Loading...
HomeMy WebLinkAboutGPA 22-0125_SR CITY OF BAKERSFIELD PLANNING COMMISSION MEETING DATE: April 20, 2023 AGENDA: 6.a. TO: Chair Cater and Members of the Planning Commission FROM: Paul Johnson, Planning Director DATE: April 12, 2023 WARD: 7 FILE: GPA/ZC No. 22-0125 and PDR 22-0403 STAFF PLANNER: Louis Ramirez, Associate Planner REQUEST: (1) General Plan Amendment to change land use designation from High Medium Density Residential (HMR) to High Density Residential (HR); (2) Zone Change to change zone classification from R- 2 (Limited Multiple-Family Dwelling) zone to R-3/PUD (Multiple-Family Dwelling/Planned Unit Development) zone; and (3) a Planned Development Review for development of a 336-unit apartment complex. APPLICANT: Cornerstone Engineering, Inc. OWNER: Timothy and Marilyn 5509 Young St. Banducci Family Trust Bakersfield, CA 93311 3001 Pendleton Ct. Bakersfield, CA 93309 PROJECT LOCATION: Southwest corner of Berkshire Road and Ashe Road APN: 539-010-08 PROJECT SIZE: 19.96 acres (gross)/17.55 acres (net) CEQA: Mitigated Negative Declaration EXISTING GENERAL PLAN DESIGNATION: HMR (High Medium Density Residential) EXISTING ZONE CLASSIFICATION: R-2 (Limited Multiple-Family Dwelling) STAFF RECOMMENDATION: (1) Adopt Resolution ADOPTING Mitigated Negative Declaration pursuant to Section 15074 of the California Environmental Quality Act; (2) Adopt Resolution APPROVING the general plan amendment to change the land use designation from HMR to HR; (3) Adopt Resolution APPROVING change in zone classification from R-2 to R-3/PUD; and (4) Adopt Resolution APPROVING the planned development review 22-0403 as depicted in the project description and subject to the listed conditions of approval; and recommend the same to City Council. SITE CHARACTERISTICS: The project site is agricultural land. Surrounding properties are primarily developed as: north – single-family residential under construction; east – vacant land; south –agricultural; and west – agricultural. GPA/ZC 22-0125 Page 2 BACKGROUND AND TIMELINE: • January 28, 1998 - City Council adopted pre-zoning of the subject property as A (Agriculture) (Ordinance 3819). • April 9, 2004 - City Council approved the annexation of the project site to the City of Bakersfield as part of Annexation No. 445 (Resolution 040-03). • May 7, 2008 - City Council approved General Plan Amendment/Zone Change No. 07-1135 for: (1) change in land use designation from R-IA (Resource-Intensive Agriculture) to HMR (High Medium Density Residential); (2) and a change in zone classification from A (Agriculture) to R-2 (Limited Multiple Family Dwelling) (Ordinance 4512; Resolution 068-08). PROJECT ANALYSIS: General Plan Amendment/Zone Change (GPA/ZC). The proposed GPA/ZC is intended to facilitate development of a gated 336-unit multi-family residential community on 17.55 net acres at a density of 19.15 dwelling units per acre. Planned Unit Development (PUD). The project is subject to the PUD zoning overlay and the stated purpose of this zone district is as follows: “The planned unit development zone is intended to allow for innovative design and diversification in the relationship of various uses, buildings, structures, lot sizes and open space while ensuring substantial compliance with the general plan and the intent of the municipal code. In addition, the development would provide adequate standards necessary to satisfy the requirements of the public health, safety and general welfare. This zone is not to be used to restrict residential development or to compromise other zoning districts that may be more appropriate for a site. Instead, it enables a developer to obtain approval of a specific, detailed plan for a residential neighborhood which ensures that the uniqueness of the project design is preserved. These standards shall be observed without unduly inhibiting the advantages of modern site planning techniques and innovative planning of residential neighborhoods.” As such, your Commission has the authority to require design standards, regulations, limitations, and restrictions which are designed to protect and maintain property values and provide or protect community amenities that would foster and maintain the health, safety, and general welfare of the community. These may include but are not limited to, categories specified in Section 17.52.060 (PUD Latitude of Regulations). Generally, the standards are related to the topics such as: construction of fences and walls, structure height, distance between buildings, parking ratios, open space, architectural design of buildings and structures, and any additional improvements and dedications reasonably necessary to fulfill public needs for the general health, safety and welfare of the neighborhood and City. Overall Project. The project would be the development of a gated 336-unit apartment complex totaling 328,890 square feet of residential dwellings. The main gate to the apartment complex will be on the north side of the Project site off Berkshire Road. A secondary gate will be located at the southeast corner of the Project site off Ashe Road. Pedestrian walkways will be located throughout the project site. The project includes 11 three-story buildings comprised of 1-bedroom, 2-bedroom and 3-bedroom apartments. Indoor amenities include a 1,720 square foot physical fitness building, a 4,360 square foot community building and a 1,485 square foot club house. Outdoor amenities include a pool, spa, barbeque and picnic GPA/ZC 22-0125 Page 3 areas, play area for children ages 2-5 years, play area for children ages 5-12, dog run, multiple yoga areas, fitness weight area, recreation area with cornhole, ping pong, and bocce ball, and fire pit. Parking is comprised of 368 uncovered spaces, 180 carport spaces, and 96 single passenger vehicle garages. The uncovered spaces include 28 electric vehicle (EV) charging stations, and all carports include solar. Landscaping will provide over 360 trees throughout the property, which includes the required 94 trees for street frontage and 95 trees for parking areas. Development Standards. The project has been designed in compliance with requirements of City standards and policies, and no deviations from zoning ordinance standards have been requested. Should the applicant decide to expand on-site development in the future, your Commission will have the opportunity to review and comment under a separate review. Compatibility with Land Use Element. Staff has reviewed the proposal for compatibility with the applicable goals and policies contained within the Metropolitan Bakersfield General Plan Land Use Element and finds the following: Goal 2: Accommodate new development which provides a full mix of uses to support its population. The project is consistent with this goal because the property owner determined the market is driving a need for multi-family residential within the project area. Additionally, the State encourages the densification of residential uses within cities throughout California. Goal 3: Accommodate new development which is compatible with and compliments existing land uses. The project is consistent with this goal by providing multi-family residential housing densification to support the local population. Goal 4: Accommodate new development which channels land uses in a phased, orderly manner and is coordinated with the provision of infrastructure and public improvements. The necessary infrastructure and public improvements are available to accommodate multiple-family residential developments or, if the project is approved, will be developed through the fair-share payment of impacts fees by the property owner. Therefore, the project is consistent with this goal. Policy 2: Allow for the development of a variety of residential types and densities. The project provides multiple-family land use within an area that predominately consists of single-family residential use. Allowing multiple-family residential at the site would allow for the increased development of a variety of residential types and densities beyond the current condition. Therefore, the project is consistent with this policy. Policy 3: Ensure that residential uses are located in proximity to commercial services, employment centers, public services, transportation routes, and recreational and cultural resources. The proposed project site is within a half mile from an existing school and commercial services. There are nearby employment centers as well as others throughout the city that can be easily accessed via the existing circulation system. Policy 75: Provide adequate land area for the expansion of existing uses and development of new uses consistent with the policies of the general plan. GPA/ZC 22-0125 Page 4 The project site is located on existing agricultural land near residential land uses. Therefore, adequate land is available for the project, and the project expands existing residential land uses at a different density. Therefore, the project is consistent with this policy. ENVIRONMENTAL REVIEW AND DETERMINATION: In accordance with the California Environmental Quality Act (CEQA), staff has reviewed the potential environmental impacts of the project. The Initial Study was based on the following project-specific analysis and technical studies: Agricultural Land Evaluation and Conversion Assessment; Air Quality Impact Analysis; Phase I Cultural Resource Survey; Biological Resource Evaluation; Trip Generation and Vehicle Miles Travel Analysis. The initial study determined that compliance with the recommended mitigation measures, local ordinances, state laws, and construction to the standards of the Uniform Building Codes will reduce impacts to a less- than-significant level. Therefore, a Mitigated Negative Declaration (MND) was prepared for this project in accordance with the California Environmental Quality Act (CEQA). The MND was circulated for a 30-day public and agency review period starting March 6, 2023, through April 4, 2023 (SCH No. 2023030201). Comments Received. One comment letter was submitted by The Department of Toxic Substances Control (DTSC). DTSC’s comments and staff’s response are as follows: 1. A State of California environmental regulatory agency such as DTSC, a Regional Water Quality Control Board (RWQCB), or a local agency that meets the requirements of Health and Safety Code section 101480 should provide regulatory concurrence that the Project site is safe for construction and the proposed use. Response: All projects that use/store hazardous material are required to submit a Hazardous Material Business Plan to the California Environmental Reporting System which in turn is reviewed by the Kern County Environmental Health Department. The Project includes Condition A. 1. With the grading plan, if the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity (WQ Order No. 99-08-DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. The project proponent was advised of this recommendation. 2. The MND should acknowledge the potential for historic or future activities on or near the project site to result in the release of hazardous wastes/substances on the project site. In instances in which releases have occurred or may occur, further studies should be carried out to delineate the nature and extent of the contamination, and the potential threat to public health and/or the environment should be evaluated. The MND should also identify the mechanism(s) to initiate any required investigation and/or remediation and the government agency who will be responsible for providing appropriate regulatory oversight. Response: Please refer to the response in comment 1. The project proponent was advised of this recommendation. GPA/ZC 22-0125 Page 5 3. Refiners in the United States started adding lead compounds to gasoline in the 1920s in order to boost octane levels and improve engine performance. This practice did not officially end until 1992 when lead was banned as a fuel additive in California. Tailpipe emissions from automobiles using leaded gasoline contained lead and resulted in aerially deposited lead (ADL) being deposited in and along roadways throughout the state. ADL-contaminated soils still exist along roadsides and medians and can also be found underneath some existing road surfaces due to past construction activities. Due to the potential for ADL-contaminated soil DTSC, recommends collecting soil samples for lead analysis prior to performing any intrusive activities for the project described in the MND. Response: A soils analysis and report is required during the grading and building permit processes where the soil will be analyzed for any potential contaminants and treated accordingly. As such, the impacts remain less than significant. The project proponent was advised of this recommendation. 4. If any projects initiated as part of the proposed project require the importation of soil to backfill any excavated areas, proper sampling should be conducted to ensure that the imported soil is free of contamination. DTSC recommends the imported materials be characterized according to DTSC’s 2001 Information Advisory Clean Imported Fill Material. Response: Importation of soil will be regulated by any applicable state/federal law mandates. The project proponent was advised of this recommendation. 5. If any sites included as part of the proposed project have been used for agricultural, weed abatement or related activities, proper investigation for organochlorinated pesticides should be discussed in the MND. DTSC recommends the current and former agricultural lands be evaluated in accordance with DTSC’s 2008 Interim Guidance for Sampling Agricultural Properties (Third Revision). Response: The project proponent was advised of this recommendation. Environmental Conclusion. The State CEQA Guidelines and the City of Bakersfield’s CEQA Implementation Procedures have been followed in the evaluation of the environmental effects of this project. With mitigation, significant environmental impacts were not identified for the proposed project. PUBLIC NOTIFICATION: Public notice for the proposed project and environmental determination was advertised in The Bakersfield Californian and posted on the bulletin board in the City of Bakersfield Development Services Building, 1715 Chester Avenue, Bakersfield, California. All property owners within 300 feet of the project site were notified by United States Postal Service mail regarding this public hearing in accordance with city ordinance and state law. Signs are required as part of the public notification process and must be posted between 20 to 60 days before the public hearing date. Photographs of the posted signage and the Declaration of Posting Public Hearing Notice signed by the applicant are on file at the Planning Division. Comments Received. As of this writing, no comments have been received. Tribal Consultation. In compliance with Senate Bill (SB) 18, staff mailed a letter on June 9, 2022, notifying the American Indian Tribes of the proposed project and location of the site. The notice starts the 90-day consultation period required under SB 18. As of this writing, no tribal consultation has been requested. GPA/ZC 22-0125 Page 6 Community Outreach. The applicant hosted a community outreach meeting on March 20, 2023. Invitation letters were mailed by the applicant to property owners within 600 feet of the project site. According to the meeting sign-in sheet, four individuals attended . CONCLUSIONS: Consistency with Surrounding Development. The project would provide for a denser residential use to complement the existing single-family residential development in the area. Consistency with General Plan/Zoning Ordinance. The proposal is consistent with land use goals and policies as contained in the General Plan related to multi-family development, as noted above. As conditioned, the planned development review is required to comply with requirements and regulations as set forth in the Bakersfield Municipal Code Title 17 (Zoning Ordinance) and City Development Standards. Recommendation. Staff finds that the applicable provisions of CEQA have been complied with, and the proposal is compatible with the surrounding area, land use designation, and zoning ordinance. Therefore, staff recommends your Commission: (1) adopt Resolution ADOPTING Mitigated Negative Declaration pursuant to Section 15074 of the California Environmental Quality Act; (2) adopt Resolution APPROVING general plan amendment to change the land use designation from HMR (High Medium Density Residential) to HR (High Density Residential); (3) adopt Resolution APPROVING change in zone classification from R-2 (Limited Multiple Family Dwelling) to R-3/PUD (Multiple Family Dwelling/Planned Unit Development); and (4) adopt Resolution APPROVING Planned Development Review No. 22-0403; and recommend same to City Council. ATTACHMENTS: Map Set • GPA/ZC Aerial • GPA/ZC Zone Classification • GPA/ZC General Plan Designation Attachment B: Site Plan Attachment C: Elevations Attachment D: Landscape Plan Attachment E: Mitigated Negative Declaration with Attachments Attachment F: Planning Commission Draft Resolutions • Adopt MND with Attachments • Approve GPA with Attachments • Approve ZC with Attachments • Approve PDR Resolution With Attachments Page 1 of 2 RESOLUTION NO. RESOLUTION OF THE BAKERSFIELD PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL ADOPT A MITIGATED NEGATIVE DECLARATION FOR AN AMENDMENT TO THE LAND USE MAP, ZONE CHANGE, AND PLANNED DEVELOPMENT REVIEW LOCATED AT THE SOUTHWEST CORNER OF BERKSHIRE ROAD AND ASHE ROAD (GPA/ZC NO. 22- 0125, PDR NO. 22-0403). WHEREAS, Cornerstone Engineering, Inc. is requesting an amendment to the land use map designation of the Metropolitan Bakersfield General Plan from HMR (High Medium Density Residential) to HR (High Density Residential) and an amendment to Title 17 of the Bakersfield Municipal Code to change the Zone District R-2 (Limited Multiple Family Dwelling) to R-3/PUD (Multiple-Family Dwelling/Planned Unit Development) on 19.96 acres located at the southwest corner of Berkshire Road and Ashe Road (the “Project”); and WHEREAS, it was determined that the Project would not have a significant effect on the environment; therefore, a Mitigated Negative Declaration was prepared in accordance with the California Environmental Quality Act (CEQA); and WHEREAS, the Secretary of the Planning Commission set Thursday, April 20, 2023 at 5:30 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before the Planning Commission to consider the proposed Mitigated Negative Declaration and Project as required by Government Code Section 65353, and notice of the public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and WHEREAS, the laws and regulations relating to the preparation and adoption of Mitigated Negative Declarations as set forth in CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been duly followed by City staff and the Planning Commission; and WHEREAS, the City of Bakersfield Development Services Department (1715 Chester Avenue, Bakersfield, California) is the custodian of all documents and other materials upon which the environmental determination is based; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above referenced public hearing support the following findings: 1. All required public notices have been given. The Project was circulated for a public review comment period from March 6, 2023 to April 4, 2023. Hearing notices regarding the Project were mailed to property owners within 300 feet of the Project area and published in the Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing. Page 2 of 2 2. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA. 3. A Mitigated Negative Declaration for the Project is the appropriate environmental document to accompany its approval as the Project will not significantly impact the physical environment. NOW, THEREFORE, BE IT RESOLVED by the Bakersfield Planning Commission as follows: 1. The above recitals, incorporated herein, are true and correct. 2. The Mitigated Negative Declaration is hereby recommended for adoption by the City Council. 3. The project is subject to mitigation measures found in Exhibit A for the Project located on the map as shown in Exhibit B, both of which are incorporated herein. I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Planning Commission of the City of Bakersfield at a regular meeting thereof held on April 20, 2023 on a motion by _________ and seconded by _________, by the following vote: AYES: NOES: ABSENT: APPROVED _______________________________________ DANIEL CATER, CHAIR City of Bakersfield Planning Commission Exhibits (attached): Exhibit A: Mitigation Measures Exhibit B: Location Map EXHIBIT “A” MITIGATION MEASURES FROM MITIGATED NEGATIVE DECLARATION GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 22-0125 Air Quality Impact Mitigation Measures: 1. Prior to grading plan approval, the applicant/developer shall submit documentation to the Planning Division that they are compliant with air quality control measures and rules required by the San Joaquin Valley Air Pollution Control District. The documentation shall specify that the Project has complied with the SJVAPCD’ Indirect Source Rule (Rule 9510) Biological Resources Impact Mitigation Measures: 2. Prior to ground disturbance, the project proponent shall comply with federal and state laws protecting species of plants, fish, and wildlife that are listed or proposed for listing as endangered or threatened, as well as their designated critical habitat. If the presence of an endangered or threatened species on private land that overlaps with development that impose certain duties, such as avoiding unauthorized take and requiring consultation with the United States Fish & Wildlife Service (USFWS) and/or California Department of Fish & Wildlife (CDFW) agency. If unauthorized take occurs, property owners and developers shall take the necessary steps to ensure compliance with federal and state laws. 3. Prior to ground disturbance, a focused survey for burrowing owl shall be submitted to California Department of Fish and Wildlife (CDFW) and Planning Division by the applicant/developer. The survey shall follow the methodology developed by the California Burrowing Owl Consortium (CBOC 1993). If the survey results identify the presence of burrowing owl nests, prior to grading (including staging, clearing, and grubbing), surveys for active nests shall be conducted by a qualified wildlife biologist no more than 30 days prior to the start of any ground disturbance and in a sufficient area around the work site to identify any nests that are present and to determine their status. A sufficient area means any nest within an area that could potentially be affected directly and/or indirectly by the Project. In addition to direct impacts, such as nest destruction, nests might be affected by noise, vibration, odors, and movement of workers or equipment. If the Project applicant identifies active nests, CDFW shall be notified and recommended protocols for mitigation shall be followed, and a copy of the mitigation protocols shall be submitted to Planning Division. If any ground disturbing activities occur during the burrowing owl nesting season (approximately February 1 through August 31), and potential burrowing owl burrows are present within the Project footprint, avoidance measures shall be implemented. In the event that burrowing owls are found, the applicant/developer shall follow CDFW protocol for mitigation and comply with the provisions of the Migratory Bird Treaty Act. Exhibit A GPA No. 22-0125 Page 2 Cultural Resources Impact Mitigation Measures: 4. Prior to construction and as needed throughout the construction period, a construction worker cultural awareness training program shall be provided to all new construction workers within one week of employment at the project site. The training shall be prepared and conducted by a qualified cultural resources specialist. 5. During construction, if cultural resources are encountered during construction or ground disturbance activities, all work within 50 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. These additional studies may include avoidance, testing, and excavation. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield. 6. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Paleontological Resources Mitigation Measures: 7. During construction, if paleontological resources are encountered during construction or ground disturbance activities, all work within 50 feet of the find shall immediately cease and the area cordoned off until a qualified paleontological resource specialist can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant paleontological resource, additional investigations may be required. These additional studies may include fossil salvage. Ground disturbance in the vicinity of the discovery site (within 50 feet) shall not resume until the resource-appropriate measures are implemented or the materials are determined to be less than significant. Traffic Impact Mitigation Measures: 8. Prior to the issuance of building permits, the project applicant shall participate in the Regional Transportation Impact Fee (RTIF) program by paying the adopted fees in place for the land use type at time of development. PARETO PL BARSANTI AVE MARCONI AVE CARDANO AVE THUNDER TRAIL DR PACIFICPINES WAYSTAR RUBYWAYPRECIOUSJEWEL WAY STAR SAPPHIRE DR SHAVER DR WALKERS GLEN LNCROOMLNCHARTLEY LNHAWKINS COVE DROCEAN JASPER DRSPARKLER WAYAMMOLITE WAYCHRYSOLITEWAYDIAMOND SPRINGS DR BAGUETTE AVE SMOKY QUARTZ DR ASHE RDR-2/P.U.D. R-2/P.U.D. R-1 R-1 R-1 R-1 R-1 R-1 R-1 A AM-1 M-1 M-1 R-2 R-2 R-2 R-2 R-1 R-1 R-1 R-1 R-1 R-1R-1 R-1 R-1 R-1R-1R-1 R-1R-1R-1R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 BERKSHIRE RD BaseEditor_MV 0 200 400 Feet_ GPA/ZC 22-0125 CITY OF BAKERSFIELD From: R-2 To: R-3 PUD R-1 One Family Dwelling 6,000 sq.ft. min lot sizeR-1-4.5 One Family Dwelling 4,500 sq.ft. min lot size E Estate 10,000 sq.ft. min lot size R-S Residential Suburban 24,000 sq.ft./dwelling unit R-S-( ) Residential Suburban 1, 2.5, 5 or 10 min lot size R-2 Limited Multiple Family Dwelling 4,500 sq.ft. min lot size (single family) 6,000 sq.ft. min lot size (multifamily) 2,500 sq.ft. lot area/dwelling unit R-3 Multiple Family Dwelling 6,000 sq.ft. min lot size 1,250 sq.ft. lot area/dwelling unit R-4 High Density Multiple Family Dwelling 6,000 sq.ft. min lot size 600 sq.ft. lot area/dwelling unit R-H Residential Holding 20 acre min lot size A Agriculture 6,000 sq.ft. min lot size A-20A Agriculture 20 acre min lot size PUD Planned Unit Development TT Travel Trailer Park MH Mobilehome C-O Professional and Administrative Office C-1 Neighborhood Commercial C-2 Regional Commercial C-C Commercial Center C-B Central Business PCD Planned Commercial Development M-1 Light Manufacturing M-2 General Manufacturing M-3 Heavy Industrial P Automobile Parking RE Recreation Ch Church Overlay OS Open Space HOSP Hospital Overlay AD Architectural Design Overlay FP-P Floodplain Primary FP-S Floodplain Secondary AA Airport Approach DI Drilling Island PE Petroleum Extraction Combining SC Senior Citizen Overlay HD Hillside Development Combining WM- West Ming Specific Plan LEGEND (ZONE DISTRICTS) A{E AÎE AvE AuE EXHIBIT "B" Page 1 of 2 RESOLUTION NO. RESOLUTION OF THE BAKERSFIELD PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL APPROVE AN AMENDMENT TO TITLE 17 OF THE BAKERSFIELD MUNICIPAL CODE TO CHANGE THE ZONE CLASSIFICATION FROM R-2 (LIMITED MULTIPLE FAMILY DWELLING) ZONE TO R-3/PUD (MULTIPLE FAMILY DWELLING/PLANNED UNIT DEVELOPMENT) ZONE ON 19.96 ACRES, LOCATED AT SOUTHWEST CORNER OF BERKSHIRE ROAD AND ASHE ROAD (GPA/ZC NO. 22-0125). WHEREAS Cornerstone Engineering, Inc. is requesting: (1) an amendment to the land use map designation of the Metropolitan Bakersfield General Plan from HMR (High Medium Density Residential) to HR (High Density Residential) ; and (2) an amendment to Title 17 of the Bakersfield Municipal Code to change the Zone District from R-2 (Limited Multiple Family Dwelling) Zone to R-3/PUD (Multiple Family Dwelling/Planned Unit Development) Zone on 19.96 acres located the southwest corner of Berkshire Road and Ashe Road (the “Project”); and WHEREAS, adoption of a Mitigated Negative Declaration for the Project has been recommended; and WHEREAS, the Secretary of the Planning Commission set Thursday, April 20, 2023 at 5:30 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before the Planning Commission to consider the proposed Mitigated Negative Declaration and Project as required by Government Code Section 65353, and notice of the public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above referenced public hearing support the following findings: 1.All required public notices have been given. Hearing notices regarding the Project were mailed to property owners within 300 feet of the Project area and published in the Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing. 2.The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA, and an initial study was completed. 3.The public necessity, general welfare, and good planning practices justify the Project. 4.The Project is compatible with the zone districts and development of surrounding properties and is consistent with the Metropolitan Bakersfield General Plan. Page 2 of 2 NOW, THEREFORE, BE IT RESOLVED by the Bakersfield Planning Commission as follows: 1.The above recitals, incorporated herein, are true and correct. 2.The Project is hereby recommended for approval by the City Council, incorporating the change into the official zoning map as described in Bakersfield Municipal Code Section 17.06.020 located on the map as shown in Exhibit A and as specifically described in Exhibit B, all of which are incorporated herein. I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Planning Commission of the City of Bakersfield at a regular meeting thereof held on April 20, 2023. AYES: NOES: ABSENT: APPROVED __________________________________________ DANIEL CATER, CHAIR City of Bakersfield Planning Commission Exhibits (attached): Exhibit A: Zone Change Map Exhibit B: Legal Description PARETO PL BARSANTI AVE MARCONI AVE CARDANO AVE THUNDER TRAIL DR PACIFICPINES WAYSTAR RUBYWAYPRECIOUSJEWEL WAY STAR SAPPHIRE DR SHAVER DR WALKERS GLEN LNCROOMLNCHARTLEY LNHAWKINS COVE DROCEAN JASPER DRSPARKLER WAYAMMOLITE WAYCHRYSOLITEWAYDIAMOND SPRINGS DR BAGUETTE AVE SMOKY QUARTZ DR ASHE RDR-2/P.U.D. R-2/P.U.D. R-1 R-1 R-1 R-1 R-1 R-1 R-1 A AM-1 M-1 M-1 R-2 R-2 R-2 R-2 R-1 R-1 R-1 R-1 R-1 R-1R-1 R-1 R-1 R-1R-1R-1 R-1R-1R-1R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 R-1 BERKSHIRE RD BaseEditor_MV 0 200 400 Feet_ GPA/ZC 22-0125 CITY OF BAKERSFIELD From: R-2 To: R-3 PUD R-1 One Family Dwelling 6,000 sq.ft. min lot sizeR-1-4.5 One Family Dwelling 4,500 sq.ft. min lot size E Estate 10,000 sq.ft. min lot size R-S Residential Suburban 24,000 sq.ft./dwelling unit R-S-( ) Residential Suburban 1, 2.5, 5 or 10 min lot size R-2 Limited Multiple Family Dwelling 4,500 sq.ft. min lot size (single family) 6,000 sq.ft. min lot size (multifamily) 2,500 sq.ft. lot area/dwelling unit R-3 Multiple Family Dwelling 6,000 sq.ft. min lot size 1,250 sq.ft. lot area/dwelling unit R-4 High Density Multiple Family Dwelling 6,000 sq.ft. min lot size 600 sq.ft. lot area/dwelling unit R-H Residential Holding 20 acre min lot size A Agriculture 6,000 sq.ft. min lot size A-20A Agriculture 20 acre min lot size PUD Planned Unit Development TT Travel Trailer Park MH Mobilehome C-O Professional and Administrative Office C-1 Neighborhood Commercial C-2 Regional Commercial C-C Commercial Center C-B Central Business PCD Planned Commercial Development M-1 Light Manufacturing M-2 General Manufacturing M-3 Heavy Industrial P Automobile Parking RE Recreation Ch Church Overlay OS Open Space HOSP Hospital Overlay AD Architectural Design Overlay FP-P Floodplain Primary FP-S Floodplain Secondary AA Airport Approach DI Drilling Island PE Petroleum Extraction Combining SC Senior Citizen Overlay HD Hillside Development Combining WM- West Ming Specific Plan LEGEND (ZONE DISTRICTS) A{E AÎE AvE AuE EXHIBIT "A" EXHIBIT "B" PARCE L 1 OF PAR C E L M A P 3 0 9 6 SEC. 2 8, T 3 0 S, R 2 7 E BK. 15, P G. 2 8 0' GRAPHIC SCALE 0'150'150' (IN FEET) 1 inch = 150 ft. PARCE L 1 OF PAR C E L M A P 3 0 9 6 SEC. 2 8, T 3 0 S, R 2 7 E BK. 15, P G. 2 8 0' GRAPHIC SCALE 0'150'150' (IN FEET) 1 inch = 150 ft. Page 1 of 2 RESOLUTION NO. RESOLUTION OF THE BAKERSFIELD PLANNING COMMISSION RECOMMENDING THAT THE CITY COUNCIL APPROVE AN AMENDMENT TO THE LAND USE MAP DESIGNATION OF THE METROPOLITAN BAKERSFIELD GENERAL PLAN FROM HMR (HIGH MEDIUM DENSITY RESIDENTIAL) TO HR (HIGH DENSITY RESIDENTIAL) ON 19.96 ACRES, LOCATED AT THE SOUTHWEST CORNER OF BERKSHIRE ROAD AND ASHE ROAD (GPA/ZC NO. 22-0125). WHEREAS, Cornerstone Engineering, Inc. is requesting: (1) an amendment to the land use map designation of the Metropolitan Bakersfield General Plan from HMR (High Medium Density Residential) to HR (High Density Residential); and (2) an amendment to Title 17 of the Bakersfield Municipal Code to change the Zone District from R-2 (Limited Multiple Family Dwelling) to R-3/PUD (Multiple Family Dwelling/Planned Unit Development) on 19.96 acres located the southwest corner of Berkshire Road and Ashe Road (the “Project”); and WHEREAS, adoption of a Mitigated Negative Declaration for the Project has been recommended; and WHEREAS, the Secretary of the Planning Commission set Thursday, April 20, 2023 at 5:30 p.m. in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before the Planning Commission to consider the proposed Mitigated Negative Declaration and Project as required by Government Code Section 65353, and notice of the public hearing was given in the manner provided in Title 17 of the Bakersfield Municipal Code; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above referenced public hearing support the following findings: 1. All required public notices have been given. Hearing notices regarding the proposed Project were mailed to property owners within 300 feet of the Project area and published in the Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing. 2. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA and an initial study was completed. 3. The public necessity, general welfare, and good planning practices justify the Project. 4. The Project is compatible with the land use designations and development of surrounding properties and is internally consistent with the Metropolitan Bakersfield General Plan. Page 2 of 2 NOW, THEREFORE, BE IT RESOLVED by the Bakersfield Planning Commission as follows: 1. The above recitals, incorporated herein, are true and correct. 2. The Project is hereby recommended for approval by the City Council subject to the conditions of approval in Exhibit A and located on the map as shown in Exhibit B, both of which are incorporated herein. I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Planning Commission of the City of Bakersfield at a regular meeting thereof held on April 20, 2023 on a motion by _______ and seconded _______, by the following vote. AYES: NOES: ABSENT: APPROVED _______________________________________ DANIEL CATER, CHAIR City of Bakersfield Planning Commission Exhibits (attached): Exhibit A: Conditions of Approval Exhibit B: Location Map EXHIBIT “A” CONDITIONS OF APPROVAL GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 22-0125 PUBLIC WORKS 1. Prior to the City’s approval of any construction plans associated with any development project, subdivision, or minor land division within the GPA/ZC area, the developer must submit the following for review and approval by the City Engineer: a. Fully executed dedication for Ashe Road to arterial standards and Berkshire Road to collector standards for the full frontage of the GPA/ZC area, unless otherwise approved by the City Engineer. Dedications must include sufficient widths for expanded intersections and additional areas for landscaping as directed by the City Engineer. b. Comprehensive drainage study of the GPA/ZC area is to be submitted for approval by the City of Bakersfield Public Works Department Subdivision section. The drainage including the frontage for the GPA/ZC area is to be retained onsite and shall be privately maintained. Flowage and drainage easements, as needed, are to be provided prior to the recording of any final map or issuance of any certificates of occupancy for development within the GPA/ZC area, whichever is earlier. c. Sewer study, which will assure that appropriate sewer service will be provided to the entirety of the GPA/ZC area. The developer will be responsible for the initial extension of the sewer line to serve the GPA/ZC area. This sewer line may be sized to serve a much larger area than the project area as directed by the City Engineer. The developer may also form a planned sewer area to provide a mechanism for the reimbursement of oversizing costs to the developer. 2. Prior to the recording of any final map or issuance of any certificates of occupancy for development within the GPA/ZC area, whichever is earlier, the developer must (a) construct all infrastructure, both public and private, within the boundary of the GPA/ZC area, including, but not limited to, any and all boundary streets to the centerline of the street as required by the City Engineer and (b) construct, and acquire any necessary right- of-way to construct, any off-site infrastructure required to support development of the GPA/ZC as determined by the City Engineer. Phasing of the construction of the required infrastructure may be allowed by the City Engineer. Per City Council Resolution 035-13, any development within the GPA/ZC area must comply with the City’s “complete streets” policy. 3. Prior to the City’s approval of any construction plans associated with any development project, subdivision, or minor land division within the GPA/ZC area, the developer must take all actions necessary to add the GPA/ZC area to the Consolidated Maintenance District (“CMD”) and pay all fees for inclusion in the CMD or, if the development is already within the CMD, update the maintenance district documents as provided in Bakersfield Municipal Code section 13.04.021 or as otherwise required by the City Engineer. GPA /ZC No. 22-0125 Conditions of Approval Page 2 4. Install traffic signal interconnect conduit and pull rope for the frontage in all arterials and collectors. 5. Prior to the City’s approval of any construction plans associated with any development project, subdivision, or minor land division within the GPA/ZC area, the developer must construct, or pay its proportionate share of the estimated cost to construct, the median (currently $100 per lineal foot), as determined by the City Engineer, for the arterial frontage of the property within the GPA/ZC area. 6. Prior to the City’s issuance of any building permits for construction within the GPA/ZC area, or an earlier time established through conditions of a subsequent City-approved subsequent development project, subdivision, or minor land division within the GPA/ZC area, the developer must pay all development fees for the GPA/ZC area including, but not limited to, the adopted regional traffic impact fee, local mitigation fees, any major bridge and thoroughfare district fees, and any planned sewer and drainage area fees. CITY ATTORNEY 7. In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners and boards ("City" herein) against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for City’s sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action or proceeding, falling under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party. PARETO PL BARSANTI AVE MARCONI AVE CARDANO AVE THUNDER TRAIL DR PACIFICPINES WAYSTAR RUBYWAYPRECIOUSJEWEL WAY STAR SAPPHIRE DR SHAVER DR WALKERS GLEN LNCROOMLNCHARTLEY LNHAWKINS COVE DROCEAN JASPER DRSPARKLER WAYAMMOLITE WAYCHRYSOLITEWAYDIAMOND SPRINGS DR BAGUETTE AVE SMOKY QUARTZ DR ASHE RDBERKSHIRE RD HMR HMR HMR HMR HMR HMR HMR HMR LI LI LI LR LR LR LR LR LR R-IA R-IA LR LR LR LR LR LR LR LR LR LR LR LR LR LR LR LR LR LR LRLRLR LR LRLR LRLR LR BaseEditor_MV 0 200 400 Feet_ GPA/ZC 22-0125 CITY OF BAKERSFIELD From: HMR To: HR LEGEND (GENERAL PLAN LAND USE) RR Rural Residential 2.5 gross acres/dwelling unit ER Estate Residential 1 dwelling unit/net acre SR Suburban Residential ≤4 dwelling units/net acre SR/LR County: ≤ 4 dwelling units/net acre City: ≤ 7.26 dwelling units/net acre LR Low Density Residential ≤ 7.26 dwelling units/net acre LMR Low Medium Density Residential > 4 but ≤ 10 dwelling units/net acre HMR High Medium Density Residential >7.26 units but ≤17.42 dwelling units/net acre HR High Density Residential >17.42 units but ≤72.6 dwelling units/net acre HC Highway Commercial GC General Commercial MC Major Commercial OC Office Commercial MUC Mixed Use Commercial LI Light Industrial SI Service Industrial HI Heavy Industrial P Public Facilities PS Public/Private Schools PT Public Transportation Corridors P-SW Solid Waste Facilities OS Open Space OS-P Parks and Recreation OS-S Slopes exceeding 30% R-IA Resource - Intensive Agriculture 20 acre minimum parcel size R-EA Resource - Extensive Agriculture 20 acre minimum parcel size 80 acre min (Williamson Act) R-MP Resource - Minerals & Petroleum 5 acre minimum parcel size UER Urban Estate Residential WesternRosedalePlan 0.5 acre net minimum parcel size WM West Ming Specific Plan A{E AÎE AvE AuE EXHIBIT "B" RESOLUTION NO. RESOLUTION OF THE BAKERSFIELD PLANNING COMMISSION APPROVING A PLANNED DEVELOPMENT REVIEW TO ALLOW DEVELOPMENT OF A 336- UNIT APARTMENT COMPLEX IN THE R-3/PUD (MULTIPLE FAMILY DWELLING RESIDENTIAL/PLANNED UNIT DEVELOPMENT) ZONE DISTRICT, LOCATED AT THE SOUTHWEST CORNER OF BERKSHIRE ROAD AND ASHE ROAD. (PDR NO. 22-60000403) WHEREAS, Cornerstone Engineering, Inc. (applicant) on behalf of the Grupe Properties, Inc. (property owner), filed an application with the City of Bakersfield Development Services Department for a Planned Development Review to allow for the development of a 336-unit apartment complex in the R-3/PUD (Multiple Family Dwelling Residential/Planned Unit Development) district, located at the southwest corner of Berkshire Road and Ashe Road; and WHEREAS, the Secretary of the Planning Commission did set Thursday, April 20, 2023, at 5:30 p.m. in the Council Chambers, City Hall South, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for consideration of the Planning Director’s report; and WHEREAS, the laws and regulations relating to the California Environmental Quality Act (CEQA) and the City of Bakersfield's CEQA Implementation Procedures have been duly followed by city staff and the Planning Commission; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above referenced public hearing support the following findings: 1. All required public notices have been given. Hearing notices regarding the Project were mailed to property owners within 300 feet of the Project area and published in The Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing. 2. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project under CEQA, and an initial study was completed. 3. The proposed development does not deviate from the intent and purpose of the PUD zone district. 4. The proposed development will constitute a land use of sustained desirability and stability, and it will compliment and harmonize with the character of surrounding development 5. The proposed preliminary development plan is consistent with the General Plan and objectives of Title 17 of the Bakersfield Municipal Code. NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING COMMISSION OF THE CITY OF BAKERSFIELD as follows: 1. The recitals above are true and correct and incorporated herein by this reference. 2. The provisions of CEQA have been followed. 3. Planned Development Review No. 22-60000403, as delineated in attached Exhibit B (Location Map) and Exhibit C (Site Development Plan), is hereby approved, subject to the conditions of approval contained in Exhibit A. I HEREBY CERTIFY that the foregoing resolution was passed and adopted by the Planning Commission of the City of Bakersfield at a regular meeting thereof held on the 20th day of April 2023. AYES: NOES: RECUSE: ABSTAIN: ABSENT: APPROVED ____________________________________ DANIEL CATER, CHAIR City of Bakersfield Planning Commission Exhibits: A. Mitigation Measures and Conditions of Approval B. Location Map C. Site Plans and Elevations EXHIBIT “A” MITIGATION MEASURES FROM MITIGATED NEGATIVE DECLARATION GENERAL PLAN AMENDMENT/ZONE CHANGE NO. 22-0125 Air Quality Impact Mitigation Measures: 1. Prior to grading plan approval, the applicant/developer shall submit documentation to the Planning Division that they are compliant with air quality control measures and rules required by the San Joaquin Valley Air Pollution Control District. The documentation shall specify that the Project has complied with the SJVAPCD’ Indirect Source Rule (Rule 9510) Biological Resources Impact Mitigation Measures: 2. Prior to ground disturbance, the project proponent shall comply with federal and state laws protecting species of plants, fish, and wildlife that are listed or proposed for listing as endangered or threatened, as well as their designated critical habitat. If the presence of an endangered or threatened species on private land that overlaps with development that impose certain duties, such as avoiding unauthorized take and requiring consultation with the United States Fish & Wildlife Service (USFWS) and/or California Department of Fish & Wildlife (CDFW) agency. If unauthorized take occurs, property owners and developers shall take the necessary steps to ensure compliance with federal and state laws. 3. Prior to ground disturbance, a focused survey for burrowing owl shall be submitted to California Department of Fish and Wildlife (CDFW) and Planning Division by the applicant/developer. The survey shall follow the methodology developed by the California Burrowing Owl Consortium (CBOC 1993). If the survey results identify the presence of burrowing owl nests, prior to grading (including staging, clearing, and grubbing), surveys for active nests shall be conducted by a qualified wildlife biologist no more than 30 days prior to the start of any ground disturbance and in a sufficient area around the work site to identify any nests that are present and to determine their status. A sufficient area means any nest within an area that could potentially be affected directly and/or indirectly by the Project. In addition to direct impacts, such as nest destruction, nests might be affected by noise, vibration, odors, and movement of workers or equipment. If the Project applicant identifies active nests, CDFW shall be notified and recommended protocols for mitigation shall be followed, and a copy of the mitigation protocols shall be submitted to Planning Division. If any ground disturbing activities occur during the burrowing owl nesting season (approximately February 1 through August 31), and potential burrowing owl burrows are present within the Project footprint, avoidance measures shall be implemented. In the event that burrowing owls are found, the applicant/developer shall follow CDFW protocol for mitigation and comply with the provisions of the Migratory Bird Treaty Act. Exhibit A GPA No. 22-0125 Page 2 Cultural Resources Impact Mitigation Measures: 4. Prior to construction and as needed throughout the construction period, a construction worker cultural awareness training program shall be provided to all new construction workers within one week of employment at the project site. The training shall be prepared and conducted by a qualified cultural resources specialist. 5. During construction, if cultural resources are encountered during construction or ground disturbance activities, all work within 50 feet of the find shall immediately cease and the area cordoned off until a qualified cultural resource specialist that meets the Secretary of the Interior’s Professional Qualification Standards can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant cultural resource, additional investigations may be required. These additional studies may include avoidance, testing, and excavation. All reports, correspondence, and determinations regarding the discovery shall be submitted to the California Historical Resources Information System’s Southern San Joaquin Valley Information Center at California State University Bakersfield. 6. During construction, if human remains are discovered, further ground disturbance shall be prohibited pursuant to California Health and Safety Code Section 7050.5. The specific protocol, guidelines, and channels of communication outlined by the Native American Heritage Commission, in accordance with Health and Safety Code Section 7050.5, Public Resources Code 5097.97, and Senate Bill 447 shall be followed. In the event of the discovery of human remains, at the direction of the county coroner, Health and Safety Code Section 7050.5(c) shall guide Native American consultation. Paleontological Resources Mitigation Measures: 7. During construction, if paleontological resources are encountered during construction or ground disturbance activities, all work within 50 feet of the find shall immediately cease and the area cordoned off until a qualified paleontological resource specialist can evaluate the find and make recommendations. If the specialist determines that the discovery represents a potentially significant paleontological resource, additional investigations may be required. These additional studies may include fossil salvage. Ground disturbance in the vicinity of the discovery site (within 50 feet) shall not resume until the resource-appropriate measures are implemented or the materials are determined to be less than significant. Traffic Impact Mitigation Measures: 8. Prior to the issuance of building permits, the project applicant shall participate in the Regional Transportation Impact Fee (RTIF) program by paying the adopted fees in place for the land use type at time of development. EXHIBIT “A” PLANNED DEVELOPMENT REVIEW 22-60000403 CONDITIONS AND ORDINANCE COMPLIANCE The following are specific items that you need to resolve before you can obtain a building permit or be allowed occupancy. These items include conditions and/or mitigation required by previous site entitlement approvals (these will be specifically noted), changes or additions that need to be shown on the final building plans, alert you to specific fees, and other conditions for your project to satisfy the City’s development standards. The items listed below will usually need to be shown on the final building plans or completed before a building permit is issued. As part of the building permit submittal, identify the location of your response by using the APPLICANT’S RESPONSE line provided directly below the item (example: sheet number, detail, etc.). A. DEVELOPMENT SERVICES - BUILDING (1715 Chester Avenue) (Staff contact – Shannon Clark; 661-326-3607 or SClark@bakersfieldcity.us) 1. Prior to review of improvement plans by the City, the developer shall submit a grading plan for the proposed site to be reviewed and approved by the City Engineer and Building Official (Bakersfield Municipal Code Section 16.44.010). With the grading plan, if the project is subject to the provisions of the National Pollutant Discharge Elimination System (NPDES), a Notice of Intent (NOI) to comply with the terms of the General Permit to Discharge Storm Water Associated with Construction Activity (WQ Order No. 99-08-DWQ) must be filed with the State Water Resources Control Board in Sacramento before the beginning of any construction activity. Compliance with the general permit requires that a Storm Water Pollution Prevention Plan (SWPPP) be prepared, continuously carried out, and always be available for public inspection during normal construction hours. APPLICANT’S RESPONSE:__________________________________________________________ 2. A grading permit is required prior to final plan approval. The developer shall submit four (4) copies of grading plans and two (2) copies of the preliminary soils report to the Building Division. A final soils report shall also be submitted to the Building Division before they can issue a building permit. Please note that grading plans must be consistent with the final building site plans and landscaping plans. Building permits will not be issued until the grading permit is approved by the Building Division, Planning Division (HCP), and Public Works Department. APPLICANT’S RESPONSE:__________________________________________________________ PDR #22-0403 Page | 2 of 9 B. DEVELOPMENT SERVICES - PLANNING (1715 Chester Avenue) (Staff contact – Louis Ramirez; 661-326-3023 or Lramirez@bakersfieldcity.us) 1. The minimum parking required for this project has been computed based on use and shall be as follows: Proposed Units or Square footage Parking Required Use Ratio Parking Residential 336 1 Bedroom/84 units 84 2 Bedroom/186 units 372 3 Bedroom/66 Units 132 Guest 10% 59 Office 250 square feet 1 per 250 sf 1 spaces Required Parking: 648 spaces (Note: 700 parking spaces are shown on the proposed site plan. By ordinance, compact and tandem spaces cannot be counted towards meeting minimum parking requirements. For commercial development containing a multi-tenant pad, any change in use where 50 percent or more of the pad requires additional parking pursuant to Bakersfield Municipal Section 17.58.110, the Planning Director may require parking commensurate with the new use.) APPLICANT’S RESPONSE:__________________________________________________________ 3. All parking lots, driveways, drive aisles, loading areas, and other vehicular access ways, shall be paved with concrete, asphaltic concrete, or other paved street surfacing material in accordance with the Bakersfield Municipal Code (Sections 15.76.020 and 17.58.060.A.). APPLICANT’S RESPONSE:__________________________________________________________ 4. Lighting is required for all parking lots, except residential lots with four units or less (Section 17.58.060.A.). Illumination shall be evenly distributed across the parking area with light fixtures designed and arranged so that light is directed downward and is reflected away from adjacent properties and streets. Use of glare shields or baffles may be required for glare reduction or control of back light. No light poles, standards and fixtures, including bases or pedestals, shall exceed a height of 40 feet above grade. However, light standards placed less than 50 feet from residentially zoned or designated property, or from existing residential development, shall not exceed a height of 15 feet. The final building plans shall include a picture or diagram of the light fixtures being used and show how light will be directed onto the parking area. (Note: Staff can require additional adjustments to installed lighting after occupancy to resolve glare or other lighting problems if they negatively affect adjacent properties.) APPLICANT’S RESPONSE:__________________________________________________________ PDR #22-0403 Page | 3 of 9 4. Business identification signs are neither considered nor approved under this review (e.g. wall, monument, pylon, etc.). A separate sign permit reviewed by the Planning and Building Divisions and issued by the Building Division, is required for all new signs, including future use and construction signs. (Note: Signs must comply with the Sign Ordinance; Chapter 17.60 of the Bakersfield Municipal Code. Review this Chapter as part of due diligence.) APPLICANT’S RESPONSE:__________________________________________________________ 5. In the event a previously undocumented oil/gas well is uncovered or discovered on the project, the developer is responsible to contact the California Geologic Energy Management Division (CalGEM). The developer is responsible for any remedial operations on the well required by CalGEM. The developer shall also be subject to provisions of BMC Section 15.66.080.B. APPLICANT’S RESPONSE:__________________________________________________________ 6. The developer shall meet all regulations of the San Joaquin Valley Air Pollution Control District (Regulation VIII) concerning dust suppression during construction of the project. Methods include, but are not limited to; use of water or chemical stabilizer/suppressants to control dust emission from disturbed area, stock piles, and access ways; covering or wetting materials that are transported off-site; limit construction-related speed to 15 mph on all unpaved areas/washing of construction vehicles before they enter public streets to minimize carryout/track out; and cease grading and earth moving during periods of high winds (20 mph or more). APPLICANT’S RESPONSE:__________________________________________________________ 7. Prior to receiving final building or site occupancy, you must contact the Planning Division (staff contact noted above) for final inspection and approval of the landscaping, parking lot, lighting and other related site improvements. Inspections will not be conducted until all required items have been installed. Any deviations from the approved plans without prior approval from the Planning Division may result in reconstruction and delays in obtaining a building or site occupancy. APPLICANT’S RESPONSE:__________________________________________________________ C. FIRE DEPARTMENT (2101 H Street) (Staff contact - Ernie Medina; 661-326-3682 or EMedina@bakersfieldcity.us) 1. Show on the final building plans the following items: a. All fire lanes. Any modifications shall be approved by the Fire Department. Fire lane identification signs shall be installed every 100 feet with red curbing when curbing is PDR #22-0403 Page | 4 of 9 required. All work shall be completed before occupancy of any building or portion of any building is allowed. b. All fire hydrants, both offsite (nearest to site) and on-site. Include flow data on all hydrants. Hydrants shall be in good working condition and are subject to testing for verification. Fire flow requirements must be met prior to construction commencing on the project site. Please provide two (2) sets of the water plans stamped by a licensed Registered Civil Engineer to the Fire Department and two (2) sets to the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA. 93311; 661-326-3715). (Note: Show: 1) distance to the nearest hydrant; and 2) distance from that hydrant to the farthest point of the project site.) c. All fire sprinkler and/or stand pipe systems, fire alarms and commercial hood systems. These suppression systems require review and permits by the Fire Department. The Fire Department will issue guidelines for these various items as they may apply to this project. d. Project address, including suite number if applicable. If the project is within a shopping or business center, note the name and address of the center. e. Name and phone number of the appropriate contact person. APPLICANT’S RESPONSE:__________________________________________________________ 2. The developer must pay required fees to and request an inspection from the Water Resources Department (1000 Buena Vista Road, Bakersfield, CA, phone: 661-326-3715) for any underground sprinkler feeds at least 2 full business days before they are buried. The Prevention Services Division (2101 H Street, Bakersfield CA, Ph. 661/326-3979) must complete all on-site inspections of fire sprinkler systems and fire alarm systems before any building is occupied. APPLICANT’S RESPONSE:__________________________________________________________ 3. Where fire apparatus access roads or a water supply for fire protection are required to be installed, such protection shall be installed and made serviceable prior to and during the time of construction. APPLICANT’S RESPONSE:__________________________________________________________ 4. Facilities, buildings or portions of buildings hereafter constructed shall be accessible to fire department apparatus by way of an approved fire apparatus access road with an asphalt, concrete or other driving surface approved by the fire chief. Must be capable of supporting the imposed load of fire apparatus weighing at least 75,000 pounds and shall be surfaced with the first lift of asphalt as to provide all-weather driving capabilities. All access (Permanent and PDR #22-0403 Page | 5 of 9 temporary) to and around any building under construction must be a least 20 feet wide (26 feet wide where building height exceeds 30 feet), with an overhead clearance of 13 feet 6 inches, and contain no obstruction. The fire apparatus access road shall extend to within 150 feet of all portions of the facility and all portions of the exterior walls of the first story of the building as measured by an approved route around the exterior of the building or facility. APPLICANT’S RESPONSE:__________________________________________________________ 5. Turning Radius: The minimum turning radius shall be thirty-seven feet. APPLICANT’S RESPONSE:__________________________________________________________ 6. The minimum gate width shall be 20 feet and a minimum vertical clearance of thirteen (13) feet six (6) inches is required when the gate is at full open position. Where there is more than one gate and two or more driveways separated by islands, a minimum horizontal clearance of fifteen (15) feet for each driveway and a minimum vertical clearance of thirteen (13) feet six (6) inches is required when gates are at full open position. Horizontal distance shall be measured perpendicular to the direction of travel on the driveway. Vertical distance shall be measured from the highest elevation of the driveway to the lowest overhead obstruction. APPLICANT’S RESPONSE:__________________________________________________________ 7. Electric gates shall be equipped with a means of opening the gate by fire department personnel for emergency access. Emergency opening devices shall be approved by the fire code official. All new construction of access gates shall be equipped with an automatic opening device which is activated through the wireless activation system utilized on City of Bakersfield owned vehicles for traffic preemption. Installation and maintenance of the wireless activation system on access gate(s) shall be completed by the gate owner. The gate opening device shall have a disconnect feature for manual operation of the gate when the power fails. APPLICANT’S RESPONSE:__________________________________________________________ 8. All projects must comply with the current California Fire Code and current City of Bakersfield Municipal Code. APPLICANT’S RESPONSE:__________________________________________________________ PDR #22-0403 Page | 6 of 9 D. WATER RESOURCES (1000 Buena Vista Road) (Staff contact – Tylor Hester; 661-326-3009 or THester@bakersfieldcity.us) 1. Developer shall submit two (2) sets of utility plans signed by a California Registered Civil Engineer to the Water Resources Department showing all offsite and onsite improvements, including connections to the existing water main and underground fire waterlines and related apparatuses. Include any existing nearby on or off-site hydrants on the plans. Plans shall be submitted along with applicable plan check fees and any other associated fees per the current fee schedule. Plans shall comply with current City Standards and Specifications, California Fire Code, and City of Bakersfield Municipal Code. City Standards and Specifications and the current Fee Schedule are available for download from the City’s website at www.bakersfieldcity.us/379/water_resources APPLICANT’S RESPONSE:__________________________________________________________ E. PUBLIC WORKS - ENGINEERING (1501 Truxtun Avenue) (Staff contact – Susanna Kormendi; 661-326-3997 or skormendi@bakersfieldcity.us) 1. The developer shall construct curbs, gutters, cross gutters, sidewalks, and street/alley paving along Berkshire Road and Ashe Road according to adopted city standards. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. APPLICANT’S RESPONSE:__________________________________________________________ 2. The developer shall install streetlights along Berkshire Road and Ashe Road. The developer shall be responsible for providing the labor and materials necessary to energize all newly installed streetlights before occupancy of the building or site. These improvements shall be shown on the final building plans submitted to the Building Division before any building permits will be issued. Submit street light location and contact the Public Works Department at (661) 326-3584 for street light number. APPLICANT’S RESPONSE:__________________________________________________________ 3. If a grading plan is required by the Building Division, building permits will not be issued until the grading plan is approved by both the Public Works Department and the Building Division. APPLICANT’S RESPONSE:__________________________________________________________ 4. All storm water generated on the project site, including the street frontage shall be retained onsite unless otherwise allowed by the Public Works Department (please contact the Public Works Department – Subdivisions at 661-326-3576). PDR #22-0403 Page | 7 of 9 APPLICANT’S RESPONSE:__________________________________________________________ 5. Any proposed or future perimeter fence and/or wall shall be placed outside of existing public road right of way or future ultimate public right of way. APPLICANT’S RESPONSE:__________________________________________________________ 6. A sewer connection fee shall be paid at the time a building permit is issued. We will base this fee at the rate in effect at the time a building permit is issued. APPLICANT’S RESPONSE:__________________________________________________________ 7. Prior to the issuance of each building permit, or if no building permit is required, the first required City approval prior to construction, the developer/owner shall pay a Transportation Impact Fee (TIF) for regional facilities. This fee will be based on the rate in effect at the time the applicable approval is issued or in accordance with the Subdivision Map Act, as applicable. The Public Works Department will calculate an estimate of the total fee upon submittal of construction plans for the project. APPLICANT’S RESPONSE:__________________________________________________________ 8. The developer shall either construct the equivalent full width landscaped median island in Ashe Road along the development’s frontage or pay their proportionate share (1/2-width) of the total cost for the future construction of the median. Median islands shall be designed by the first development that occurs along an applicable street frontage. That developer shall either construct the full width landscaped median island or pay the median island fee. The median island fee shall be satisfied by fulfilling one of the following options: (1) Pay the standard fee of $100 per linear foot; or (2) Pay the calculated fee based upon actual cost estimates prepared by the Project Engineer, which shall be reviewed and approved by the City Engineer. If the median island is not constructed by the first development along an applicable street frontage, the second development along that street frontage shall construct the full width landscaped median island. APPLICANT’S RESPONSE:__________________________________________________________ 9. The developer shall form a new Maintenance District. Undeveloped parcels within an existing Maintenance District are required to update Maintenance District documents. Updated documents, including Proposition 218 Ballot and Covenant, shall be signed and notarized. If there are questions, contact Louis Rodriguez at 661-326-3571. (Note: If already within a maintenance district, may need to update the maintenance district form.) APPLICANT’S RESPONSE:__________________________________________________________ PDR #22-0403 Page | 8 of 9 F. PUBLIC WORKS - TRAFFIC (1501 Truxtun Avenue) (Staff contact – Susanna Kormendi; 661-326-3997 or skormendi@bakersfieldcity.us) 1. The developer shall dedicate additional road right-of-way to the City of Bakersfield along Berkshire Road to full collector width according to adopted city standards with the grading plan submittal. APPLICANT’S RESPONSE:__________________________________________________________ 2. The developer shall dedicate additional road right-of-way to the City of Bakersfield along Ashe Road to full arterial width according to adopted city standards with the grading plan submittal. APPLICANT’S RESPONSE:__________________________________________________________ 3. The developer shall dedicate any sidewalk extending out of the right of way to the City of Bakersfield for the pedestrian way along all arterial streets. This must be conducted with a separate instrument or final map. APPLICANT’S RESPONSE:__________________________________________________________ G. PUBLIC WORKS - SOLID WASTE (4101 Truxtun Avenue) (Staff Contact - Richard Gutierrez: 661-326-3114 or RMGutierrez@bakersfieldcity.us ) 1. You must contact the staff person noted above before building permits can be issued or work begins on the property to establish the level and type of service necessary for the collection of refuse and/or recycled materials. Collection locations must provide enough containment area for the refuse that is generated without violating required zoning or setback restrictions (see Planning Division conditions). Levels of service are based on how often collection occurs as follows:  Cart service -- 1 cubic yard/week or less 1 time per week  Front loader bin services -- 1 cubic yard/week - 12 cubic yards/day  Roll-off compactor service -- More than 12 cubic yards/day APPLICANT’S RESPONSE:__________________________________________________________ 2. Show on the final building plans refuse/recycle bin enclosures. Each enclosure shall be designed according to adopted city standard (Detail # ST-27 and ST-28), at the size checked below . Before occupancy of the building or site is allowed, 14, 3 -cubic yard front loading type refuse/recycle bin(s) shall be placed within the required enclosure(s). PDR #22-0403 Page | 9 of 9  ____________6' deep x 8' wide (1 bin)  ____________8' deep x 15' wide (3 bins)  ____________8' deep x 10' wide (2 bins)  ____________8' deep x 20' wide (4 bins)  ____________8' deep x 10' wide; on skids for direct stab only (1-6 yard recycling bin) (Note: All measurements above are curb-to-curb dimensions inside the enclosure. If both refuse and recycling containers are to be combined in the same enclosure area, this area must be expanded in size to accommodate multiple containers/bins - contact the staff person above for the appropriate enclosure size.) APPLICANT’S RESPONSE:__________________________________________________________ 3. Examples of enclosure styles can be found on (Detail # ST-32). APPLICANT’S RESPONSE:__________________________________________________________ 4. Facilities with existing refuse service must improve the service location area(s) according to adopted City standards (Detail # ST-27 and ST-28). These improvements shall be clearly shown on the final building plans. APPLICANT’S RESPONSE:__________________________________________________________ PARETO PL BARSANTIAVE MARCONIAVE CARDANOAVE THUNDER TRAIL DR PACIFIC PINESWAYSTARRUBY WAYPRECIOUSJEWEL WAYSTAR SAPPHIRE DR SHAVER DR WALKERS GLEN LNCROOM LNCHARTLEY LNHAWKINS COVE DROCEAN JASPER DRSPARKLER WAYAMMOLITE WAYCHRYSOLITEWAYDIAMOND SPRINGS DR BAGUETTE AVE SMOKY QUARTZ DR BERKSHIRE RD ASHE RDFUTURE BERKSHIRE RD Copyright nearmap 2015 BaseEditor_MV 0 200 400 Feet_ GPA/ZC 22-0125 CITY OF BAKERSFIELD GPA/ZC 22-0125 AERIAL A{E AÎE AvE AuE PDR 22-0403 GASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGASGAS3 CYTRASH 3 CYTRASH3 CYTRASH 3 CYTRASH (AMBULATORY)EV CAPABLE(ADA)EV CAPABLEEV CAPABLE EV CAPABLE EV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEEV CAPABLEVANEV CAPABLE 3 CYTRASH 3 CYTRASH 3 CYTRASH3 CYTRASH 3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF3-BED1,221 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED977 SF1-BED790 SF3-BED1,221 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED977 SF1-BED790 SF3-BED1,221 SF 2-BED993 SF 2-BED977 SF 1-BED790 SF 2-BED993 SF 3-BED1,174 SF 2-BED977 SF 1-BED790 SF 2-BED977 SF 1-BED790 SF 3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED987 SF2-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED987 SF4616COVER556664523212631658GARAGES8GARAGES8GARAGES8GARAGES8GARAGES48GARAGESEV CAPABLE EV CAPABLEEV CAPABLEEV CAPABLE22COVER3-BED1,221 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF 2-BED977 SF1-BED790 SF 2-BED977 SF1-BED790 SF3-BED1,221 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED977 SF1-BED790 SF(ADA)EV CAPABLEEV CAPABLE EV CAPABLE EV CAPABLEEV CAPABLE EV CAPABLE3 CYTRASH3 CYTRASH3 CYTRASH3 CYTRASH8GARAGES8GARAGES8GARAGES8GARAGES 18162573 CYTRASH3 CYTRASH3 CYTRASH3 CYTRASH8GARAGES 142-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED987 SF2-BED987 SF3-BED1,221 SF2-BED993 SF2-BED977 SF1-BED790 SF2-BED993 SF3-BED1,174 SF2-BED977 SF1-BED790 SF2-BED977 SF1-BED790 SF1817COVER22COVER66620COVER8COVER3028COVER36COVER28COVER10COVER16COVER10COVER10COVER23COVER66666554"48"72"72"60"TREESBOTANICAL NAMECOMMON NAMECONTWUCOLSFORMQTYREMARKSACACIA BAILEYANA 'PURPUREA'PURPLE-LEAF BAILEY ACACIA 24" BOX LOWSTANDARD 17 EVERGREENCHILOPSIS LINEARISDESERT WILLOW24"BOX VERY LOW STANDARD 14 DECIDUOUSELAEOCARPUS DECIPIENSJAPANESE BLUEBERRY TREE 24"BOX MODERATE STANDARD 4 EVERGREENERIOBOTRYA DEFLEXABRONZE LOQUAT24" BOX LOWSTANDARD 32 EVERGREENGEIJERA PARVIFLORAAUSTRALIAN WILLOW24" BOX MODERATE STANDARD 18 EVERGREENGLEDITSIA TRIACANTHOSHONEY LOCUST24" BOX LOWSTANDARD 20 DECIDUOUSLAURUS NOBILISSWEET BAY24"BOX LOWSTANDARD 14 EVERGREENOLEA EUROPAEA 'SWAN HILL'SWAN HILL OLIVE48" BOX VERY LOW MULTI6 EVERGREENPHOENIX DACTYLIFERA `DEGLET NOOR` DATE PALM12` BTH LOW8 MALE TREES; EVERGREENPINUS NIGRAAUSTRIAN BLACK PINE24" BOX LOWSTANDARD 68 EVERGREENPISTACIA CHINENSIS 'KEITH DAVEY' KEITH DAVEY CHINESE PISTACHE 24" BOX LOWSTANDARD 21 DECIDUOUSPLATANUS X ACERIFOLIA 'BLOODGOOD' LONDON PLANE TREE24" BOX LOWSTANDARD 33 DECIDUOUSPYRUS CALLERYANA 'ARISTOCRAT' ARISTOCRAT CALLERY PEAR 24" BOX MODERATE STANDARD 96 DECIDUOUSQUERCUS AGRIFOLIACOAST LIVE OAK24" BOX VERY LOW STANDARD 18 EVERGREENSCHINUS MOLLEPERUVIAN PEPPER24" BOX LOWSTANDARD 32 EVERGREENULMUS PARVIFOLIACHINESE ELM24" BOX MODERATE STANDARD 30 DECIDUOUSPLANT SCHEDULETREESBOTANICAL NAMECOMMON NAMECONTWUCOLSFORMQTYREMARKSACACIA BAILEYANA 'PURPUREA'PURPLE-LEAF BAILEY ACACIA 24" BOX LOWSTANDARD 17 EVERGREENCHILOPSIS LINEARISDESERT WILLOW24"BOX VERY LOW STANDARD 14 DECIDUOUSELAEOCARPUS DECIPIENSJAPANESE BLUEBERRY TREE 24"BOX MODERATE STANDARD 4 EVERGREENERIOBOTRYA DEFLEXABRONZE LOQUAT24" BOX LOWSTANDARD 32 EVERGREENGEIJERA PARVIFLORAAUSTRALIAN WILLOW24" BOX MODERATE STANDARD 18 EVERGREENGLEDITSIA TRIACANTHOSHONEY LOCUST24" BOX LOWSTANDARD 20 DECIDUOUSLAURUS NOBILISSWEET BAY24"BOX LOWSTANDARD 14 EVERGREENOLEA EUROPAEA 'SWAN HILL'SWAN HILL OLIVE48" BOX VERY LOW MULTI6 EVERGREENPHOENIX DACTYLIFERA `DEGLET NOOR` DATE PALM12` BTH LOW8 MALE TREES; EVERGREENPINUS NIGRAAUSTRIAN BLACK PINE24" BOX LOWSTANDARD 68 EVERGREENPISTACIA CHINENSIS 'KEITH DAVEY' KEITH DAVEY CHINESE PISTACHE 24" BOX LOWSTANDARD 21 DECIDUOUSPLATANUS X ACERIFOLIA 'BLOODGOOD' LONDON PLANE TREE24" BOX LOWSTANDARD 33 DECIDUOUSPYRUS CALLERYANA 'ARISTOCRAT' ARISTOCRAT CALLERY PEAR 24" BOX MODERATE STANDARD 96 DECIDUOUSQUERCUS AGRIFOLIACOAST LIVE OAK24" BOX VERY LOW STANDARD 18 EVERGREENSCHINUS MOLLEPERUVIAN PEPPER24" BOX LOWSTANDARD 32 EVERGREENULMUS PARVIFOLIACHINESE ELM24" BOX MODERATE STANDARD 30 DECIDUOUSPLANT SCHEDULECONCEPTUAL LANDSCAPE PLANBakersfield, CAMarch 8, 2023BERKSHIRE APARTMENTSLEGEND574321CONCRETE PAVING @ POOL DECK:COLOR: TBD (COLORED)FINISH: TOP CAST 03CONCRETE PAVING (TYP.):COLOR: NATURAL GRAYFINISH: SANDFITNESS WEIGHT AREA FLEX SPACEDECORATIVE CONCRETE UNITPAVERSSMALL GROUP BREAKOUT AREA:* APPROX. 300 SF CONCRETE PAVING* OVERHEAD SHADE STRUCTURE* 4 PERSON TABLE & CHAIRS* BBQDOG RUN:*APPROX. 800 SF CONCRETE PAVING*BENCH*DOG WASTE STATION*42" HIGH TUBULAR STEEL FENCE/GATE*DOG WASH STATION*SHADE STRUCTURE*SEAT WALL6ARTIFICIAL TURF FITNESS FLEXSPACE8TRANQUIL YOGA SPACE9DECORATIVE SPA/YOGA WALL10OUTDOOR KITCHEN/DINING:* APPROX. 500 SF CONCRETE PAVING* PREFAB SHADE STRUCTURE* 2 DINING TABLES* BUILT IN OUTDOOR KITCHEN W/ 2 BBQ's11SMALL GROUP BREAKOUT AREA:* APPROX. 300 SF CONCRETE PAVING* OVERHEAD FESTOON LIGHTING* SOFT SEATING12FIRE PIT:* DECORATIVE PAVING* BUILT IN SEATING* SOFT SEATING* PREFAB FIRE PIT136' HIGH TUBULAR STEEL POOL FENCE & GATE14FLEX TURF SPACE15BIKE RACKS (SHORT TERM PARKING)ASHE RD.GAS PIPEEASEMENT16RECREATION/PARTY AREA17"THE FRONT PORCH:"* DECOMPOSED GRANITE PAVING* ADIRONDACK SEATING* 2 PREFAB FIRE PITS18BENCH SEATING W/ ADA COMPANION(TYP.)BERKSHIRE RD.ADJACENT PROPERTYVACANTNOT A PARTADJACENTPROPERTYVACANTNOT A PARTBLDG. 1AMENITIESFITNESSPOOLSPAScale: 1" = 50'-0"100'25' 50'0L1123456789101111121314TURFTURF151617181819AGE 5-12 TOT LOT:* RUBBERIZED PLAY SURFACING* 1 PLAY EQUIPMENT* BENCH SEATING20AGE 2-5 TOT LOT:* RUBBERIZED PLAY SURFACING* MOUNDING20195521LANDSCAPE MOUNDING (TYP.)21222223PERIMETER CMU BLOCK WALL(SPLIT FACE)23235TURFTURFTURFBREAKOUT SEATING AREA:* CONCRETE PAVING* TABLES & CHAIRSTURF