Loading...
HomeMy WebLinkAbout6501 DISTRICT BLVD_CAL ARP #2 10-17-22Facility: Street Address Citv State Zip Code CERS CCR Section Has It Violation Violation YES No N/A Minor, 1. 2 Pre -Startup Review 5010093 2760.7(a) The owner/operator shall perform a pre -startup safety review for new and significantly modified stationary sources. 5010094 2760.7(b) The pre -startup review shall include; construction and equipment is in accordance with design specifications, safety, operating, maintenance and emergency procedures are in place, PHA has been completed. Compliance Audits 5010095 2760.8(a) The owner / operator shall certify that they have evaluated compliance at least every three years. 5010096 2760.8(b) The compliance audit shall be conducted by at least one person ✓ knowledgeable in the process. 5010098 2760.8(d) The owner / operator shall promptly determine and document an appropriate response to each finding. They shall also retain the two most recent compliance audits. Incident Investigation 5010100 2760.9(a) The owner / operator shall investigate each incident which results in or could reasonably have resulted in a catastrophic release 5010101 2760.9(b) An incident investigation shall be initiated within 48 hours of the incident and shall include the following: Date of incident, Date investigation began, Description of the incident and any recommendations resulting from the investigation. 5010106 2760.9(g) The owner / operator shall address and resolve the findings and recommendations. These resolutions shall be documented and retained for five years. Employee Participation 5010107 2760.10(a) The owner/operator shall develop a written plan of action regarding the implementation of the employee participation. 5010108 2760.10(b) The owner/operator shall consult with employees on the conduct and development of PHA and other elements of process safety. Hot Work Permit 5010110 2760.11(a) The owner/operator shall issue a hot work permit for operators conducted on or near a covered process. 5010111 2760.11(b) The permit shall document fire prevention and protections have been implemented. This permit shall be kept on file until the hot work in completed. Contractors 5010113 2760.12(b) The owner/operator shall inform the contractor of the known potential fire, explosive or toxic release hazard. -; v .. ' 1 rC .. 4_1-A t, 6 ; - ­' �- 5010114 2760.12(b) The owner/operator shall develop and implement safe work practice consistent to control the entrance presence, and exit of the contractors. 5010114 2760.12(c) The owner/operator shall periodically evaluate the performance of the contractor. Page 4 of 5 FD 2124 (Rev. 01/13) Facility: Street Address City State Zip Code CERS CCR Section Has it Violation Violation YES NO N/A Minor, 1,2 Article 4: Hazard Assessment Hazard Assessment 5010036 2750.1 The owner / operator shall prepare a worst -case scenario analysis and complete the five 5 year accident history p OY Off -Site Consequence Analysis Parameters 2750.2 Off -site consequence analysis parameters shall include the following: 5010037 Endpoints of regulated substances, wind speed and atmospheric stability class, ambient temperature / humidity, height of release, surface roughness, dense or neutrally buoyant gases and temperature of released substance. Worst Case Scenario Analysis 2750.3 Worst -case Release Scenario Analysis shall include: release from the 5010035 greatest amount of a single vessel and from the greatest amount in the , piping system. Alternative Release Scenario Analysis 5010035 2750.4 Alternative Release Scenario Analysis shall consider: at least one alternative release for each covered process utilizing the parameters from 2750.2. Parameters shall give consideration of mitigation. Article 5: Prevention Program Process Safety Information 5010064 2760.1(a)(b) The owner / operator shall complete written process safety information for the regulated substances and include the following: Toxicity information, Permissible Exposure Limits, Physical and Reactivity Data, Corrosive Data, Thermal and Chemical Data and Hazardous Effects of "Mixing of Chemicals". 5010065 2760.1(a)(c) Contain information pertaining to the technology of the process including block flow diagrams, process chemistry, maximum intended inventory,F, upper and lower safe limits and evaluation of the consequences of deviations. 5010066 2760.1(a)(d)( Information pertaining to the equipment in the process shall include: 1) Materials of construction, Piping and instrument diagram (P&ID), Electrical classification, Relief system design and design basis, Ventilation system design, Design codes and standards employed, Safety systems and document that all equipment complies with good engineering practices. Hazard Review 5010069 2755.2(a) The owner / operator shall preform an initial PHA on processes covered and shall identify, evaluate and control the hazards involved in the process. 5010074 2755.2(d) The PHA shall include the considerations of external events including seismic events. 5010075 2760.2(e) The PHA shall be performer: by a team with expertise in engineering and process operationj. 5010077 2760.2(f) At least every five (5) years after completion of the initial PHA, the PHA shall be updated to assure that the PHA is consistent with the current process. The owner/operator shall retain the PHA and updates or revalidations for each process for the life of the process. Page 2 of 5 FD 2124 (Rev. 01/13)