HomeMy WebLinkAboutFMC 2021 RESULTS$SSHQGL[9,
8QGHUJURXQG6WRUDJH7DQN0RQLWRULQJ6\VWHP&HUWLILFDWLRQ)RUP
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION Installation Repair 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of PagesTech
✔
10-27-21
255866 UPS
3800 SILLECT AVE BAKERSFIELD 93308
IDECO INC 714-279-2690
431 W BLUERIDGE AVE ORANGE CA 92865
RICH POQUETTE
744619
8814853 11-4-2022
VEEDER ROOT C23197 8-15-2023
VMI 4556 10-22-2023
10-27-21
(UPS - BAKERSFIELD)
10120222
8QGHUJURXQG6WRUDJH7DQN0RQLWRULQJ6\VWHP&HUWLILFDWLRQ)RUP
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; Monitoring System Set-up Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturers specifications?
Secondary containment systems are free of damage, debris, or liquid?
Are the audible and visual alarms operational?
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational?
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment?
The monitoring system set-up was reviewed, and proper settings confirmed?
Was the monitoring control panels backup battery v isually inspected, functionally
tested, and confirmed operational?
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment?
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected?
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) Sump UDC
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational?
Describe all answers marked No or Fail and prop osed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
VEEDER ROOT TLS 350 329.00
✔✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔✔
✔
✔
8QGHUJURXQG6WRUDJH7DQN0RQLWRULQJ6\VWHP&HUWLILFDWLRQ)RUP
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List Sensor ID as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
Describe all answers marked No or Fail and prop osed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
L2 409 87 ANNULAR
✔
L3 208 DIESEL STP
✔
L4 409 DIESEL ANNULAR
✔
L5 208 87 UDC
✔
L6 208 DIESEL UDC
✔
L1 208 87 UDC
✔
8QGHUJURXQG6WRUDJH7DQN0RQLWRULQJ6\VWHP&HUWLILFDWLRQ)RUP
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
3 GPH 0.1 GPH 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated?
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected?
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected?
For electronic LLDs, does the turbine automatically shut off when a release is
detected?
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected?
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test?
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks?
Were all items on the equipment manufacturers main tenance checklist completed?
Were all LLDs confirmed operational within regulatory requirements?
LLD ID LLD Model Lines Monitored Pass Fail
Describe all answers marked No or Fail and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
✔
✔
✔
✔
✔
✔
✔
✔
✔
✔
DIESEL MLLD DIESEL ✔
87 MLLD 87 ✔
8QGHUJURXQG6WRUDJH7DQN0RQLWRULQJ6\VWHP&HUWLILFDWLRQ)RUP
Page 5 of 6
8. IN-TANK GAUGING TESTING
Check this box if tank gauging is used only for inventory control.
Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults?
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational?
Was accuracy of systems product level readings tes ted?
Was accuracy of systems water level readings tested?
Were all probes reinstalled properly?
Were all items on the equipment manufacturers main tenance checklist completed?
Probe ID Probe Model Tanks Monitored Pass Fail
9. COMMENTS
Describe all answers marked No or Fail and prop osed remedy.
List all monitoring equipment either replaced or repaired.
✔
✔
✔
✔
✔
✔
DIESEL MAG 1 DIESEL ✔
87 MAG 1 87 ✔