Loading...
HomeMy WebLinkAbout2022 - New Tank ELD (12-12-2022) UST System Post Installation Test Report ELD Test Date: Customer: Location: Tested By: CGRS, Inc. 5444 Dry Creek Road Sacramento, CA 95838 Project No:61-26212 Tanknology 7-11 #32376 11000 N. MoPac Expressway #500 Austin, TX 78759 9600 Brimhall Rd Bakersfield, CA 93312 December 12, 2022 ® Final Test Date:IOTA Technicians: Site Information CGRS Project No :61-26212 Installation Contractor Information Facility:Customer Name: Address:Address: City, State, Zip:City, State, Zip: County:Contact: CUPA Email:Phone/Email: Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS Tank 3 12,000 Diesel DW Fiberglass Xerxes Yes PASS Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result S1 42 60 359.86 87 TS PASS S2 42 60 359.86 87 FS PASS S3 42 60 359.86 91 TS PASS S4 42 60 359.86 91 FS PASS S5 42 60 359.86 DSL TS PASS S6 42 60 359.86 DSL FS PASS Junction Boxes with Tank Connection Description Test Result S1 Tank Probe and Turbine J-Box Open During Test PASS S3 Tank Probe and Turbine J-Box Open During Test PASS S5 Tank Probe and Turbine J-Box Open During Test PASS UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result UDC1 38 28 32 147.39 OPW PASS UDC2 38 28 32 147.39 OPW PASS UDC3 38 28 32 147.39 OPW PASS UDC4 38 28 32 147.39 OPW PASS UDC5 38 28 32 147.39 OPW PASS UDC6 38 28 32 147.39 OPW PASS Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result TS1 24 22 32 73.14 Bravo PASS Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result 87 PL NOV DW Fiberglass 2 320 PASS 91 PL NOV DW Fiberglass 2 300 PASS DSL PL NOV DW Fiberglass 2 240 PASS Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result 87 Vent NOV DW Fiberglass 2 60 PASS 91 Vent NOV DW Fiberglass 2 90 PASS DSL Vent NOV DW Fiberglass 2 75 PASS Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result VR NOV DW Fiberglass 3 310 PASS Reviewed By Date IOTA Tech Signature Date 12/12/2022 CA License No. 12/12/2022 06-1727 9600 Brimhall Rd 4583 E. Eisenhower Circle Anaheim, CA 92807 COMPONENTS IN CONTAINMENT Kern Gary Redfern lpreece@bakersfieldfire.us; mwmoore@bakersfieldfire.us; parmagost@bakersfieldfire.us 714-497-5812/gredfern@rdbuilders.com Leak Logs / Repair Bakersfield, CA 93312 PIPING TANKS Final ELD Test Project Worksheet 12/12/2022 7-11 #32376 RD Builders Sergio L. Nunez Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services 12/12/2022 Date 12/12/2022 Date 91 Octane Primary Containment System PASS Diesel Primary Containment System PASS Post Installation ELD Test Results 87 Octane Primary Containment System PASS 9600 Brimhall Rd Sergio L. Nunez Bakersfield, CA 93312 Test Certification Post Installation Enhanced Leak Detection (ELD) 61-26212 7-11 #32376 December 12, 2022 This document certifies that the UST systems listed below at the above referenced location have been tested and passed the iota®VaporTite V005 tightness test and iotaVision™L005.CGRS further certifies that the iota®VaporTite V005 and iotaVision™L005 meets the post installation testing requirements for post installation testing for newly installed underground storage tank systems as per the California Health and Safety Code,Chapter 6.7,section 25290.1(j)(1). Location:CGRS Project No : Test Date: CGRS Techs: IOTA Tech Signature: Sergio L. Nunez CA Tank Tester #06-1727 Reviewed by: Chris Murphy Director of CA Services Secondary Flow Communication Test Certification 61-26212 7-11 #32376 December 12, 2022 9600 Brimhall Rd Sergio L. Nunez Bakersfield, CA 93312 COMPONENTS RESULTS Piping Secondary Communication Confirmation 87 PL PASS 91 PL PASS 12/12/2022 Date DSL PL PASS 12/12/2022 Date VR PASS DSL Vent PASS 87 Vent PASS 91 Vent PASS CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed throughout the secondary piping components listed below.