HomeMy WebLinkAboutRES NO 019-2023RESOLUTION NO. U 1 9- 2 02 3
RESOLUTION DISPENSING WITH BIDDING UNDER
SECTION 3.20.060(D)(5) OF THE BAKERSFIELD
MUNICIPAL CODE RELATING TO DESIGN/BUILD
CONSTRUCTION PROCUREMENT PROCESS FOR.
THE MODIFICATION AND REPAIR TO THE
MAINTENANCE BUILDING LOCATED. AT
WASTEWATER TREATMENT PLANT NO. 3
WHEREAS; the City's Maintenance Building at Wastewater Treatment Plant
No. 3 (Plant 3) needs modificationand repairsto the existing building, including
but not limited to restrooms, break room, locker rooms, plumbing repairs, new
floor coverings, and ceiling repairs; cnd
WHEREAS, the use of design/build methodologies has been shown to be
an effective method of reducing construction costs and
WHEREAS, the use of design/build joins the construction and design of a
project under one single legal entity thereby reducing conflicts; and
WHEREAS, the City Council believes theuse of design/build. is appropriate
for certain unique projects where specialized design or construction methods
are necessary or special design expertise must be employed; and
WHEREAS, the City Council believes the public and the procurement
process can be adequately protected through the use of a fair competitive
process for choosing a design/build entity which best serves the interests of the
City.
NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield
as follows,
I. The above recitals are true and correct and incorporated herein by
reference.
2. The Maintenance Building at the Plant 3 is appropriate for
design/build because of the specialized nature of the design and
construction of the project.
3. The proposed modification and repair work to the Maintenance
Building at Plant 3justifies the exception to the bidding process and
the City Council hereby determines that the work, .supplies
equipment and material can best be obtained through the
design/build construction procurement process.
4. Upon adoption of this Resolution, the Public Works Director is
authorized to proceed with the design/build procurement process,
as set forth in the Bakersfield Municipal Code Section 3.20.060(D) (5),
for the Maintenance Building at Plant 3 project.
gPK J
-aaeei orz Page:
UJ.aCi.,� p,0
5. The Public Works Director shall recommend a design/build entity
that combines appropriately licensed contracting, architectural
and engineering services, as needed, into one legal entity.
b. The Public Works. Director shall invite no less than three appropriate
design/build entities to participate in the selection process,
The Public Works Director shallin a timely manner. bring the
contract for award of theproject to the City Council for approval
with a report setting forth the reasons the award is recommended
to thechosen design/build entity.
I HEREBY CERTIFY that the foregoing Resolution was passed. and adopted
by the Council off the City of Bakersfield at a regular meeting thereof held on
FEB 2 2 2023 by the following vote:
i i i r i
VfS: COUNCIL MEMBER ARIAS,GONZNLES. WEIR. SMITH, FREEMAN. GRAY,.KAUR —
COUNCIL MEMBER
ABSENT: COUNCIL MEMBER
ABSENT: COUNCIL MEMBER
JULIE: DRIMAKI , CP C, MMC
CITY CLERK and EX OFFICIO CLERKof
the Council of the City of Bakersfield
APPROVED
By
KAREN GOH
Mayor
APPROVED ASTOFORM:
VIRGINIA.GENNARO
City Attorney
By
ASHLEY MBRANO
Deputy ity Attorney
JHR_em
0PK`9
Page 2 & Z Pages-
T m
00^`.C!N,. TD