Loading...
HomeMy WebLinkAboutRES NO 019-2023RESOLUTION NO. U 1 9- 2 02 3 RESOLUTION DISPENSING WITH BIDDING UNDER SECTION 3.20.060(D)(5) OF THE BAKERSFIELD MUNICIPAL CODE RELATING TO DESIGN/BUILD CONSTRUCTION PROCUREMENT PROCESS FOR. THE MODIFICATION AND REPAIR TO THE MAINTENANCE BUILDING LOCATED. AT WASTEWATER TREATMENT PLANT NO. 3 WHEREAS; the City's Maintenance Building at Wastewater Treatment Plant No. 3 (Plant 3) needs modificationand repairsto the existing building, including but not limited to restrooms, break room, locker rooms, plumbing repairs, new floor coverings, and ceiling repairs; cnd WHEREAS, the use of design/build methodologies has been shown to be an effective method of reducing construction costs and WHEREAS, the use of design/build joins the construction and design of a project under one single legal entity thereby reducing conflicts; and WHEREAS, the City Council believes theuse of design/build. is appropriate for certain unique projects where specialized design or construction methods are necessary or special design expertise must be employed; and WHEREAS, the City Council believes the public and the procurement process can be adequately protected through the use of a fair competitive process for choosing a design/build entity which best serves the interests of the City. NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows, I. The above recitals are true and correct and incorporated herein by reference. 2. The Maintenance Building at the Plant 3 is appropriate for design/build because of the specialized nature of the design and construction of the project. 3. The proposed modification and repair work to the Maintenance Building at Plant 3justifies the exception to the bidding process and the City Council hereby determines that the work, .supplies equipment and material can best be obtained through the design/build construction procurement process. 4. Upon adoption of this Resolution, the Public Works Director is authorized to proceed with the design/build procurement process, as set forth in the Bakersfield Municipal Code Section 3.20.060(D) (5), for the Maintenance Building at Plant 3 project. gPK J -aaeei orz Page: UJ.aCi.,� p,0 5. The Public Works Director shall recommend a design/build entity that combines appropriately licensed contracting, architectural and engineering services, as needed, into one legal entity. b. The Public Works. Director shall invite no less than three appropriate design/build entities to participate in the selection process, The Public Works Director shallin a timely manner. bring the contract for award of theproject to the City Council for approval with a report setting forth the reasons the award is recommended to thechosen design/build entity. I HEREBY CERTIFY that the foregoing Resolution was passed. and adopted by the Council off the City of Bakersfield at a regular meeting thereof held on FEB 2 2 2023 by the following vote: i i i r i VfS: COUNCIL MEMBER ARIAS,GONZNLES. WEIR. SMITH, FREEMAN. GRAY,.KAUR — COUNCIL MEMBER ABSENT: COUNCIL MEMBER ABSENT: COUNCIL MEMBER JULIE: DRIMAKI , CP C, MMC CITY CLERK and EX OFFICIO CLERKof the Council of the City of Bakersfield APPROVED By KAREN GOH Mayor APPROVED ASTOFORM: VIRGINIA.GENNARO City Attorney By ASHLEY MBRANO Deputy ity Attorney JHR_em 0PK`9 Page 2 & Z Pages- T m 00^`.C!N,. TD