) 401.02 +74.36 45.80 Lt "23RD" 401.01 +79.12 41.46 Lt "23RD" +76.46 35.27 Lt "23RD" +99.74 48.20' Lt "23RD" 400.86 +84.71 33.43' Lt "23RD" 400.95 +70.66 27.15' Lt "23RD" 8.74% 7' 5' SW 7' PkwyMATCH LINE "23RD" Sta 365+75SEE SHEET C-34SEE SHEET C-37MATCH LINE "23RD" Sta 368+00MATCH Exist (401.30) MATCH Exist (401.30) 400.41 FL MATCH LINE SEE SHEET C-36 TCE TCE 5.5' SW 400.85 400.89 Dwy TYPE "B-2" ModMATCH Exist (400.13) FL +41.42 27.14' Lt "23RD" +31 41.12' Lt "23RD" +31 27.13' Lt "23RD" 27.12' Lt "23RD" +87 +87 41.11' Lt "23RD" +76.19 27.11' Lt "23RD" 400.16 FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 400.32 FL ELEVATIONS INTERSECTION SEE C-65 FOR 70 400.82 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 400.84 400.87 400.90 400.93 401.01 401.03 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 2. PROVIDE 5' BY 5' "LANDING" AT PROPOSED DOOR LOCATION. 3. MAXIMUM LONGITUDINAL SLOPE SHALL BE 5%. 10/01/212 AS-BUILT 5' SW +10SEE NOTE 2 AND 3 2 2 DG "23RD" LINE H St23RD St P ASPH ASPH ASPHH STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga036.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' C-36R/WR/WR/WR/WMATCH Exist SW (401.04) Dwy TYPE "B-1" MATCH Exist SW (402.12) MATCH Exist SW (402.48) MATCH LINE SEE SHEET C-35 SW 5.5' 401.97 FL W=27' • Sta +60.54 7'6' 205.33' Lt "23RD" +74.33 +05.07 141.01' Lt "23RD" +74.15 242.33' Lt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: 205.31' Lt "23RD" +60.57 MATCH Exist (401.83) FL 242.31' Lt "23RD" +60.51 MATCH Exist (402.11) FL 71 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 H St CONC ASPH ASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga037.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 37089 CONSTRUCTION DETAILS SCALE: 1" = 10' C-37 R/W R/W R/W R/W Exist LIP MATCH 400.66 400.58 400.59 400.60400.68 400.70 400.11 FL 400.06 FL 400.64 400.01 FL 400.60 400.54 400.42 400.19 FL 400.12 FL 400.02 FL 399.90 FL 27' 10'TCE +00 +00 +25 +25 +50 +75 +75 +00 +25 +25 +50 +50 +75 +75 +25 +00 +25 393.93 FL +00 +24.71 BCR 27.00' Lt "23RD" 399.95 FL +00 399.90 FL 400.79 400.88 ANGLE Pt MATCH Exist (400.68) 400.10 FL400.05 FL MATCH Exist (400.49) MATCH Exist SW (400.79) 400.08 FL 5'5'8'400.06 FLW=32.5' • Sta +77.75400.05 FL6'4'8'27.00' Lt +10 399.94 FL 399.97 FLW=34'• Sta +32MATCH Exist SW (400.70) 27.00' Lt +54 399.99 FLDwy TYPE "B-2"7~ TCETCE Dwy TYPE "B-1"7 ~R/WR/WR=5' MATCH Exist (400.92)MATCH LINE "23RD" Sta 368+00SEE SHEET C-35SEE SHEET C-38MATCH LINE "23RD" Sta 370+25MATCH Exist (401.09) 6.07%25'±MATCH Exist (401.19) MATCH Exist (401.26) 7.05% 7 ~+90.84 BCR 27.00' Lt +18.34 ECR 27.00' Lt +95.84 ECR 32.00' Lt 400.25 FL +13.34 BCR 32.00' Lt 400.44 FL 27.27' Rt "23RD" +14.50 45.24' Rt "23RD" +61.01 27.25' Rt "23RD" +46.02 27.24' Rt "23RD" +56.50 27.26' Rt "23RD" +99 45.26' Rt "23RD" +93.62 +14.81 45.00' Lt "23RD" 34.76' Lt "23RD" +59 45.00' Lt "23RD" +49.50 46.00' Lt "23RD" +97.84 +82.84 35.00' Lt "23RD" 46.00' Lt "23RD" +13.34 41.00' Lt "23RD" +26.34 37.01' Lt "23RD" +30.33 27.23' Rt "23RD" +16.54 MATCH Exist (399.71) FL 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: MATCH Exist (400.01) FL 400.06 FL 400.08 FLW=17.50'• Sta +04.59Dwy TYPE "A"72 401.03 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 401.02 401.00 400.94 400.90 400.91 400.92 400.93 400.94 400.76 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St P ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga038.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 1 2 CONSTRUCTION DETAILS SCALE: 1" = 10' No.#R CURVE DATA T L R/W R/W R/W+49.71 ECR 51.97' Lt "23RD" +09.44 BCR 51.89' Lt "23RD" 401.02 MATCH Exist (400.44) FL MATCH Exist (400.19) FL 23I1 23I2 23I3 23I1 23I2 23I3 23I4 C-38R/WR/WR/WR/W25' 20' 24.97'39.24' 18.98'30.37' 25'25.00'39.27' 4.12'2.18' +52.36 48.88' Rt "23RD" 400.42 400.84 400.85 400.94 401.01 399.90 FL 400.27 FL 400.28 FL 400.31 FL 400.35 FL 27'6'+25 +50 +50 +50 +75 +75 +75 +00 +00 +00 +25 +25 +50 +52.22 ECR 46.18 Rt "23RD" 400.15 FL +75 +00 400.24 FL MATCH Exist (400.50) FL MATCH Exist (400.90) 400.42 FL 400.37 FL 401.16 400.48 FL 49.46' Rt "23RD" +06.68 47.29' Rt "23RD" +06.68 BCR 27.28' Rt "23RD" +26.59 ECR MATCH Exist (400.51) FL (401.08) TC 400.27 FL 400.85 TC +25 TYPE 3 CURB RAMP TYPE 8 CURB RAMP 8'20'8.73'16.46' 1 2 5' 3 12.74'11.97'5' 2 2 3 400.26 FL 35.00' Lt +20.17 BC 400.48 FL 400.37 FL 11 ~ Conc PAD 27.00' Lt "23RD" +25 BCR 400.24 FL 400.78 TC Beg CURB Trans (H=6.5") 400.16 FL 400.83 TC END CURB Trans (H=8") CURB (H=8") CITY TYPE B 400.17 FL 400.84 TC Beg CURB Trans (H=8") 400.36 FL 400.86 TC Trans (H=6") END CURB TYPE 5 CURB RAMP R=5' +32.98 39.39' Lt "23RD" 401.09 +38.81 40.81' Lt "23RD" 400.59 +41.34 45.11' Lt "23RD" 400.69 +42.68 50.93' Lt "23RD" 401.08 +49.59 58.40' Lt "23RD" MATCH Exist SW (401.11) TYPE 3 Mod CURB RAMP TYPE 8 CURB RAMP +14.96 48.54' Lt "23RD" 401.08 401.20 +19.96 48.54' Lt "23RD" 400.54 +19.93 40.31' Lt "23RD" 401.29 +28.93 40.31' Lt "23RD" 401.17 +28.93 35.31' Lt "23RD" +41.01 44.72' Rt "23RD" 400.84 +40.99 36.72' Rt "23RD" 400.15 +32.99 36.72' Rt "23RD" 400.32 +07.29 54.46' Rt "23RD" MATCH Exist SW (401.16) +13.68 49.45' Rt "23RD" 401.23 +22.77 34.86' Rt "23RD" MATCH Exist (401.07)MATCH LINE "23RD" Sta 370+25SEE SHEET C-37SEE SHEET C-39MATCH LINE "23RD" Sta 372+502%400.94 400.44 FL 401.11 TC 400.47 FL 401.14 TC 400.50 FL 401.17 TC 400.53 FL 401.20 TC 400.27 FL 401.10 TC +34.49 ECR 26.94' Lt"23RD" 400.29 FL 400.96 TC 23I4 20'20.00'31.41' +46.56 PRC 28.60' Lt "23RD" +38.44 27.00' Lt "23RD" 56.00' Lt "23RD" +43.09 +34.83 PRC 28.60' Lt "23RD" 27.13' Rt "23RD" +41.49 +25.79 27.15' Rt "23RD" 41.25' Rt "23RD" +33.50 56.25' Rt "23RD" +46.50 +61.22 EC 35.00' Lt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: +62.01 27.22' Rt "23RD" 400.17 FL +32.25 BCR 27.22' Rt "23RD" 399.64 FL 11 ~ INTERSECTION ELEVATIONS SEE C-66 FOR 32.00' Lt "23RD" +43.50 EC 27' Lt "23RD" +42.89 BC 73 400.76 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 401.08 401.07 401.09 401.10 401.121 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St EYE St ASPHASPH CONCASPH ASPHHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga039.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 375341 CONSTRUCTION DETAILS SCALE: 1" = 10' C-39 No.#R CURVE DATA T L R/W R/W R/W 401.02 +00.15 ECR 41.85' Lt "23RD" MATCH Exist (400.80) FL +85.04 BCR 26.86' Lt "23RD" +00.21 ECR 42.02' Rt "23RD"R/WR/WR/WR/W23J1 23J2 23J3 23J4 23J1 23J2 23J423J3 15' 12' 15' 20' 14.99' 11.98' 14.96' 20.06' 23.55' 18.83' 23.52' 31.48' MATCH Exist (401.77) FL +85.47 BCR 47.31' Rt "23RD" +00.22 43.27' Rt "23RD" 401.05 401.10 401.20 401.32 401.39 401.74 401.90 400.43 FL 400.55 FL 400.65 FL 400.77 FL 400.89 FL 400.72 FL +85.19 BCR 27.08' Rt "23RD" 400.98 FL2%6'27'400.94 FL TCE +50 +75 +75 +00 +00 +25 +25 +25 +50 +50 +75 +75 +25 +25 +00 +00 +25 +50 400.93 FL 56.00' Lt +62.79 MATCH Exist (401.25) 400.42 FL Dwy TYPE "A"Dwy TYPE "A"400.40 FLW=19'• Sta +53TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP 5'9.1'400.67 FLW=25'• Sta +87.505'9.1'400.84 FLW = 22'• Sta +58Dwy TYPE "B-2"Dwy TYPE "B-2"8'400.51 FL 11 2 3 2 1 5' 20' 5' 12.74' 8.73' 2.18'4.12' 16.46' 11.97' 2 3 Conc PAD ~ 400.95 FL 400.83 FL +85.46 BCR 39.08' Lt "23RD" +97.46 ECR 27.10' Lt "23RD" MATCH Exist (401.00) FL 54.08' Lt "23RD" +85.44 TYPE 5 CURB RAMP R/WMATCH Exist (400.89) +00.16 61.09' Lt "23RD" +85.33 41.27' Rt "23RD" 401.72 +37.83 43.27' Rt "23RD" MATCH Exist (402.56) +48.67 47.38' Rt "23RD" +85.97 49.17' Rt "23RD" MATCH Exist SW (402.33) MATCH Exist (402.59) +00.83 41.72' Rt "23RD" 402.55 +97.46 44.10' Lt "23RD" +97.46 38.21' Lt "23RD" 401.75 +02.46 38.21' Lt "23RD" MATCH Exist SW (401.74) 400.82 FLR/WMATCH LINE "23RD" Sta 372+50SEE SHEET C-38SEE SHEET C-40MATCH LINE "23RD" Sta 375+25400.45 FL 401.12 TC 400.64 FL 401.31 TC 400.81 FL 401.48 TC 401.01 FL 401.68 TC 400.95 FL 401.62 TC 400.71 FL 401.38 TC 400.93 FL 401.60 TC 400.80 FL 400.84 FL 400.90 FL 400.79 FL 400.65 FL 400.53 FL 400.51 FL MATCH Exist (401.00) FL 56.25' Rt "23RD" +59.50 41' Lt "23RD" +85.22 MATCH Exist SW (401.82) 27.11' Rt "23RD" +05 27.10' Rt "23RD" +74 27.12' Rt "23RD" +64.50 27.12' Rt "23RD" +70.27 +42 27.14' Rt "23RD" 32.00' Lt "23RD" +62.50 BCR 27.00' Lt "23RD" +67.50 28.60' Lt "23RD" +71.17 PRC 35' Lt "23RD" +66.82 BC +85.83 EC 35.00' Lt "23RD" 28.60' Lt "23RD" +81.48 PRC 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: TYPE 4 CURB RAMP 400.47 FLW=13'• Sta +53R=5' 401.29 FL +05.49 ECR 27.27' Rt "23RD" MATCH Exist (400.98) FL +00 ELEVATIONS INTERSECTION SEE C-67 FOR 74 401.12 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 401.22 401.34 401.44 401.56 401.68 402.18 401.91 2/27/19 2 REVISIONS TO PARKING PULLOUT 2 2 400.80 400.92 400.91 1 43.27' Rt "23RD" +02.22 MATCH Exist (400.84) 3 3 REVISED SW CURB RETURN308/21/19 400.77 401.55 400.69400.65 400.60 400.73400.56401.50 401.62 33 3 3 400.50 400.51 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St CHESTER Ave ASPHASPH CONCASPH ASPHHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 375341 CONSTRUCTION DETAILS SCALE: 1" = 10' C-39 R/W R/W +00.15 ECR 41.85' Lt "23RD" +85.04 BCR 26.86' Lt "23RD"R/WR/WR/WR/W23J1 400.45 FL 400.55 FL 400.84 FL6'27'TCE +75 +00 +75 +00 56.00' Lt +62.79 400.42 FL TYPE 1 CURB RAMP8'400.51 FL 11 2 2 ~R/WR/WMATCH LINE "23RD" Sta 372+50SEE SHEET C-38SEE SHEET C-40MATCH LINE "23RD" Sta 375+25400.45 FL 401.12 TC 400.80 FL 401.47 TC 401.04 FL 401.71 TC 400.95 FL 401.62 TC 400.86 FL 401.53 TC 400.98 FL 401.65 TC 41' Lt "23RD" +85.22 32.00' Lt "23RD" +62.50 BCR 27.00' Lt "23RD" +67.50 28.60' Lt "23RD" +71.17 PRC 35' Lt "23RD" +59.82 BC 28.60' Lt "23RD" +74.48 PRC 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES:74 400.85 FL 27' Lt "23RD" +78.15 EC REVISION DATE DESCRIPTION 1 2/27/19 400.94 FL 400.87 FL 3 35.00' Lt "23RD" +85.83 EC (401.82) MATCH Exist (401.25) +85.83 (401.59)(401.62)(401.66)(401.69)(401.73) +59.82 (401.77) +74.48 (401.80) +00 +15 +30 +45 400.90 FL 401.57 TC 400.94 FL 401.61 TC 400.61 FL 400.67 FL 400.75 FL 400.80 FL 41' Lt "23RD" +62.50 (400.76) CURB RAMP TYPE 4 +15 +30 +45 +15 +30 +45 +59.82 400.43 FL +85.83 Conc PAD MATCH Exist +00.16 61.09' Lt "23RD" MATCH Exist (401.00) FL No.#R CURVE DATA T L 23J1 15'14.99'23.55' 3 2 1 5' 20' 5' 12.74' 8.73' 2.18'4.12' 16.46' 11.97' 401.33 FS (401.55) FS +70.50 1.5%VarREVISIONS TO PARKING PULLOUT r REVISED SHEET 1 r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE CHESTER Ave P PP P FP CONC ASPH ASPH CONC ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga040.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 CONSTRUCTION DETAILS SCALE: 1" = 10' C-40 R/W R/W R/W R/W 402.50402.06 402.20 402.66 Exist LIP MATCH Exist LIP MATCH 400.98 402.34 402.82 403.00 403.17 401.19 FL 401.34 FL 402.18 FL 402.36 FL 402.58 FL TCE +25 +25 +50 +50 +75 +00 +25 +50 +75 +75 +00 +25 +00 +25 MATCH Exist (402.39) 401.74 FL401.73 FL 402.11 FL 402.01 FL MATCH Exist (402.00)Dwy TYPE "A"MATCH Exist (401.70) FL MATCH Exist SW (402.48) 401.77 FL MATCH Exist (402.10) MATCH Exist (402.18) FL 402.90 ANGLE Pt 402.13 FL 402.07 FL +50 R=15' R=4'401.95 FLW=31'• Sta +40.33401.87 FLW=14'• Sta +32.50MATCH Exist MATCH Exist (401.34) FL MATCH Exist (402.29) FL 401.45 FLW=33'• Sta +55.506'8'3' MATCH Exist SW (402.06) MATCH Exist (402.77) FL 401.49 FL MATCH Exist SW (402.16) 401.66 FL401.58 FLW=16'• Sta +85.505.5'5.5'Dwy TYPE "B-2"7 ~ TCEDwy TYPE "B-2" ModR/WR/WR/WR/WMATCH Exist (402.34) R=5' 402.67 401.95 402.44 9.5%MATCH LINE "23RD" Sta 375+25SEE SHEET C-39SEE SHEET C-41MATCH LINE "23RD" Sta 377+256.31% 7 ~ 7~Dwy TYPE "A-C"25'±MATCH Exist SW (402.77) ANGLE Pt 402.09 FL +33 401.79 FL +33 401.88 FL 402.64 FL 401.32 FL +25 MATCH Exist (401.55) FL 26.93' Lt "23RD" +44.51 ECR27.09' Lt "23RD" +17.50 +20.50 BCR 27.09' Lt "23RD" 38.00' Lt "23RD" +50.50 +39.50 BCR 31.93' Lt "23RD" +45.50 38.00' Lt + "23RD" +45.50 38.00' Lt "23RD" 26.95' Lt "23RD" +57.19 +25.50 ECR 32.09' Lt "23RD" 48.00' Lt +25.50 "23RD" "23RD" 38.00' Lt +25.50 401.77 "23RD" +17.50 38.00' Lt 32.45' Lt "23RD" +67.50 27.09' Lt "23RD" +72.50 +98.50 27.10' Lt "23RD" +70.81 ECR 27.22' Rt "23RD" +24.83 ECR 31.29' Rt "23RD" +20.83 BCR 27.29' Rt "23RD"+77 27.31' Rt "23RD" 27.93' Rt "23RD" +82 27.31' Rt "23RD"+34 44.31' Rt "23RD" +39.13 44.31' Rt "23RD" +74.60 +11.83 27.30' Rt "23RD" +11.83 41.22' Rt "23RD" +24.83 46.25' Rt "23RD" +42.80 46.25' Rt "23RD" +55.86 BCR 41.25' Rt "23RD" +70.30 41.25' Rt "23RD" 27.22' Rt "23RD" +78.03 48.00'Lt "23RD"+39.50 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: PROTECT IN PLACE LIGHT POLE 401.76 FL 401.94 FL 75 402.18 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 402.39 402.51 402.63 402.75 402.87 403.04 403.19 403.32 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St FP PP P PP FP FP CONC ASPHK STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga041.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 8 9 CONSTRUCTION DETAILS SCALE: 1" = 10' C-41 No.#R CURVE DATA T L 23K1 23K2 23K3 23K4 8' R/W R/W R/W R/W +78.51 ECR 34.71' Lt "23RD" +48.00 ECR 27.18' Rt "23RD" +32.97 BCR 41.98' Rt "23RD" 403.37 MATCH Exist (402.78) FL MATCH Exist (402.63) FL +58.82 BCR 27.22' Rt "23RD" +78.73 ECR 47.20' Rt "23RD" 403.21 +70.53 BCR 27.08' Lt "23RD" 23K1 23K4 23K3 MATCH Exist (402.33) FL R/WR/WR/WR/W+37.11 78.63' Lt "23RD" MATCH Exist (402.76) FL +78.73 48.04' Rt "23RD" 15' 20' 15' 7.62' 14.90' 19.90' 31.31' 12.18' 23.47' 31.31' 23.40' 403.17 403.20 403.28 403.35 403.39 402.58 FL 402.72 FL 402.58 FL +25 +25 +50 +50 +50 +75 +00 +25 +50 402.68 FL 402.83 FL 402.77 FL 402.34 FL 27.19' Rt "23RD" +50 TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP MATCH Exist (403.68) MATCH Exist (403.69)5.5'5'3' 23K2 5.5'5'3'2% Max7 ~~ 7 402.64 FLW=20'• Sta +72.75402.61 FL +33.13 BCR 41.99' Lt "23RD" +48.13 ECR 27.09' Lt "23RD"402.73 FLW=20'• Sta +23.50MATCH Exist SW (403.18) MATCH Exist (402.50) FL 402.62 +53.66 34.07' Rt "23RD" 402.98 MATCH Exist SW (403.36) +33.62 43.98' Lt "23RD" 403.68 +78.75 52.25' Lt "23RD" +59.62 27.07' Lt "23RD" MATCH Exist (402.77) FL +78.24 49.34' Rt "23RD" MATCH Exist SW (403.35) +56.82 27.86' Rt "23RD" MATCH Exist SW (403.17)Dwy TYPE "B-2"Dwy TYPE "B-2"16.41% 16.26% 402.67 FL 402.71 FL 402.75 FL 402.65 FL MATCH Exist (402.70) FL +31.12 47.99' Rt "23RD"SEE SHEET C-42MATCH LINE "23RD" Sta 379+50MATCH LINE "23RD" Sta 377+25SEE SHEET C-4040.59' Lt "23RD" +51.31 46.11' Lt "23RD" +45.72 +50.08 37.60' Lt "23RD" +55.75 27.09' Lt "23RD" +89.75 27.10' Lt "23RD" +06.50 27.09' Lt "23RD"+40.50 27.12' Lt "23RD" 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: +32.95 43.98' Lt "23RD" MATCH Exist SW (402.52) +75 402.49 FL 402.64 FL 402.70 FL 403.28 FL +00 +25 +50 +50 402.79 FL ELEVATIONS INTERSECTION SEE C-68 FOR 76 403.32 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 403.42 403.37 403.51 403.56 403.58 403.59 1 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St K St P P P PPPP CONC ASPH ASPHASPASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga042.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 380 1 2 CONSTRUCTION DETAILS SCALE: 1" = 10' C-42 No.#R CURVE DATA T L 23L1 23L2 23L3 23L4 R/WR/WR/W R/W R/W R/WR/WR/W20' 10' 15' 10' 19.81' 9.84' 15.23' 10.02' 31.23' 15.55' 23.79' 15.73' 403.46 403.52 Exist LIP MATCH Exist LIP MATCH +24.96 ECR 47.09' Lt "23RD" +05.14 BCR 27.10' Lt "23RD" 23L1 23L2 +79.66 BCR 37.00' Lt "23RD" 23L3 +79.44 BCR 37.02' Rt "23RD" 23L4 +24.97 50.32' Lt "23RD" MATCH Exist (403.15) FL +89.66 ECR 27.17' Lt "23RD" +92.42 27.17' Lt "23RD" +18.61 ECR 42.48' Rt "23RD" +03.62 BCR 27.23' Rt "23RD" +89.44 ECR 27.00' Rt "23RD" MATCH Exist (403.18) FL MATCH Exist (403.09) FL +79.59 40.94' Lt "23RD" MATCH Exist (402.92) FL403.39 403.59 403.65 403.68 403.19 FL 403.64 403.74 402.95 FL 403.02 FL 403.03 FL 6'+50 +75 +00 +25 +25 +50 +50 +75 +75 +25 +00 +25 403.20 FL 403.06 FL 402.94 FL 403.06 FL 27.11' Lt +10.50 402.90 FL 27.11' Lt +14.00 MATCH Exist (402.90) FL 27.76' Lt +22.81 MATCH Exist SW (403.47) 37.50' Lt +18.50 403.65 ANGLE Pt 402.88 FL 402.92 FL 403.61 ANGLE Pt 402.76 FL 27.29' Rt "23RD" +66 403.63 ANGLE Pt TYPE 1 CURB RAMPTYPE 1 CURB RAMP TYPE 2 CURB RAMP TYPE 1 CURB RAMP R=2'R=2' TCE (BY OTHERS) RELOCATE BUSINESS SIGN 403.61 403.59 +92.97 39.43' Rt "23RD" 403.52 403.46 +94.89 37' Rt "23RD" 403.07 FL +04.34 34.41' Rt "23RD" 403.71 +93.45 33.34' Rt "23RD" 404.14 +06.14 36.24' Rt "23RD" 403.63 +09.64 39.81' Rt "23RD" 403.73 +11.06 41.25' Rt "23RD" 403.91 +80.11 48.07' Lt "23RD" MATCH Exist SW (403.68)+85.75 43.07' Rt "23RD" 403.67 +98.29 33.50' Rt "23RD" 403.67 MATCH Exist FL (402.98) +10.60 27.19' Rt "23RD" +18.62 48.90' Lt "23RD" 403.82 +03.99 34.15' Lt "23RD" 403.83 MATCH Exist SW (403.19) +94.00 27.09' Lt "23RD" 403.31 403.59 403.25 403.55 37.50' Lt +13.50 37.50' Lt +05.50 R=5'25'±Dwy TYPE "A-C"SEE SHEET C-44MATCH LINE "23RD" Sta 382+25MATCH LINE "23RD" Sta 379+50SEE SHEET C-41MATCH LINE SEE SHEET C-43 7 ~ +79.47 55.36' Rt "23RD" MATCH Exist (403.15) FL +11.33 45.27' Rt "23RD" 403.88 +12.31 45.31' Rt "23RD" 403.86 +18.26 64.03' Rt "23RD" MATCH Exist (403.81) FL MATCH Exist (403.43) +72.50 43.00' Lt "23RD" +05.50 41.25' Lt "23RD" MATCH Exist (403.38) +72.50 38' Lt "23RD" +64.00 37.50' Lt "23RD" +67.50 27.18' Lt "23RD" +64 27.18' Lt "23RD" +69.25 27.29' Rt "23RD" +97.74 27.19' Rt "23RD" 27.17' Rt "23RD" +13.94 33.31' Rt "23RD" +13.94 38.50' Rt "23RD" +08.75 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. NOTES: +50 402.79 FL R=5' TYPE 4 CURB RAMP 402.89 FLW=33'• Sta +89402.87 FL 402.74 FL 402.86 FL Dwy TYPE "A"+50 403.28 FL 402.78 FLW=24.50'• Sta +83.5033.59' Rt "23RD" +53.34 38.50' Rt "23RD" +58.25 TYPE 4 CURB RAMP TYPE 4 CURB RAMP 403.02 FL 25'±ELEVATIONS INTERSECTION SEE C-69 FOR 4'27' Rt "23RD" +11 402.97 FL 27' Rt "23RD" +00 403.08 FL 403.42 77 403.59 REVISION DESCRIPTION 1 3/18/19 REVISED CL ELEVATIONS DATE 403.61 403.64 403.69 403.73 403.79 403.76 403.84 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "23RD" LINE23RD St L St P P P P P ASPH ASPHL STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:4917-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga043.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 23R/WR/WR/WR/WDwy TYPE "B-1" MATCH Exist (404.03) FL 403.38 FL 403.44 FL 403.40 FL W=30' • Sta +24.97 5' SW MATCH LINE SEE SHEET C-42 404.17 404.15 404.04 404.15 5'5' 206.53' Lt "23RD" +24.68 164.48' Lt "23RD" +19.56 158.00' Lt "23RD" +25.03 158.04' Lt "23RD" +14.28 128.00' Lt "23RD" +24.93 128.04' Lt "23RD" +14.36 121.82' Lt "23RD" +14.38 CONSTRUCTION DETAILS C-43 R=1'2SAWCUT & JOIN Exist Pvmt SCALE: 1" = 10' A A 6.50' Lt "C" +75 6.50' Lt "C" +50 6.50' Lt "C" +25 6.27' Lt "C" +00 01.95 "C" +74.89 4.50' Lt "C" +75 4.50' Lt "C" +50 2.91' Lt "C" +25 4.50' Lt "C" +25 0.12' Lt "C" +74.95 6.50' Lt "C" +00 6.50' Lt "C" +05.54 4.50' Lt "C" +00 4.50' Lt "C" +05.54 32' Med 1' SAWCUT 1' SAWCUT 10 TYPE "M" CITY CURB TYPE "M" CITY CURB 4.5' "C" LINE 2 2 402.80 FL402.78 FL 402.80 FL 402.83 FL 402.77 FL 402.75 FL 402.75 FL 402.84 FL 402.77 FL 402.80 FL 402.82 FL 402.90 FL MATCH Exist 402.73 FL MATCH Exist 402.68 FL NO SCALE SECTION A-A MATCH Exist Conc PATTERN STAMPED 7 78 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 L StCHESTER Ave"C" LINE P PASPH ASPH ASPH 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga044.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 CONSTRUCTION DETAILS SCALE: 1" = 10' C-44 R/W R/W R/W 403.95 403.99 404.03 404.23 404.31 Exist LIP MATCH 403.74 403.19 FL 403.83 403.26 FL 403.91 403.32 FL 404.07 404.15 Exist LIP MATCH TCE +25 +25 +50 +50 +75 +75 +00 +25 +50 +75 +00 +25 +50 MATCH Exist (403.40) FL 403.37 FL 27.00' Rt +21 6'4'8'403.39 FLW=24'• Sta +386'4'2'403.82 FLW=24'• Sta +38MATCH Exist (403.57) FL 39.27' Rt +48 MATCH Exist (404.07) FL MATCH Exist SW (404.08) MATCH Exist SW (404.18)MATCH Exist (404.43)7 ~ 7 ~Dwy TYPE "B-1"6.71%403.33 FL +0026'25'MATCH LINE "23RD" Sta 382+25SEE SHEET C-42SEE SHEET C-45MATCH LINE "23RD" Sta 384+50MATCH Exist (404.43) MATCH Exist (404.44)Dwy TYPE "B-1" 403.89 MATCH Exist (404.10) +55 27.30' Rt "23RD" +13 27.24' Rt "23RD" +48 27.27' Rt "23RD" 45.05' Rt "23RD" +25.98 31.00' Rt "23RD" +04.73 79 39.24' Rt "23RD" +13 45.31' Rt "23RD" +55 27.95' Rt "23RD" +60 27.83' Rt "23RD" +08 403.84 403.93 404.08 404.19 404.27 404.30 404.34 404.43 404.50 404.61 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/18/19 403.71403.63 8/23/19 REVISED FL ELEVATIONS2 2 3 1 3 10/01/21 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON AS-BUILT 10/01/21 "23RD" LINE23RD St P ASPHASPH ASPHCONCASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga045.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6 7 CONSTRUCTION DETAILS SCALE: 1" = 10' C-45 No.#R CURVE DATA T L 23M1 23M2 23M3 23M4 8' R/W R/W R/W R/W R/WR/WR/WR/W20' 8.16'12.73' 19.89'31.30' 8'8.06'12.63' 8'7.88'12.45' 23M1 23M2 23M3 +20.21 BCR 23.05' Rt "E178" 23M4 +71.90 39.25' Lt "23RD" +28.23 ECR 15.19' Rt "E178" +71.93 ECR 35.07' Lt "23RD" +63.82 BCR 27.25' Rt "23RD" +71.79 ECR 35.34' Rt "23RD" +71.76 37.53' Rt "23RD" +40.26 ECR 47.73' Lt "E178" MATCH Exist (403.76) FL MATCH Exist (403.74) FL +32.74 15.21' Rt "E178" +50 404.31 403.55 FL 403.41 FL 403.61 FL 403.77 FL 403.78 FL 27.01' Lt "23RD" +63.83 BCR 27.06' Lt "23RD" +59.65 +61.64 27.24' Rt "23RD" TYPE 1 CURB RAMP TYPE 1 CURB RAMP TYPE 1 CURB RAMP +71.65 46.68' Rt "23RD" +58.46 33.46' Rt "23RD" 404.32 404.95 +65.46 47.11' Lt "23RD" MATCH Exist SW (404.40) +71.74 59.50' Lt "23RD" +17.49 71.64' Lt "E178" MATCH Exist (403.67) MATCH Exist (403.53) FL 404.34 +40.26 ECR 54.45' Lt "E178" +20.42 BCR 65.63' Lt "E178" +33.40 47.73' Lt "E178" MATCH Exist SW (404.14) +31.10 27.91' Rt "E178" 404.46 +33.30 25.77' Rt "E178" 404.47 +53.38 15.28' Rt "E178"MATCH LINE "23RD" Sta 384+50SEE SHEET C-44RELINQUISHMENT LIMIT OF MATCH Exist (403.64) FL +53.10 47.70' Lt "E178" MATCH Exist (403.59) FL MATCH Exist (403.75) FL MATCH Exist (403.88) FL 403.68 FL 403.93 FL NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 33.60' Lt "23RD" +55 CURB RAMP TYPE 1 27.79' Lt "23RD" +50 MATCH Exist SW (404.18) MATCH Exist SW (404.40) "23RD" +50 33.58' Lt MATCH Exist SW (403.50) FL +20 34.08' Rt "E178" 404.02 FL 404.01 FL 403.94 FL ELEVATIONS INTERSECTION SEE C-70 FOR SEE C-47 FOR DETAILS 80 404.61 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/18/19 403.75 403.74 403.72 403.71 REVISED FL ELEVATIONS8/23/192 404.39 3 2 1 403.78 3 10/01/21 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 AS-BUILT "23RD" LINE23RD St M St"E178" LINE EB ROUTE 178 PP A SP H ASPH ASPHASPHASPHASPHP P P P P FP FP A SPH ASPHTRAILER ASPH M STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga046.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 R /W CONSTRUCTION DETAILS C-46 SCALE: 1" = 20' 405.35 405.41 405.48 405.62 405.75 405.91 406.25 405.20 406.15 406.43 406.72 407.12 407.53 406.68 407.12 407.62 408.03 407.96 408.47 408.46 408.97 409.04 409.54 409.65 410.15 410.20 410.70 410.81 411.31 406.29 406.48 406.76 407.14 407.58 408.13 406.64 407.08 407.63 8'10'10'8'ES ETW ETW ESR/WR/W 405.80 406.11 405.97 24'24'405.89 LIP 406.08 LIP LIP 404.80 LIP 404.95 LIP 405.01 LIP 405.08 LIP 405.34 LIP 405.59 LIP 405.87 GUTTER LIP OF R /W +25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +50 +75 +75 +00 +00 +25 +25 +50 +50 +50 +75 +00 +25 +25 +50 +50 +75 +00 +00 +25 +25 +50 +50 ~ 406.36 LIP& JOIN SAWCUT & JOIN SAWCUT & JOIN SAWCUT +50 +50 SEE SHEET C-47 MATCH LINE R=3' (404.51) (405.18) (404.48) +84 (405.34) +99 (405.32) +25 (405.48) +50 (405.54) +75 (405.61) +00 (405.72) +25 (405.85) +50 (405.87) +75 (405.86) +00 (406.17) +25 (406.49) +50 (406.85) +75 (407.21) +00 (407.61) +25 (408.04) +50 (408.61) +75 +00 (409.76) +25 (410.41) +50 (409.18) (405.28) +75 +00 (405.43) (405.62) +25 +50 (405.82)+75 (405.99)+00 (406.16)+25 (406.39) (406.64) +50 (407.00) +75 (407.40) +00 (408.51) +50 (407.93) +25 +75 SEE SHEET C-48MATCH LINE "W178" Sta 400+50(404.24) +75 (404.43) +00 (404.54) +25 (404.62) +50 (404.63) +75 +00 (404.76) +25 (404.80) +50 (404.70) +75 (404.67) (404.68) +82 (405.63) +93 (405.57) +75 (405.52) +50 +25 (405.50)Exist LIP MATCH TCE SEE C-28. FOR DETAILS 81 4006789 7 SHEET C-46r SEE REVISED REVISION DATE DESCRIPTION 1 4/11/19 REVISED WB LAYOUT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21"W 178" L IN E M St24 th S t FRONTAGE Rd N StW B R O U T E 178"24TH" LINE PP P A SP H ASPH ASPHASPHASPHASPH ASPHP P P P P FP FP A SPH ASPHTRAILER ASPH M STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 4006789 7 R /W CONSTRUCTION DETAILS C-46 SCALE: 1" = 20'R/WR/W R /W ~ & JOIN SAWCUT & JOIN SAWCUT & JOIN SAWCUT +50 +50 SEE SHEET C-47 MATCH LINE (404.51) (405.18) (404.48) +84 (405.34) +99 (405.32) +25 (405.48) +50 (405.54) +75 (405.61) +00 (405.72) +25 (405.85) +50 (405.87) +75 (405.86) +00 (406.17) +25 (406.49) +50 (406.85) +75 (407.21) +00 (407.61) +25 (408.04) +50 (408.61) +75 +00 (409.76) +25 (410.41) +50 (409.18) (405.28) +75 +00 (405.43) (405.62) +25 +50 (405.82)+75 (405.99)+00 (406.16)+25 (406.39) (406.64) +50 (407.00) +75 (407.40) +00 (408.51) +50 (407.93) +25 SEE SHEET C-48MATCH LINE "W178" Sta 400+50(404.24) +75 (404.43) +00 (404.54) +25 (404.62) +50 (404.63) +75 +00 (404.76) +25 (404.80) +50 (404.70) +75 (404.67) (404.68) +82 (405.63) +93 Exist LIP MATCH TCE SEE C-28. FOR DETAILS ESETW ETW ES SEE TABLE A +25 405.46 FL 405.44 FL +50 405.52 FL +75 405.58 FL +14.44 +83.38 (405.60) FL FLFL SEE TABLE B 410.92410.77 410.29410.14 409.73409.58 409.12408.97 408.54408.39 408.05407.90 407.59407.47 407.21407.06 406.79406.67 406.44406.37 406.12406.09 405.72405.90 405.55405.77 405.37405.65 405.19405.51 405.12405.44 405.07405.38 404.91405.23 400+50 400+25 400+00 399+75 399+50 399+25 399+00 398+75 398+50 398+25 398+00 397+75 397+50 397+25 397+00 396+75 396+50 396+25 STATION Elev ETW Elev FL/ES TABLE A 399+25 399+50 399+75 400+00 400+25 400+50 STATION Elev ETW Elev FL/ES TABLE B 405.64 405.82 406.11 406.58 407.03 407.59 406.21 406.39 406.68 407.08 407.53 408.09 REVISION DATE DESCRIPTION 0 4/11/19 REVISED WB LAYOUT REVISED SHEET r 81r 1 10/01/21 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON AS-BUILT 10/01/21 "W 178" L IN E M St24 th S t FRONTAGE Rd N StW B R O U T E 178"24TH" LINE P P ASPHASPH ASPHTRAILERCONC PP ASPH ASPH ASPHCONCASPH ASPH CONC x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga047.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 400 6 7 8 9 ES R/WCONSTRUCTION DETAILS C-47 SCALE: 1" = 20' 404.34 404.49 404.73 405.09 405.55 406.15 406.86 407.77 408.70 409.70 410.73 411.80 412.83 404.51 404.53 404.56 +25.00 404.63 404.70 404.80 404.92 405.05 405.24 405.45 405.74 406.15 406.79 407.78 406.99 408.54 409.42 410.26 411.19 412.58 12' 1 0' 1 0' 5 %ES ETW R/W 407.49 408.28 409.04 409.92 410.76 411.69 412.08 5 %+75 +00 +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +00 +25 +50 +50 +75 +00 +25 +50 +75 +00 +25 +50 45.61' Lt +75 45.10' Lt +00 44.59' Lt +25 44.07' Lt +50 12.66' Rt +25 17.05' Rt +50 21.17' Rt +75 25.01' Rt +00 28.56' Rt +25 31.83' Rt +50 34.80' Rt +75 +00 +25 +50 +75 +00 +25 +50 45.59' Lt +00 46.57' Lt +75 46.95' Lt +65 MATCH Exist (403.79) FL 403.87 FL 404.04 FL 25.72' Rt +77 MATCH Exist (403.85) FL 28.70' Rt +00 403.93 FL 32.79' Rt +25 403.99 FL 38.45' Rt +52.98 MATCH Exist (404.08) FL 404.00 FL W=18' Dwy • Sta +94 5' & JOIN SAWCUT & JOIN SAWCUT & JOIN SAWCUT & JOIN SAWCUT ~ SEE C-45. NOT SHOWN, FOR DETAILS R/WR/WR/WR/WR/WR/W 0.00 0.0039492.770.00 0.0039492.770.00 0.0039492.77 +50 +75 +00 +25 +50 +75 +00 +75 +25 +50 +75 +00 +50 +75 +00 +25 +50 +00 +25 +22 +21 +00 +00 404.89 +21 406.12 405.25 32'Rt+77 35'Rt+77 +77 43'Rt+77 +25 404.25 404.38 +85 404.42 +04 +25 +50 +75 +00 +25 406.05 +50 +75 +00 +25 +50 +75 +00 +25 +50 2 4' 1 2' 404.21 +20 +25 +50 SEE SHEET C-46 MATCH LINE (403.72) (404.70) (404.64)(404.69)(404.77)(404.80) (404.87) (404.94) (405.04)(405.16) (405.29) (405.48) (405.69) (405.98) (406.45) (407.09) (407.79) (408.58) (409.40) (410.28) (411.18) (412.11) (413.00) ETW MATCH LINE "E178" Sta 400+50SEE SHEET C-48(404.71) (404.83) (404.99) (405.23) (405.59) (406.65) (407.36) (408.27) (409.20) (410.18) (411.18) (412.23) (413.23) (404.90) (404.96) (405.03) (405.08) (405.14) (405.18) (405.19) (405.19) (405.33) 404.83 404.14 +50 (403.78) +75 (403.79) +00 (403.82) +25 (403.87) +50 (403.94) RELINQUISHMENT LIMIT OF 82 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "E178" LINEM St23rd St FRONTAGE Rd "23RD" LINE EB ROUTE 178 PPASPH ASPHASPHASPH24TH STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga048.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 412.83 5%CONSTRUCTION DETAILS C-48 SCALE: 1" = 20' 407.63 408.13 410.81 411.31 408.77 409.44 410.13 410.83 411.51 412.23 413.01 413.69 408.27 408.94 409.63 410.33 411.01 411.73 412.51 413.19 413.96 414.46 414.82 415.32 415.64 416.13 416.41 416.90 418.12 418.59 419.80 420.25 420.56 421.01 421.31 421.75 422.13 422.56 418.97 419.43 417.25 417.73 (422.63) (423.36) 416.29 415.59 414.89414.20 413.51 412.81 412.14 411.48 411.98 412.64 413.31 414.01 414.57 415.14 415.84 416.54 417.03 417.75 418.51 419.24 417.28 417.99 418.68 419.35 (419.96) (419.95) 413.77 414.72 415.64 416.54 417.43 (418.20) 412.085%412.58 413.40 414.24 415.02 415.88 416.73 417.57 418.37 419.14 419.98 420.81 421.64 412.90 413.74 414.54 415.41 416.27 417.12 417.93 418.71 419.56 420.40 421.28 +43.17 (422.08) (422.25)22'10'10'R/W R/W 24'24'ES ETW ETW ES ETW ES ETW ES +50 44.07' Lt +75 43.56' Lt +00 43.02' Lt +25 42.45' Lt +50 41.88' Lt +75 41.31' Lt +00 40.74' Lt +50 12.00' Rt +75 12.00' Rt +00 12.13' Rt +25 12.34' Rt +50 12.56' Rt +75 12.77' Rt +00 12.99' Rt +25 13.20' Rt +50 13.42' Rt +75 13.63' Rt +00 13.84' Rt +25 14.06' Rt +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 +00 +25 +43.17 14.06' Rt +50 +75 +00 +25 +50 +75 31.52' Rt +00 29.00' Rt +25 29.00' Rt +50 29.00' Rt +75 28.95' Rt +00 28.72' Rt +25 28.46' Rt +50 28.18' Rt +75 27.87' Rt +75 23.66' Rt +50 23.78' Rt +25 23.87' Rt+00 23.94' Rt +75 23.99' Rt +50 +25 +50+25 +00 +00 +75 +75 +50 +25 +50 +00 +25 +00 +75 +50 +75 +50 +50 +75 +00 +25 +50 +75 +00 +25 +50 +75 34.03' Lt +75 24.03' Lt +00 34.15' Lt +00 24.15' Lt +25 32.77' Lt +25 22.92' Lt +50 31.39' Lt +50 21.69' Lt +75 30.03' Lt +75 20.45' Lt +00 28.62' Lt +00 19.22' Lt +25 27.23' Lt +25 18.02' Lt +50 25.84' Lt +50 16.75' Lt +75 24.45' Lt +75 15.52' Lt +00 23.06' Lt +00 14.28' Lt +25 21.67' Lt +25 13.05' Lt +50 20.27' Lt +50 11.82' Lt & JOIN SAWCUT & JOIN SAWCUT SAWCUT & JOIN & JOIN SAWCUT (418.53) +00 35.33' Lt (418.07) +00 12.00' Lt (418.87) +25 12.00' Lt & JOIN SAWCUT (418.20) +75 11.15' Lt (423.41) +50 10.82' LtMATCH LINE "W178" Sta 400+50SEE SHEET C-46MATCH LINE "E178" Sta 400+50SEE SHEET C-47+50 (413.23) +75 (413.15) +00 +25 (415.97) +50 (416.85) +75 (417.71)(415.07) +50 (413.00) +75 (413.82) +00 (414.66) +25 (415.51) +50 (416.37) +75 (417.23) +25 (418.57) +50 (419.44) +75 (420.26) +00 (421.07) +25 (421.93) +43 (422.57) +50 (410.41)+75 (411.10) +00 (411.78)+25 (412.50)+50 (413.23)+75 (413.96)+00 (414.69) +25 (415.43) +50 (416.17) +75 (416.93) +00 (417.68)+25 (418.44) +50 (419.19)+75 (419.91) +50 (408.51) +75 (409.20) +00 +25 (410.63) (411.36) +50 (412.08) +75 (412.84) +00 (413.58) +25 (414.30) +50 (415.09) +75 (415.92) +00 (416.70) +25 (417.46) +50 (409.90) (418.94) +00 (419.71) +25 +50 (420.48)(421.20) +75 (421.91) +00 (422.66) +25 NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 83 405 1 2 3 4 40512 3 4 SHEET C-48r SEE REVISED REVISION DATE DESCRIPTION 1 4/11/19 REVISED WB LAYOUT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23rd St FRONTAGE Rd "E178" LINE "W178" LINE WB ROUTE 178 EB ROUTE 178 24th St FRONTAGE Rd PPASPHASPH ASPHASPHASPH 23RD ST ASPH 24TH STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 405 1 2 3 4 40512 3 4 CONSTRUCTION DETAILS C-48 SCALE: 1" = 20' R/W R/W MATCH LINE "W178" Sta 400+50SEE SHEET C-46MATCH LINE "E178" Sta 400+50SEE SHEET C-47NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. +50 410.77 ES ETW+50 410.92 +75 411.44 +75 411.59 +00 412.11 +00 412.26 +25 412.80 +25 412.95 +50 413.50 +50 413.65 +75 414.19 +75 414.34 +00 414.89 +00 415.04 +25 415.59 +25 415.74 +50 416.29 +50 416.44 +75 417.03 +75 417.18 +00 417.77 +00 417.92 +25 418.52 +25 418.64 +50 419.26 +50 419.34 +75 +75 +00 412.23 +00 411.73+75 411.50 +75 411.00+50 410.82 +50 410.32+25 410.11 +25 409.61+00 409.41 +00 408.91+75 408.73 +75 408.23 +50 408.09 +50 407.59 +25 413.01 +25 412.51 (419.96) (419.65) ETW ES 83r REVISED SHEET r REVISION DATE DESCRIPTION 0 4/11/19 REVISED WB LAYOUT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23rd St FRONTAGE Rd "E178" LINE "W178" LINE WB ROUTE 178 EB ROUTE 178 24th St FRONTAGE Rd ASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga049.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 5 0 12 CONSTRUCTION DETAILS C-49 SCALE: 1" = 10' Dwy TYPE "B-2" 399.51 FLW=16'• Sta +49 MATCH Exist (398.42) FL TYPE "B" CITY CURB MATCH Exist SW (399.66) TYPE 5 CURB RAMP R=5' R=150' R=632' R=5' R=25' R=25' 399.27 FL 58.80 Rt "23RD" +48.81 62.81' Rt "23RD" +39.14 83.11' Rt "23RD" +53.25 96.75' Rt "23RD" +58.34 89.92' Rt "23RD" +67.52 2'2'399.80 FL 399.41 72.81 Rt "23RD" +58.59 77.93 Rt "23RD" +65.18 15'20'15'15'20'R=15' R=15' 15'39'MATCH Exist SW (399.62) MATCH Exist (400.02) MATCH Exist (400.52) MATCH Exist (400.62) MATCH Exist (399.81) MATCH Exist (400.52)MATCH Exist (400.45) MATCH Exist (400.05) MATCH Exist SW (399.72) MATCH Exist SW (399.66) MATCH Exist SW (399.66) MATCH Exist SW (399.91) NOTES: 1. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 50.54' Rt "23RD" +52.16 44.44' Rt "23RD" +49.68 37.85' Rt "23RD" +52.09 CURB (TYPE A1-6) 33.92' Rt "23RD" +60.76 BC 399.78 FL EC 400.00 FL BC 399.93 FL EC 399.68 FL 36.63' Rt "23RD" +66.93 EC 399.49 FL 45.90' Rt "23RD" +70.43 BC 398.98 FL 48.72' Rt "23RD" +76.44 EC 398.68 FL BC 398.13 FL 38.47' Rt "23RD" +02.67 32.00' Rt "23RD" +39.69 32.00' Rt "23RD" +24.14 PRC 399.42 FL 34.15' Rt "23RD" +31.39 EC 399.60 FL 36.42' Rt "23RD" 34.87 399.73 FL 36.52' Rt "23RD" +31.42 37.66' Rt "23RD" +37.63 33' EC MATCH Exist (399.89) BC MATCH Exist (400.19) BC MATCH Exist (399.55) FL 398.95 FL EC MATCH Exist (399.57) EP 399.68 EC MATCH Exist EP (399.61) FL PCC 398.57 FL 60.73' Rt "23RD" +28.72 52.42' Rt "23RD" +16.33 59.16' Rt "23RD" +11.09 399.60 FL 399.33 FL 6' 4' FL CURB (TYPE A1-6) MATCH Exist MATCH Exist 56.02' Rt "23RD" +51.25 BC 399.43 FL 2%2%81.86' Rt "23RD" +50.07 (399.83) (399.85) 61.70' Rt "23RD" +45.34 61.24' Rt "23RD" +46.80 8.33%8.33% 2'2' 6" PCC FL DETAIL A NO SCALE SEE DETAIL A MATCH Exist SW (399.76) MATCH Exist SW (399.63) MATCH Exist SW (397.40) "23RD" +14.33 52.43' Rt "23RD" +25.11 45.21' Rt "23RD" +00.17 70.24' Rt "23RD" +63.06 50.93' Rt 57.66' Rt "23RD" +60.06 46.76' Rt "23RD" +81.19 65.64' Rt "23RD" +32.25 85.72' Rt "23RD" +37.24 81.41' Rt "23RD" +51.50 77.96' Rt "23RD" +64.27 41.50' Rt "23RD" +71.48 72.85' Rt "23RD" +86.97 83.77' Rt "23RD" +29.48 82.12' Rt "23RD" +42.58 65.76' Rt "23RD" +41.11 "23RD" +49.26 54.51' Rt "23RD" +56.56 53.85' Rt "23RD" +55.72 41.93' Rt 52.34' Rt "23RD" +83.43 49.70' Rt "23RD" +97.04 398.69 EP 398.58 EP BC 398.83 EP VarVarGRADE BREAK LOW POINT PRC 397.40 FL 6 84 399.00 FL 399.03 FL 399.07 FL 399.11 FL 398.90 FL 399.01 FL 398.77 FL 398.66 FL 398.51 FL 33.29' Rt "23RD"+23.05 LOW POINT 398.35 FL 398.55 FL 399.59 FL 399.68 FL 398.98 398.56 398.91 399.13 0.5%398.94 0.5%1.5%1.5%1.5%REVISION DATE DESCRIPTION 1 5/30/19 REVISED PARKING LOT GRADES 398.89 FL 399.18 58.07' Rt "23RD"+42.48 398.94 61.69' Rt "23RD"+46.30 398.86 76.23' Rt "23RD"+56.20 399.05 80.75' Rt "23RD"+58.10 398.49 FL 398.52 FL 398.60 FL Dwy DETAIL "B-2" CL Sta "23RD" 350+49 398.62 FL 0.5%1 1 1 1 1 1 1 1 1 1 "23RD"+51.30 78.63' Rt "23RD"+39.14 62.18' Rt "23RD"+42.58 66.05' Rt "23RD"+53.25 83.11' Rt 5%1% 1 1 1 15'20'2 10/01/21 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 AS-BUILT AVOID TREES SHORTEN DRIVEWAY TO REPLACE WALKWAY GATE TO 14' GATE MODIFY EXISTING 10' 2"23R D " L IN E23R D St ASPH24TH ST C STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga050.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 1 2 3399.99399.98400.25400.22400.06400.62400.10400.32400.43400.64400.28400.48400.18400.66400.13400.27400.43400.03400.58400.58400.38399.83400.15400.12400.53(400.70)(400.49)6'6'19'400.13400.248'400.04400.05399.92399.899'10'14' 8' 17' 3'5'8'12'6'C-50 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 400.25 FL À/4 À/2 3À/4 400.13 FL 400.19 FL 399.76 FL À/2 3À/4 399.70 FL 399.67 FL À/4 À/4 399.91 FL À/2 399.85 FL 3À/4 399.79 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS (400.78)(400.48)4 0 0.6 2 20'1 85 12/31/19 1 9'4 0 0. 3 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH StC St ASPH PPASPH ASPH FP x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga051.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 5 6 7400.24399.84399.92399.96400.14400.48400.03400.00400.04400.07400.33400.31400.29400.26399.87399.91399.94399.96400.37399.99(400.69)(400.02)(400.22)(400.68)(400.03)3'5'3' 7'5'15'399.94400.00399.84399.78399.88399.858'7'18'8'5'6'5'C-51 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: À/2 399.57 FL 399.76 FL À/2 399.74 FL À/2 399.64 FL À/2 399.60 FL À/4 3À/4 399.67 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS 400.74400.78400.89400.67400.56400.28400.42400.75400.28400.11400.15400.66400.02 399.94400.09400.26400.10399.98399.94400.13400.04399.82399.97(400.12)(400.60)(399.99)(400.57)(400.06)399.73 399.88 1 400.18400.70400.3223 .7'11'12'86 11/12/19 1 2 10/01/21 AS-BUILT 2 SEE C-51r FOR REVISED ELEVATIONS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINEDRAKE StD St ASPHASPH ASPH CONC ASPH ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga052.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 360 8 9400.36401.06400.98400.62400.38400.37400.37400.37400.87400.86400.85400.84400.84400.52400.53400.54400.55400.39400.95400.81400.54400.55400.86400.52400.53400.84400.37(400.32)(400.28)(401.21)(401.00)(401.18)(401.03)7'5'2'5'11'400.34400.35400.26400.44400.54400.517'7'10'12'10'5'10'6'5'C-52 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 400.24 FL À/2 À/2 400.25 FL 400.11 FL À/2 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS 400.95400.98401.18401.56401.30400.95400.94400.58400.78401.21400.90400.54400.55400.50401.09400.76400.35400.97401.04 400.30400.34400.49401.06400.80400.41400.42400.55400.81400.87400.67400.93400.78(401.17)(401.02)400.13 1 12'12/31/19 1 87(400.35)400.28400.16400.27 400.55 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINEENCINA StE St P P PP P P P PP PPPP CONCASPH ASPHASPHASPH FP CONC ASPH 401.03401.34400.93401.00401.33400.94401.32401.30400.98400.96401.35401.28401.11401.07401.03400.99400.95400.84401.54401.29400.82401.32401.33400.90400.9210'5'(401.59)(401.63)(400.78)(401.07)(401.74)(401.75)(400.83)401.04401.30400.96400.72401.04401.32400.908'5'3'400.92400.95400.92400.82400.97401.06400.98400.837'12'7'13'6'6'12'13'x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga053.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 C-53 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 400.72 FL À/2 3À/4 400.64 FL 400.81 FL À/4 À/4 400.62 FL 400.64 FL À/2 400.65 FL 3À/4 À/2 400.78 FL 3À/4 400.80 FL 400.75 FL À/4 3À/4 400.61 FL 400.55 FL À/4 400.58 FL À/2 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS112/31/19 88 400.75 400.89 401.02401.00 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINEF StF St PP P P PP ASPH ASPH PP P ASPH 24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga054.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 5 6 7(402.22)(402.79)(402.55)(402.40)(402.66)(401.97)402.00402.57402.34401.96402.03401.97401.98402.00401.99402.24402.27402.29402.31402.32402.34401.92401.87401.83401.78401.74401.69402.26402.53402.1510'5'2'3' 8' 7'5'4'5'5'401.67401.82401.79401.89401.99401.957'13'7'5'C-54 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 401.48 FL À/2 401.67 FL À/2 3À/4 401.71 FL 401.67 FL À/2 401.64 FL À/4 3À/4 401.72 FL 401.78 FL À/2 401.75 FL À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS 402.40402.70401.67402.19402.48401.90401.71401.77402.29402.58402.09401.94402.37402.43402.59402.88402.66402.43402.33402.58402.24401.99402.07 402.13402.48401.99402.36402.64402.21 1 12/31/19 1 89 401.71 401.69 401.68 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINEG StG St P P P P P FPP P P ASPH CONC x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5017-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga055.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3709 1402.53402.52402.51402.88402.60402.64402.50403.28403.04402.69402.74402.91402.92403.16403.20403.11403.03402.94402.89402.55402.57402.59402.61402.90403.11402.62402.62(402.56)(403.32)(403.07)(403.14)(403.43)(402.62)5'5'10'7'3'5'5'1'9'402.45402.52402.47402.54402.69402.697'13'7'5'C-55 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 402.34 FL À/2 402.46 FL À/2 400.27 FL À/2 402.34 FL À/2 402.30 FL À/4 402.38 FL 3À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 90 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINEH StH St ASPH ASPH ASPH CONC ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5117-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga056.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 5 5'4'5'5'6'5'19' 17' 9'402.35402.34402.34402.33402.37402.09402.07402.05402.04402.03402.02402.37401.91401.86401.91402.38402.01402.08402.17402.10402.39401.96401.95401.94401.91401.87402.34402.45(402.17)(402.32)(402.36)(402.50)401.85401.97402.01401.98401.92401.88401.807'7'9'7'13'12'C-56 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 401.73 FL À/2 401.79 FL 3À/4 401.67 FL À/4401.61 FL 3À/4 À/2 401.66 FL 401.71 FL À/4 401.57 FL À/2 401.68 FL À/2 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS (402.50)(402.41)402.36402.55 1 12/31/19 91 1 13'CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINE EYE StEYE St ASPHASPH CONC ASPHASPH ASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5117-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga057.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 8 33'5'5'18'5'12'5'15'6'9'7'1'1' 9'(401.95)(402.59)(402.82)(402.41)(402.33)(402.66)(402.77)(402.56)401.98402.41402.52402.22401.88401.89401.89401.90401.90401.91401.92401.92402.34402.34402.33402.33402.32402.32402.32402.31401.91401.90401.90401.90401.89401.89401.88401.88402.75401.92401.90402.33401.89401.92401.92401.90401.85401.90401.81401.92401.89401.84401.7512'5' 6' 7' 8'7'(402.80)7'13'10' C-57 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 401.55 FL À/2 401.58 FL 3À/4 401.53 FL À/4 401.70 FL 3À/4 401.68 FL À/2 À/4 401.66 FL À/4 401.65 FL 401.71 FL À/2 401.76 FL 3À/4 401.65 FL À/4 401.68 FL À/2 401.66 FL 3À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 92 REVISION DATE DESCRIPTION 1 AS-BUILT10/01/21 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON SHEET C-57r SEE REVISED 1 10/01/21 24TH St "24TH" LINE CHESTER AveCHESTER Ave x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-57 CONSTRUCTION DETAILS SCALE: 1" = 10' REVISION DATE DESCRIPTION 1 AS-BUILT10/01/21 r REVISED SHEET 92r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 P P P ASPH FP CONC CONC ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5117-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga058.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 380 1 2403.30403.20403.60403.21403.56403.15403.09403.59403.20403.36403.03402.97402.96403.42403.43402.96403.10403.40403.47403.52403.45(403.71)(403.90)(403.23)5'5'5'6'5'3'8'8'403.04403.06402.937'13'C-58 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 402.81 FL 3À/4 À/2 402.76 FL 402.72 FL À/4 3À/4 402.84 FL 402.81 FL À/2 402.79 FL À/4 3À/4 402.92 FL 402.91 FL À/2 402.89 FL À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS 402.95402.96403.13403.32403.15403.01 1 93 1 403.25403.51403.32403.17403.07403.33403.26403.16403.06 403.22403.37403.00 403.00 402.99402.99 03/05/20 15'7.5'CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINE K StK St PPPPP P ASPH ASPH FP CONCAS PHASPH CONC24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga059.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 5 C-59 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS112/31/19 (404.50)(404.56)(404.71)(404.48)404.22404.44403.97403.98403.94403.83404.06404.12404.51404.53404.47404.44404.41404.05404.03404.00403.97404.39404.00404.03404.05404.07404.09404.11403.72403.79403.70404.13404.3519'22'8'12'17'14' 14' 14' SHEET C-59r SEE REVISED 403.52 FL À/2 403.49 FL À/2 403.92 FL À/2 3À/4 403.68 FL À/2 403.56 FL À/4 403.43 FL CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 1 10/01/21 24TH St "24TH" LINE L StL St PPPPP P ASPH ASPH FP CONCAS PHASPH CONC24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3 4 5(404.50)(404.56)(404.71)(404.48)404.01404.25403.58404.21404.49404.41404.52405.02403.78404.07404.63404.53404.28404.20404.12404.11403.67403.70403.74404.12404.0917'14' 14' 14'404.08403.77404.91404.36404.28404.28404.42404.55404.51404.4214'12'5'C-59 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 3À/4 403.42 FL 403.53 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS012/31/19 À/2 À/2 À/2 À/4 403.36 FL À/2 404.45 FL 403.39 403.37 r REVISED SHEET 94r CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "24TH" LINE L StL St A SPH ASPHASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga060.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 677 C-60 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 3À/4 404.40 FL 404.53 FL À/2 404.65 FL À/4 404.39 FL 404.45 FL À/2 404.51FL 3À/4 404.26 FL À/4 404.21 FL À/2 404.16 FL 3À/4 À/2 404.49 FL À/4 RELINQUISHMENT LIMIT OF 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 95 REVISION DATE DESCRIPTION REVISED ELEVATIONS112/31/19 (405.04)(405.55)(404.88)(404.55)(405.02)(404.52)404.99405.36404.97404.58404.60404.50404.99405.03404.63404.56404.72404.86404.87404.57404.62404.71404.80405.31405.52405.08404.70404.65404.99404.56404.83404.78405.00404.52404.74404.99405.03405.39405.43405.47405.08404.67[405.30][405.53][405.38][404.69][404.58]405.057'8'10'13' 12' 7'5'4'3'5'4'10'9'4'17'18'6' 12'3'SHEET C-60r SEE REVISED CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 1 10/01/21 "24TH" LINE M StM St"W 178" LIN EW B R O U TE 178 A SPH ASPHASPH ASPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 677 (405.14)(405.68)(405.38)(404.55)(405.02)(404.52)405.44405.14404.85404.87405.16405.21404.91405.01405.23404.98404.75405.03404.56404.89404.97404.58404.92405.46405.52405.56405.25404.94(405.30)(405.53)(405.38)(404.69)404.897' 5' 6' 405.10 405.51405.20404.5313' 12'405.23405.54404.92C-60 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: RELINQUISHMENT LIMIT OF 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. REVISION DATE DESCRIPTION REVISED ELEVATIONS r REVISED SHEET 95r 0 12/31/19 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "24TH" LINE M StM St"W 178" LI N EW B R O U TE 178"24TH" LINE "W 178" LI N EW B R O U TE 178 P PP ASPH ASPH CONC D STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga061.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 355 3 4(400.04)(399.92)(400.14)(400.03)399.75399.69399.27399.68399.65399.23399.33399.41399.39399.67399.22399.24399.63399.28399.66399.17399.22399.17399.59399.61399.29399.2418' 14'10'12'5'399.626' 12'13'19'8'5'6'399.16399.22399.20399.26399.23399.109'8'8'7'C-61 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 399.01 FL À/2 399.02 FL À/2 À/4 398.89 FL À/2 398.95 FL 399.01 FL 3À/4 399.13 FL À/2 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 96399.89399.65399.76399.25399.46399.35399.98399.89399.26399.18399.87399.72399.52400.03400.06399.99400.00399.54399.37399.46399.70399.54399.34399.80399.69399.64399.48399.48399.48REVISED CL ELEVATIONS3/18/19 1 REVISION DATE DESCRIPTION 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD StD StD St"23RD" LINE P P P P ASPH ASPH ASPHE ST23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga062.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 7 8399.45399.42399.21399.04398.95398.86398.77398.69399.45399.17399.21399.48399.52399.57399.61399.64399.36399.33399.29399.25399.34399.19(399.62)(399.63)(399.17)(399.42)5'11'18'5'16'5'7'5'14'5'399.29399.22399.20399.15398.59398.79398.88399.047'7'7'7'19'12' C-62 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 398.38 FL 3À/4 398.42 FL 398.45 FL À/4 398.95 FL À/2 À/4 398.87 FL 398.92 FL 3À/4 À/4 399.16 FL À/2 399.20 FL 3À/4 399.05 FL 398.97 FL À/4 399.00 FL À/2 398.97 FL 3À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. À/2399.48399.45398.72399.08399.37399.48399.26399.13399.85399.88399.93399.98399.78399.52399.44399.49399.52(399.22)(399.49)399.32399.15398.83399.29399.32399.18399.12399.41399.36399.29399.33399.29REVISION DATE DESCRIPTION REVISED CL ELEVATIONS3/18/1922.3'REVISED FL ELEVATIONS26/4/19 398.85 398.87 398.83399.092 2 2 399.171 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 97 1 10/01/21 23RD St "23RD" LINE E StE St PP P PP P P ASPH ASPH ASPHASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga063.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 360 1 2(400.26)(400.67)(400.35)(400.24)(400.58)(400.42)400.09400.31399.85399.54399.56399.60399.65399.52399.51399.50400.01400.00399.97399.93399.84399.44399.90399.87399.57399.63399.68400.05400.34400.12399.74399.79399.805'17'5'10'5'8' 10'3'4' 10'16'399.48399.45399.55399.50399.62399.71399.707'7'7'10'5'C-63 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 399.39 FL À/2 399.34 FL À/4 3À/4 399.44 FL 399.38 FL À/4 399.33 FL À/2 399.27 FL 3À/4 399.62 FL 3À/4 À/2 399.65 FL 399.58 FL À/4 399.33 FL À/2 À/4 399.30 FL 399.35 FL 3À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 98400.20400.39400.16399.58399.60399.77399.92400.07400.26400.37399.84400.01399.54400.14400.30400.50400.69400.48400.19(400.44)(400.83)(400.34)399.49399.68400.03399.87400.05400.39400.28399.49400.15400.03400.19399.91399.8321'REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/18/19 1399.64400.27CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE F StF St P P P P P P CONC ASPH ASPH23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga064.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 3 4400.27400.27399.72399.76399.82399.87399.93399.89400.42400.40400.36400.33400.29400.26399.89400.09400.12400.12400.13400.09400.14400.15(400.52)(400.48)(400.21)(400.17)5'16'5'19'7'11'5'9'5'2'400.02400.04400.05400.05399.64399.76399.827'7'399.9219' 12' C-64 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 399.82 FL À/2 399.99 FL À/2 399.74 FL 3À/4 399.82 FL À/2 399.89 FL À/4 399.53 FL 3À/4 399.49 FL À/2 À/4 399.45 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 99400.35400.31399.98400.15400.04400.18399.74399.95399.77400.00400.68400.24400.63400.09400.59400.55400.52(400.69)400.11400.66400.26400.12400.20400.36400.43400.16400.27400.16400.05(400.79)REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/20/19 17.4'1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE G StG St P PP P CONC ASPH ASPH ASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga065.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 8 9(401.39)(401.48)(401.08)(401.05)400.92400.94400.33400.42400.51400.47400.43400.44400.81400.84400.86400.92400.86400.78400.53400.53400.65400.59400.53400.53400.85400.935'9'5'12'3'18'5'5'16'18'12'400.49400.47400.52400.48400.35400.39400.37400.287'7'C-65 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: À/2 400.34 FL 400.32 FL À/4 400.37 FL 3À/4 400.41 FL À/4 400.37 FL À/2 400.33 FL 3À/4 400.14 FL À/2 400.11 FL 3À/4 400.18 FL À/4 400.19 FL À/2 400.18 FL À/4 400.20 FL 3À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 100 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/20/19401.51400.96401.58400.94400.50400.64400.39400.65400.76400.98400.55401.01401.05401.09401.04400.68401.03400.59400.94400.46400.62400.71400.56400.79400.66400.57400.38400.991 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE H StH St P P ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga066.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 370 1 2400.53400.65400.55400.49400.44400.38400.31400.25400.23400.14400.42399.96399.99400.47400.54400.10400.37400.22400.72400.63400.33400.45400.47400.79400.74400.67400.60(400.70)(400.98)(400.81)(400.60)(401.09)(400.90)4'15'5'8'12'7'5'14'5'5'9'6'400.43400.33400.30400.22400.20400.03400.20400.297'7'C-66 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 400.42 FL À/4 400.36 FL À/2 400.30 FL 3À/4 400.34 FL À/2 400.39 FL À/4 400.29 FL 3À/4 400.20 FL À/2 400.35 FL 3À/4 400.05 FL À/4 400.02 FL 3À/4 399.90 FL À/2 399.77 FL À/4 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 101 REVISED CL ELEVATIONS3/20/19400.41400.84400.74400.51400.62400.47400.57400.13400.31400.61400.51400.16400.02400.47400.21400.76400.38400.23400.56400.29400.43400.67400.34400.48400.55400.39400.54400.62400.55401.09401.03400.95400.87400.83400.791 REVISION DATE DESCRIPTION 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE EYE StEYE St ASPHASPHASPH CONC ASPH ASPH ASPHASPHTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga067.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 3754 6(401.90)(402.33)(402.08)(400.93)(401.87)(402.57)(402.42)(401.77)401.78402.14401.92401.30401.25401.03401.06401.20401.12401.15401.17401.42401.09401.46401.15401.22401.52401.57401.29401.36401.63401.68401.74401.78401.49401.46401.43401.84402.05402.44401.733'2'7'11'3' 5'5'3'2'5'15'5'400.90401.04401.16401.12401.10401.06401.22401.38401.39401.437'7'18' 18' 18'5'C-67 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 3À/4 À/2 À/4 400.97 FL À/4 401.00 FL À/2 3À/4 400.97 FL 401.06 FL À/4 401.08 FL À/2 401.11 FL 3À/4 3À/4 401.41 401.53 À/2 401.65 À/4 400.75 FL 400.76 FL 400.77 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 102 400.92 400.91 400.89 REVISION DATE DESCRIPTION 1 2/21/19 REVISIONS TO CURB & GUTTER401.23401.41401.23401.69401.51401.67402.01401.78401.95401.73401.93402.19402.45402.27402.09400.71401.38401.85401.58401.76401.56402.02401.72401.15401.30401.08401.57401.73401.81402.15402.05402.51401.98401.88402.22401.75401.60401.82401.91401.1721.1'(401.92)(402.37)14'(402.15)(400.94)3/28/192 REVISED CL ELEVATIONS 2 400.82 400.85 400.88 1 3 08/22/193 REVISED SW CURB RETURN CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE CHESTER AveCHESTER Ave FP PP P P P PP FP FP CONC CONC ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga068.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 8 9402.99403.00403.02402.97402.92402.86402.84403.49403.60403.20403.20402.95402.94403.20402.83402.78403.20403.21403.21403.21402.65402.67402.72403.12403.42402.93(403.68)(403.57)(403.82)(403.40)11'2'5'1'5'8'19'11'5'8'5'402.76402.77402.67402.94403.00402.937'7'19' C-68 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 402.38 FL 3À/4 402.42 FL À/2 402.46 FL À/43À/4 402.74 FL À/2 402.70 FL À/4 402.67 FL 402.76 FL À/2 402.72 FL À/4 402.67 FL À/2 3À/4 402.63 FL 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 103 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/28/19403.24403.40402.83402.94402.99403.10402.93403.06403.04403.44403.46403.43403.41403.38(403.77)(403.62)403.04403.44402.93403.10402.98403.38403.08402.95403.45402.85402.65403.39402.19402.80402.6612.3'1402.93CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE K StK St P P P PPP CONC ASPHASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga069.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 1 2 3(403.98)(404.14)(403.92)(403.94)403.84403.34403.82403.33403.33403.32403.67403.67403.66403.65403.65403.34403.34403.64403.22403.24403.28403.32403.36403.38403.67403.755'16'5'13'10'18'5'10'5'18'403.26403.33403.33403.32403.16403.26403.29403.347'7'19'15'C-69 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: À/2 403.28 FL 403.24 FL 3À/4 403.22 FL À/4 403.00 FL À/2 À/2 403.20 FL 403.11 FL 3À/4 403.14 FL À/2 403.10 FL À/4 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 104 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/28/19 403.75403.69403.24403.42403.30403.47403.36403.50403.43403.88403.92403.96403.92403.51403.23403.78403.30403.44403.34403.46403.52403.56403.88403.31403.38403.65403.37(403.98)(404.01)403.18403.361403.70CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 23RD St "23RD" LINE L StL St P P ASPHASPH ASPHASPH CONCASPH 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga070.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 4 395 6404.17404.22404.20404.14404.63404.08404.24404.16404.16404.06404.15404.20404.23404.37404.46404.28404.41404.43(404.20)(404.64)(404.35)(404.21)(404.46)(404.24)404.26(404.65)(404.65)12' 12' 2'17'13'6'18' 2'14'12'2' 18'17'6'19'404.06404.06404.00403.93403.93403.72404.015'13'(404.00)13' C-70 CONSTRUCTION DETAILS SCALE: 1" = 10' NOTE: 403.78 FL À/2 403.51 FL À/2 403.63 FL À/2 403.58 FL À/4 3À/4 403.59 FL 403.82 FL À/2 RELINQUISHMENT LIMIT OF 4. CONCRETE CURB RAMPS SHALL BE PROMENADE BLEND COLOR. 3. SEE LAYOUT SHEETS FOR INFORMATION NOT SHOWN. 2. ELEVATIONS SHOWN IN PARENTHESES MATCH EXISTING. 1. GRID DIMENSIONS ARE 20'X20' UNLESS OTHERWISE NOTED. 105 REVISION DATE DESCRIPTION 1 REVISED CL ELEVATIONS3/28/19404.60404.52404.66404.46404.50404.06403.99403.69404.68404.43(404.26)(404.52)404.4122' 22' (404.67)(404.70)19.3'19.1'404.09404.03404.08403.82 403.70403.53 8/27/192 REVISED ELEVATIONS 2 2 2 2 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 23RD St"23RD" LINE M StM StEB ROUTE 178 "E178" LINE ASPH DIRT AS P HCONC ASPH ASPH+00.00 PVIElev 410.62+80.00 BVCElev 410.39+95.00 PVIElev 410.35+10.00 EVCElev 409.60+45.00 BVCElev 402.85-0.28% -5.00%30' VC FG OG FG OG x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga071.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FF F1 220 1 2 410 20+00 1 2 CONSTRUCTION DETAILS C-71 SCALE: 1" = 20' "KR1" LINE VERT - 1" = 2' SCALE: HORIZ - 1" = 20' 21+00 22+00 405 400 415 415 410 405 400SEE SHEET C-72MATCH LINE "KR-1" 22+50SEE SHEET C-72 MATCH LINE "KR-1" 22+50 20+27.21 EC 35.84' Rt +00.68 (410.51) MATCH Exist 22.18' Lt +29.32 (410.61) MATCH Exist R=10' R=10' 132.63 N6022' A No.#R CURVE DATA T L A B 25'15.13'27.21'AANOT TO SCALE 10 4'4' EP 2'2' EP HPHP 2%5%5% PG FLATTER 3:1 OR FLATTER 3:1 OR OG 254.17' Rt "EBL" 312+06.85 "KR1" 20+00 BC=20 TOE OF FILLTOP OF FILL TOE OF SLOPE TOE OF SLOPE CONFORM SAWCUT AND 106 20+42.12 BC 8' 6 B 21+59.84 BC 100'58.79'106.30' 1 REVISION DATE DESCRIPTION 1 06/07/19 REMOVED RW No. 314 22+43.07 PRC B 6 6 94'55.96'100.95' 1 1 1 8' 6:1 2.5:1 2' 2 08/16/192 ADDED SWALE AT TOE OF SLOPE CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 KERN RIVER Pkwy TRAIL "KR1" LINE R/W2 4 TH St 622 SECTION A-A LINE "KR1" 605 613 ASPHASPH6 25 43 25 3 4 6+60.00 PVIElev 402.10+75.00 EVCElev 402.05+05.00 BVCElev 401.31+20.00 PVIElev 401.27+35.00 EVCElev 402.02+23.80 BVCElev 406.46+38.80 PVIElev 407.21+53.80 EVCElev 407.43-0.32% 5.00% 30' VC 30' VC 30' VC OG FG OG FG x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga072.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 25 3 4 6 405 23+00 "KR1" LINE VERT - 1" = 2' SCALE: HORIZ - 1" = 20' 24+00 25+00 400 395 410 CONSTRUCTION DETAILS C-72 SCALE: 1" = 20' 26+00MATCH LINE "KR-1" 22+50SEE SHEET C-71410 405 400 395 "KR1" 26+71.67 PT= 71.82' Rt "EB2" 317+63.59 No.#R CURVE DATA T L B 94'55.96'100.95' C D 46'9.42' E 25'19.91' 18.58' 33.63' 11.00' N5507' 8'MATCH LINE "KR-1" 22+50SEE SHEET C-71107 1585'178.59 355.67 26+60.67 EC 25+85.08 PRC 23+43.27 BC 77.12' N5842' 22+66.14 EC D E 26+19.16 PRC TOE OF SLOPE C6 B C 6 "KR1" LINE 8' TOE OF SLOPE 26+50.95 EC D E 26+17.32 PRC 25+98.74 PRC 06/07/19 8.89' No.#R CURVE DATA T L C D E 1585' 46' 25' 178.59' 9.42' 19.91' 355.67' 18.58' 33.63' REMOVED RW No. 314 1 1 1 21 11/01/192 REVISED PATH PROFILE 5%5% 2' 2 FLATTER 2:1 OR SECTION B-B NOT TO SCALE LINE "KR1" 4'4' EP 2'2' EP HPHP 2% PGFLATTER 3:1 OR OG 6:1 6 FILL TOE OF 22 BB SOUTH OF BIKE PATH INTO PARK. ACHIEVE POSITIVE SLOPE TO DAYLIGHT PIPE COVER OF PIPE WILL BE DEPENDENT TO PIPE SHALL BE 4" SCHEDULE 80. "WALL DRAIN DETAIL." "RETAINING WALL, GUTTER OUTLET" AND PURSUANT TO CALTRANS STD PLAN B3-6 GRATED AREA DRAIN WITH CONCRETE APRON 3 10/01/21 AS-BUILT 3 REVISION DATE DESCRIPTION 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St O AK St R/W613 125 230 770 "KR1" LINE 125 230 770 P A SPH ASPHASPH ASPH ASPH+10.00 PVIElev 410.31+25.00 BVCElev 410.61+50.00 PVIElev 411.11+75.00 EVCElev 411.19+00.00 BVCElev 411.57+25.00 PVIElev 411.65+50.00 EVCElev 412.24+75.00 BVCElev 412.84+00.00 PVIElev 413.43+25.00 EVC2.00% 0.31% 2.37% 50' VC 50' VC 50' VC OG Elev 413.560.43%Elev 413.54+30.00 PVIFG CONFORM BACK OF SW CONFORM TO x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga073.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 F FF F 415 30+00 "KR2" LINE VERT - 1" = 2' SCALE: HORIZ - 1" = 20' 410 405 420 420 415 410 405 31+00 32+00 33+00 CONSTRUCTION DETAILS C-73 SCALE: 1" = 20' 30 1 2 3 4 30+00 PT= "KR2" 313+54.52 44.50' Lt "WBL" 30+15 BC 30+39.56 PRC 31+86.26 EC 33+03.86 PI "KR2" 34+03.86 PT= 438.82' Lt "WB2" 314+28.34 4.00' Rt +03.86 MATCH Exist 117.60' N5118' 100.00' N4714' (409.95) MATCH Exist 1' Min G F No.#R CURVE DATA T L F G 50' 170' 12.53'24.56' 78.27'146.70' (PROTECT IN PLACE) Exist POLE 4'4' 2' EP HP TRAIL Exist OG Var 10 2%Var NOT TO SCALE PG AABB4'4' 2' EP HP 2' EPHP 5%2% 10 PG 5% FLATTER 3:1 OR OG FLATTER 3:1 OR NOT TO SCALE 8' 6 TOE OF SLOPE TOE OF SLOPE 16.27' Lt +30 SAWCUT 0-12.3' EP Exist 1'3000.00+50 411.08 +75 412.52 +00 413.28 +25 413.50 +50 413.61 +75 413.67 +00 413.78CONFORM SAWCUT AND 108 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 KERN RIVER Pkwy TRAIL "KR2" LINE 280 492 LINE "KR2" SECTION B-B LINE "KR2" SECTION A-A 24TH St R/WR/WR /W P DIRT ASPHASPHDIRTASPHASPHDIRTCONC CONC ASPH P ASPHASPHASPHCONCASPHASPH P PFF FF F FFx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga074.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 9 1 2 3 315491234315 310 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET C-75MATCH LINE "WB2" Sta 315+50R/W R/W R/W R/W "EB2" LINE "WB2" LINE CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) SCALE: 1" = 50' C-74 NO ADL WORK THIS SHEET ROADWAY EXCAVATION (TYPE Z-2) LEGEND (SHEETS C-74 TO C-81): 109 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "WBL" LINE "EBL" LINE Kern River 400400400P P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHCONC390 405410405 400 4004054 0 5 4054054 0 5 40 5 4 05 405 405 405 405 405405405405 ASPH P P P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STPASPHCONC ASPH 405400390405405P PP P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga075.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FFCF260 2651234FFFFFFC CFC 3206789 1 2 3206789 1 21012347 89FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET C-76MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR / W R/WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET C-74C-75 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) Beg REMOVAL "EB2" 318+80 REMOVAL DEPTH 0.5' 20' 110 20'CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 10/01/21 AS-BUILT1 1 10/01/21 20' FROM EP. REVISED ADL LIMITS,"WB2" LINE "EB2 " L INE "OAK-1" LINE24TH StOAK StOAK St"OAK-2" LINEOLIVE StOAK St"OAK-1" LINE PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P ASPHASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONCCONC ASPHASPHPOOLS POOLPOOL CONCASPHP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLFC F FF FF F FFFF F F F F F F x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga076.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 UB UB 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET C-77MATCH LINE "B" Sta 336+50R/W R/W R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET C-75C-76 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) Beg REMOVAL "B" 332+02 END REMOVAL "B" 334+81 REMOVAL DEPTH 0.5' 62.80' Rt "EB2" 324+05 END REMOVAL DEPTH 0.5' REMOVAL END REMOVAL Beg REMOVAL END REMOVAL 43.20' Rt "EB2" 327+95 Beg REMOVAL REMOVAL DEPTH 0.5' 4.50' Rt "EB2" 325+10 3.15' Rt "EB2" 326+44 8.80' Rt "EB2" 326+89 20'20' DEPTH 0.5' REMOVAL 20' 111 20' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 10/01/211 AS-BUILT 1 10/01/21 20' FROM EP. REVISED ADL LIMITS, 24TH StCarrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "EB2" LINE "WB2" LINE PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL F F F F F F FF F F F F F FFF F FF x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga077.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET C-78MATCH LINE "24TH" Sta 347+50R/W R/W R/W R/WMATCH LINE "B" Sta 336+50SEE SHEET C-76C-77 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) NO ADL WORK THIS SHEET 112 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONCPOOLCONCASPHASPH CONC PPP P PP P P P P P P P P P PP P P P P POOLPOOL CONC CONCCONCPOOLPOOL ASPH ASPH ASPH ASPHASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPH ASPH A S P H ASPHASPH ASPHASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH CONC CONCASPH CONC ASPH ASPH CONCCONCC STDRAKE STASPHASPHASPHD STE ST23RD ST 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga078.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FF F F F 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET C-79MATCH LINE "24TH" Sta 360+50SEE SHEET C-79MATCH LINE "23RD" Sta 358+50R/W R /W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET C-77C-78 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) Beg REMOVAL END REMOVAL "23RD" 347+29 "23RD" 348+60 DEPTH 0.5' REMOVAL 20' 113 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St"24T H " L IN E " 2 3 RD" LI NEBAY StB StC StD StE StC StDRAKE StENCINA St ASPHASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP P PP PPPP ASPH ASPH ASPHASPHCONC ASPH ASPH ASPHASPHASPH ASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH P P P P P P P P P P P P PPP PPP P FPP P P P P ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST 23RD ST 25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga079.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2 SEE SHEET C-80MATCH LINE "24TH" Sta 374+50SEE SHEET C-80MATCH LINE "23RD" Sta 372+50FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET C-78MATCH LINE "23RD" Sta 358+50SEE SHEET C-78C-79 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) NO ADL WORK THIS SHEET 114 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St "24TH" LINE "23RD" LINE G StH StF StF StG StH StEYE StEYE St PP A SPH ASPH ASPHASPH TRAILER CONCCONC ASPH P P P P ASPHCONCASPH CONC FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP P PP FP P FP ASPH ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STL STK STASPHCHESTER AV25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga080.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 77 8395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 SEE SHEET C-81"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R/W R/W R/W R/W R/W R/W R/W R/W MATCH LINE "24TH" Sta 374+50SEE SHEET C-79MATCH LINE "23RD" Sta 372+50SEE SHEET C-79SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) C-80 NO ADL WORK THIS SHEET 115 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St L StK StK StL StM StM StCHESTER AveCHESTER Ave"E178" LINE"W 178" LIN E"24TH" LINE "23RD" LINE P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPH ASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPHP P FP ASPHASPHASPHCONC CONC CONCASPH ASPHASPH23RD ST M STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga081.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 F F FF F F C FC F400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 395 67 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R /W R /W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET C-80C-81 SCALE: 1" = 50' CONSTRUCTION DETAILS (AERIALLY DEPOSITED LEAD) Beg REMOVAL "E178" 397+09 END REMOVAL "E178" 402+00 10' 5' REMOVAL DEPTH 1' 121 CY Beg REMOVAL "E178" 398+54 END REMOVAL "E178" 403+31 5' Beg REMOVAL "W178" 396+18 END REMOVAL "W178" 403+75 15' 7' 5' REMOVAL DEPTH 1' 81 CY REMOVAL DEPTH 1' 247 CY REMOVAL DEPTH 1' 115 CY END REMOVAL "W178" 405+50 Beg REMOVAL "W178" 399+10 16'3' 116 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEM StN StO StM StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd LINE "24TH" LINE "23RD" x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga082.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-82 CONSTRUCTION DETAILS NO SCALE FL FL TRANSITION10' CONCRETE CONCRETE CURB TRANSITION No. 1 STATION PER PLAN Beg CITY TYPE "B" CURB TYPE E FL FL TRANSITION10' STATION PER PLANSTATION PER PLAN TYPE B2-6 TO TYPE E FL FL TRANSITION10' CURB (TYPE B2-6) (TYPE E) HA DIKE STATION PER PLAN Beg CURB (TYPE B2-6) TRANSITION No. 3 CONCRETE CURB TO HA DIKE CITY TYPE "B" CURB (Hz=6") CITY TYPE "B" CURB (Hz=8") 117 ........ ............................ ........ ................................2'-6"TENSION WIRELINE POST BAR BAND POST LINE POST WILDLIFE OPENING 8"LINE POST TENSION WIRE BAR BAND TENSION WIRE8" STRETCHER BAR ‚" x ƒ" STRETCHER BAR NOTES: 1. STRETCH AND SECURELY FASTEN THE FABRIC TO THE POSTS PRIOR TO CUTTING THE 8"X8" WILDLIFE OPENING. 2. THE 8"X8" WILDLIFE OPENING SHALL BE SPACED A MINIMUM OF 100 FT APART ALONG THE LENGTH OF THE FENCE. 3. FOR ADDITIONAL CHAIN LINK FENCE DETAILS, SEE STANDARD PLANS A85, A85A AND A85B. HA HA DIKE (TYPE E) Beg HA DIKE (TYPE E)Beg HA DIKE (TYPE E) HA HA DIKE TRANSITION No. 2 CITY TYPE "B" (Hz=8") TO CITY TYPE "B" (Hz=6") BOG STRETCHER BAR ‚" x ƒ" FLAT Gal CHAIN LINK FENCE (TYPE CL-6) Mod CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga083.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-83 CONSTRUCTION DETAILS NO SCALE R=0.5"12"6" 1.5" 24"2"6"9.0" 5.0"4.0"6.0"SIDEWALK0.5% MIN4' CROSS GUTTERA A CITY R/W FL R=5' 2'2'Var FL 6" Max6.66% Max8.33% Max 8 .33% SECTION A-A MATCH Exist Elev Exist SW FLOWLINE (FL) H CURB HEIGHTS ARE 6" UNLESS OTHERWISE NOTED CONTROL Pt TOP OF CURB (TC) (2%) * * NOTES: 6 6 FL W SEE NOTE 1 SEE NOTE 2 2" * *UNLESS OTHERWISE NOTED (Typ) R=0.5" (Typ) R=0.5" 2' Gtr 2' Gtr BREAK GRADE 6.5"4"16.5"(UNLESS OTHERWISE NOTED) CURB RAMP TYPE 5 PARKWAYSEE NOTE 1 ADJACENT TO Exist SW 1.5% Max1.5% Max 6. "Ret CURB" SHOWN IN PLANS REFER TO CT Std PLAN A87A TYPE A1-6 CURB UNLESS OTHERWISE NOTED. 5. FOR DETAILS NOT SHOWN SEE CT Std PLAN RSP A88A. 4. FOR DETAILS NOT SHOWN SEE CT Std PLAN A87A. 3. FOR DETAILS NOT SHOWN SEE CITY OF BAKERSFIELD Std PLAN ST-3. 2. FOR DETAILS NOT SHOWN SEE CITY OF BAKERSFIELD Std PLAN ST-2. 1. FOR DETAILS NOT SHOWN SEE CITY OF BAKERSFIELD Std PLAN ST-1. CITY COMMERCIAL DRIVE APPROACH (TYPE A) SEE NOTES 3 & 5 . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . 6"VARIES(Typ) R=0.5"6"RETAINING CURB CITY TYPE "B" CURB CITY TYPE "B" CURBH*CURB HEIGHTS ARE 6" UNLESS OTHERWISE NOTED* 5' R/W CITY MEDIAN CURB CITY TYPE "M" 9.0" 5.0"4.0"6.0"SEE NOTE 2 (Typ) R=0.5"6.5"4"16.5"MEDIAN CURB CITY TYPE "M" Mod #4 REBAR Long 118 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga084.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-84 CONSTRUCTION DETAILS NO SCALE NOTES: SIDEWALK 1" DRIVEWAY 1 0' SIDEWALK 1 0' DRIVEWAY FRONT SIDEWALK BACK SIDEWALK1.0"Min.6.0"1.0"Min.6.0"BACK SIDEWALK 2 - #4 Rebar Full Width of Drive 6.0" x 6.0" - #10 x #10 EWWM 2 - #4 Rebar Full Width of Drive 6.0" x 6.0" - #10 x #10 EWWM 1" SIDEWALK WIDTH NOTED ON PLANS SIDEWALK WIDTH NOTED ON PLANS Exist SW MATCH 5' Exist SW MATCH Max6.66% Max6.66% FRONT SIDEWALK CITY COMMERICIAL DRIVE APPROACH "TYPE B-1"CITY RESIDENTIAL DRIVE APPROACH "TYPE B-2" *UNLESS OTHERWISE NOTED * *UNLESS OTHERWISE NOTED * SEE NOTE 1 SEE NOTE 1 *UNLESS OTHERWISE NOTED * 6. 6 6 % Ma x 6. 6 6 % Ma x * *UNLESS OTHERWISE NOTED CITY COMMERICIAL DRIVE APPROACH "TYPE B-1" (ISOMETRIC VIEW)CITY RESIDENTIAL DRIVE APPROACH "TYPE B-2" (ISOMETRIC VIEW) 1. FOR DETAILS NOT SHOWN SEE CITY OF BAKERSFIELD STD PLAN S-4 1. 5 % Ma x Max 1.5% 1.5% Max 1. 5 % Ma x 10'* R/W CITY 10'* R/W CITY Max7.5% 84" FOR 8" CURB 60" FOR 6" CURB 84" FOR 8" CURB 60" FOR 6" CURB Ma x 1. 5 % Ma x 1. 5 % 119 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 10/01/211 AS-BUILT 3' 3' WIDTH TO MATCH SIDEWALK DETECTABLE WARNING SURFACE WIDTH TO MATCH SIDEWALK DETECTABLE WARNING SURFACE 3' 3' WIDTH TO MATCH SIDEWALK DETECTABLE WARNING SURFACE WIDTH TO MATCH SIDEWALK DETECTABLE WARNING SURFACE 1 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga085.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-85 CONSTRUCTION DETAILS NO SCALE TYPE 1 TYPE 2 TYPE 3 TYPE 4 TYPE 5 CURB RAMPS (CITY JURISDICTION)Typ 6"Max SIDEWALK 3'-0"TYPE 6 TYPE 3 Mod TYPE 7Typ 6"SW SW SW SW OF SIDEWALK FRONT EDGE AREAPLANTINGAREAPLANTINGRAMP) SIDES OF CURB (BOTH RETAINING SIDEWALK EDGE OF FRONTMaxSIDEWALK EDGE OF FRONT Typ6"Typ 6" Typ 6" SIDEWALK SIDEWALK SIDEWALK MaxMax OF SIDEWALK FRONT EDGE OF SIDEWALK NECESSARY AT EDGE RETAINING CURB IF SIDEWALKTyp6"SIDEWALK EDGE OF FRONT SIDEWALK 1.5% Max 4'-6" Min 4'-6" Min Min 4'-0" CURB RETAINING Max OF SIDEWALK FRONT EDGE OF SIDEWALK NECESSARY AT EDGE RETAINING CURB IF SIDEWALKTyp6"1.5% Max Max Max Max 1.5% 6" Typ 1.5% IF NECESSARY RETAINING CURB Max RETAINING CURB EDGE OF SIDEWALK IF NECESSARY AT RETAINING CURB Gutter not shown TYPE 8 NOTE:1.5% Max1.5% MaxBEGIN CURB RETURN SIDEWALK RETAINING CURB AT EDGE OF IF NECESSARY, CONSTRUCT Typ 6"Max SIDEWALK BEGIN CURB RETURN SIDEWALK RETAINING CURB AT EDGE OF IF NECESSARY, CONSTRUCT TYPE 6 ModMax10.0%Pkwy Max 1.5%Min4'-2" 1.5% MaxAT CURB 9.0% Max AT CURB 9.0% Max 5'-0" 1.5% Max Max1.5% 1.5% MaxMin4'-2"Max1.5%AT CURB 9.0% Max AT CURB 9.0% Max 5'-0"Max1.5%Max1.5%Max1.5%5'0"5'-0" 1.5% Max Max1.5%7.5%Max7.5% Max 7.5% Max 7.5% 7.5%7.5% 7.5% Max 1.5%Min4'-2"Max1.5%AT CURB 9.0% Max Max7.5% Max 1.5%Min4'-2"Max1.5%Max7.5%5'-0" 7.5%Max1.5%Max 1.5%Max7.5%9.0% Max 1.5%Max1.5%5'-0"5'-0" Max 7.5%Max1.5%Max7.5%5'-0"5'-0"Max1.5%7.5%Max1.5%5'-0" 1.5% Max 5'0"Max1.5%RSP A88A AND RSP A88B. FOR INFORMATION NOT SHOWN, REFER TO CALTRANS STD PLAN 7.5% 120 Typ 6"SW RETAINING CURBMax7.5%Max 1.5%Max1.5%5'-0" Max 7.5%Max1.5%Max 1.5% SW 5'-0"TYPE 8 Mod CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga086.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-86 CONSTRUCTION DETAILS NO SCALE A A PLAN NOTES: MINOR CONCRETE (TEXTURED PAVING) STAMPED CONCRETE DETAIL 1. 36" •" DEEP JOINTS 36"TEXTURE FRACTURED ROCK FOR LIMITS OF STAMPED CONCRETE, SEE X AND L SHEETS. 12" (SEE S SHEETS FOR LOCATIONS) FOR ROADSIDE SIGN POSTS PROVIDE OPENING IN Conc 12"SECTION A-A PATTERN STAMPED STONE 10 SOUND WALL MINOR CONCRETE (TEXTURED PAVING) STAMPED CONCRETE DETAIL B B PLAN SECTION B-B 2.MINOR CONCRETE (TEXTURED PAVING) SHALL BE COLORED CONCRETE, COLOR MATCH PROMENADE BLEND. CONCRETE CURB CONCRETE CURB STAMPED STONE PATTERN STAMPED STONE PATTERN DETAIL ROADSIDE SIGN LOCATIONS DETAIL CONCRETE CURB SOUND WALL STAMPED STONE PATTERN Var 2% 18" ADJACENT TO TOP OF CURB OP OF CONCRETE SET FLUSHT 10 2% 18" 10 ADJACENT TO TOP OF CURB OP OF CONCRETE SET FLUSHT ADJACENT TO TOP OF CURB OP OF CONCRETE SET FLUSHT 10 CITY CURB TYPE "M" CITY CURB TYPE "M" CITY CURB TYPE "M" Mod 2% 18" ADJACENT TO TOP OF CURB OP OF CONCRETE SET FLUSHT 2% 18" ADJACENT TO TOP OF CURB OP OF CONCRETE SET FLUSHT 10 10 RETAINING CURBRETAINING CURB CITY CURB TYPE "M" Mod PROMENADE BLEND COLOR MINIOR CONCRETE CITY CURB TYPE "M" CITY CURB TYPE "M" 121 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 10/01/211 AS-BUILT 3.STAMPED STONE PATTERN NAME IS "FLAGSTONE" DAVIS COLOR BRICK RED SEE NOTE 3 DAVIS COLOR BRICK RED 1 1 1 10/01/21 MEDIAN Sta "23RD" 349+62.92 TO 351+19.00 Sta "B" 338+09 TO 338+76 NARROW MEDIAN x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5217-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga087.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 4 Const Jt 25 7"7"1'-6"•32"OPTIONAL Conc BARRIER 1•" Min36" Max12" #4 @ 128"8"8"8"3"VARIES SEE NOTE 1 OFFSET ROADBED SURFACES 0% SLOPE NOTES: 3. REINFORCING STIRRUP NOT REQUIRED FOR ROADBED OFFSETS LESS THAN 1'-0". 4. FOR ROADBED SURFACES OFFSET GREATER THAN 1•" AND LESS THAN OR EQUAL TO 3", OR EQUAL TO 8", USE TWO #4 Reinf AT 3" ABOVE THE LOWER ROADBED SURFACE. FOR ROADBED SURFACES OFFSET GREATER THAN 8" AND LESS THAN OR EQUAL TO 12", USE TWO #4 Reinf AT 3" ABOVE THE LOWER ROADBED SURFACE AND TWO #4 Reinf AT 8" ABOVE THE LOWER ROADBED SURFACE. FOR ROADBED SURFACES OFFSET GREATER THAN 12" AND LESS THAN OR EQUAL TO 36", USE TWO #4 Reinf AT 3" ABOVE THE LOWER ROADBED SURFACE AND TWO #4 Reinf AT EVERY 8" INCREMENT VERTICAL SPACING ABOVE THE FIRST TWO #4 Reinf. C-87 CONSTRUCTION DETAILS NO SCALE CONCRETE BARRIER Exist BRIDGE 10' TRANSITION BBSECTION A-A SEE NOTE 2 #4 BAR PLAN • CONCRETE BARRIER TYPE 60SC TRANSITIONVarAAVar COMPACTED BASE Pvmt OR WELL #5 5'-0" Tot 410"5" DIRECTION OF TRAVEL TYPE 60SC CONCRETE BARRIER 2. FOR END ANCHORAGE DETAILS NOT SHOWN SEE Std PLAN A76H. 1. FOR DETAILS NOT SHOWN SEE Std PLAN A76G. TYPE 60SC CONCRETE BARRIER NO Reinf REQUIRED. FOR ROADBED SURFACES OFFSET GREATER THAN 3" AND LESS THAN 6" 6" 7" 7" 5" 122 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 P ASPHCONCP P P ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga088.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 TCE Dwy TYPE "B-1" 180.28' Lt "WB2" +17.27 203.41' Lt "WB2" +34.14 191.60' Lt "WB2" +41.20 164.20' Lt "WB2" +73.56 MATCH Exist (404.28) MATCH Exist (404.31) MATCH Exist (404.43)R/WR/WR/WCONSTRUCTION DETAILS 152.13' Lt "WB2" +27.61 195.24' Lt "WB2" +44.03 MATCH Exist (403.38) 148.57' Lt "WB2" +63.01 SCALE: 1" = 10'C-88 4' 5'6 404.82 404.64 404.50 RESIDENTIAL Dwy No. 1 403.93 FL W=10' 191.11' Lt "WB2" 326+89.58 191.77' Lt "WB2" +96.33 404.11 191.77' Lt "WB2" +96.33 404.11 184.07' Lt "WB2" +90.21 404.13 123 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21BEECH St PPP CONC CONC POOLASPH2 3 1 1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga089.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 Dwy TYPE "B-1" 399.92 FL W=12' • Sta +07.14 83.22' Lt "B" +50.91 73.01' Lt "B" +50.91 63.51' Lt "B" +30.43 107.52' Lt "B" +06.32 MATCH Exist (399.96) FL 56.66' Lt "WB2" +52.01 400.09 FL W=12' • Sta +81.07 Dwy TYPE "B-1" MATCH Exist (400.18) FL (400.95) (401.13) 63.51' Lt "B" +18.43 MATCH Exist (401.31) MATCH Exist (401.38) R=23' R=25' R=5' R=5' 89.76' Lt "WB2" +44.89 94.37' Lt "WB2" +82.24 72.92' Lt "WB2" +71.70 56.64' Lt "WB2" +63.86 5'5' 5' 5' SCALE: 1" = 10'C-89 CONSTRUCTION DETAILS 64.91' Lt "WB2"+63.86 68.01' Lt "WB2"+30.43 73.01' Lt "WB2" +35.43 BC MATCH Exist (400.87) 401.00 401.04 401.17 401.17 RESIDENTIAL Dwy No. 2 & RESIDENTIAL Dwy No. 3 77.73' Lt "WB2" +44.85 89.84' Lt "WB2" +71.97 77.83' Lt "WB2" +70.84 400.92 400.36 400.86 BC 400.94 99.38' Lt "B" +17.58 400.17 91.69' Lt "B" +32.59 400.61 401.00 89.43' Lt "B" +16.60 400.14 6' 6' 124 R=8' CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21MYRTLE St24TH St"WB2" LINE "EB2" LINE "B" LINE P OOL CONC CONC ASPHPOOLx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga090.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 R/WR/WR/W 63.93' Lt "B" +93.35 63.94' Lt "B" +81.35 78.54' Lt "B" +03.30 90.81' Lt "B" +03.24 97.51' Lt "B" +72.89 104.52' Lt "B" +62.89 MATCH Exist (401.05) FL 401.00 FL W=12' • Sta +62.89 Dwy TYPE "B-1" 74.32' Lt "B" +95.30 90.62' Lt "B" +95.26 402.01 74.37' Lt "B" +17.27 111.34' Lt "B" +95.21 111.37' Lt "B" +17.24 401.13 FL W=20' • Sta +27.22 Dwy TYPE "B-1" 117.39' Lt "B" +27.24 MATCH Exist (401.17) FL R=10'R=5' MATCH Exist (401.95) MATCH Exist (402.11) MATCH Exist (401.90) MATCH Exist (401.80) R/W CONSTRUCTION DETAILS SCALE: 1" = 10'C-90 5' 402.01 401.52 401.52 RESIDENTIAL Dwy No. 4 & RESIDENTAIL Dwy No. 5 5' 5'5' R=25' R=25' 401.58 91.37' Lt "B" +17.24 401.55 85.51' Lt "B" +72.88 401.36 94.37' Lt "B" +85.01 401.61 401.41 6' 7' 125 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21PINE St24th St POOLASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga091.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 R/WR/W 73.92' Lt "B" +31.35 85.80' Lt "B" +49.64 106.79' Lt "B" +49.79 114.07' Lt "B" +09.43 MATCH Exist (400.77) FL 400.73 FL W=14' • Sta +09.40 Dwy TYPE "B-1" MATCH Exist (401.69) MATCH Exist (401.63) R/W R/W5'5' C-91 CONSTRUCTION DETAILS SCALE: 1" = 10' RESIDENTAIL Dwy No. 6 401.14 401.42 401.63 75.92' Lt "B" +31.36 401.31 85.50' Lt "B" +41.43 401.48 R=10' 401.10 93' Lt "B" +19.39 107' Lt "B" +19.42 74' Lt "B" +19.35 7' 126 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21CEDAR St24TH St ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga092.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 80.76' Lt "B" +87.97 80.81' Lt "B" +00.44 96.99' Lt "B" +00.36 96.98' Lt "B" +93.86 102.61' Lt "B" +93.87 81.45' Lt "B" +68.43 110.49' Lt "B" +56.00 MATCH Exist (400.40) FL 60.64' Rt "B" +87.91 71.25' Lt "B" +68.38 MATCH Exist (401.59) MATCH Exist (401.61) MATCH Exist (401.60) Dwy TYPE "B-1" CONSTRUCTION DETAILS C-92SCALE: 1" = 10'R/WR/WR/W R/W 5'5' 401.43 401.59 401.23 401.19 401.02 400.76 400.37 FL W=16' • Sta +55.92 RESIDENTIAL Dwy No. 7 102.48' Lt "B" +65.96 401.58 86.44' Lt "B" +65.91 R=20' 127 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21ALDER St24TH St P ASPH ASPH CONCCONC CONC ASPHP ASPH ASPH ASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga093.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 340 3 CONSTRUCTION DETAILS SCALE: 1" = 10'C-93 RESIDENTAIL Dwy No. 8 AND RESIDENTIAL No. 9 61.50' Rt "B" +64.93 55.50' Rt "B" +64.93 56' Rt "B" +36.17 55.50' Rt "B" +45.93 50.50' Rt "B" +53.09 400.09 FL 55.50' Rt "B" +59.93 70.35' Rt "B" +64.93 61.50' Rt "B" +45.93 70.35' Rt "B" +33.37 MATCH Exist (400.83) MATCH Exist (401.13) 5' 6' 5' 6' 69.22' Rt "B" +23.43 63.22' Rt "B" +23.43 63.22' Rt "B" +18.45 400.10 FL 58.22' Rt "B" +10.95 63.22' Rt "B" +03.45 77.61' Rt "B" +93.67 MATCH Exist (400.83) 69.22' Rt "B" +03.45 MATCH Exist (401.41) 77.77' Rt "B" +23.43 333 334 7%8% 6.6%63.73' Rt "B" +95.61 400.21 400.54 400.56 400.65 400.77 400.63 400.21 400.52 400.47 400.63 400.75 400.56 1.5% 1.5% 128 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON REVISION DATE DESCRIPTION 1 10/01/21 AS-BUILT 1.4% 401.48 401.38 1.0% 4.1% 401.34 401.45 401.55 401.61 401.53 401.50 401.57 401.55 401.44 401.71 401.77 3.6% 401.63 1% 1% 1 1 10/01/21 24TH St "B" LINE "B" LINE P P P P ASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>11:5317-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>JXIA DGN FILE =>06xxxxxxxxga094.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 CONSTRUCTION DETAILS SCALE: 1" = 10' TCE TCE 2%61.36' Lt "WB2" +88.53 ANGLE POINT 65' Lt "WB2" +87.26 71' Lt "WB2" +77.68 6' 116.69' Lt "WB2" +50 119.23' Lt "WB2" +25 121.92' Lt "WB2" +00 124.75' Lt "WB2" +75 134.13' Lt "WB2" +00 130.86' Lt "WB2" +25 127.73' Lt "WB2" +50 2%405.01 FL 404.71 FL 404.42 FL 404.12 FL 403.83 FL 403.53 FL 403.23 FL 123.98' Lt "WB2" +78.23 122.52' Lt "WB2" +88.84 ANGLE POINT 71' Lt "WB2" +69.31 327 328 6' 6' C-942%2%2%2% 2% 407.22 ANGLE POINT 406.82 ANGLE POINT 406.38 ANGLE POINT 406.22 ANGLE POINT 65' Lt "WB2" +00 406.63 65' Lt "WB2" +25 406.47 65' Lt "WB2" +50 406.27 65' Lt "WB2" +75 406.05 65' Lt "WB2" +00 405.81 65' Lt "WB2" +25 405.54 405.02 ANGLE POINT 65' Lt "WB2" +69.12 405.25 "WB2" +50 65' Lt 129 58' Lt "WB2" +00 406.54 58' Lt "WB2" +25 406.38 58' Lt "WB2" +50 406.18 58' Lt "WB2" +75 405.96 58' Lt "WB2" +00 405.72 58' Lt "WB2" +25 405.45 58' Lt "WB2" +70.91 404.74 ANGLE POINT "WB2" +50 58' Lt 405.16 58' Lt "WB2" +79.35 406.56 ANGLE POINT 64' Lt "WB2" +81.46 406.64 ANGLE POINT 76.49' Lt "WB2" +71.85 406.74 ANGLE POINT1.5% 64' Lt "WB2" +89.62 404.29 ANGLE POINT 6'1.5%2.4%1 REVISION DATE DESCRIPTION 2 10/01/21 AS-BUILT CCO No. 36 REVISED STRUCTURAL SECTIONS06/05/191 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON SHEET C-94r SEE REVISED 10/01/21 "WB2" LINE x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 REVISED SHEET r REVISION DATE DESCRIPTION 0 10/01/21 AS-BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON CONSTRUCTION DETAILS C-94 129r SCALE: 1" = 12' 10/01/21 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 C-94 NOTES: REVISION DATE DESCRIPTION 0 1. ONE 3" CONDUIT. WHEN A 3" CONDUIT IS USED, IT IS RESTRICTED TO THE BASE OF THE BARRIER. MAXIMUM NUMBER OF CONDUITS IN THE BARRIER IS LIMITED TO TWO 2" CONDUITS ALONG WITH SEE STANDARD PLANS ES-9A, ES-9B, ES-9C, ES-9D AND ES-9E FOR ELECTRICAL DETAILS. THE 2.FOR ELECTROLIER MOUNTING DETAILS, SEE STANDARD PLANS ES-6A AND ES-6B. 3. SEE NOTE 2 • ELECTROLIER, BOLTS, SEE NOTE 3 ELECTROLIER ANCHOR 4. MINIMUM CONCRETE EDGE DISTANCE, TO THE REINFORCING SHOWN, SHALL BE MAINTAINED. Tot2 #5 x 6'-6" 3'6'-2" CB (TYPE 60MS) PLAN ELEVATION PEDESTAL ELEVATION SECTION A-A CB (TYPE 60MS) 06/19/19 REMOVED RW No.314 CONSTRUCTION DETAILS NO SCALE a ADDITIONAL SHEET a129 FG 10"36"24" #5 5'-0" Tot 4 9" 1'-8" Min 1'-3‚" LONG #6 x 6'-0" SEE PLAN VIEW SPACED AS SHOWN, Var #5 TOTAL 4 2'-0" LEG Reinf LONGITUDINAL BARRIER EXTEND ALL #5 TOTAL 2 Reinf TYPICAL EXTEND BOTTOM, TOTAL 2 LONG, TOP AND #5 x 6'-6" CENTER Clr3"PULL BOX DRAIN TO LOW SIDE 9"1'-8" 1'-6" Min 3'-0" BOX PULL #5 TOTAL 4 • ELECTROLIER #5 Tot 2 PULL BOX #522"#5 TOTAL 5 ELECTROLIER, TOTAL 9 PLACE (4) #5 @ 8 EACH SIDE A A FG FOR DETAILS NOT SHOWN, SEE STANDARD PLANS RSP A76G, RSP A76H AND RSP B11-55. Reinf LONGITUDINAL BARRIER EXTEND ALL FG #4 3 PER SCUPPER TOTAL 3 PER SCUPPER #5 x 6'-0" LONG 2" Clr 3" OPENING 1 11/04/19 CONCRETE BARRIER SCUPPER DETAIL 1 CB (TYPE 60MS) 2'20' SPACING B B SECTION B-B ELEVATION FG 2' #4 3 PER SCUPPER TOTAL 3 PER SCUPPER #5 x 6'-0" LONG OPENING CONCRETE BARRIER TYPE 60MS SCUPPER Mod Beg Mod STATION PER PLAN 2' END Mod STATION PER PLAN 2' CB (TYPE 60MS) 10/01/212 AS-BUILT 1'0.6'STD PLAN A76A PURSUANT TO CALTRANS #5 DOWELS @ 24" STRUCTURE CONCRETE MIX. UNREINFORCED CONCRETE SLAB. 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 405 410410405400395405410410405390390390400 405 410 395 395395400400395410P DIRT ASPH ASPH ASPHASPHDIRTASPHASPHDIRTCONC CONC ASPH P ASPHASPHASPHCONCASPH405400395405405410410405400395400400390 390410405400395405 410 ASPH P P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 410 410F FFF F FF405 405 8 9 1 2 3 3154891234315 310 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: G-1SEE SHEET G-2MATCH LINE "WB2" Sta 315+50R/W R/W "EB2" LINE "WB2" LINE CONTOUR GRADING SCALE: 1" = 50' R/W R/W148 REVISION DATE DESCRIPTION 1 06/13/19 REMOVED RW No. 314 1 2 08/16/19 ADDED SWALE AT TOE OF SLOPE 2 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "WBL" LINE "EBL" LINE Kern River 400400400P P P P ASPHASPHASPHASPH ASPHASPHOAK STASPHASPH405405405405P P P P P P P DENSE TREESPOOLASPH ASPHASPHASPHCONC ASPHASPH4054054054054 0540 5 400400400390 390405405405405410405 400 4004054 0 5 4054054 0 5 40 5 4 05 405 405 405 405 405405405405 ASPH P P P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STPASPHCONC ASPH 405400390405405P PP P x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FFFCCF 4003953902602651234F405405FFFFFC CF400 395 390 400395390C 405405400405405 3206789 1 2 3206789 1 21012347 89G-2SEE SHEET G-3MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR / W R/WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET G-1CONTOUR GRADING SCALE: 1" = 50' FOR ACCURATE RIGHT OF WAY DATA, NOTE: RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE.R/WR/W149 ROAD ACCESS 14' 14' R=48' R=55' R=23' 14'ROAD ACCESS 14' R=48' RAMP ACCESS 10%REVISION DATE DESCRIPTION 06/13/191 REMOVED RW No. 314 12 08/16/192 ADDED SWALE AT TOE OF SLOPE 3 11/04/193 REVISED 24TH St & OAK St INTERSECTION 4 10/01/21 AS-BUILTS unchanged. Engineer. Grades directed by the Clean up slope as 4 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 9%12%Engineer. directed by the Modify grading as Location of pipe. 4 10/01/21 "WB2" LINE "EB2 " L INE "OAK-1" LINE24TH StOAK StOAK St"OAK-2" LINEOLIVE StOAK St"OAK-1" LINE 405405 405 405405405 405400400400400PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P ASPH405405405405405ASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONCCONC ASPHASPHPOOLS POOLPOOL CONCASPHP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOL4 05405405405 405 405400400400400 4004004004004004004004004 0 0 4 0 5405405x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 UB UB FC 405 405405 405 4 0 5 400 F FF FF F FFFF F F F F F F 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 G-3 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET G-4MATCH LINE "B" Sta 336+50R/W R/W R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET G-2CONTOUR GRADING SCALE: 1" = 50' 150 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St Carrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "EB2" LINE "WB2" LINE PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 400 F F F F F F FF F F F F F FFF F FF 7 340 345 7 8 9 1 2 3 4 6 4 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: G-4SEE SHEET G-5MATCH LINE "24TH" Sta 347+50R/W R/W R/W R/WMATCH LINE "B" Sta 336+50SEE SHEET G-3CONTOUR GRADING SCALE: 1" = 50' 151 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE 4 0 0 400 400400 4 0 0 400400 400400400 P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONCPOOLCONCASPHASPH CONC PPP P PP P P P P P P P P P PP P P P P POOLPOOL CONC CONCCONCPOOLPOOL ASPH ASPH ASPH ASPHASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPH ASPH A S P H ASPHASPH ASPHASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH CONC CONCASPH CONC ASPH ASPH CONCCONCC STDRAKE STASPHASPHASPHD STE ST23RD ST 23RD ST 400 400 4004004 0 0 400400400 400 400 400400400400400400400 400 400400 400 400400400400 400 400 400 400 400 FF F F F x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8 G-5 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET G-6MATCH LINE "24TH" Sta 360+50SEE SHEET G-6MATCH LINE "23RD" Sta 358+50R/W R /W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET G-4CONTOUR GRADING SCALE: 1" = 50' 152 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St "24TH" L INE " 2 3 RD" LI NEBAY StB StC StD StE StC StDRAKE StENCINA St ASPHASPH400400 P PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP P PP PPPP ASPH ASPH ASPHASPHCONC ASPH ASPH ASPHASPHASPH ASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH P P P P P P P P P P P P PPP PPP P FPP P P P P ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST 23RD ST 25TH ST 400 400 400 400 400 400 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2 SEE SHEET G-7MATCH LINE "24TH" Sta 374+50SEE SHEET G-7MATCH LINE "23RD" Sta 372+50G-6 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET G-5MATCH LINE "23RD" Sta 358+50SEE SHEET G-5CONTOUR GRADING SCALE: 1" = 50' 153 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St "24TH" LINE "23RD" LINE G StH StF StF StG StH StEYE StEYE St PP A SPH ASPH ASPHASPH TRAILER CONCCONC ASPH P P P P ASPHCONCASPH CONC FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP P PP FP P FP ASPH ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STL STK STASPHCHESTER AV25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 6 77 8405 405405 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 SEE SHEET G-8"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: G-7 R/W R/W R/W R/W R/W R/W R/W R/W MATCH LINE "24TH" Sta 374+50SEE SHEET G-6MATCH LINE "23RD" Sta 372+50SEE SHEET G-6CONTOUR GRADING SCALE: 1" = 50' R/W 154 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St L StK StK StL StM StM StCHESTER AveCHESTER Ave"E178" LINE"W 178" LIN E"24TH" LINE "23RD" LINE P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPH ASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPHP P FP ASPHASPHASPHCONC CONC CONCASPH ASPHASPH23RD ST M STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 405 405 405 405 410 420 415 410 415410 415 410 410 420415410 405 405 F F FF F F C FC F400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 405 405405 395 67 G-8 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: R /W R/W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET G-7CONTOUR GRADING SCALE: 1" = 50' 155 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEM StN StO StM StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd LINE "24TH" LINE "23RD" P ASPHASPHDIRTASPHDIRTCONC CONC ASPH P ASPHASPHASPHCONCASPHASPH P P 9 1 2 3 315491234315 310 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5617-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SEE SHEET U-2MATCH LINE "WB2" Sta 315+50R/W R/W R/W R/W "EB2" LINE "WB2" LINE U-1 UTILITY PLAN SCALE: 1" = 50' NOTES: APPROVED FOR UTILITY INFORMATION ONLY IN 24" STEEL CONDUIT WATER LINE 12" CalW C.L.&C. WATER LINE 12" CalW AC 70kV PG&E TRANSMISSION LINE 70kV PG&E TRANSMISSION LINE 115kV PG&E TRANSMISSION LINE 115kV PG&E TRANSMISSION LINE 16 17 SEWER LINE 15" VCP C.O.B. FIBER OPTIC LINE AT&T TRANSCONTINENTAL UNLESS OTHERWISE STATED. ELEVATIONS SHOWN REFER TO THE TOP OF THE PIPE OR CONDUIT, 3. PRIOR TO CONSTRUCTION. APPROXIMATE AND SHALL BE VERIFIED BY THE CONTRACTOR LOCATION OF UTILITY FACILITIES SHOWN ON THESE PLANS ARE 2. ENGINEERING AT THE DISTRICT OFFICE. FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY 1. ABBREVIATIONS: BHN FIBER OPTIC LINE VERIZON LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 8. FOR POSITIVE LOCATION INFORMATION SEE SHEET U-9 AND U-10. SW-2. FRAME AND COVERS SHALL CONFORM TO COB Std PLAN SW-6. ADJUST TO GRADE SEWER MANHOLE TYPE "A" PER COB Std PLAN 7. SHALL BE PROTECTED IN PLACE UNLESS OTHERWISE NOTED. EXISTING UTILITIES INCLUDING ABOVE GROUND FACILITIES 6. PRIOR TO EXCAVATION WITHIN THE PROJECT AREA. UTILTY COMPANIES AND USA SHALL BE NOTIFIED 48 HOURS 5. - CALIFORNIA WATER SERVICE COMPANY (CalW)WATER - VERIZON - AT&TTELECOM - CITY OF BAKERSFIELD (C.O.B.)SEWER - CHEVRONOIL - CITY OF BAKERSFIELD (C.O.B.)IRRIGATION - PACIFIC GAS AND ELECTRIC (PG&E)GAS - BRIGHT HOUSE NETWORKS (BHN) - AT&T FIBER OPTICS - PACIFIC GAS AND ELECTRIC (PG&E)ELECTRIC UTILITY OWNERSHIP ON THIS PROJECT:4. LEGEND: TEST HOLE SYMBOL MARKING THE EXACT LOCATION 4" AT&T FIBER OPTIC LINE 0224 (Abn) 10" CHEVRON OIL LINE STEELStl PUBLIC UTILITY EASEMENTPUE CEMENT MORTAR LINED AND COATED STEELC.L.&C. ASBESTOS CEMENTAC S1 C.O.B. SEWER CONSTRUCTION NOTES: SEWER MH ADJUST TO GRADE. S1 CONDUIT TO BE LOWERED REVISION DATE DESCRIPTION 1 10/01/21 As-Builts 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St "WBL" LINE "EBL" LINE Kern River P P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCASPH P P P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STPASPHCONC ASPH P PP P 3206789 1 2 3206789 1 21012347 892602651234x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SEE SHEET U-3MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR / W R/WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET U-1U-2 UTILITY PLAN SCALE: 1" = 50' 70kV PG&E TRANSMISSION LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE WATER LINE 6" CalW AC BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. NOTES: APPROVED FOR UTILITY INFORMATION ONLY 115kV PG&E TRANSMISSION LINE 115kV PG&E TRANSMISSION LINE 70kV PG&E TRANSMISSION LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 3" PG&E GAS LINE 3" PG&E GAS LINE 3" PG&E GAS LINE SEWER LINE 8" VCP C.O.B. SEWER LINE 8" VCP C.O.B. 3" PG&E GAS LINE MH VERIZON LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL)R/WR/WR/W (INACTIVE) 10" CHEVRON OIL LINE 19B 19A 20 21 22 25 23 24 SEWER LINE 15" VCP C.O.B COB SEWER MH BHN FIBER OPTIC LINE VERIZON TELEPHONE LINE 14C 14A 14B BHN FIBER OPTIC LINE VERIZON TELEPHONE LINE 230 (INACTIVE) 10" CHEVRON OIL LINE FIBER OPTIC LINE AT&T TRANSCONTINENTAL WATER LINE 12" CalW AC OPTIC LINE AT&T FIBER AT&T CONDUIT AT&T CONDUIT (Abn) 10" CHEVRON OIL LINE 225 4" HP PL PG&E GAS LINE 2" Stl PG&E GAS LINE (Abn) GAS LINE 4" HP PL PG&E 3" HP PL PG&E GAS LINE (Abn) GAS LINE (Abn) 2" HP Stl PG&E GAS LINE 2" HP PL PG&E S1 C.O.B. SEWER CONSTRUCTION NOTES: SEWER MH ADJUST TO GRADE. A1 AT&T CONSTRUCTION NOTES: S1 A1 GRADE BY OTHERS. MANHOLE TO BE ADJUSTED TO A2 RELOCATE CABINET BY OTHERS. A3 A2 A3 FROMA2 TOTO FROMRELOCATE CABLE BY OTHERS. REVISION DATE DESCRIPTION 1 11/13/18 1 1 1 PG&E GAS REVISIONS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 "W B2" LI NE"EB2" LINE "OAK-1" LINE24TH StOAK StOAK St"OAK-2" LINEOLIVE StOAK St"OAK-1" LINE PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P P P PPOOLCONC ASPHPOOL CONCASPHP P PP P P P P POOLDENSE TREES POOLPOOLMYRTLE STBEECH STCONC CONCCONCCONCCONC CONC POOLUB UB 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 WWWWWWSEE SHEET U-4MATCH LINE "B" Sta 336+50R/W R/W R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET U-2U-3 UTILITY PLAN SCALE: 1" = 50' WATER LINE 12" CalW AC WATER LINE 8" CalW AC WATER LINE 8" CalW CI WATER LINE 8" CalW PVC WATER LINE 6" CalW PVC WATER LINE 4" CalW CI WATER LINE 4" CalW CI WATER LINE 4" CalW CI THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. NOTES: APPROVED FOR UTILITY INFORMATION ONLY 12kV PG&E ELECTRIC LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL)AT&T TELECOM LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 3" PG&E GAS LINE WATER LINE 4" CalW CI SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 10" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 8" VCP C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 10" VCP C.O.B. SEWER LINE 6" CONCRETE C.O.B. 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 4" PG&E GAS LINE 4" PG&E GAS LINE 3" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE C.O.B. SEWER MH 29 30 37 36 31 44A 45B 44 S1 CalW CONSTRUCTION NOTES: C1 C.O.B. SEWER CONSTRUCTION NOTES: SEWER MH ADJUST TO GRADE. C2 C4 S1 S1 S1 C3 S1 C4 C4 S1 C4 26 27 28 31B 31A 34 33A D4 D3 32 D2 35 39 D7 43 38 41 42 WATER LINE 8" CalW CI FIBER OPTIC LINE AT&T TRANSCONTINENTAL D5 207 209 210 208 212 AT&T FIBER OPTIC LINE 16" CASING WATER LINE 8" CalW PVC WATER LINE 8" CalW PVC 14" CASING WATER LINE 6" CalW PVC WATER LINE 6" CalW PVC WATER LINE 6" CalW CI 14" STEEL CASING WATER LINE 8" CalW PVC 226 GAS LINE (Abn 30') 2" HPL Stl PG&E GAS LINE (Abn 60') 2" HPL Stl PG&E GAS LINE (Abn 82') 2" HPL Stl PG&E WATER LINE 8"CalW CI C1 C1WATER LINE 8"CalW CI FROMTO WATER LINE 8"CalW PVC C2 WATER LINE 8"CalW PVC C2 C1 WATER LINE 4"CalW CI BY OTHERS TO BE RELOCATED BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) T OFRO M C3 WATER LINE 8"CalW PVC C2 WATER LINE (Abn) 6" CalW STEEL WATER LINE 6"CalW CI C1 WATER LINE 6"CalW DI C2 TO BE ABN BY OTHERS. TO BE INSTALLED BY OTHERS. C3 C4 RELOCATE FIRE HYDRANT BY OTHERS. VALVE COVER TO BE ADJUSTED TO GRADE BY OTHERS. C1 C2 6" CalW PVC & CL&C WATER LINE 6" CalW CL&C IN 14" Stl CASING WATER LINE 235 236 BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) LINE (Abn) 6" CalW Stl WATER LINE Stl WATER 12" CalW A4AT&T CONDUIT A2 A3 FROM TOFROM TOA4POLE AT&T A2 C.O.B. SEWER CONSTRUCTION NOTES: A3 A4 RELOCATE CABINET BY OTHERS. RELOCATE CABLE BY OTHERS. TO BE INSTALLED BY OTHERS. 16' 65' 81' REVISION DATE DESCRIPTION 1 11/13/18 PG&E GAS REVISIONS 1 1 1 AT&T1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St Carrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "EB2" LINE "WB2" LINE PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P PPP P PP P CONC POOLx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4WWWWWW SEE SHEET U-5MATCH LINE "24TH" Sta 347+50R/W R/W R/W R/WMATCH LINE "B" Sta 336+50SEE SHEET U-3U-4 UTILITY PLAN SCALE: 1" = 50' WATER LINE 4" CalW CI WATER LINE 4" CalW CI WATER LINE 6" CalW PVC WATER LINE 4" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW PVC NOTES: THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. APPROVED FOR UTILITY INFORMATION ONLY SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. SEWER LINE 6" CONCRETE C.O.B. AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 4" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 6" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE C.O.B. SEWER MH C.O.B. SEWER MH C.O.B. SEWER MH WATER LINE 6" CalW CI SEWER LINE 6" CONCRETE C.O.B.WATER LINE 6" CalW DIP WATER LINE 6" CalW DIP 47 46 49 48 52 55 56 CalW CONSTRUCTION NOTES: C1 C2 C4 C4 D8 D9 50 51 D12 56A D13 213 214 215 216 14" STEEL CASING WATER LINE 6" CalW PVC 14" STEEL CASING WATER LINE 6" CalW PVC 14" STEEL CASING WATER LINE 6" CalW C.L.&C. WATER LINE 6" CalW PVC WATER LINE 6" CalW PVC 14" STEEL CASING WATER LINE 6" CalW C.L.&C. 227 GAS LINE (Abn 120') 2" HPL Stl PG&E (Abn 14') GAS LINE 2" HPL Stl PG&E GAS LINE (Abn 47') 2" HPL Stl PG&E C4C4C4 C4 C1WATER LINE 6" CalW CI WATER LINE 6" CalW DI C2 TO BE ABN BY OTHERS. TO BE INSTALLED BY OTHERS. C4 VALVE COVER TO BE ADJUSTED TO GRADE BY OTHERS. C56" CalW PVC WATER LINE C2& DI WATER LINE 6.63" CalW CL&C C5 TO BE REMOVED BY OTHERS. 87' REVISION DATE DESCRIPTION 1 11/13/18 PG&E GAS REVISIONS 1 16' 1 57' 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC POOLCONC ASPHASPHPP P P P P P P P P PP P P P P POOL ASPHASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPH A S P H ASPH ASPHASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH CONC CONCASPH CONC CONC DRAKE STD STE ST23RD ST 23RD ST 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 WWWSEE SHEET U-6MATCH LINE "24TH" Sta 360+50SEE SHEET U-6MATCH LINE "23RD" Sta 358+50R /W R/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET U-4U-5 UTILITY PLAN SCALE: 1" = 50' WATER LINE 6" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW CI WATER LINE 1" CalW COPPER WATER LINE 3" CalW CI SAND TRAP 4" CalW STEEL WATER LINE 1" CalW COPPER WATER LINE 4" CalW CI WATER LINE 8" CalW CI WATER LINE 6" CalW CI WATER LINE 8" CalW STEEL WATER LINE 4" CalW CI WATER LINE 6" CalW CI NOTES: THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. APPROVED FOR UTILITY INFORMATION ONLY SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 8" C.O.B.SEWER LINE 12" C.O.B. SEWER LINE 12" C.O.B. AT&T TELECOM LINE 12kV PG&E ELECTRIC LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE AT&T FIBER OPTIC LINE JOINT OVERHEAD (AERIAL) AT&T FIBER OPTIC LINEAT&T FIBER OPTIC LINE AT&T TELECOM LINE AT&T FIBER OPTIC LINE JOINT TRENCH AT&T TELECOM LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 6" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 6" PG&E GAS LINE 2" PG&E GAS LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) SEWER LINE 6" C.O.B. GAS LINE 4" PG&E CalW CONSTRUCTION NOTES:C.O.B. SEWER CONSTRUCTION NOTES: S1 SEWER MH ADJUST TO GRADE.C2 C3 S1 S1 S1 S1 C3 C4 C4 S1 C4C4C4 S1 ELECTRIC LINE 12kV PG&E 59 64 66 68 67 OPTIC LINE BHN FIBER D18 D20 D21 77 75A 75 D17 65A57 D15 6" PG&E GAS LINE 60 62 73 74 70 70A SEWER LINE 8" C.O.B. WATER LINE 8" CalW CI GAS LINE 2" PG&E LINE IN 6" PIPE 2" PG&E GAS 217 218 219 SEWER LLINE 12" C.O.B. 228 LINE (Abn) 12" C.O.B. SEWER 6" STEEL CASING 6" CalW WATER LINE WATER LINE 6" CalW DI 221 C5 6" CalW DI WATER LINE C2 6.63" CalW CL&C WATER LINE C4 C5 TO BE INSTALLED BY OTHERS. RELOCATE FIRE HYDRANT BY OTHERS. VALVE COVER TO BE ADJUSTED TO GRADE BY OTHERS. TO BE REMOVED BY OTHERS. CL&C WATER LINE 6" CalW DI & GAS LINE 2" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E GAS LINE 2" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E REVISION DATE 1 11/13/18 DESCRIPTION PG&E GAS REVISIONS 1 1 1 LINE (Abn) 2" PG&E GAS 2 12/14/18 TEST HOLE REVISIONS 72 2 2 2 S2 RECONSTRUCT Exist SEWER. 10/01/213 As-Builts 3 S2 3 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH St 23RD St "24TH" LINE "2 3 RD" LI NEBAY StB StC StD StE StC StDRAKE StENCINA St ASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P PP P PP PPPP ASPH ASPH ASPHASPHCONC ASPH ASPH ASPHASPHASPH ASPHASPH FP ASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH P P P P P P P P P P P P PPP PPP P FPP P P P P ASPHASPH ASPH ASPHASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STG STF ST24TH ST 23RD ST 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SEE SHEET U-7MATCH LINE "24TH" Sta 374+50SEE SHEET U-7MATCH LINE "23RD" Sta 372+50R/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET U-5MATCH LINE "23RD" Sta 358+50SEE SHEET U-5U-6 UTILITY PLAN SCALE: 1" = 50' WATER LINE 8" CalW AC WATER LINE 6" CalW CI WATER LINE 4" CalW AC WATER LINE 4" CalW CI WATER LINE 4" CalW CI WATER LINE 8" CalW CI WATER LINE 3" CalW CI WATER LINE 6" CalW AC WATER LINE 6" CalW PVC WATER LINE 8" CalW CI WATER LINE 3" CalW CI WATER LINE 8" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW CI12kV PG&E ELECTRIC LINE THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. NOTES: APPROVED FOR UTILITY INFORMATION ONLY SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 12" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 20" C.O.B. SEWER LINE 12" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B.SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 16" C.O.B. SEWER LINE 12" C.O.B. AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) WATER LINE 6" CalW CI AT&T TELECOM LINE AT&T FIBER OPTIC LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE AT&T CONDUIT AT&T CONDUIT AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) WATER LINE 6" CalW AC AT&T TELECOM LINE AT&T FIBER OPTIC LINE PP 2" PG&E GAS LINE 2" PG&E GAS LINE 1-1/4" PG&E GAS LINE 6" PG&E GAS LINE 2" PG&E GAS LINE 6" PG&E GAS LINE 2" PG&E GAS LINE 6" PG&E GAS LINE 4" PG&E GAS LINE ELECTRIC LINE 12kV PG&E AT&T TELECOM LINE AT&T FIBER OPTIC LINE JOINT OVERHEAD (AERIAL) ELECTRIC LINE 12kV PG&E ELECTRIC LINE 12kV PG&E ELECTRIC LINE 12kV PG&E 2" PG&E GAS LINE SEWER LINE 6" C.O.B. GAS LINE 2" PG&E GAS LINE 6" PG&E AT&T CONSTRUCTION NOTES:C.O.B. SEWER CONSTRUCTION NOTES: S1 SEWER MH ADJUST TO GRADE.A1 C4 C4 C4 C4 C4 S1 S1 S1 S1 S1 82 S1 87 89 92 96 98 99 105B 105A 113 123 127 126 125 124 122 130B 128 86 85 95 94 112 110 117 118A 118 119 D23 D25 D26A D28 114 D30 115A 116A D32 121 109 D27 91 90 83 80 79A C4 AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) 104 111 108 129 105 OPTIC LINE AT&T FIBER SEWER LINE 12" C.O.B. Abn SEWER LINE 12" C.O.B. Abn 229 WATER LINE 6" CalW DI & CL&C WATER LINE 6" CalW DI & CL&C WATER LINE 6" CalW DI & CL&C WATER LINE 6" CalW DI & CL&C GAS LINE 2" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E GAS LINE 4" HPL Pl PG&E GAS LINE (Abn) 4" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E GAS LINE 2" HPL Pl PG&E GAS LINE 2" HPL Pl PG&E GAS LINE 4" HPL Pl PG&E GAS LINE (Abn) 4" HPL Pl PG&E LINE (Abn) 6" CalW CI WATER WATER LINE 8" CalW PVC & CL&C WATER LINE 6" CalW DI & CL&C PG&E GAS LINE (Abn) 2" HPL Pl IN 6" Stl CASING CalW CONSTRUCTION NOTES: C4 TO GRADE BY OTHERS. VALVE COVER TO BE ADJUSTED TO GRADE BY OTHERS. MANHOLE TO BE ADJUSTED A5 CONDUIT TO BE LOWERED BY OTHERS. A5 A1 A1 A1 A5 S1 AT&T CONDUIT A5 REVISION DATE 1 11/13/18 DESCRIPTION PG&E GAS REVISIONS 1 1 1 1 1 1 1 2 2 12/14/18 TEST HOLE REVISIONS S3 RECONSTRUCT MANHOLE TOP. 10/01/213 As-Builts 3 3 S3 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 3 3 3 3 24TH St 23RD St "24TH" LINE "23RD" LINEG StH StF StF StG StH StEYE StEYE St FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P PP PP P P P P P P P P FP FP FP FP ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONCASPH ASPH CONCASPH ASPH CONCASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH 24TH ST 23RD ST M STL STK STASPHCHESTER AV395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 18"18"18"18"1 8 "18"18"18"18"36"36"36"36" 36"36" 30" 18"18"18"(2) 4'x2' RCB 18"18"SEE SHEET U-8"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION R/W R/W R/W R/W R/W R/W R/W MATCH LINE "24TH" Sta 374+50SEE SHEET U-6MATCH LINE "23RD" Sta 372+50SEE SHEET U-6U-7 UTILITY PLAN SCALE: 1" = 50' WATER LINE 4" CalW CI WATER LINE 3" CalW CI WATER LINE 12" CalW CI WATER LINE 12" CalW CI WATER LINE 8" CalW CI WATER LINE 12" CalW CI WATER LINE 4" CalW CI WATER LINE 4" CalW AC WATER LINE 3" CalW CI WATER LINE 3" CalW CI WATER LINE 3" CalW CI WATER LINE 6" CalW AC WATER LINE 4" CalW AC WATER LINE 3" CalW CI WATER LINE 4" CalW AC WATER LINE 3" CalW CI WATER LINE 4" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW CI WATER LINE 4" CalW CI WATER LINE 4" CalW CI SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 8" C.O.B. SEWER LINE 12" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 8" C.O.B. AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T FIBER OPTIC LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T CONDUIT AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE AT&T FIBER OPTIC LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE AT&T TELECOM LINE AT&T TELECOM LINE AT&T FIBER OPTIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) VERIZON LINE LEVEL 3 COMM APPROVED FOR UTILITY INFORMATION ONLY 4" PG&E GAS LINE 4" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 4" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 1-1/4" PG&E GAS LINE 8" PG&E GAS LINE 2" PG&E GAS LINE 2" PG&E GAS LINE 6" PG&E GAS LINE 6" PG&E GAS LINE ADJUST TO GRADE TELECOM MH OPTIC LINE BHN FIBER OPTIC LINE BHN FIBER OPTIC LINE BHN FIBER AT&T CONDUIT GAS LINE 6" PG&E AT&T CONDUIT AT&T CONDUIT AT&T CONDUIT TIME WARNER LINE FIBER OPTIC LINE LEVEL 3 COMMUNICATIONS JOINT TRENCH TIME WARNER LINE FIBER OPTIC LINE LEVEL 3 COMMUNICATIONS JOINT TRENCH SEWER LINE 10" C.O.B. GAS LINE 1-1/4" PG&E C4 C4 C4 S1 C4 S1 S1 S1 TO GRADE ADJUST TELECOM MH S1 S1 S1 S1 S1 132A 157 158 160 169 130 131 132 130A 134 136 140 138 142 144B 144A 143 R/W SEWER LINE 6" C.O.B. D39 156 D40 D43 D44 D45 167 D46 D48 D49 151 153 D34 133A 133 137 135 D43A D37 D38A 145 D38 148 149 150 D39A 141 155 161 144 6" VERIZON LINE 2" PG&E GAS LINE 224 227 228 S1 SEWER LINE Abn 12" C.O.B. SEWER LINE 12" C.O.B. 230 LINE (Abn) 6" CalW CI WATER WATER LINE 8" CalW PVC & CL&C LINE (Abn) 12" CalW CI WATER WATER LINE 12" CalW DI LINE (Abn) 6" CalW CI WATER WATER LINE 6" CalW PVC LINE (Abn) 4" CalW CI WATER WATER LINE 6" CalW DI WATER LINE 6" CalW DI GAS LINE 2" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E GAS LINE (Abn) 2" HPL Pl PG&E PG&E GAS LINE 2" HPL Pl GAS LINE (Abn) 1‚" Pl PG&E GAS LINE 1‚" Pl PG&E 231 233 AT&T CONSTRUCTION NOTES:C.O.B. SEWER CONSTRUCTION NOTES: S1 SEWER MH ADJUST TO GRADE.A1 TO GRADE BY OTHERS. MANHOLE TO BE ADJUSTED A5 CONDUIT TO BE LOWERED BY OTHERS. CalW CONSTRUCTION NOTES: C4 TO GRADE BY OTHERS. VALVE COVER TO BE ADJUSTED A5 A1 A1 AT&T CONDUIT A5 AT&T CONDUIT 1 REVISION DATE 1 11/13/18 DESCRIPTION PG&E GAS REVISIONS 1 1 2 2 12/14/18 TEST HOLE REVISIONS S5 S6 CAP Exist. MANHOLE. CONSTRUCT C.O.B. MANHOLE IN ALLEY. S6 S5 3 3 3 3 10/01/21 As-Builts CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 S4 S7 S9 S8 S4 S4 S7 S9 3 3 NOTES: THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING AT FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. NATIVE AROUND LINE WITH 6' SLURRY. OVER LIVE PG&E LINE. 6' UNDISTURBED PROTECT IN PLACE. 2-SACK SLURRY CAP TIE INTO Exist MANHOLE. Exist 12" SEWER. REMOVE AND REPLACE Approx. 60 LF OF APPROVED COUPLING CONNECT S8 24TH St 23RD St L StK StK StL StM StM StCHESTER AveCHESTER Ave"24TH" LINE "23RD" LINE P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH STN STQ STASPH400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 R /W R / W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET U-7U-8 UTILITY PLAN SCALE: 1" = 50' WATER LINE 3" CalW CI WATER LINE 6" CalW CI WATER LINE 6" CalW AC WATER LINE 8" CalW CI WATER LINE 2" CalW CI WATER LINE 4" CalW AC WATER LINE 4" CalW AC WATER LINE 3" CalW Unk MATERIAL WATER LINE 6" CalW AC WATER LINE 6" CalW CI WATER LINE 6" CalW AC IN 14" STEEL CONDUIT WATER LINE 10" CalW STEEL WATER LINE 6" CalW CI WATER LINE 6" CalW AC WATER LINE 8" CalW CI NOTES: APPROVED FOR UTILITY INFORMATION ONLY SEWER LINE 15" C.O.B. SEWER LINE 6" C.O.B. SEWER LINE 6" C.O.B. AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) VERIZON LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) VERIZON LINE 12kV PG&E ELECTRIC LINE BHN FIBER OPTIC LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T TELECOM LINE AT&T TELECOM LINE BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) BHN FIBER OPTIC LINE 12kV PG&E ELECTRIC LINE JOINT OVERHEAD (AERIAL) AT&T FIBER OPTIC LINE AT&T TELECOM LINE 12kV PG&E ELECTRIC LINE PP 6" PG&E GAS LINE 8" PG&E GAS LINE 8" PG&E GAS LINE 2" PG&E GAS LINE2" PG&E GAS LINE 2" PG&E GAS LINE ELECTRIC LINE 12kV PG&E ELECTRIC LINE 12kV PG&E ELECTRIC LINE 12kV PG&E WATER LINE 3" CalW CI BHN FIBER OPTIC LINE GAS LINE 1-1/4" PG&E 174 173 175 C.O.B. SEWER CONSTRUCTION NOTES: S1 SEWER MH ADJUST TO GRADE. AT THE DISTRICT OFFICE. CONTACT RIGHT OF WAY ENGINEERING FOR ACCURATE RIGHT OF WAY DATA, 2. PRIOR TO CONSTRUCTION. SHALL BE VERIFIED BY THE CONTRACTOR ON THESE PLANS ARE APPROXIMATE AND LOCATION OF UTILITY FACILITIES SHOWN1. S1 D53 D51A D54 D52 D51 172 SEWER LINE 12" C.O.B. 231 GAS LINE 1‚" Pl PG&E GAS LINE (Abn) 1‚" Pl PG&E WATER LINE 6" CalW DI REVISION DATE 1 11/13/18 DESCRIPTION PG&E GAS REVISIONS 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 WB ROUTE 178 EB ROUTE 178"W 178" L IN E"E178" LINE N StO StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>14:5717-DEC-2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>ADELACRUZ DGN FILE =>06xxxxxxxxka009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 U-9 UTILITY PLAN OWNERSHEET No.No. POSITIVE LOCATION INFORMATION LOCATION ELEVATION METHOD OWNERSHEET No.No. POSITIVE LOCATION INFORMATION LOCATION ELEVATION METHOD NO SCALE U-1 U-2 U-3 U-4 D3 D21 U-5 U-6 96 87 98 24.00' Rt "23RD" 357+25.13 24.68' Lt "23RD" 362+07.82 20.70' Lt "23RD" 364+40.87 24.76' Lt "23RD" 365+56.51 D5 6.07' Rt "WB2" 329+91.93 NOTE: 1. ELEVATIONS SHOWN REFER TO THE TOP OF THE PIPE OR CONDUIT, UNLESS OTHERWISE STATED. AT&T CalW AT&T PG&E VERIZON/BHN CalW IRRIGATION AT&T BHN PG&E CalW AT&T CalW PG&E AT&T AT&T PG&E CalW AT&T CalW PG&E PG&E PG&E CalW PG&E CalW CalW PG&E CalW PG&E CalW PG&E CalW CalW CalW CalW PG&E C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER CalW CalW PG&E PG&E CalW CalW PG&E CalW PG&E CalW C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP 407.38 405.47 401.49 401.14 401.27 397.71 403.51 395.51 402.11 400.40 398.94 400.13 399.79 401.47 401.45 400.90 402.28 398.12 403.23 402.72 397.00 400.86 400.98 401.66 398.26 401.26 398.99 397.86 398.45 397.74 398.13 397.98 397.62 397.74 396.95 396.82 397.46 397.79 396.53 397.55 397.16 396.22 396.54 396.94 398.11 398.22 397.99 397.90 397.05 397.85 397.77 397.23 397.17 396.75 395.51 397.52 397.06 397.87 71.05' Lt "WB2" 317+20.52 71.51' Lt "WB2" 313+85.74 57.99' Lt "WB2" 314+28.39 196.72' Rt "WB2" 318+41.74 191.15' Rt "WB2" 318+58.94 224.61' Rt "WB2" 317+90.67 43.50' Lt "WB2" 316+41.18 85.97' Lt "WB2" 317+28.52 51.59' Lt "WB2" 319+29.25 52.60' Lt "WB2" 319+29.37 71.43' Lt "WB2" 319+69.56 71.68' Lt "WB2" 321+87.16 69.88' Lt "WB2" 321+87.33 86.10 Lt "WB2" 321+67.32 68.91 Lt "WB2" 323+67.87 50.93' Lt "WB2" 324+64.25 50.01' Lt "WB2" 324+64.22 55.85' Lt "WB2" 324+98.42 54.87' Lt "WB2" 324+98.23 69.45' Lt "B" 331+98.63 34.06 Lt "WB2" 325+66.83 38.12 Lt "WB2" 325+67.74 31.67 Lt "WB2" 326+07.59 37.79 Rt "WB2" 326+20.39 25.74 Rt "WB2" 326+21.58 20.41 Lt "WB2" 327+86.63 135.28' Lt "WB2" 328+91.47 121.69' Lt "WB2" 328+28.42 54.91 Rt "WB2" 329+92.15 58.28 Rt "WB2" 330+36.96 48.60 Rt "B2" 333+12.51 51.83 Rt "B2" 333+13.15 52.25 Rt "B2" 334+82.47 40.04 Lt "B" 334+83.47 87.23' "B" 334+83.45 101.21' Lt "B" 335+08.56 145.92 Lt "WB2" 326+44.72 23.85 Lt "WB2" 326+31.85 23.85 Lt "WB2" 326+31.85 81.75 Rt "WB2" 326+31.16 89.44 Rt "B2" 333+25.03 36.60' Lt "B" 338+29.88 68.26' Lt "B" 338+29.89 68.95' Lt "B" 338+57.04 38.30' Lt "B" 338+56.79 84.70' Lt "B" 341+77.03 51.39' Rt "B2" 341+69.33 78.37' Lt "B" 342+02.23 75.01' Lt "B" 345+23.23 84.96' Lt "B" 345+49.82 51.68' Rt "B2" 345+25.63 89.21 Rt "B2" 336+72.23 90.96 Rt "B2" 340+18.93 96.25 Rt "B2" 343+64.61 64.51 Rt "23RD" 343+90.19 19B 16 17 14A 14B 14C 19A 19C 20 21 22 23 24 25 26 27 28 29 30 31 31A 31B 32 33A 34 35 36 37 38 39 41 42 43 44 44A 45B D2 D4 D7 46 47 48 49 50 51 52 55 56 56A D8 D9 D12 D13 PG&E CalW CalW CalW PG&E PG&E PG&E C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER CalW PG&E PG&E PG&E PG&E CalW CalW UNKNOWN PG&E CalW PG&E AT&T PG&E CalW AT&T CalW CalW PG&E PG&E AT&T AT&T AT&T PG&E PG&E CalW CalW CalW CalW AT&T AT&T PG&E PG&E PG&E PG&E PG&E AT&T AT&T PG&E AT&T TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP MANHOLE DIP TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE 395.77 397.74 397.91 396.80 396.39 397.81 397.54 397.77 398.02 397.19 394.61 396.72 396.69 396.68 397.33 397.71 398.13 399.31 398.47 396.59 396.50 396.45 398.68 398.05 396.26 400.48 399.58 394.23 396.55 398.13 398.52 401.31 399.29 394.93 399.44 400.22 399.84 397.28 399.67 398.40 397.35 398.13 398.01 400.61 399.06 399.13 399.81 395.21 398.25 398.78 397.34 398.82 197.29 Lt "23RD" 347+61.42 52.42' Rt "24TH" 355+54.98 76.23' Lt "24TH" 355+56.32 19.30' Rt "24TH" 356+26.90 22.16' Lt "23RD" 353+92.01 21.99 Lt "24TH" 358+02.77 21.05' Lt "24TH" 359+81.58 105.94' Lt "23RD" 349+81.28 171.98' Lt "24TH" 355+64.59 41.85' Lt "23RD" 355+21.03 26.53' Rt "23RD" 357+21.17 19.26' Lt "24TH" 360+95.18 19.97' Lt "24TH" 361+04.68 22.96' Lt "23RD" 358+71.06 21.48' Lt "24TH" 361+44.59 22.49' Lt "24TH" 363+42.63 19.53' Rt "24TH" 363+31.34 24.48' Lt "23RD" 362+16.89 19.99' Lt "24TH" 364+40.20 19.53 Lt "24TH" 364+48.40 20.62' Lt "23RD" 363+20.50 21.07 Lt "24TH" 366+86.11 19.77 Rt "24TH" 366+79.02 24.64' Lt "23RD" 365+62.12 20.80 Lt "24TH" 369+15.37 20.97' Lt "23RD" 366+66.14 22.82' Lt "23RD" 366+60.71 21.96' Lt "23RD" 367+73.63 21.55 Lt "24TH" 371+24.35 21.49' Lt "24TH" 371+33.66 23.24' Lt "24TH" 371+34.14 24.76' Rt "24TH" 371+05.69 23.61' Lt "23RD" 369+00.27 34.51' Rt "23RD" 368+97.18 19.87' Lt "23RD" 369+72.62 19.30' Lt "23RD" 369+79.85 21.09' Lt "24TH" 372+69.11 21.57' Lt "24TH" 373+37.60 18.81' Lt "24TH" 373+31.05 17.81' Lt "24TH" 373+72.15 22.83' Lt "23RD" 370+99.00 20.27' Lt "23RD" 370+98.41 17.44' Lt "23RD" 370+98.45 41.80' Rt "23RD" 370+99.66 42.37' Rt "23RD" 370+97.94 65A 66 67 68 70A 75 77 D15 D17 D18 D20 79A 80 82 83 85 86 89 90 91 92 94 95 99 104 105 105B 108 109 110 111 112 113 114 115A 116A 117 118 118A 119 122 123 124 125 126 403.42 TEST HOLE AT&T23049.56' Rt "EB2" 316+43.19 CalW PG&E PG&E PG&E UNKNOWN TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE 396.54 398.61 398.49 394.36 398.26 11.94 Rt "23RD" 345+28.47 118.12 Lt "23RD" 345+50.55 22.26' Rt "23RD" 347+93.41 88.94' Lt "23RD" 349+37.33 82.58' Lt "23RD" 349+45.77 57 59 60 62 64 CalW PG&E CalW AT&T TEST HOLE TEST HOLE TEST HOLE TEST HOLE TEST HOLE 402.31 401.80 401.50 402.75 397.4052.20' Lt "B" 333+35.68 207 208 209 210 212 53.79' Rt "EB2" 324+23.00 58.79' Rt "EB2" 324+36.37 61.18' Rt "EB2" 324+50.42 71.47' Rt "EB2" 324+94.19 C.O.B. SEWER TEST HOLE TEST HOLE TEST HOLE TEST HOLE 397.56 397.34 397.84 398.13 17.75' Lt "B" 336+71.88 17.24' Lt "B" 340+18.74 69.69' Lt "B" 343+65.00 213 214 215 216 5.85' Lt "24TH" 347+01.47 C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER C.O.B. SEWER CalW PG&E CalW PG&E TEST HOLE TEST HOLE TEST HOLE TEST HOLE 397.95 397.21 398.11 397.24 75.39' Rt "23RD" 345+74.30 56.80' Rt "23RD" 346+20.46 49.24' Rt "23RD" 347+74.83 55.49' Lt "24TH" 352+08.41 217 218 219 221 232 235 398.41 TEST HOLE 236 396.83 TEST HOLE 113.30' Lt "WB2" 328+22.59 CalW 56.47' Lt "WB2" 331+81.88 CalW 74 23.42' Lt "23RD" 355+11.19 395.49 TEST HOLE PG&E REVISION DATE DESCRIPTION 1 12/14/18 TEST HOLE REVISIONS 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 CONSTRUCTION AREA SIGN - ONE POST CONSTRUCTION AREA SIGN - TWO POST CONSTRUCTION AREA SIGN NUMBER LOCATIONS FOR CONSTRUCTION AREA SIGNS ARE APPROXIMATE. EXACT LOCATIONS TO BE DETERMINED BY THE ENGINEER. FOR ADDITIONAL CONSTRUCTION AREA SIGNS AND DETAILS SEE STAGE CONSTRUCTION AND TRAFFIC HANDLING PLAN AND MOTORIST INFORMATION PLAN. PORTABLE CHANGEABLE MESSAGE SIGNS SHALL BE PLACED AND MOVED TO PROVIDE UPDATED TRAFFIC CONTROL AND/OR ALERT MESSAGES AS NEEDED AND AS DIRECTED BY THE ENGINEER. 1. 2. 3. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:25:23 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxla001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 FresnoTo AngelesTo Los IsabellaTo Lake To Buttonwillow APPROVED FOR CONSTRUCTION AREA SIGN WORK ONLY CS-1 NO SCALE CONSTRUCTION AREA SIGNSKern Riv e r Carrier CanalBAKERSFIELD 2 4 TH St OAK StELM StBEECH St178ROUTE MYRTLE StCEDAR StALDER StBAY StA StB StC StDRAKE StD StE StENCINA StF StG StH StEYE StK StL StM StN StO StROUTE 178BUCK OWENS BlvdSPRUCE StPINE StCHESTER Ave24TH St 24TH St 23RD St AA C B B B B B B B B B B B B AA B B AA B B AA B B B B B E D C B B B B B B AA B B AA B B AA B B B B W20-1 x ROAD WORK AHEAD 1 4" x 6" G20-2 x END ROAD WORK 1 4" x 4" C40 x TRAFFIC FINES DOUBLED IN 2 6" x 8" x 1 4" x 6" No. SIGN FEDERAL CALIFORNIA SIGN MESSAGE AND SIZE No. OF POSTS - SIGN CODE STATIONARY MOUNTED CONSTRUCTION AREA SIGNS SIZE PANEL A C40 x108"CONSTRUCTION ZONES TRAFFIC FINES DOUBLED IN 6" x 6"2 W20-1 CONSTRUCTION ZONES 36"36" 18" 60" 48" 36" 144" 48" 42" NOTES: LEGEND: WORK ZONE CONSTRUCTION AREA SIGN - ONE POST A - - - - 9 37 3 1 1 P StC StQ StROAD WORK AHEAD No. OF SIGNSOLIVE StRIVERSIDE Dr ROUTE 99A B A B C C D E B 234 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:30 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-1 MOTORIST INFORMATION PLAN No. SIGN FEDERAL CALIFORNIA SIGN MESSAGE AND SIZE No. OF POSTS W20-2 x "DETOUR AHEAD 1 -4" x 6"" SIGN CODE STATIONARY MOUNTED CONSTRUCTION AREA SIGNS SIZE PANEL 30" x 12" Spec 3 BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE APPROVED FOR MOTORIST INFORMATION WORK ONLY Spec 1 USE BAY ST ACCESS CLOSED ALDER/CEDAR/PINE/SPRUCE BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE 78" x 42" Spec 2 BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE 78" x 42" USE BEECH St ACCESS CLOSED SPRUCE/PINE/CEDAR/ALDER 18" x 12" Spec 4 BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE Spec 5 Q St STATE Ave GOLDEN BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE 36" x 24" BARRICADE ON TYPE III SIGNS MOUNTED EA 24th St AA 48 48 M4-8a 24 x 18"END DETOUR 1 -4" x 4""AB SC3-1 48 x 18"UP ARROW DETOUR 1 -4" x 4" M4-10R 48 x 18" RIGHT ARROW DETOUR 1 -4" x 4" M4-10L 48 x 18"LEFT ARROW DETOUR 1 -4" x 4" " " " A1 A2 A3 SC3-1 48 x 18"UP ARROW DETOUR 1 -4" x 6" 30 x 12"24th St M4-10R 48 x 18" RIGHT ARROW DETOUR 1 -4" x 6" 30 x 12"24th St M4-10L 48 x 18"LEFT ARROW DETOUR 1 -4" x 6" 30 x 12"24th St " " " " " " C1 C2 C3 Spec 3 Spec 3 Spec 3 SC3-1 48 x 18" 1 -x 12" " "D1 Spec 4 18 Q St Spec 5 x ""36 24 GOLDEN STATE Ave 6" x 6" 48 x 18" 1 -x 12" " "D2 Spec 4 18 Q St Spec 5 x ""36 24 GOLDEN STATE Ave 6" x 6" 48 x 18" 1 -x 12" " "D3 Spec 4 18 Q St Spec 5 x ""36 24 GOLDEN STATE Ave 6" x 6" 48 x"18" M4-10L 48 x 18""LEFT ARROW DETOUR UP ARROW DETOUR RIGHT ARROW DETOURM4-10R W20-3 36 x 36"ROAD CLOSED 500FT 1 -4" x 6""E1 R11-4 60 x 30"ROAD CLOSED TO THRU TRAFFIC M4-10R 48 x 18" RIGHT ARROW DETOUR " " E2 ALDER/CEDAR/PINE/SPRUCE SPRUCE/PINE/CEDAR/ALDER 78 x 42"ACCESS CLOSED 2 -4" x 6" 78 x 42"ACCESS CLOSED 2 -4" x 6" " " USE BAY ST USE BEECH ST B1 B2 Spec 1 Spec 2 1 9 16 8 6 2 2 2 3 SIGNS No. OF x "1 -"AC 1SC6-4 48 60 RAMP CLOSED (MORE THAN ONE DAY)6" x 6" B3 x ""32 12 2Spec 6 MYRTLE St PANEL ONLY MYRTLE St Spec 6 BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE 30" x 12" E4 x" 48 x 18"" 6E5 E6 36 36x"" R11-2 48 30"ROAD CLOSED 12 R6-1 48 x 18"" RIGHT ARROW DETOUR ONE WAY R3-2 NO LEFT TURN 12 36 M4-10R 42 48 "18x" "x " 7 R3-2 SC3-1 36 36 UP ARROW DETOUR E8 NO LEFT TURN R3-1 48 "18x" "x "36 36 UP ARROW DETOUR 5 SC3-1 E7 9 NO RIGHT TURN F1 36 36x""4" x 6"-1 4W9-3R F2 36 36x""4" x 6"-1 2W4-2R LANE ENDS F3 36 36x""4" x 6"-1 3W12-1 F4 36 36x""4" x 6"-1 1 F5 x" F6 36 36x""4" x 6"-1 2W4-2R LANE ENDSF7 x""4" x 6"-1 2R3-7R DOUBLE ARROW W3-3 CENTER LANE CLOSED AHEAD C30 30 "30 LANE CLOSED 30 30 RIGHT LANE MUST TURN RIGHT 7 3 2 235 G1 x"30 "30 15R9-9 SIDEWALK CLOSED G2 x"48 "24 5R9-10 SIDEWALK CLOSED USE OTHER SIDE G3 x"48 "36 20R9-11 SIDEWALK CLOSED AHEAD CROSS HERE G4 x"18 "18 5 R9-3a x"18 "12R9-3b NO PEDESTRIAN CROSSING USE CROSSWALK LANE ENDS MERGE RIGHT 2 24" x 12" Spec 7 BLACK/ORANGE 6"-B LOWER CASE 6"-B UPPER CASE OAK St E3 H1 H2 M4-10L Spec 7 M4-10L Spec 7 M4-10R 6 R6-1 M3-3 M3-1 x"24 "12 x"24 "12 x"48 "18 x"24 "12 x"24 "12 x"" x""48 18 x"48 "18 48 18 LEFT ARROW DETOUR ONE WAY RIGHT ARROW DETOUR SOUTH OAK St LEFT ARROW DETOUR NORTH OAK St 6" x 6"-1 1 -6" x 6"1 1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:30 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-2 MOTORIST INFORMATION PLAN E2 E4 DETAIL A APPROVED FOR MOTORIST INFORMATION WORK ONLY A2 A3 DETOUR PLAN No. 1A A3 A1 E5 DETOUR PLAN No. 1B . . . . A3 A3 DETOUR PLAN No. 1C A2 DETOUR PLAN No. 2A A3 A1 DETOUR PLAN No. 2B A3 DETOUR PLAN No. 2C A3 DETAIL A SEE A2 . . . . A2 E5 DETAIL B E2 E4 A2 DETAIL B SEE STAGE 1 AND 2 DAYTIME AND NIGHTIME EAST ON 22ND St SOUTH ON NEXT STREET EAST ON 23RD St . . . EB 23RD St TO NB STREET WEST ON 24TH St NORTH ON NEXT STREET CONTINUE EAST ON 23RD St . . . WEST ON 24TH St NORTH ON NEXT STREET EAST ON 23RD St NORTH ON STREET SB STREET TO EB 23RD St EAST ON 23RD St SOUTH ON NEXT STREET WEST ON 24TH St SOUTH ON STREET . . . . SB STREET TO WB 22ND St WEST ON 22ND St SOUTH ON NEXT STREET EAST ON 23RD St SOUTH ON STREET . . . . NB STREET TO EB 23RD St EAST ON 23RD St NORTH ON NEXT STREET WEST ON 22ND St NORTH ON STREET E8 TYPE III BARRICADE CONSTRUCTION AREA SIGN - ONE POST LEGEND: LIMITS OF FULL CLOSURE DIRECTION OF TRAFFIC, SIGNED DETOUR ROUTE GENERAL NOTES: E7 NOTES ON THIS SHEET: CONSTRUCTION AREA SIGNS SHALL BE COVERED WHEN NOT IN USE. DIRECTED BY THE ENGINEER. REMOVE OR COVER ALL CONFLICTING EXISTING SIGNS AS AND TRAFFIC HANDLING PLANS. CONSTRUCTION AREA SIGNS AND STAGE CONSTRUCTION FOR ADDITIONAL CONSTRUCTION AREA SIGNS AND DETAILS, SEE LOCATIONS WILL BE DETERMINED BY THE ENGINEER. MOTORIST INFORMATION SHEETS ARE APPROXIMATE ONLY. EXACT LOCATIONS OF CONSTRUCTION AREA SIGNS AND PCMS SHOWN ON 4. 3. 2. 1. 23RD St CLOSED INTERSECTION WITH NORTH SIDE OF 23RD St CLOSED INTERSECTION WITH SOUTH SIDE OF E3 LANES. BARRICADES SHALL BE TYPE I, II OR III. MINUMIUM OF THREE BARRICADER PER LANE SHALL BE USED TO CLOSE THE DETOUR PLAN. THE LIST OF STREETS ABOVE ARE REFERRED TO AS "STREET" ON F St, G St, H St, EYE St, CHESTER Ave, K St, L St AND M St. THE DETOUR PLAN IS TYPICAL FOR THE FOLLOWING STREETS: D St, E St, CONTRACTOR TO ALTERNATE INTERSECTION CLOSURES ON 23RD ST. 3. 2. 1. FLASHING ARROW SIGN #SIGN NUMBER (SEE SHEET MI-1) TRAFFIC CONE NB STREET TO WB 24TH St EB 23RD St TO SB STREET 236 23RD ST 24TH ST 22ND ST 23RD ST 24TH ST 22ND ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:31 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MOTORIST INFORMATION PLAN APPROVED FOR MOTORIST INFORMATION WORK ONLY NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. A1 A1 A1 CLOSED INTERSECTION WITH 24TH St OAK St SOUTH SIDE OF MI-3 STAGE 2 DAYTIME A2 A3 SB OAK St TO OAK St NB OAK St TO OAK St WEST ON 21ST St SOUTH ON F St EAST ON 24TH St . . . WEST ON 21ST St SOUTH ON F St EAST ON 24TH St . . . DETOUR PLAN No. 3A DETOUR PLAN No. 3B DETOUR PLAN No. 3C A3 WEST ON 24TH St NORTH ON F St CONTINUE EAST ON 23RD St EAST ON 24TH St . . . . 237 EB 24TH St TO SB OAK St A1 A2 H2 H1 OAK STELM STBEECH STMYRTLE STSPRUCE STPINE STCEDAR STA STB ST22ND ST 23RD ST 24TH STLA W N STBAY STALDER STCEDAR STPI NE STSPRUCE STOLIVE STAUDUBON DRELM STASP E N S T BEECH STMYRTLE ST21ST ST C STD STE STF ST24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:31 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-4 MOTORIST INFORMATION PLAN DETOUR PLAN No. 5 . . . C3 AA C1 C1 C2 C2 AA C2 AA C2 AA C3 C1 C1 B1 B2 E2 E1 E3 E1 DETAIL A DETAIL B DETAIL B SEE DETAIL B SEE DETAIL B SEE DETAIL A SEE SOUTH ON BAY St EAST ON ASPEN St SOUTH ON ALDER St SB ALDER St TO 24TH St DETOUR PLAN No. 7 A3 B2 A2 APPROVED FOR MOTORIST INFORMATION WORK ONLY WITH 24TH St CLOSED AND ALDER St INTERSECTIONS SPRUCE St, PINE St, CEDAR St WB 24TH St TO ALDER St/ SPRUCE St/PINE St/CEDAR St C2 WEST ON ASPEN St NORTH ON BAY St WEST ON 24TH St . . . B3SEE NOTE 2 DETOUR PLAN No. 4B EB 24TH St TO ALDER St/ SPRUCE St/PINE St/CEDAR St EAST ON ASPEN St NORTH ON BEECH St NORTH ON MYRTLE St EAST ON 24TH St . . . . STAGE 2 DAY TIME NOTES: BEECH St AND MYRTLE St INTERSECTIONS. ALTERNATE FULL WEEKEND CLOSURE OF FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. 2. 1. DETOUR PLAN No. 6 . . . SOUTH ON BEECH St WEST ON LAWN St SOUTH ON SPRUCE St/PINE St/CEDAR St DETOUR PLAN No. 4A EB 24TH St TO ALDER St/ SPRUCE St/PINE St/CEDAR St EAST ON ASPEN St NORTH ON BEECH St EAST ON 24TH St . . . SB SPRUCE St/PINE St/CEDAR St TO 24TH St 238 B2 B3 B1 SEE NOTE 2 A1 OAK STELM STBEECH STMYRTLE STSPRUCE STPINE STCEDAR STA STB ST22ND ST 23RD ST 24TH STLAW N STBAY STALDER STCEDAR STPI NE STSPRUCE STOLIVE STAUDUBON DRELM STASP E N S T BEECH STMYRTLE ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:32 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-5 MOTORIST INFORMATION PLAN NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. APPROVED FOR MOTORIST INFORMATION WORK ONLY DAOR EGATNORF tS HT42 871 ETUOR D2 D3 D3 D1AAAC DETOUR PLAN No. 8 EAST ON 23RD St FRONTAGE ROAD NORTH ON O St EAST ON 22ND St SOUTH ON M St EAST ON 23RD St . . . . . OFF-RAMP CLOSED 23RD St FRONTAGE ROAD D1 AB EB 23RD St TO 23RD St FRONTAGE ROAD STAGE 2 NIGHT TIME 239 24TH St 23RD St M StL St22ND St N StO StP StQ St23RD St 24TH StGOLDEN STATE Av e 23RD St FRONTAGE ROADN St25TH StO StP St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:33 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-6 MOTORIST INFORMATION PLAN E2 E4 DETAIL A APPROVED FOR MOTORIST INFORMATION WORK ONLY A3 A3 A1 . . . . A3 A2 DETAIL A SEE . . . . A3 E3 DETAIL B E2 E4 E5 DETAIL B SEE WB 24TH St TO EB 23RD St STAGE 3 AND 4 DAYTIME AND NIGHTIME EAST ON 23RD St SOUTH ON NEXT STREET WEST ON 24TH St . . . WB 24TH St TO NB STREET EAST ON 25TH St NORTH ON NEXT STREET CONTINUE WEST ON 24TH St . . . SB STREET TO WB 24TH St WEST ON 24TH St SOUTH ON NEXT STREET EAST ON 25TH St SOUTH ON STREET . . . . SB STREET TO EB 23RD St EAST ON 23RD St SOUTH ON NEXT STREET WEST ON 24TH St SOUTH ON STREET . . . . NB STREET TO WB 24TH St WEST ON 24TH St NORTH ON NEXT STREET EAST ON 23RD St NORTH ON STREET E7 E8 NOTES: A2 A2 A3 A3 A1 A2 A3 A1 NB STREET TO NB STREET DETOUR PLAN No. 10A DETOUR PLAN No. 10B DETOUR PLAN No. 10C A3 DETOUR PLAN No. 9A DETOUR PLAN No. 9B DETOUR PLAN No. 9C A2 LANES. BARRICADES SHALL BE TYPE I, II OR III. MINUMIUM OF THREE BARRICADER PER LANE SHALL BE USED TO CLOSE THE DETOUR PLAN. THE LIST OF STREETS ABOVE ARE REFERRED TO AS "STREET" ON F St, G St, H St, EYE St, CHESTER Ave, K St, L St AND M St. THE DETOUR PLAN IS TYPICAL FOR THE FOLLOWING STREETS: D St, E St, CONTRACTOR TO ALTERNATE INTERSECTION CLOSURES ON 23RD ST. 3. 2. 1. 24TH St CLOSED INTERSECTION WITH NORTH SIDE OF 24TH St CLOSED INTERSECTION WITH SOUTH SIDE OF EAST ON 25TH St NORTH ON NEXT STREET WEST ON 24TH St NORTH ONSTREET 240 23RD ST 24TH ST 25TH ST 23RD ST 24TH ST 25TH ST 22ND ST 22ND ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:33 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MOTORIST INFORMATION PLAN APPROVED FOR MOTORIST INFORMATION WORK ONLY NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. A1 DETAIL A E5 E6 E5 E6 DETOUR PLAN No. 11A A3 A1A1 CLOSED INTERSECTION WITH 24TH St OAK St CENTER OF DETAIL A SEE STAGE 3 DAYTIME MI-7 A2 A1 A1 A3 DETOUR PLAN No. 11B NB OAK St TO WB 24TH St WEST ON 24TH St NORTH ON F St EAST ON 24TH St NORTH ON OAK St . . . . EB 24TH St TO NB OAK St . . . . E8 E8 2. SIGNS SHOWN ARE IN ADDITION TO SIGNS SHOWN ON MI-8. NORTH ON OAK St WEST ON 24TH St NORTH ON F St CONTINUE EAST ON 24TH St 241 OAK STELM STBEECH STMYRTLE STSPRUCE STPINE STCEDAR STA STB ST22ND ST 23RD ST 24TH STLA W N STBAY STALDER STCEDAR STPI NE STSPRUCE STOLIVE STAUDUBON DRELM STASP E N S T BEECH STMYRTLE ST21ST ST C STD STE STF ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:34 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MOTORIST INFORMATION PLAN APPROVED FOR MOTORIST INFORMATION WORK ONLY NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. CLOSED INTERSECTION WITH 24TH St OAK St CENTER OF A2 SB OAK St TO OAK St DETOUR PLAN No. 11C A1 A2 A2 A1 . . . . . DETAIL A SEE STAGE 3 DAYTIME MI-8 A3 NORTH ON OAK St EAST ON CALIFORNIA Ave EXIT CALIFORNIA Ave SOUTH ON ROUTE 99 WEST ON 24TH St DETOUR PLAN No. 11D . . . . . WB 24TH St TO SB OAK St NORTH ON OAK St EAST ON CALIFORNIA Ave EXIT CALIFORNIA Ave SOUTH ON ROUTE 99 CONTINUE WEST ON 24TH St 2. SIGNS SHOWN ARE IN ADDITION TO SIGNS SHOWN ON MI-7. DETAIL A E5 E6 E5 E6 E8 E8 242 AB OAK STELM STBEECH ST24TH STOLIVE STELM STMYRTLE ST17TH STGIBSON STGIBSON STROSEDALE HWY 18TH ST 19TH ST 20TH ST 21ST ST 22ND ST CALIFORNIA AVE ELM STTRUXTON AVEROUTE 99 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:34 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MI-9 MOTORIST INFORMATION PLAN NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. APPROVED FOR MOTORIST INFORMATION WORK ONLY DAOR EGATNORF tS HT42 871 ETUOR C2 DETOUR PLAN No. 12 . . . . . AA C3 C1C3 WEST ON 24TH St SOUTH ON M St WEST ON 25TH St NORTH ON O St WEST ON 24TH St FRONTAGE ROAD ON-RAMP CLOSED 24TH St FRONTAGE ROAD WITH 24TH St CLOSED K St INTERSECTION C1 C3 C3 C3 C1 C2 . . . C1 AA AA AA EB 25TH St TO WB 24TH St WEST ON 24TH St SOUTH ON L St EAST ON 25TH St . . . . . WB 25TH St TO WB 24TH St WEST ON 24TH St SOUTH ON EYE St WEST ON 26TH St NORTH ON CHESTER St WEST ON 25TH St SB K St TO WB 24TH St WEST ON 24TH St SOUTH ON L St EAST ON 25TH St SOUTH ON K St . . . .TO WB 24TH St 24TH St FRONTAGE ROAD C2 STAGE 3 NIGHT TIME DETOUR PLAN No. 13A DETOUR PLAN No. 13B DETOUR PLAN No. 13C C2 243 AB 24TH St 23RD St M StL St22ND St N StO StP StQ St23RD St 24TH StGOLDEN STATE Av e 23RD St FRONTAGE ROAD 25TH St N StO StP St26TH St K StCHESTER StEYE St ASPH ASPHASPH ASPHASPHASPHASPH DIRT ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHASPHDIRTASPHASPHASPHASPH RIVERSIDE DR ASPHBUCK OWENS BLVD24TH ST ASPHCONCASPHCO N CASP H A S P H DI R T C ONC C O NC C ONCC O N C A S P H A S P H A S P H AS P HAS P H S R-99 ASPH CONCASPHCONCASPHCONCASPHASPHCONCASPHASPHCONCBUCK OWENS BLVDASPHASPHBAK - 99CONCCONCASPHASPHASPHASPHASPHDIRTDIRTDIRTDIRTBAK - 99BAK - 99CONCCONCASPHYI ELDFOFOx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:36 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 MOTORIST INFORMATION PLAN MI-10 NO SCALE STAGE 5 NIGHT TIME F1 50'300' BUFFERSHIFT TAPER 480' LEFT LANE MERGE 2 4 0' L E F T L A NE C L OS UR E 300' SHIFT TAPER 250' 250' F2 F3 FLASHING ARROW SIGN F3 F4 20' C-C SPACING TRAFFIC CONE 20' C-C SPACING TRAFFIC CONE 20' C-C SPACING TRAFFIC CONE F5 LANE CLOSURE ON KERN RIVER BRIDGE EASTBOUND OVERNIGHT TEMPORARY SHIFT TRAFFIC SOUTH 11' 12' 244 DETAIL 10 Temp PAVEMENT MARKERS 24TH St S R- 9 9 B U C K O WE NS Blv d ASPH ASPHASPH ASPHASPHASPHASPH DIRT ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHASPHDIRTASPHASPHASPH ASPH ASPH RIVERSIDE DR ASPHBUCK OWENS BLVD24TH ST ASPHCONCASPHCO N CASP H A S P H DI R T C ONC C O NC C ONCC O N C A S P H A S P H A S P H AS P HAS P H S R-99 ASPH CONCASPHCONCASPHCONCASPHASPHCONCASPHASPHCONCBUCK OWENS BLVDASPHASPHBAK - 99CONCCONCASPHASPHASPHASPHASPHDIRTDIRTDIRTDIRTBAK - 99BAK - 99CONCCONCASPHYI ELDFOFOx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:37 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 MOTORIST INFORMATION PLAN MI-11 NO SCALE STAGE 5 NIGHT TIME F1 50'300' BUFFERSHIFT TAPER 480' LEFT LANE MERGE 3 0 0' 280' 250' 250' F7 FLASHING ARROW SIGN F3 F4 20' C-C SPACING TRAFFIC CONE 20' C-C SPACING TRAFFIC CONE 20' C-C SPACING TRAFFIC CONE F5 LANE CLOSURE ON KERN RIVER BRIDGE EASTBOUND OVERNIGHT TEMPORARY SHIFT TRAFFIC NORTH F5 50' BUFFER REVERSING CURVES 20' C-C SPACING TRAFFIC CONE 1 0 0'T A P E R C E NT E R L ANE C L OS U R E 2 5 0' 11' 12' 245 DETAIL 10 Temp PAVEMENT MARKERS 24TH St S R- 9 9 B U C K O WE NS Blv d DIRT ASPH ASPHASPHDIRTASPHASPHASPHDIRTASPH pASPHASPH ASPHASPH ASPHASPH ASPH CONC POOLCONCASPH POOLASPHASPHASPHASPH ASPHASPH ASPH O A K ST OLIVE STELM STASPHASPH ASPHCONC ASPH ASPHASP HASPHASPH ASPHCONCASPHCONCCONCPOOL POOLPOOL POOL ASPHC O N C CONC CONCASPHSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:37 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 MOTORIST INFORMATION PLAN MI-12 NO SCALE STAGE 5 NIGHT TIME 50' BUFFER LANE CLOSURE ON KERN RIVER BRIDGE WESTBOUND OVERNIGHT TEMPORARY SHIFT TRAFFIC SOUTH 20' C-C SPACING TRAFFIC CONE RIGHT TWO LANES CLOSED 480' RIGHT LANE MERGE CLOSED RIGHT LANE 12' 12' F7 F1250' F5 F5 F5 FLASHING ARROW SIGN 20' C-C SPACING TRAFFIC CONE 20' C-C SPACING TRAFFIC CONE 246 24TH St OAK St DIRT ASPH POOL CONC ASPHASPHDIRTASPHASPHASPHDIRTASPH pASPHASPH ASPHASPH ASPHASPH ASPH CONC POOLCONCASPH POOLASPHASPHASPHASPH ASPHASPH ASPH O A K ST OLIVE STELM STASPHASPH ASPHCONC ASPH ASPHASP HASPHASPH ASPHCONCASPHCONCPOOL POOLPOOL ASPHSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:38 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 MOTORIST INFORMATION PLAN MI-13 NO SCALE STAGE 5 NIGHT TIME 50' BUFFER LANE CLOSURE ON KERN RIVER BRIDGE WESTBOUND OVERNIGHT TEMPORARY SHIFT TRAFFIC NORTH 20' C-C SPACING TRAFFIC CONE 480' LEFT LANE MERGE 12' 11' F2 F6 F5 FLASHING ARROW SIGN 370'50' BUFFER 200' SHIFT TAPER SHIFT TAPER F6 F1 250' 20' C-C SPACING TRAFFIC CONE 247 DETAIL 10 Temp PAVEMENT MARKERS 24TH St OAK St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:39 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxlb014.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE MOTORIST INFORMATION PLAN NOTES: 1. FOR LEGEND AND GENERAL NOTES, SEE SHEET MI-2. APPROVED FOR MOTORIST INFORMATION WORK ONLY G1 G1 G2 G3 G3 MI-14 G1 G3 G3 G4 TYPICAL DOWNTOWN SIDEWALK DETOUR SIDEWALK DETOURS DO NOT OVERLAP STAGGER BLOCK CLOSURES 248 ASPH ASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH DIRTDIRTASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH SILLECT AV ASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH DIRT ASPH ASPH ASPH ASPH ASPHPOOLCONC ASPHASPH DIRT ASPH ASPHASPH ASPHASPHDIRTCONC CONC ASPH ASPH pASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC POOL CONCASPH POOLASPH ASPHASPHASPHASPH ASPHASPH ASPHASPHASPHASPH ASPH CONC ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH ASPH ASPH ASPH ASPHCONC ASPHCONC POOLPOOLCONC CONC POOL CONC CONC CONC CONC POOLASPH ASPH CONC CONCCONC CONC CONC ASPHPOOL POOL POOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPH ASPHASPHASPHASPHRIVERSIDE DRASPHBUCK OWENS BLVD24TH ST 24TH ST 24TH ST OAK STOAK ST OLIVE STELM STASPHELM STASPH BEECH STASPHASPH MYRTLE STASPHSPRUCE STPINE STCEDAR STASPHA STB STASPHC STASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH ASPH ASPH ASPH CONCASPH CONC CONCSTAND FP FP CONC ASPHASPH POOL CONC CONCCONC CONC POOL POOL CONCPOOL CONC POOL POOL POOLCONCCONC POOL ASPHAUDUBON DRASPH CONC CONC CONC CONC POOLASPH ASPH ASPH 21TH ST ASPH ASPH POOLASPHASPH OAK STASPH ASPH ASPHASPHASP HASPH CONC POOL POOLPOOL POOLS POOLPOOL ASPHCON CCONC CONCASPH ASPHPOOL POOLPOOLPOOL POOL POOLPOOL POOL POOLPOOL ASPHASPHASPHASPH ASPH ASPH SPRUCE STMYRTLE STBEECH ST CONC ASPHASPHCONCCONC CONC CONC CONC CONCASPH CONC ASPH POOL CONC CONC POOLCONC CONC CONC CONC ASPHASPHASPHASPHPOOLCONCCONC ASPHPOOLPOOL POOLSASPHCONC CONCASPH CONC CONC CONC ASPHCEDAR STASPH CONCPINE ST CONC POOLPOOL ALDER STFP POOL PO OLCONC CONC CONC CONC CONCPOO LPOOL CONC ASPH ASPH ASPH CON CASPHASPHASPH ASPHASPHASPH ASPH ASPH ASPH ASPH ASPHASPH ASPHASPHASPH ASPH ASPH ASPHASPH ASPHASPHASPH ASPH CONCCONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPHCONC ASPHASPHASPH CONCCONCASPHC STASPHBAY STDRAKE STASPHASPH ASPHD STE STENCINA ST23RD ST 23RD ST ASPHPOOL ASPH ASPHASPH HEAVY SHADOW ASPH CONC CONCASPH ASPH ASPH ASPH CONCASPH ASPH ASPHASP HASPHASPH CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ASPH ASPH ASPHASPHASPH CONC ASPH ASPH ASPH ASPHASPH FPASPH AS PHASPH CO NCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPH AS PHASPH ASPH ASPH ASPH ASPHASPH ASPH FP FP ASPH ASPH ASP HASPH ASPH ASPH ASPH ASPH TRAILER ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASP HASPH ASPH ASPH ASP HASPH ASPH ASPHASPH CO NCCONC CONC CONC ASPH ASPHCONC ASPH ASPHCONC ASPH ASPH ASPH ASPHASPH ASPH CONCASPH CONCASPHCONC CONC ASPH ASPH ASPH ASPH ASPH CONC CONC CONC ASPHCONCCONCASPH ASP HASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPH ASPH ASPHASPH FP FP FP FP FP ASPH ASPH CONC ASPH ASP HASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOLCONC ASPH FP ASPH FP ASPH ASPH ASPH AS PHASP HASPH ASP HASPH ASPH CONC CONCCONC CONCASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONC CONC CONC ASP HASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH TRAILER ASPH CONCCONC ASPH CONC ASPHASPH AS PHASPH ASPH ASPH CONCCONCASPH CONC CONC ASPH ASPH ASPH CONC ASPH ASPH CONCASPHAS PHASPH ASPH ASPH ASPH ASPH ASPHASP HASPH ASPH ASPH ASPHASPHASPHASPH ASPH ASPHASPH AS PHASPH ASPHASPHASPH ASPH ASPH FPFP AS PHASPH ASPH AS PHASPH ASP HASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH TRAILER CONC ASPH CONC ASPH ASPH ASPHASPHASPH CONCASPH ASPH ASPH ASPH ASPH ASP HASPH ASP HCONC CONC ASPH ASPH ASPH CONC HEAVY SHADOW HEAVY SHADOW SR-178 SR-178 24TH ST 23RD ST 23RD ST ASPH 24TH ST 24TH ST 25TH ST ASPH P STASPH O STN STM ST M STL ST L ST K STK ST ASPH CHESTER AVASPHCHESTE R AVEYE ST EYE STASPHASPHH ST H STG STG ST F STF ST24TH ST 23RD ST 25TH ST 25TH ST GOLDEN STATE AV Q STASPHQ STASPH DIKE DIRT ASP HASPH DIRT CONC CON CCONCCONCCONCASPHASPHASPH ASP HASP HASPH FPFPFPCONC POOLS CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH CON CASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ROSEDALE HWY CAMI NO DEL RI O CT SR-99CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONCUB UB UB UB UB UB ASPHDIRT UB UB UBDIRT CONCASPH CONCASPHCONCASPHUB ASPHUBCONCASPH CONC ASPH ASPH ASPH DIRTASPH CONC CONCASPHTSTS TSCONCBARGMAN LN CONCBUCK OWENS BLVDASPHASPHBAK - 99DIRT DIRTTHOMAS WAYCONCCONCCONC ASPH ASPHBAK - 99BAK - 99CONCASPHASPHASPHASPHBAK - 99BAK - 99CONCASPH ASPHASPHASPHBUCK OWENS BLVDCONCASPH ASPHUB DIRT DIRT DIRT ASPHDIRT DIRT UB DIRT ASPHASPHTANKS DIRT UBUBUBGATE DIRTASPH GATEASPHASPH UBUB ASPH ASPHCONCUBCONCASPH POOLPOOLDIRT DIRTDIRTDIRTCONCASPHPOOLCONCDIRTASPHUB ASPH ASPHASPHASPHASPHASPH 21st STASPHPOOL DIRTASPHASPHASPHASPHASPHDIRTDIRTCONCCONCDIRTPOOL BAK - 99BAK - 99BAK - 99BAK - 99CONC CONCASPHASPHCONCBAK - 99BAK - 99BAK - 99CONCCONC ASPH ASPHASPHASPHBAK - 99BAK - 99CONCCONC CONCASPHASPH ASPHASPH ASPH ASPHASPHASPHASASAS ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:17:56 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10SPRUCE StPINE StCEDAR StA StB StC StD StE StF StG StH StEYE StCHESTER StK StL StM StN StO StMYRTLE StBEECH St24TH St 23RD St ROUTE 99OAK StSC-1 SR-178ALDER StBAY StELM StOLIVE StTRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SCALE 1' = 400' STAGE 1 INDEX CONSTRUCTION THIS STAGE GENERAL NOTE (INDEX SHEETS): NUMBER OF LANES AND DIRECTION OF TRAFFIC LEGEND (INDEX SHEETS): 4 12 2 7 #244 2 2 2 3 2 2 2 3 3 22BUCK OWENS Blvd"24TH" LINE "23RD" LINE "E178" LINE "W178" LINE "B" LINE "OAK-2" LINE "OAK-1" LINE "WB2" LINE "EB2" LINE 13 9 ENCINAStAT END OF WORK SHIFT CONTRACTOR TO PROVIDE ACCESS Temp Pvmt PLACED THIS STAGE 4 3KERN RIVER 8 SR 58 DAY TIMENIGHT TIMEDAY TIMENIGHT TIMEDAY TIME STAGE CONSTRUCTION NOTES THIS SHEET:DAY TIME TRAFFIC HANDLING NOTES THIS SHEET: 1 NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: NIGHT TIME TRAFFIC HANDLING NOTES THIS SHEET: 1 14 3 3 7 5 15 10 11 10 16 15 1 3 4 5 6 CLOSE WB INSIDE LANE. SHIFT EB 23RD St TRAFFIC SOUTH. 7 SHIFT WB 24TH St TRAFFIC SOUTH. SHIFT EB TRAFFIC SOUTH 3 SHIFT EB 23RD St TRAFFIC SOUTH. 4 SHIFT EB SR-178 TRAFFIC SOUTH. 2 1 2 3 Const CARRIER CANAL BRIDGE. SEE STRUCTURE PLANS. Const RETAINING WALL. SEE STRUCTURE PLANS. Const SOUND WALL. SEE STRUCTURE PLANS. Const BASIN IMPROVEMENTS. SEE DRAINAGE PLANS. Const MEDIAN IMPROVEMENTS. Const PORTION OF EB 24TH St WIDENING. Const PORTION OF NB OAK St WIDENING. Const ELM St CUL-DE-SAC. Const ALLEY IMPROVEMENTS. Const MAINTENANCE ACCESS ROAD. 4 5 7 8 9 10 11 12 13 Const NORTH PORTION OF 23RD St. Const NORTH PORTION OF 24TH St. 14 1 2 3 4 5 Const NORTH PORTION OF 23RD St. Const NORTH PORTION OF INTERSECTION. Const MEDIAN IMPROVEMENTS. Const NORTH PORTION OF EB SR-178. 15 16 Const Temp Pvmt. Const DRIVEWAY IMPROVEMENTS. EACH WORK SHIFT. CONTRACTOR TO MAINTAIN ACCESS TO ALLEY AT END OF SEE MI PLANS. ALTERNATING OVERNIGHT FULL CLOSURE OF INTERSECTION, 3 1 3 ONLY CONSTRUCTION DAY TIME 84 AND/OR T12. WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11 5 6 3 333 3 3 3 3 3 3 3 3 3 3 3 3 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 5 4 3 3 1 1 4 22 22 22 22 22 84 84 6 Const NORTH PORTION OF INTERSECTION. 2 SEE MI PLANS. ALTERNATING OVERNIGHT FULL CLOSURE OF INTERSECTION, AND/OR T12. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11 Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. 64 64 DURING CONSTRUCTION CONTRACTOR TO PROVIDE ACCESS COLD PLANE AND HMA OVERLAY SLURRY SEAL WEEKEND OR OVERNIGHT SHORT TERM CLOSURE ONLY 249 STAGE CONSTRUCTION INDEX SHEETS SHOW OVERALL STAGE CONSTRUCTION AND TRAFFIC HANDLING. FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING DETAILS, SEE STAGE CONSTRUCTION AND TRAFFIC HANDLING PLANS, SHEETS SC-6 THROUGH SC-48. 17 4 (CalW) 17 Const UTILITY IMPROVEMENTS (BY OTHERS). SEE UTILITY PLANS. 4 4 4 4 5 8 6 6 6 5 3 3 3 SPRUCE StPINE StCEDAR StA StB StC StD StE StEYE StCHESTER StK StL StM StN StO StMYRTLE StBEECH StROUTE 99OAK StSR-178ALDER StBAY StELM StOLIVE StKERN RIVER 1 2 3 7 7 7 5 FOR GENERAL NOTES AND LEGEND, SEE SHEET SC-1. 5 6 5 1 1 1 ASPHASPH ASPHASPH ASPH ASPH ASPH ASPHASPHASPH ASPH U/C U/C U/C U/C DIRT DIRT DIRT U/C DIRTASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH SILLECT AV ASPHASPHASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH DIRT ASPH ASPH ASPH ASPH ASPHPOOLCONC ASPHASPH DIRT ASPH ASPHASPH ASPHASPHDIRTCONC CONC ASPH ASPH pASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC POOL CONCASPH POOLASPH ASPHASPHASPH ASPHASPH ASPHASPHASPHASPH ASPH CONC ASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH ASPH ASPH ASPH ASPHCONC ASPHCONC POOLPOOLCONC CONC POOL CONC CONC CONC CONC POOLASPH ASPH CONC CONCCONC CONC CONC ASPHPOOL POOL POOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPH ASPHASPHASPHASPHRIVERSIDE DRASPHBUCK OWENS BLVD24TH ST 24TH ST 24TH ST OAK STOAK ST OLIVE STELM STBEECH STASPHASPH MYRTLE STASPHSPRUCE STPINE STCEDAR STASPHA STB STASPHC STASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH ASPH ASPH ASPH CONCASPH CONC CONCSTAND FP FP CONC ASPHASPH POOL CONC CONCCONC CONC POOL POOL CONCPOOL CONC POOL POOL POOLCONCCONC POOL ASPHAUDUBON DRASPH CONC CONC CONC CONC POOLASPH ASPH ASPH 21TH ST ASPH ASPH POOLASPHASPH OAK STASPH ASPH ASPHASPHASP HASPH CONC POOL POOLPOOL POOLS POOLPOOL ASPHCON CCONC CONCASPHPOOL POOLPOOLPOOL POOL POOLPOOL POOL POOLPOOL ASPHASPHASPHASPH ASPH ASPH SPRUCE STMYRTLE STBEECH ST CONC ASPHASPHCONCCONC CONC CONC CONC CONCASPH CONC ASPH POOL CONC CONC POOLCONC CONC CONC CONC ASPHASPHASPHASPHPOOLCONCCONC ASPHPOOLPOOL POOLSASPHCONC CONCASPH CONC CONC CONC ASPHCEDAR STASPH CONCPINE ST CONC POOLPOOL ALDER STFP POOL PO OLCONC CONC CONC CONC CONCPOO LPOOL CONC ASPH ASPH ASPH CON CASPHASPHASPH ASPHASPH ASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH ASPHASPHASPH ASPH CONCCONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPHCONC ASPHASPHASPH CONCCONCASPHC STASPHBAY STDRAKE STASPHASPH ASPHD STE STENCINA ST23RD ST ASPHPOOL ASPH ASPHASPH HEAVY SHADOW ASPH CONC CONCASPH ASPH ASPH ASPH CONCASPH ASPH ASPHASP HASPHASPH CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ASPH ASPH ASPHASPHASPH CONC ASPH ASPH ASPH ASPHASPH FPASPH AS PHASPH CO NCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH ASPH AS PHASPH ASPH ASPH ASPHASPH ASPH FP FP ASPH ASPH ASP HASPH ASPH ASPH ASPH ASPH TRAILER ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASP HASPH ASPH ASPH ASP HASPH ASPH ASPHASPH CO NCCONC CONC ASPH ASPHCONC ASPH ASPHCONC ASPHASPH ASPH CONCASPH CONCASPHCONC CONC ASPH ASPH ASPH ASPH ASPH CONC CONC CONC ASPHCONCCONCASPH ASP HASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPH ASPH ASPHASPH FP FP FP FP FP ASPH ASPH CONC ASPH ASP HASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOLCONC ASPH FP ASPH FP ASPH ASPH ASPH AS PHASP HASPH ASP HASPH ASPH CONC CONCCONC CONCASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONC CONC CONC ASP HASPH ASPH ASPHASPH ASPH ASPH TRAILER ASPH CONCCONC ASPH CONC ASPHASPH AS PHASPH ASPH ASPH CONCCONCASPH CONC CONC ASPH ASPH ASPH CONC ASPH ASPH CONCASPHAS PHASPH ASPH ASPH ASPH ASPH ASPHASP HASPH ASPH ASPH ASPHASPHASPHASPH ASPH ASPHASPH AS PHASPH ASPHASPHASPH ASPH ASPH FPFP AS PHASPH ASPH AS PHASPH ASP HASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH TRAILER CONC ASPH CONC ASPH ASPH ASPHASPHASPH CONCASPH ASPH ASPH ASPH ASPH ASP HASPH ASP HCONC CONC ASPH ASPH ASPH CONC HEAVY SHADOW HEAVY SHADOW SR-178 SR-178 24TH ST 23RD ST ASPH 24TH ST 24TH ST 25TH ST ASPH P STASPH O STN STM ST M STL ST L ST K STK ST ASPH CHESTER AVASPHCHESTE R AVEYE ST EYE STASPHASPHH ST H STG STG ST F STF ST24TH ST 25TH ST 25TH ST GOLDEN STATE AV Q STASPHQ STASPH DIKE DIRT ASP HASPH DIRT CONC CON CCONCCONCCONCASPHASPHASPH ASP HASP HASPH FPFPFPCONC POOLS CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH CON CASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ROSEDALE HWY CAMI NO DEL RI O CT SR-99CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONCUB UB UB UB UB UB ASPHDIRT UB UB UBDIRT CONCASPH CONCASPHCONCASPHUB ASPHUBCONCASPH CONC ASPH ASPH ASPH DIRTASPH CONC CONCASPHTSTS TSCONCBARGMAN LN CONCBUCK OWENS BLVDASPHASPHBAK - 99DIRT DIRTTHOMAS WAYCONCCONCCONC ASPH ASPHBAK - 99BAK - 99CONCASPHASPHASPHASPHBAK - 99BAK - 99CONCASPH ASPHASPHASPHBUCK OWENS BLVDCONCASPH ASPHUB DIRT DIRT DIRT ASPHDIRT DIRT UB DIRT ASPHASPHTANKS DIRT UBUBUBGATE DIRTASPH GATEASPHASPH UBUB ASPH ASPHCONCUBCONCASPH POOLPOOLDIRT DIRTDIRTDIRTCONCASPHPOOLCONCDIRTASPHUB ASPH ASPHASPHASPHASPHASPH 21st STASPHPOOL DIRTASPHASPHASPHASPHASPHDIRTDIRTCONCCONCDIRTPOOL BAK - 99BAK - 99BAK - 99BAK - 99CONC CONCASPHASPHCONCBAK - 99BAK - 99BAK - 99CONCCONC ASPH ASPHASPHASPHBAK - 99BAK - 99CONCCONC CONCASPHASPH ASPHASPH ASPH ASPHASPHASPHASASAS ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:00 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10YIEL DSTOPSTOP234 2 2 2 3 2 2 2 3 3 22NOTE THIS SHEET: 4 312 3 6 6 6 11 6 6 5 5 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 5 13 3 4 2 SC-2 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SCALE 1' = 400' STAGE 2 INDEX DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET:NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: DAY TIME TRAFFIC HANDLING NOTES THIS SHEET: NIGHT TIME TRAFFIC HANDLING NOTES THIS SHEET:BUCK OWENS BlvdDAY TIMENIGHT TIMEDAY TIMENIGHT TIME24TH St 23RD St "24TH" LINEENCINAStF StG StH St1 2 3 4 5 6 9 10 11 12 13 CONTINUE Const FROM PREVIOUS STAGE. REMOVE Exist RAISED MEDIAN AND Const Temp Pvmt. Const SOUND WALL. SEE STRUCTURE PLANS. Const PORTION OF EB 24TH St WIDENING. Const PORTION OF WB 24TH St WIDENING. Const PORTION OF INTERSECTION. Const MAINTENANCE DRIVEWAY AND PRIVATE DRIVEWAY. Const OAK St WIDENING. Const OH SIGN. SEE SIGN PLANS. 7 8 Const SOUTH PORTION OF 23RD St. Const B St CUL-DE-SAC. Const C St CUL-DE-SAC. 1 3 4 5 6 FULL CLOSURE OF INTERSECTION, SEE MI PLANS. 2 SHIFT EB TRAFFIC WEST OF OAK St NORTH. SHIFT EB AND WB TRAFFIC SOUTH. 7 SHIFT EB 23RD St TRAFFIC NORTH. 8 WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11. CONTRACTOR TO MAINTAIN ACCESS TO DRIVEWAY AT ALL TIMES. 1 3 4 Const SOUTH PORTION OF 23RD St. Const SOUTH PORTION OF INTERSECTION. Const DRIVEWAY ACCESS. Const SOUTH PORTION OF EB SR-178. 2 1 3 4 5 SHIFT EB SR-178 TRAFFIC NORTH. 2 SHIFT EB 23RD St TRAFFIC NORTH. FULL CLOSURE OF 23RD St FRONTAGE ROAD ACCESS, SEE MI PLANS. ALTERNATING OVERNIGHT FULL CLOSURE OF INTERSECTION, SEE MI PLANS. CONTRACTOR TO MAINTAIN ACCESS TO DRIVEWAY AT ALL TIMES. SEE MI PLANS. ALTERNATING FULL WEEKEND CLOSURE OF INTERSECTION, USE Std PLAN T12 AND/OR T13. CONTRACTOR TO MAINTAIN ACCESS DURING CONSTRUCTION, 1 3 5 7 10 9 7 8 14 Const SOUTH PORTION OF 24TH St. 1 1 2 2 "23RD" LINE 2 2 2 2 2 2 22 3 4 53434 6 6 5 6 5 Const PORTION OF 24TH St WIDENING. 6 CLOSE WB INSIDE LANE. 6 Const SOUTH PORTION OF WB SR-178. 7 SHIFT WB SR-178 TRAFFIC NORTH. 6 7 250 Const UTILITY IMPROVEMENTS (BY OTHERS). SEE UTILITY PLANS. 14 (CalW) 6 14 (CalW) 14 (CalW) 14 (CalW) "E178" LINE "W178" LINE "B" LINE"OAK-1" LINE "WB2" LINE "EB2" LINE SR 58 "OAK-2" LINE ASPHASPHASPH ASPH ASPH ASPH ASPHASPHASPH ASPH U/C U/C U/C U/C DIRT DIRT DIRT U/C DIRTASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH SILLECT AV ASPHASPHASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH DIRT ASPH ASPH ASPH ASPH ASPHPOOLCONC ASPHASPH DIRT ASPH ASPHASPH ASPHASPHDIRT ASPH pASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC POOL CONCASPH POOLASPH ASPHASPHASPHASPHASPH ASPH CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHCONC ASPHCONC POOLPOOLCONC CONC POOL CONC CONCCONC POOL ASPH CONC CONCCONC CONC ASPHPOOL POOL POOL POOLASPHASPHASPHASPH ASPHASPH ASPHASPHASPHRIVERSIDE DRASPHBUCK OWENS BLVD24TH ST OAK STOAK ST OLIVE STELM STBEECH STASPH MYRTLE STASPHSPRUCE STPINE STCEDAR STASPHA STASPHC STASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH ASPH ASPH ASPH CONCASPH CONC CONCSTAND FP FP CONC ASPHASPH POOL CONC CONCCONC CONC POOL POOL CONCPOOL CONC POOL POOL POOLCONCCONC POOL ASPHAUDUBON DRASPH CONC CONC CONC CONC POOLASPH ASPH ASPH 21TH ST ASPH ASPH POOLASPHASPH OAK STASPH ASPH ASPHASPHASP HASPH CONC POOL POOLPOOL POOLS POOLPOOL ASPHCON CCONC CONCASPHPOOL POOLPOOLPOOL POOL POOLPOOL POOL POOLPOOL ASPHASPHASPHASPH ASPH ASPH SPRUCE STMYRTLE STBEECH ST CONC ASPHASPHCONCCONC CONC CONC CONC CONCASPH CONC ASPH POOL CONC CONC POOLCONC CONC CONC CONC ASPHASPHASPHASPHPOOLCONCCONC ASPHPOOLPOOL POOLSASPHCONC CONCASPH CONC CONC CONC ASPHCEDAR STASPH CONCPINE ST CONC POOLPOOL ALDER STFP POOL PO OLCONC CONC CONC CONC CONCPOO LPOOL CONC ASPH ASPH ASPH CON CASPHASPHASPH ASPHASPH ASPHASPHASPHASPH ASPHASPH ASPHASPHASPH ASPH CONCCONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPHCONC ASPHASPHASPH CONCCONCASPHC STASPHBAY STDRAKE STASPHASPH ASPHD STE STENCINA ST23RD ST ASPHPOOL ASPH ASPH ASPH ASPH DIKE DIRT ASP HASPH DIRT CONC CON CCONCCONCCONCASPHASPHASPH ASP HASP HASPH FPFPFPCONC POOLS CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH CON CASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ROSEDALE HWY CAMI NO DEL RI O CT SR-99CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONCUB UB UB UB UB UB ASPHDIRT UB UB UBDIRT CONCASPH CONCASPHCONCASPHUB ASPHUBCONCASPH CONC ASPH ASPH ASPH DIRTASPH CONC CONCASPHTSTS TSCONCBARGMAN LN CONCBUCK OWENS BLVDASPHASPHBAK - 99DIRT DIRTTHOMAS WAYCONCCONCCONC ASPH ASPHBAK - 99BAK - 99CONCASPHASPHASPHASPHBAK - 99BAK - 99CONCASPH ASPHASPHASPHBUCK OWENS BLVDCONCASPH ASPHUB DIRT DIRT DIRT ASPHDIRT DIRT UB DIRT ASPHASPHTANKS DIRT UBUBUBGATE DIRTASPH GATEASPHASPH UBUB ASPH ASPHCONCUBCONCASPH POOLPOOLDIRT DIRTDIRTDIRTCONCASPHPOOLCONCDIRTASPHUB ASPH ASPHASPHASPHASPHASPH 21st STASPHPOOL DIRTASPHASPHASPHASPHASPHDIRTDIRTCONCCONCDIRTPOOL BAK - 99BAK - 99BAK - 99BAK - 99CONC CONCASPHASPHCONCBAK - 99BAK - 99BAK - 99CONCCONC ASPH ASPHASPHASPHBAK - 99BAK - 99CONCCONC CONCASPHASPH ASPHASPH ASPH ASPHASPHASPHASASAS ASPHYIELD ASPH ASPHASPH HEAVY SHADOW ASPH CONC CONCASPH ASPH ASPH ASPH CONCASPH ASPH ASPHASP HASPHASPH CONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ASPH ASPHASPHASPH CONC ASPH ASPH ASPH ASPHASPH FPASPH AS PHASPH CO NCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPH AS PHASPH ASPH ASPH ASPHASPH FP FP ASPH ASPH ASP HASPH ASPH ASPH ASPH ASPH TRAILER ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASP HASPH ASPH ASPH ASP HASPH ASPH ASPHASPH CO NCCONC CONC ASPH ASPHCONC ASPH ASPHCONC ASPHASPH ASPH CONCASPH CONCASPHCONC CONC ASPH ASPH ASPH ASPH ASPH CONC CONC CONC ASPHCONCCONCASPH ASP HASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPH ASPH ASPHASPH FP FP FP FP FP ASPH ASPH CONC ASPH ASP HASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOLCONC ASPH FP ASPH FP ASPH ASPH ASPH AS PHASP HASPH ASP HASPH ASPH CONC CONCCONC CONCASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONC CONC CONC ASP HASPH ASPH ASPHASPH ASPH ASPH TRAILER ASPH CONCCONC ASPH CONC ASPHASPH AS PHASPH ASPH CONCCONCASPH CONC CONC ASPH ASPH ASPH CONC ASPH ASPH CONCASPHAS PHASPH ASPH ASPH ASPH ASPH ASPHASP HASPH ASPH ASPH ASPHASPHASPHASPH ASPH ASPHASPH AS PHASPH ASPHASPHASPH ASPH ASPH FPFP AS PHASPH ASPH AS PHASPH ASP HASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH TRAILER CONC ASPH CONC ASPH ASPH ASPHASPHASPH CONCASPH ASPH ASPH ASPH ASPH ASP HASPH ASP HCONC CONC ASPH ASPH ASPH CONC HEAVY SHADOW HEAVY SHADOW SR-178 SR-178 24TH ST 23RD ST ASPH 24TH ST 24TH ST 25TH ST ASPH P STASPH O STN STM ST M STL ST L ST K STK ST ASPH CHESTER AVASPHCHESTE R AVEYE ST EYE STASPHASPHH ST H STG STG ST F STF ST24TH ST 25TH ST 25TH ST GOLDEN STATE AV Q STASPHQ STSTOPSTOP x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:08 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10STOP STOP STOPSTOP STOP STOP SAASSTOPSTOPKCSTOPSTOPSTOPSTOPSTOPSTOP STOPSTOPSTOP232 2 2 2 2 4 3 3 2134 2 2 2 2 3 6SPRUCE StPINE StCEDAR StA StB StC StD StE StG StH StEYE StCHESTER StK StL StM StN StO StMYRTLE StBEECH StROUTE 99OAK StSR-178 ALDER StBAY StELM StOLIVE StBUCK OWENS Blvd"E178" LINE "W178" LINE "B" LINE "OAK-2" LINE "OAK-1" LINE "WB2" LINE "EB2" LINE 3 6 1 ENCINA StKERN RIVER 4 SR 58 SC-3 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SCALE 1' = 400' STAGE 3 INDEX NOTE THIS SHEET: FOR GENERAL NOTES AND LEGEND, SEE SHEET SC-1. DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET:NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: NIGHT TIME TRAFFIC HANDLING NOTES THIS SHEET: DAY TIME TRAFFIC HANDLING NOTES THIS SHEET: 1 2 3 4 5 6 SHIFT WB TRAFFIC NORTH. SHIFT EB TRAFFIC SOUTH. SHIFT NB OAK St TRAFFIC EAST. CLOSE SB OAK St INSIDE LANE. 7 8 9 SHIFT EB 23RD St TRAFFIC SOUTH. FULL CLOSURE OF C St. WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11. 1 2 3 Const CENTER PORTION OF 24TH St WIDENING. 4 5 6 7 8 Const NORTH PORTION OF 23RD St. Const SOUTH PORTION OF 24TH St. 1 2 3 4 FULL CLOSURE OF INTERSECTION, SEE MI PLANS. ALTERNATING OVERNIGHT FULL CLOSURE OF INTERSECTION, SEE MI PLANS. 1 2 3 CONSTRUCTED OAK St. SHIFT OAK St TRAFFIC, NORTH OF 24TH St, TO NEWLY DAY TIMENIGHT TIME24TH St "24TH" LINE DAY TIMENIGHT TIME"23RD" LINE 23RD St 9 10 Const NORTH PORTION OF 24TH St. Const NORTH PORTION OF INTERSECTION. Const DRIVEWAY ACCESS. Const NORTH PORTION OF WB SR-178. COLD PLANE AND HMA OVERLAY. SLURRY SEAL. 4 5 6 7 5 6 CONTRACTOR TO MAINTAIN ACCESS TO DRIVEWAY AT ALL TIMES. SHIFT WB SR-178 TRAFFIC SOUTH. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11. 5 Const CENTER PORTION OF OAK St WIDENING. Const PORTION OF 23RD AT B St. 8 8 7 7 7 1 4 5 10 WEEKEND CLOSURE OF INTERSECTION. SEE MI PLANS. WEEKEND LANE CLOSURES ONLY, USE Std PLAN T12 AND/OR T13. 11 99 11 7 1010 SHIFT WB 24TH St TRAFFIC NORTH. 1 1 4 4 5 5 7 6 6 6 2 2 2 2 2 2 2 222 3 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY SHIFT WB 24TH St TRAFFIC SOUTH. Const DRAINAGE MAIN SYSTEM. 3 6 2 2 3 6 63 63 2 2 Const NORTH PORTION OF BAY St INTERSECTION. Const PORTION OF 24TH St WIDENING AT KERN RIVER BRIDGE. Const C St IMPROVEMENTS. Const Temp Pvmt. Const REMAINDER OF INTERSECTION. 251 ASPHASPHASPH ASPH ASPH ASPH ASPHASPH ASPH U/C U/C U/C U/C DIRT DIRT DIRT U/C DIRTASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH SILLECT AV ASPHASPHASPH ASPH ASPH ASPH ASPHASPHASPHASPH ASPH DIRT ASPH ASPH ASPH ASPHPOOLCONC ASPHASPH DIRT ASPH ASPHASPH ASPHASPHDIRT ASPH pASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC POOL CONCASPH POOLASPH ASPHASPHASPHASPHASPH ASPH CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPHCONC ASPHCONC POOLPOOLCONC CONC POOL CONC CONCCONC POOL ASPH CONC CONCCONC CONC ASPHPOOL POOL POOL POOLASPHASPHASPHASPH ASPHASPH ASPHASPHASPHRIVERSIDE DRASPHBUCK OWENS BLVD24TH ST OAK STOAK ST OLIVE STELM STBEECH STASPH MYRTLE STASPHSPRUCE STPINE STCEDAR STASPHA STASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH ASPH ASPH ASPH CONCASPH CONC CONCSTAND FP FP CONC ASPHASPH POOL CONC CONCCONC CONC POOL POOL CONCPOOL CONC POOL POOL POOLCONCCONC POOL ASPHAUDUBON DRASPH CONC CONC CONC CONC POOLASPH ASPH ASPH 21TH ST ASPH ASPH POOLASPHASPH OAK STASPH ASPH ASPHASPHASP HASPH CONC POOL POOLPOOL POOLS POOLPOOL ASPHCON CCONC CONCASPHPOOL POOLPOOLPOOL POOL POOLPOOL POOL POOLPOOL ASPHASPHASPHASPH ASPH ASPH SPRUCE STMYRTLE STBEECH ST CONC ASPHASPHCONCCONC CONC CONC CONC CONCASPH CONC ASPH POOL CONC CONC POOLCONC CONC CONC CONC ASPHASPHASPHASPHPOOLCONCCONC ASPHPOOLPOOL POOLSASPHCONC CONCASPH CONC CONC CONC ASPHCEDAR STASPH CONCPINE ST CONC POOLPOOL ALDER STFP POOL PO OLCONC CONC CONC CONC CONCPOO LPOOL CONC ASPH ASPH ASPH CON CASPHASPHASPH ASPHASPH ASPHASPHASPHASPH ASPHASPH ASPHASPHASPH ASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPHCONC ASPHASPHASPH CONCCONCASPHC STASPHBAY STDRAKE STASPHASPH ASPHD STE STENCINA STASPHPOOL ASPH ASPHASPH HEAVY SHADOW ASPH CONC CONCASPH ASPH ASPH ASPH CONCASPH ASPH ASPHASP HASPHASPH CONC ASPH ASPH ASPH ASPH CONCASPH ASPHASPHASPH CONC ASPH ASPH ASPH ASPHASPH FPASPH AS PHCO NCASPH CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH FP ASPH ASPH ASP HASPH ASPH ASPH ASPH ASPH TRAILER ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASP HASP HASPH ASPH ASPH CONC CONCCONC ASPH CONCASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONC CONCASPH ASP HASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ASPH ASP HASPH ASPHCONC ASPH ASPH ASPH ASPH FP FP CONC POOLCONC ASPH FP ASPH FP ASPH ASPH AS PHASPH ASPHCONCCONCCONCASPHASPH CONC ASP HASPH ASPHASPH TRAILER ASPH CONCCONC ASPH CONCASPHASPH CONCCONCASPH CONC ASPH ASPH CONC ASPH ASPHASPHASPHASPH ASPH ASPH ASPH ASPH ASPHASP HASPH ASPH ASPH ASPHASPHAS PHASPHASPHASPH ASPH FPFP AS PHASPH ASPH AS PHASPH ASP HASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPH TRAILER CONC ASPH CONC ASPHASPH CONCASPH ASPH ASPH ASPH ASP HASP HCONC CONC ASPH CONC HEAVY SHADOW HEAVY SHADOW SR-178 SR-178 24TH ST 24TH ST 25TH ST ASPH P STASPH O STN STM ST L STK ST ASPH CHESTER AVEYE STH ST G STF ST25TH ST 25TH ST GOLDEN STATE AV Q STASPHQ STASPH DIKE DIRT ASP HASPH DIRT CONC CON CCONCCONCCONCASPHASPHASPH ASP HASP HASPH FPFPFPCONC POOLS CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH CON CASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ROSEDALE HWY CAMI NO DEL RI O CT SR-99CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONCUB UB UB UB UB UB ASPHDIRT UB UB UBDIRT CONCASPH CONCASPHCONCASPHUB ASPHUBCONCASPH CONC ASPH ASPH ASPH DIRTASPH CONC CONCASPHTSTS TSCONCBARGMAN LN CONCBUCK OWENS BLVDASPHASPHBAK - 99DIRT DIRTTHOMAS WAYCONCCONCCONC ASPH ASPHBAK - 99BAK - 99CONCASPHASPHASPHASPHBAK - 99BAK - 99CONCASPH ASPHASPHASPHBUCK OWENS BLVDCONCASPH ASPHUB DIRT DIRT DIRT ASPHDIRT DIRT UB DIRT ASPHASPHTANKS DIRT UBUBUBGATE DIRTASPH GATEASPHASPH UBUB ASPH ASPHCONCUBCONCASPH POOLPOOLDIRT DIRTDIRTDIRTCONCASPHPOOLCONCDIRTASPHUB ASPH ASPHASPHASPHASPHASPH 21st STASPHPOOL DIRTASPHASPHASPHASPHASPHDIRTDIRTCONCCONCDIRTPOOL BAK - 99BAK - 99BAK - 99BAK - 99CONC CONCASPHASPHCONCBAK - 99BAK - 99BAK - 99CONCCONC ASPH ASPHASPHASPHBAK - 99BAK - 99CONCCONC CONCASPHASPH ASPHASPH ASPH ASPHASPHASPHASASAS YIEL DSTOPSTOPCKSTOPSTOPSTOPSTOPSTOPSTOP STOPSTOP STOP STOP CONCASPH STOPSTOP STOP STOPASPHASPH ASPH ASPH ASPH CONC ASPH AS PHASPH ASPH FP ASPHCO NCASPH ASPHASPHCONC ASPHASPH ASPH CONCASPH ASPH ASPHCONCCONCASPH CONC ASPH ASPHASPH FP FP FP FP FP ASP HASP HASPH ASPH ASPH ASPH ASPH CONCCONCCONC CONC ASPH ASPH ASPH ASPHASPH CONCASPH CONCASPHASPH ASPH ASPHASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH 23RD ST ASPHM STL ST K STASPHCHESTE R AVEYE STASPHASPH H STG STF STSSAASTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:14 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10STOP STOPSTOP STOPSTOP SSSAAASC-4 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SCALE: 1" = 400' STAGE 4 INDEX436 2 2 2 4 2 3 3 21332 5SPRUCE StPINE StCEDAR StA StB StC StD StE StG StH StEYE StCHESTER StL StM StN StO StMYRTLE StBEECH StROUTE 99OAK StSR-178 ALDER StBAY StELM StOLIVE StBUCK OWENS Blvd"E178" LINE "W178" LINE "OAK-2" LINE "OAK-1" LINE "WB2" LINE "EB2" LINE "B" LINE ENCINA St4 2 3 3 KERN RIVER 2 SR 58 4 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTE THIS SHEET: FOR GENERAL NOTES AND LEGEND, SEE SHEET SC-1. DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET:NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: NIGHT TIME TRAFFIC HANDLING NOTES THIS SHEET: DAY TIME TRAFFIC HANDLING NOTES THIS SHEET: 1 2 3 4 5 6 WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11. 1 1 2 SHIFT WB 24TH St TRAFFIC NORTH. 1 2 Const SOUTH PORTION OF 24TH St. Const SOUTH PORTION OF INTERSECTION. Const SOUND WALL. SEE STRUCTURE PLANS. Const ALLEY IMPROVEMENTS. Const REMAINDER OF EB 24TH St WIDENING.DAY TIMENIGHT TIMENIGHT TIMEDAY TIME24TH St 23RD St "24TH" LINE "23RD" LINE4 21 SHIFT EB TRAFFIC NORTH. SHIFT NB OAK St LEFT/THROUGH TRAFFIC WEST. SHIFT SB OAK St TRAFFIC EAST. 3 44 SHIFT EB 24TH St TRAFFIC SOUTH. 85 96 7 EACH WORK SHIFT. CONTRACTOR TO MAINTAIN ACCESS TO ALLEY AT END OF 10 7 10 7 10 7 2 2 11 2 2 2 2 2 2 22 WEEKEND CLOSURE OF INTERSECTION. SEE MI PLANS. 3 2 3 4 5 8 9 2 Const PORTION OF EB 24TH St WIDENING. 6 7 Const PORTION OF 23RD St. Const PORTION OF 24TH St. 6 71 Const REMAINDER OF OAK St WIDENING. Const NORTH PORTION OF 24TH St, BETWEEN BAY ST AND C ST. Const NORTH PORTION OF INTERSECTION AT C ST. 252 SEE MI PLANS. ALTERNATING OVERNIGHT FULL CLOSURE OF INTERSECTION, 10 Const UTILITY IMPROVEMENTS (BY OTHERS). SEE UTILITY PLANS. 10 (CalW) 10 (CalW) ASPHASPHASPH ASPH ASPH ASPH ASPHASPH ASPH U/C U/C U/C U/C DIRT DIRT DIRT U/C DIRTASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH SILLECT AV ASPHASPHASPH ASPH ASPH ASPH ASPHASPHASPHASPH DIRT ASPH ASPH ASPHPOOLCONC ASPHASPH DIRT ASPH ASPHASPH ASPHASPHDIRT ASPH pASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC POOL CONCASPH POOLASPH ASPHASPHASPHASPH ASPH CONC ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPHCONC ASPHCONC POOLPOOLCONC CONC POOL CONC CONCCONC POOL ASPH CONC CONCCONC CONC ASPHPOOL POOL POOL POOLASPHASPHASPHASPH ASPHASPH ASPHASPHASPHRIVERSIDE DRASPHBUCK OWENS BLVD24TH ST OAK ST OLIVE STELM STBEECH STASPH MYRTLE STSPRUCE STPINE STCEDAR STASPHA STASPH ASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH ASPH ASPH ASPH CONCASPH CONC CONCSTAND FP FP CONC ASPHASPH POOL CONC CONCCONC CONC POOL POOL CONCPOOL CONC POOL POOL POOLCONCCONC POOL ASPHAUDUBON DRASPH CONC CONC CONC CONC POOLASPH ASPH ASPH 21TH ST ASPH ASPH POOLASPHASPH OAK STASPH ASPH ASPHASPHASP HASPH CONC POOL POOLPOOL POOLS POOLPOOL ASPHCON CCONC CONCASPHPOOL POOLPOOLPOOL POOL POOLPOOL POOL POOLPOOL ASPHASPHASPHASPH ASPH ASPH SPRUCE STMYRTLE STBEECH ST CONC ASPHASPHCONCCONC CONC CONC CONC CONCASPH CONC ASPH POOL CONC CONC POOLCONC CONC CONC CONC ASPHASPHASPHASPHPOOLCONCCONC ASPHPOOLPOOL POOLSASPHCONC CONCASPH CONC CONC CONC ASPHCEDAR STASPH CONCPINE ST CONC POOLPOOL ALDER STFP POOL PO OLCONC CONC CONC CONC CONCPOO LPOOL CONC ASPH ASPH ASPH CON CASPHASPHASPH ASPH ASPHASPHASPHASPH ASPHASPH ASPHASPHASPHCONC ASPH FP ASPH ASPHASPHASPH ASPH ASPHASPH CONC CONCASPHCONC ASPHASPHASPH CONCCONCASPHC STASPHBAY STDRAKE STASPHASPH ASPHD STE STENCINA STASPHPOOL ASPH HEAVY SHADOW CONCASPHASPH CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH HEAVY SHADOW HEAVY SHADOW SR-178 SR-178 24TH ST GOLDEN STATE AVQ STASPH DIKE DIRT ASP HASPH DIRT CONC CON CCONCCONCCONCASPHASPHASPH ASP HASP HASPH FPFPFPCONC POOLS CONCASPH ASPH ASPH ASPH ASPH ASPH ASPH CON CASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ROSEDALE HWY CAMI NO DEL RI O CT SR-99CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC CONC CONCUB UB UB UB UB UB ASPHDIRT UB UB UBDIRT CONCASPH CONCASPHCONCASPHUB ASPHUBCONCASPH CONC ASPH ASPH ASPH DIRTASPH CONC CONCASPHTSTS TSCONCBARGMAN LN CONCBUCK OWENS BLVDASPHASPHBAK - 99DIRT DIRTTHOMAS WAYCONCCONCCONC ASPH ASPHBAK - 99BAK - 99CONCASPHASPHASPHASPHBAK - 99BAK - 99CONCASPH ASPHASPHASPHBUCK OWENS BLVDCONCASPH ASPHUB DIRT DIRT DIRT ASPHDIRT DIRT UB DIRT ASPHASPHTANKS DIRT UBUBUBGATE DIRTASPH GATEASPHASPH UBUB ASPH ASPHCONCUBCONCASPH POOLPOOLDIRT DIRTDIRTDIRTCONCASPHPOOLCONCDIRTASPHUB ASPH ASPHASPHASPHASPHASPH 21st STASPHPOOL DIRTASPHASPHASPHASPHASPHDIRTDIRTCONCCONCDIRTPOOL BAK - 99BAK - 99BAK - 99BAK - 99CONC CONCASPHASPHCONCBAK - 99BAK - 99BAK - 99CONCCONC ASPH ASPHASPHASPHBAK - 99BAK - 99CONCCONC CONCASPHASPH ASPHASPH ASPH ASPHASPHASPHASASAS YIEL DSTOPSTOPCKSTOPSTOPSTOPSTOPSTOPSTOP STOP STOPSTOPSTOP STOP ASPHASPH ASPH CONCASPH ASPH AS PHASPHASPH CONC ASPH ASPH ASPH ASPH CONC ASPHASPH CONC ASPH ASPH ASPH ASPHASPH FPASPH AS PHCO NCASPH CONC CONC ASPH ASPH ASPH ASPHASPH FP ASPH ASPH ASP HASPH ASPH ASPH ASPH ASPH TRAILER ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASP HASP HASPH ASPH ASPHASPH CONCASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONC CONCASPH ASP HASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH CONC ASPH ASP HASPH ASPHCONC ASPH ASPH ASPH ASPH FP FP CONC POOLCONC ASPH FP ASPH FP ASPH ASPH AS PHASPH ASPHCONCCONCASPHASPH CONC ASP HASPH ASPHASPH TRAILER ASPH CONCCONC ASPH CONCASPHASPH CONCCONCASPH CONC ASPH ASPH CONC ASPH ASPHASPHASPHASPH ASPH ASPH ASPH ASPH ASPHASP HASPH ASPH ASPH ASPHASPHAS PHASPHASPHASPH ASPH FPFP AS PHASPH ASPH AS PHASPH ASP HASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPH TRAILER CONC ASPH CONC ASPHASPH CONCASPH ASPH ASPH ASPH ASP HASP HCONC CONC ASPH CONC 24TH ST 25TH ST ASPH P STASPH O STN STM ST L STK ST ASPH CHESTER AVEYE STH ST G STF ST25TH ST 25TH ST Q STASPH CONC STOPSTOP STOP STOPASPH ASPH ASPH ASPH CONC ASPH AS PHASPH ASPH FP ASPHCO NCASPH ASPHASPHCONC ASPHASPH ASPH CONCASPH ASPH ASPHCONCCONCASPH CONC ASPH ASPHASPH FP FP FP FP FP ASP HASP HASPH ASPH ASPH ASPH ASPH CONCCONCCONC CONC ASPH ASPH ASPH ASPHASPH CONCASPH CONCASPHASPH ASPH ASPHASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH 23RD ST ASPHM STL ST K STASPHCHESTE R AVEYE STASPHASPH H STG STF STASPHASPH CONC ASPH STOP STOPSTOPSTOPFOFOSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:18 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LLLLSASASASANTTNTNTNSTOP STOPSTOPSTOP STOP STOP STOP STOPSTOP STOPSTOPKCKCSTOPSTOPSTOPSTOPSTOPSTOPSTOPSTOP 320 260330 340 350 3 5 0 360 360 370 370 380 380 400 400103 1 0 10SC-5 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SCALE: 1" = 400' STAGE 5 INDEX466 4 3 3 3 3 523 3 SPRUCE StPINE StCEDAR StA StB StC StD StE StG StH StEYE StCHESTER StK StL StM StN StO StMYRTLE StBEECH StROUTE 99OAK StSR-178ALDER StBAY StELM StOLIVE StBUCK OWENS Blvd"23RD" LINE "E178" LINE "OAK-2" LINE "OAK-1" LINE "WB2" LINE "EB2" LINE "B" LINE ENCINA St4 KERN RIVER SR 58 NOTE THIS SHEET: FOR GENERAL NOTES AND LEGEND, SEE SHEET SC-1. DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET:NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 1 NIGHT TIME TRAFFIC HANDLING NOTES THIS SHEET:DAY TIME TRAFFIC HANDLING NOTES THIS SHEET: 1 2 WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11.1 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY "W178" LINE PLACE BRIDGE TREATMENT. SLURRY SEAL. OVERNIGHT LANE CLOSURES. SEE MI PLANS. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11.NIGHT TIMEDAY TIMEDAY TIMENIGHT TIME23RD St 24TH St "24TH" LINE "23RD" LINE 21 1 2 11 COLD PLANE AND HMA OVERLAY. 4 4 2 23 253 6 USE Std PLAN T12 AND/OR T13. CONTRACTOR TO MAINTAIN ACCESS DURING CONSTRUCTION, 32 CONSTRUCTION THIS STAGE DURING CONSTRUCTION CONTRACTOR TO MAINTAIN TRAFFIC CHANNELIZER (SURFACE MOUNTED) TYPE II BARRICADE (CONSTRUCTION AREA SIGN AS NOTED ON PLANS) TYPE III BARRICADE (CONSTRUCTION AREA SIGN AS NOTED ON PLANS) CONSTRUCTION AREA SIGN - ONE POST CONSTRUCTION AREA SIGN - TWO POST DIRECTION OF TRAFFIC Exist LANE DIMENSION STAGE CONSTRUCTION NOTE CONSTRUCTION AREA SIGN (SIGN AS NOTED ON PLANS) PLACED IN PREVIOUS STAGE (TYPE AS NOTED ON PLANS) PAVEMENT DELINEATION ANGLE POINT Beg OR END OF PAVEMENT DELINEATION DETAIL CHANGE OF PAVEMENT DELINEATION DETAIL 12" WHITE LIMIT LINE 12" WHITE CROSSWALK (XX') XX' CHANNELIZER (SURFACE MOUNTED) SEE PAVEMENT DELINEATION PLANS FINAL PAVEMENT DELINEATION, BARRICADE TEMPORARY RAILING (TYPE K) DRAINAGE SYSTEM SURFACE MOUNTED TEMPORARY PAVEMENT DELINEATION DETAIL NUMBER TEMPORARY RAILING (TYPE K) TEMPORARY FENCE (TYPE CL-6) TEMPORARY CRASH CUSHION MODULE (ARRAY AS NOTED ON PLANS) TEMPORARY CRASH CUSHION (ABSORB 350) TEMPORARY RAILING (TYPE K) TEMPORARY FENCE (TYPE CL-6) FLASHING ARROW SIGN FLASHING ARROW SIGN (TYPE II) LANE DIMENSION IN PLACE THIS STAGE (PERMANENT OR TEMPORARY) PAVEMENT MARKING AS SHOWN Temp Pvmt PLACED THIS STAGE AT END OF WORK SHIFT CONTRACTOR TO PROVIDE ACCESS COLD PLANE AND HMA OVERLAY SLURRY SEAL OVERNIGHT OR WEEKEND SHORT TERM CLOSURE ONLY TEMPORARY RAILING (TYPE K) STAKED ALL CONFLICTING PAVEMENT DELINEATION, TEMPORARY RAILING (TYPE K), AND TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE REMOVED PRIOR TO STARTING WORK ON EACH STAGE. ALL CONFLICTING SIGNS SHALL BE COVERED OR REMOVED AS DETERMINED BY THE ENGINEER. ALL STAGE CONSTRUCTION STRIPING AND MARKINGS SHALL BE PAINT UNLESS OTHERWISE NOTED ON THE PLANS. PAVEMENT MARKERS SHALL BE AS SHOWN IN THE DETAIL NUMBER. FOR FINAL PAVEMENT DELINEATION SEE PAVEMENT DELINEATION PLANS. MAINTAIN ACCESS TO PRIVATE PROPERTIES AND BUSINESSES. LOCATIONS FOR CONSTRUCTION AREA SIGNS ARE APPROXIMATE. EXACT LOCATIONS TO BE DETERMINED BY THE ENGINEER. FOR ADDITIONAL CONSTRUCTION AREA SIGNS AND DETAILS SEE CONSTRUCTION AREA SIGNS PLAN AND MOTORIST INFORMATION PLAN. CONSTRUCTION AREA SIGNS SHALL HAVE BLACK LEGEND AND BORDER ON AN ORANGE BACKGROUND. ALL APPROACH TAPERS FOR TEMPORARY RAILING (TYPE K) SHALL BE AT A 10:1 OR FLATTER AND SHALL HAVE APPROACH CRASH CUSHIONS AS SHOWN ON THE PLANS. THE LAST TEMPORARY RAILING (TYPE K) SECTION SHALL BE STAKED OR SECURED AS DETERMINED BY THE ENGINEER AS REQUIRED FOR PUBLIC SAFETY. ADDITIONAL LOCATIONS REQUIRING STAKED TEMPORARY RAILING (TYPE K) ARE SHOWN ON STANDARD PLAN T3A AND T3B. INSIDE/OUTSIDE SHOULDER DIMENSIONS ARE MEASURED FROM THE BOTTOM EDGE OF BARRIER OR FLOW LINE OF THE CURB. OFFSETS AND DIMENSIONS TO TEMPORARY RAILING (TYPE K) ARE MEASURED TO THE BOTTOM EDGE OF BARRIER ADJACENT TO THE TRAVELED WAY. CONSTRUCTION INDICATED AS NIGHT WORK SHALL BE PERFORMED AT NIGHT DURING THE HOURS INDICATED IN THE STANDARD SPECIAL PROVISIONS. LANE CLOSURES REQUIRED TO PERFORM THE WORK SHALL CONFORM TO THE PLANS AND STANDARD SPECIAL PROVISIONS. EACH NIGHT, CLOSURES SHALL NOT COMMENCE UNTIL THE TIME SPECIFIED. EACH NIGHT, AT THE CONCLUSION OF THE NIGHT WORK, ALL CONSTRUCTION ACTIVITIES SHALL CEASE AND ALL LANES SHALL BE FULLY OPEN TO TRAFFIC AS SHOWN ON THE PLANS UNTIL THE COMMENCEMENT OF THE NEXT NIGHT'S WORK. AT THE END OF EACH SHIFT IF A DIFFERENCE IN EXCESS OF 0.15' EXISTS BETWEEN THE ELEVATION OF THE EXISTING PAVEMENT AND THE ELEVATION OF THE EXCAVATION OR PERMANENT PAVEMENT WITHIN 8' OF THE RIGHT TRAVELED WAY OR 5' OF THE LEFT TRAVELED WAY, PLACE AND COMPACT MATERIAL AGAINST THE VERTICAL CUT ADJACENT TO THE TRAVELED WAY AND TAPER AT A SLOPE OF 4:1 OR FLATTER. THE INSTALLATION OF TEMPORARY PAVEMENT DELINEATION AND TRAFFIC HANDLING ELEMENTS FROM STAGE TO STAGE REQUIRES OVERNIGHT/WEEKEND LANE OR SHOULDER CLOSURES. SEE STANDARD PLAN TRAFFIC CONTROL SYSTEMS AND MI SHEETS FOR DETOURS. NON-CONFLICTING EXISTING DRAINAGE SYSTEMS SHALL REMAIN IN PLACE UNTIL NEW DRAINAGE SYSTEM IS IN PLACE AND OPERATIONAL. NEW DRAINAGE INLETS CONSTRUCTED PRIOR TO THE CONSTRUCTION OF THE CONNECTING PIPE SHALL BE CAPPED UNTIL THE CONNECTING PIPE IS IN PLACE AND OPERATIONAL. SEE WPC SHEETS FOR TEMPORARY WATER POLLUTION CONTROL ELEMENTS TO BE INSTALLED DURING STAGE CONSTRUCTION. LANDSCAPE TO BE INSTALLED AT THE END OF EACH STAGE IN AREAS SUFFICIENTLY COMPLETED. STAGE CONSTRUCTION PLANS DO NOT SHOW ALL WORK REQUIRED TO BE COMPLETED. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. CALIFORNIA WATER SERVICE x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:22 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND NO SCALE NOTES AND LEGEND GENERAL NOTES:LEGEND: LEGEND FOR SECTIONS: CS E F APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY XX LL CW PM ABBREVIATIONS: Barr K-RAIL DS SM FAS X SC-6 2' Min2' Min LC ETW Rt ETW Lt FS CHANNELIZER (SURFACE MOUNTED) TYPICAL LEFT AND RIGHT SHOULDER INSTALLATION 254 CalW Const MEDIAN IMPROVEMENTS. Const PORTION OF EB 24TH ST WIDENING. Const RETAINING WALL, SEE STRUCTURE PLANS. ASPHASPHASPH ASPH P DIRT ASPH ASPH ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTCONC CONC ASPH P ASPHASPH RIVERSIDE DR ASPH24TH ST CONCASPHCONCBRUSHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:23 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 6 7 8 9 1 2 3 3154 305 2 3 4 6 8 9 1 2 3 4 315 310 LINE "WB2" LINE "EB2" 11'12'12' OG 9 CHANNELIZER (SM)K-RAIL 11'(18')(12') CHANNELIZER (SM) Var 2' Shld 2' Var AREA Const 5.1'-7.8' Var LIP Gtr Exist 6'-16' AREA Const 10' 8.25' 2 AREA Const VarLOL RW R/W R/W R/W R/W "EB2" LINE "WB2" LINE SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET: (12') (12') (12') 11' 11' 12' 12'9 10 END TAPER "EBL" +00 Beg TAPER CONFORM TO Exist STRIPING END TAPER Beg 60' BAY TAPER 9 38 27B25 No.#R CURVE DATA T L 1.12' Lt "EB2" +09.51 1 1 186.17'111 93.38'954.00' NOTES: 1. A A SECTION A-A NO SCALE 30' C-C SPACING (29 EA) CHANNELIZER (SM) 9 10 STAGE 1 DAY TIME 15.5' Rt "EBL" +65.19 12.23' Rt "EBL" +79.66 CSC27(CA) 30' C-C SPACING (8 EA) CHANNELIZER (SM) 15.20' Rt "EBL" +00 (12') (18')+53Beg K-RAIL 49.71' Rt "EBL" +59 55.71' Rt "EBL" +99 CSC30(CA) CSC30(CA) 2 2 0.64' Rt "EBL" +99.66 Beg TAPER 37B (ARRAY TS11) Tempo CRASH CUSHION MODULE 10'2' BC END 60' BAY TAPER (12)(12)12' (Var) PMTYPE IV (L) ARROW +75CSC30(CA) SC-7 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, SEE SHEET SC-8MATCH LINE "WB2" Sta 315+5030' C-C SPACING (28 EA) CHANNELIZER (SM) 255 24TH St "EBL" LINE Kern River"WBL" LINE R/W Const PORTION OF EB 24TH St WIDENING. Const PORTION OF NB OAK St WIDENING. Const Temp Pvmt Const RETAINING WALL , SEE STRUCTURE PLANS. Const MAINTENANCE ACCESS ROAD. Const MEDIAN IMPROVEMENTS. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. Const BASING IMPROVEMENTS, SEE DRAINAGE PLANS. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:24 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 26026512343206789 1 2 3206789 1 210127 89LINE "OAK-1" K-RAIL (12') OG 10 2' 1' Clr (12') K-RAIL AREA Const Var AREA Const (4') 4 14' 11 2' 1' Min 15'9'(12') (6') OG ASPH P P P P P P P P P P PP P P PP ASPH ASPH ASPH POOLCONCASPHASPHASPH ASPHASPHASPHASPH ASPHASPH OLIVE STP P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCLINE "EB2" LINE "WB2" (4') (12')(22') 2' Shld 2' K-RAIL Var 4 AREA Const 15 (12')(12')12'12' 1' Min Var 0'-26' Var OG SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT SCALE: 1" = 50' TRAFFIC HANDLING PLANS STAGE CONSTRUCTION AND R/WR/WR/W APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET: 1 1'12'12'12' (12 ')(12')(12')(12')(12')(16')(11')(12')(11')(13')(11')(12')10 10 14 (12') (12') EC END Temp STRIPING 40.87' Rt "EB2" +26.35 LL PM PM 9 25 38 27B 1 CS CS R9-9 NOTES: 1. B B C C 2. 14 15 R/W15 2 4 11 (10')STAGE 1 DAY TIME (18')(12') TYPE IV (L) ARROW 2 9 (12')15'11 37B (22 ') (12 ') (12 ') TCE (Var) (Var) R /W (24')43' Lt "OAK-1" +20 Beg K-RAIL 11 4 10 CSR9-9 END K-RAIL +8763'CSC30(CA) 10 No.#R CURVE DATA T L 1 186.17'111 93.38'954.00' 3. 9 +25(2 EA) TYPE IV (R) ARROW 4.36' Lt "EB2" +11.30 46.5' SEE NOTE 3 (ARRAY TS11) Temp CRASH CUSHION MODULE R/W TYPE III Barr (3 EA) R4-7 23'(12')32' Rt "OAK-1" +34 30' C-C SPACING (12 EA) CHANNELIZER (SM) 20' C-C SPACING (3 EA) CHANNELIZER (SM)R/WCRASH CUSHION MODULE. REMOVE Exist BIKE LANE STRIPING, PAST Temp VarSEE Sht SCD-1 4 18 18 DS No. 3 DS No. 218 DS No. 117 18DS No. 84 SC-8MATCH LINE "WB2" Sta 315+50SEE SHEET SC-7SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR SECTIONS B-B AND C-C SEE SHEET SC-9. 30' C-C SPACING (11 EA) CHANNELIZER (SM)14'256 R/WR/WSECTION B-B NO SCALE SECTION C-C NO SCALE R/WR/WSEE SHEET SC-9MATCH LINE "WB2" Sta 322+5015'"WB2" LINE "EB2" LINE "OAK-1" LINE24TH St OAK StOLIVE StOAK St"OAK-1" LINE"OAK-2" LINEOAK St Const CARRIER CANAL BRIDGE. SEE STRUCTURE PLANS. Const PORTION OF EB 24TH St WIDENING. Const MAINTENANCE ACCESS ROAD. Const Temp Pvmt. Const ALLEY IMPROVEMENTS. Const SOUNDWALL. SEE STRUCTURE PLANS. WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11. Const DRAINAGE MAIN SYSTEM, SEE DRAINAGE PLANS. Const Const ELM St CUL-DE-SAC.Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. ONLY, USE Std PLAN T11. SEE UTILITY PLANS. WEEKEND LANE CLOSURES Const UTILITY IMPROVEMENTS (BY OTHERS), PP P P P P pPOOLASPH ASPHCONC ASPHASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH ST ELM STASPHELM STASPHBEECH STASPHASPHMYRTLE STASPHSPRUCE STP P ASPHASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONC ASPHPOOLS POOLPOOL CONCASPHP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLUB UB 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:25 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND TCE TCE TCE (12') (12') (16') (Var) (Var) (16')(26')(24')APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET: 15 12 14 END K-RAIL Beg Temp STRIPING END Temp STRIPING 41.70' Rt "EB2" +00 CS C27(CA) CS C27(CA) CS TYPE III Barr (4 EA) R11-2 (EA) NOTES: 1. 20' C-C SPACING (17 EA) CHANNELIZER (SM) 15 3 10 8 1 14 4.22' Lt "EB2" +14.21 (Var) (Var) 1 10 TCE TCET CE TCE TCE TCE 8 TCE 23'R/WR/W(22')(12')(12')13 13 STAGE 1 DAY TIME R/W 3 46.26' Rt "EB2" +15.24 1023'3.82' Lt "EB2" +33 3 SEE Sht SCD-1 DS No. 3 12 17 18 DS No. 3MATCH LINE "WB2" Sta 322+50SEE SHEET SC-8SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 17.07' Rt "EB2" +42.22 257 SC-9 18 17 (CalW)Carrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "EB2" LINE "WB2" LINE 24TH St Const NORTH PORTION OF 23RD St. Const Temp Pvmt. Const DRIVEWAY IMPROVEMENTS.Const NORTH PORTION OF INTERSECTION. Const NORTH PORTION OF 24TH St. LANE CLOSURES ONLY, USE Std PLAN T11 AND/OR T12. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. WEEKEND Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. P PP PP P ASPHASPHASPH ASPHASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONC PP P P P P P P P P P PP P P P PASPH ASPHASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPH ASPH A S P H ASPHASPH ASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHCONC CONCASPH CONC ASPHASPH ASPH CONC ASPHD STE ST23RD ST 23RD ST P P P P P P PP P ASPH ASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:26 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 355 36067 8 9 12 3 4 6 7 8 9 SCALE: 1" = 50' SC-10 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY TCE TCE (12') (16') STAGE CONSTRUCTION NOTES THIS SHEET: 5 TCE "24TH" +22 NOTES: 1. 8 R/W T C E No.#R CURVE DATA T L 111.96'141 56.27'448.00' 2 3 4 5 6 2 3 11' 12' 425.00'124 47.20'94.01 7 4 5 7 323.00'344 282.00'492 243.34'129.83' 6 850.00'083 63.67' 846.87'084 64.61'128.96' 1 3' 1 3' (12') (16') TCE R/W (Var) (19') 20' C-C SPACING (16 EA) CHANNELIZER (SM) 20' C-C SPACING (20 EA) CHANNELIZER (SM)R/WR/W 12' 11'11' 14' 18' 11' 22' 18' (21') 12' 21' 11' 12' 11' 12' 20' C-C SPACING (23 EA) CHANNELIZER (SM)20' C-C SPACING (24 EA) CHANNELIZER (SM) 20' C-C SPACING (18 EA) CHANNELIZER (SM) BC 12.08' Rt "24TH" +89 PRC 26' Rt "24TH" +00 101.07'195.91 127.10' 5 16 5 5 88 CSR4-8 CSC27(CA)CSR3-7 CS R3-7 CS R4-7 CS C27(CA) CS C27(CA) 8 3' "23RD" +50 "23RD" +96 END Temp STRIPING CS R4-7 +17R/W 9 27B +08+62+4020' C-C SPACING (9 EA) CHANNELIZER (SM) 25 9 38 9 40 25 9 9 25 25 8 27B PM TYPE IV (R) ARROW TYPE IV (R) ARROWPM TYPE VII (L) ARROW PM TYPE VII (R) ARROW PM EC PRC PCC 14.01' Rt "23RD" +80 END TAPER R/W R/W 8 15 TCE TCE Beg TAPER END TAPER 6' Rt "24TH" +51 14' Rt "24TH" +00 15 16 +52+32+85STAGE 1 DAY TIME+866 7 3.34' Rt "24TH" +96.52 7 EC End Temp STRIPING Beg Temp STRIPING "24TH" +62 Beg Temp STRIPING "24TH" +40 "24TH" +17 Exist STRIPING CONFORM TO END Temp STRIPING "24TH" +00 "24TH" +53 37B 6 6 9 27B "23RD" +34 Beg Temp STRIPING END Temp STRIPING "23RD" +53 8 8+259.34' Lt "23RD" +86.24 3.65' Lt "23RD" +85.67 PCC 0.16' Rt "23RD" +14.06 EC Beg TAPER 11.90' Rt "24TH" +13.10 73.80' Lt "23RD" +40.34 SCD-1 SEE Sht 17 8 DS No. 25 DS No. 27 DS No. 28 8 DS No. 19 DS No. 20 DS No. 55 DS No. 32 DS No. 34 DS No. 35 17 33,35 & 55 DS No. 31, SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, CONFORM TO Exist STRIPING BC CONFORM TO Exist STRIPING PM PM TYPE VII (L) ARROW TYPE VII (R) ARROW PM PM TYPE VII (L) ARROW TYPE VII (R) ARROW 258 SEE SHEET SC-11MATCH LINE "24TH" Sta 360+50NIGHT TIMESEE SHEET SC-11MATCH LINE "23RD" Sta 359+85STRIPING Beg Temp 24TH St 23RD St "23R D" LI NEBAY StB StC StD StE StC StDRAKE StENCINA St"2 4TH " L INE DAY TIME NIGHT TIMEDAY TIMENIGHT TIME Const NORTH PORTION OF 23RD St. Const NORTH PORTION OF INTERSECTION Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. LANE CLOSURES ONLY, USE Std PLAN T11 AND/OR T12. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. OVERNIGHT ASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP PPPP ASPHASPHCONCASPH ASPHASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHASPHP P P P P P P P P P P P PPP PPP P FPP P P P P ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC CONC ASPH ASPHCONC ASPH ASPH CONC ASPH ASPH ASPH ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STG STF ST24TH ST 23RD ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:27 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 1 2 3 4 6 7 8 9 1 2 R/W R/W R/W R/W SCALE: 1" = 50'SEE SHEET SC-12MATCH LINE "24TH" Sta 374+50SEE SHEET SC-12MATCH LINE "23RD" Sta 372+50SC-11 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES: 1. (21') (19') (12') (21') 11' 11' "23RD" +85 25 9 CS R4-7 CS C27(CA) 2 1 STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 25 9 TYPE VII (L) ARROW TYPE VII (R) ARROW PM PM 2 CS R4-7 CS C27(CA)+35"23RD" +73 Exist STRIPING CONFORM TO 25 9+83+40+302 CS R4-7 CS C27(CA) CS R4-7 CS (23 EA) 20' C-C SPACING CHANNELIZER (SM) 1 2 1 (CA) C27 25 9 TCE TCE 11' 11' 3'3' 3'3' 1(14')(12')(14')(12')(12')(12')(10')(12')(12')(19')(19')(17')(12')(19')(22')(22')(12')(12')(10')(12')(12')(12')(12')(12')(12')(17')(11')(11')(11')(18')(11')(11')(11')(22')(22')(22')(22')3 TCE TCE TCE TCE STAGE 1 NIGHT TIME 3 3 3 3 3 (22 EA) 20' C-C SPACING CHANNELIZER (SM) (22 EA) 20' C-C SPACING CHANNELIZER (SM)+95+45+84(11 EA) 20' C-C SPACING CHANNELIZER (SM) CONFORM TO Exist STRIPING "23RD" +55 END Temp STRIPING Beg Temp STRIPING "23RD" +25 END Temp STRIPING "23RD" +93 END Temp STRIPING "23RD" +55 Beg Temp STRIPING "23RD" +20 6 DS No. 47 3 DS No. 36 DS No. 49 3 DS No. 50 DS No. 56 DS No. 54 3 DS No. 58 6 51, 53, 55, 56 & 58 DS No. 47, 48, 50, TCE SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, (6 EA) 20' C-C SPACING CHANNELIZER (SM) TYPE VII (L) ARROW PM PMTYPE VII (R) ARROW 12' 11' 12' 11' TYPE VII (R) ARROW PM PM TYPE VII (L) ARROW 259 MATCH LINE "24TH" Sta 360+50SEE SHEET SC-10MATCH LINE "23RD" Sta 359+85SEE SHEET SC-10DAY TIME21' 12' CSW74 Lt (CA) 37B "24TH" +96 Temp STRIPING CONFORM TO 24TH St 23RD St "24TH" LINE G StH StF StF StG StH StEYE StEYE St"23RD" LINE NIGHT TIME Const NORTH PORTION OF 23RD St. Const NORTH PORTION OF INTERSECTION. LANE CLOSURES ONLY, USE Std PLAN T11 AND/OR T12. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. OVERNIGHT Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. ONLY, USE Std PLAN T11 AND/OR T12 Const MEDIAN IMPROVEMENTS. OVERNIGHT LANE CLOSURES FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPH ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P PP PP P P P P P P P P FP FP P PP FP P FP ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPH ASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST 23RD ST M STL STL STK STASPHCHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:28 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-12MATCH LINE "23RD" Sta 372+50SEE SHEET SC-11MATCH LINE "24TH" Sta 374+50SEE SHEET SC-11SEE SHEET SC-13"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES: 1. STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 (19') (12') (21') (Var) (13 ') (Var) (13 ') 11' 11' 11' 11' "23RD" +88 Exist STRIPING CONFORM TO+75+16CS R4-7 CS C27(CA) 2 PM PM 25 9 3 1 25 9 +57+552 CS R4-7 CS C27(CA) 2 CS R4-7 CS C27(CA) 2 1 1 1 25 9 25 9 TYPE VII (L) ARROW TYPE VII (R) ARROW PM PM+00+02+50(23 EA) 20' C-C SPACING CHANNELIZER (SM) (29 EA) 20' C-C SPACING CHANNELIZER (SM) (23 EA) 20' C-C SPACING CHANNELIZER (SM) 3' (L) ARROW TYPE VII (R) ARROW TYPE VII 3'3'3'(11')(11')(16')(14')(13')(10')(12')(12')(10')(12')(11')(15')(10')(10')(15')(22')(22')(19')(12')(19')(19')(11')(20')(19')(30')(12')(12')(11')(12')(12')(12')(12')(11')(12')(20')(10')(11')(11')(20')(11')(20')(20')(11')(9')(11')(10')(10')(16')4 TCE TCE STAGE 1 NIGHT TIME (12 EA) 20' C-C SPACING CHANNELIZER (SM) 4 3 3 3 TCE TCE TCETCE TCE TCE TCE TCE TCE 3 R/W R/WCHANNELIZER (SM) "23RD" +97 "23RD" +67 "23RD" +45 "23RD" +10 "23RD" +91 "23RD" +60 "23RD" +33 6 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, DS No. 60 DS No. 76 3 DS No. 61 3 DS No. 88 55 & 78 DS No. 6 76, 77 & 78 DS No. 55, 62, DS No. 81 Exist STRIPING CONFORM TO DS No. 803 Exist STRIPING CONFORM TO Exist STRIPING CONFORM TO DS No. 833 DS No. 823 6DS No. 80 DS No. 816 6DS No. 82 PMTYPE VII (L) ARROW PMTYPE VII (R) ARROW 11' 12' 11' 12' Exist STRIPING CONFORM TO Exist STRIPING CONFORM TO PM PM (L) ARROW TYPE VII (R) ARROW TYPE VII Exist STRIPING CONFORM TO Exist STRIPING CONFORM TO 260 23RD St L StK StK StL StM StCHESTER AveCHESTER Ave"24TH" LINE "23RD" LINE 24TH St M St"E178" LINE Const NORTH PORTION OF 23RD St. Const NORTH PORTION OF EB SR-178. LANE CLOSURES ONLY, USE Std PLAN T11 AND/OR T12. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. OVERNIGHT P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHASPH TRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHTRAILER ASPH CONC ASPH ASPH ASPHASPHASPH A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST Q STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:29 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 R /W R / W R /W R/W R/W R/W SCALE: 1" = 50' SC-13 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET SC-12APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 5 CS R4-7 CS C30(CA) 30' C-C SPACING (26 EA) CHANNELIZER (SM) EC Exist STRIPING CONFORM TO Var 11'(V ar)(13')(13')1 Exist STRIPING CONFORM TO 25 9 27B 8 BC 10.11' Lt "E178" +55.58 (12')(12')(12')(12') (12') (18')(18')(14')(12') (12') (12') No.# 8 R CURVE DATA 165 T L 218.86'110.23'743.63' 4.77' Rt "E178" +76.65 "23RD" +80 STAGE CONSTRUCTION NOTE THIS SHEET: 3 NOTES: RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT 2. SEE SHEET SC-11. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 1 3 STAGE 1 NIGHT TIME 5 3 INSTALL Temp OVERLAY NO SCALE DETAIL A Lake Isabella EAST Union Ave Q Street Golden State Ave 178 CS DETAIL A SEE DS No. 111 DS No. 83 261 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEN StO StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd Const PORTION OF WB 24TH St WIDENING. Const PORTION OF EB 24TH St WIDENING. Const OH SIGN. SEE SIGN PLANS. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:30 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma014.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 6 7 8 9 1 2 3 3154 305 2 3 4 6 8 9 1 2 3 4 315 310 YI ELDLINE "EBL" LINE "WBL" 12'12' K-RAIL 2' Shld 2' 1' Clr 12' 2' Shld 5 4 OG 11' K-RAIL 1' Clr 2' AREA Const Var 11' 1' Var Var Const AREA ASPHASPHASPH ASPH P DIRT ASPH ASPH ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTCONC CONC ASPH P ASPHASPH RIVERSIDE DR ASPH24TH ST ASPHCONCASPHCONCBRUSHDIRTASPH R/W R/W R/W"EB2" LINE SCALE: 1" = 50'SEE SHEET SC-15MATCH LINE "WB2" Sta 315+50SC-14 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W 11' 12' 12' 11' 12' STAGE CONSTRUCTION NOTES THIS SHEET: 5 13 4 Beg K-RAIL 26.91' Rt "EBL" +60 END TAPER 27B NOTES: 1. A A SECTION A-A NO SCALE APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 4 5 13 PM(L) ARROW TYPE IV END K-RAIL 28.68' Lt "WBL" +43.67 STAGE 2 DAY TIME 27B 9 41.92' Rt "EBL" +91.71 32.10' Rt "EBL" +91.06 12.75' Rt "EBL" +62.93 PM PM PM"YIELD" PM"YIELD LINE" CSR1-2 CSW4-2R CSW20-5R MODULE (ARRAY TS11) Temp CRASH CUSHION (18 EA) 30' C-C SPACING CHANNELIZER (SM) (14 EA) 30' C-C SPACING CHANNELIZER (SM) TYPE I ARROW (24') "EBL" +14 "WBL" +41 9 Beg TAPER TYPE VI ARROW (3 EA) 25 35.86' Rt "EBL" +80 10.50' Lt "WBL" +40 10' SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 28' 27' END Temp STRIPING END TAPER Beg TAPER CONFORM TO Exist STRIPING (12') (12)' (12') (20') 12.75 "EBL" +25 CONFORM TO Exist STRIPING (Var) (Var) (12') (12') Beg TAPER END TAPER 11' Rt "EB2" +63.09 Ret WALL LOLCONFORM TO Exist STRIPING 262 12' (12) (12) (12') 24TH St"WBL" LINE "EBL" LINE Kern River"WBL" LINE REMOVE Exist RAISED MEDIAN AND Const Temp Pvmt. Const PORTION OF EB 24TH St WIDENING. Const PORTION OF WB 24TH St WIDENING. Const OAK St WIDENING. ACCESS DURING CONSTRUCTION, USE Std PLAN T12 AND/OR T13. Const PORTION OF INTERSECTION. CONTRACTOR TO MAINTAIN SEE DRAINAGE PLANS. Const DRAINAGE SYSTEM. Const SOUND WALL. SEE STRUCTURE PLANS. Std PLAN T12 AND/OR T13. CONTRACTOR TO MAINTAIN ACCESS DURING CONSTRUCTION, USE Const UTILITY IMPROVEMENTS (BY OTHERS), SEE UTILITY PLANS. ASPH P P P P P P P P P P P P P P PP PP P P P PP ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHASPHASPH ASPHASPHASPHASPH ASPH ASPH ASPHASPH OAK STOLIVE STPASPH ASPH P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:31 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma015.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 26026512343206789 1 2 3206789 1 21012347 89SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR/W R/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT SCALE: 1" = 50'MATCH LINE "WB2" Sta 315+50SEE SHEET SC-14SEE SHEET SC-17MATCH LINE "WB2" Sta 322+50SC-15 TRAFFIC HANDLING PLANS STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY12'11' 1 2'12' 1 1' 4 12' 12' 11' 12' 12' 12' 12' TCE R/W 5 (11')(13')(11')(12')STAGE CONSTRUCTION NOTES THIS SHEET: 5 5 12 6 6 6 +00+05+06+90+47Beg K-RAIL CS LL 27B 9 38 STRIPING CONFORM TO Exist 30' C-C SPACING (16 EA) CHANNELIZER (SM) PM 29 9 C27(CA)CS C31A(CA)CS C31A(CA)CS C27(CA)CS 20' C-C SPACING (10 EA) CHANNELIZER (SM) 20' C-C SPACING (36 EA) CHANNELIZER (SM) CS C31A(CA) R9-10 9 27B NOTES: 1. "EB2" +4327'5' 12 2 C R/WR/WR/WR/W23' Rt "EB2" +13.40 2. 14 2 4 5 6 ARROW TYPE IV (L) 10' 3 END K-RAIL 21.42' "EB2" +15.54 MODULE (ARRAY TS11) Temp CRASH CUSHION 20' C-C SPACING (7 EA) CHANNELIZER (SM) 13.44' Rt "OAK-2" +36.11 14.36' Rt "EB2" +80.26R/WR/W11' 38 27B 27B (16')(11')PM TYPE IV (L) ARROW (4 EA) 33.80' Rt "EB2" +24.09 No.#R CURVE DATA T L 2' Rt "WB2" +89.56' 550.00'13 115 4024.00'14 064 PCC Beg 120' BAY TAPER BC 24' Rt "WB2" +69.70' 24' Rt "WB2" +35.94' PRC 22 21.32' Rt "EB2" +95.07 BC END 120' BAY TAPER 15 0731632.00'108.56' STAGE 2 DAY TIME 12 12 1654.00'081 118.81'237.21' 13 14 114.45'52.73' 216.87' 15 15 DS No. 1 END K-RAIL 25' Rt "EB2" +46.13 15DS No. 1 DS No. 2 15 (12')(12')(12')(16')(11')(12')(Var)C SEE Sht SCD-2 B B END Temp STRIPING 3.FULL WEEKEND CLOSURE OF INTERSECTION, SEE MI PLANS. SEE NOTE 4 SEE NOTE 3 E CHANNELIZER (SM) SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR SECTION B-B AND SECTION C-C SEE SHEET SC-16. 1 2' 1 2' 3 235.13'469.74' 15 END Temp STRIPING "EB2" +91.50 263 (CalW)14 "WB2" L INE "EB2" LINE24T H St OAK St"OAK-2" LINEOLIVE St"OAK-1" LINEOAK St"OAK-1" LINEOAK St REMOVE Exist RAISED MEDIAN AND Const Temp Pvmt. Const PORTION OF WB 24TH St WIDENING. Const OAK St WIDENING. SLURRY SEAL. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:32 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma016.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LINE "OAK-2" K-RAIL 2' OG 2' CHANNELIZER (SM) 5'4' AREA Const AREA Const 121412 Var Var 13'12' LINE "EB2" OG LINE "WB2" 12'12' K-RAIL 2' 11'11'12' 2' 12'Var 1.3' 5' AREA Const 5 CHANNELIZER (SM) 2 2' Shld LINE "B" OG Var AREA Const Var 1'-12' 12'12' 2' Shld 2' K-RAIL 12'12' 5 Var 0'-11' SC-16 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET:NOTES: 1. SECTION C-C NO SCALE 2 SECTION B-B 2. FOR LOCATION OF SECTION D-D SEE SHEET SC-17.3. 5 12 SECTION D-D 14 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR LOCATION OF SECTION B-B AND SECTION C-C SEE SHEET SC-15. STAGE 2 DAY TIME 264 Const PORTION OF WB 24TH St WIDENING. REMOVE Exist RAISED MEDIAN AND Const Temp Pvmt. Const PORTION OF INTERSECTION. CONTRACTOR TO MAINTAIN ACCESS TO DRIVEWAY AT ALL TIMES. Const MAINTENANCE DRIVEWAY AND PRIVATE DRIVEWAY. CONTINUE Const FROM PREVIOUS STAGE. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. PLANS. SEE NOTE 3. Const UTILITY IMPROVEMENTS (BY OTHERS), SEE UTILITY PP P P P P pPOOLASPHCONC ASPHASPHASPH ASPH P P P P P P PPP P P P PP P P PP P P ASPH ASPH ASPHCONC CONCCONC CONC POOL CONC CONC CONC CONC POOLASPHASPHCONC CONCCONC CONCCONC ASPH24TH STELM STBEECH STASPHASPHMYRTLE STASPHSPRUCE STP ASPHP P P P P P PPP P C O NC POOLCONCC ONC ASPHPOOLS POOLPOOL CONCP P P P PP P P P P P P POOLDENSE TREESPOOLP O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONC CONC ASPH POOLx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:33 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma017.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 R/W R/W R/W SCALE: 1" = 50' SC-17 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE "WB2" Sta 322+50SEE SHEET SC-15SEE SHEET SC-18MATCH LINE "B" Sta 336+50R/W TCE TCE TCE 12'(12')12' 12' 12'12' 12' 12' 12' STAGE CONSTRUCTION NOTES THIS SHEET: 5 5 5 5 115 Beg TAPER PMARROW (2 EA) TYPE IV (L) 38 30' C-C SPACING (23 EA) CHANNELIZER (SM) CSC27(CA) C30(CA)CS 20' C-C SPACING (20 EA) CHANNELIZER (SM) 27B 9 CSC27(CA) 22 C31A(CA)CS CS 27B END Temp STRIPING 29 9 22 14 20' C-C SPACING (34 EA) CHANNELIZER (SM) 20' C-C SPACING (33 EA) CHANNELIZER (SM) TYPE III Barr (4 EA) R11-2 (2 EA) NOTES: 2.+275' Beg 60' BAY TAPER 12' 12' D D 2 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY18'20'20'5' 12' 12' 11 5 6 1. No.#R CURVE DATA T L 4024.00'14 064 15 0731632.00'216.87'108.56' TCE Beg FLARE 11.89' Lt "EB2" +75.20 18.38' Rt "EB2" +99.36 PM Beg FLARE END FLARE 8.12' Lt "EB2" +66.82 13.54' Lt "EB2" +17.58 2' Rt "WB2" +44.05 16.40' Rt "WB2" +86.74 15.88' Lt "EB2" +99.11 END FLARE 33.38' Rt "EB2" +74.74 END TAPER 26.40' Rt "EB2" +38.20 32.95' Rt "B" +09.55 40' Rt "EB2" +50 29 22 TCE 15 18.08' Lt "EB2" +10.29 END K-RAIL PRC 18.73' Rt "WB2" +24.70 EC END 60' BAY TAPER 16.95' Rt "EB2" +43.81 BC 19.38' Rt "EB2" +25.81 PRC 34.38' Rt "B" +36.76 40' Rt "B" +16.87 BC PRC EC 3' Rt "B" +13.15 Beg K-RAIL 29' Rt "B" +60 21 22 24 25 Beg Temp STRIPING "EB2" +77 "EB2" +75 "B" +10 Beg Temp STRIPING 6 6 6 20' C-C SPACING (8 EA) CHANNELIZER (SM) TCE TCE TCE 12' 12' 12' 12'+75+80+80+60+60+60+60+20TCE 17 6000.00'021 243.28' 19 1024.00'020 20 1000.00 574.00' 045 080 42.60'85.16' 24 22 550.00' 550.00' 073 080 36.19'72.91' 21 25 574.00'080 18.94' 39.80'81.34' 38.57'77.01' 40.25'80.37'27'TYPE III ARROW (2 EA) 2 23 150.00'173 23.27'46.18' 23 11' 3. USE Std PLAN T12 AND/OR T13. CONTRACTOR TO MAINTAIN ACCESS DURING CONSTRUCTION,4. ALTERNATING FULL WEEKEND CLOSURE OF INTERSECTION, SEE MI PLANS. SEE NOTE No.4 END Temp STRIPING Beg 60' BAY TAPER EC END 60' BAY TAPER TYPE IV (L) ARROW (2 EA) SEE NOTE No.3 SEE NOTE No.3 1 1 15 15 DS No. 3, 4, 5, 7 & 8 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR SECTION D-D SEE SHEET SC-16. LL 46.73' Rt "EB2" +88.96 235.13'469.74' 121.65' 37.88' STAGE 2 DAY TIME 9' Rt "EB2" +05.26 EC PRC PRC "EB2" +84.14 19.71' Rt TCE 17 19 20 27B 29 CSC31A(CA) 265 14 14(CalW) CSR3-2 24TH StCarrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StELM St"EB2" LINE "B" LINE BEECH St"WB2" LINE Const PORTION OF WB 24TH St WIDENING. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. UTILITY PLANS. Const UTILITY IMPROVEMENTS (BY OTHERS), SEE PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPH ASPH ASPH ASPH CONC CONC ASPHASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:34 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma018.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4 R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-18MATCH LINE "B" Sta 336+50SEE SHEET SC-17SEE SHEET SC-19MATCH LINE "24TH" Sta 347+50R/W TCE 12' 12' 12' 12' 12' 12' 12' 12' 5 STAGE CONSTRUCTION NOTES THIS SHEET: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY CS CSTYPE III Barr (4 EA) R11-2 (2 EA) TYPE III Barr (4 EA) R11-2 (2 EA) CS TYPE III Barr (4 EA) R11-2 (2 EA) 27B 9 22 +5040' Rt "B" +55 29 40' Rt "B" +55 Beg 60' BAY TAPER TCE NOTES: 1. 3' 5 TCE TCE TCE TCE 5 5 5 Beg ANGLE POINT TCE STAGE 2 DAY TIME 11' 15 DS No. 3, 12, 14 & 16 14 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 266 15 14 (CalW) 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE Const SOUNDWALL. SEE SOUNDWALL PLANS. Const PORTION OF WB 24TH St WIDENING. Const SOUTH PORTION OF 23RD St. Const SOUTH PORTION OF 24TH St. Const B St CUL-DE-SAC Const C St CUL-DE-SAC WEEKEND CLOSURE OF INTERSECTIONS, SEE MI PLANS. Const PORTION OF INTERSECTION. ALTERNATING FULL SEE DRAINAGE PLANS. Const DRAINAGE SYSTEM. SEE UTILITY PLANS. SEE NOTE 2. Const UTILITY IMPROVEMENTS (BY OTHERS), P PP PP P ASPHASPHASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPH 24TH ST B STASPHC STP P P PP CONC CONC PP P P P P P P P P P PP P P P PASPH ASPHASPH ASPHASPHASPHASPHASPH ASPH A S P H ASPHASPH ASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPH CONC ASPHASPH ASPH CONC ASPHD STE ST23RD ST PP P ASPH ASPH ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:35 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma019.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 93 4 5 3 5 0 35567 8 9 12 3 4 6 7 8 9STOPSTOPR/W R/W R/W R/W SCALE: 1" = 50'MATCH LINE "24TH" Sta 347+50SEE SHEET SC-18SC-19 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W TCE R/W TCE 12' 12' 11' 11' 7 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET: 5 6 7 NOTES: 1. 25 79.77' Lt "23RD" +78.71 43.20'' Lt "23RD" +98.12 CS 20' C-C SPACING (30 EA) CHANNELIZER (SM) 9 27B +4 6 +0 0 +53CS CS CS 26 OF 22ND St & C St) (PLACE AT THE NE CORNER R11-4 CS OF 22ND St & C St) (PLACE AT THE NE CORNER R11-4 CS (3 EA) W1-8L TYPE III Barr (4 EA) R11-2 (2 EA) TYPE III Barr (4 EA) R11-2 (2 EA) TYPE III Barr (4 EA) R11-2 (2 EA) 8 3 3 27 PCC CONFORM TO Exist STRIPING BC 15.04' Lt "23RD" +05.12 15' Lt "23RD" +35.36 9 27B 11' 11'+00"23RD" +87 Beg Temp STRIPING EC END Temp STRIPING Beg Temp STRIPING "23RD" +35 9 15.02' Lt "23RD" +72.21 END ANGLE POINT END 60' BAY TAPER 29 22 38 9 25 9 25 25 9 38 9 37B PMTYPE IV (L) ARROW (2 EA) Beg Temp STRIPING END Temp STRIPING CONFORM TO Exist STRIPING CSR3-7CSR3-7L CS R4-7 CSC27(CA) CSC27(CA) "24TH" +58 END Temp STRIPING "24TH" +13 Beg Temp STRIPING END Temp STRIPING "24TH" +01 "24TH" +17 "24TH" +40 "24TH" +17 "24TH" +64 "24TH" +53 "24TH" +51 9 27B TCE TCE 11' 21' 22' 6' Rt "24TH" +00 Beg TAPER 21' 11' 22' 13' 11' 22' END TAPER 5' Rt "24TH" +52.15 15.02' Lt "23RD" +72.21 MODULE (ARRAY TS11) Temp CRASH CUSION 20' C-C SPACING (4 EA) CHANNELIZER (SM) Beg K-RAIL END K-RAIL 28.05' Rt "23RD" +27.36 20' C-C SPACING (17 EA) CHANNELIZER (SM) 20' C-C SPACING (19 EA) CHANNELIZER (SM) 20' C-C SPACING (24 EA) CHANNELIZER (SM) 20' C-C SPACING (11 EA) CHANNELIZER (SM) TCE 11' 13'13' 11' 9 10 3 7 6 6 5 8 9 10 +75+05+40+60+1515'13'24'38'46 ' 34' 2 8'12'6'+87No.R T L CURVE DATA 372208.00'26 27 585.00'161 70.14' 165.68' 135.67' 83.40' 14'12' CS R4-8 CS C27(CA) C27(CA)CS CSR4-8 CSC27(CA) IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ASPH7 # STAGE 2 DAY & NIGHT TIME 12' 12' 7.94' Rt "23RD" +35.64 14 15DS No. 3 & 18 1621, 22 & 24 DS No. 19, SEE SHEET SC-20MATCH LINE "24TH" Sta 360+50SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, NIGHT TIMESEE SHEET SC-20MATCH LINE "23RD" Sta 359+85355 PM(L) 2 EA TYPE IV END K-RAIL END Temp STRIPING 11' 11' PM (L) ARROW TYPE VII PM (R) ARROW TYPE VII PM PM (R) ARROW TYPE VII Beg Temp STRIPING END Temp STRIPING TYPE VII (L) ARROW 267 PM(L) ARROW TYPE VII (R) ARROW TYPE VII PM 2. USE Std PLAN T12 AND/OR T13. CONTRACTOR TO MAINTAIN ACCESS DURING CONSTRUCTION, (CalW)14 15 SEE NOTE 2 15 PM "STOP" LL PM"STOP" LL 24TH St 23RD St "24TH" LINE "23RD" LINEBAY StB StC StD StE StC StDRAKE StENCINA StDAY TIMENIGHT TIMENIGHT TIME DAY TIME Const SOUTH PORTION OF "23RD" LINE. Const SOUTH PORTION OF INTERSECTION. Const DRIVEWAY ACCESS.ASPHP PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP PPPP ASPHASPHCONCASPH ASPHASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPHP P P P P P P P P P P PPP PPP P FPP P P P P ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC ASPH ASPHCONC ASPH ASPH CONC ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:36 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma020.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 1 2 3 4 6 7 8 9 1 2STOPSTOPR/W R/W R/W R/W R/W R/W SCALE: 1" = 50'SEE SHEET SC-21MATCH LINE "24TH" Sta 374+50SEE SHEET SC-21MATCH LINE "23RD" Sta 372+50SC-20 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND (19') (12') (21') (19') (12') (21')+95"23RD" +96 "23RD" +85 9 CS R4-8 CS C27(CA) 2 1 "23RD" +55 STRIPING END Temp "23RD" +25 Beg Temp STRIPING 9 TYPE VII (R) ARROW TYPE VII (L) ARROW PM PM CS C27(CA)+45+35"23RD" +96 "23RD" +15 9 "23RD" +50 STRIPING END Temp "23RD" +20 Beg Temp STRIPING +84+83+40+302 CS R4-8 CS C27(CA) CS R4-8 CS (23 EA) 20' C-C SPACING CHANNELIZER (SM) (24 EA) 20' C-C SPACING CHANNELIZER (SM) 1 (24 EA) 20' C-C SPACING CHANNELIZER (SM) 2 1 (CA) C27 9 TCE TCE TCE 1 4 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 11' 11' NOTES: 1 2 4 27B 27B 27B 27B 11' 11' 11' 11' 11' 11' 3'3' 3'3'(14')(12')(12')(14')(12')(12')(10')(12')(12')(19')(19')(19')(12')(17')(22')(22')(12')(12')(10')(12')(12')(12')(12')(12')(12')(18')(11')(11')(11')(11')(11')(11')(17')(22')(22')(22')(22')2 CS R4-8 TCE TCE TCE 1. (4 EA) 20' C-C SPACING CHANNELIZER (SM) (12 EA) 20' C-C SPACING CHANNELIZER (SM) PM "STOP" "STOP"PM 51.75m Off=169.79' Sta=362+97.67 E=6256596.40 Lon=1191'24.2 N=2326711.96 Lat=3522'53.3 TCE CW CW LL LL 9 9 21 TCE 21 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, MATCH LINE "24TH" Sta 360+50SEE SHEET SC-19365 MATCH LINE "23RD" Sta 359+85SEE SHEET SC-19DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET: STAGE 2 NIGHT TIME PM PM (L) ARROW TYPE VII (R) ARROW TYPE VII Beg Temp STRIPING STRIPING END Temp PM PM(L) ARROW TYPE VII (R) ARROW TYPE VII END Temp STRIPING Beg Temp STRIPING L=6' L=6'L=12' 268 24TH St"24TH" LINE G StH StF StG StEYE StH StEYE St"23RD" LINE F St23RD St NIGHT TIME DAY TIME Const SOUTH PORTION OF "23RD" LINE. Const SOUTH PORTION OF INTERSECTION. Const DRIVEWAY ACCESS. Const PORTION OF 24TH St WIDENING. Const SOUTH PORTION OF WB SR-178. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. FPASPHASPHASPHASPH ASPHASPH CONCCONC ASPHASPH ASPH CONCA SPHCONCCONC CONC ASPHASPHASPHP P P P PPPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P PP PP P P P P P P P P FP FP P PP FP P FP ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPHASPH ASPHCONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST M STL STL STK STASPHCHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:37 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma021.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-21MATCH LINE "23RD" Sta 372+50SEE SHEET SC-20MATCH LINE "24TH" Sta 374+50SEE SHEET SC-20SEE SHEET SC-22"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION 11' 11' "23RD" +88 "23RD" +97 +75+16CS R4-8 CS C27(CA)2 PM PM 9 1 9 "23RD" +67 "23RD" +45 +57+552 CS R4-8 CS C27(CA) CS R4-8 CS C27(CA) 1 1 1 9 9 TYPE VII (L) ARROW PM PM +00+02+50"23RD" +10 "23RD" +93 "23RD" +60 (23 EA) 20' C-C SPACING CHANNELIZER (SM) R/W NOTES: 1. STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 (19') (12') (21') (Var) (13 ') TCE TCE TCE TCE 3' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY (R) ARROW TYPE VII (L) ARROW TYPE VII 27B 27B27B27B 11' 11' 11' 11' 11' 11'3'3'3' TCE(11')(11')(14')(13')(10')(16')(10')(12')(11')(12')(12')(15')(10')(15')(10')(22')(22')(19')(12')(19')(19')(30')(19')(11')(20')(12')(12')(11')(12')(12')(12')(12')(12')(11')(10')(11')(11')(20')(11')(10')(10')(16')(20')(11')(20')(20')(11')(9')SPACING (23 EA) (SM) 20' C-C CHANNELIZER 4 6 DS No. 78 2 2 SPACING (23 EA) (SM) 20' C-C CHANNELIZER TCE TCE (11 EA) 20' C-C SPACING CHANNELIZER (SM) SPACING (4 EA) (SM) 20' C-C CHANNELIZER TCE TCE TCETCE TCE 4 4 5 5 5 13 '(7 EA) 20' C-C SPACING CHANNELIZER (SM) (16 EA) 20' C-C SPACING CHANNELIZER (SM) C30(CA)CS 5 6 CW CW CW CW 9 38 9 27B 39A 21 38 9 STAGE 2 NIGHT TIME 7 7DS No. 72 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 21 25 END Temp STRIPING END Temp STRIPING PM PM (L) ARROW TYPE V11 (R) ARROW TYPE VII STRIPING END Temp STRIPING Beg Temp 9 9 TYPE VII (L) ARROW TYPE VII (R) ARROW STRIPING END Temp Beg Temp STRIPING STRIPING Beg Temp L=23' L=23' L=23' L=23' L=12' L=12' (R) ARROW TYPE VII 269 L StK StL StM StCHESTER AveCHESTER Ave"24TH" LINE 23RD St "23RD" LINE 24TH St K StM St Const SOUTH PORTION OF EB SR-178 Const SOUTH PORTION OF WB SR-178. P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHTRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH STN STQ STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:38 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma022.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 R /W R/W R /W R/W R/W SCALE: 1" = 50' SC-22 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET SC-21NOTES: 1.3 (V ar)(12') (12') (12')(12')(12')(12')(12') (12') (18')(18')(14')12' 11' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY Beg TAPER 38' Lt "E178" +50 END TAPER STRIPING CONFORM TO Exist "E178" +50 20' C-C SPACING (55 EA) CHANNELIZER (SM) CSC27(CA) 3 9 CSC27(CA) CS C27(CA) CS R4-8 25 27B +453' STAGE CONSTRUCTION NOTE THIS SHEET: 6 R/W CSR11-2 CS W4-2L PM 20' C-C SPACING (36 EA) CHANNELIZER (SM) 6 STAGE 2 NIGHT TIME12' SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, NO SCALE DETAIL A DETAIL A SEECS INSTALL Temp OVERLAY INSTALL Temp OVERLAY INSTALL Temp OVERLAY Lake Isabella EAST Union Ave Q Street Golden State Ave 178 CLOSED CLOSED CLOSED CLOSED TYPE VI ARROW (3 EA) 25 25 CS W9-1L 250' 270 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEN StO St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd N StO StP StO St Const CENTER PORTION OF 24TH St WIDENING. 29 051 83.56' 32 237.54' 167.00' 110 30 34 014 24.39' 1,012.00'082 74.17'148.08' 119.15' 48.77' 1,000.00'082 73.29'146.32' 1,542.00' 1,224.00' 1,798.00' 31 1,531.00'064 90.10'180.00' 33 550.00'100 48.49'96.74' 35 36 1131,600.00'324.56'162.84' WEEKEND LANE CLOSURES ONLY, USE Std PLAN T11. Const PORTION OF 24TH St WIDENING AT KERN RIVER BRIDGE. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:39 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma023.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 6 7 8 9 1 2 3 3154 305 2 3 4 6 8 9 1 2 3 4 315 310 ASPHASPHASPH ASPH P DIRT ASPH ASPH ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTP ASPHASPH RIVERSIDE DR ASPH24TH ST CONCASPHCONCASPHBRUSHDIRTASPH YI ELDLINE "EBL" LINE "WBL" OG 11'12'11' CHANNELIZER (SM) 11'3'11' CHANNELIZER (SM) 3'27' Const AREA 22 Pkwy SW/ Var 2'2' Shld 28' Const AREA 11'6'ASPHASPHASPH ASPH P DIRT ASPH ASPH ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTP ASPHASPH RIVERSIDE DR ASPH24TH ST CONCASPHCONCASPHBRUSHDIRTASPH YI ELDR/W R/W R/W "EB2" LINE "WB2" LINE SCALE: 1" = 50'SEE SHEET SC-24MATCH LINE "WB2" Sta 315+50SC-23 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W 11'11' 12' 12' Var 2 2 1 11' NOTES: 1. PM ARROW TYPE IV (L) 38 25 CSC27(CA) 9 27B 30' C-C SPACING (53 EA) CHANNELIZER (SM) 20.50' Lt "WBL" +00 EC (29 EA) 30' C-C SPACING CHANNELIZER (SM) 259 30 31 No.#R CURVE DATA T L STAGE CONSTRUCTION NOTE THIS SHEET: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 12' 12' 41' Rt "EB2" +83.2634'F 0.74' Rt "EBL" +00 4.92' Rt "EB2" +67.18 EC Beg TAPER END TAPER 29 32 33 34 BC PRC PCC (12') (12') (Var) (12')(12') ASPH (12')17.5' 1' Rt "WBL" +06.65 EC 9.81'' Lt "WBL" +54.20 CS W4-2L PM F 31' Rt "EB2" +41.63 CSC27(CA) 2 +39EC Beg 60' BAY TAPER 35 BC Beg Temp STRIPING 36 20.50' Lt "WBL" +69.36 BC BC END 60' BAY TAPER STAGE 3 DAY TIME SECTION A-A NO SCALE A A SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 36.79' Rt "EBL" +39.41 "EBL" +35.05 46.94' Rt CS W9-1L "EBL" +00 "EBL" +20 Beg TAPER Exist STRIPING CONFORM TO 37.60' Rt "EBL" +20 END Temp STRIPING 14' Rt "EBL" +79.66 14' Rt "EBL" +04.31 38' Rt "EBL" +04.31 END TAPER 27B 250' 1 Exist STRIPING CONFORM TO ARROW (3 EA) TYPE VI (L) ER1-2 BC 271 (12')24TH St "WBL" LINE "EBL" LINE Kern River Const CENTER PORTION OF 24TH St WIDENING. Const REMAINDER OF OAK St. 35 36 1,531.00' 1,600.00' 064 113 90.10' 162.84' 180.00' 324.56' 40 39 1,528.00' 1,600.00' 211 205 295.32' 568.45' 584.06' 287.55' 37 121 38 122 118.78' 562.00'60.27'120.08' 550.00'59.62' CLOSURE OF INTERSECTION, SEE MI PLANS. Const REMAINDER OF INTERSECTION. WEEKEND Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. ASPH P P P P P P P P P P P P P P PP PP P P ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHAS PH ASPH ASPH ASPH ASPH OAK STOLIVE STPASPHCONC ASPH P P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:41 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma024.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 26026512343206789 1 2 3206789 1 21012347 89STOPSEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR / WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT SCALE: 1" = 50'MATCH LINE "WB2" Sta 315+50SEE SHEET SC-23SEE SHEET SC-26MATCH LINE "WB2" Sta 322+50SC-24 TRAFFIC HANDLING PLANS STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY12'12' 1 2'12'11' 11' 12' 12' 12' 12' TCE R/W 2 (11')(13')(11')(12')STAGE CONSTRUCTION NOTES THIS SHEET: 2 1 2' NOTES: 1.+00+71PMTYPE IV (L) ARROW PM LL 38 25 9 2 TYPE III Barr (5 EA) R4-7CS25 9 CS C27(CA) TYPE VII (R) ARROWPM PM TYPE VII (L) ARROW CW TYPE III Barr (5 EA) R4-7CS 40 R=196' 40 R=95' 4 R/W25 9 9 25 CS C27(CA) 30' C-C SPACING (5 EA) CHANNELIZER (SM)17'12'16'12'12'CW CSR4-7 TYPE III Barr (6 EA) CSC27(CA) PM BIKE LANE SYMBOL WITH PERSON BIKE LANE ARROW PM TYPE IV (R) ARROW (2 EA) PM TYPE VII (L) ARROW (2 EA) 25 39 20' C-C SPACING (5 EA) CHANNELIZER (SM) 20' C-C SPACING (12 EA) CHANNELIZER (SM) 3 3 12'16'VarCS C27(CA) 17.22' Lt "OAK-1" +82.14 30' Lt "OAK-1" +00 BC PRC EC STRIPING CONFORM TO Exist "OAK-1" +63 37 No.#R CURVE DATA T L 25 20' C-C SPACING (14 EA) CHANNELIZER (SM)R/WR/WR/WCS F 2 4 40 35 36 TYPE II (R) ARROW CS R3-7R R3-7R 40 39 CS W74(CA) Lt 20' C-C SPACING (21 EA) CHANNELIZER (SM) 30' Lt "WB2" +00 EC EC BC +71.30 28' Rt "EB2" BC 4.19' Lt "OAK-1" +37 EC STAGE 3 DAY TIME 30' Lt "EB2" +17.98 30' Lt "WB2" +25.49 20' C-C SPACING (7 EA) CHANNELIZER (SM) 37B SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, C C 2.FOR SECTIONS B-B AND C-C SEE SHEET SC-25. B B 12 12 No. 1 DS 12 DS No. 2 (14 EA) 20' C-C SPACING CHANNELIZER (SM) 27B 272 1 L=34' PM PM LL TYPE IV (R) ARROW "STOP" 24TH StOAK St"OAK-2" LINEOLIVE St"OAK-1" LINE OAK St"OAK-1" LINEOAK St"WB2" LINE "EB2" LINE Const CENTER PORTION OF 24TH St WIDENING. Const CENTER PORTION OF OAK St WIDENING. Const SOUTH PORTION OF 23RD St. Const NORTH PORTION OF 24TH St. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:41 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma025.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2' LINE "OAK-1" 3 17'16' OG 8' SW 12'27' Const AREA 11'7'6' SW 2' 4'3' CHANNELIZER (SM)CHANNELIZER (SM) LINE "EBL" 11' 2 5' LINE "WBL" 3'Var11' CHANNELIZER (SM)CHANNELIZER (SM) 12'12' Const AREA Var Pkwy SW/ 2'2' Var Pkwy SW/ LINE "B" 12'13'11'24.5'7.5' OG 2 4.5' CHANNELIZER (SM) 18' CHANNELIZER (SM) 13' Const AREA 7.5' 3.5' Var Pkwy SW/ 12' OG 9 Var LINE "23RD" LINE "24TH" CHANNELIZER (SM)CHANNELIZER (SM) 11'12'Var 0'-16' 3'-5' Var Const AREA 5'-38' Var 12' CHANNELIZER (SM) Var Pkwy SW/ 2' Pkwy SW/ 2' Var 10 SC-25 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND 2 NOTES: 1. 2. SECTION D-D NO SCALE STAGE CONSTRUCTION NOTE THIS SHEET: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 3 SECTION C-C SECTION B-B SECTION E-E 9 10 3.FOR LOCATION OF SECTION D-D SEE SHEET SC-26. 4.FOR LOCATION OF SECTION E-E SEE SHEET SC-28. SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR LOCATION OF SECTION B-B AND SECTION C-C SEE SHEET SC-24. STAGE 3 DAY TIME 273 Const CENTER PORTION OF 24TH St WIDENING. 2051,600.00'40 39 1,528.00'211 162.84' 293.93' 324.56' 584.06' 41 052550.00'25.65'51.27' 42 618.00'085 48.41'96.61' Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. PP pPOOLASPHCONC ASPH P P P P P P PPP P P P PP P P PP P P ASPHCONC CONCCONC CONC POOL CONC CONCCONC POOLASPHCONC CONCCONC CONC ASPHELM STBEECH STASPHMYRTLE STASPHSPRUCE STP P ASPHASPH P P P P P P PPP P PP PPPP P C O NC POOLCONCC ONC ASPHPOOLS POOLPOOL CONCP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:42 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma026.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6STOPKCSTOPSTOPSTOP R/W R/W R/W SCALE: 1" = 50' SC-26 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE "WB2" Sta 322+50SEE SHEET SC-24SEE SHEET SC-27MATCH LINE "B" Sta 336+50R/W TCE TCE TCE TCE TCE 11'(22')(18')(26')(24')12' 12' 11' 12' STAGE CONSTRUCTION NOTES THIS SHEET: 2 3 13' 2 NOTES: 1. "WB2" +82.64 END TAPER EC CS C27(CA) CS CS 38 PM CS 37B 9 20' C-C SPACING (55 EA) CHANNELIZER (SM) 21.95' Rt "EB2" +23.18 EC 28' Rt "EB2" +29.33 25 9 No.#R CURVE DATA T L 2. D D R3-7R APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 11' Var 12' 12' 27.65' Lt "WB2" +71.68 30' Lt "WB2" +20.48 PCC Beg TAPER 3.69' Lt "WB2" +80.02 4' Lt "WB2" +99.66 24.75' Rt "EB2" +20.80 39 40 42+4020' C-C SPACING (71 EA) CHANNELIZER (SM)+60+40+20TCE TCE TCE 20' C-C SPACING (6 EA) CHANNELIZER (SM) 11'12' 12' 11' 12' STAGE 3 DAY TIME+9313' C30(CA) R3-7R C27(CA)CS C27(CA)CS 25 41 TCE SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, FOR SECTION D-D SEE SHEET SC-25. 12 DS No. 9 Beg TAPER 12 ARROW TYPE IV (R) 4' Lt "WB2" +47.97 +48EC BC 274 LL PM PM "STOP" TYPE IV (R) ARROW CW 22 PM PM L=29' "CLEAR" "KEEP" CW 22 L=15' CW END TAPER+3627B +51+4627B PM "STOP" LL PM (14 EA) 20' C-C SPACING CHANNELIZER (SM) LL PM PM "STOP" (R) ARROW TYPE IV (R) ARROW TYPE IV 24TH St Carrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StELM St"EB2" LINE "WB2" LINE "B" LINE BEECH St 43 777.00'123 85.18'169.68' Const CENTER PORTION OF 24TH St WIDENING. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. LANE CLOSURES ONLY, USE Std PLAN T11. Const PORTION OF 23RD AT B St. WEEKEND PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:43 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma027.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4STOPSTOPSTOPR/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-27MATCH LINE "B" Sta 336+50SEE SHEET SC-26SEE SHEET SC-28MATCH LINE "24TH" Sta 347+50R/W TCE 12' 11' 12' 2 STAGE CONSTRUCTION NOTES THIS SHEET: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 2 6 13' NOTES: 1.35.5'BC 43 25 9 27B No.#R CURVE DATA T L 21.94' Rt "24TH" +12.21 TCE TCE 20' C-C SPACING (55 EA) CHANNELIZER (SM) 11' 20' C-C SPACING (9 EA) CHANNELIZER (SM) 20' C-C SPACING (15 EA) CHANNELIZER (SM) 20' C-C SPACING (15 EA) CHANNELIZER (SM) 20' C-C SPACING (10 EA) CHANNELIZER (SM) 20' C-C SPACING (2 EA) CHANNELIZER (SM) 11' 4.5' 6 TCE TCE +50CSC30(CA) CSC30(CA) C30(CA)CS STAGE 3 DAY TIME 13' 12' SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 12DS No. 14 12 275 +97+93+44+39+95+86PM"STOP" PMTYPE IV (R) ARROW LL LL LL TYPE IV (R) ARROW "STOP"PM PM TYPE IV (R) ARROW "STOP" PM PM 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE 43 777.00'123 84.31'169.68' 44 601.00'105 114.47' 45 425.00'143 108.00' 46 447.00'143 57.10' 57.41' 54.29' 113.58 50 966.00'34.16'68.29' 51 215.00'162 31.05'61.67' 040 47 226.53'155 31.55'62.70' Const NORTH PORTION OF 23RD St. Const SOUTH PORTION OF 24TH St. Const NORTH PORTION OF 24TH St. Const NORTH PORTION OF INTERSECTION. Const C St IMPROVEMENTS. LANE CLOSURES ONLY, USE Std PLAN T11. Const PORTION OF 23RD AT B St. WEEKEND LANE CLOSURES ONLY, USE Std PLAN T12 AND/OR T13. Const NORTH PORTION OF BAY St INTERSECTION. WEEKEND ONLY, USE Std PLAN T11. Const Temp Pvmt. WEEKEND LANE CLOSURES Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:44 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma028.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 93 4 5 3 5 0 35567 8 9 12 3 4 6 7 8 9 STOPSTOPSTOPSTOPSTOP 360 6 7 8 9 PPASPH ASPHASPH CONCCONC ASPH FP ASPH ASPH ASPHP PP PP P ASPHASPHASPH ASPH ASPH ASPHASPH ASPH ASPH ASPH ASPHC STP P PP CONC PP P P P P P P P P PP P P P PASPH ASPHASPHASPHASPHASPH ASPH CONCCONC ASPH FP ASPH ASPHASPH ASPHASPH ASPH ASPHCONC CONCASPH CONC ASPHASPH CONC ASPHD STE ST23RD ST P P P ASPH ASPH 3 4 5 67 R/W R/W R/W R/W R/W SCALE: 1" = 50'MATCH LINE "24TH" Sta 347+50SEE SHEET SC-27SC-28 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY TCE TCE 11 '12 '10 6 2.35' Rt "24TH" +99.52 EC 6.12' Rt "24TH" +85.48 25 43 9 25 PRC TCE 13' 44 45 46 50 51 No.#R CURVE DATA T L EC EC 3' Lt "24TH" +00.80 PRC 25' Rt "24TH" +20.01 47 TCE PRC 8' Lt "23RD" +27.13 BC PCC 8' Lt "23RD" +55.60 PRC PCC 4' Rt "23RD" +85.28 9 40 TCE TCE LL PM"STOP" PMTYPE IV (R) ARROW "23RD" +85 CONFORM TO FINAL STRIPING F 11' 12' 11' 12' 12' 11' 11' 12' F 11'' 11' Var 11' 5 8 9 10 DAY TIME STAGE CONSTRUCTION NOTE THIS SHEET: 360 NIGHT TIMESEE SHEET SC-29MATCH LINE "23RD" Sta 359+857 2 3 NIGHT TIME STAGE CONSTRUCTION NOTE THIS SHEET: 1 6 5 8 9 1 2 2 3 8 1 13' 11' 9 27B 27B 9 R3-2 CS CS R3-2 CS M4-01R R11-2 CS R3-2 CSC27(CA) CSR4-8 CS TYPE III BARRICADE (2 EA) R11-2 (2 EA) CSC27(CA) PM TYPE VII (L) ARROW TYPE VII (R) ARROWPM 12' 12' +07.64 10.65' Rt "24TH" "24TH" +45 END Temp STRIPING "24TH" +16 END Temp STRIPING "24TH" +85 Beg Temp STRIPING "24TH" +65 Exist STRIPING CONFORM TO "23RD" +85 END Temp STRIPINGDAY TIMENIGHT TIMENIGHT TIME DAY TIME (4 EA) 20' C-C SPACING CHANNELIZER (SM) 20' C-C SPACING (39 EA) CHANNELIZER (SM) 20' C-C SPACING (15 EA) CHANNELIZER (SM) 20' C-C SPACING (23 EA) CHANNELIZER (SM) 20' C-C SPACING (11 EA) CHANNELIZER (SM) 20' C-C SPACING (47 EA) CHANNELIZER (SM) +46 +00 +00+54+75+25+62STAGE 3 DAY & NIGHT TIME 38 AND 40 DS No. 37, 7 7 27B F F F F SEE SHEET SC-29MATCH LINE "24TH" Sta 360+501.68' Lt "23RD" +24.18 +15+75+05+40+6524'39'13' 11' 6 E E "23RD" +65.42 1.58' Lt DETAIL A SCD-2 SEE Sht SEE DETAIL A 3 4 '28'12' 6' NOTES: 2. 1. FOR SECTION E-E SEE SHEET SC-25. SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 12 12 DS No. 18 DS No. 2312 No. 29 DS 4 11' 13' PM PM PM PM TYPE VII (R) ARROW TYPE VII (L) ARROW (R) ARROW TYPE VII (L) ARROW TYPE VII 276 +22+0027B 24TH St 23RD StBAY StB StC StD StE StC StDRAKE StENCINA St"24TH" LINE "23RD" LINE "23RD" LINE Const NORTH PORTION OF 24TH St. Const NORTH PORTION OF INTERSECTION.Const DRIVEWAY ACCESS. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS.ASPHPP ASPH P PP PP P P P PP P P P PP P P PP P P PP P PP P P P P P P P P P PP PP ASPHASPHCONC ASPHASPHASPH ASPHASPH FP ASPHASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPHP P P P P P P P P P P PPP PPP P FPP P P P P ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPH ASPH ASPHASPH CONC ASPH ASPHCONC ASPH ASPH CONC ASPHASPHCONC CONC ASPH ASPH ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPH EYE STASPHASPHH STH STG STF ST24TH ST STOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:46 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma029.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 STOPSTOP STOPSTOP 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 1 2 3 4 6 7 8 9 1 2 R/W R/W R/W R/W R/W R/W SCALE: 1" = 50'SEE SHEET SC-31MATCH LINE "24TH" Sta 374+50SEE SHEET SC-31MATCH LINE "23RD" Sta 372+50SC-29 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES: 1. STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 TCE TCE TCE TCE "24TH" +16 STRIPING TO Exist CONFORM "24TH" +27 "24TH" +60 "24TH" +85 STRIPING END Temp "24TH" +03 STRIPING TO Exist CONFORM "24TH" +26 STRIPING TO Exist CONFORM STRIPING Beg Temp "24TH" +80 STRIPING END Temp "24TH" +50 STRIPING Beg Temp+18+26+75+60+15+13+70+50PM TYPE VII (R) ARROW TYPE VII (L) ARROWPM 9 27B 11' 11' 3' 11' 11'3' 27B 9 PM PM TYPE VII (L) ARROW 27B 9 11' 11' 3' TYPE VII (R) ARROW 9 CS R4-8 CS C27(CA) CS R4-7 CS C27(CA)CS R4-8 CS C27(CA)CS R4-8 CS C27(CA) 1 1 1 1 27B 2 2 2 11' 11' 27B 9 (14 EA) 20' C-C SPACING CHANNELIZER (SM)20' C-C SPACING (22 EA) CHANNELIZER (SM) 20' C-C SPACING (22 EA) CHANNELIZER (SM) 20' C-C SPACING (22 EA) CHANNELIZER (SM) 20' C-C SPACING (9 EA) CHANNELIZER (SM) 3' 3'(14')(12')(12')(14')(12')(12')(12')(12')(10')(12')(12')(10')(12')(12')(12')(12')(12')(12')(11')(11')(11')(18')(11')(11')(11')(17')(22')(22')(22')(22')2(19')(19')(17')(12')(19')(22')(22')3 844, 45 AND 45 DS No. 37, 41, 42 865 AND 65 DS No. 63, 64 F F F 2 MATCH LINE "24TH" Sta 360+50SEE SHEET SC-28MATCH LINE "23RD" Sta 359+85SEE SHEET SC-28DAY TIMESTAGE 3 NIGHT TIME 4 4 4 1+35+50+07+22SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 12' 11' 11' 12' 12' 11' 11' 12' 8 3 DS No. 64 PM PM ARROW TYPE VII (R) ARROW TYPE VII (L) PM PM TYPE VII (R) ARROW TYPE VII (L) ARROW Exist STRIPING CONFORM TO 277 24TH St 23RD St "24TH" LINEG StH StF StF StG StH StEYE St"23RD" LINE EYE St Const NORTH PORTION OF "24TH" LINE. 53 763.00'173 54 819.00'020 55 819.00'185 14.96'29.91' 118.02'234.18' 136.67'270.84' Const NORTH PORTION OF INTERSECTION. OVERNIGHT LANE CLOSURES ONLY, USE Std PLAN T11. Const DRAINAGE MAIN SYSTEM. SEE DRAINAGE PLANS. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. FPASPHASPHASPH ASPHASPH CONCCONC ASPH CONCA SPHCONC ASPHASPHP P P PPPPP P P P PP PP P PP P P P PP P P P P P P P P P P P P P P PP P PP PPFP P P P PP P P P PP PP P P P P P P P P FP FP FP FP ASPH ASPH ASPHCONC ASPH ASPH ASPH ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH ASPH FP ASPH ASPHASPH ASPH CONC CONCCONC CONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH ASPHASPHASPHCONC CONC ASPHASPHASPHASPH ASPHCONCCONCASPH ASPH CONCASPH ASPH CONCASPHASPHASPH ASPHASP HASPHASPHASPHASPHASPH ASPHASPH ASPHASPH ASPH 24TH ST M STL STL STK STASPHCHESTER AV25TH ST x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:47 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma030.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 18"395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123R/W R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-30MATCH LINE "23RD" Sta 372+50SEE SHEET SC-29MATCH LINE "24TH" Sta 374+50SEE SHEET SC-29SEE SHEET SC-31"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES: 1. STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 TCE TCE TCE TCE +08+40+40+45+15"24TH" +29 STRIPING TO Exist CONFORM "24TH" +19 STRIPING TO Exist CONFORM "24TH" +99 "24TH" +76 "24TH" +45 STRIPING CONFORM TO Exist "24TH" +29 "24TH" +00 CS R4-8 CS C27(CA) R4-8 CS CSC27(CA) R4-7 CS CSC27(CA) R4-8 CS C27(CA)CS PM PM 9 27B 11' 11' 3' TCE STRIPING TO Exist CONFORM ARROW TYPE VII (R) ARROW TYPE VII (L) 40 27B 9 20' C-C SPACING (13 EA) CHANNELIZER (SM) 20' C-C SPACING (40 EA) CHANNELIZER (SM) 20' C-C SPACING (24 EA) CHANNELIZER (SM) 27B 9 CW CW CW 12' Var 12' 12' 1 1 1 1 2 22 3 27B 9 CS TYPE III Barr (6 EA) R11-2 (2 EA) CS TYPE III Barr (2 EA) W1-6L R11-2 11' 11' 3' TCE TCE (16')(11')(11')(14')(13')(10')(12')(12')(10')(12')(11')(12')(12')(11')(12')(12')(20')(11')(11')(10')(10')(11')(16')(10')(9')(11')(20')(20')(11')(20')(22')(22')(19')(30')2 (19')(11')(20')(19')(12')(19')(15')(10')(10')(15')9 71, 72, 73, 74 AND 75 DS No. 63, 68, 69, 70 TCE TCE TCE TCE TCEF F F F 53 54 55 No.#R CURVE DATA T L 1' Rt "24TH" +76.11 BC 1' Rt "24TH" +29.38 BC 1' Rt "24TH" +00.55 BC TCE STAGE 3 NIGHT TIME 11' 12' 11' 12' 12' 11' 11' 12' SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 8 3No. 68 DS BC STRIPING CONFORM TO Exist No. 71 DS 3 No. 72 DS 3 PM PM PM PM ARROW TYPE VII (R) ARROW TYPE VII (L) (L) ARROW TYPE VII Exist STRIPING CONFORM TO Exist STRIPING CONFORM TO 278 ARROW TYPE V 24TH St 23RD St L StK StK StL StM StCHESTER AveCHESTER Ave"24TH" LINE "23RD" LINE M St Const NORTH PORTION OF WB SR-178. COLD PLANE AND HMA OVERLAY. SLURRY SEAL. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. P ASPHA SPH ASPHASPH ASPHP PP P P A SPH ASPH ASPHASPHTRAILER ASPH CONCCONC ASPH P P P P PP PP P PP P P P P P P P FP FP ASPH ASPH ASPH ASPHASPH ASPH ASPH ASPHASPH ASPH A SPH ASPHASPHASPH TRAILER ASPH CONC ASPH ASPH ASPHASPHASPH CONC A SPH ASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC 23RD ST ASPH 24TH ST 25TH ST N STQ STASPHx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:48 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma031.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SAAS400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 R /W R / W R /W R/W R/W R/W SCALE: 1" = 50' SC-31 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET SC-30NOTES: RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT 2. APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY (12')(12')(12')(12') (12') (18')(18')(14')(12') (12') (12')12'12'12' 50' END TAPER STRIPING CONFORM TO Exist 26.20' Rt "W178" +50.93 BC 5 PM "W178" +15 STRIPING TO Exist CONFORM 27B CS 25 9 CS TYPE III Barr (6 EA) R11-2 (2 EA)CS TYPE III Barr (2 EA) R11-2 CS TYPE III Barr (5 EA) R11-2 (2 EA) CS M4-10R R11-4CSM4-10R R11-4 20' C-C SPACING (58 EA) CHANNELIZER (SM) No.# 56 R CURVE DATA 332 T L 390.85'201.19'668.59' STAGE CONSTRUCTION NOTE THIS SHEET: 5 5 160' TAPER F CS C27(CA) W4-2R PM ARROW (2 EA) TYPE IV (R) CS 6 7 5 BC 1.31' Lt "W178" +57.90 25.02' Rt "W178" +57.68 6.57' Lt "W178" +50.93 57 58 PCC 57 698.01'332 210.04'408.05' 58 2445.17'055 125.27'250.32' STAGE 3 NIGHT TIME Var 11'12'11' Beg TAPER EC END TAPER 1' Rt "W178" +60 END 60' BAY TAPER 1' Rt "W178" +20 Beg 60' BAY TAPER 11' Rt "W178" +00 56 12' 11' 11' Var SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 9 DS No. 108 8 DS No. 109 PM"AHEAD"PM 8 "SIGNAL" ARROW (3 EA) TYPE VI 6 7 W9-1 279 38 WB ROUTE 178 EB ROUTE 178 "W178" LINE "E178" LINEN StO StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd ASPHASPHASPH ASPH P DIRT ASPH ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTP ASPHASPH RIVERSIDE DR ASPH24TH ST ASPHCONCASPHCONCBRUSHDIRTYI ELDx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:49 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma032.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 6 7 8 9 1 2 3 3154 305 2 3 4 6 8 9 1 2 3 4 315 310 R/W R/W R/W "EB2" LINE "WB2" LINE SCALE: 1" = 50'SEE SHEET SC-33MATCH LINE "WB2" Sta 315+50SC-32 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W NOTE: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE 4 DAY TIME (11') (12') (11') E CHANNELIZER (SM) (12') (12') (12') (12') (14') (12') (12') SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 280 (12') (12')24TH St Kern River"EBL" LINE "WBL" LINE Const REMAINDER OF OAK St WIDENING. ASPH P P P P P P P P P P P P PP P ASPH ASPH ASPH ASPH POOLCONCASPH ASPHAS PH ASPH ASPH ASPH OAK STOLIVE STASPH STOPP P P ASPHASPHASPHASPH ASPHASPHOAK STP P POOLASPHASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:50 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma033.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 26026512343206789 1 2 3206789 1 21012347 892'LINE "OAK-1" 1 24'12' OG 8' SW Var Const AREA 6' SW 2' CHANNELIZER (SM) 12'12'6'6' 3.5' Const AREA CHANNELIZER (SM)1 5' 3206789 1 2 3206789 1 21012347 89SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR/W R/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT SCALE: 1" = 50'MATCH LINE "WB2" Sta 315+50SEE SHEET SC-32SEE SHEET SC-34MATCH LINE "WB2" Sta 322+50SC-33 TRAFFIC HANDLING PLANS STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY(12')12' 12' R/W (11')(13')(11')(12')STAGE CONSTRUCTION NOTES THIS SHEET: 1 20' C-C SPACING (13 EA) CHANNELIZER (SM) 20' C-C SPACING (23 EA) CHANNELIZER (SM) 25 9 No.# 40 R 1,100.00' CURVE DATA 225 T L 438.57'222.24' NOTE:12'12'PM A A 29 12'12'12'"OAK-1" +50R/W27B 29 R/WR/WR/W(12')CHANNELIZER (SM)E TCE(12')12'12'12'12'27B 12' 12' "EB2" +13.77 BC STRIPING CONFORM TO Exist 40 "OAK-1" +08 Exist STRIPING CONFORM TO 38 27B 27B 1 BC 50' Lt "OAK-1" +11.65 EC CONFORM TO Exist STRIPING PRC 32.83' Lt "OAK-1" +49.49 PRC 7' Lt "OAK-1" +50 5' Lt "OAK-1" +00 0.15' Rt "OAK-1" +40.31 PRC EC CONFORM TO Exist STRIPING "OAK-1" +26.85 27B 38 41 42 43 44 41 141 222.24'139.27' 42 140 222.24'138.53' 43 090 222.24' 44 090 222.24' 562.00' 562.00' Beg TAPER END TAPER 9' Lt "OAK-1" +00 574.00'90.69' 550.00'86.90' 20' C-C SPACING (26 EA) CHANNELIZER (SM) 20' C-C SPACING (21 EA) CHANNELIZER (SM) CS C30(CA) 4 SECTION A-A NO SCALE SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 4 DAY TIME TYPE VII (L) ARROW (2 EA) 281 CHANNELIZER (SM)E (12')(12') (11')(11')(12')(12')(12')(12') (12') 30' C-C SPACING (22 EA) CHANNELIZER (SM) Barr (4 EA) TYPE III "WB2" LINE "EB2 " L INE 24TH StOAK St"OAK-2" LINEOLIVE St"OAK-1" LINE OAK St"OAK-1" LINEOAK St Const REMAINDER OF EB 24TH St WIDENING. LANE CLOSURES ONLY, USE Std PLAN T11. Const PORTION OF EB 24TH St WIDENING. WEEKEND Const ALLEY IMPROVEMENTS. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. UTILITY PLANS. Const UTILITY IMPROVEMENTS (BY OTHERS). SEE PP pPOOLASPHCONC P P P P P P PPP P P P PP P P PP P P ASPHCONC CONCCONC CONC POOL CONC CONCCONC POOLASPHCONC CONCCONC CONC ASPHELM STBEECH STASPHMYRTLE STASPHSPRUCE STP ASPH P P P P PPP P PP PPPP P C O NC POOLCONCC ONC ASPHPOOL CONCP P P P PP P P P P P P POOLDENSE TREESPOOLPOOL P O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLSTOPKCSTOPSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:51 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma034.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6 LINE "B" 12'12' OG 2 (16')(12')(13')7.5'Var CHANNELIZER (SM) 4' Const AREA 7.5'Var Pkwy SW/ R/W R/W SCALE: 1" = 50' SC-34 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE "WB2" Sta 322+50SEE SHEET SC-33SEE SHEET SC-35MATCH LINE "B" Sta 336+50R/W 2 R/W (18')(22')(26')(24')(12') (12') (13') 12' 12' 12' 12' 3 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 30' C-C SPACING (47 EA) CHANNELIZER (SM) 9 38 27B 40 EC 45 No.#R CURVE DATA T L 45 033 127.77' 323.66'163.29'184988.00'40 2,000.00'63.91' NOTE: B B SECTION B-B END Temp STRIPING 1' Lt "EB2" +86.41 STAGE CONSTRUCTION NOTES THIS SHEET: 11 DS No. 9 3 2 4 STAGE 4 DAY TIME PRC 3.64' Rt "EB2" +45.73 TCE TCE TCE 3 4 4 3 10 TCE TCE TCE TCE TCE TCE 1' Lt "EB2" +29.33 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 4' NO SCALE 282 11 CHANNELIZER (SM)E 25 40 E CHANNELIZER (SM) CHANNELIZER (SM)E 10(CalW) (12') (12') CS C30(CA)Carrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StBEECH StELM St"B" LINE "EB2" LINE"WB2" LINE MYRTLE St24TH St Const REMAINDER OF EB 24TH St WIDENING. Const PORTION OF "23RD" LINE. Const SOUND WALL. SEE STRUCTURE PLANS. Const ALLEY IMPROVEMENTS. Const DRAINAGE SYSTEM. SEE DRAINAGE PLANS. SEE UTILTY PLANS. Const UTILITY IMPROVEMENTS (BY OTHERS). PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL STOPSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:52 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma035.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4 SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-35MATCH LINE "B" Sta 336+50SEE SHEET SC-34SEE SHEET SC-36MATCH LINE "24TH" Sta 347+50R/W R/W R/W TCE 3 4 (12') (13') 12' 12'12' 12' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTES THIS SHEET: 3 6 NOTE: 27B 9 9 R/W11DS No. 14 STAGE 4 DAY TIME 10 4 3 3 4 5 6 TCE Var 12' "B" +65.20 BC Exist STRIPING CONFORM TO 46 No.#R CURVE DATA T L 323.66'163.29'184988.00'46 30' C-C SPACING (37 EA) CHANNELIZER (SM) 4 TCE TCETCE TCE 5 SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 283 4 11 CHANNELIZER (SM)E E CHANNELIZER (SM) 10 (CalW) 24TH StPINE StCEDAR StALDER StPINE StCEDAR St"B" LINE "24TH" LINE "23RD" LINE A St Const FINAL LIFT OF PAVEMENT.Const SOUTH PORTION OF 24TH St. Const SOUTH PORTION OF INTERSECTION.Const SOUND WALL. SEE STRUCTURE PLANS. Const PORTION OF 23RD St. LANE CLOSURES ONLY, USE Std PLAN T11. Const PORTION OF 24TH St. OVERNIGHT Const NORTH PORTION OF 24TH St, BETWEEN BAY ST. AND C ST. Const NORTH OF INTERSECTION, AT C ST. 350 355 8 9 1 2 3 4 3 4 5 3 5 0 35567 8 9 12 3 4 6 7 8 9 P PP PP P ASPHASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH P P P PP CONC CONC P P P P P P P P P PP P P P P ASPHASPHASPHASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPH CONC ASPHASPH ASPH CONC ASPHD STE STP P ASPHSTOPSTOPSTOPSTOP P ASPH ASPHSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:53 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma036.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 360 6 7 8 9 STOP STOPSTOPPPASPH ASPHASPHASPHASPH CONC ASPH FP ASPH ASPH ASPHR/W R/W R/W R/W R/WSCALE: 1" = 50'MATCH LINE "24TH" Sta 347+50SEE SHEET SC-35SC-36 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND (11') R/W APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTE: 1SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, (12') (12') (11') 11'NIGHT TIMEDAY TIMENIGHT TIMESEE SHEET SC-38MATCH LINE "23RD" Sta 359+85STAGE 4 DAY & NIGHT TIME DAY TIMESEE SHEET SC-38MATCH LINE "24TH" Sta 360+50DAY TIME STAGE CONSTRUCTION NOTES THIS SHEET: 1 NIGHT TIME STAGE CONSTRUCTION NOTES THIS SHEET: R/W R/W 12' TCE TCE 13' Lt "23RD" +00 27B 9 "24TH" +85 STRIPING END Temp EC BC 13' Rt "24TH" +25.80 1 2' 47 9 7 8 LL PM"STOP" 27B 20' OC SPACING (27 EA) CHANNELIZER (SM) EC 12' 12' 46 5 6 TCE Beg TAPER END TAPER STRIPING CONFORM TO FINAL R/W 11' 11' "24TH" +62 END Temp STRIPING BC PRC 48 BC 3' Lt "24TH" +20 "24TH" +40 END Temp STRIPING 11' END 60' BAY TAPER "24TH" +07.64 10.65' Lt 11.63' Lt "24TH" +47 Beg 60' BAY TAPER CS R3-7 "24TH" +13.17 10.65' Rt 9 27B 25 "24TH" +00 25' Rt 38 L=90' PM (23 EA) 20' OC SPACING CHANNELIZER (SM) 9 49 TCE TCE TCE 12' 12' 12' 12'DAY TIMENIGHT TIMESEE SHEET SC-37MATCH LINE "23RD" Sta 359+85NIGHT TIMEDAY TIMESEE SHEET SC-38MATCH LINE "24TH" Sta 360+50"24TH" +01.30 13' Rt 5 2 No.#R CURVE DATA T L 47 400 163.29'217.96' 46 141 215.22'144.64' 312.00' 48 541 163.29'274.21'290.00' 584.00' 49 541 163.29'274.21'290.00' 16.06' Rt "24TH" +59.88 12' Lt "23RD" +40 11'11' 11' "24TH" +28 STRIPING Beg Temp "24TH" +85 STRIPING Beg Temp "24TH" +59 PM PM TYPE VII (R) ARROW TYPE VII (L) ARROW TYPE IV (R) ARROW (2 EA) LL PM "STOP" 25 PM "STOP"PM LL 25 9 +27+90+60CSC27(CA) 20' C-C SPACING (29 EA) CHANNELIZER (SM) CSR4-7 30' C-C SPACING (6 EA) CHANNELIZER (SM) CW 2 1 2 1 20' C-C SPACING (9 EA) CHANNELIZER (SM) 3'3' 6 7 8 9 PM (R) ARROW TYPE VII STRIPING END Temp (L) ARROW TYPE VII NIGHT TIME DAY TIME 284 27B +22+159 38 25 24TH St 23RD St"23RD" LINEBAY StB StC StD StE StC StENCINA StDRAKE St"24TH" LINE ASPHP P P PP P P PP P P PP P P PP PPPP CONCASPH ASPHASPHASPH ASPHASPH FP ASPHCONCASPH CONC CONC ASPH ASPH ASPHASPHP P P P P PPP P FPP P P ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPHASPH CONC CONC ASPH ASPHCONC CONC ASPH ASPH ASPH CONCASP HASPH ASPH ASPHH STSTOPSTOP STOPSTOP P PP PP P P P PP P PP PP P P P P P ASPHASPHASPH CONC ASPH ASPHASPH ASPH P P P P P P PPP P P ASPH ASPHASPH CONC ASPHASPH CONCCONCASPH CONC ASPH ASPHASPH EYE STASPHASPHH STG STF STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:54 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma037.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 1 2 3 4 6 7 8 9 1 2STOPSTOP24TH StG StH StF StG StEYE StR/W R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50'MATCH LINE "24TH" Sta 360+50SEE SHEET SC-36SEE SHEET SC-38MATCH LINE "24TH" Sta 374+50SEE SHEET SC-38MATCH LINE "23RD" Sta 372+50SC-37 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDH St EYE St"23RD" LINE F StAPPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTE: 1 STAGE CONSTRUCTION NOTES THIS SHEET: Const SOUTH PORTION OF "23RD" LINE.(14')(12')(12')(14')(12')(12')(10')(12')(12')(19')(19')(19')(12')(17')(22')(22')(12')(12')(12')(12')(18')(11')(11')(11')(11')(11')(11')(17')(22')(22')(22')(22')23RD St STAGE 4 NIGHT TIME SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, MATCH LINE "23RD" Sta 359+85SEE SHEET SC-36DAY TIME(12') (11') (11') (12') (12') (11') (11') (12') "24TH" +16 11' 11'+26(22 EA) 20' C-C SPACING CHANNELIZER (SM) 1 PM TYPE VII (L) ARROW TYPE VII (R) ARROWPM 9 3'3'11' 11' "24TH" +60 STRIPING Beg Temp "24TH" +75 STRIPING END Temp CS C27(CA)+75CS R4-7 +6022+179 27B 1 C27(CA) CS CS R4-7 20' C-C SPACING (14 EA) CHANNELIZER (SM) PM LL "STOP" 9 CW CW "24TH" +28 STRIPING END Temp "24TH" +27 STRIPING END Temp "24TH" +03 STRIPING Beg Temp STRIPING Beg Temp "24TH" +50 STRIPING END Temp "24TH" +70 CS +15CS C27(CA) R4-7 2 1 PM PM TYPE VII (R) ARROW TYPE VII (L) ARROW 11' 11'3' 9 CSR4-7 LL PM "STOP" 11' 11'3' 9 CSC27(CA)1 +552 20' C-C SPACING (22 EA) CHANNELIZER (SM)(22 EA) 20' C-C SPACING CHANNELIZER (SM) (10 EA) 20' C-C SPACING CHANNELIZER (SM)+55+551 2 Const SOUTH PORTION OF INTERSECTION. 9L=8' L=8'22 Beg Temp STRIPING9L=8' L=8'22 25 PM PM TYPE VII (R) ARROW TYPE VII (L) ARROW 25 PM PM (R) ARROW TYPE VII (L) ARROW TYPE VII 25 25 285 "24TH" LINE Const SOUTH PORTION OF "24TH" LINE. Const SOUTH PORTION OF INTERSECTION. ASPHASPHASPHASPH CONC CONCCONC CONC ASPHASPHP P P P P PP P P P P P P P P P P P PPP P P P PP P ASPHCONC ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHCONCCONC CONCASPHASPH CONCASPH ASPH ASPHCONC CONCASPHASPH CONCCONCASPH CONC ASPH CONCASPH ASPHASPH ASPH ASPHASP HASPHASPHASPHASPHASPHASPH L STPPPPP CONCAS PHFP ASPHCONCASPHASPH ASPH CONCA SPHASPHP P PP PP P PP P P P P P P PP P PPFP P P PP P P PP PP P P P P P P FP FP FP FP ASPHASPH ASPH ASPH ASPH ASPH CONCCONCCONC CONC ASPH ASPHASPHASPHASPH CONCASPH CONCASPHASPH ASPHASPH ASPH ASPH M STL STK STASPHCHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:55 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma038.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123R/W R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-38MATCH LINE "23RD" Sta 372+50SEE SHEET SC-37MATCH LINE "24TH" Sta 374+50SEE SHEET SC-37SEE SHEET SC-39"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES:STAGE CONSTRUCTION NOTES THIS SHEET: 1 2 TCE TCE TCE TCE TCE 9 25 9 25 25 9 TYPE VII (L) ARROWPM PM TYPE VII (R) ARROW 9 25 "24TH" +18 "24TH" +29 +09+38+88+87+30+39+90"24TH" +99 "24TH" +76 "24TH" +48 "24TH" +31 "24TH" +99 40 R4-7 CS C27(CA)CS 1 1 C27(CA)CS CS R4-7 20' C-C SPACING (23 EA) CHANNELIZER (SM) CS R4-7 C27(CA)CS 20' C-C SPACING (23 EA) CHANNELIZER (SM) CSR4-7 C27(CA) 20' C-C SPACING (24 EA) CHANNELIZER (SM) CS 1 11' 11' 11' 11' Var 11' Var 12' (12') (11') (11') (12') (12') (11') (11') (12')(12')(12')(12')(11')(12')(12')(12')(12')(11')(10')(11')(11')(20')(16')(10')(11')(10')(20')(11')(20')(20')(11')(9')(16')(11')(11')(10')(13')(14')2 (12')(12')(10')(12')(11')(15')(10')(10')(15')(22')(22')(19')(12')(19')2 (20')(11')(19')(19')(30')TCE 3'3' 3' 4' 4'3' SPACING (13 EA) (SM) 20' C-C CHANNELIZER CW STRIPING Beg Temp STRIPING END Temp 2 2 STRIPING END Temp STRIPING Beg Temp TCE CW STRIPING END Temp Beg Temp STRIPING 21 L=18' CW STRIPING END Temp CW 21 L=31' SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 4 NIGHT TIME PM TYPE VII (R) ARROW PM TYPE VII (L) ARROW PM PM (R) ARROW TYPE VII 1 (L) ARROW TYPE VII 286 L StK StK StL StM StCHESTER AveCHESTER Ave"24TH" LINE 23RD St "23RD" LINE 24TH St M St P ASPHA SPH ASPHASPH ASPHPP P ASPH ASPHTRAILER ASPH CONCCONC P P PP P PP P P P P P P P FP FP ASPH ASPHASPH ASPHASPHASPHASPHASPH TRAILER ASPH CONC ASPHASPH A SPH ASPH ASPH ASPHASPHCONCCONC ASPHCONC 24TH STN STQ STASPHP P ASPHASPH P P PP ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH 23RD ST ASPHSSAAx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:56 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma039.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SSAASA400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 R /W R / W R /W R/W R/W R/W SCALE: 1" = 50' SC-39 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET SC-38NOTE: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY (12')(12')(12')(12') (12') (18')(18')(14')(12') (12') (12')12'12'12'19.50' Rt "W178" +00 Beg TAPER 4' Lt "W178" +60 END TAPER 15.21' Rt "W178" +40 4.50' Lt "W178" +79.86 EC BC +65+60CS R3-7R CS CS W73A Rt(CA) W74 Lt(CA)CS CS W4-2L PM PM TYPE IV (R) 37B 27B 25 9 (12') (12') (12') (Var) 90 No.#R CURVE DATA T L 686.00'341 409.12'210.84' 12' 12'12' 90 15.89' Lt "W178" +64.58 38 BC EC STRIPING CONFORM TO Exist 159' 91 91 116.96'233.54'0801,656.00' CS C27(CA) SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 4 NIGHT TIME 20' C-C SPACING (58 EA) CHANNELIZER (SM) TYPE VI ARROW (3 EA) PM "SIGNAL" (3 EA) PM "AHEAD" (3 EA) W9-1L 287 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEN StO StN StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd OVERNIGHT LANE CLOSURES. SEE MI PLANS. PLACE BRIDGE TREATMENT. SEE STRUCTURAL PLANS.ASPHASPHASPH P DIRT ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPH ASPHASPHASPHDIRTP ASPHASPH RIVERSIDE DR ASPH24TH ST CONCASPHCONCBRUSHYI ELDFOFOx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:58 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma040.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 2 3 4 6 7 8 9 1 2 3 3154 305 2 3 4 6 8 9 1 2 3 4 315 310 R/W R/W R/W "EB2" LINE "WB2" LINE SCALE: 1" = 50'SEE SHEET SC-41MATCH LINE "WB2" Sta 315+50SC-40 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND R/W 12' 12' STAGE CONSTRUCTION NOTES THIS SHEET:NOTE: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY 1 F SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 5 DAY TIME 12' 12' 12' (14') (12') (12') (12') (12') (12') (12') (12') (12') (12') (12') (12') F 1 1 288 24TH St "WBL" LINE "EBL" LINE Kern River ONLY, USE Std PLAN T11. SLURRY SEAL. WEEKEND LANE CLOSURES ASPH P P P P P P P P P P P P P P PP PP P P ASPH AS P HASPH ASPH ASPH ASPH ASPH ASPH CONC POOLCONCASPH ASPHAS PH ASPH ASPH ASPH ASPH OAK STOLIVE STPASPHCONC ASPH STOPP P P ASPHASPHASPHASPH ASPHASPHP P POOLASPHASPHCONCx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:58 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma041.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 26026512343206789 1 2 3206789 1 21012347 89STOPSEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50R/WR/W R/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT SCALE: 1" = 50'MATCH LINE "WB2" Sta 315+50SEE SHEET SC-40SEE SHEET SC-42MATCH LINE "WB2" Sta 322+50SC-41 TRAFFIC HANDLING PLANS STAGE CONSTRUCTION AND APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY(12')12'12' TCE R/W (11')(13')(11')(12')STAGE CONSTRUCTION NOTES THIS SHEET: 2 NOTE:12'R/WR/WR/WR/W2 (12')SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, (12')(12') (12')(12') (12')12'12' (12')(12')(12')(12')(12')(12')(12')12'12'12'12'12'12'18'(12') (12') (12') (12') (12') (12') 1 2' 1 2' 1 2' 1 2'12' 12' 12' 12'12'12'12'12'Var12'STAGE 5 DAY TIME F FF F 289 F 2 F F "WB2" LINE "EB2 " L INE 24TH StOAK St"OAK-2" LINEOLIVE St"OAK-1" LINE OAK St"OAK-1" LINEOAK St PP pPOOLCONC P P P P P P PPP P P P PP P P PP P P ASPHCONC CONCCONC CONC POOL CONC CONCCONC POOLASPHCONC CONCCONC CONC ASPHELM STBEECH STASPHMYRTLE STSPRUCE STP ASPHASPH P P P P P P PPP P PP PP C O NC POOLCONCC ONC ASPHPOOLS POOLPOOL CONCP P P P PP P P P P P P POOLDENSE TREESPOOLP O OL POOLPOO LPOOLPOOLPOOL ASPHASPHASPHASPHASPHASP HMYRTLE STBEECH STCONC ASPHCONCCONC CONCCONC CONCCONCASPH CONC ASPH POOLSTOPKCSTOPSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:18:59 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma042.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6KCKCSTOPSTOPSTOPSTOP R/W R/W R/W SCALE: 1" = 50' SC-42 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE "WB2" Sta 322+50SEE SHEET SC-41SEE SHEET SC-43MATCH LINE "B" Sta 336+50R/W 12' 12' 12' 12' NOTE: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 5 DAY TIME(20')(20')(20')(20')12' 12' (12') (12') (12') (12') (12') (12') 12' (12') (12') (12') 12' F 290 F 24TH StCarrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StELM St"EB2" LINE "B" LINE BEECH St"WB2" LINE PPP ASPHCONCPOOLPOOLP P P PP P OOL POOLPOOL POOL ASPHASPHASPHASPHASPHASPHASPHPINE STCEDAR STASPHA STP P P P POOLDENSE TREES ASPHP PP PPP P PP P P P CONC CONC ASPHASPHPOOLCONCCONC DENSE TREES ASPHPOOLPOOLPOOLSDENSE TREESASPHDENSE TREESASPHCONC CONC CONC ASPHCEDAR STASPHCONCPINE STCONC POOL POOLALDER STPOOL STOPSTOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:00 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma043.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 7 340 345 7 8 9 1 2 3 4 6 4STOPSTOPSTOPR/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-43MATCH LINE "B" Sta 336+50SEE SHEET SC-42SEE SHEET SC-44MATCH LINE "24TH" Sta 347+50R/W 12' 12' 12' 12' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTES: SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 5 DAY TIME (12') (12') (12') 12' 12' (12 ') (12 ') (12 ') F 291 F 24TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:01 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma044.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 P PP PP P ASPHASPHASPH ASPH ASPH ASPH ASPH ASPH ASPH ASPH P P P PP CONC CONC P P P P P P P P P PP P P P P ASPHASPHASPHASPH ASPHASPH ASPHASPH ASPH ASPHASPH CONC CONCASPH CONC ASPHASPH ASPH CONC ASPHD STE STPP P ASPH ASPHSTOPSTOPSTOPSTOP STOP ASPHSTOP350 355 8 9 1 2 3 4 3 4 5 3 5 0 35567 8 9 12 3 4 6 7 8 9STOPSTOPSTOPASPHASPHASPHASPH FP ASPH ASPHPP ASPHASPH CONCSTOPSTOPSTOPSTOP STOP STOP 360 6 7 8 9 R/W R/W R/W R/W R/WSCALE: 1" = 50'MATCH LINE "24TH" Sta 347+50SEE SHEET SC-43SC-44 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND (11') R/W 12' 12' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTE: SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, 12' 12' 12'(20')12' (12') (12') (11') 12' 11' 11' F F NIGHT TIMEDAY TIMENIGHT TIMESEE SHEET SC-45MATCH LINE "23RD" Sta 359+85STAGE 5 DAY & NIGHT TIME DAY TIME12' F R/W R/W SEE SHEET SC-45MATCH LINE "24TH" Sta 360+50292 24TH St 23RD St "24TH" LINE "23RD" LINEBAY StB StC StD StE StC StENCINA StDRAKE StNIGHT TIME DAY TIME ASPHPPPP ASPH ASPH P P P PP P P PP P P PP P P PP CONC ASPHASPHASPHASPH FP ASPHCONCASPH CONC CONC ASPH ASPH ASPHASPHP P P P P PPP P FPP P P ASPHASPH ASPH ASPH ASPH ASPHASPH ASPH ASPHASPHASPH ASPH ASPHCONC CONC ASPH ASPH ASPH CONCASP HASPH ASPH ASPHH STSTOPSTOP STOPSTOP P PP PP P P P PP P PP PP P P P P P ASPHASPHASPH CONC ASPH ASPHASPH ASPH P P P P P P PPP P P ASPH ASPHASPH CONC ASPHASPH CONCCONCASPH CONC ASPH ASPHASPH EYE STASPHASPHH STG STF STASPH STOPSTOPx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:03 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma045.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 1 2 3 4 6 7 8 9 1 2STOPSTOPSTOP STOP 24TH St"24TH" LINE G StH StF StG StEYE StR/W R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50'MATCH LINE "24TH" Sta 360+50SEE SHEET SC-44SEE SHEET SC-46MATCH LINE "24TH" Sta 374+50SEE SHEET SC-46MATCH LINE "23RD" Sta 372+50SC-45 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDH St EYE St"23RD" LINE F StAPPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY NOTE:(14')(12')(12')(14')(12')(12')(10')(12')(12')(19')(19')(19')(12')(17')(22')(22')(12')(12')(12')(12')(18')(11')(11')(11')(11')(11')(11')(17')(22')(22')(22')(22')23RD St STAGE 5 NIGHT TIME SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, MATCH LINE "23RD" Sta 359+85SEE SHEET SC-44DAY TIME(12') (11') (11') (12') (12') (11') (11') (12') 12' 11' 11' 12' 12' 11' 11' 12' F 293 ASPHASPHASPHASPH CONCCONC CONC ASPHASPHP P P P P PP P P P P P P P P P P P PPP P P P PP P ASPHCONC ASPH ASPH ASPH ASPH FP FP CONC POOL CONC ASPH FP ASPH ASPHCONC CONCASPHASPH CONCASPH ASPH ASPHCONC CONCASPHASPH CONCCONCASPH CONC ASPH CONCASPH ASPHASPH ASPH ASPHASP HASPHASPHASPHASPHASPHASPH L STPPPPP CONC FP ASPHCONCASPHASPH ASPH CONCA SPHASPHP P PP PP P PP P P P P P P PP P PPFP P P PP P P PP PP P P P P P P FP FP FP FP ASPHASPH ASPH ASPH ASPH ASPH CONCCONCCONC CONC ASPH ASPHASPHASPHASPH CONCASPH CONCASPHASPH ASPHASPH ASPH ASPH M STL STK STASPHCHESTER AVx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:04 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma046.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123R/W R/W R/W R/W R/W R/W R/W SCALE: 1" = 50' TRAFFIC HANDLING PLAN STAGE CONSTRUCTION AND SC-46MATCH LINE "23RD" Sta 372+50SEE SHEET SC-45MATCH LINE "24TH" Sta 374+50SEE SHEET SC-45SEE SHEET SC-47"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION R/W NOTE: APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY(11')(11')(14')(13')(10')(16')(15')(10')(15')(10')(22')(22')(20')(12')(19')(30')(19')(11')(20')(12')(12')(12')(11')(10')(11')(11')(20')(11')(10')(10')(16')(20')(11')(20')(20')(11')(9')SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, F F 12' 11' 11' 12'12'12'10'12'11'(20')12 '11 '11 '12 '11 '12'12'10'12'11'(12') (11') (11') (12') (12') (11') (11') (12') STAGE 5 NIGHT TIME 0294 L StK StL StM StCHESTER AveCHESTER Ave"24TH" LINE 23RD St 24TH St K StM St"23RD" LINE CLOSURES ONLY, USE Std PLAN T11. COLD PLANE AND HMA OVERLAY. OVERNIGHT LANE P ASPHA SPH ASPHASPH ASPHPP P ASPH ASPHTRAILER ASPH CONCCONC P P PP P PP P P P P P P P FP FP ASPH ASPHASPH ASPHASPHASPHASPHASPH TRAILER ASPH CONC ASPHASPH A SPH ASPH ASPH ASPHASPHCONCCONC ASPHCONC 24TH STN STQ STASPHP P ASPHASPH P P PP ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH 23RD ST ASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:05 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxma047.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 LLLLSASASASANTTNTNTN400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 R /W R / W R /W R/W R/W SCALE: 1" = 50' SC-47 TRAFFIC HANDLING PLAN STAGE CONSTRUCTION ANDMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET SC-46NOTE: (12') (12') (12')(12')(12')(12')(12') (12') (18')(18')(14')APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY STAGE CONSTRUCTION NOTE THIS SHEET: 2SEE SHEET SC-6. FOR GENERAL NOTES, LEGEND AND ABBREVIATIONS, STAGE 5 NIGHT TIME12'12'12'12'15' (12') (12') (12') (Var)(18') (Var) F1 295 WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINEN StO St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd N StO StP StO St P ASPHASPHASPHASPH 24TH ST B STASPHC STx x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:06 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmb001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 325 3307 89 1 2 3 4 6 7 8 9 1 320 325 3307 89 1 2 3 4 6 7 8 9 1 350 8 91 2 3 4 3 45 67 P P PP P P P P P P P P P P P PP P pPOOLCONCPOOLASPH ASPHASPHASPH ASPH ASPHASPHASPHASPHASPH ASPH P P CONC POOLASPHASPHCONC24TH ST ELM STASPHASPHBEECH STASPHMYRTLE STP BC Beg Temp Pvmt BC END Temp Pvmt EC ANGLE POINT PRC PRC PCC 21.94' Rt "EB2" +59.22 16.28' Rt "EB2" +80.44 6.52' Rt "EB2" +98.25 24.86' Rt "EB2" +03.10 35.57' Rt "EB2" +81.99 No.#R CURVE DATA T L 1 2 3 SCD-1 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY TRAFFIC HANDLING DETAILS STAGE CONSTRUCTION AND SCALE: 1" = 50'SCD-1 TRAFFIC HANDLING DETAILS STAGE CONSTRUCTION AND BC Beg Temp Pvmt EC END Temp Pvmt PRC 5.79' Rt "24TH" +34.20 15' Rt "24TH" +88.46 28.97' Rt "24TH" +05.37 6 4 SAWCUT AND CONFORM SAWCUT AND CONFORM B B A A SECTION A-A OG Var NO SCALE EP Exist 1' HMA (TYPE A) Temp Pvmt AND CONFORM SAWCUT 1'2' FLATTER 4:1 ORSLOPE Exist MATCH SLOPE Exist FG SECTION B-B OG Var NO SCALE 1' HMA (TYPE A) Temp Pvmt AND CONFORM SAWCUT 1'2' FLATTER 4:1 OR SLOPE Exist FG Gtr LIP Exist SLOPE Exist MATCH MEDIAN REMOVE Exist STAGE 1 DAY TIME 50.65' Rt "EB2" +86.85 296 1 224.08'112.21' 2 142.90' 1,682.00' 3 578.00'71.82' 4 118.08'451.00' 29.13' 59.38' 422.00'55.55'"E B 2" L IN E"WB 2 " L IN E "24 TH " L IN E "23RD" LI NE24TH St OAK St24TH St 23RD St OLIVE StELM StBEECH St253.63'506.58' 5 3,996.00' ASPHPP P P P P P P P P P P P PP P pPOOLCONCPOOLASPHASPHASPH ASPH ASPHASPHASPHASPH x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:08 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmb002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 320 325789 1 2 3 4 6 320 325789 1 2 3 4 6 7 350 7 8 9 34 5 4 67 SECTION C-C SCD-2 APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY TRAFFIC HANDLING DETAILS STAGE CONSTRUCTION AND SCALE: 1" = 50' APPROVED FOR STAGE CONSTRUCTION AND TRAFFIC HANDLING WORK ONLY TRAFFIC HANDLING DETAILS STAGE CONSTRUCTION AND NO SCALE Beg Temp Pvmt "EB2" +27 EC END Temp Pvmt 25' Lt "EB2" +38.72 BC 6 No.#R CURVE DATA T L 25' Lt "EB2" +80.58 CONFORM SAWCUT AND C C D D 10' AND CONFORM SAWCUT EP Exist 1' HMA (TYPE A) Temp Pvmt FG OG AND CONFORM SAWCUT MEDIAN REMOVE Exist 2%-5% Var SECTION D-D NO SCALE Var AND CONFORM SAWCUT EP Exist 1' HMA (TYPE A) Temp Pvmt FG OG AND CONFORM SAWCUT MEDIAN REMOVE Exist 2%-5% Var 1.5'-10' BC Beg Temp Pvmt 18.50' Rt "23RD" +90.18 EC END Temp Pvmt 18.50' Rt "23RD" +15.05 7 CONFORM SAWCUT AND E E SECTION E-E NO SCALE Gtr LIP Exist Var1' AND CONFORM SAWCUT FG 1' HMA (TYPE A) Temp Pvmt SLOPE Exist SLOPE Exist MATCH OG CURB & GUTTER REMOVE Exist STAGE 2 AND 3 DAY TIME 297 6 139.68'1,605.00 69.88'"W B 2" LIN E"EB2" LI N E24TH St OAK StELM StOLIVE St7 581.50'12.05'24.10' "24TH" S t "23RD" S t 24TH St x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:09 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmc001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE FEDERAL CALIFORNIA SIGN MESSAGE AND SIZE No. OF POSTSSIGN CODE STATIONARY MOUNTED CONSTRUCTION AREA SIGNS SIZE PANEL EA BARRICADE ON TYPE III SIGNS MOUNTED EA BARRICADE ON TYPE II SIGNS MOUNTED No. SHEET No. STAGE SCQ-1 30"x 30" QUANTITIES AND TRAFFIC HANDLING STAGE CONSTRUCTION SIGNS No. OF 1 DAY SC-7 C30 LANE CLOSED 3 C27 36"x 36"OPEN TRENCH 1 R4-7 24"x 30"KEEP RIGHT 1 SC-8 1LANE CLOSED30"x 30"C30 R9-9 30"x 18"SIDEWALK CLOSED 2 R11-2 48"x 30"ROAD CLOSED 1 C27 36"x 36"OPEN TRENCH 2 SC-10 1 NIGHT R4-7 24"x 30"KEEP RIGHT 2 24"x 30"R4-8 KEEP LEFT 1 C27 36"x 36"OPEN TRENCH 3 R3-7R "x "RIGHT LANE MUST TURN RIGHT 1-48 48 2 W74 Lt 48"x 48"THRU TRAFFIC MERGE LEFT 1-6" x 6"1 R4-7 24"x 30"KEEP RIGHT 4 SC-11 C27 36"x 36"OPEN TRENCH 4 SC-12 R4-7 24"x 30"KEEP RIGHT 3 C27 36"x 36"OPEN TRENCH 3 SC-13 R4-7 24"x 30"KEEP RIGHT 1 C30 30"x 30"LANE CLOSED 1 2 DAY SC-14 "x "48 48 1-1W20-5R RIGHT LANE CLOSED AHEAD 6" x 6" 11-4" x 6""x "30 30R1-2 YIELD SC-15 C31A 36"x 36"NO SHOULDER 3C31A36"x 36"NO SHOULDER C27 36"x 36"OPEN TRENCH 2 R9-10 24"x 12"SIDEWALK CLOSED USE OTHER SIDE 1 R11-2 48"x 30"ROAD CLOSED 2 C31A 36"x 36"36"x 36"NO SHOULDER 1 C27 36"x 36"OPEN TRENCH 2 C30 30"x 30"LANE CLOSED 1 SC-17 SC-18 R11-2 48"x 30"ROAD CLOSED 6 6ROAD CLOSED48"x 30"R11-2 C27 36"x 36"OPEN TRENCH 4 W1-8L 18"x 24"CHEVRON ALIGNMENT 1-4" x 4"3 24"x 30"KEEP RIGHT 2 24"x 30"KEEP RIGHT 1 2 NIGHT "x "48 48 1-2 4" x 6" R3-7L LEFT LANE MUST TURN LEFT 4" x 6" 24"x 30"KEEP RIGHT 1 4 C27 36"x 36"OPEN TRENCH 4 48"x 48"1-6" x 6"1W74 Rt THRU TRAFFIC MERGE RIGHT SC-19 C30 30"x 30"LANE CLOSED 1 24"x 30"KEEP RIGHT 3 C27 36"x 36"OPEN TRENCH 3 SC-20 SC-21 C27 36"x 36"OPEN TRENCH 3 R4-7 24"x 30"KEEP RIGHT 1 R11-2 48"x 30"ROAD CLOSED 1 C27 36"x 36"OPEN TRENCH 2 "x "1-4" x 4"1W4-2L 30 30 LANE ENDS, MERGE LEFT SC-22 SC-23 C27 36"x 36"OPEN TRENCH 4 R4-7 24"x 30"KEEP RIGHT 3 R3-7R "x "48 48 1-4" x 6"2RIGHT LANE MUST TURN RIGHT W74 Rt 48"x 48"THRU TRAFFIC MERGE LEFT 1-6" x 6"1 C27 36"x 36"OPEN TRENCH 3 SC-24 R3-7R "x "48 48 RIGHT LANE MUST TURN RIGHT 21-4" x 6" C30 30"x 30"LANE CLOSED 1 SC-26 C30 30"x 30"LANE CLOSED 3 R3-2 "x "24 24 LEFT TURN PROHIBITION 2 R11-2 48"x 30"ROAD CLOSED 1 48"x "M4-10R 18 RIGHT ARROW DETOUR "x "R3-2 24 24 LEFT TURN PROHIBITION 1 C27 36"x 36"OPEN TRENCH SC-27 SC-28 3 DAY 3 NIGHT 1 R4-8 R4-8 R4-8 R4-8 W9-1L x ""48 48 LEFT LANE ENDS 1-4" x 6"1 W9-1L 48"x 48"LEFT LANE ENDS 1 4" x 6"-1 298 SC-9 R3-2 LEFT TURN PROHIBITION24x24""1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:10 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmc002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE FEDERAL CALIFORNIA SIGN MESSAGE AND SIZE No. OF POSTSSIGN CODE STATIONARY MOUNTED CONSTRUCTION AREA SIGNS SIZE PANEL EA BARRICADE ON TYPE III SIGNS MOUNTED EA BARRICADE ON TYPE II SIGNS MOUNTED No. SHEET No. STAGE SCQ-2 QUANTITIES AND TRAFFIC HANDLING STAGE CONSTRUCTION SIGNS No. OF C27 C27 R4-8 SC-29 24"x 30" 36"x 36" 36"x 36" KEEP LEFT OPEN TRENCH OPEN TRENCH 4 4 1SC-28 3 NIGHT C27 36"x 36"OPEN TRENCH 3 24"x 30"KEEP RIGHT 3 R11-2 48"x 30"ROAD CLOSED 1 "x 24"W1-6L 48 LEFT DIRECTION LARGE ARROW R11-2 48"x 30"ROAD CLOSED R11-2 48"x 30"ROAD CLOSED 2 5 "x "1-4" x 4"1W4-2L 30 30 LANE ENDS, MERGE LEFT 48"x "48 1-14" x 6" C27 36"x 36"OPEN TRENCH 1 SC-34 C30 30"x 30"LANE CLOSED 1 SC-30 SC-31 R3-7R "x "48 48 RIGHT LANE MUST TURN RIGHT 1-4" x 6"1 C27 36"x 36"OPEN TRENCH 1 R4-7 24"x 30"KEEP RIGHT 1 R4-7 24"x 30"KEEP RIGHT 4 C27 36"x 36"OPEN TRENCH 4 R4-7 24"x 30"KEEP RIGHT 4 C27 36"x 36"OPEN TRENCH 4 SC-36 SC-37 SC-38 4 DAY 4 NIGHT R3-7R "x "48 48 RIGHT LANE MUST TURN RIGHT -4" x 6"11 48"x 48"1-6" x 6"1W73A Rt RIGHT LANE TURNS RIGHT AHEAD W74 Lt 48"x 48"THRU TRAFFIC MERGE LEFT 1-6" x 6"1 W4-2L "x "30 30 LANE ENDS, MERGE LEFT 1-4" x 4"1 W9-1L 48"x "48 1-4" x 6"1 SC-39 R4-8 W9-1 RIGHT LANE ENDS LEFT LANE ENDS 299 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:11 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmc003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE SCQ-3 QUANTITIES AND TRAFFIC HANDLING STAGE CONSTRUCTION TEMPORARY PAVEMENT DELINEATION QUANTITIES STAGE No. SHEET TEMPORARY TRAFFIC STRIPE (PAINT) 6"DETAIL 27BSOLID WHITEDETAIL 9(17-7)BROKEN WHITEDETAIL 40(6-1)BROKEN WHITEDETAIL 39SOLID WHITELF LF LF LF LF LF LF LF EA EA EA 852 161 SC-10 SC-11 951 SC-12 SC-13 SC-14 SC-15 SC-17 SC-18 SC-19 SC-19 SC-20 SC-21 SC-22 800 SC-23 SC-24 SC-26 SC-27 SC-28 SC-28 SC-29 SC-30 SC-31 SC-32 SC-33 SC-34 SC-35 SC-36 SC-36 SC-37 SC-38 SC-39 SUBTOTAL 19,926 24,724 279 425 TOTAL TYPE DTYPE GTYPE H 1,766 5,112 SC-7 SC-81 DAY 1 NIGHT 2 DAY 2 NIGHT 3 DAY 3 NIGHT 4 DAY 4 NIGHT DETAIL 25 AND 25ASOLID YELLOW1,235 240 400 567 1 1,674 1,656 2,344 1,194 1,634 1 1,165 355 524 802 363 955 1,109 94,593AND 29DETAIL 21, 22 YELLOWSOLID DOUBLE 603 1,884 1,286 159 6 17 1,092 16 49 12 DETAIL 37B(12-3)BROKEN WHITE8" LFLFAND 38DETAIL 36, 36A SOLID WHITE DETAIL 1(17-7)BROKEN YELLOW 255 180 571 1,050 105 1,421 1,052 1,854 1,101 1,044 962 1,232 1,886 103 323 353 1,069 976 1,104 1,730 1,414 1,187 827 1,068 827 47 428 170 1,526 951 244 1,635 1,142 2,595 2,191 1,714 379 997 1,173 805 1,672 1,141 2,343 1,194 1,652 353 1,069 979 1,435 358 1,408 1,187 363 1,084 958 1,473 38,269 67 496 118 681 462 135 56 653 DETAIL 39ASOLID WHITE (8-4)23 23 26 264 517 18 634 395 517 42 10 175 91 1 90 571 2 59 3,768 78 75 178 244 204 1,390 35 51 94 92 10 46 2 16 20 32 32 6 35 71 46 36 37 23 17 36 47 69 25 35 8 23 21 34 32 30 25 67 23 21 47 999 18 4 26 20 5 9 12 1 17 35 35 49 25 35 1 25 8 11 17 8 20 24 MARKING (PAINT)PAVEMENTTEMPORARY 15 45 54 54 198 75 144 30 54 804 870 141 939 15 56 54 108 330 282 54 249 370 330 522 6,020 6,020 STAGE No. SHEET LF 644 SC-10 SC-11 392 SC-12 388 SC-13 SC-14 SC-15 SC-17 SC-18 SC-19 SC-19 SC-20 SC-21 SC-22 490 SC-23 SC-26 SC-27 SC-28 SC-29 SC-30 SC-31 SC-32 SC-33 SC-34 SC-35 SC-36 SC-37 SC-39 10,373 SC-7 SC-81 DAY 1 NIGHT 2 DAY 2 NIGHT 3 DAY 3 NIGHT 4 DAY 4 NIGHT 594 209 188 1,486TRAFFIC STRIPEREMOVE THERMOPLASTIC PAVEMENT MARKINGREMOVE THERMOPLASTIC LF PAVEMENT MARKINGREMOVE PAINTEDEATRAFFIC STRIPEREMOVE PAINTEDPAVEMENT MARKERREMOVE SC-40 SC-41 SC-42 SC-43 SC-44 SC-45 SC-46 SC-47 5 DAY 5 NIGHT 1,203 1,595 1,055 12 246 3,096 2,869 7,833 4,672 2,826 3,365 126476126 225 300 878 84 84 438 234 90 90 15 462 563 1,010 30 1,200 1,197 89 195 1,766 2,189 2,799 1,401 1,361 1,665 2,966 2,336 SC-44 1,566 513 1,531 2,766 30 126 628 995 54 68 282 178 413 469 267 13 34 32 84 33 21 28 14 52 20 46 18 35 65 123 108 33 16 29 121 80 17 22 5 56 59 62 46 84 16 46 44 70 3,026 53,269 5,285 1,990 DELINEATION QUANTITIES REMOVE PAVEMENT 943 943 20 20 108 300 PAVEMENT MARKER TOTAL LF 328 108 1,059 14 133 1,605 148 328 878 108 4,709 518 91 1,032 560 689 141 690 491 176 121 146 201 111 SQFTSQFT SC-9 SC-10 178 33 35 1,030 223 2,484 97 97 239 256 36 8 119 SQFT (HAZARDOUS WASTE)TRAFFIC STRIPE THERMOPLASTIC REMOVE YELLOW x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>9:19:11 AM7/30/2018CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>CDiaz1 DGN FILE =>06xxxxxxxxmc004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 NO SCALE SCQ-4 QUANTITIES AND TRAFFIC HANDLING STAGE CONSTRUCTION (SURFACE MOUNTED)CHANNELIZERTYPE III BARRICADE(TYPE K)TEMPORARY RAILINGFLASHING ARROW SIGN360 7 5,780 3 55 STAGE No. SHEET STATION LIMITS (TYPE A) ASPHALT HOT MIX TON SCD-1 SCD-1 TOTALARRAY TS11CUSHION MODULETEMPORARY CRASH2,356 1,180 360 44 CONSTRUCTION QUANTITIES TEMPORARY STAGE SCD-2 SCD-2 1 DAY 2 DAY 3 DAY "EB2" 80+59.22 TO "EB2" 329+86.80 "24TH" 350+34.20 TO "24TH" 351+05.37 "23RD" 344+90.18 TO "23RD" 345+15.05 "EB2" 318+27 TO "EB2" 323+80.58 1,461 140 361 9 STAGE No. SHEET EA SC-10 SC-11 SC-12 SC-13 SC-14 SC-15 SC-17 SC-18 SC-19 SC-20 SC-21 SC-22 SC-23 SC-26 SC-27 SC-28 SC-28 SC-29 SC-30 SC-31 SC-33 SC-34 SC-35 SC-36 SC-7 SC-8 1 DAY 1 NIGHT 2 DAY 2 NIGHT 3 DAY 3 NIGHT 4 DAY 4 NIGHT EA LF EA EA SC-36 SC-37 SC-38 SC-39 SC-24 65 26 17 84 26 110 88 32 69 118 TOTAL 88 82 64 105 107 91 146 106 105 34 105 89 58 74 38 90 105 56 37 83 58 3 2 6 3 13 7 760 900 800 320 1,100 1 1 1 11 11 11 11 11 301 SC-9 3 1,971* *QUANTITY INCLUDED IN PAVEMENT STRUCTURE QUANTITIES. STRUCTURE QUANTITIES TEMPORARY PAVEMENT x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEO F CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>$TIME$DATECHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>$USER DGN FILE =>$REQUEST RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 00000000001BORDER LAST REVISED 7/2/2010 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD IRVINE, CA 92618 SUITE 350 20 PACIFICA T.Y. LIN INTERNATIONAL ERIC JOHNSON C69305 06/30/18 KAREN CHAPMAN0.2/R1.9178 ALBERT PANCHRISTINA DIAZ477 04/06/2018 07/27/2018 SUMMARY OF QUANTITIES LOCATIONSTATIONSHEET No. L-9 L-11 "WBL" 312+82 TO "WB2" 315+50 L-10 "WB2" 315+50 TO "WB2" 322+50 "OAK-1" 259+50 TO "OAK-1" 265+00 L-12 L-13 "24TH" 347+50 TO "24TH" 360+50 "24TH" 347+50 TO "24TH" 360+50 L-14 "24TH" 360+50 TO "24TH" 374+50 L-15 "24TH" 360+50 TO "24TH" 374+50 "23RD" 358+50 TO "23RD" 372+50 "23RD" 358+50 TO "23RD" 372+50 "24TH" 374+50 TO "W178" 396+09.45 "24TH" 374+50 TO "W178" 396+09.45 "23RD" 372+50 TO "E178" 395+34.02 "23RD" 372+50 TO "E178" 395+34.02 L-16 "E178" 395+34.02 TO "E178" 405+50 Lt Lt Rt Rt Rt Lt Rt Lt Rt Lt Rt Lt Rt Lt Rt Lt TOTAL 28,727 REMOVE ASPHALT CONCRETE PAVEMENT QUANTITIES 890 10,424 242 3,110 194 224 282 4,348 1,198 1,595 1,190 1,876 1,506 898 1,309 122 SQFT LOCATIONSTATIONSHEET No. L-9 L-11 "WBL" 312+82 TO "WB2" 315+50 L-10 "WB2" 315+50 TO "OAK" 259+50 L-16 "W178" 396+09.45 TO "W178" 405+50 Lt Rt Rt TOTAL 2,239 306 200 607 REMOVE ASPHALT CONCRETE DIKE QUANTITIES "WB2" 315+50 TO "OAK" 259+50 "E178" 395+34.02 TO "E178" 405+50 Lt 449 "E178" 395+34.02 TO "E178" 405+50 479 Rt Rt Rt LF 21 177 LOCATIONSTATIONSHEET No. L-11 Lt LF TOTAL REMOVE RETAINING WALL QUANTITIES 76 76 LOCATIONSTATIONSHEET No. L-11 Lt LF TOTAL REMOVE SOUND WALL QUANTITIES 142 142 LOCATIONSTATIONSHEET No. L-10 Lt LF 361 REMOVE CHAIN LINK FENCE QUANTITIES L-10 Lt 242 L-11 Rt 507 L-16 Rt 223 TOTAL "OAK-1" 315+50 TO "WB2" 322+50 "OAK" 259+50 TO "OAK" 265+00 "E178" 395+34.02 TO "E178" 405+50 1,333 LOCATIONSTATIONSHEET No. L-9 Lt EA L-10 Lt L-13 Lt TOTAL "WB2" 315+50 TO "WB2" 322+50 REMOVE BOLLARD QUANTITIES "WBL" 312+82 TO "WB2" 315+50 "24TH" 347+50 TO 360+50 6 40 6 52 LOCATIONSTATIONSHEET No. L-11 Rt EA L-12 Rt TOTAL 20 31 51 REMOVE CHANNELIZERS QUANTITIES "OAK-1" 259+50 TO "OAK-1" 265+00 MEDIAN 1,686 "24TH" 347+50 TO "24TH" 360+50 MEDIAN 1,3092 361 Q-1 "WB2" 320+50 TO "B" 336+50 "B" 336+50 TO "24TH" 347+50 "WB2" 320+50 TO "B" 336+50 "WB2" 320+50 TO "B" 336+50 "WB2" 320+50 TO "B" 336+50 "WB2" 320+50 TO "B" 336+50 "WB2" 320+50 TO "B" 336+50 "B" 336+50 TO "24TH" 347+50 4,235 2,248 31,906 REVISION DATE DESCRIPTION 06/12/201 REVISED REMOVAL LIMITS CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 1 1 10/01/21 F-301DECOMPOSED GRANITE (DG)NAMELOCATIONDIMENSIONSDGMOW CURBLINEBEG. STATIONOFFSETEND STATIONOFFSETWIDTH (FT)LENGTH (FT)MONUMENT LOCATION CHARTMONUMENTEND POINTS (EP)HIGHPOINT (HP)EP#1EP#2EP#3HPSTA:OFFSET (LF)STA:OFFSET (FL)STA:OFFSET (LF):STA:OFFSET (LF)ELEMONUMENT QUANTITY TABLEMONUMENTBASECONCRETEWIRE MESHCOBBLESTONE(CY)(CY)(CY)(SF)(SF)REVISIONDATEDESCRIPTION REVISIONDATEDESCRIPTION X-2X-1REVISIONDATEDESCRIPTION W-1W-2W-3W-4W-5A-1A-2A-3A-4A-5REVISIONDATEDESCRIPTION B-1B-2C-1C-2 D-1D-2E-1E-2F-301F-301 F-1F-2G-1 E-6E-7E-8E-11E-10E-9G-1H-1H-2H-3H-4H-5H-6SIGN 1SIGN 2 4LLD-14LLD-1ROCK BLANKET LAYOUTROCK BLANKET - SECTIONCHAIN LINK RAILING - POSTCHAIN LINK RAILING DECOMPOSED GRANITE - LOCATION A & HDECOMPOSED GRANITE PLANTINGBAKERSFIELDSTEEL SIGN DIMENSIONSSTEEL SIGN - SECTIONBASTEEL SIGN - MOUNTING BRACKETREVISIONDATEDESCRIPTION PLANT SCHEDULEMULCH SCHEDULEPLANTING NOTESGENERAL LANDSCAPE NOTES (CITY OF BAKERSFIELD):REVISIONDATEDESCRIPTION GENERAL PROJECT NOTES (CITY OF BAKERSFIELD):GENERAL RECORD DRAWING NOTE (CITY OF BAKERSFIELD):MAINTENANCE PERIOD (CITY OF BAKERSFIELD): REVISIONDATEDESCRIPTION REVISIONDATEDESCRIPTION REVISIONDATEDESCRIPTION X-2X-1REVISIONDATEDESCRIPTION W-1W-2W-3W-4W-5A-1A-2A-3A-4A-5REVISIONDATEDESCRIPTION B-1B-2C-1C-2 D-1D-2E-1E-2F-301F-301 F-1F-2G-1 E-6E-7E-8E-11E-10E-9G-1H-1H-2H-3H-4H-5H-6SIGN 1SIGN 2 GENERAL IRRIGATION NOTESIRRIGATION NOTESGENERAL IRRIGATION NOTES (CITY OF BAKERSFIELD):REVISIONDATEDESCRIPTION CRITICAL ANALYSISREVISIONDATEDESCRIPTION 1"2"1"1"1"1"1"1"EXISTING IRRIGATION LEGENDREVISIONDATEDESCRIPTION 1"1"1"1"1"112"1"EXISTING IRRIGATION LEGENDREVISIONDATEDESCRIPTION 1"1"2"1"1"REVISIONDATEDESCRIPTION X-2X-11"1"1"1"1"REVISIONDATEDESCRIPTION W-1W-2W-3W-4W-5A-1A-2A-3A-4A-51"1"1"1"1"1"1"1"1"1"1"1"1"1"1"1"1"1"1"REVISIONDATEDESCRIPTION B-1B-2C-1C-21"1"1"1"1"1"1"1"112"1"1"1"1"1"1"1"1"1"1" D-1D-2E-1E-2F-301F-3011"1"1"1"1"1"1"1"1"1" F-1F-2G-11"1"1"1"1"112"1"1"1"1"1"1"1"1"1"1"1"1" E-6E-7E-8E-11E-10E-9G-1H-1H-2H-3H-4H-5H-6SIGN 1SIGN 21"1"1"1"1"1"1"1"1"1"1"1" 1"1" DRIP-LINE RISER DETAIL6DRIPLINE MANIFOLD LAYOUT7DRIP ZONE VALVE12345678910111213141516171819123456789101112131415161718198FLUSH VALVE - MANUAL 9REVISIONDATEDESCRIPTION E-1 NO SCALE Exist MAGNETIC DETECTOR NEW MAGNETIC DETECTOR PG&E - PACIFIC GAS AND ELECTRIC SI - SIGN ILLUMINATION SYMBOLS:ABBREVIATIONS: NOTES: 1. 2. A MINIMUM 4' x 4' LANDING SHALL BE WITHIN 10" OF THE PEDESTRIAN PUSH BUTTON. PEDESTRIAN PUSH BUTTONS MUST BE PLACED SO THAT THE PATH OF THE PEDESTRIAN IS UNOBSTRUCTED. 4. 3. RAMP, BUT NO GREATER THEN 5' FROM THE CROSSWALK LINE. OF THE CROSSWALK LINE (EXTENDED) FARTHEST FROM THE CENTER OF THE INTERSECTION AND THE SIDE OF A CURB PEDESTRIAN PUSH BUTTONS MUST BE NO GREATER THAN 6' FROM THE EDGE OF THE CURB, SHOULDER, THE EDGE ALL PEDESTRIAN SIGNAL HEADS MUST BE LED COUNT DOWN TYPE. Exist LED WALL-MOUNTED LUMINAIRE STANDARD PLAN SHEET No. DETAIL INFORMATION Exist CITY FIBER OPTIC SPLICE VAULT CITY FIBER OPTIC SPLICE VAULT ABBREVIATIONS, AND NOTES ELECTRICAL SYMBOLS, RRFB - RECTANGULAR RAPID FLASHING BEACON ATC - AUTOMATIC TRAFFIC COUNTER SMFO - SINGLE MODE FIBER OPTIC CABLE STC - SCREENED TRANSMISSION CABLE VCS - VEHICLE CLASSIFICATION STATION X X Exist TYPE 30 ELECTROLIER, NEW Lum ON Exist LMA Exist TYPE 15 ELECTROLIER, NEW Lum ON Exist LMA CONDUCTOR LINE 2 GROUND NEUTRAL LINE 1 BLACK RED WHITE GREEN COLOR LIGHTING (CITY STREET) NOTES: 1. 2.REPLACE CONDUCTORS INSIDE LIGHTING STANDARD UP TO THE LUMINAIRE WHERE ANY WORK IS DONE. 3. 4.CITY LUMINAIRES MUST BE: TYPE MANUFACTURER MODEL No. A B C D AMERICAN ELECTRIC LIGHTING AMERICAN ELECTRIC LIGHTING AMERICAN ELECTRIC LIGHTING AMERICAN ELECTRIC LIGHTING ATBO 20BLEDE53 MVOLT R2 NL P7 PCLL RFD 196218 ATBO 20BLEDE70 MVOLT R2 NL P7 PCLL ATBO 20BLEDE10 MVOLT R3 NL P7 PCLL ATBO 30BLEDE10 MVOLT R3 NL P7 PCLL CITY ELECTROLIER, X = CITY Lum TYPE REPLACE CONDUCTORS INSIDE POLE FROM PB TO Lum Exist TYPE 15 CITY ELECTROLIER, NEW Lum ON Exist LMA, X = CITY Lum TYPE CITY LUMINAIRE INFORMATION CONDUCTOR INSULATION CONDUCTOR INSULATION COLORS FOR CITY STREET LIGHTING MUST BE: AND ELECTRICAL (661) 326-3781. WATTS Dr. SCHEDULE DELIVERY WITH PETER MARTIN, GENERAL SERVICES SUPERVISOR OF TRAFFIC SIGNALS AS PART OF THIS PROJECT TO THE CITY'S POLE STORAGE AREA AT THE BAKERSFIELD AIRPARK AT UNION AVE AND DELIVER AND UNLOAD ALL CITY STREET LIGHTING STANDARDS AND LUMINAIRES THAT ARE BEING REMOVED PIEZO-ELECTRIC AXLE SENSOR 404 WIRELESS BROADBAND RADIO (ENCOM WIRELESS E-LITE 5.8GHz) CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:33 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 DIRT ASPH ASPHASPHDIRTASPHASPHFOFOFOR/W R/W R/W R/W 24TH St "WBL" LINE "EBL" LINE Kern River1 BC OH SIGN No. 1 2 ISL SC2A RC RSSI "EB2" LINE "WB2" LINE 1 3 CC 23 4 LEGEND (THIS SHEET ONLY): 2 4 1 3 5 6 7 2 1 3 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - V - 100 240 2 YES YES YES MAIN BREAKER 40 240 2 20 120 1 LIGHTING 20 120 1 SPARE YES - 40 240 2 SPARE YES - ---6 SPACES-- SPARE 30 2 YES240SIGN ILLUMINATION LC3 CTID: 06501780009021L AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - - 100 240 2 YES YES YES MAIN BREAKER 50 120 1 TRAFFIC SIGNAL 50 120 1 YES -20 120 1 20 120 1 YES 40 240 2 YES -- SPARE SPARE - - -6 SPACES-- RAMP METER RRFB CTID: 06501780009021T 2 O CONDUIT AND CABLE SEE INTERCONNECTION Exist 1•"C, 2#8 (SI), 1 SIC, ADD: 1 SICRC SCPB WITH TAMPER RESISTANT COVER PER DETAIL "B" ON SHEET ED-1. SI CONDUCTORS IN NEW PB. Exist 2"C, 2#8 (SI), 1 SIC, ADD: 1 SICRC RCExist 2"C, 1 DLC (Sig), 2#8 (SI), 1 SIC, ADD: 1 SIC RCExist 4"C, 3-12CSC (Sig),6 DLC (Sig), 1 EVUC (Sig), 2#8 (Ltg), 2#8 (SI), 1 SIC, ADD: 1 SIC 5 RCExist 4"C, 4-12CSC (Sig), 1-3CSC (Sig), 11 DLC (Sig), 1 EVUC (Sig), 2#8 (Ltg), 2#8 (SI), 1 SIC, ADD: 1 SIC 6 RCExist 2-4"C, Sig CABLES, 1 SIC, ADD: 1 SIC 7 Exist 3"C, 2#6 (RM), 2#8 (Ltg), 2#8 (SI), 2#8 (RRFB) R/W R/W MODIFY SIGN ILLUMINATION SYSTEM MODIFYING EXISTING ELECTRICAL SYSTEM SCALE: 1" = 50' E-2 FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: Exist TYPE III-CF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE Exist CONTROLLER ASSEMBLY TO REMAIN, RECONNECT NEW SIC (COORDINATE WITH PHASE 1). WITH THE FOLLOWING BREAKERS TO REMAIN (COORDINATE WITH PHASE 1): 405 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:34 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 3 4 6 7 8 9 1 2 3 3154 305 3 4 6 8 9 1 2 3 4 315 310 DIRT ASPH ASPH ASPH POOL CONC ASPHASPHDIRTASPHASPHDIRTASPHFOFOFOSEE SHEET E-4MATCH LINE "WB2" Sta 315+50R/W R/W R/W 24TH St "WBL" LINE "EBL" LINE Kern River1 1 SEE SHEET E-12 TO LOOP DETECTOR PB 2"C, 2#8 (Ltg - CITY) SIRS RC AB SEE SHEET E-11 TO Exist MAGNETIC DETECTOR PB "EB2" LINE "WB2" LINE 9A RSP ES-6A Elev B R/W R/W FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: LIGHTING (CITY STREET) SCALE: 1" = 50' E-3 406 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:34 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 3 4 6 7 8 9 1 2 3 3154 305 3 4 6 8 9 1 2 3 4 315 310 D ASPHASPHASPH ASPHASPHPOOLASPHCONCASPH ASPH AS P HASPH ASPH ASPH ASPH CONC ASPH ASPH ASPH ASPH ASPH ASPH STOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET E-5MATCH LINE "WB2" Sta 322+50SEE ABOVE RIGHT MATCH LINE "OAK-1" Sta 259+50 "WB2" L INE "EB2 " L INE 24TH StOAK StOAK St"OAK-2" LINEOLIVE StOAK StR/WR/WR/WR/W R/WR/WR/WMATCH LINE "OAK-1" Sta 259+50 SEE BELOW LEFT MATCH LINE "WB2" Sta 315+50SEE SHEET E-3SCALE: 1" = 50' E-4 LIGHTING (CITY STREET) 1 SEE SHEET E-12 TO LOOP DETECTOR PB 1 1 3 3 1 LINE"OAK-1"7892654321260LINE"OAK-1"R/WR/WR/WR / W 2"C, 3#6 (Ltg-CITY) Ckt A 6' LMA "WB2" 321+00 40706Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:35 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 3206789 1 2 3206789 1 2101234D CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 pPOOL CONC CONC POOL CONC CONCCONC POOLASPHCONC CONCCONC CONC ASPH C O N C POOLCONCC ONCCONC ASPHASPHPOOLS POOLPOOL CONCPOOLPOOLP O OL POOLPOO LPOOLPOOLASPHASPHCONC ASPHCONCCONC CONCCONC CONCCONC CONC ASPH POOLSTOPKCKCSTOPSTOPSTOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET E-6MATCH LINE "B" Sta 336+5024TH StCarrier CanalELM StBEECH StMYRTLE StSPRUCE StSPRUCE StMYRTLE StBEECH StELM St"B" LINE "WB2" LINE R/W R/W R/W R/W MATCH LINE "WB2" Sta 322+50SEE SHEET E-4"EB2" LINE LIGHTING (CITY STREET) SCALE: 1" = 50' E-5 1 3 1 1 Exist OH Ltg CONDUCTORS TO BE REMOVED BY OTHERS. U 11 RS 1 2 RC RS AB RC AB ABRC 3 AB RC RS RC 3 AB RC AB RC RS 4 RSRS RC AB RC AB 4 AB 4 RC RS 1 3 3 3 3 3 3 3 3 3 1 2 3 1 LEGEND (THIS SHEET ONLY): 2 3 3 3 3 2 3 3 3 3 3 3 3 3 4 4 2 2 4 32"C, 3#6 (Ltg-CITY) 2"C, 2#6 (Ltg-CITY) 2"C, 2#8 (Ltg-CITY) 2"C, 3#8 (Ltg-CITY) 3 Ckt A 6' LMA "EB2" 324+78, 78.2' Rt Ckt A 6' LMA "WB2" 325+91, 168.1' Lt, Ckt A 6' LMA "WB2" 327+71, 136.7' Lt Ckt A 6' LMA "EB2" 327+99, 65.7' Rt Ckt A 6' LMA "EB2" 331+78, 60.0' Rt Ckt B 6' LMA "B" 334+99, 96.4' Rt Ckt A 6' LMA "EB2" 323+60 Ckt B 6' LMA "WB2" 324+76 Ckt B 6' LMA "EB2" 326+80 Ckt A 6' LMA "EB2" 329+72 Ckt B 6' LMA "B" 332+71 Ckt A 6' LMA "B" 336+28 Ckt A 6' LMA "B" 334+47 Ckt B 6' LMA "WB2" 331+50 Ckt B 6' LMA "WB2" 327+75 408 1 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:35 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 325 330 3 4 6 7 8 9 1 325 330 3 4 6 7 8 9 1 335234 6DD AAAA DDDDDDDDDCONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 POOLPOOLP OOL POOLPOOL POOLPOOL ASPHCONC CONC ASPHPOOLCONCCONC ASPHPOOLPOOLPOOLSASPHASPHCONC CONC CONC POOL POOL STOPSTOPSTOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET E-7MATCH LINE "24TH" Sta 347+5024TH StPINE StCEDAR StALDER StPINE StCEDAR StA St"B" LINE "23RD" LINE "24TH" LINE R/W R/WR/WMATCH LINE "B" Sta 336+50SEE SHEET E-5SCALE: 1" = 50' E-6 LIGHTING (CITY STREET) Exist 120/240V TYPE C SERVICE ON UTILITY POLE.RS2 1 AB 2 1 CB AB 3 RC AB RC RS4 2 2 2 1 1 RS RC AB RC AB RC RS AB RC AB AB 2 RC AB AB 1 RC RS RC RS 1 O AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - V 100 240 2 YES YES MAIN BREAKER WITH THE FOLLOWING BREAKERS: TYPE III-BF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE LIGHTING Ckt A LIGHTING Ckt B YES V 1 TYPE H SERVICE 120/240V SP, PG&E 2 3 U U 2 R/W 3 3 3 3 3 3 3 3 1 3 3 LEGEND (THIS SHEET ONLY): 3 3 2 3 1 4 3"C, 3#2 (SERVICE) 2"C, 6#8 (Ltg-CITY) 2"C, 2#8 (Ltg-CITY) LIGHTING Ckt C LIGHTING Ckt D120 1 V1 1 1 20 20 120 120 2 1 20 20 120 YES YES V 2"C, 3#8 (Ltg-CITY) Ckt D 6' LMA "B" 338+44, 68.2' Rt Ckt C 6' LMA "B" 342+05, 68.9' Rt Ckt D 6' LMA "B" 345+40, 69.2' Rt Ckt D 6' LMA "B" 341+42 Ckt C LMA "B" 344+896' Ckt A 6' LMA "23RD" 343+55 Ckt D 6' LMA "B" 343+12 Ckt C 6' LMA "B" 339+71 40906Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:36 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 7 340 345 7 8 9 1 2 3 4 6 4 AAADDDDDCONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPH ASPH ASPH ASPH ASPH ASPHPOOLCONC POOLPOOL CONC CONCCONCPOOLPOOL ASPH ASPH ASPH ASPH ASPH FP ASPH ASPHASPHASPH ASPH CONC CONCASPH CONC ASPH ASPH CONCCONCASPHASPHSTOP STOPSTOPSTOPSTOP STOP STOP STOP STOP STOPSTOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE:SEE SHEET E-8MATCH LINE "24TH" Sta 360+50SEE SHEET E-8MATCH LINE "23RD" Sta 358+5024TH St 23RD St "24TH" LINE "23 RD" LI NEBAY StB StC StD StE StC StDRAKE StENCINA StR/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 347+50SEE SHEET E-6SCALE: 1" = 50' E-7 LIGHTING (CITY STREET) U 3 2 RS RC RC AB RS RC AB RC RS AB 2 AB2 AB RS 2 1 RC RS RC 2 7 SP, PG&E TYPE H SERVICE 120/240V 4 5 1 6 3 3 RC RS AB Exist 120/240V TYPE C SERVICE ON UTILITY POLE.RS3 1 O AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - V 100 240 2 YES YES MAIN BREAKER WITH THE FOLLOWING BREAKERS: TYPE III-BF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE LIGHTING Ckt A LIGHTING Ckt B YES V 1 2 3 2 1 2 1 U 4 3 U 2 4 4 5 R/W 3 3 3 3 3 3 3 37 8 PB PER PG&E REQUIREMENTS. 225W2 225W3 225X6 225X7 225X8 RC 225W5 3 RS AB LEGEND (THIS SHEET ONLY): 3 AB 3 3 AB RC RC RS RC RC RC RC AB RC AB RC AB AB RCRC RC AB 3 4 3 3 3 AB 4 AB RC3 3 3 3 3 3 8 3"C, PT (CONDUCTORS BY PG&E) V YES YESLIGHTING Ckt D LIGHTING Ckt E YES V LIGHTING Ckt F YES V 20 20 120 120 1 1 LIGHTING Ckt C 2"C, 2#8 (Ltg-CITY) 2"C, 3#8 (Ltg-CITY) 2"C, 3#6 (Ltg-CITY) 2"C, 2#6 (Ltg-CITY) 2"C, 6#8, 3#6 (Ltg-CITY) 3"C, 3#2 (SERVICE) 2 Ckt D Ckt F Ckt E Ckt F Ckt CCkt C 20 20 20 20 120 120 120 120 1 1 1 1 V 6 2"C, 2#8, 3#6 (Ltg-CITY) 3 3 3 3 3 RC 3 AB 3 2 AB 2 AB Ckt E 6' LMA "23RD" 349+83, 59.5' Rt Ckt B 6' LMA "24TH" 348+19 Ckt A 6' LMA "24TH" 351+73 Ckt B Ckt A 6' LMA "23RD" 346+25 Ckt C 6' LMA "24TH" 353+00 Ckt E 6' LMA "24TH" 352+63 Ckt F 6' LMA "23RD" 350+55 Ckt E 6' LMA "23RD" 353+00 Ckt D 6' LMA "24TH" 358+73 410 U 2 Exist OH Ltg CONDUCTORS TO BE REMOVED BY OTHERS. 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:36 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 350 355 360 8 9 1 2 3 4 6 7 8 9 34 5 3 5 0 35567 8 9 12 3 4 6 7 8DDDDDDDADBDDDDDDCONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPHASPH CONC ASPH ASPH ASPH ASPH ASPHASPH FP ASPH CONCASPH CONC CONC CONC ASPH ASPH ASPH ASPH ASPHASPH FP ASPH ASPH ASPH ASPH ASPH ASPH ASPHASPH ASPH ASPH CONC ASPHCONC CONC ASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH CONC ASPH ASPH ASPHASPHH ST25TH ST STOPSTOPSTOPSTOPSTOP STOP STOP STOP SEE SHEET E-9MATCH LINE "24TH" Sta 374+50SEE SHEET E-9MATCH LINE "23RD" Sta 372+60FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: 24TH St 23RD St "24TH" LINE "23RD" LINE G StH StF StF StG StH StEYE StEYE StR/W R/W R/W R/W R/W R/W R/W R/WMATCH LINE "24TH" Sta 360+50SEE SHEET E-7MATCH LINE "23RD" Sta 358+50SEE SHEET E-7SCALE: 1" = 50' E-8 LIGHTING (CITY STREET) 1 1 11SEE SHEET E-1 TO Exist Sig PB 1 1 1 2 1 2" C, 2#8 (Ltg) 1 AB SEE SHEET E-18 TO Exist Sig PB ABAB RS RS Exist 120/240V TYPE C SERVICE ON UTILITY POLE.1 1 1 SEE SHEET E-19 TO LOOP DETECTOR PB 1 SEE SHEET E-21 TO LOOP DETECTOR PB 1 SEE SHEET E-20 TO Exist Sig PB SEE SHEET E-17 TO Exist LOOP DETECTOR PB SEE SHEET E-20 TO Exist Sig PB RC AB 225X1 225X2 330KM 330LA 330KZ 225Y4 LEGEND (THIS SHEET ONLY): ABRC RC AB ABAB RC AB RC AB RC AB RC 1 RC AB RC RC AB RC AB RC AB RC RC AB 3 3 3 3 3 3 3 3 3 3 3 2 2" C, 2#8 (Ltg), 2#10 (CCTV) PB SEE SHEET E-22 TO Exist LOOP DETECTOR AB 1 3 RS 6' LMA "24th" 372+54 6' LMA "23RD" 364+24 411 U U 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:37 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 365 370 1 2 3 4 6 7 8 9 1 2 3 4 360 365 370 9 1 2 3 4 6 7 8 9 1 2DDCONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 FPASPHASPHCONC ASPHASPH ASPH CONC CONC FP FP FP ASPHASPH ASPH ASPH FP FP ASPH ASPH ASPHASPH ASPH CONC CONCCONCASPHASPH ASPH ASPH ASPH ASPH CONC CONC CONCCONCCONCASPHASPH ASPH CONC ASPH CONCCONCASPHCONC CONC ASPH ASPH CONCASPH ASPH CONCASPHASP HASPHASPH ASPH ASPH ASPH ASPH SEE SHEET E-10"E178" Sta 395+34.02"W178" Sta 396+09.45MATCH LINE CALTRANS PORTION FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: 24TH St 23RD St R/W R/W R/W R/W R/W R/W R /W R/WL StK StL StM StM StCHESTER AveCHESTER AveMATCH LINE "24TH" Sta 374+50SEE SHEET E-8MATCH LINE "23RD" Sta 372+60SEE SHEET E-8"24TH" LINE "23RD" LINE SCALE: 1" = 50' E-9 LIGHTING (CITY STREET) 1 3 2 3 4 2 4 SEE SHEET E-23 TO Exist Sig PB SEE SHEET E-26 TO Exist Sig PB U 1 2 RS Exist 120/240V TYPE C SERVICE ON UTILITY POLE.1 AB 2 1 AB SEE SHEET E-25 TO LOOP DETECTOR PB 4 2 5 E-19 AND E-21 Exist 2" C, 1-24 SMFO SEE SHEETS 5 4 4 SEE SHEET E-24 TO Exist Sig PB 330KW 330KX 330LF 330LG LEGEND (THIS SHEET ONLY): RC RC RC BC RC AB RC RC CC AB RCRCAB RC AB SEE SHEET E-24 TO Exist Sig PB RC SEE SHEET E-25 TO Sig PBK St3 3 3 3 3 3 3 3 AB 2 2 2 2 2" C, REROUTE Exist 1-24 SMFO 3 Exist 2" C, 2#8 (Ltg-CITY), 1-24 SMFO 2" C, 2#8 (Ltg-CITY), REROUTE Exist 1-24 SMFO 2" C, 2#8 (Ltg-CITY) 3 "C" LINERC REROUTE Exist 24 SMFO CABLE TO PROPOSED CONDUIT. Exist CONDUIT. 41206Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:38 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 395 6375 380 385 6 7 8 9 1 2 3 4 6 7 375 380 3 4 6 7 8 9 1 2 3 410123 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPHA SPH ASPHASPH ASPHASPH ASPHASPHASPH ASPH ASPHASPH ASPHASPHASPHASPH TRAILER ASPH CONC ASPHASPH ASPH ASPH ASPH ASPH N STQ STASPHSASASASALTNNTLLLTTNNFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: WB ROUTE 178 EB ROUTE 178 "W178" LINE "E178" LINE O StO StP StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd R /W R/W R /W R/W R/W R/WMATCH LINE CITY PORTION "E178" Sta 395+34.02"W178" Sta 396+09.45SEE SHEET E-9SCALE: 1" = 50' E-10 13 3 RS L1.75 AB 3 4 RC 3 3 3 3 5 9 5 5 5 U U AB RC L1.78 12' LMA "E178" 399+50 (T) RS AB4 RC L1.84 RS RC AB CB SEE SHEET E-31 TO Exist Sig PB 9 5 Sig PB TO Exist Exist SP, PG&E 7 Exist SP, PG&E TYPE H SERVICE 120/240V SEE SHEET E-29 TO Exist Sig PB 10 3 Exist SI TO REMAIN 4 8 U 2 5 1 Exist SP, PG&E TYPE H SERVICE 120/240V 3 3 3 3 3 6 AMPERES VOLTS POLES 100 240 YES MAIN BREAKER - 40 240 2 40 NAMEPLATE METER PEC TYPE - O4 70 2 120 1 TRAFFIC SIGNAL HIGHWAY LIGHTING NO NO AMPERES VOLTS POLES 100 240 YES MAIN BREAKER - 40 240 2 12030 1 NAMEPLATE METER PEC TYPE - O5 70 2 120 1 TRAFFIC SIGNAL HIGHWAY LIGHTING NO SC V -YES ENCLOSURE WITH THE FOLLOWING BREAKERS TO REMAIN: Exist TYPE III-AF 120/240V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE WITH THE FOLLOWING BREAKERS TO REMAIN: Exist TYPE III-AF 120/240V 1 , 3-WIRE SERVICE EQUIPMENT CTID: 06501780001.728M INTERSECTION LIGHTING2402 IV IV 30 120 1 YES - 40 240 2 NOSPARE SPARE - 1 5 Exist 1•" C, 2#8 (Ltg) 6 3 Exist 1•" C, 2#8 (Ltg), 1 SIC Exist 1•" C, 1 SIC 7 8 9 10 2"C, 2#8 (Ltg) Exist SI TO REMAIN SC 9 12 -- CTID: 06501780001.726M 6 G1.732 G1.86 L1.88 L1.92 L1.71 L1.79 L1.85 L1.72 TYPE H SERVICE 120/240V L1.74 L1.76 L1.82 L1.882 AMPERES VOLTS POLES 100 240 MAIN BREAKER 40 240 2 12030 1 NAMEPLATE METER PEC TYPE - O6 3 HIGHWAY LIGHTING NO IV -SPARE YES ENCLOSURE WITH THE FOLLOWING BREAKERS TO REMAIN: Exist TYPE III-AF 120/240V 1 , 3-WIRE SERVICE EQUIPMENT - CTID: 06501780001.881M AB 11 11 11 9 Exist 3" C, 2#4 (Sig), 2#8 (INTERSECTION Ltg) 1 PB WITH TAMPER RESISTANT COVER PER DETAIL "C" ON SHEET ED-1. 2 REPLACE Exist PB COVER WITH TAMPER RESISTANT COVER PER DETAIL "B" ON SHEET ED-1. 2 1 2 2 2 2 1 1 2 2 2 2 2 2 2 2 2 LEGEND (THIS SHEET ONLY): ELECTRICAL SYSTEM MODIFYING EXISTING MODIFY LIGHTING SYSTEM SEE SHEET E-30 TO VCS PB 2 2 2 2 2 13 Exist 3"C, 1 SIC Exist 3"C, 2#4 (Sig), 2#8 (Ltg) 12 ADD: 2#8 (VCS) Exist 1•" C, 2#4 (Sig), 2#8 (Ltg); 2 VCS (Exist SPARE) 4 3" C, 2#8 (Ltg) ADD: 2#8 (VCS) Exist 1•" C, 2#8 (Ltg), 1 SIC: CB 3 Exist HPS Lum, INSTALL LED Lum ON Exist LMA. 3 3 3 CB SC 3 2#8 (Ltg), 2#8 (SI) Exist 2" C, 2#4 (Sig), 2#8 (INTERSECTION Ltg), Exist 1•" C, 2#8 (Ltg), 2#8 (SI) Exist 1•" C, 2#8 (SI) RS 3 LEGEND (THIS SHEET ONLY) (CONTINUED): 12' LMA "W178" 399+47, 37.9' Rt 12' LMA "E178" 401+30, 25.4' Rt 41306Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:38 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPHASPHO1 O6 O6 O8 O8 O8 O6 O5 O2 O2 O7O7O7 O 1O2 O8 AB AB AB AB AB AB AB AB AB L IM IT L IN E200' T O LIMIT LINE200' TO LIMT LINE250' TO AB RC RS RS RC AB RC AB RCAB AB AB AB U RC AB RC RC AB RC RS RS RC AB AB AB AB AB O6P O2P O8P O2PABABAB AB AB AB AB AB RC RC RC RS AB RS RC AB AB AB AB AB ABAB AB AB Exist 2"C, 3#2 (service) AB AB AB 24TH St 8 810 719 7 7 "WB" LINE "EB" LINE"OAK-2" LINE"OAK-1" LINEOAK StDETAIL "A" STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM O1 O5 O1 O6 O5 O2 O6 O2 P O7 O8 O8P O2 PO2 PO6 SCALE 1"=20' E-11 O5 O8 O8P AB 1 AB AB AB RS RS 1 AB NO SCALE DETAIL "A" O6P (24th St AND OAK St EQUIPMENT REMOVAL) RS RS 1 RR SEE SHEET E-3 TO OH SIGN No. 3 R/W R/W R/W PO6 RC Exist 2"C, 1-48 SMFO Exist 2"C, 1-48 SMFO RR Exist CCTV CAMERA TO Loc ON SHEET E-12. Exist CCTV CABINET AS SHOWN ON SHEET E-12. Exist SP, PG&E TYPE H SERVICE, 120/240 V R/W R/W AB C LEGEND (THIS SHEET ONLY): SEE SHEET E-32 AB (CITY STREET LOCATION 1) SIGNAL AND LIGHTING R/W 41406Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:39 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua011.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 1017CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 U Exist 2"C, 3#2 (service) 24TH St 8 810 719 7 7 "WB" LINE "EB" LINE"OAK-2" LI NE"OAK-1" LI NEOAK St SCALE 1"=20' E-12315315 9 1 (24th St AND OAK St) O6 O6 O1 O2 O2 O5 O5 O8 O8 O8 O7O7 O7 O7 2 CC 3 O6 4 5 4 6 2"C, 9 DLC 2"C, 1 DLC 2"C, 1 DLC LI MT LI NE230' TO 7 8 10 O6P O8P 11 O7 O2P O2P O6P O8P 6 6 6(E) 6 6 6 6 6 3 O52&O 3 O61&O 3 O8 3O7 O5 O 1 O6 O5 O2 O6 O2 P O7 O8 O8P O2 PO2 PO6 STEADY DEMAND SEQUENCE PHASE DIAGRAM R/W R/W R/W (T) (T) 1I9U 1I1L 6J3L 6J2U 8J 8L8J 6L8J 6L8J 8U8I 5L8I 5U5J1U 2I4U 214L 2I3U 2I3L 2I2L 5J1L 2I2U 8J 6UExist SP, PG&E TYPE H SERVICE, 120/240 V 8J7U8J 7L7J5L7J 9LL IM T L IN E230' T O LIMIT LINE230' TO DETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' 10' LEFT TURN LANE THROUGH LANE RIGHT TURN LANE OLA OLA OLA OLB O1 OLB R/W PO6 OLB 3#6 (Ltg) 2"C, 5 DLC, 3#6 (Ltg) 2"C, 1 DLC, 3#6 (Ltg) 2"C, 1 DLC, SEE SHEET E-4 TO Ltg PB OLB Y R G GA NO SCALE DETAIL "A" DETAIL "A"7J 5U6J3U 6J4L 6J4U 1I9U 1I1U 7 7 8 5 9 6 5 6 10 2-3"C, 2#6 (CCTV), 1-CA252D Exist 2"C, 1-48 SMFO 11 2"C, 1-12 SMFO SPLICE VAULT AT OAK St AND 21ST St Exist 2"C, 1-48 SMFO TO Exist O6 8 9 DH DH9A WIRES 1"C WITH LOOP No. 9A PB DH FG NO SCALE DETAIL "B" 9A DETAIL "B" DETAIL "B" Conc BARRIER ON PLAN AND CABLES AS SHOWN 2"C WITH CONDUCTORS 2#8 (Ltg) 2"C, 1 DLC, 2#8 (Ltg) 2"C, 4 DLC, 2#8 (Ltg) 2"C, 1 DLC, SEE SHEET E-3 TO Ltg PB SEE SHEET E-33 TO INTERCONNECT PB D C E F A B H I J 1 3"C, 2#6 (Sig) 2 1 3"C, 2#8 (Ltg), 2#8 (CCTV) 2"C, 3#2 (SERVICE) G O 1 O 1 (CITY STREET LOCATION 1) SIGNAL AND LIGHTING RETAINING WALL PROPOSED R/W R/W R/W R/W 41506Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:39 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua012.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 1017CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 E-13 (24th St AND OAK St) NO SCALE F F2 SMA DIMENSIONS: 1 O2 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - - 100 240 2 YES YES YES MAIN BREAKER 50 120 1 TRAFFIC SIGNAL 15 120 1 -15 120 1 20 120 1 YES 40 240 2 YES SPARE SPARE - - 3 INSTALL EVUD PER ES-4E, DETAIL "B". CCTV 4 RELOCATED Exist CCTV CABINET. NO SCALE MODIFIED TYPE D BICYCLE DETECTOR DETAIL 6"1'-6"1' 4' 1'1'1'3' LIMIT LINE D3-1 (24TH STREET). SEE SIGN PLANS. IS IS IS5 6 7 IS8 D3-1 (OAK STREET). SEE SIGN PLANS. R73-2 (CA) PER ES-7N, DETAIL "U". SEE SIGN PLANS. R73-6 (CA) PER ES-7N, DETAIL "U". SEE SIGN PLANS. 9 10 THIS SHEET. MODIFIED TYPE D BICYCLE DETECTOR LOOP PER DETAIL 1'11 BOX WITH EXTENSION AND STEEL LID. CITY FIBER OPTIC SPLICE VAULT. OLDCASTLE MODEL B2436 112020 VNO LIGHTING CONTROL NO LEGEND (E-12 AND E-13 ONLY): E-11 PER ES-7R. INSTALL CCTV CAMERA RELOCATED FROM SHEET POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A 26-4-100 40'15'ROADWAY 1 MAS,MAS-4C SV-1-T SP-1-T 6 F=13' B 15TS -15'--SV-2-TA SP-1-T 8 C 61-5-100 65'15'ROADWAY 1 MAS,MAS,MAS SV-1-T SP-1-T 8 F=27', F2=25' D 1-A ----TV-2-T SP-1-T 2 E 26-4-100 40'15'ROADWAY 1 MAS,MAS SV-1-T ---F=15' F 15TS -15'ROADWAY 1 -SV-2-TA SP-1-T -- G 1-B Mod ------2 H 16-3-100 15'--MAS,MAS ----F=12' I 61-5-100 65'15'ROADWAY 1 MAS,MAS SV-1-T SP-1-T --F=24 J 1-A ----TV-2-T -6 3 5 8 3 6 7 9 3 7 8 3 6 SEE SHEET ED-3 5 (CITY STREET LOCATION 1) SIGNAL AND LIGHTING 15 120 1 INTERSECTION LIGHTING NO STREET LIGHTING Ckt A 112020 VNOSTREET LIGHTING Ckt B V CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 10 11 VEH-PED A 8,OLB,8P 1 1 12CSC 6P 1 1 B 5,6,6P 1 1 1 8P 1 1 1 C 2,5,OLA,2P 2 2 2 2 2 8P 1 1 1 1 1 D 7,OLB,8P 1 1 1 1 1 1 2P 1 1 1 1 1 1 E 7 1 1 1 1 1 1 1 F 1,OLA,2P 1 1 1 1 1 1 1 1 G 2P 1 1 1 1 1 1 1 1 H 1 1 1 1 1 1 I 6,6P 1 1 1 1 J 7,8 1 1 1 6P 1 1 1 APS TOTAL 10 10 6 5 5 3 2 1 1 2 3 3CSC 6 6 4 3 3 2 1 1 --1 AWG Ckt #6 CCTV 2 2 2 2 #8 Ltg 2 2 2 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 1 1 SIC 1 1 1 1 12 SMFO 1 1 1 1 1 1 1 EVUC 4 4 2 2 2 1 1 1 1 LOOP DLC (TYPE B) PHASE 1 3 3 3 3 PHASE 2 6 6 4 4 4 4 4 4 2 2 2 PHASE 5 2 2 2 2 2 PHASE 6 5 5 5 PHASE 7 3 3 3 PHASE 8 9 9 9 9 9 9 TOTAL DLC 28 28 21 16 13 13 4 4 4 4 7 CONDUIT SIZE 3-4''3-4''2-4''4''4''2-4''2-4''4''4''4''4'' 416 CONTRACTOR FURNISHED WITH THE FOLLOWING BREAKERS: TYPE III-AF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE BBS CABINET AND BATTERIES. CABINET AND CITY FURNISHED BBS SYSTEM. CONTRACTOR FURNISHED CITY FURNISHED 170E CONTROLLER ASSEMBLY WITH MODEL 332L CONTRACTOR FURNISHED ES8/31/18REVISION DATE DESCRIPTION 8/31/2018 CHANGED CITY FURNISHED TO CONTRACTOR FURNISHED 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:40 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua013.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 1 1 STOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: SCALE: 1" = 20' (24th St AND PINE St) E-14PINE St24TH St "WB" LINE A B D F G R/WR/W R/WR/W E C O2 O2 O2 O2 O6 O6 O6 O6 6(E) PEDESTRIAN HYBRID BEACON SYSTEM 1 O2 LEGEND (E-14 AND E-15 ONLY): 6 5 IS 4 3 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - V 100 240 2 YES YES MAIN BREAKER 50 120 1 15 120 1 15 120 1 - SIGNAL LIGHTING NO IS CROSSWALK SIGN. SEE SIGN PLANS. R10-23. SEE SIGN PLANS. PB PER PG&E REQUIREMENTS. 1 2 2 3"C, 2#6(Sig) 6 SP, PG&E TYPE H SERVICE 120/240 V 3"C, PT (CONDUCTORS BY PG&E) 3"C,3#2(SERVICE) 1 3"C, 2#8(Ltg) 6 3 4 5 O 6P O 6P DETAIL "B" 4 DETAIL "C"5 4 DETAIL "B" 5 DETAIL "A" DETAIL "A" DETAIL "C" O 2P O 2P R R Y FITTER SLIP R R Y R R Y PIPE TENON MAST ARM OR SIGNAL-FACE VEHICLE TYPE MAS-4A MODIFIED BLANK FLASHING YELLOW ON/OFF PPB ACTIVATION STEADY YELLOW STEADY RED HAND UPRAISED STEADY HAND UPRAISED STEADY HAND UPRAISED STEADY WALK PED STEADY DOWN DIGITS HAND/COUNT UPRAISED FLASHING HAND UPRAISED STEADY BLANK FLASHING ON/OFF RED ALTERNATING FLASHING R R Y R R Y R R Y R R Y R R Y R R Y R R Y Y 3 NO SCALE DETAIL "A" MAS-4A (Mod) NO SCALE DETAIL "B" SV-1-T (Mod) NO SCALE DETAIL "C" TV-1-T (Mod) SEQUENCE OF OPERATION PEDESTRIAN HYBRID BEACON 34098 20 240 1 - LIGHTING CONTROL NO 15 120 1 -SPARE - 417 METER 1 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - 240 2 YES YES MAIN BREAKER 15 120 1 240 2 15 120 1 - METER 2 AT F St AND 24th St. DETAIL B. WIRELESS COMMUNICATION TO SIGNAL WIRELESS BROADBAND RADIO ON LMA PER ES-7R, SPARE - IRRIGATION CONTROLLER BOOSTER PUMP YES - SPARE YES 100 60 U REVISION DATE DESCRIPTION 8/31/2018 CHANGED CITY FURNISHED TO CONTRACTOR FURNISHED CONTRACTOR FURNISHED CONTRACTOR FURNISHED WITH THE FOLLOWING BREAKERS: TYPE III-CF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT ENCLOSURE BBS CABINET AND BATTERIES. CABINET AND CITY FURNISHED BBS SYSTEM. CONTRACTOR FURNISHED CITY FURNISHED 170E CONTROLLER ASSEMBLY WITH MODEL 332L 8/31/18ES06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:40 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua014.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 1 1 E-15 NO SCALE (24th St AND PINE St) PEDESTRIAN HYBRID BEACON SYSTEM J14-D J14-J COM J14-K J13-K J12-E J13-E J13-D J13-J J12-D J12-J J12-K 1 2 3 4 5 6 7 8 9 10 11 12 TB8 TB9 111-D 111-J 111-KCOM 2PPB 4PPB 6PPB 8PPB INTERFACE BOARD VOICE ACTIVATION CONTROLLER Y G R G R Y G R Y G R Y 101 102 103 104 105 106 107 108 109 110 111 112 4 4P 8 8P FT1 12 COM 13 COM R R Y R R Y Y G R G R Y G R Y G R Y 127 128 129 125 133 134 136 130 131 132 137 126 FT3 6 5 2 1Y G R G R Y G R Y G R Y 113 114 115 116 117 118 119 120 121 122 123 124 3 7 FT2 6P 2P OUTPUT FILE FIELD TERMINAL CONNECTIONSINPUT FILE POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A 27-4-100 40'--MAS-4A(Mod), MAS-4A(Mod)SV-1-T (Mod)- B 15TS -12'165W --6 C ------6 D 1-A ----TV-1-T (Mod) E ------2 F 1-A ----TV-1-T (Mod) G 26-4-100 40 12'165W MAS-4A(Mod), MAS-4A(Mod)SV-1-T (Mod)2 4 5 3 4 5 APS/PB -- -- -- F=12' F=12' 1-B Mod 1-B Mod SEE SHEET ED-3 SEE SHEET ED-3 CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 VEH-PED A 6 1 1 1 9CSC B 6P 1 1 6P 1 1 C 6P 1 1 1 D 6.6P 1 1 1 E 2P 1 1 1 1 F 2,2P 1 1 1 1 G 2,2P 1 1 1 1 1 2P 1 1 1 1 1 APS TOTAL 5 5 3 2 1 1 3CSC 4 4 3 2 1 - AWG Ckt #8 Ltg 2 2 2 2 #8 G 1 1 1 1 1 1 CAT 5E (WIRELESS Comm)1 1 CONDUIT SIZE 2-4"4"4"4"4"4" 418 SP-1-T SP-1-T SP-1-T SP-1-T 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:41 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua015.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 SCALE 1"=20' E-16F St"23RD" LINE 23RD St1360 2 (23rd St AND F St) LIMIT LINE 185' TO LIMIT LINE105' TO LIMIT LINE105' TO O8 O8 O2 O2 O2O7O7O4O4 O2 O2 O4 O8 O2 O2P O2P O2P O2P O4P O4P O8P O8P O8 3 4 RS Exist PBA AND INSTALL APS. 5 RS34 3 4 3 4 3 4 2 3 434 3 4 1 Exist 2"C, 2#4 (Sig) 1 Exist 2"C, 2#8 (Ltg) 2 10 TYPE H SERVICE, 120/240 V Exist SP, PG&E Exist 2"C, 3#2 (SERVICE) 4 5 7 8 9 3 6 1 Exist 170 CONTROLLER ASSEMBLY TO REMAIN. 2 Exist SERVICE EQUIPMENT ENCLOSURE TO REMAIN. AB R/W R/W R/W R/W 6 Exist POLE AND SIGNAL EQUIPMENT TO REMAIN. 5 5 5 55 5 5 3 4 5 RC AB MAGNETIC DETECTORS. 1. ALL Exist DETECTOR LOOPS. ALL Exist RC U BCSC O8 O4 PO8O4P PO2 PO2 O4P O4 O7O2 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM AB AB 55'RC 2I2U 2I2L 2I3U 2I3L 2J5U 2I4U 2I4L 2J5L 8J8U8J8L8J6U8J6L4I6L4I6U4I8L4I8U7J9L7J5UDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN TO 24TH St AND F St Exist 2"C, 1-12 SMFO 1-12 SMFO Exist 2"C, Exist 2"C, 2 DLC Exist 2"C, 2 DLC DOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT (SERVICE) Exist 2"C, 3#2 Exist PB. NEW PB.RC BC 6 3 LOCATIONS UNLESS OTHERWISE NOTED. 2. ADJUST ALL Exist PB TO GRADE IN NEW SW ADD: 1 DLC Exist 3"C; ADD: 1 DLC Exist 2"C, 3 DLC; Exist 2"C, 2 DLC Exist 2"C, 2 DLC SC SC (N) = NEW (R) = NOTE: ALL CONDUITS AND CONDUCTORS ARE Exist UNLESS OTHERWISE NOTED. RC A B C D E F G H CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 10 VEH-PED A 2,2P 1 1 12CSC 8P 1 1 B 7,8,8P 1 1 1 2P 1 1 1 C 4,7,4P 1 1 1 1 2P 1 1 1 1 D 2,2P 1 1 1 1 1 4P 1 1 1 1 1 E 2,2P 1 1 1 1 1 1 4P 1 1 1 1 1 1 F 4,8,4P 2 2 2 2 2 2 2 2P 1 1 1 1 1 1 1 G 8,8P 1 1 1 2P 1 1 1 H 2,2P 1 1 8P 1 1 APS TOTAL 9 7 6 5 4 3 2 -1 2 3CSC 8 6 5 4 3 2 1 -1 2 AWG Ckt #8 Ltg 4 4 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 1 12 SMFO 1 LOOP DLC (TYPE B) PHASE 2 6 6 6 6 6 1 2(N)2(N)2(N)2(N)2(N)1(N) PHASE 4 4 4 4 4 4 4 4 PHASE 7 1(R)1(R)1(R) 2(N)2(N)2(N)2(N)2(N)2(N)2(N) PHASE 8 4 4 4 TOTAL DLC 14 14 14 10 10 5 4 --- 1(R)-------1(R)1(R) 4(N)4(N)4(N)4(N)4(N)3(N)2(N)--- CONDUIT SIZE 2-4"3"3"3"3"3"3"3"3"3" LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *26-4-80 40'12'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 8 B *1-A ----*TV-2-T *SP-1-T 2 C *24-4-80 35'12'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 2 D *1-A ----*TV-1-T *SP-1-T 4 E *15 -12'*ROADWAY 1 -*SV-1-T *SP-1-T 4 F *1-A ----*TV-2-T *SP-1-T 2 G *17-3-80 20'12'*ROADWAY 1 *MAS *SV-1-T *SP-1-T 2 H *1-A ----*TV-1-T *SP-1-T 8 * Exist EQUIPMENT 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 (CITY STREET LOCATION 2) SIGNAL AND LIGHTING 6 419 7 IS SEE SIGN PLANS. R61-22 (CA) (Mod) PER ES-7N, DETAIL "U". 7 REVISION DATE DESCRIPTION 1 9/29/20 MAST ARM SIGN ADDITIONAL SIGNAL JK9/29/209/30/22 1 1 7 1 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:41 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua016.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 SCALE 1"=20' E-17 2 3 365 F St(24th St AND F St) 24TH St "24TH" LINELIMIT LINE185' TO LIMIT LINE105' TO LIMIT LINE 185' TO C D E F G H O6 O6 O6 O6P O6PO6 O4 O4 O4 O6 O6 O3 O8 O8 O8 O3 O4P O4P O8P O8P O6P O6P R/W R/W R/W R/W R/W 3 4 RS Exist PBA AND INSTALL APS. 5 1 Exist 170 CONTROLLER ASSEMBLY TO REMAIN. 2 Exist SERVICE EQUIPMENT ENCLOSURE TO REMAIN. AB 6 Exist POLE AND SIGNAL EQUIPMENT TO REMAIN. Exist SP, PG&E O8 O4 PO8O4P PO6 PO6 O8 O8P O3O6 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM 102'Exist 2"C, 3#2 (SERVICE) Exist 2"C, 2#4 (Sig) 2 LIMIT LINE 145' TO Approx 2 1 1 3 4 5 6 2 DLC Exist 2"C, 7 3 4 5 8 MAGNETIC DETECTORS. 1. ALL Exist DETECTOR LOOPS. ALL EXIST RC U Exist 2"C, 2 DLC TYPE H SERVICE, 120/ 240 V A 6 Exist CCTV CABINET TO REMAIN. 6I1L 6J4L 6J4U 6I1U 6J3L 6J3U 6J2L 6J2U4I8L4I8U4I6L4I6U 8J6U8J6L3I5L8J8U8J8L3I5UDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN TO 23RD St AND F St Exist 2"C, 1-12 SMFO 1-12 SMFO Exist 2"C, Exist 2"C, 1-24 SMFO 1-24 SMFO Exist 2"C, B TO 24TH St AND H St Exist 2"C, 1-24 SMFO Exist 2"C, 2#8 (Ltg), 2#6 (CCTV) 1-CA252D Exist 2"C, 2#6 (CCTV), Exist 2"C, 1-12 SMFO DOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT RS SC SC Exist 2"C, 3 DLC; ADD: 2#8 (Ltg), 1 DLC Exist 2"C, 3 DLC; ADD: 2#8 (Ltg), 1 DLC SEE SHEET E-8 TO Exist Ltg PB CB SEE SHEET E-8 TO Exist Ltg PBAB R/W R/W ADD: 2 DLC Exist 3"C, RC RC ADD: 2 DLC 2 DLC, Exist 2"C, ADD: 2 DLC 2 DLC, Exist 2"C, LOCATIONS UNLESS OTHERWISE NOTED. 2. ADJUST ALL Exist PB TO GRADE IN NEW SW SC SC SC SC 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 (N) = NEW (R) = NOTE: ALL CONDUITS AND CONDUCTORS ARE Exist UNLESS OTHERWISE NOTED. RC POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *24-3-80 35'12'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 6 B *1-A ----*TV-1-T *SP-1-T 8 C *15 35'12'*ROADWAY 1 -*SV-1-T *SP-1-T 8 D *1-A ----*TV-1-T *SP-1-T 6 E *19-2-80 20'12'*ROADWAY 1 *MAS *SV-1-T *SP-1-T 6 F *1-A ----*TV-2-T *SP-1-T 4 G *26-4-80 40'12'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 4 H *1-A ----*TV-2-T *SP-1-T 6 * Exist EQUIPMENT 3 4 5 543 543 543 543 543 543 543 LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): (CITY STREET LOCATION 3) SIGNAL AND LIGHTING 7 HYBRID BEACON SYSTEM AT PINE St AND 24th St. DETAIL B. WIRELESS COMMUNICATION TO PED WIRELESS BROADBAND RADIO ON LMA PER ES-7R, CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 VEH-PED A 3,8,8P 1 1 12CSC 6P 1 1 B 6,6P 1 8P 1 C 6,6P 1 1 8P 1 1 D 8,8P 1 1 1 6P 1 1 1 E 4,4P 1 1 1 6P 1 1 1 F 6,6P 1 1 1 1 4P 1 1 1 1 G 6,6P 1 1 1 4P 1 1 1 H 3,4,4P 1 1 6P 1 1 APS TOTAL 8 1 4 1 2 1 1 2 3CSC 8 1 4 1 2 1 1 2 AWG Ckt #8 Ltg 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 12 SMFO 1 CA252D (CCTV)1 1 1 EVUC 3 1 1 1 1 1 CAT 5E (WIRELESS Comm)1 1 1 LOOP DLC (TYPE B) PHASE 3 2 2 2 PHASE 4 2 2 2(R)2(R) 2(N)2(N) PHASE 6 6 2 2(N) PHASE 8 4 4 4 TOTAL DLC 14 -8 6 ---2 2(R)2(R)------ 4(N)2(N)------ CONDUIT SIZE 2-3''3''3''3''2''1.5''3''3'' 7 420 9/29/20REVISION DATE DESCRIPTION 1 9/29/20 MAST ARM SIGN ADDITIONAL SIGNAL JK9/30/22 8 IS SEE SIGN PLANS. R61-22 (CA) (Mod) PER ES-7N, DETAIL "U". 1 8 8 1 1 9 REINSTALL EXISTING CONDUCTORS. LOWER Exist CONDUIT AS DIRECTED BY THE ENGINEER. 12/15/212 AS-BUILT CONDITION 2 9 9 2 2 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:42 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua017.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 "23RD" LINE 23RD St7 SCALE 1"=20' E-18 8 H St(23rd St AND H St EQUIPMENT REMOVAL) AB AB R/W R/WR/W R/W R/W R/W R/W R/W RC AB RC RSRC RS AB RS RC RS O8 O4 PO8O4P PO2 PO2 O2 O8 O8 O2P O4P O2P O8P O4O4 O4P O2P O2 O2 O2P O4 O8P O2 O8 O2 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM 3 RR RLExist CCTV CAMERA. TO Loc ON SHEET E-19. RC RR 1 2 1 4 AB TO 24TH St AND H St Exist 2"C, 1-12 SMFO RS AB Exist CCTV CABINET TO REMAIN. AB 5 Exist 120/240V TYPE C SERVICE ON UTILITY POLE.RS 5 AB AB 2 3 AB SEE SHEET E-8 TO Exist Ltg PB 6 RL Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-19. 6 7 RL Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-19. 7 AB PROTECT IN PLACE Exist FIBER OPTIC CABLES AND CONDUITS. RC 4 Sig PB SEE SHEET E-20 TO 24TH St AND H St C C G CONDUIT. AND INSTALL IN NEW Sig CONDUIT No. 3 ON SHEET E-19. Exist Sig CONDUCTORS. Exist CA252D CCTV CABLE LEGEND (THIS SHEET ONLY): (CITY STREET LOCATION 4) SIGNAL AND LIGHTING 421 U 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:42 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua018.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 "23RD" LINE 23RD St3657 8 H StR/W R/W R/W R/W R/W R/W LIMIT LINE105' TO LIMIT LINE105' TO LIMIT LINE 185' TO O2 O2 O2 O8 O8 O2P O2 O4 O7 O7 O4 O2 O2 O2P O2P O4P O4P O2P O8P O8 O8P O4 3 5 7 8 4 6 6 6 6 6 7 CB 2"C, 2 DLC 2"C, 2 DLC 120 /240 V TYPE H SERVICE, 3O8 3O2 O4&O73 4 D3-1 (23RD STREET). SEE SIGN PLANS.IS 5 IS D3-1 (H STREET). SEE SIGN PLANS. 7 3 INSTALL EVUD PER ES-4E, DETAIL "B". CB 6(E) SP, PG&E 2"C, 3#2 (SERVICE) 2"C, 3#2 (SERVICE) 2 2"C, 2#8 (Ltg), 2#6 (CCTV) 2"C, 2#6 (Sig) 1 Exist 2"C, 2#6 (CCTV) 1 2 Exist 2"C, 1 CA252D (CCTV) O2 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - 100 240 2 YES YES MAIN BREAKER 50 120 1 TRAFFIC SIGNAL 15 120 1 - -- 40 240 2 LIGHTING VNO LIGHTING CONTROL 15 120 1 SPARE ENCLOSURE WITH THE FOLLOWING BREAKERS: TYPE III-AF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT 1 R/W 6 IS R3-18 PER ES-7N, DETAIL "U". SEE SIGN PLANS. 4 5 6 4 15 120 1 YES -CCTV U 2I2U 2I2L 2I3U 2I3L 2I4U 2I4L 2J5U 2J5L 8J6U8J6L8J8U8J8L4I6U4I8U7J5U7J9LDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN LIMIT LINE 127' TO Approx Exist 2"C, 1-12 SMFO TO 24TH St AND H St Exist 2"C, 1-12 SMFO 6 8 Exist CCTV CABINET TO REMAIN. 8 2"C, 4 DLC, 2#8 (Ltg) 2"C, 4 DLC, 2#8 (Ltg) 2"C, 4 DLC, 2#8 (Ltg) TO Ltg PB SEE SHEET E-8 O8 O4 PO8O4P PO2 PO2 O4 O4P O7 STEADY DEMAND SEQUENCE PHASE DIAGRAM O2 2"C, 1 DLC 2"C, 1 DLC NO POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A 19-4-100 30'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 2 F=15' B 1-A ----TV-1-T SP-1-T 4 C 15TS -12'ROADWAY 1 -SV-1-T SP-1-T 4 D 1-A ----TV-1-T SP-1-T 2 E 16-2-100 15'12'ROADWAY 1 MAS SV-1-T SP-1-T 2 F 1-A ----TV-1-T SP-1-T 8 G 26-4-100 40'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 8 F=22' H 1-A ----TV-2-T SP-1-T 2 3 4 7 3 4 6 3 5 Exist EQUIPMENT TO BE FROM SHEET E-18RL C D E F G H A B LEGEND (THIS SHEET ONLY): E-18 PER ES-7R. INSTALL CCTV CAMERA RELOCATED FROM SHEET CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 VEH-PED A 4,7,4P 1 1 12CSC 2P 1 1 B 2,2P 1 4P 1 C 2,2P 1 1 1 4P 1 1 1 D 4,4P 1 1 2P 1 1 E 8,8P 1 1 1 2P 1 1 1 F 2,2P 1 1 1 1 8P 1 1 1 1 G 2,2P 1 1 1 1 8P 1 1 1 1 H 7,8,8P 1 1 1 2P 1 1 1 APS TOTAL 8 3 4 1 2 1 1 2 3CSC 8 3 4 1 2 1 1 2 AWG Ckt #8 Ltg 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 #6 CCTV 2 12 SMFO 1(E)1(E) CA252D (CCTV)1 1 EVUC 3 3 1 1 1 1 LOOP DLC (TYPE B) PHASE 2 8 2 2 2 PHASE 4 2 2 2 PHASE 7 2 2 2 PHASE 8 4 4 4 TOTAL DLC 16 10 6 2 ---4 CONDUIT SIZE 2-4''3''3''3''3''3''3''3'' (E) = Exist NOTE: ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED. 1-12 SMFO 2"C, 1 CA252D, SCALE 1"=20' E-19 (23rd St AND H St) (CITY STREET LOCATION 4) SIGNAL AND LIGHTING 422 ES8/31/18REVISION DATE DESCRIPTION 8/31/2018 CONTRACTOR FURNISHED CHANGED CITY FURNISHED TO CONTRACTOR FURNISHED FURNISHED BBS CABINET AND BATTERIES. BBS SYSTEM. CONTRACTOR ASSEMBLY WITH MODEL 332L CABINET AND CITY FURNISHED CITY FURNISHED 170E CONTROLLER CONTRACTOR FURNISHED 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:43 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua019.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 1 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPH 9 H StSCALE 1"=20' E-20 370 (24th St AND H St EQUIPMENT REMOVAL) "24TH" LINE 24TH St R/W R/W R/W R/W R/W R/W R/W R/W O8 O8 O6 O6 O6 O6 O4 O4 O4 O4P O6P O6P O4P O6P O6P O8P O8P RS RC RS RC RS RS RC O8 O4 PO8O4P PO6 PO6 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM O6 F St SMFO CABLE TO Exist 2"C, 1-24 TO 24TH St AND CHESTER Ave Exist 2"C, 1-24 SMFO 1 PROTECT IN PLACE Exist FIBER OPTIC CABLES AND CONDUITS. 2 AB 3 RS Exist 120/240V TYPE C SERVICE ON UTILITY POLE. AB AB 2 RC AB RS AB AB AB AB 1 1 1 3 TO 23RD St AND H St Exist 2"C, 1-12 SMFO SEE SHEET E-8 TO Exist Ltg PBAB 1 4 Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-21. 5 Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-21. RL RL 4 5 Sig PB SEE SHEET E-18 TO 23RD St AND H St C G 2 REROUTE Exist FIBER OPTIC CABLES TO NEW CONDUIT AS REQUIRED. LEGEND (THIS SHEET ONLY): 2 2 1 (CITY STREET LOCATION 5) SIGNAL AND LIGHTING 423 AB SEE SHEET E-8 TO Exist Ltg PB U 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:43 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua020.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 24TH St9 H St"24TH" LINE SCALE 1"=20' E-21 2370 (24th St AND H St) C D G O3 O8 O8 O8 O6 O6 O6P O6 O4O4 O4 O4 O4P O6 O6P O6P O6O6P O8P O8PO4P R/W R/W R/W R/W R/W R/WLIMIT LINE 185' TO LIMIT LINE105' TO LIMIT LINE185' TO O6 5 7 H 3 6 A 4 3O6 3O3&O8 3 O4 TYPE H SERVICE, 120/240 V SP, PG&E 2"C, 3#2 (SERVICE) 2 B 2"C, 2#8 (Ltg)2"C, 3#2 (SERVICE) 2"C, 2#6 (Sig) 1 1 6 4 8 E 2"C, 1 DLC 2"C, 1 DLC 4 2"C, 2 DLC 2"C, 2 DLC 4 D3-1 (24TH STREET). SEE SIGN PLANS.IS 5 IS D3-1 (H STREET). SEE SIGN PLANS. 3 INSTALL EVUD PER ES-4E, DETAIL "B". O2 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - 100 240 2 YES YES MAIN BREAKER 50 120 1 TRAFFIC SIGNAL 15 120 1 - -- 40 240 2 LIGHTING VNO LIGHTING CONTROL 15 120 1 SPARE ENCLOSURE WITH THE FOLLOWING BREAKERS: TYPE III-AF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT 1 6 IS R3-18 PER ES-7N, DETAIL "U". SEE SIGN PLANS. U CHESTER Ave SMFO CABLE TO Exist 2"C, 1-24 F St SMFO CABLE TO Exist 2"C, 1-24 O8 O4 PO8O4P PO6 PO6 O8 O8P O3 STEADY DEMAND SEQUENCE PHASE DIAGRAM O6 DETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN 6I1L 6J4L 6J4U 6I1U 6J2U 6J2L 6J3U 6J3L 8J6U8J6L4I8U4I6U3I5U3I9L8J8UTO 23RD St AND H St Exist 2"C, 1-12 SMFO 1-12 SMFO 1-24 SMFO, Exist 2"C, Exist 2"C, 1-12 SMFO Exist 2"C, 1-24 SMFO F 1-12 SMFO 2"C, TO 24TH St AND CHESTER Ave Exist 2"C, 1-24 SMFO 6(E) 6 6 6 6 6 7 2"C, 4 DLC, 2#8 (Ltg) 2"C, 4 DLC, 2#8 (Ltg) Ltg PB SEE SHEET E-8 2"C, 2#8 (Ltg) TO Exist NO 2 CC 7 5 7 CC 7 CC CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 VEH-PED A 3,8,8P 1 1 12CSC 6P 1 1 B 6,6P 1 8P 1 C 6,6P 1 1 8P 1 1 D 4,8,8P 1 1 1 6P 1 1 1 E 4,4P 1 1 1 1 6P 1 1 1 1 F 6,6P 1 1 1 1 1 4P 1 1 1 1 1 G 6,6P 1 1 1 1 4P 1 1 1 1 H 4,4P 1 1 1 6P 1 1 1 APS TOTAL 8 3 4 3 2 1 1 2 3CSC 8 3 4 3 2 1 1 2 AWG Ckt #8 Ltg 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 12 SMFO 1 EVUC 3 2 1 1 1 1 1 LOOP DLC (TYPE B) PHASE 3 2 2 2 PHASE 4 2 2 2 PHASE 6 8 PHASE 8 3 3 3 TOTAL DLC 15 2 5 5 ---2 CONDUIT SIZE 2-4"3"3"3"3"3"3"3" LEGEND (THIS SHEET ONLY): LEGEND (THIS SHEET ONLY): CONDUIT AS REQUIRED. REROUTE Exist FIBEROPTIC CABLES IN TO NEW 2" POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A 19-4-100 30'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 6 F=17' B 1-A ----TV-1-T SP-1-T 8 C 15TS -12'ROADWAY 1 -SV-1-T SP-1-T 8 D 1-A ----TV-2-T SP-1-T 6 E 17-3-100 15'12'ROADWAY 1 MAS SV-1-T SP-1-T 6 F 1-A ----TV-1-T SP-1-T 4 G 26-4-100 45 12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 4 F=22' H 1-A ----TV-1-T SP-1-T 6 Exist EQUIPMENT TO BE FROM SHEET E-20RL 3 4 634 3 5 (CITY STREET LOCATION 5) SIGNAL AND LIGHTING 424 ES8/31/18CONTRACTOR FURNISHED CONTRACTOR FURNISHED FURNISHED BBS CABINET AND BATTERIES. BBS SYSTEM. CONTRACTOR ASSEMBLY WITH MODEL 332L CABINET AND CITY FURNISHED CITY FURNISHED 170E CONTROLLER REVISION DATE DESCRIPTION 8/31/2018 CONTRACTOR FURNISHED CHANGED CITY FURNISHED TO 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:44 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua021.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 1 "23RD" LINE 23RD St SCALE 1"=20' E-22 4 CHESTER Ave375 (23rd St AND CHESTER Ave) R/W R/W R/W R/W R/W O7 O7 O4 O4 O2 O2 O2 O2P O2 O8 O8 O8 O4 O4P O2 O2 O2P O2P O4P O8 O8P O8P O2P R/W R/W LIMIT LINE185' TO LIMIT LINE185' TO LIMIT LINE 185' TO 3 4 RS Exist PBA AND INSTALL APS. 5 RS 1 Exist 170 CONTROLLER ASSEMBLY TO REMAIN. 2 Exist SERVICE EQUIPMENT ENCLOSURE TO REMAIN. AB 6 Exist POLE AND SIGNAL EQUIPMENT TO REMAIN. 5 6 7 8 9 2#6 (Sig) Exist 2"C, 3#2 (SERVICE) Exist 2"C, Exist SP, PG&E TYPE H SERVICE, 120/240 V 3#2 (SERVICE) Exist 2"C, 2 10 1 12 4 3 3 4 5 MAGNETIC DETECTORS. 1. ALL Exist DETECTOR LOOPS. ALL Exist RC U 2I3U 2I3L 2I2L 2I2U 2I4U 2I4L 2J1U 2J1L 8J8U8J8L8J6U8J6LDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN 7J5L7J9L4I8L4I8U4I6L4I6UDOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT Exist 2"C, 1-12 SMFO LOCATIONS UNLESS OTHERWISE NOTED. 2. ADJUST ALL EXIST PB TO GRADE IN NEW SW Exist CCTV CABINET TO REMAIN. 6 (CCTV) Exist 2"C, 2#6 SC Exist 2"C, 2 DLC SC Exist 2"C, 2 DLC Exist 2"C, 1-12 SMFO 24TH St AND CHESTER Ave Exist 2"C, 1-12 SMFO TO 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 RC ADD: 2 DLC Exist 3"C; ADD: 2 DLC 2 DLC; Exist 2"C; O8 O4 PO8O4P PO2 PO2 O4P O4 O7 O2 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *26-4-80 45'15'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 2 B *1-A ----*TV-1-T *SP-1-T 4 C *15 -12'*ROADWAY 1 -*SV-1-T *SP-1-T 4 D *1-A ----*TV-2-T *SP-1-T 2 E *19-3-80 30'12'*ROADWAY 1 *MAS *SV-1-T *SP-1-T 2 F *1-A ----*TV-2-T *SP-1-T 8 G *26-4-80 40'12'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 8 H *1-A ----*TV-2-T *SP-1-T 2 * Exist EQUIPMENT 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 D E F G HA B C LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): (CITY STREET LOCATION 6) SIGNAL AND LIGHTING CB 2#10 (CCTV) ADD: 1 DLC, 2#8 (Ltg), Exist 2"C, 3 DLC; 2#10 (CCTV) ADD: 1 DLC, 2#8 (Ltg), Exist 2"C, 3 DLC; (CCTV) ADD: 2#10 2#8 (Ltg); Exist 2"C, CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 10 VEH-PED A 4,7,4P 1 12CSC 2P 1 B 2,2P 1 1 4P 1 1 C 2,2P 1 1 1 4P 1 1 1 D 2 2 2 2 2P 1 1 1 1 E 8,8P 1 1 1 1 1 1 2P 1 1 1 1 1 1 F 2,2P 1 1 1 1 1 8P 1 1 1 1 1 G 2,2P 1 1 1 1 8P 1 1 1 1 H 7,8,8P 1 1 1 2P 1 1 1 APS TOTAL 9 4 3 2 -1 2 3 4 3CSC 8 3 2 1 -1 2 3 4 AWG Ckt #10 CCTV 2 #8 Ltg 2 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 1 12 SMFO 1 CA252D (CCTV)1 1 1 EVUC 3 1 1 2 2 3 LOOP DLC (TYPE B) PHASE 2 6 6 1 2(N)2(N)1(N) PHASE 4 4 4 4 4 PHASE 7 1(R)1(R)1(R)1(R)1(R)1(R) 2(N)2(N)2(N)2(N) PHASE 8 2 2 2 2(R)2(R) 2(N)2(N) TOTAL DLC 12 10 5 4 ----2 2 3(R)----1(R)1(R)1(R)1(R)3(R) 6(N)4(N)3(N)2(N)-----2(N) CONDUIT SIZE 2-4''3''3''3''3''3''3''3''3''3'' (N) = NEW (R) = NOTE: ALL CONDUITS AND CONDUCTORS ARE Exist UNLESS OTHERWISE NOTED. RC TO Ltg PB SEE SHEET E-8 2"C, 2#10 (CCTV)"C" LINE1 1 5 5 4,8,4P 425 REVISION DATE DESCRIPTION 1 9/29/20 MAST ARM SIGN ADDITIONAL SIGNAL 9/29/20JK9/30/22 7 IS SEE SIGN PLANS. R61-22 (CA) (Mod) PER ES-7N, DETAIL "U". 1 7 7 1 1 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:44 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua022.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 SCALE 1"=20' E-23 6 7 CHESTER Ave"24TH" LINE 24TH St 9 (24th St AND CHESTER Ave) E F G A O3 O8 O8O3 O4 O8P O6 O6 O6 O6P O4P O6P O6 O6 O4O4 O4P O6P O8P R/W R/W R/W O8 O6 O6P R/W R/W LIMIT LINE 185' TO LIMIT LINE185' TO LIMIT LINE185' TO O8 O4 PO8O4P PO6 PO6 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM O8 O8P O3O6 3 4 RS Exist PBA AND INSTALL APS. 5 1 Exist 170 CONTROLLER ASSEMBLY TO REMAIN. 2 Exist SERVICE EQUIPMENT ENCLOSURE TO REMAIN. AB 6 Exist POLE AND SIGNAL EQUIPMENT TO REMAIN. ADD: 1 DLC Exist 2"C, 3 DLC; ADD: 1 DLC Exist 2"C, 3 DLC, Exist SP, PG&E TYPE H SERVICE, 120/240 V Exist 2"C, 3#2 (SERVICE) Exist 2"C, 3 DLC; ADD: 1 DLC Exist 2"C, 3#2 (SERVICE) 2 Exist 2"C, 2#6 (Sig) Exist 2"C, 2#8 (Ltg) 1 9 1 2 5 B 8 3 4 5 3 4 5 C D 3 4 5 3 4 6 7 RC U H 8J6U8J6LDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN 6I1L 6J4L 6J4U 6I1U 6J3L 6J3U 6J2L 6J2U 8J8U8J8L4I8U4I8L4I7U4I6U4I6L3I5U3I9L1-24 SMFO Exist 2"C, TO H St 1-24 SMFO Exist 2"C, 1-24 SMFO Exist 2"C, Exist 2"C, 1-24 SMFO Exist 2"C, 1-24 SMFO 6 Exist CCTV CABINET TO REMAIN. SC RC AB SC DOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT RS TO Exist Ltg PB AT K St AND 24TH St Exist 2"C, 2#8 (Ltg), 1-24 SMFO RC Exist 2"C, 1 CA252D (CCTV) Exist 2"C, 3 DLC, 1 CA252D (CCTV); ADD: 1 DLC 2. ADJUST ALL EXIST PB TO GRADE IN NEW SW LOCATIONS UNLESS OTHERWISE NOTED. 1. ALL Exist DETECTOR LOOPS. ALL Exist MAGNETIC DETECTORS AND CONDUIT.AB 2 DLC Exist 2"C, 2 DLC Exist 2"C, AND CHESTER Ave SMFO TO 23RD St Exist 2"C, 1-12 1-12 SMFO Exist 2"C, ADD: 2 DLC Exist 3"C; ADD: 2 DLC 2 DLC; Exist 2"C; 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 (N) = NEW (R) = NOTE: ALL CONDUITS AND CONDUCTORS ARE Exist UNLESS OTHERWISE NOTED. RC 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 3 4 5 POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *26-4-80 45'15'*ROADWAY 1 *MAS,MAT *SV-1-T *SP-1-T 6 B *1-A ----*TV-1-T *SP-1-T 8 C *15 -12'*ROADWAY 1 -*SV-1-T *SP-1-T 8 D *1-A ----*TV-1-T *SP-1-T 6 E *19-3-80 30'12'*ROADWAY 1 *MAS *SV-1-T -6 F *1-A ----*TV-1-T *SP-1-T 8 G *26-4-80 40'12'*ROADWAY 1 *MAS,MAS *SV-1-T *SP-1-T 4 H *1-A ----*TV-2-T *SP-1-T 6 * Exist EQUIPMENT CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 VEH-PED A 3,8,8P 1 1 12CSC 6P 1 1 B 6,6P 1 8P 1 C 6,6P 1 1 1 8P 1 1 1 D 8,8P 1 1 1 6P 1 1 1 E 4,4P 1 1 1 1 6P 1 1 1 1 F 6,6P 1 1 1 1 1 4P 1 1 1 1 1 G 6,6P 1 1 1 4P 1 1 1 H 3,4,4P 1 1 6P 1 1 APS TOTAL 8 4 1 3 2 1 1 2 1 3CSC 8 4 1 3 2 1 1 2 1 AWG Ckt #8 Ltg 2 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 12 SMFO 1 EVUC 3 1 1 1 1 1 1 LOOP DLC (TYPE B) PHASE 3 2 2 2 PHASE 4 3 3 2(R)2(R) 2(N)2(N) PHASE 6 6 1 1 2(N)1(N)1(N) PHASE 8 4 4 4 TOTAL DLC 15 7 1 6 ---3 - 2(R)-------2(R) 4(N)1(N)1(N)-----2(N) CONDUIT SIZE 2-4"3"3"3"3"3"3"3"3" LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): (CITY STREET LOCATION 7) SIGNAL AND LIGHTING "C" LINE1 1CA252D (CCTV) 426 JK9/29/20REVISION DATE DESCRIPTION 1 9/29/20 MAST ARM SIGN ADDITIONAL SIGNAL 9/30/22 7 IS SEE SIGN PLANS. R61-22 (CA) (Mod) PER ES-7N, DETAIL "U". 1 71 7 1 2 12/15/21 AS-BUILT CONDITION 8 REINSTALL EXISTING CONDUCTORS. LOWER Exist CONDUIT AS DIRECTED BY THE ENGINEER. 2 8 2 2 8 BC 2-2"C, PT BC 2 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:45 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua023.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 "23RD" LINE 23RD St SCALE 1"=20' E-24 1 L St2 (23rd St AND L St EQUIPMENT REMOVAL) AB RC RC AB RC AB O8 O8 O2 O2 O2P O2 O8P O2P O4 O2O4O4 O2P O4P O4P O2 O2P R/W R/W R/W R/W O8 O4 PO8O4P PO2 PO2 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM O2 O8P RS RS RS 1 2 RS AB 1 RR AB RC Exist TYPE C SERVICE ON UTILITY POLE. RC AB AB RS RC AB AB AB 2 3 RC RS TO 24TH St AND L St Exist 2"C, 1-12 SMFO 3 TO 2RD St AND M St Exist 2"C, 1-12 SMFO SHEET E-9 TO Exist Ltg PB SEE 4 Exist 1•"C, 2#8 (Ltg) TO REMAIN. SEE SHEET E-25. 4 5 RL Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-25. Exist ROADWAY 1 LED Lum TO LMA AT Loc ON SHEET E-25.RL6 5 6 C G Sig CONDUIT No. 7 ON SHEET E-25. Exist CONDUIT. Exist Sig CONDUCTORS. Exist 12 SMFO AND INSTALL IN NEW LEGEND (THIS SHEET ONLY): PROTECT IN PLACE Exist FIBER OPTIC CABLE AND CONDUIT. (CITY STREET LOCATION 8) SIGNAL AND LIGHTING 427 U 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:45 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua024.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 SCALE 1"=20' E-25 1 L St2 (23rd St AND L St) R/W R/W LIMIT LINE 185' TO U O2 O2 O2 R/W O2O7O7O4O4 O4 O4P O4P O2P O2P O8 O8 O2 O2P O2P O8P O8P "23RD" LINE 23RD St LIMIT LINE185' TO LIMT LINE185' TO 2"C, 1 DLC 2"C, 1 DLC 3 7 6 5 4 2"C, 2 DLC 2"C, 2 DLC O8 O2 4 2 CB TYPE H SERVICE, 120/240 V SP, PG&E 81 1 2"C, 2#8 (Ltg) 2"C, 2#6 (Sig) 2 3 O4&O7 3O2 3O8 O2 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - 100 240 2 YES YES MAIN BREAKER 50 120 1 TRAFFIC SIGNAL 15 120 1 - -- 40 240 2 LIGHTING VNO LIGHTING CONTROL 15 120 1 SPARE ENCLOSURE WITH THE FOLLOWING BREAKERS: TYPE III-AF 120/ 240 V 1 , 3-WIRE SERVICE EQUIPMENT 1 3 INSTALL EVUD PER ES-4E, DETAIL "B". 4 IS R3-18 PER ES-7N, DETAIL "U". SEE SIGN PLANS. 5 IS D3-1 (L STREET). SEE SIGN PLANS. 6 IS D3-1 (23RD STREET). SEE SIGN PLANS. 6 56(E) DOWN TYPE. 1. ALL PEDESTRIAN SIGNAL HEADS TO BE LED COUNT 2I3U 2I3L 2I2L 2I2U 2J1U 2I4U 2I4L 2J1L 8J6U8J8U8J8L7J5U7J9L4I8L4I8U4I6L4I6UDETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN TO 24TH St AND L St Exist 2"C, 1-12 SMFO Exist 2"C, 1-12 SMFO 6 6 6 6 BC TO 2RD St AND M St Exist 2"C, 1-12 SMFO 2"C, 4 DLC, 2#8 (Ltg) 2#8 (Ltg) 2"C, 4 DLC, STEADY DEMAND SEQUENCE PHASE DIAGRAM O8 O4 PO8O4PO2 PO2 PO2 O4P O4 O7 NO 6 D E F G HA B C (SERVICE) 2"C, 3#2 BY PG&E CONDUCTORS Exist 2"C, 2"C, 3#2 (SERVICE) POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A 24-4-100 35'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 2 F=15' B 1-A ----TV-1-T SP-1-T 4 C 15TS -12'ROADWAY 1 -SV-1-T SP-1-T 4 D 1-A ----TV-1-T SP-1-T 2 E 17-3-100 15'12'ROADWAY 1 MAS SV-1-T SP-1-T 2 F 1-A ----TV-1-T SP-1-T 8 G 26-4-100 40'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T 8 F=22' H 1-A ----TV-2-T SP-1-T 2 Exist EQUIPMENT TO BE FROM SHEET E-24RL 3 6 3 4 6 3 5 LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 VEH-PED A 4,7,4P 1 1 12CSC 2P 1 1 B 2,2P 1 4P 1 C 2,2P 1 1 4P 1 1 D 4,4P 1 1 1 2P 1 1 1 E 8,8P 1 1 1 1 2P 1 1 1 1 F 2,2P 1 1 1 8P 1 1 1 G 2,2P 1 1 8P 1 1 H 7,8,8P 1 1 1 2P 1 1 1 APS TOTAL 8 2 1 1 2 1 4 1 3CSC 8 2 1 1 2 1 4 1 AWG Ckt #8 Ltg 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 12 SMFO 1(E)1(E) EVUC 3 1 1 2 1 LOOP DLC (TYPE B) PHASE 2 8 2 PHASE 4 4 4 4 PHASE 7 2 2 2 PHASE 8 3 3 3 TOTAL DLC 17 8 6 --3 3 - CONDUIT SIZE 2-4''3''3''3''3''3''3''3'' (E) = Exist NOTE: ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED. (CITY STREET LOCATION 8) SIGNAL AND LIGHTING SEE SHEET E-9 TO Ltg PB SHEET E-9 TO Ltg PB SEE 2"C, 2#8 (Ltg-CITY) 7 PB PER PG&E REQUIREMENTS. 428 ES8/31/18REVISION DATE DESCRIPTION 8/31/2018 CONTRACTOR FURNISHED CHANGED CITY FURNISHED TO CONTRACTOR FURNISHED CONTRACTOR FURNISHED FURNISHED BBS CABINET AND BATTERIES. BBS SYSTEM. CONTRACTOR ASSEMBLY WITH MODEL 332L CABINET AND CITY FURNISHED CITY FURNISHED 170E CONTROLLER 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:46 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua025.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 1 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 1 ASPH FP CONC CONC ASPHASPH SCALE 1"=20' E-26 3 4 6 "24TH" LINE 24TH St L St(24th St AND L St EQUIPMENT REMOVAL) AB RC AB RC Exist 2"C, 1 DLCRC Exist 2"C, 1 DLCRC RC RC 385 AB AB AB AB AB RC AB AB RCO8P O6P O8P O6P O6 O6 O6 O6 O6 O8 O8O3 O3 O4 O4 O6P O6 O4 O4P O4P O6P RC AB RC Exist 2"C, 1 DLCRC AB AB AB AB R/W R/WR/W R/W R/W PO6 PO6 O8 O4 PO8O4P O3 PO8 O8 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM LIMIT LINE185' TO LIMIT LINE185' TO LIMT LINE185' TO Exist 2"C, 1 DLC 1 SP, PG&E TYPE H SERVICE, 120/240 V U O6 2 TO 24TH St AND L St Exist 2"C, 1-12 SMFO Exist 2"C, 1-12 SMFO 4 3 2 5 6 7 7 RC RS RS 1 RS RS RS LEGEND (THIS SHEET ONLY): Exist CCTV CAMERA TO Loc ON SHEET E-27.RL E 2 RRRC 3 RRRC AB 4 RRRC AB 5 RRRC AB 6 RRRC AB 7 RRRC NEW Sig CONDUIT No. 3 ON SHEET E-27. Exist CONDUIT. Exist Sig CONDUCTORS. Exist 24 SMFO AND CA 252D AND INSTALL IN NEW Sig CONDUIT No. 9 ON SHEET E-27. Exist CONDUIT. Exist Sig CONDUCTORS. Exist 24 SMFO AND CA 252D AND INSTALL IN NEW Sig CONDUIT No. 8 ON SHEET E-27. Exist CONDUIT. Exist Sig CONDUCTORS. Exist 24 SMFO AND INSTALL IN NEW CONDUIT ON SHEET E-27. Exist CONDUIT. Exist 2 DLC. Exist 24 SMFO AND INSTALL IN Exist CONDUIT ON SHEET E-27. Exist 2 DLC. Exist 24 SMFO AND INSTALL IN Sig CONDUIT No. 2 ON SHEET E-27. Exist Sig CONDUCTORS. Exist 24 SMFO AND CA 252D AND INSTALL IN CC AB (CITY STREET LOCATION 9) SIGNAL AND LIGHTING AB 429 REVISION DATE DESCRIPTION 1 1 9/30/20 ESREMAIN TO MATCH REVISED WB LAYOUT Exist EQUIPMENT AT SW CORNER TO 6/5/196/5/19 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:46 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua026.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 CONCSCALE 1"=20' E-27 3 4 "24TH" LINE 24TH St L St(24th St AND L St) STEADY DEMAND SEQUENCE PHASE DIAGRAM 1 2 3 8 6385 R/W R/W R/W R/W CC 7 5 2 TYPE H SERVICE, 120/240 V SP, PG&E U Exist 3"C, 3#2 (SERVICE) 2 O6 O6 O6 O6P O8P O6P O3 O8 O8PO6 O6 O6 O3 PO6 PO6 O8 O4 PO8O4P O3 PO8 O8 O6 LIMT LINE185' TO Exist 2"C; ADD: 1 DLC Exist 2"C; ADD: 1 DLC Exist 2"C; ADD: 1 DLC LIMIT LINE185' TO LIMIT LINE185' TO 6J3L 3I5U8J8U3I5L8J8L4I7U4I8U4I7LO8 O8 2"C, 1 DLC O6PO6PO4P4I6L 8J6U43 CB CC 6 Exist 2"C; ADD: 1 DLC 6 6 6 4 1 Exist 2"C, 1-12 SMFO CABLE TO 23RD St Exist 2"C, 1-12 SMFO CABLE 6J3U 6J4L 6J4U 6I1U 6J2U 6J2L 2"C, 1 DLC 9 REINSTALL Exist 1-24 SMFO Exist 2"C; ADD: 1 DLC, REINSTALL Exist 1-24 SMFO Exist 2"C; ADD: 1 DLC, 20 24TH St AND M St Exist 2"C, 1-24 SMFO6 A B C D E F GH 6 O4 8 7 REINSTALL Exist 1-24 SMFO 2"C, 1 DLC, Exist 1•"C, 2#8 (Ltg), 1-24 SMFO SEE SHEET E-9 1-24 SMFO TO 24TH St AND CHESTER Ave Exist 1•"C, 2#8 (Ltg) TO 24TH St AND K ST, 1-24 SMFO, 1-12 SMFO Exist 2"C, 2#8 (Ltg), (CITY STREET LOCATION 9) SIGNAL AND LIGHTING NOTE: 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 430 REVISION DATE DESCRIPTION TO MATCH REVISED WB LAYOUT REVISED EQUIPMENT LOCATION 1 1 9/30/20 2#8 (Ltg) Exist 3"C 2#6 (Sig), Exist 2"C, 2#6 (Sig) 1-12 SMFO, 1-24 SMFO Exist 2"C, 2#8 (Ltg), (CCTV) Exist 2"C, 2#6 (CCTV) Exist 2"C, 1 CA252DESI O4 O4 O4P CB 1 56/5/196/5/19 12/15/212 AS-BUILT CONDITION BY THE ENGINEER Approx 120' EAST AS DIRECTED EXTEND CC POINT FOR 2"C IC 2 J 2 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:47 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua027.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 E-28 (24th St AND L St) 1 3 2 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - - - 100 240 2 YES YES YES MAIN BREAKER 60 120 1 TRAFFIC SIGNAL 20 120 1 AMPERES VOLTS POLES NAMEPLATE METER PEC TYPE - V - 100 240 2 YES YES YES MAIN BREAKER 40 240 2 30 120 1 LIGHTING SPARE -YES201201 SPARE LIGHTING CONTROL NO SCALE METER A: METER B: 4 5 6 7 8 Exist D3-1 (ROUTE 178), INSTALL D3-1 (24TH STREET). SEE SIGN PLANS.RS DETECTOR LOOP PLACEMENT DETAIL NO SCALE 6" LIMIT LINE 10'10'10' 10'15' LEFT TURN LANE THROUGH LANE ON PLAN IF SHOWN (E) = Exist (CC) = NEW CONNECTED TO Exist NOTE: ALL CONDUITS AND CONDUCTORS ARE NEW UNLESS OTHERWISE NOTED. R73-2 (CA) PER ES-7N, DETAIL "U". SEE SIGN PLANS.IS IS R3-1 PER ES-7N, DETAIL "U". SEE SIGN PLANS. LEGEND (E-27 AND E-28 ONLY): INSTALL CCTV CAMERA RELOCATED FROM SHEET E-26 PER ES-7R. (CITY STREET LOCATION 9) SIGNAL AND LIGHTING CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 VEH-PED A 6,6P 1 12CSC 1 B 4P 1 C 6,6P 1 1 4P 1 1 D 3,4,4P 1 1 1 6P 1 1 1 E 3,8,8P 1 1 1 1 1 1 6P 1 1 1 1 1 1 F 6,6P 1 1 1 1 1 8P 1 1 1 1 1 G 6,6P 1 1 1 1 8P 1 1 1 1 H 8,8P 1 1 1 6P 1 1 1 I 4,4P 1 1 6P 1 1 APS TOTAL 8 2 1 5 4 3 2 1 - 3CSC 9 2 1 5 4 3 2 1 - AWG Ckt #8 Ltg 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 12 SMFO 1(E) 24 SMFO 1(E)1(E)1(E) CA252D (CCTV)1(E)1(E)1(E) LOOP DLC (TYPE B) PHASE 3 2 2 2 PHASE 4 4 4 4 PHASE 6 7 7 7 7 4 PHASE 8 3 3 3 TOTAL DLC 16 4 4 12 12 7 4 -- CONDUIT SIZE 2-4''3''3''4''3''3''3''3''3'' CONDUIT STATUS NEW NEW NEW NEW NEW NEW NEW 431 9/30/22 3 4 8 POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *61-5-100 60'15'*ROADWAY 1 *MAS,MAS *SV-1-T *SP-1-T -- B *PBA POST ------4 C 1-A ----TV-1-T SP-1-T 4 D 1-A ----TV-2-T SP-1-T 6 E 19-4-100 30'12'ROADWAY 1 MAS,MAS SV-1-T SP-1-T - F 1-A ----TV-1-T SP-1-T 8 G 15TS -12'ROADWAY 1 -SV-1-T SP-1-T 8 H 1-A ----TV-1-T SP-1-T 6 I *17-3-100 20'12'*ROADWAY 1 *MAS *SV-1-T *SP-1-T 6 * Exist EQUIPMENT Exist ExistES REVISION DATE DESCRIPTION TO MATCH REVISED WB LAYOUT REVISED EQUIPMENT LOCATION 1 1 1 1 Exist 2070 CONTROLLER ASSEMBLY AND BBS TO REMAIN. ENCLOSURE WITH THE FOLLOWING BREAKERS TO REMAIN: Exist TYPE III-CF SERVICE 120/ 240 V SERVICE EQUIPMENT Exist CCTV CABINET TO REMAIN. Exist R3-2 R3-18 PER ES-7N, DETAIL "U". SEE SIGN PLANS.RC IS 1 1 16/5/196/5/19 9 Exist POLE, FOUNDATION, AND MAST ARM TO REMAIN. PROVIDE MATERIALS TO CITY OF BAKERSFIELD. 2 AS-BUILT CONDITION 2 9 9 9 9 2 2 2 J ----1-B Mod 66-- -2 2 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:47 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua028.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 12/15/21 SCALE 1"=20'M St"23RD" LINE 23RD St 6395 "EB178" LINE R/W 7 6 53 LIMIT LINE 160' TO 2 4 4 9 8 (1.706) (1.702) (1.708) O2 O2 O2 O8 O8 O2 O4 O4O4 O2 (1.704) R/W R/W O4P O2P O2P O8P O2P O2P O4P 1 2 REPOSITION Exist MAGNETIC DETECTOR TO CENTER OF LANE. 3 2 2 2 R/W 8 26'10' 1' TURN DETECTION INSTALL FOR LEFT DETECTOR LOOP PLACEMENT DETAIL NO SCALE LIMIT LINE O8 O4 4 AS DIRECTED BY THE ENGINEER. FURNISH AND INSTALL C11 WIRE HARNESS. MODIFY INPUT FILES E-29 1 RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTE: 2I2U 2I3U 2J1U 2J1L 2I4U 2I4L 8J8U8J8L8J7UAB 4J5L4J9L4I8U4I7UEB Rte 178 RS 3 SEE SHEET E-29 Exist 2"C, 1 SIC R/W R/W O2 PO2 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM PO2 O8 O4 PO8O4P 1 RS Exist PBA AND INSTALL APS.6 RS7 Exist POLE AND SIGNAL EQUIPMENT TO REMAIN.8 5 FURNISH AND INSTALL WIRELESS MODEM. 763 TYPE H SERVICE, 120/240 V Exist SP, PG&E U 5 876 3 6 7 8 3 76 8 876 6 7 8 Exist 2"C, 3#2 (SERVICE) SEE SHEET E-10 FOR Exist CB SCHEDULE 2#8 (Ltg) Exist 3"C, 2#4 (Sig), 2#8 (SI - SEE SHEET E-10) Exist 1•"C, 2#8 (Ltg) 6 7 8 6 7 8 SEE SHEET E-10 Exist 1•"C, 2#4 (Sig), 2#8 (Ltg & SI), SMFO CABLE Exist 2"C, 1-12 AND L St SMFO TO 23RD St Exist 2"C, 1-12 DOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT O8P A B C D E F G H Exist 200W HPS Lum, INSTALL 165W LED Lum ON LMA. MODIFYING EXISTING ELECTRICAL SYSTEM MODIFYING SIGNAL AND LIGHTING SYSTEM LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): SHEET ED-1. OUTFITTED WITH TAMPER RESISTANT COVERS PER DETAIL "B" ON 2. PULL BOXES BOTH NEW AND EXISTING TO REMAIN TO BE 1. ALL Exist DETECTOR LOOPS. 3 REMAIN IN PLACE. FURNISH AND INSTALL BBS CABINET AND BATTERIES. INSTALL MODEL 2070 CONTROLLER UNIT. Exist 332 CABINET TO DEPARTMENT WILL REMOVE Exist 170 CONTROLLER UNIT AND 2I3L KEEP: 1 DLC Exist 2"C, 2 DLC, RC (N) = NEW (R) = RC NOTE: ALL CONDUITS AND CONDUCTORS ARE Exist UNLESS OTHERWISE NOTED. CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 VEH-PED A 4,4P 1 12CSC 2P 1 B 2,2P 1 1 4P 1 1 C 2P 1 1 4P 1 1 D 4,4P 1 1 1 1 1 1 2P 1 1 1 1 1 1 E 8,8P 1 1 1 1 1 2P 1 1 1 1 1 F 2,2P 1 1 1 1 8P 1 1 1 1 G 2,2P 1 1 1 8P 1 1 1 H 4,8,8P 1 1 2P 1 1 APS TOTAL 8 1 1 -1 2 3 4 5 3CSC 8 1 1 -1 2 3 4 5 AWG Ckt #8 Ltg 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 #4 Sig 2 2 2 2 SIC 1 1 1 1 12 SMFO 1 1 LOOP DLC (TYPE B) PHASE 2 5 1 1 2(R)2(R) 2(N) PHASE 4 2 2 2 2 2 2 2(N)2(N)2(N)2(N)2(N)2(N) PHASE 8 1 1 2(N)2(N) TOTAL DLC 8 1 1 -2 2 2 2 3 -2(R)2(R)------ 6(N)---2(N)2(N)2(N)2(N)4(N) CONDUIT SIZE 2-4''3''2''3''3''3''3''3''3'' POLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *19-3-80 25'12'165W *MAT *SV-1-T *SP-1-T 2 B *1-A ----*TV-1-T *SP-1-T 4 C *15 -12'165W --*SP-1-T 4 D *1-A ----*TV-1-T *SP-1-T 2 E *17-2-80 20'12'165W *MAS *SV-1-T *SP-1-T 2 F *1-A ----*TV-1-T *SP-1-T 8 G *26-4-80 40'12'*165W *MAS,MAT *SV-1-T *SP-1-T 8 H *1-A ----*TV-2-T *SP-1-T 2 * Exist EQUIPMENT 3 6 7 8 876 876 876 3 6 7 8 3 6 7 8 6 7 8 6 7 8 432 (23rd St/EB Rte 178 AND M St) 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:48 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua029.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 SCALE 1"=20' E-30 7 76 "24TH" LINE 24TH St "W 178" L IN EM StW B R t e 178R/WR/W R/W R/W AB AB RC AB AB AB RC AB RC RC L IM IT L INE 2 46' T O L IM IT L INE 4 0 4' TO RC RS AB RC AB RS AB O8 O8 O8P O6P O6 O6 O6 O6 O6P O4P O4P O6P O6 O4 O4 O4 AB AB RC RS RC AB RS AB AB O8 O8P SEE SHEET E-27 Exist 2"C, 1 SIC O6 PO6 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM PO6 O8 O4 PO8O4P AB AB RC AB RC AB 4 0 0 TYPE H SERVICE, 120/240 V Exist SP, PG&E Exist 3"C, 2#4 (Sig), 2#8 (Ltg) AB Exist 3"C, 1 SIC 1 SIC SEE SHEET E-10 Exist 1•"C, 2#8 (Ltg) TO 24TH St AND L St Exist 2"C, 1-24 SMFO SEE SHEET E-10 FOR Exist CB SCHEDULE MODIFYING EXISTING ELECTRICAL SYSTEMMODIFYING SIGNAL AND LIGHTING SYSTEM (24th St/W B Rte 178 AND M St EQUIPMENT REMOVAL) AB AB 433 U RS RSJK REVISION DATE DESCRIPTION TO MATCH REVISED WB LAYOUT REVISED EQUIPMENT REMOVAL RC RC4/25/194/25/19 1 1 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:48 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua030.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 9/30/22 TTTTSCALE 1"=20' E-31 7 76 "24TH" LINE 24TH St "W 178" LIN E M StW B R t e 178(1.695) O8 O8 O6P O8P O6 O6 O6 O6 O6P O4P O4 8400L IM IT L IN E 1 9 8' TO L IM IT L IN E405' TO (T)(E) (T)(E) (T)(E) (T)(E) 2"C, 1 DLC 2"C, 1 DLC 2"C, 2 DLC 2"C, 2 DLC SEE SHEET E-29 Exist 2"C, 1 SIC CC O6 O4 O4 O6 O6P O4P O8 O6P O8P 5 6 2"C, 1 SIC 6 4 7 1 2 3 REMAIN IN PLACE. INSTALL MODEL 2070 CONTROLLER UNIT. Exist 332 CABINET TO DEPARTMENT WILL REMOVE Exist 170 CONTROLLER UNIT AND AS DIRECTED BY THE ENGINEER. FURNISH AND INSTALL C11 WIRE HARNESS. MODIFY INPUT FILES RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT NOTE: 3 31 1 9 6 8 1.690 R/W R/W R/W4I7U4I8U 26'10' 1' TURN DETECTION INSTALL FOR LEFT DETECTOR LOOP PLACEMENT DETAIL NO SCALE LIMIT LINE 8J8U8J7U8I5L8I9L6 I1U 6 I1L 6 J4U 6 J4L 6 J3L 6 J3U 6 I9U 6 J2L6J2U RS O6 PO6 STEADY DEMAND SEQUENCE Exist PHASE DIAGRAM PO6 O8 O4 PO8O4P R/W U FURNISH AND INSTALL WIRELESS MODEM.4 Exist PBA AND INSTALL APS.RS5 6 Exist SP, PG&E TYPE H SERVICE, 120/240 V 2 5 6 2 1 SIC SEE SHEET E-10 Exist 1•"C, 2#8 (Ltg) SEE SHEET E-10 FOR Exist CB SCHEDULE Exist 2"C, 3#2 (SERVICE) 5 6 4 R/W 200' BETWEEN PULL BOXES. No. 5(T)(E) PULL BOX TO MAINTAIN MAXIMUM SPACING OF 7 7 7 DOWN Ped SIGNAL MODULE IN Exist HOUSING. Exist Ped SIGNAL MODULE. INSTALL LED COUNT RS 8 IS D3-1 (24TH STREET). SEE SIGN PLANS. 8 BC CB Exist 3"C, 1 SIC Exist 3"C, 2#4 (Sig), 2#8 (Ltg) 1 SIC 2#8 (Ltg), 3"C, 2#4 (Sig), 6TO 24TH St AND L St Exist 2"C, 1-24 SMFO "B" ON SHEET ED-1. OUTFITTED WITH TAMPER RESISTANT COVERS PER DETAIL 1. PULL BOXES BOTH NEW AND EXISTING TO REMAIN TO BE (E) = Exist NOTED OTHERWISE. NOTE: ALL CONDUITS AND CONDUCTORS IN THIS SCHEDULE ARE NEW UNLESS Exist 200W HPS Lum, INSTALL 165W LED Lum ON LMA. F D C B A H G MODIFYING EXISTING ELECTRICAL SYSTEM MODIFYING SIGNAL AND LIGHTING SYSTEM (24th St/W B Rte 178 AND M St) LEGEND (THIS SHEET ONLY): NOTES (THIS SHEET ONLY): E 1.675 CONDUCTOR AND CONDUIT SCHEDULE CABLE SCHEDULE CONDUIT RUN NUMBER AND SIZE CABLE TYPE Loc PHASE 1 2 3 4 5 6 7 8 9 VEH-PED A 8,8P 1 1 12CSC 6P 1 1 B 6,6P 1 1 1 8P 1 1 1 C 6,6P 1 1 1 1 8P 1 1 1 1 D 8,8P 1 1 1 1 1 6P 1 1 1 1 1 E 4,4P 1 1 1 1 1 1 6P 1 1 1 1 1 1 F 6,6P 1 1 1 1 1 1 1 4P 1 1 1 1 1 1 1 G 6,6P 1 1 1 1 4P 1 1 1 1 H 4,4P 1 1 1 6P 1 1 1 APS TOTAL 8 8 5 4 3 2 1 1 2 3CSC 8 8 5 4 3 2 1 1 2 AWG Ckt #8 Ltg 2 2 2 2 2 2 #8 G 1 1 1 1 1 1 1 1 1 #4 Sig 2 2 2 SIC 2(E)2(E)2(E)1(E)1(E) 12 SMFO 1(E) 24 SMFO 1(E)1(E)1(E) LOOP DLC (TYPE B) PHASE 4 2 2 2 PHASE 6 9 9 9 5 PHASE 8 4 4 4 4 4 TOTAL DLC 15 15 13 9 4 ---2 CONDUIT SIZE 2-4''3''2''3''3''3''3''3''3'' CONDUIT STATUS Exist Exist NEW NEW NEW NEW NEW Exist Exist 434 2 5 6 5 6 JKPOLE AND EQUIPMENT SCHEDULE Loc STANDARD MAST ARMS Lum SIGNAL MOUNTING APS SPECIAL REQUIREMENTS TYPE Sig Ltg LED MAST ARM POLE PED 0 ARROW A *19-2-80 25'12'165W *MAT *SV-1-T *SP-1-T 6 B *1-A ----*TV-1-T *SP-1-T 8 C 15TS -12'165W -SV-1-T SP-1-T 8 D 1-A ----TV-1-T SP-1-T 6 E 17-3-100 15'12'165W MAS SV-1-T SP-1-T 6 F 1-A ----TV-1-T SP-1-T 4 G 45'12'165W *MAS,MAT 4 H *1-A ----6 * Exist EQUIPMENT REVISION DATE DESCRIPTION 1.670 LOCATION TO MATCH REVISED WB LAYOUT REVISED EQUIPMENT AND EQUIPMENT 6/26/196/26/191 1 *SV-1-T *SP-1-T *TV-1-T *SP-1-T *19-3-80 2 5 6 5 6 5 6 625 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:49 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua031.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 9/30/22 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPHA SPH ASPHASPH ASPHASPH ASPHASPHTRAILER ASPH CONC ASPH ASPH ASPH ASPH ASPHASPHASPHASPH TRAILER ASPH CONC ASPH ASPHASPHASPH ASPH ASPH ASPHASPH ASPHCONCCONC ASPH ASPHASPH CONC Q STASPHSASASASALTNNTLLLTTNNFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: WB ROUTE 178 EB ROUTE 178 "W 178" L IN E "E178" LINE O StO StQ St24TH St FRONTAGE Rd 23RD St FRONTAGE Rd R /W R/W R /W R/W SCALE: 1" = 50' E-32 1 AB AB RC 1 2 4 MODIFYING EXISTING ELECTRICAL SYSTEM LEGEND (THIS SHEET ONLY): PB WITH TAMPER RESISTANT COVER PER DETAIL "C" ON SHEET ED-1. RC VEHICLE CLASSIFICATION STATION RS Exist PORTABLE TRAFFIC COUNTER. 2 2 3 334L VCS CABINET WITH ATC, WIRELESS MODEM, AND 2070 CONTROLLER. 6(E) 3 4 1 1 3 4 4 2 4 CB SEE SHEET E-10 DETAILS ON SHEET ED-4. LOOP DETECTORS, PIEZOELECTRIC AXLE SENSORS, AND PULL BOX PER 3"C, 2#8 (VCS) 2 3 4 3"C, 8 DLC, 4 STC 3"C, 16 DLC, 8 STC 2-3"C, 2#8 (VCS), 16 DLC, 8 STC 435 400 405 6 7 8 9 1 2 3 4 400 405 789 1 2 3 4 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:49 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua032.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ASPH ASPH ASPH POOL CONC ASPHASPHASPHDIRTASPHASPHFOFOFOSEE BELOW LEFTMATCH LINE "WB2" Sta 316+00R/W R/W R/W R/W 24TH St "WBL" LINE "EBL" LINEKern River1 1 AB "EB2" LINE "WB2" LINE FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: SCALE: 1" = 50' E-33 INTERCONNECTION CONDUIT AND CABLE SEE SHEET E-2 SEE SHEET E-2 SEE SHEET E-2 SEE SHEET E-2 SEE SHEET E-2 SEE SHEET E-2 (E) 1 1 (E) 3"C, 1 SIC SEE ABOVE RIGHTMATCH LINE "WB2" Sta 316+00SEE SHEET E-11 TO Exist Sig PB AB 1 Sig PB SEE SHEET E-12 R/W R/W Sig CONTROLLER SEE SHEET E-12 Sig CONDUITS SEE SHEET E-12 SHEET E-12 Sig PB SEE Sig CONDUIT SEE SHEET E-12 436 7 8 9 7 8 9101 7 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:50 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua033.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 STOPFOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE DISTRICT OFFICE. NOTE: SCALE: 1" = 20'PINE St24TH St "WB" LINE R/WR/W R/WR/W ELECTRIC SERVICE FOR IRRIGATION 98 436A 1 SEE SHEET E-14 123 ICC (SEE IRRIGATION PLANS) BP (SEE IRRIGATION PLANS) SEE SHEET E-14 1 2 3 3"C, 2#10 (ICC), 2#4 (BP) 2"C, 2#10 (ICC) 3"C, 2#4 (BP) E-34 340 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESAPPROVED FOR ELECTRICAL WORK ONLY SIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:50 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxua034.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-1 NO SCALE NOTES: GROUT CRUSHED ROCK SUMP TO PB COVER GROUND WIRE AROUND PB 12" Min PCC ALL GROUT CONDUIT (Qty, TYPE AND PLACEMENT Var BY Loc) DETAIL "C"18"PB EXTENSION NATIVE SOIL TO PB COVER GROUND WIRE AROUND PB 12" Min PCC ALL DETAIL "A"18"No. 5(T) PULL BOX ON Exist EXTENSION (Var BY Loc) NATIVE SOIL OR PCC (Qty, TYPE AND PLACEMENT Var BY Loc) Exist CONDUIT Exist CRUSHED ROCK SUMP (Var BY Loc) Exist PB EXTENSION Exist GROUT TO PB COVER GROUND WIRE Exist GROUT Exist GROUT (Var BY Loc) Exist PB EXTENSION Exist CRUSHED ROCK SUMP (Qty, TYPE AND PLACEMENT Var BY Loc) Exist CONDUIT Exist PB NATIVE SOIL Exist PCC DETAIL "B" GROUT GROUT AND Exist EXTENSION COMPLETELY AROUND PB WRAP ROOFING PAPER MANUFACTURER NOT SHOWN VARIES BY LOCKING MECHANISM (PULL BOX DETAILS) ELECTRICAL SYSTEMS DETAILS TAMPER RESISTANT COVER ON Exist PULL BOX RESISTANT COVER MUST BE FLUSH WITH PB. GALVANIZED AFTER FABRICATION. TAMPER ‰" Min STEEL LOCKING PLATE COVER, MANUFACTURER NOT SHOWN VARIES BY LOCKING MECHANISM AND 2 IN THE MIDDLE OF THE LONGEST SIDES. ANCHORS. 6 CONCRETE ANCHORS MUST BE INCLUDED FOR EACH PB. 4 PLACED IN THE CORNERS 4. FOR DETAIL "A" FRAME MUST BE ANCHORED TO THE PB WITH ‚" x 2•" CONCRETE 3. FOR DETAILS "A" AND "C" FURNISH AND INSTALL …" -16 COURSE THREAD PENTA HEAD HOLD-DOWN BOLTS. 2. FOR DETAIL "A" ADJUST PB TO FINISHED GRADE. 1. MODIFIED PB DETAILS. SEE STANDARD PLANS FOR DETAILS NOT SHOWN. SEE NOTE 4 RESISTANT COVER MUST BE FLUSH WITH PB. GALVANIZED AFTER FABRICATION. TAMPER ‰" Min STEEL LOCKING PLATE COVER, TAMPER RESISTANT COVER AND PULL BOX 43706Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:51 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . ......... . . . . . . . . . . . . . . . . . . . . . .. . . ED-2 NO SCALE 3"C, TYPE 3 CONDUIT SECTION A-A PCC FILL FOR PCC SURFACED ROADWAYS SURFACED ROADWAYS DEPTH1'-0"PCC FILL WITH TOP 2" AC FILL FOR AC CURB LINECURB LINECONDUIT NO. 5(E) PB No. 5(E) PB PLAN 3"C, TYPE 3 CONDUIT A A • INSTALLATION DETAILS .. . . ... .. . .. . . ROADWAY SPLICE MAGNETIC VEHICLE DETECTOR NO.5(E) PB ELEVATION TWO CONDUCTOR CABLE FURNISHED WITH EACH DETECTOR PROBE 3"C, TYPE 3 CONDUIT PITCHED TO DRAIN INTO PB MAGNETIC DETECTOR PROBE LOCATED AT THE CENTERLINES OF APPROACH LANE LEAD-IN-CABLE (MAGNETIC VEHICLE DETECTOR) ELECTRICAL SYSTEMS DETAILS 43806Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:51 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-3 NO SCALE (TYPE 1-B MODIFIED PEDESTRIAN PUSH BUTTON POST)3'-4"ELEVATION RAIN TIGHT CAP PROVIDE REMOVABLE 1'-6"5'-7" FOR APS APPLICATIONS4'-7" FOR PBA APPLICATIONS1'-6" FG RSP ES-7N Det A A A 1‚" BASE PLATE SEE RSP ES-7B Det A-4 (THREAD BOTH ENDS †") Galv STEEL PIPE OR CONDUIT 4 NPS STANDARD SECTION A-A1'-6"1'-6" 1‚" BASE PLATE SEE RSP ES-7B Det A-4 TYPE 1-B (Mod) PEDESTRIAN PUSH BUTTON POST WASHERS EACH. 4 Tot THREAD 6" WITH 2 NUTS AND 2 ƒ" X 1'-6" ANCHOR BOLTS ELECTRICAL SYSTEMS DETAILS 43906Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:52 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-4 NO SCALE ELECTRICAL SYSTEMS DETAILS (PIEZO-ELECTRIC SENSOR INSTALLATION)1"2"PAVEMENT SURFACE EPOXY GROUT 2"14°(NO TWISTS) LEVEL ƒ" SECTION A-A SENSOR PIEZO AXLE EPOXY GROUT ALTERNATING (9 TOTAL) HOLES AT 14° SPACED AT 12" •" DIAMETER BY 2" DEPTH 6" (17 TOTAL) BRACKETS SPACED AT STC A ASLOT ƒ" SAW SENSOR PIEZO AXLE 8' „" 12" 6" (17 TOTAL) BRACKETS SPACED AT 6" ALTERNATING (7 TOTAL) HOLES AT 14° SPACED AT 12" •" DIAMETER BY 2" DEPTH INWARD AT BOTH ENDS HOLES AT 14° DIRECTED •" DIAMETER BY 2" DEPTH . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . •" HEX NUT EXTENSION ƒ" FLAT WASHER AND ~7" TOTAL LENGTH •" EYEBOLT WITH 2" EYE SENSOR DESIGNATION INDUCTIVE LOOP DETECTOR DIRECTION OF TRAFFIC E - EASTBOUND N - NORTHBOUND , W - WESTBOUND , S - SOUTHBOUND 2 - LEAVING 1 - ENTERING 1 - FIRST LANE FROM LEFT 2 - SECOND LANE DIRECTION OF TRAFFIC 2 - SECOND LANE 1 - FIRST LANE FROM LEFT E - EASTBOUND, W - WESTBOUND N - NORTHBOUND, S - SOUTHBOUND N-P-1-1 1 - FOR ALL PIEZO AXLE SENSORS TYPE A LOOPS TYPE A LOOPS 20' 20' PIEZO AXLE SENSOR INSTALLATION DETAIL "A" - TOP VIEW PAVEMENT SURFACE PULL BOX EYE BOLT DETAIL DETAIL "C" DIRECTION OF TRAFFIC N-1-2 LANE NUMBER PIEZO AXLE SENSOR DESIGNATION PIEZO AXLE SENSOR DIRECTION OF TRAFFIC LANE NUMBER DETAIL "B" PLACEMENT AND DESIGNATION LOOP DETECTOR AND PIEZOELECTRIC AXLE SENSOR LANES W-2-2 W-1-2 W-P-2-1 W-2-1 W-P-1-1 W-1-1 12" PIEZO AXLE SENSOR (Typ) LANES E-2-1 E-P-2-1 E-P-1-1 12" E-2-2 E-1-2 MEDIAN E-1-1 WB EBO. . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . .. . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . .. . ... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . .. ... . .. . . .. . .. . . . . . . . . . .. . ... . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. . .. .. . . . .. .. . . . . .. . .. ... . .. . . .. . .. . ... . . . .. . .. .. . .. . .... . . . .. . . .. .. . . 44006Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:52 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub004.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-5 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) 44106Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:44:53 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub005.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-6 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) 44206Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:47:35 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub006.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-7 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) 44306Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:49:43 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub007.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-8 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) FUSES: TRM20 44406Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:51:59 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub008.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 ED-9 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) 44506Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:53:55 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub009.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 NO SCALE ELECTRICAL SYSTEMS DETAILS (CITY ELECTRICAL) ED-10 44606Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/18 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:56:11 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxub010.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 EQ-1 NOTE: AND SPECIFICATIONS TO DETERMINE ALL MATERIALS NEEDED FOR EACH SYSTEM. ELECTRICAL SYSTEM QUANTITY TABLES SUMMARIZE SIGNIFICANT COMPONENTS. SEE ELECTRICAL SYSTEMS PLANS ELECTRICAL SYSTEMS QUANTITIES No. SHEET CONDUCTOR COPPER No. 8 2"C TYPE 3 3"C TYPE 3 SIC ISL 165W Lum 235W Lum PB No. 5(T) PB COVER RESISTANT TAMPER LF LF LF LF EA EA EA EA EA EA E-2 ---1,021 2 ---1 1 E-10 1,550 349 360 --5 4 1 2 25 TOTAL 1,550 349 360 1,021 2 5 4 1 2 26 No. SHEET CONDUCTOR COPPER No. 2 CONDUCTOR COPPER No. 6 CONDUCTOR COPPER No. 8 TYPE 3 2"C TYPE 3 3"C Lum CITY TYPE D Lum CITY TYPE A Lum CITY TYPE B CABINET SERVICE III BF TYPE PB No.3 1/2 No.9 PB PB PG&E LF LF LF LF LF EA EA EA EA EA EA EA EA E-3 --316 105 -1 1 ----1 - E-4 -715 -179 -1 1 ---2 -- E-5 -4,310 3,382 1,080 -11 4 ---- E-6 58 -4,621 1,391 19 8 3 -1 -- E-7 530 4,538 6,231 2,815 177 14 1 1 1 -1 E-8 --2,930 977 -2 2 ---12 -- E-9 --1,786 754 ------9 -- TOTAL 588 9,563 19,265 7,301 196 8 1 2 1 1 No. SHEET CONDUCTOR No. 2 CONDUCTOR No. 6 CONDUCTOR No. 8 3 2" C TYPE 3 3" C TYPE 3 4" C TYPE CABLE 3 CSC CABLE 12 CSC DLC TYPE B EVUC SIC VCH CABLE SMFO 12 LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D CABINET SERVICE TYPE III A LF LF LF LF LF LF LF LF LF LF LF LF LF EA EA EA EA EA E-12 81 1,286 2,498 712 28 733 853 1,671 5,531 640 128 7 340 50 20 1 1 1 MAS HEAD TYPE SIGNAL MAS-4C HEAD TYPE SIGNAL SV-1-T HEAD TYPE SIGNAL SV-2-TA HEAD TYPE SIGNAL TV-2-T HEAD TYPE SIGNAL SP-1-T HEAD TYPE SIGNAL PEDESTRIAN 26-4-100 TYPE STANDARD SIGNAL 61-5-100 TYPE STANDARD SIGNAL TYPE 1-A STANDARD SIGNAL TYPE 15TS STANDARD SIGNAL 16-3-100 TYPE STANDARD SIGNAL PB No. 5 PB No. 6 PB No. 6(E) PB No. 5(T)No. 9A PB Rdwy 1 LED EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 10 1 4 2 2 6 2 2 2 2 1 5 7 1 2 2 5 No. SHEET B DLC TYPE LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D PB No. 5 1/2 PB No. 3 APS MODULE SIGNAL DOWN PED LED COUNT LF EA EA EA EA EA EA E-16 757 23 9 1 1 8 8 No. SHEET CABLE (6-PAIR) INTERCONNECT SIGNAL CONDUCTOR COPPER No. 8 TYPE 3 3"C LF LF LF MODIFYING EXISTING ELECTRICAL SYSTEM LIGHTING (CITY STREET) PEDESTRIAN HYBRID BEACON SYSTEM SIGNAL AND LIGHTING (CITY STREET LOCATION 2) INTERCONNECTION CONDUIT AND CABLE SIGNAL AND LIGHTING (CITY STREET LOCATION 1) No. SHEET 3 2" C TYPE 3 3" C TYPE 3 4" C TYPE CONDUCTOR No. 2 CONDUCTOR No. 6 CONDUCTOR No. 8 CABLE 3CSC CABLE 9CSC 27-4-100 TYPE STANDARD SIGNAL CAT5E LF LF LF LF LF LF LF LF LF EA EA EA E-14 6 462 308 318 26 24 529 627 6 4 1 2 447 E-33 1600 400 400 (Mod) MAS-4A TYPE SIGNAL HEAD 26-4-100 TYPE STANDARD SIGNAL TYPE 15TS STANDARD SIGNAL TYPE 1-A STANDRAD SIGNAL (Mod) SV-1-T TYPE HEAD SIGNAL (Mod) TV-1-T HEAD SIGNAL CABINET SERVICE A TYPE-III RADIO BROADBAND WIRELESS PPB No. 5 PB EA EA EA EA EA EA EA EA EA EA EA 1 1 2 1 3 4 2 7 1 1 1 WITH BBS ASSEMBLY CONTROLLER 170E SP-1-T TYPE HEAD SIGNAL PEDESTRIAN EA 1 PB No. 6(E) LUM 165W LED No. 5 PB EA - 2 2 EA - 1 1 ELECTROLIER TYPE 30 ELECTROLIER TYPE 15D ELECTROLIER CITY TYPE 15 15 ELECTROLIER CITY TYPE 15D EA - - - - - - 1 1 EA 2 PB No. 5(E) VAULT SPLICE OPTIC CITY FIBER 35 EA (Mod) TYPE 1-B STANDARD SIGNAL 1 8 5 34 21 13 24 81 BBS ASSEMBLY WITH 170E CONTROLLER No. SHEET CONDUCTOR COPPER No. 10 LF E-34 ELECTRIC SERVICE FOR IRRIGATION LF CONDUCTOR COPPER No. 4 LF LF 3"C TYPE 3 2"C TYPE 3 No. 5 PB EA 2 EA 2 (Mod) TYPE 1-B STANDARD SIGNAL 155 10530354 REVISION DATE DESCRIPTION 1 12/15/21 AS-BUILT CONDITION 1 THE RED-LINED CLOUDS THIS SHEET SHALL BE CONSTRUCTED PURSUANT TO CALTRANS 2006 STANDARD PLANS AND SPECIFICATIONS. ALL SIGNAL AND STREET LIGHTING POLES, FOUNDATIONS (INCLUDING ANCHOR BOLTS) AND MAST ARMS INCLUDED WITHIN 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/22 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:58:27 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxuc001.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 EQ-2 NOTE: AND SPECIFICATIONS TO DETERMINE ALL MATERIALS NEEDED FOR EACH SYSTEM. ELECTRICAL SYSTEM QUANTITY TABLES SUMMARIZE SIGNIFICANT COMPONENTS. SEE ELECTRICAL SYSTEMS PLANS ELECTRICAL SYSTEMS QUANTITIES No. SHEET CONDUCTOR No. 2 CONDUCTOR No. 6 CONDUCTOR No. 8 CABLE 3 CSC CABLE 12 CSC CABLE 12 SMFO LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D CABINET SERVICE TYPE III A SYSTEM WITH BBS ASSEMBLY CONTROLLER 170E TYPE MAS SIGNAL HEAD TYPE SV-1-T SIGNAL HEAD TV-1-T HEAD TYPE SIGNAL TV-2-T HEAD TYPE SIGNAL TYPE SP-1-T SIGNAL HEAD PEDESTRIAN 26-4-100 TYPE STANDARD SIGNAL 19-4-100 TYPE STANDARD SIGNAL TYPE 16-2-100 STANDARD SIGNAL TYPE 1-A STANDARD SIGNAL TYPE 15TS STANDARD SIGNAL No. SHEET CONDUCTOR No. 2 CONDUCTOR No. 6 CONDUCTOR No. 8 3 4" C TYPE CABLE 3 CSC CABLE 12 CSC B DLC TYPE CABLE 12 SMFO LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D CABINET SERVICE TYPE-III A BBS SYSTEM ASSEMBLY WITH CONTROLLER 170E TYPE MAS SIGNAL HEAD TYPE SV-1-T SIGNAL HEAD TYPE TV-1-T SIGNAL HEAD TV-2-T HEAD TYPE SIGNAL TYPE SP-1-T SIGNAL HEAD PEDESTRIAN 26-4-100 TYPE STANDARD SIGNAL 19-4-100 TYPE STANDARD SIGNAL 17-3-100 TYPE STANDARD SIGNAL TYPE 1-A STANDARD SIGNAL 15TS TYPE STANDARD SIGNAL No. SHEET CONDUCTOR No. 8 CONDUCTOR No. 10 LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D SIGNAL MODULE DOWN PED LED COUNT No. SHEET CONDUCTOR No. 8 LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D SIGNAL MODULE DOWN PED LED COUNT SIGNAL AND LIGHTING (CITY STREET LOCATION 3) SIGNAL AND LIGHTING (CITY STREET LOCATION 4) SIGNAL AND LIGHTING (CITY STREET LOCATION 5) SIGNAL AND LIGHTING (CITY STREET LOCATION 6)SIGNAL AND LIGHTING (CITY STREET LOCATION 7) 448 No. SHEET CONDUCTOR No. 8 B DLC TYPE DETECTOR LOOP TYPE E DETECTOR LOOP TYPE D APS SIGNAL MODULE DOWN PED LED COUNT RADIO BROADBAND WIRELESS LF LF EA EA EA EA EA E-17 722 664 23 9 8 8 1 CA252D REVISION DATE DESCRIPTION 1 12/15/21 AS-BUILT CONDITION THE RED-LINED CLOUDS THIS SHEET SHALL BE CONSTRUCTED PURSUANT TO CALTRANS 2006 STANDARD PLANS AND SPECIFICATIONS. ALL SIGNAL AND STREET LIGHTING POLES, FOUNDATIONS (INCLUDING ANCHOR BOLTS) AND MAST ARMS INCLUDED WITHIN 1 2" C TYPE 3 3" C TYPE 3 4" C TYPE 3 EVUC DLC TYPE B LF LF LF LF LF LF LF LF LF LF LF LF EA EA EA E-19 447 93 1,683 518 332 8 885 885 378 2,305 137 5 20 8 1 No. 5 PB No. 6 PB No. 6(E) PB Rdwy 1 LED EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 1 5 4 3 1 8 1 1 1 4 1 6 5 1 2 2" C TYPE 3 3" C TYPE 3 EVUC LF LF LF LF LF LF LF LF LF LF LF EA EA EA EA E-21 387 21 1,741 647 263 10 691 691 1,737 282 10 18 7 1 1 No. 5 PB No. 6 PB No. 6(E) PB Rdwy 1 LED EA EA EA EA EA EA EA EA EA EA EA EA EA EA 5 4 3 1 8 1 1 1 4 1 5 5 1 2 DLC TYPE B APS LF LF LF EA EA EA EA E-22 401 30 1,117 23 9 8 8 DLC TYPE B EVUC APS LF LF LF EA EA EA EA E-23 281 754 75 24 10 8 8 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/22 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:58:28 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxuc002.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 EQ-3 NOTE: AND SPECIFICATIONS TO DETERMINE ALL MATERIALS NEEDED FOR EACH SYSTEM. ELECTRICAL SYSTEM QUANTITY TABLES SUMMARIZE SIGNIFICANT COMPONENTS. SEE ELECTRICAL SYSTEMS PLANS ELECTRICAL SYSTEMS QUANTITIES No. SHEET CONDUCTOR No. 2 CONDUCTOR No. 6 CONDUCTOR No. 8 3 4" C TYPE CABLE 3 CSC CABLE 12 CSC B DLC TYPE LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D CABINET SERVICE TYPE-III A WITH BBS ASSEMBLY CONTROLLER 170E TYPE MAS SIGNAL HEAD TYPE SV-1-T SIGNAL HEAD TYPE TV-1-T SIGNAL HEAD TV-2-T HEAD TYPE SIGNAL SP-1-T HEAD TYPE SIGNAL PEDESTRIAN 26-4-100 TYPE STANDARD SIGNAL 17-3-100 TYPE STANDARD SIGNAL TYPE 1-A STANDARD SIGNAL 15TS TYPE STANDARD SIGNAL 24-4-100 TYPE STANDARD SIGNAL No. SHEET CONDUCTOR No. 8 CABLE 12 SMFO LOOP DETECTOR TYPE E LOOP DETECTOR TYPE D TYPE MAS SIGNAL HEAD TYPE SV-1-T SIGNAL HEAD TYPE TV-1-T SIGNAL HEAD TYPE TV-2-T SIGNAL HEAD TYPE SP-1-T SIGNAL HEAD PEDESTRIAN TYPE 1-A STANDARD SIGNAL (MOD) TYPE 1-B STANDARD SIGNAL TYPE 15TS STANDARD SIGNAL 19-4-100 TYPE STANDARD SIGNAL 17-3-100 TYPE STANDARD SIGNAL No. SHEET TYPE B DLC LOOP DETECTOR TYPE A LOOP DETECTOR TYPE D DETECTOR MAGNETIC HARNESS C11 WIRE MODEM WIRELESS MODULE SIGNAL DOWN PED LED COUNT No. SHEET CONDUCTOR No. 4 CONDUCTOR No. 8 3 3" C TYPE 3 4" C TYPE CABLE 3 CSC CABLE 12 CSC B DLC TYPE (6-PAIR) SIC LOOP DETECTOR TYPE A LOOP DETECTOR TYPE D DETECTOR MAGNETIC TYPE MAT SIGNAL HEAD MAS HEAD TYPE SIGNAL TYPE TV-1-T SIGNAL HEAD TYPE SV-1-T SIGNAL HEAD TYPE SP-1-T SIGNAL HEAD PEDESTRIAN 17-3-100 TYPE STANDARD SIGNAL TYPE 1-A STANDARD SIGNAL TYPE 15TS STANDARD SIGNAL PB No. 5(T)(E) LAMP 165W LED HARNESS C11 WIRE MODEM WIRELESS MODULE SIGNAL DOWN PED LED COUNT SIGNAL AND LIGHTING (CITY STREET LOCATION 8) SIGNAL AND LIGHTING (CITY STREET LOCATION 9) MODIFYING EXISTING ELECTRICAL SYSTEM MODIFYING EXISTING ELECTRICAL SYSTEM 449 2" C TYPE 3 3" C TYPE 3 EVUC LF LF LF LF LF LF LF LF LF LF EA EA EA EA E-25 366 36 1,857 682 319 8 770 770 2,280 314 22 9 1 1 No. 5 PB No. 6 PB No. 6(E) PB Rdwy 1 LED EA EA EA EA EA EA EA EA EA EA EA EA EA EA 5 4 3 1 8 1 1 4 1 1 6 4 1 2 2" C TYPE 3 3" C TYPE 3 3 CSC CABLE 12 CSC CABLE DLC TYPE B No. 5 PB No. 6 PB APS Rdwy 1 LED LF LF LF LF LF LF LF EA EA EA EA EA EA E-27 1,385 594 375 805 805 2,555 76 19 9 4 4 8 3 EA EA EA EA EA EA EA EA EA EA 4 3 3 1 7 4 1 1 1 1 165W LED APS LF EA EA EA EA EA EA EA EA E-29 616 8 8 1 3 1 1 8 8 2" C TYPE 3 SIC (6-PAIR) LF LF LF LF LF LF LF LF LF LF EA EA EA EA EA E-31 112 1,513 401 391 3 1,058 1,058 2,168 28 28 9 8 9 1 1 No. 5 PB No. 6 PB APS EA EA EA EA EA EA EA EA EA EA EA EA EA EA 2 2 4 1 2 1 2 3 4 4 1 1 4 4 SHEET No.CONDUCTOR COPPER No. 8 3"C TYPE 3 TYPE B DLC STC CABINET SERVICE 334L VCS No. 5 PB.No. 6 (E) PB PB COVER RESISTANT TAMPER LF LF LF LF EA EA EA EA EA E-32 320 517 6,758 2,599 1 16 2 1 3 MODIFYING EXISTING ELECTRICAL SYSTEM SENSORS PIEZOELECTRIC Type A CONSTRUCTED PURSUANT TO CALTRANS 2006 STANDARD PLANS AND SPECIFICATIONS. AND MAST ARMS INCLUDED WITHIN THE RED-LINED CLOUDS THIS SHEET SHALL BE ALL SIGNAL AND STREET LIGHTING POLES, FOUNDATIONS (INCLUDING ANCHOR BOLTS) REVISION DATE DESCRIPTION 1 12/15/21 AS-BUILT CONDITION 1 06 Ker BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD SAN DIEGO, CA 92108 SUITE 100 1450 FRAZEE ROAD DOKKEN ENGINEERING EDUARDO SIMONSENJOSE OSTDIEKJOHN KLEMUNESSIMONSEN EDUARDO G. C82608 9/30/22 178 0.2/R1.9 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>4:58:28 PM12/9/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS R00-00-00USERNAME =>_csantos DGN FILE =>06xxxxxxxxuc003.dgn RELATIVE BORDER SCALE IS IN INCHES 0 1 2 3 UNIT 0000 PROJECT NUMBER & PHASE 0600000485BORDER LAST REVISED 7/2/2010 477 07/27/2018 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/1/2021 KERN RIVER BRIDGE 6'-0"±KERN RIVER310 310 11 12 13 131211 9 98 8 Exist MEDIAN9'-0"± 1'-0"± 3'-0" 50-0064 R/L 0.2 PLAN 1"=30' TYPICAL SECTION ‰"=1'-0" "WBL" LINE "EBL" LINE PROPOSED LAYOUT 1'-0" 1'-0" APPROACH STRUCTURE EXISTING EB 312+56.47± "WBL" LINE APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING BB 308+87.51± "WBL" LINE "EBL" LINE S59°59'19"E NEW MEDIAN3'-0""WBL" LINE S59°59'19"E BRIDGE No. 50-0064L BRIDGE No. 50-0064R TO ROUTE 99 TO BAKERSFIELD BB 308+90.32± "EBL" LINE EB 312+48.67± "EBL" LINE -1.5%± MEDIAN 1'-9" LIMITS OF JOINT SEAL (TYPE AL) LEGEND: - Indicates existing structure - Indicates remove median - Indicates new median SECTION IDENTIFICATION PLAN SYMBOLS SHEET NO. STANDARD PLAN (2015) DETAIL NO. 2'-3"± 1'-6"± EXISTING LAYOUT 50'-0"±57'-6"± DECK LIMITS OF REFINISH BRIDGE FURNISH BRIDGE DECK TREATMENT MATERIALFURNISH BRIDGE DECK TREATMENT MATERIAL 6'-0"± Shld 48'-0" EB TRAVELED WAY 6'-0"±6'-0"± Shld 48'-0" WB TRAVELED WAY 1'-9"± 9'-0"± Exist MEDIAN 12'-9" Sheet No:Title INDEX TO PLANS MEDIAN REPLACEMENT DETAILS DECK REHABILATATION PLAN REMOVAL PLAN GENERAL PLAN 4 3 2 1 1 -2%± CONCRETE OVERLAY LIMITS OF POLYESTER 5'-0" DECK SURFACE, TREAT BRIDGE DECK AND LIMITS OF PREPARE CONCRETE BRIDGE DECK SURFACE, TREAT BRIDGE DECK AND LIMITS OF PREPARE CONCRETE BRIDGE 3'-3" (DATED 2015) STANDARD PLANS B6-21 A10E A10D A10C A10B A10A A3C A3B A3A (MAXIMUM MOVEMENT RATING = 2") JOINT SEALS LEGEND LINES AND SYMBOLS (SHEET 5 OF 5) LEGEND LINES AND SYMBOLS (SHEET 4 OF 5) LEGEND LINES AND SYMBOLS (SHEET 3 OF 5) LEGEND LINES AND SYMBOLS (SHEET 2 OF 5) LEGEND LINES AND SYMBOLS (SHEET 1 OF 5) ABBREVIATIONS (SHEET 3 OF 3) ABBREVIATIONS (SHEET 2 OF 3) ABBREVIATIONS (SHEET 1 OF 3) RSP Shld 1'-0" Shld 1'-0" 9" 10'-6" DECK SURFACE, TREAT BRIDGE DECK AND LIMITS OF PREPARE CONCRETE BRIDGE FURNISH BRIDGE DECK TREATMENT MATERIAL 308+39.99± "WBL" LINE 7.00'± Rt 308+39.66± "EBL" LINE 5.77'± Lt 312+95.71± "WBL" LINE 7.00'± Rt 312+95.37± "EBL" LINE 5.77'± Lt - Indicates direction of flow - Indicates direction traffic 450 9'± REVISED 1 AND BRIDGE REMOVAL (PORTION) 1 Andy Toledo DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>8:37:50 PM12/17/2021USERNAME =>imartinPROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE DESIGN DETAILS QUANTITIES BY CHECKED SPECIFICATIONS CHECKED PLANS AND SPECS COMPARED BY BY LAYOUT DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF CHECKED CHECKEDBY BY POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 GENERAL PLAN UNIT: PROJECT NUMBER & PHASE: REVISION DATES CONTRACT NO.: DESIGN GENERAL PLAN SHEET (ENGLISH) (REV. 03/14/12) OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL Andy Toledo FACTOR DESIGN LOAD & RESISTANCE Jeremy LaHaye 50-0064rl-a-gp02.dgnFILE => 0000 00000000001 06-493904 KERN RIVER BRIDGE50-0064 R/L 0.2 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 4 Pete Smith 12/16/14 4/25/17 0.2/R1.9178 11/3/17 FINAL PS&E477 Dina Kasawdish Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton Albert Pan Dina Kasawdish 4/06/18 Dina K. Kasawdish C84019 09/30/19 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT KERN RIVERLEGEND: 310 310 11 12 13 131211 9 98 8 JOINT, SEE NOTE 1 EXISTING LONGITUDINAL Exist MEDIAN9'-0"±50-0064 R/L 0.2 PLAN 1"=30' EXISTING MEDIAN SECTION ƒ"=1'-0" - Indicates existing structure APPROACH STRUCTURE EXISTING EB 312+56.47± "WBL" LINE APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING BB 308+87.51± "WBL" LINE "EBL" LINE S59°59'19"E "WBL" LINE S59°59'19"E BRIDGE No. 50-0064L BRIDGE No. 50-0064R TO ROUTE 99 TO BAKERSFIELD BB 308+90.32± "EBL" LINE EB 312+48.67± "EBL" LINE - Indicates remove median LIMITS OF JOINT SEAL (TYPE AL) SURFACE 1" BELOW CONCRETE REMOVE Exist #4 @ 18 POLYSTYRENE REMOVE 2" EXPANDED 9"± 7'-6"± 9"± JOINT FILLER REMOVE ‚" Exp6"±REMOVAL PLAN JOINT, SEE NOTE 1 Exist LONGITUDINAL NOTES: B6-21 replace it with TYPE AL SEAL the expansion joint filler and 1. Clean existing joint by removing LIMITS OF REMOVE Exist MEDIAN 455'-9"± 2 - Indicates direction of flow - Indicates direction traffic 451 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 50-0064rl-c-rem01.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 KERN RIVER BRIDGE50-0064 R/L 0.2 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 4 Pete Smith 12/16/14 4/25/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 11/3/17 0.2/R1.9178 FINAL PS&E477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 KERN RIVERLEGEND: 310 310 11 12 13 131211 9 98 8 50-0064 R/L 0.2 PLAN 1"=30' - Indicates existing structure APPROACH STRUCTURE EXISTING EB 312+56.47± "WBL" LINE APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING APPROACH STRUCTURE EXISTING BB 308+87.51± "WBL" LINE "EBL" LINE S59°59'19"E "WBL" LINE S59°59'19"E BRIDGE No. 50-0064L BRIDGE No. 50-0064R TO ROUTE 99 TO BAKERSFIELD BB 308+90.32± "EBL" LINE EB 312+48.67± "EBL" LINE DECK REHABILATATION PLAN - Indicates new median 3'-0" NEW MEDIAN SECTION ƒ"=1'-0" "EBL" LINE"WBL" LINE 1'-3"9" LIMITS OF REFINISH BRIDGE DECK SEE "MEDIAN REPLACEMENT DETAILS" SHEET 3 5'-0" CONRETE OVERLAY LIMITS OF POLYESTER JOINT EXISTING LONGITUDINAL 455'-9"± NEW MEDIAN 6" NEW MEDIAN, AND POLYESTER CONCRETE OVERLAY LIMITS OF REFINISH BRIDGE DECK, CONSTRUCT - Indicates direction of flow - Indicates direction traffic 452 9'± (SEE NOTE 1) 11'-0"± 4'-3" 9' LIMITS OF POLYESTER CONCRETE OVERLAY (SEE NOTE 2) NOTES: prepared prusuant to Section 60-3.02C(7). (outside the limits of bridge refinish) shall be Bridge area under new curb and median Overlays" shall apply. Section 60-3.04B "Polyester Concrete the prepared surface required under Polyester concrete shall be placed against Scetion 60-4.02c(2) and 60-3.2c(3). placement of concrete pursuant to bridge refinish requirements shall exclude Within footprint area of polyester concrete, 2. 1. 1 1 1'-10•" REMOVAL (PORTION) LIMITS OF BRIDGE ƒ"AND BRIDGE REMOVAL (PORTION) 1 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 50-0064rl-c-rem02.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 KERN RIVER BRIDGE50-0064 R/L 0.2 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 4 Pete Smith 12/16/14 4/25/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 11/3/17 0.2/R1.9178 FINAL PS&E477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT 50-0064 R/L 0.2 NEW MEDIAN 1"=1'-0" slope MATCH Exist 3'-0" 9"1'-6"9" SEE "CURB DETAILS" 9" 4"5"6"4"10"Exist BRIDGE DECK1•"ClrTot 2 #4 Cont EMBED 4" SPACED AT 18" DRILL AND BOND DOWELS, #5 X 9" MEDIAN DETAIL AT BRIDGE JOINTS PLAN ƒ"=1'-0" "EBL" LINE BB OR EB CURB AA SECTION A-A 1"=1'-0" TOP OF BRIDGE DECK 4 MEDIAN REPLACEMENT DETAILS #4 Cont CITY CURB TYPE "m-1" Mod 3"=1'-0"4"CONCRETE OVERLAY POLYESTER #4 @ 182"±MEDIAN DECK JOINT WIDTH OPENING TO MATCH EXPANSION JOINT Exist • Exist EXPANSION JOINT "CONSTRUCTION DETAILS" SHEET STAMPED CONCRETE, SEE 453 ƒ" Min1 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 50-0064rl-d-rep01.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 KERN RIVER BRIDGE50-0064 R/L 0.2 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 4 Pete Smith 12/16/14 4/25/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 11/3/17 0.2/R1.9178 FINAL PS&E477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT 400.8 401.3 416.5 402.3 409.8 409.5 410.5 408.6 DATUM Elev 380.00 317 316315 314 BEGIN WALL END WALL "EB2" LINE "EBL" LINE 1+00 2+00 3+00 4+00 4+00 3+00 2+001+00313 S59°59'19"E Vert: 1"=10' Horiz: 1"=20' DEVELOPED ELEVATION No.R T L 163.10' CURVE DATA 13°08'48"1 PLAN 1"=20' Sta 324+29.33 "EB2" LINE ECSta 314+63.09 "EB2" LINE BC 6.20' Rt Sta 314+63.09 "EB2" LINE BC Sta 314+63.09 "EBL" LINE PT= TOP OF Conc BARRIER 2 TYPICAL SECTION ‚"=1'-0" 1567.42'117.71'234.99'08°35'23"2 18.79'37.42' 1 S58°42 '56"E 1500.00'500.55'966.24'36°54'28"3 3 6 1 "RW314" LOL FG B11-55 RSP "RW314" LOL TYPE 732A Conc BARRIER FG FG 1'-5" 54 3 2 "KR-1" LINE 6'-1" DESIGN "H"PERVIOUS BACKFILL WEEP HOLE AND B0-3 RETAINING WALL TYPE 1 (Mod) 345'-0" (MEASURED ALONG "RW314" LOL) "EB2" LINE "EBL" LINE 66'-10ƒ" Min & VARIES 66'-0" TOP OF WALL -2% "ELECTRICAL PLANS" ELECTROLIER, SEE ELECTROLIER TOP OF WALL Min6"PLACE) (PROTECT IN SEWER LINE Exist 15" Á (PROTECT IN PLACE) Exist AT&T LINE "KR-1" LINE PLANS" SEE "DRAINAGE STORM DRAIN, W FMin1'-10"NOTE 4NOTES: adequate clearance to the utility. at the footing step above the 15" sewer line to provide The footing minimum soil cover is reduced to 1'-10" Min of wall Architectural Treatment. Limits of Anti Graffiti Coating equals limits "INDEX TO PLAN" sheet. See "ARCHITECTURAL FINISH DETAIL" on "STANDARD PLANS" see "INDEX TO PLANS" sheet. For "INDEX TO RETAINING WALL PLANS" and 4. 3. 2. 1. RSP OG Approx 2'-1" -5% (Mod) TYPE 1 (CASE 1) RETAINING WALL B3-1A RSP B11-51 RSPHAND RAILING TUBULAR Approx OG (PROTECT IN PLACE) Exist 15" SEWER LINE SEE "ROAD PLANS" "EBL" LINE= 66.90 Rt Sta 313+52.77 Sta 1+00.00 "RW314" LOL BC= BEGIN "RW314" "ROAD PLANS" TYPE 60 SC, SEE Conc BARRIER "EBL" LINE 72.00 Rt Sta 313+89.76 Sta 1+37.42 "RW314" LOL EC= MANHOLE SEWER MANHOLE SEWER "EBL" LINE 73.61 Rt Sta 314+62.34 Sta 2+10.00 "RW314" LOL BC= "EB2" LINE 67.42 Rt Sta 316+87.26 Sta 4+45.00 "RW314" LOL EC= END "RW314" SEE NOTES 2 AND 3 GRAFFITI COATING, FINISH AND ANTI ARCHITECTURAL B C & VARIES 11'-0"± Min (PROTECT IN PLACE) Exist AT&T LINE LINE (ABANDONED) 10" CHEVRON OIL LINE (REMOVE) IRRIGATION 454 1 Andy Toledo DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>8:37:54 PM12/17/2021USERNAME =>imartinPROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE DESIGN DETAILS QUANTITIES BY CHECKED SPECIFICATIONS CHECKED PLANS AND SPECS COMPARED BY BY LAYOUT DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF CHECKED CHECKEDBY BY POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 GENERAL PLAN UNIT: PROJECT NUMBER & PHASE: REVISION DATES CONTRACT NO.: DESIGN GENERAL PLAN SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo FACTOR DESIGN LOAD & RESISTANCE Jeremy LaHaye 06-493904rw314-a-gp01.dgnFILE => 0000 00000000001 06-493904 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTERED PROFESS I ONAL E NGI NEERST ATE OF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 5 RETAINING WALL 314 5/3/17 FINAL PS&ENardin Metwashla 10/9/17 0.2/R1.9178 Nardin Metwashla 11/3/17 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish 477 Brad Wilton Albert Pan Dina Kasawdish CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT INDEX TO PLANS SECTION IDENTIFICATION SHEET NO. STANDARD PLAN DETAIL NO. PLAN SYMBOLS ELEVATION ARCHITECTURAL FINISH DETAIL NO SCALE SECTION A-A A A 1'-3•"3•"0•"1•"0•"0ƒ" 2 (DATED 2015) STANDARD PLANS RSP RSP RSP RSP RSP RSP ES-6B ES-6A B11-55 B11-51 B3-6 B3-5 B3-1A B0-3 A62B A10G A10F A10E A10D A10C A10B A10A A3C A3B A3A GROUTING FOR TYPE 15 AND TYPE 21 BARRIER RAIL MOUNTED) ELECTRICAL SYSTEMS (ELECTROLIER ANCHORAGE AND ELECTRICAL SYSTEMS (LIGHTING STANDARD, TYPE 15 AND 21) CONCRETE BARRIER TYPE 732 TUBULAR HAND RAILING RETAINING WALL DETAILS NO. 2 RETAINING WALL DETAILS NO. 1 RETAINING WALL TYPE 1 (CASE 1) BRIDGE DETAILS BRIDGE SURCHARGE AND WALL LIMITS OF PAYMENT FOR EXCAVATION AND BACKFILL - LEGEND - SOIL (SHEET 2 OF 2) LEGEND - SOIL (SHEET 1 OF 2) LEGEND - LINES AND SYMBOLS (SHEET 5 OF 5) LEGEND - LINES AND SYMBOLS (SHEET 4 OF 5) LEGEND - LINES AND SYMBOLS (SHEET 3 OF 5) LEGEND - LINES AND SYMBOLS (SHEET 2 OF 5) LEGEND - LINES AND SYMBOLS (SHEET 1 OF 5) ABBREVIATIONS (SHEET 3 OF 3) ABBREVIATIONS (SHEET 2 OF 3) ABBREVIATIONS (SHEET 1 OF 3) RSP Sheet No:Title RETAINING WALL PLANS INDEX TO LOG OF TEST BORINGS RETAINING WALL LAYOUT NO. 2 RETAINING WALL LAYOUT NO. 1 INDEX TO PLANS GENERAL PLAN 5 4 3 2 1 THIS EDGE JOINT, Typ • MORTAR Typ BLOCK THIS EDGE, JOINT OR MATCH • MORTAR CT: SOIL: REINFORCED CONCRETE: fy = 60,000 psi f'c = 3,600 psi Q = 1.00DC+1.00EV+1.00EH+1.00CT Q = 1.00DC+1.00EV+1.00EH+1.00EQD+1.00EQE Q = DC+ EV+ EH+1.75LS Q = 1.00DC+1.00EV+1.00EH+1.00LS Service I Strength I Extreme I Extreme II SEISMIC:k = 0.2, k = 0.0h v Á = 30°, Ê = 120 pcf CT: EQD: EQE: LS: EV: EH: DC: : : : Q: Where: LOAD COMBINATIONS AND LIMIT STATES: Vehicular Collision Force Soil and Structural and Nonstructural Components Inertia Seismic Earth Pressure Live Load Surcharge Vertical Earth Pressure from Earth Fill Weight Horizontal Earth Fill Pressure Dead Load of Structure Components 1.50 or 0.90, Whichever Controls Design 1.35 or 1.00, Whichever Controls Design 1.25 or 0.90, Whichever Controls Design Force Effects Distribution below footing taken no less than 40'. and 1 : 1 distribution down and outward. distributed over 10 feet at the top of wall 54 kip transverse force applied at He = 32", DESIGN NOTES: DESIGN: LS:Varied surcharge on level ground surface AASHTO LRFD Bridge Design Specifications, 4th Edition with California Amendments 455 1 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904rw314-a-itp.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo 5 REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTERED PROFESS I ONAL E NGI NEERST ATE OF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 RETAINING WALL 314 5/3/17 FINAL PS&ENardin Metwashla 10/9/17 0.2/R1.9178 Nardin Metwashla 11/3/17 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish 477 Dina Kasawdish Brad Wilton 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 PLAN 1"=10' DEVELOPED ELEVATION 1"=10' RETAINING WALL LAYOUT NO. 1 1+00 2+00 MATCH LINE 2+80.00MATCH LINE 2+80.001+00 2+00 Sta 1+00.00 Elev 409.66 TOP OF WALL BEGIN WALL Sta 1+50.00 Elev 408.94 Sta 1+25.00 Elev 409.27 Sta 1+75.00 Elev 408.57 Sta 2+00.00 Elev 408.19 Sta 2+25.00 Elev 407.78 Sta 2+50.00 Elev 407.36 Sta 2+75.00 Elev 406.98 3 RSP "RW314" LOL LENGTH DESIGN "H" 24'-0" 8'-0" B3-5 Elev 400.00 Elev 398.00Elev 398.00 for details see 1. Expansion Joints at 96'-0" max on center, B0-3 3-4 EXPANSION JOINTS WEAKENED PLANE Jt Approx OG B0-3 3-2PLANE Jt WEAKENED 96'-0"96'-0" 24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0"24'-0" S58°42'56"E R=163.10' R=1567.42' NOTES: "RW314" LINE FG ALONG SEE NOTE 2 ELECTROLIER TYPE 21, AND NOTE 2 ELECTRICAL PLANS ELECTROLIER, SEE Sta 1+34.28 "RW314" LOL B11-55 ES-6A ES-6B DATUM Elev 380.00 8'-0" 120'-0" 10'-0" 80'-0" RSP TYPE 732A Conc BARRIER B11-55 RSP Elev 398.75 8'-0" 16'-0" (PROTECT IN PLACE) SEWER LINE Exist 15" Á (PROTECT IN PLACE) Exist AT&T LINE PLACE) (PROTECT IN SEWER LINE Exist 15" Á RSP RSP RSP JOINTS EXPANSION B0-3 3-3 RSP ELEV 397.37 TOP OF PIPE Typ FOOTING STEP, 10'-0" 24'-0" and "ELECTRICAL PLANS" 2. For Electrolier Details see, MANHOLE SEWER "EBL" LINE= 66.90 Rt Sta 313+52.77 Sta 1+00.00 "RW314" LOL BC= BEGIN "RW314" "EBL" LINE 72.00 Rt Sta 313+89.76 Sta 1+37.42 "RW314" LOL EC="EBL" LINE 73.61 Rt Sta 314+62.34 Sta 2+10.00 "RW314" LOL BC= 456 1 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904rw314-c-rwlo1.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo 5 REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTERED PROFESS I ONAL E NGI NEERST ATE OF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 RETAINING WALL 314 5/3/17 FINAL PS&ENardin Metwashla 10/9/17 0.2/R1.9178 Nardin Metwashla 11/3/17 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish 477 Dina Kasawdish Brad Wilton 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 PLAN 1"=10' RETAINING WALL LAYOUT NO. 2 DATUM Elev 380.00 DEVELOPED ELEVATION 1"=10' 4+003+00 4+003+00 MATCH LINE 2+80.00END WALL Sta 4+45.00 Elev 405.29 MATCH LINE 2+80.00TOP OF WALL Sta 4+25.00 Elev 405.36 Sta 4+00.00 Elev 405.51 Sta 3+75.00 Elev 405.72 Sta 3+50.00 Elev 406.00 Sta 3+25.00 Elev 406.33 Sta 3+00.00 Elev 406.65 RSP 4 FG ALONG "RW314" LINE "RW314" LOL LENGTH EXPANSION JOINTS WEAKENED PLANE Jt Elev 400.00 for details see 1. Expansion Joints at 96'-0" max on center, B0-3 3-4 FOOTING STEP B3-5 JOINTS EXPANSION PLANE Jt WEAKENED B0-3 3-3 B0-3 3-2 Approx OG DESIGN "H" 96'-0"96'-0" 24'-0" R=1567.42' 33'-0" 4'-0"8'-0" 120'-0" TYPE 732A Conc BARRIER B11-55 RSP RSP RSP PLACE) (PROTECT IN SEWER LINE Exist 15" Á (PROTECT IN PLACE) Exist AT&T LINE Elev 398.00 48'-0" 6'-0" 24'-0"24'-0"24'-0"24'-0"24'-0"24'-0" MANHOLE SEWER "EB2" LINE 67.42 Rt Sta 316+87.26 Sta 4+45.00 "RW314" LOL EC= END "RW314" NOTE: 457 1 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904rw314-c-rwlo2.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo 5 REVISION DATES $DATE$$TIME$$USER$Jeremy LaHaye UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES DATE No. Exp. CIVILREGISTERED PROFESS I ONAL E NGI NEERST ATE OF CALIFORNIA completeness of scanned copies of this plan sheet. SAN DIEGO, CA 92108 06 Ker 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 RETAINING WALL 314 5/3/17 FINAL PS&ENardin Metwashla 10/9/17 0.2/R1.9178 Nardin Metwashla 11/3/17 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish 477 Dina Kasawdish Brad Wilton 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 401.3 416.5 402.3 410 409.8 409.5 410.5 408.6 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 8" SILTY SAND (SM); brown; moist; mostly SAND; some fines. SILTY SAND (SM); brown; moist; mostly SAND; little fines; little GRAVEL. Poorly graded SAND (SP); medium dense; brown; moist; mostly SAND; little GRAVEL. SILTY SAND (SM); medium dense; light brown; moist; mostly SAND; some fines. Poorly graded SAND with GRAVEL (SP); dense; light brown to tan; moist; mostly SAND; little fine to coarse GRAVEL. Encountered intermittent cobbles beginning at 22 feet. Drilling became slower with some drill chatter. Significant drill chatter at 28 feet. Generally slow drilling with intermittent drill chatter. Cuttings indicate gravel up to 2.5 inches. Very dense. Very hard drilling beginning at approximately 36 feet (cobbles likely from 36 feet to the bottom of the boring. 12-10-14 Terminated at Elev 359.5' ERi = 81% Groundwater Not Encountered 400 390 380 370 360 401.0' A-14-404 8" 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 8 8 17 12 23 35 44 91 "EB2" LINE 315+10, 88' R 350 PLAN 1" = 20' PROFILE Vert: 1" = 10' Horiz: 1" = 10' 400 390 380 370 360 350 NOTES: 315+00 6. 5. 4. 3. 2. 1. A-14-404 BORING LOCATION APPROXIMATE 316+00"EB2" LINE 12-10-14 a corrected standard penetration test (SPT) N60 value. The apprarent density of coarse-grained soil is based on overburden or any other correction factor. which have not been corrected for hammer energy, sample size, The blow counts shown on the logs are the raw blow counts, advance the drive samplers for all borings. weight of 140 lbs. free falling a distance of 30" was used to A CME automatic hammer system consisting of a hammer Sample blow counts to estimate SPT equivalent blow count. Sampler. A factor of 0.67 may be applied to California Modified 2.5" samples were taking using a 2.42" I.D. California Modified per standard Penetration Test. 1.4" samples were taken using 1.4" I.D. split barrel sampler, Soil & Rock Logging, Classification, and Presentation Manual (2010). This LOTB sheet was prepared in accordance with the Caltrans RETAINING WALL 314 317 316315 314 "EB2" LINE "EBL" LINE 4+003+00 2+001+00313 S59°59'19"E Sta 324+29.33 "EB2" LINE ECSta 314+63.09 "EB2" LINE BC 6.20' Rt Sta 314+63.09 "EB2" LINE BC Sta 314+63.09 "EBL" LINE PT= Sta 314+62.34 "EBL" LINE 73.61 Rt Sta 313+89.76 "EBL" LINE 72.00 Rt S58°42'56"E 5 6 4 3 2 "KR-1" LINE Sta 313+52.77 "EBL" LINE= BEGIN "RW314" 66.90 Rt Sta 1+00.00 "RW314" LOL BC "RW314" LOL Sta 1+37.42 "RW314" LOL EC Sta 2+10.00 "RW314" LOL BC Sta 316+87.26 "EB2" LINE END "RW314" 67.42 Rt Sta 4+45.00 "RW314" LOL EC STORM DRAIN Poorly graded SAND with SILT (SP-SM); medium dense; brown to light brown; moist; mostly SAND; little fines; trace GRAVEL. M. Wilson Trace to little gravel. 05/22/1708/21/14 WRECO 8331 SIERRA COLLEGE BLVD SUITE 208 ROSEVILLE, CA 95661 5 5 DEPARTMENT OF TRANSPORTATION LOG OF TEST BORINGS The State of California or its officers or agents shall not be responsible for the accuracy or DIST COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No TOTAL SHEETS PLANS APPROVAL DATE ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 FILE =>06-493904rw314-z-ltb01.dgn POST MILES DISREGARD PRINTS BEARING EARLIER REVISION DATES REVISION DATES SHEET OF USERNAME =>imartinDATE PLOTTED =>12/17/2021TIME PLOTTED =>8:37:58 PM 458 477 UNIT: PROJECT NUMBER & PHASE: PREPARED FOR THE STATE OF CALIFORNIA PROJECT ENGINEER GS GEOLOGIST LOG OF TEST BORINGS SHEET (ENGLISH) (REV. 03/14/12) DESIGN OVERSIGHT SIGN OFF DATE DRAWN BY CHECKED BY FIELD INVESTIGATION BY: DATE: DATE CONTRACT NO.: completeness of scanned copies of this plan sheet. 06 Ker M. DU M. WILSON R. LAWRENCE BRIDGE NO. 06-493904 ROBERT LAWRENCE E NGI NEERAINROFILACOFTEATSEGIRPROFESSIONALDERETS2785No. Exp.06-30-18 GEOTECHNICAL REGISTERED GEOTECHNICAL ENGINEER 10/9/17 0.2/R1.9178 FINAL PS&ELINE (ABANDONED) 10" CHEVRON OIL LINE (REMOVE) IRRIGATION 4/06/18ROBERT LAWRENCE 1 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 399.93 399.80 407.53 405405DATUM Elev. 380.00 ELEVATION 1"=10' PLAN 1"=10' END BOX CULVERT • BOX CULVERT HEAD WALL EXISTING INVERT Elev "EB2" LINE BEGIN BOX CULVERT END Exist BOX CULVERT= BEGIN BOX CULVERT BOX CULVERT EXISTING Approx HGL INVERT Elev 396.68 ± (MATCH Exist) 6'-0"± 10'-0"± 10'-0"± OPENING MATCH Exist OPENING MATCH Exist OPENINGExistMATCHFG "EB2" LINE AND WINGWALL OF Exist HEAD WALL REMOVE 3'-0" BC 314+63.09 "EB2" LINE EC 324+29.33 "EB2" LINE N83°06'10"E 323+00 11'-1"± 11'-1"± 61'-8" BOX CULVERT SLOPE MATCH EXISTING 48'-0" TRAVELED WAY Shld6'-0" SIDEWALK6'-0" 396.05± MEDIAN LEGEND: - Indicates existing structure - Indicates bridge removal, portion - Indicates direction of flow Exist CHANNEL FLOOR HAND RAILING TUBULAR CARRIER CANAL (PCC) (CHANNEL LINING) CONCRETE (PCC) CHANNEL LINING REMOVE Exist END BOX CULVERT • BOX CULVERT (PCC) (CHANNEL LINING) CONCRETE LIMITS OF CONCRETE 30'-0" TRANSITION (CHANNEL LINING) (PCC) 6/2/15 LIMITS OF REMOVE Exist CHANNEL LINING (PCC) 104'-3" (MEASURED ALONG • BOX CULVERT) N34°07'23"E N23°21'12"E 11/3/17 B11-58 RSP RSP B11-51 TYPE 736A Conc BARRIER B11-56 RSP 399.86± FG = Approx OG INVERT Elev D81 SEE NOTE 1 NOTES:D81 D82 BOX CULVERT CIP/RC DOUBLE 3. 2. 1. 4.63 Rt "EB2" LINE Sta 323+37.75± 88.58 Rt "EB2" LINE Sta 322+77.78 CURVE DATA No.R T L 966.24'1 36°54'28"500.55'1500.00' 1 5'-10„" TYPE 732SW (Mod) Conc BARRIER HGL (Based on Carrier Canal As-Builts dated 1962) - Indicates hydraulic grade line ** * - Match existing slope TYPICAL SECTION ‚"=1'-0" 21'-9" ACCESS ROAD * * PARKWAY4'-0" B11-52 RSP TYPE 7 CHAIN LINK RAILING 26'-2ƒ" 7'-5" 4'-11•" 4/28/17 - Indicates Concrete Barrier Type 732SW (Mod) - Indicates Concrete Barrier Type 736A bottom slabs, as applicable, shall be 1'-0". The transition to existing Box Culvert walls and top and begin Box Culvert. joint to be placed at 20'-0" from Expansion Joints must be placed per . The first expansion Height, H=6' and Maximum Earth cover of 10'. The Box Culvert must be constructed per for Span, S=10', DETAILS NO. 2" SHEET SEE "BOX CULVERT TYPE 732SW (MOD) CONCRETE BARRIER DETAILS NO. 1" SHEET SEE "BOX CULVERT Type 736A Concrete Barrier - Indicates direction traffic 8' -11"± 12' -3"± 11' -11•"±459 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 Andy Toledo DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>9:49:02 AM12/20/2021USERNAME =>imartinPROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE DESIGN DETAILS QUANTITIES BY CHECKED SPECIFICATIONS CHECKED PLANS AND SPECS COMPARED BY BY LAYOUT DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF CHECKED CHECKEDBY BY DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 POST MILES DATE GENERAL PLAN UNIT: PROJECT NUMBER & PHASE: No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REVISION DATES CONTRACT NO.: completeness of scanned copies of this plan sheet. DESIGN GENERAL PLAN SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo FACTOR DESIGN LOAD & RESISTANCE SAN DIEGO, CA 92108 Jeremy LaHaye 06-493904bc-a-gp03.dgnFILE => 06 Ker 0000 00000000001 06-493904 CARRIER CANAL BOX CULVERT 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 1 5 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 0.2/R1.9178 477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Dina Kasawdish Nardin Metwashla Brad Wilton Albert Pan Dina Kasawdish 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 0.5 MISCELLANEOUS DETAILS CAST-IN-PLACE REINFORCED CONCRETE BOX CULVERT BO-3 BRIDGE DETAILS No Scale LIMITS OF EARTHWORK SECTION IDENTIFICATION PLAN SYMBOLS SHEET NO. STANDARD PLAN (2015) DETAIL NO. D81 CAST-IN-PLACE REINFORCED CONCRETE DOUBLE BOX CULVERT D84 BOX CULVERT WINGWALLS TYPES A, B AND C 2 A62B A62E BO-1 BRIDGE DETAILS B11-51 TUBULAR HAND RAILING RSP B11-56 RSP B11-58 INDEX TO PLANS Bot of Box Culvert Wall Ftg, Typ Bot of Ret Typ2'-0" Min -Structural Concrete, Box Culvert No Scale CONCRETE STRENGTH AND TYPE LIMITS (DATED 2015) STANDARD PLANS A62E A62B A10G A10F A10E A10D A10C A10B A10A A3C A3B A3A REINFORCED CONCRETE BOX AND ARCH CULVERTS EXCAVATION AND BACKFILL CAST-IN-PLACE BRIDGE SURCHARGE AND WALL LIMITS OF PAYMENT FOR EXCAVATION AND BACKFILL LEGEND - SOIL (SHEET 2 OF 2) LEGEND - SOIL (SHEET 1 OF 2) LEGEND LINES AND SYMBOLS (SHEET 5 OF 5) LEGEND LINES AND SYMBOLS (SHEET 4 OF 5) LEGEND LINES AND SYMBOLS (SHEET 3 OF 5) LEGEND LINES AND SYMBOLS (SHEET 2 OF 5) LEGEND LINES AND SYMBOLS (SHEET 1 OF 5) ABBREVIATIONS (SHEET 3 OF 3) ABBREVIATIONS (SHEET 2 OF 3) ABBREVIATIONS (SHEET 1 OF 3) CONCRETE BARRIER TYPE 736 D82 RSP RSP RSP B11-52 CHAIN LINK RAILING TYPE 7 CONCRETE BARRIER TYPE 732SW (SHEET 1 OF 2) CONCRETE BARRIER TYPE 732SW (SHEET 2 OF 2)Min2'-0"Sheet No:Title INDEX TO PLANS LOG OF TEST BORINGS BOX CULVERT DETAILS NO. 2 BOX CULVERT DETAILS NO. 1 INDEX TO PLANS GENERAL PLAN 5 4 3 2 1 RSP B11-59 NOTE 2NOTE 22. 2'-0" Minimum excavation below the box culvert and the wing wall footings. 1. For other limits of excavation and backfill not shown, see and - Structure Backfill, (Culvert) - Structure Excavation, (Culvert) NOTES: LEGEND: 460 (f'c = 3600 psi @ 14 days) T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904bc-b-gnotes.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 POST MILES DATE DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$8/21/15 Jeremy LaHaye 06 Ker UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 SAN DIEGO, CA 92108 CARRIER CANAL BOX CULVERT 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 59/4/15 4/28/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 0.2/R1.9178 11/3/17 477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton Nardin Metwashla 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 0.5 ELEVATION B-B ‚"=1'-0" ELEVATION C-C ‚"=1'-0" SECTION A-A •"=1'-0" A A C C B B PLAN 1"=1'-0" LENGTH DESIGN HEIGHT DATUM Elev 390.00 DATUM Elev 390.00 LENGTH DESIGN HEIGHT 392.50 392.50 N07°37'23"E N 42°29'48"EROOF FG #4 Tot 7 1:1 1'-0"Max3'-7"N23°21'12"E WW LOL WW LO LNEOPRENE STRIP B0-1 1-3 WEEP HOLE TYPICAL WALL SECTION •"=1'-0" D84 Min2'-0"WEEP HOLE B0-3 3-1 BOX CULVERT DETAILS NO. 1 3 TYPE 736A CONCRETE BARRIER B11-56 RSP BARRIER DOWELS ELEV INVERT LINING TOP OF CHANNEL BOTHWAYS #4 @ 12 LINING TOP OF CHANNEL 6"TYPE 736A CONCRETE BARRIER B11-56 RSP LINING CHANNEL TOP OF LINING CHANNEL TOP OF Elev 408.00 TOP OF WW Elev 405.96 TOP OF WW Elev 405.96 TOP OF WWElev 407.00 TOP OF WW BARRIER DOWELS 1:1 #5 @ 8 1'-4" 11" #4 Tot 4 CONCRETE (CHANNEL LINING) (PCC) 30'-0" LINING CHANNEL EXISTING 14' 16'-9" 14' 18'-3" TYPE 736A Conc BARRIER TYPE 736A Conc BARRIER Tubular handrailing not shown for clarity NOTE: JOINT FILLER •" EXPANSION JOINT FILLER 1" EXPANSION D D 6"2'-0" #6 @ 4 #5 @ 16 4'-0" #5 @ 16 & VARIES 1'-0" #5 @ 8 1'-4" 11" 1'-0" 6"(Mod) WINGWALL TYPE B BOX CULVERT SECTION D-D •"=1'-0" 6"1'-0"6" EXISTING MATCH6"EXISTINGMATCH EXISTING MATCH EXISTING MATCH • BOX CULVERT 4'-6" FG TOP OF WALL HANDRAILING TUBULAR B11-51 RSP HANDRAILING TUBULAR B11-51 RSP MATCH ExistMATCH ExistWW WW MATCH EXISTING 22'-2"± LINING CHANNEL LINING CHANNEL 15'-0" PLANE JOINT SPACING TO WEAKENED PLANE JOINT" DETAIL SEE "WEAKENED 1'-0" D84 Reinforcement shown is in addition to NOTE: SEE DETAIL A WEEP HOLES 4" Á PLASTIC ROCK FILTER MATERIAL 1" Max CRUSHED 3" 1'-0" DETAIL A ƒ"=1'-0" WEAKENED PLANE JOINT ƒ"=1'-0" 1"„" SAWED JOINT JOINT MATERIAL OR ‰" PREMOLDED 461 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904bc-k-tsdt01.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 POST MILES DATE DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$8/21/15 Jeremy LaHaye 06 Ker UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 SAN DIEGO, CA 92108 CARRIER CANAL BOX CULVERT 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 59/4/15 4/28/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 0.2/R1.9178 11/3/17 477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton Nardin Metwashla 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 0.5 DOWEL CONNECTION •"=1'-0" SECTIONELEVATION BOX CULVERT DETAILS NO. 2 4 Sym ABOUT • BOX CULVERT Typ 11 EQUAL SPACES Typ7 EQUAL SPACES DOWELS @ 12" Max (CHEMICAL ADHESIVE) DRILL AND BOND #6 2'-6" INTO Exist Conc DOWELS, EMBED 6" (CHEMICAL ADHESIVE) DRILL AND BOND #6 CONCRETE BARRIER TYPE 732SW (MOD) •"=1'-0" Sta 322+34.20 to Sta 323+25.59 "EB2" Line NOTE: For dimensions and reinforcement not shown, see B11-58 and B11-59 RSP RSP 2'-6"1'-9" 1'-0" 5" SIDEWALK 6'-0"Pkwy SEE "ROAD PLANS" 8" 1 1 -1.5% 1'-2"ACCESS ROAD TYPE 7 CHAIN LINK RAILING B11-52 RSP #5 @ 12 ALTERNATING Tot 8 #5 Cont #5 @ 12 Tot 2 #4 Cont #6 @ 8 2'-4•" #5 @ 16 SEE "ROAD PLANS" FG #6 @ 8 #5 Tot 12 462 T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 DEPARTMENT OF TRANSPORTATION PREPARED FOR THE STATE OF CALIFORNIA TIME PLOTTED =>DATE PLOTTED =>USERNAME =>PROJECT ENGINEER DESIGN OVERSIGHT SIGN OFF DATE 06-493904bc-k-tsdt02.dgnFILE => DISREGARD PRINTS BEARING EARLIER REVISION DATES BRIDGE NO. SHEET OF DIST COUNTY ROUTE SHEET TOTAL PLANS APPROVAL DATE REGISTERED CIVIL ENGINEER NoTOTAL PROJECT SHEETS The State of California or its officers or agents shall not be responsible for the accuracy or POST MILES ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 POST MILES DATE DESIGN DETAILS QUANTITIES BY CHECKED CHECKED CHECKEDBY BY No. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA completeness of scanned copies of this plan sheet. DESIGN DETAIL SHEET (ENGLISH) (REV. 03/14/12) Andy Toledo REVISION DATES $DATE$$TIME$$USER$8/21/15 Jeremy LaHaye 06 Ker UNIT: PROJECT NUMBER & PHASE:CONTRACT NO.: 0000 00000000001 06-493904 SAN DIEGO, CA 92108 CARRIER CANAL BOX CULVERT 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 59/4/15 4/28/17 OR FABRICATING ANY MATERIAL. DIMENSIONS BEFORE ORDERING VERIFY ALL CONTROLLING FIELD NOTE: THE CONTRACTOR SHALL 0.2/R1.9178 11/3/17 477 4/06/18 Dina K. Kasawdish C84019 09/30/19 Dina Kasawdish Dina Kasawdish Dina Kasawdish Brad Wilton Nardin Metwashla 7/27/2018 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 0.5 A-14-302 Poorly graded SAND (SP); medium dense; brown; moist. Mottled green and brown; trace clay. Hard drilling begining at 40'± and drill rig chatter to bottom of boring. SILTY SAND (SM); very dense; brown; moist. 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 36 25 18 12 13 14 19 24 65 41 94 SILTY SAND (SM); dense; light brown; dry; (FILL). SANDY SILT (ML); very stiff; light brown; moist; PP=2.5 tsf; (FILL). SILTY SAND (SM); medium dense; brown; moist; trace roots. Poorly graded SAND (SP); brown; dry; fine to med sand with trace silt. Moist; trace coarse sand and trace roots. Trace fine gravel. Poorly graded GRAVEL (GP); drill rig chatter. SILTY SAND (SM); medium dense; dark brown; moist. Drill rig chatter 36'-43' drill rig jumping 41'-42'. Gravel up to 1.5", medium to coarse sand, little fine sand, trace silt. 09-09-14 Terminated at Elev 357.1' ERi = 81% 408.6' A-14-301 400 390 380 370 360 410 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 25 11 4 13 12 11 9 11 25 50/5 69/6 408.2' Dense. Medium dense; moist; (FILL). 09-09-14 Terminated at Elev 356.7' ERi = 81% Groundwater Not EncounteredGroundwater Not Encountered NOTES: Poorly graded SAND with GRAVEL (SP); very dense; brown; moist; Thin gravel layers from 47-50ft. Driller noted entering and exiting gravel from 36-50 ft. 8" 8" 400 390 380 370 360 410 8" SILTY SAND (SM); very dense; brown; moist. 8" Dense; trace gravel. Loose; (FILL). SILTY SAND (SM); Dense; brown; dry; mostly fine sand; (FILL). PROFILE Vert: 1" = 10' Horiz: 1" = 10' Poorly graded GRAVEL with SAND (GP); very dense; brown; moist; gravel up to 1", medium to coarse sand, little fine sand, trace silt. 350350 6. 5. 4. 3. 2. 1. Poorly graded SAND with GRAVEL (SP); very dense; SANDY SILT (ML); stiff; brown; moist; contains mica; PP=2.5 tsf. brown; moist; gravel up to 1". 9-9-14 CARRIER CANAL BOX CULVERT 58,99,178 8" PLAN 1" = 10' A-14-301 BORING LOCATION APPROXIMATE "EB2" Sta ~323+1212' Rt "EB2" Sta ~323+46penetration test (SPT) N60 value. The apprarent density of coarse-grained soil is based on a corrected standard correction factor. been corrected for hammer energy, sample size, overburden or any other The blow counts shown on the logs are the raw blow counts, which have not all borings. free falling a distance of 30", was used to advance the drive samplers for A CME automatic hammer system consisting of a hammer weight of 140 lbs. estimate SPT equivalent blow count. factor of 0.67 may be applied to California Modified Sample blow counts to 2.5" samples were taking using a 2.42" I.D. California Modified Sampler. A Penetration Test. 1.4" samples were taken using 1.4" I.D. split barrel sampler, per standard Logging, Classification, and Presentation Manual (2010). This LOTB sheet was prepared in accordance with the Caltrans Soil & Rock 25.7, 0.0/R1.9 51.7/51.8, 25.5/ SILTY SAND (SM); medium dense brown, dry; fine to medium sand. Well-graded SAND with SILT (SW-SM); medium dense; light brown; trace gravel. PA PA PA END BOX CULVERT • BOX CULVERT HEAD WALL EXISTING "EB2" LINE BEGIN BOX CULVERT END Exist BOX CULVERT= BC 314+63.09 "EB2" LINE EC 324+29.33 "EB2" LINE N83°06'10"E 323+00Elev 407.09 4.63 Rt "EB2" LINE Sta 323+37.75± Elev 405.96 88.58 Rt "EB2" LINE Sta 322+77.78± MEDIAN CARRIER CANAL A-14-302 LOCATION BORING APPROXIMATE 5 5 Mottling; less clay. WRECO 8331 SIERRA COLLEGE BLVD SUITE 208 ROSEVILLE, CA 95661 08/21/14 05/22/17 DEPARTMENT OF TRANSPORTATION LOG OF TEST BORINGS The State of California or its officers or agents shall not be responsible for the accuracy or DIST COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No TOTAL SHEETS PLANS APPROVAL DATE ORIGINAL SCALE IN INCHES FOR REDUCED PLANS 0 1 2 3 FILE =>06-493904bc-z-ltb01.dgn POST MILES DISREGARD PRINTS BEARING EARLIER REVISION DATES REVISION DATES SHEET OF USERNAME =>imartinDATE PLOTTED =>12/20/2021TIME PLOTTED =>3:18:27 PM UNIT: PROJECT NUMBER & PHASE: PREPARED FOR THE STATE OF CALIFORNIA PROJECT ENGINEER GS GEOLOGIST LOG OF TEST BORINGS SHEET (ENGLISH) (REV. 03/14/12) DESIGN OVERSIGHT SIGN OFF DATE DRAWN BY CHECKED BY FIELD INVESTIGATION BY: DATE: DATE CONTRACT NO.: completeness of scanned copies of this plan sheet. 06 Ker M. DU M. WILSON R. LAWRENCE BRIDGE NO. 06-493904 ROBERT LAWRENCE E NGI NEERAINROFILACOFTEATSEGIRPROFESSIONALDERETS2785No. Exp.06-30-18 GEOTECHNICAL REGISTERED GEOTECHNICAL ENGINEER 1600 TRUXTUN AVENUE CITY OF BAKERSFIELD, CITY HALL NORTH BAKERSFIELD, CA 93301 477 463 4/06/18ROBERT LAWRENCE 0.5 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SOUND WALL No.1 SCALE AS SHOWN DEVELOPED ELEVATION 1"=10' PLAN 1"=10' 11+00 DATUM Elev 380.00 SW No. 1 BEGIN SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, 10+00 11+00 10+68.00 EC 10+83.33 PI 11+37.33 PI 11+53.33 PI10+00 S72°50'23"E S89°10'00"E N47°32'49"EN0°49'03"E "SW-1" LOL 10+22.00 10+44.00 10+66.00 10+83.33 11+01.33 11+19.33 11+51.33 Typ, SEE NOTE 2 16"x24" PILASTER PILE SPACING "SW-1" LOL MEASURED ALONG 3'-0" No. 1 1553.33' R T L 02°30'30"34.01'68.00' 16'-0"34'-0"35'-4"44'-0"24'-0" Sta 319+70.01 76.67' Lt "WB2" LINE 10+00 "SW-1" LOL=BC Sta 321+25.13 93.03' Lt "WB2" LINE 11+57.33 "SW-1" LOL Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS H=14' 157'-4" 157'-4" (MEASURED ALONG "SW-1" LOL)SW No. 1 END 4'-0" B15-5 1 SEE NOTE 4 TOP OF WALL, B15-5 B15-2 SEE NOTE 5 DESIGN HEIGHT "H" LENGTH EXPANSION JOINT "SW-1" LOL MEASURED ALONG NOTES 1 & 4 CAP, SEE TOP OF PILE Hwy 178 OLIVE StSEE NOTE 6 Elev=400.42± 6" AT&T FO, SEE NOTE 6 Elev=401.45± 6" AT&T FO, LINE, NOTE 6 6" AT&T FO WATER LINE 12" Cal W GAS LINE 3" PG&E 3'-0" 16'-0" EQUAL SPACES 20'-0" EQUAL SPACES 11'-0" 13'-0" 10'-0" 25'-4" EQUAL SPACES 10'-0" 25'-8" EQUAL SPACES 8'-4" 12'-0" NOTES: 8. For LAYOUT OF "WB2" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL the top of pipe and bottom of wall. Minimum 6" clearance is required between Elevations shown refer to the top of pipe. utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, 464 153'-4" 153'-4" 8'-0" 3'-0" 1 BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, SOUND WALL WORK ONLY APPROVED FOR T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 06 Ker 0.2/R1.9178 4/06/18 09/30/18 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:04 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE0000 06000004851Karen ChapmanDina TobiaNardin Metwashla477 A SPH ASPHSCALE AS SHOWN PLAN 1"=10' 11+00 DATUM Elev 380.00 EXPANSION JOINT DESIGN HEIGHT "H" "SW-2 LOL MEASURED ALONG SW No. 2 BEGIN LENGTH SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, SEE NOTE 4 TOP OF WALL, 10+00 Typ, SEE NOTE 2 16"x24" PILASTER SOUND WALL No.2 12+00 3 EQUAL SPACES = 39'-0" 3'-0" PILE SPACING "SW-2" LOL MEASURED ALONG 10+00 11+00 12+00 10+22.00 10+44.00 10+66.00 11+08.66 11+29.33 11+50.00 10+88.00 PI 11+70.00 PI 11+94.00 PI N85°32'35"E"SW-2" LOL S89°59'18"E N41°40'29"E 317'-4" (MEASURED ALONG "SW-2" LOL) 42'-8"39'-4"44'-0"46'-0"22'-0" H=14' 90'-0" H=16' 82'-0" 19'-0" EQUAL SPACES MATCH LINE STA 12+00H=14' 24'-0"MATCH LINE STA 12+00S83°06'10"E Typ, SEE NOTE 5 8"X4"X16" BLOCKS Typ, SEE NOTE 2 16"x24" PILASTERS Sta 323+26.05 65.50' Rt "EB2" LINE 10+00 "SW-2" LOL= H=16' 121'-4" 30'-8" SEE NOTE 6 Elev=402.31± 4" WATER, SEE NOTE 6 Eev=401.8± 2" GAS, SEE NOTE 6 Elev=402.75± AT&T DUCT, 11+50 LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 B15-5 SEE NOTE 6 Elev=401.5± 8" WATER, LOCATION) PILASTER STEP (MATCH DEVELOPED MIRROR ELEVATION 1"=10' B15-5 B15-2 NOTES 1 & 4 CAP, SEE TOP OF PILE CARRIE R CANALNOTE 5 SEE WATER LINE 4" Cal W GAS LINE 2" PG&E WATER LINE 8" Cal W FO LINE AT&T 9'-0" 3 EQUAL SPACES = 34'-0" 9'-0" 12'-0" 9'-4" 34'-0" 3 EQUAL SPACES 8'-8" 13'-0" 9'-0" NOTES: "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "EB2" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL the top of pipe and bottom of wall. Minimum 6" clearance is required between Elevations shown refer to the top of pipe. utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, 465 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:05 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 p SCALE AS SHOWN PLAN 1"=10' 13+00 DATUM Elev 380.00 SEE NOTE 3 Approx OG, SOUND WALL No.2 12+00 Typ, SEE NOTE 2 16"x24" PILASTER SEE NOTE 3 Approx FG, SEE NOTE 4 TOP OF WALL, EXPANSION JOINT DESIGN HEIGHT "H" "SW-2" LOL MEASURED ALONG LENGTH SW No. 2 END H=16' 13+0012+00 12+22.67 12+54.00 PI12+52.00 12+84.00 PI S83°06'11"ES89°14'08"E N83°06'10"E "SW-2" LOL PILE SPACING "SW-2" LOL MEASURED ALONG 317'-4" (MEASURED ALONG "SW-2" LOL) 121'-4" 3'-0"MATCH LINE STA 12+00MATCH LINE STA 12+00Sta 326+32.50 65.08' Rt "EB2" LINE 13+17.33 "SW-2" LOL Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS 29'-4" 32'-0" 31'-4"30'-8" DEVELOPED MIRROR ELEVATION 1"=10' B15-5 NOTES: 8. For LAYOUT OF "EB2" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, B15-2 NOTES 1 & 4 CAP, SEE TOP OF PILE LOCATION) PILASTER STEP (MATCH B15-5 NOTE 5 SEE WATER LINE 4" Cal W 20'-8" 2 EQUAL SPACES 19'-4" EQUAL SPACES 23'-4" EQUAL SPACES 10'-0" 10'-0" 22'-0" EQUAL SPACES 10'-0" 466 13+20.53 326+35.70 1 320'-6 3/8" 124'-6 3/8" 34'-6 3/8" 3 26'-6 3/8" 1 1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:06 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT ASPHSCALE AS SHOWN PLAN 1"=10' 11+00 DATUM Elev 380.00 EXPANSION JOINT DESIGN HEIGHT "H" "SW-3" LOL MEASURED ALONG SW No. 3 BEGIN LENGTH SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, SEE NOTE 4 TOP OF WALL, 10+00 Typ, SEE NOTE 2 16"x24" PILASTER SOUND WALL No.3 12+00 H=16' PILE SPACING "SW-3" LOL MEASURED ALONG 3'-0" 10+00 "SW-3" LOL 10+23.33 11+00 10+46.66 10+70.00 10+93.33 11+16.00 11+16.67 PI 11+17.33 PI 11+38.00 11+59.33 11+80.67 N81°52'35"E N81°52'35"EN08°07'25"W 12+00 MATCH LINE STA 12+00MATCH LINE STA 12+00324'-0" (MEASURED ALONG "SW-3" LOL) 44'-8"46'-8"25'-4"44'-0" 276'-0" Sta 326+58.35 64.72' Rt "EB2" LINE 10+00 "SW-3" LOL Typ, SEE NOTE 5 8"X4"X16" BLOCKS Typ, SEE NOTE 2 16"x24" PILASTERS 42'-0" 8" 10+90 11+80 LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 DEVELOPED MIRROR ELEVATION 1"=10'BEECH StB15-5 NOTES: "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "EB2" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, NOTES 1 & 4 CAP, SEE TOP OF PILE B15-2 NOTE 5 SEE WATER LINE 4" Cal W SEWER LINE 6" Conc GAS LINE 2" PG&E 3 EQUAL SPACES = 32'-8" 17'-4" EQUAL SPACES 10'-0" 3 EQUAL SPACES = 36'-8" 10'-0" 3 EQUAL SPACES = 34'-8" 10'-8" 3 EQUAL SPACES = 34'-0" 10'-0" 467 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:07 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 24TH ST SCALE AS SHOWN PLAN 1"=10' 13+00 DATUM Elev 380.00 SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, SEE NOTE 4 TOP OF WALL, 12+00 SOUND WALL No.3 EXPANSION JOINT DESIGN HEIGHT "H" "SW-3" LOL MEASURED ALONG LENGTH SW No. 3 END H=14' Typ, SEE NOTE 2 16"x24" PILASTER 13+0012+00 12+26.00 12+50.00 12+74.00 12+98.00 12+02.00 N81°52'35"E"SW-3" LOL 12+03.33 PI 12+04.00 PI PILE SPACING "SW-3" LOL MEASURED ALONG 3'-0" 324'-0" (MEASURED ALONG "SW-3" LOL) 48'-0"48'-0"24'-0"MATCH LINE STA 12+0048'-0" H=16' 276'-0" Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS MATCH LINE STA 12+00S08°07'25"E LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 12+40 8" 42'-0" DEVELOPED MIRROR ELEVATION 1"=10' B15-5 NOTES: "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "EB2" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, 13+01.40 BC Sta 329+82.85 56.92' Rt "EB2" LINE 13+24.00 "SW-3" LOL = EC No. 1408.97' R T L 00°54'38"11.18'22.36'1 1 NOTES 1 & 4 CAP, SEE TOP OF PILE B15-2 NOTE 5 SEE LOCATION) PILASTER STEP (MATCH B15-5 WATER LINE 4" Cal W SEWER LINE 6" Conc GAS LINE 2" PG&E WATER LINE 8" Cal W GAS LINE 4" PG&E 16'-0" EQUAL SPACES 10'-0" 38'-0" 3 EQUAL SPACES 10'-0" 38'-0" 3 EQUAL SPACES 10'-0" 468 329'-5" 53'-5" 29'-5" 21'-5" 13+29.43 56.66' 329+88.48 WOODEN FENCE EXTEND EXISTING SIDE ACCESS. FURNISHED SWING GATE FOR AND EXISTING). INSTALL OWNER (CMU TO MATCH BACK WALL CONSTRUCT SIDE WALL 1 1 1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:08 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT ASPH SCALE AS SHOWN PLAN 1"=10'SOUND WALL No.4 EXPANSION JOINT DESIGN HEIGHT "H" "SW-4" LOL MEASURED ALONG SW No. 4 BEGIN LENGTH H=14' 140'-8" (MEASURED ALONG "SW-4" LOL) SEE NOTE 4 TOP OF WALL, SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, 10+00 DATUM Elev 380.00 11+00 Typ, SEE NOTE 2 16"x24" PILASTER 10+00 11+00 PILE SPACING "SW-4" LOL MEASURED ALONG 3'-0"3'-8" No. 568.30' R T L 07°39'44"38.06'76.00' 571.33'06°17'04"31.36'62.67' 10+16.67 10+36.00 10+55.33 10+74.67 10+97.33 11+18.00 10+76.00 PI 10+78.00 PI 1 2 2 "SW-4" LOL 1 Sta 343+93.52 28.98' Rt "23RD" LINE 10+00 "SW-4" LOL=BC Sta 345+39.00 28.68' Rt "23RD" LINE 11+40.66 "SW-4" LOL=EC S11°32'22"W Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS SW No. 4 END 38'-0"38'-0"20'-8"42'-0" LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 B15-5 NOTES: 10+80 2'-0" NOTES 1 & 4 CAP, SEE TOP OF PILE DEVELOPED MIRROR ELEVATION 1"=10' B15-5 STEP "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "23RD" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, NOTE 5 SEE B15-2 WATER LINE 4" Cal W SEWER LINE 6" Conc GAS LINE 2" PG&E WATER LINE 8" Cal W 18'-0" EQUAL SPACES 12'-0" 40'-0" 4 EQUAL SPACES 28'-0" 3 EQUAL SPACES 36'-0" 3 EQUAL SPACES 469 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:09 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SCALE AS SHOWN PLAN 1"=10'SOUND WALL No.5 10+00 11+00 12+00 EXPANSION JOINT DESIGN HEIGHT "H" "SW-5" LOL MEASURED ALONG SW No. 5 BEGIN LENGTH 10+00 11+00 12+00 SEE NOTE 4 TOP OF WALL, SEE NOTE 3 Approx FG, NOTES 1 & 4 CAP, SEE TOP OF PILE DATUM Elev 380.00 H=14' No. 571.33' R T L 21°00'10"1 10+22.00 10+44.00 10+66.00 10+88.00 11+10.00 11+54.001 "SW-5" LOL MATCH LINE STA 12+00397'-11" (MEASURED ALONG "SW-5" LOL) Sta 345+49.76 28.67' Rt "23RD" LINE 10+00 "SW-5" LOL = BC MATCH LINE STA 12+00Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 SEE NOTE 6 Elev = 397.61±, 6" WATER, PILE SPACING "SW-5" LOL MEASURED ALONG SEE NOTE 3 Approx OG, DEVELOPED MIRROR ELEVATION 1"=10' B15-5 Typ, SEE NOTE 2 16"x24" PILASTER SEE NOTE 6 Elev = 398.38±, 2" GAS, WATER LINE 6" Cal W GAS LINE 2" PG&E GAS LINE 2" PG&E 209.43' B15-5 LOCATION) PILASTER STEP (MATCH SEE NOTE 5 B15-2 NOTES: "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "23RD" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL the top of pipe and bottom of wall. Minimum 6" clearance is required between Elevations shown refer to the top of pipe. utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, 105.90' 11+32.00 11+76.00 52'-0"15'-0" 11'-0"3 EQUAL SPACES 39'-0" 9'-0"8'-0"9'-0"8 EQUAL SPACES 397'-11" 3'-0" 4 EQUAL SPACES SPACES 2 EQUAL 24'-0"44'-0"44'-0"44'-0"44'-0"11+0011+98.00 104'-0" x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:10 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES0600000485re001.dgn imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE Sound Wall work only This plan accurate for T.Y. LIN INTERNATIONAL 404 CAMINO DEL RIO SOUTH, SUITE 700 SAN DIEGO, CA 92108 BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, XXXX XXXXXXXxxKumar GhoshxxCONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 06 Ker 178 Nardin Metwashla C85513 09/30/18 4/06/18 0.2/R1.9 470 477 SCALE AS SHOWN PLAN 1"=10'SOUND WALL No.5 No.R T L 628.67'06°03'21"33.25' 1 2 571.33'21°00'10"209.43' 68.45' EXPANSION JOINT DESIGN HEIGHT "H" "SW-5 LOL MEASURED ALONG LENGTH SW No. 5 END H=14' Typ, SEE NOTE 2 16"x24" PILASTER PILE SPACING "SW-5" LOL MEASURED ALONG SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, SEE NOTE 4 TOP OF WALL, 14+0013+00 DATUM Elev 380.00 13+00 12+00 "SW-5" LOL 2 S50°08 '40"E 397'-11" (MEASURED ALONG "SW-5" LOL) 12+00MATCH LINE STA 12+00397'-11"MATCH LINE STA 12+00Typ, SEE NOTE 2 16"x24" PILASTERS Typ, SEE NOTE 5 8"X4"X16" BLOCKS LEGEND: 8"X8" Opening for Kit Fox, NOTE 9 13+0012+00 SEE NOTE 6 Elev = 398.49± 2" GAS, SEE NOTE 6 Elev = 398.11± 6" WATER, SEE NOTE 6 Elev = 397.48± 6" SEWER, B15-5 DEVELOPED MIRROR ELEVATION 1"=10' 12+09.43 EC WATER LINE 4" Cal W SEWER LINE 6" Conc GAS LINE 2" PG&E B15-2 SEE NOTE 5 NOTES 1 & 4 CAP, SEE TOP OF PILE B15-5 STEP , Typ NOTES: "WALL DETAILS NO.2" sheet. 9. For wall opening details, see "WALL OPENING" on 8. For LAYOUT OF "23RD" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL the top of pipe and bottom of wall. Minimum 6" clearance is required between Elevations shown refer to the top of piles. utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, 471 1 105.90' 12+20.00 12+42.00 13+29.43 BC 12+64.00 12+86.00 13+08.00 13+52.00 13+74.00 13+30.00 44'-0"44'-0"44'-0"44'-0" 3'-0" 13'-0"8'-0"8 EQUAL SPACES 17'-0" 3 EQUAL SPACES 39'-0"18'-0" 4 EQUAL SPACES 52'-0" SPACES 2 EQUAL SPACES 2 EQUAL 23'-11" 104'-0" Sta 349+55.06 28.67' Rt "23RD" LINE 13+97.91 "SW-5" LOL = EC 7/27/2018 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:11 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 ASPHSCALE AS SHOWN PLAN 1"=10' 11+00 DATUM Elev 380.00 EXPANSION JOINT DESIGN HEIGHT "H" "SW-6" LOL MEASURED ALONG SW No. 6 BEGIN LENGTH SEE NOTE 3 Approx FG, SEE NOTE 3 Approx OG, SEE NOTE 4 TOP OF WALL, 10+00 Typ, SEE NOTE 2 16"x24" PILASTER SOUND WALL No.6 11+0010+00 10+17.33 10+34.67 10+74.67 N00°50'06"E S89°10'36"E SW No. 6 END "SW-6" LOL MEASURED ALONG PILE SPACING "SW-6" LOL 3'-0" 100'-0" (MEASURED ALONG "SW-6" LOL) H=14' 100'-0" 48'-0" 52'-0" 3'-0" Sta 362+22.83 92.85' Rt "23RD" LINE 10+00 "SW-6" LOL Sta 362+70.94 40.86' Rt "23RD" LINE 11+00 "SW-6" LOL Typ, SEE NOTE 5 8"X4"X16" BLOCKS Typ, SEE NOTE 2 16"x24" PILASTERS10+52.00 PI B15-5 SEE NOTE 5 NOTES 1 & 4 CAP, SEE TOP OF PILE B15-2 NOTES: 8. For LAYOUT OF "23RD" LINE, see "ROADWAY PLANS". location see "SOUND WALL DETAILS No.1" sheet. 7. For sound wall "TYPICAL SECTION" and wall LOL utilities before installation of CIDH piles. 6. Contractor shall verify locations of existing DETAILS No. 2" sheet. 5. For sound wall details see, "SOUND WALL cap, see "SOUND WALL DETAILS No.1" sheet. 4. For elevations at top of sound wall and pile "SOUND WALL DETAILS No.1" sheet. 3. For Approx OG and FG elevations, see DETAILS No.4" sheet. 2. For PILASTER DETAILS, see "SOUND WALL see "SOUND WALL DETAILS No.3" and 1. For PILE CAP AND PILE DETAILS, WATER LINE 4" Cal W SEWER LINE 6" Conc GAS LINE 2" PG&E SEWER LINE 6" Conc DEVELOPED MIRROR ELEVATION 1"=10' 26'-0" EQUAL SPACES 11'-0" 18'-0" EQUAL SPACES 39'-0" 3 EQUAL SPACES 472 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:12 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 SCALE AS SHOWN DEVELOPED ELEVATION 1"=10' PLAN 1"=10'SOUND WALL No.8 TYPICAL SECTION ƒ"=1'-0" 10+00 11+00 DATUM Elev 380.00 48'-0"48'-0"EXPANSION JOINT DESIGN HEIGHT "H" "SW-8" LOL MEASURED ALONG SW No. 8 BEGIN LENGTH SW No. 8 END 164'-2•" (MEASURED ALONG "SW-8" LOL) SEE NOTE 2 Approx FG, SEE NOTES 1 AND 3 TOP OF FOOTING, 11+00 3'-0"1'-0"Min6"Approx FGApprox OG "H"DETAILS, SEE FOR SOUND WALL B15-1 TOP OF WALL BLOCKS 8"X4"X16" PG = TOP OF FOOTING 10+00 11+00 Sta 349+62.87 20.41' Rt "23RD" LINE 10+00 "SW-8" LOL "SW-8" LOL Typ, SEE NOTE 5 8"X4"X16" BLOCKS "SW-8" LOL 48'-0" H=6' SEE NOTE 2 Approx OG, SEE NOTE 3 10+12.88 BC 10+33.61 EC 10+75.73 BC 11+18.33 PRC Sta 351+19.00 32.33' Rt "23RD" LINE 11+64.21 "SW-8" LOL EC No. 559.528' R T L 10.37' 203.421'11°59'49"21.37' 1 2 20.73' 632.33'22.95'3 2°07'23" 42.59' 4°09'26"45.88' 1 2 3 S54°44'51"E 10+54.59 IP S52°58'25"E S54°55'10"E 12"X4"X16" CAP SEE NOTE 3 TOP OF WALL,SEE NOTE 5 SEE NOTE 6 Elev = 395.10± 18" STORM DRAIN EACH BOND BEAM #5 Cont AT CENTERS BELOW, SEE NOTE 7 JOINT AT TOP AND AT 4'-0" Max INVERTED WITH A …" MORTAR DEEP OPENING), SECOND COURSE BOND BEAM 2-(8"X4"X16"X1" LEGEND: 8"X8" Opening for Kit Fox, Note 5 B15-1 B15-2 NOTES: No grout joint allowed at bond beam location. 7. The 2 bond beam units must be grouted together. the top of pipe and bottom of wall. Minimum 6" clearance is required between Elevations shown refer to top of the pipe. utilities before installation of CIDH piles. 6. Contractors shall verify locations of existing on "WALL DETAILS NO.2" sheet. 5. For wall opening details see "WALL OPENING" 4. For layout of "23RD" LINE, see "ROADWAY PLANS". see "SOUND WALL DETAILS No.1" sheet. 3. For elevations at top of Soundwall and footing, see "SOUND WALL DETAILS No.1" sheet. 2. For Approx OG and FG elevations, 1. For Sound Wall Footing, see and . 473 a 5. Add Mortar Cap. described in "TYPICAL SECTION". Deep Opening) with #5 Cont bar, as 4. Add Bond Beam 2-(8"x4"x16"x1" 3. Add 1'-8"x4"x16" Block. 2'-0" into Existing Grout. per Caltrans Std Plan B15-1. Embed 2. Drill and Bond #4 Bars at 1'-4" 1. Remove Mortar Cap. No. 8 to 6 feet, To increase the height of Sound Wall MORTAR CAP INTO EXISTING GROUT BARS, EMBED 2'-0" DRILL AND BOND a 8"X4"X16" BLOCKS 1 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:13 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT SOUND WALL ELEVATIONS SOUND WALL DETAILS No. 1 SCALE AS SHOWN Approx OG AT BOTTOM OF WALL FULL MORTAR BED PILE CAP PG = TOP OF TOP OF WALL FG Approx "SW" LOL 2'-3" Max6" Min3'-11" Max0" MinSTREET SIDE SIDE PROPERTY PRIVATE TYPICAL SECTION ƒ"=1'-0" OG Approx H = VARIES, SEE LAYOUT SHEETS"SW-8" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-8" LOL 11+64.21 11+50.00 11+25.00 11+00.00 10+75.00 10+50.00 10+25.00 10+00.00 398.929 398.918 398.899 398.927 399.009 399.147 399.295 399.423 398.929 398.918 398.899 398.927 399.009 399.147 399.295 399.423 398.33 398.33 398.33 398.33 398.33 398.33 398.33 398.33 403.33 403.33 403.33 403.33 403.33 403.33 403.33 403.33 "SOUNDWALL NO. 8" sheet. For SW NO. 8 TYPICAL SECTION, see NOTE: "ROADWAY PLANS" LIMITS (5'-0") SEE Approx GRADING Approx FG MORTAR CAP "SW-2" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-2" LOL 13+17.33 13+00.00 12+84.00 12+75.00 12+50.00 12+25.00 12+00.00 11+94.00 11+75.00 11+70.00 11+50.00 11+25.00 11+00.00 10+75.00 10+50.00 10+25.00 10+00.00 406.19 406.37 406.50 406.53 406.59 406.68 406.74 406.75 407.03 407.05 407.04 406.96 406.88 406.80 406.72 406.70 406.67 404.20 404.27 404.34 404.37 404.47 404.58 404.68 404.70 404.68 404.68 404.68 404.50 404.79 405.55 405.86 406.18 406.49 403.67 403.67 403.67 403.67 403.67 403.67 404.00 405.00 405.00 404.00 404.00 404.00 404.67 405.00 405.00 405.00 405.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 419.00 "SW-3" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-3" LOL 13+24.00 13+00.00 12+75.00 12+50.00 12+25.00 12+04.00 12+03.33 12+00.00 11+75.00 11+50.00 11+25.00 11+16.67 11+00.00 10+75.00 10+50.00 10+25.00 10+00.00 402.10 402.39 402.69 402.98 403.27 403.50 403.51 403.55 403.84 404.13 404.41 404.51 404.71 405.00 405.31 405.61 405.92 401.78 401.94 402.13 402.32 402.50 402.66 402.66 402.69 402.68 402.66 402.64 402.65 402.67 402.70 402.74 402.77 402.80 401.25 401.25 401.25 401.25 401.25 402.00 402.00 402.00 402.00 402.00 402.00 402.00 402.00 402.00 402.00 402.00 402.00 414.58 414.58 415.58 415.58 415.58 416.33 416.33 416.33 416.33 416.33 417.00 417.00 417.00 417.00 418.00 418.00 418.00 "SW-4" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-4" LOL 11+40.66 11+25.00 11+00.00 10+78.00 10+75.00 10+50.00 10+25.00 10+00.00 401.91 401.91 401.89 401.85 401.82 401.76 401.68 401.58 401.38 401.58 401.69 401.77 401.68 401.12 400.95 400.83 400.83 400.83 400.83 400.83 400.83 400.33 400.33 400.33 414.83 414.83 414.83 414.83 414.83 414.33 414.33 414.33 "SW-1" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-1" LOL 11+57.33 11+53.33 11+50.00 11+37.33 11+25.00 11+00.00 10+83.33 10+75.00 10+68.00 10+50.00 10+25.00 10+00.00 405.19 405.23 405.29 405.21 404.96 404.78 404.67 404.66 404.65 404.59 404.54 404.52 405.17 405.05 405.04 404.84 404.73 404.56 404.44 404.74 405.10 405.01 405.15 404.52 404.00 404.00 404.00 404.00 404.00 404.00 404.00 404.00 404.00 404.00 404.00 404.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 418.00 "SW6" LINE Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-6" LOL 11+00.00 10+75.00 10+52.00 10+50.00 10+25.00 10+00.00 401.76 401.09 400.38 400.41 401.07 401.02 401.76 401.09 400.38 400.41 401.07 401.02 399.50 399.50 399.50 399.50 399.50 399.50 413.50 413.50 413.50 413.50 413.50 413.50 "SW-5" LOL Sta (Ft) Approx FG (Ft) Approx OG (Ft) PG (Ft) TOP OF WALL "SW-5" LOL 10+00.00 10+25.00 10+50.00 10+75.00 11+00.00 11+25.00 11+50.00 11+75.00 12+00.00 12+25.00 12+50.00 12+75.00 13+00.00 13+25.00 13+50.00 13+75.00 401.86 401.84 401.80 401.71 401.58 401.46 401.34 401.16 400.92 400.74 400.56 400.38 400.20 400.01 399.85 399.74 399.62 401.00 401.00 401.00 401.00 401.00 399.00 399.00 399.00 415.00 415.00 415.00 415.00 415.00 413.00 413.00 413.00 413.00 413.00 413.00 413.00 474 13+97.91 401.86 401.84 401.80 401.71 401.58 400.88 400.71 400.53 400.24 400.42 400.55 400.47 400.29 400.08 399.78 399.77 399.37 413.75 413.75 413.00 413.75 413.00 399.75 399.75 399.75 399.75 400.75 399.75 399.00 399.00 399.00 7/27/2018 404.33 404.33 404.33 404.33 404.33 404.33 404.33 404.33 1 BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, SOUND WALL WORK ONLY APPROVED FOR T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 06 Ker 0.2/R1.9178 4/06/18 09/30/18 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 1 10/01/21 REVISION DATE DESCRIPTION AS BUILT No. 3" sheet DETAILS "SOUND WALL PILE DETAILS, SEE FOR PILE CAP AND No. 2" sheet SEE "SOUNDWALL DETAILS FOR SOUNDWALL DETAILS x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:14 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE0000 06000004851Karen ChapmanDina TobiaNardin Metwashla477 "S" 5'-0" Max 1'-6" Min Approx PILE SPACING • PILE DETAIL D FG 8" Typ b bars a bars 2'-10"LIMITS OF "SECTION A-A"b BARS a BARS OG Approx #5 SW LOL BOND BEAM #5 Cont AT EACH FOR LOCATION SEE OTHER SHEETS EXPANSION JOINTS. B-B""SECTION LIMITS OF TYPICAL SECTION NO SCALE ELEVATION NO SCALE 2. 3. 4. NOTES: 5. 6. Approx FG Approx OG ELEVATION PILASTER NO SCALE 8"2'-0" THROUGH PILASTER AND #5 REINFORCEMENT CONTINUE BOND BEAM 8"x4"x16" BLOCKS, TYP a WITHIN LIMITS OF PILASTER FROM TOP OF PILASTER CAP BARS TO BE EXTENDED TO 2" SOUND WALL DETAILS No. 2 SCALE AS SHOWN SHEET WALL DETAILS No. 3" DETAILS, SEE "SOUND FOR END OF WALL WALL No. 5 No. 3, WALL No. 4 AND AT TOP OF WALL FOR WALL Reinf EXTENSION FOR STEP 4'-0" Min BOND BEAM AND No. 3" SHEET "SOUNDWALL DETAILS PILASTER CAP, SEE No. 4" SHEET "SOUNDWALL DETAILS DETAILS, SEE FOR PILASTER VARIES"Y""H"1. B15-5 B15-5 B15-5 (H=12'-0" THRU 16'-0") B15-5 OPENING DETAIL 1"=1'-0" 8"x4"x16" BLOCKS, TYPSOUND WALL Reinf FG OR FOOTING TOP OF PILE CAP 1'-3"Tot 2 EACH SIDE #5 X 3'-0" CENTERED OVER OPENING #5 X 4'-0" Tot 2 7. 8. Full mortar bed at bottom of wall. B15-3 B15-4 For details not shown, see and FG Approx 2" MORTAR CAP SEE NOTE 9 8"X8" OPENING OPENING, SEE NOTE 10 PLATE CENTERED OVER 18"X14" 12 Ga STEEL TOP BOND BEAM 1-(8"x4"x16"x…" DEEP OPENING), 4'-0" Max CENTERS BELOW, SEE NOTE 8 WITH A …" MORTAR JOINT AT TOP AND AT DEEP OPENING), SECOND COURSE INVERTED INTERMEDIATE BOND BEAM 2-(8"x4"x16"x1" on each side. The steel plate to be bolted to the masonry block with 2 - 3/8" Á studs The bottom of the opening to be at finished grade. No grout joint allowed at bond beam location. The 2 bond beam units must be grouted together. For FG, OG AND TOP OF PILE CAP Elev, see "SOUNDWALL DETAILS No. 1" sheet. For pile spacing, see soundwall layout sheets. For "DETAIL D" and pile details, see For details not shown, see "SOUNDWALL DETAILS No. 3" and Masonry strengths are listed in "SOUNDWALL REINFORCEMENT TABLE". Horizontal and vertical joints shall be tooled concave. All blocks shall be laid in running bond. DETAILS, SEE FOR PILE CAP AND PILE 9. 10. 475 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:15 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 PILASTER ALONG WALL PILASTER AT CORNERPILASTER AT END WALL DETAILS AT PILASTER •"=1'-0"3" "L"PAYMENTLENGTH OF1'-9"4" Clr9"9" #4 PILE CAP#4 ALTERNATE TAILS #5 TOTAL 7 Approx OG, NOTE 3 FG, NOTE 3 Approx PILE CAP SECTION NO SCALE DETAILS No. 4" SHEET WALL" ON "SOUND WALL SEE "PILASTER DETAIL ALONG SW LOL SW LOL No. 4" SHEET ON "SOUND WALL DETAILS AT EXPANSION JOINT" SEE "PILASTER DETAIL SHEETS FOR LOCATION SEE WALL LAYOUT EXPANSION JOINT. • BLOCK CELL • PILE CAP = • PILE = • PILE PILE CAP TOP OF WITH #5 BOND BEAMS INTERMEDIATE 4'-0"±MORTAR CAP 4'-0"BOND BEAMS #5 Cont AT END OF WALL DETAILS NO SCALE FG, NOTE 3 Approx PILASTER CAP - PLAN NO SCALE ELEVATION PILASTER CAP - MORTAR CAP PILASTER CAP PRECAST OR CIP a BARS SOUNDWALL REINFORCEMENT LOCATION OF HOLES WITH CAP OPTION. COORDINATE 2" HOLES FOR PRECAST Typ 1" Clr PILE CAP LIMITS OF "END OF WALL DETAILS" DETAILS No. 4" SHEET AND WALL END" ON "SOUND WALL SEE "PILASTER DETAIL AT NO SCALE WIRE REINFORCEMENT 4 x 4 - W 4.0 x 4.0 WELDED4"8"SCALE AS SHOWN 3"SHRINK GROUT HOLES WITH LOW OPTION, FILL 2" FOR PRECAST CAP 2'-4" 2'-9" Var 2'-4" TO 2'-9"TO 2'-1"Var 1'-8" SOUND WALL DETAILS No. 3 NOTES: 1. 2. 3. 4. measured along the SW LOL. Pile spacing shown on the wall layout sheets shall be DETAILS No. 4" sheet. For pilaster details not shown, see "SOUND WALL DETAILS No. 1" sheet. For FG, OG AND TOP OF PILE CAP Elev, see "SOUND WALL with a 6" tail hooked around a longitudinal bar. splices and at ends shall be terminated with a 135° hook at least 80 wire diameters. Spiral reinforcement at Lapped splices in spiral reinforcement shall be lapped For Case 1, = 25 Min. "SOUND WALL DETAILS No. 2" and For pile details not shown, see 5. B15-5 • PILE • PILE • PILE • PILE • PILE Max 5'-0" SW LOL NOTE 1 CIDH PILE, 476 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:17 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21 PILASTER DETAIL ALONG WALL ƒ"=1'-0" SECTION F-F ƒ"=1'-0" FOOTING DETAIL AT CORNER ƒ"=1'-0" DETAIL AT WALL CORNER ƒ"=1'-0"6"LIMITS OF PILE CAP AT EACH BOND BEAM #5 OR BLOCKS 8"X4"X16" a b NOTE 2 SEE "DETAIL D", #4 PILE CAP LIMITS OF PILASTER LIMITS OF Tot 3 WITHIN #4 SEE NOTE 2 #5 PILE CAP Reinf, BLOCKS PILASTER SW LOL SW LOL SW LOL #4 Tot 4 #4 1'-6"Reinf PILE CAP TYPICAL Tot 4 #4 1'-6" SEE NOTE 2 #5 OR #6 PILE CAP Reinf,6"3" a b PILASTER DETAIL AT WALL END ƒ"=1'-0" 3"6"a b LIMITS OF PILE CAP AT EACH BOND BEAM #5 OR LIMITS OF PILE CAP BLOCKS 8"X4"X16" BLOCKS 8"X4"X16" F F F BOND BEAM AT EACH #4 BOND BEAM AT EACH #4 2'-3" SW LOL SW LOL NOTE 4 PILE CAP LIMITS OF PILE CAP LIMITS OF 2'-6" AT EACH BOND BEAM #5 Cont F NOTE 4 SW LOL BLOCKS 8"X4"X16" a a NOTES: 5. 4. 3. 2. 1. BLOCKS 8"X4"X16"6"3" ba a b F F PILE CAP LIMITS OFPILE CAP LIMITS OF AT CORNER ALONG WALL6"3" PILE CAP LIMITS OF a b PILASTER DETAIL AT EXPANSION JOINT ƒ"=1'-0" BLOCKS 8"X4"X16"BLOCKS 8"X4"X16" PILE CAP LIMITS OF BOND BEAM AT EACH #4 BOND BEAM AT EACH #4 AT EACH BOND BEAM #5 LIMITS OF PILE CAP JOINT EXPANSION JOINT EXPANSION AT CORNERS 2'-0" HOOK, Typ NOTE 4 SW LOL BOND BEAM AT EACH #5 BOND BEAM AT EACH #5 SW LOL BOND BEAM AT EACH #5 NOTE 4 BLOCKS 8"X4"X16" BLOCKS 8"X4"X16"a a SOUND WALL DETAILS No. 4 B15-5 PILE CAP For pilaster cap details, see "SOUND WALL DETAILS No. 3" SHEET. Vertical bars 1" clear from cell wall. DETAILS No. 1" sheet. For FG, OG AND TOP OF PILE CAP Elev, see "SOUND WALL "SOUND WALL DETAILS No. 3" . For pile cap details not shown, see and DETAILS No. 2" sheet. For wall details not shown, see "SOUND WALL 3"6"a b 2'-6" LIMITS OF PILE CAP SW LOL BLOCKS 8"X4"X16" SW LOL AT SHORT CORNER STATION 12+02 SIMILAR SOUND WALL No. 3 STATION 11+16 SHOWN, AT EACH BOND BEAM #5 Cont PILE CAP PILE CAP LIMITS OF a NOTE 4 477 x x x x x Dist COUNTY ROUTE POST MILES TOTAL PROJECT SHEET No. TOTAL SHEETS LAST REVISIONSTATE OF CALIFORNIA - DEPARTMENT OF TRANSPORTATIONNo. Exp. CIVILREGISTEREDPROFESS I ONAL E NGI NEERST ATEOF CALIFORNIA REGISTERED CIVIL ENGINEER TIME PLOTTED =>DATE PLOTTED =>8:38:18 PM12/17/2021CHECKED BYDESIGNED BYCALCULATED-REVISED BYDATE REVISEDPLANS APPROVAL DATE DATE CONSULTANT FUNCTIONAL SUPERVISORRCOPIES OF THIS PLAN SHEET. THE ACCURACY OR COMPLETENESS OF SCANNED OR AGENTS SHALL NOT BE RESPONSIBLE FOR THE STATE OF CALIFORNIA OR ITS OFFICERS RPen Table =>$PLTDRVS$Driver Name =>$PENTBLS$$SCALE$SCALE:=>00-00-00BORDER LAST REVISED 7/2/2010 USERNAME => DGN FILE => RELATIVE BORDER SCALE IS IN INCHES imartin 0 1 2 3 UNIT PROJECT NUMBER & PHASE BAKERSFIELD, CA 93301 1600 TRUXTUN AVENUE CITY HALL NORTH CITY OF BAKERSFIELD, 0000 SOUND WALL WORK ONLY APPROVED FOR 06000004851 T.Y. LIN INTERNATIONAL SAN DIEGO, CA 92108 404 CAMINO DEL RIO SOUTH, SUITE 700 Karen ChapmanDina TobiaNardin Metwashla06 Ker 0.2/R1.9178 4/06/18 09/30/18 477 Nardin Metwashla C85513 CONTRACT No. R.E. NAME AS BUILT C.C.A. DATE 06-484704 RYAN WILSON 10/01/21