HomeMy WebLinkAbout2022 - New Tank ELD (12-12-2022) UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:61-26212
Tanknology
7-11 #32376
11000 N. MoPac Expressway #500
Austin, TX 78759
9600 Brimhall Rd
Bakersfield, CA 93312
December 12, 2022
®
Final Test Date:IOTA Technicians:
Site Information CGRS Project No :61-26212 Installation Contractor Information
Facility:Customer Name:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Email:Phone/Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 12,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 42 60 359.86 87 TS PASS
S2 42 60 359.86 87 FS PASS
S3 42 60 359.86 91 TS PASS
S4 42 60 359.86 91 FS PASS
S5 42 60 359.86 DSL TS PASS
S6 42 60 359.86 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 38 28 32 147.39 OPW PASS
UDC2 38 28 32 147.39 OPW PASS
UDC3 38 28 32 147.39 OPW PASS
UDC4 38 28 32 147.39 OPW PASS
UDC5 38 28 32 147.39 OPW PASS
UDC6 38 28 32 147.39 OPW PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 32 73.14 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 320 PASS
91 PL NOV DW Fiberglass 2 300 PASS
DSL PL NOV DW Fiberglass 2 240 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 60 PASS
91 Vent NOV DW Fiberglass 2 90 PASS
DSL Vent NOV DW Fiberglass 2 75 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 310 PASS
Reviewed By Date IOTA Tech Signature Date
12/12/2022
CA License No.
12/12/2022 06-1727
9600 Brimhall Rd 4583 E. Eisenhower Circle
Anaheim, CA 92807
COMPONENTS IN CONTAINMENT
Kern Gary Redfern
lpreece@bakersfieldfire.us; mwmoore@bakersfieldfire.us; parmagost@bakersfieldfire.us 714-497-5812/gredfern@rdbuilders.com
Leak Logs / Repair
Bakersfield, CA 93312
PIPING
TANKS
Final ELD Test Project Worksheet
12/12/2022
7-11 #32376 RD Builders
Sergio L. Nunez
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
12/12/2022
Date
12/12/2022
Date
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
9600 Brimhall Rd Sergio L. Nunez
Bakersfield, CA 93312
Test Certification
Post Installation Enhanced Leak Detection (ELD)
61-26212
7-11 #32376 December 12, 2022
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the
iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code,Chapter 6.7,section 25290.1(j)(1).
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Secondary Flow Communication Test Certification
61-26212
7-11 #32376 December 12, 2022
9600 Brimhall Rd Sergio L. Nunez
Bakersfield, CA 93312
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
87 PL PASS
91 PL PASS
12/12/2022
Date
DSL PL PASS
12/12/2022
Date
VR PASS
DSL Vent PASS
87 Vent PASS
91 Vent PASS
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.