Loading...
HomeMy WebLinkAboutRES NO 050-2023RESOLUTION NO. 0 5 0- 2 13 RESOLUTION DISPENSING WITH BIDDING UNDER SECTION 3.20.060(D)(5) OF THE BAKERSFIELD MUNICIPAL CODE RELATING TO DESIGN/BUILD CONSTRUCTION PROCUREMENT PROCESS FOR THE MODIFICATION AND UPGRADE TO THE ELECTRICAL INFRASTRUCTURE FOR THE BAKERSFIELD CONVENTION CENTER WHEREAS, the Convention Center has no trade show power infrastructure that provides safe, industry standard access to electricity for vendors during scheduled events; and WHEREAS, the Convention Center Exhibit Hall needs an outside firm to design/build the necessary electrical modifications and upgrades to the existing designated hall so that vendors and staff can access electricity for booths, equipment, lights, events, etc.; and WHEREAS, the use of design/build methodologies has been shown to be an effective method of reducing construction costs; and WHEREAS, the use of design/build joins the construction and design of a project under one single legal entity thereby reducing conflicts; and WHEREAS, the City Council believes the use of design/build is appropriate for certain unique projects where specialized design or construction methods are necessary or special design expertise must be employed; and WHEREAS, the City Council believes the public and the procurement process can be adequately protected through the use of a fair competitive process for choosing a design/build entity which best serves the interests of the City. NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows: 1. The above recitals are true and correct and incorporated herein by reference. 2. The Convention Center Trade Show Power Project is appropriate for design/build because of the specialized nature of the design and construction of the project. 3. The Convention Center Trade Show Power justifies exception to the bidding process and the City Council hereby determines that the - Page 1 of 2 Pages - ►- m OORIGINALr work, supplies equipment and material can best be obtained through the design/build construction procurement process. 4. Upon adoption of this Resolution, the Public Works Director is authorized to proceed with the design/build procurement process, as set forth in the Bakersfield Municipal Code Section 3.20.060(D) (5), for the Convention Center Trade Show Power Project. 5. The Public Works Director shall recommend a design/build entity that combines appropriately licensed contracting, architectural and engineering services, as needed, into one legal entity. 6. The Public Works Director shall invite no less than three appropriate design/build entities to participate in the selection process. 7. The Public Works Director shall, in a timely manner, bring the contract for award of the project to the, City Council for approval with a report setting forth the reasons the award is recommended to the chosen design/build entity. HEREBY CERTIFY that -the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on APR 2 & 2023 , by the following vote: NOES: ABSTAIN ABSENT: COUNCIL MEMBER ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, KAUR COUNCIL MEMBER COUNCIL MEMBER COUNCIL MEMBER JULIE DRIMAKIS, MMC City Clerk and Ex Officio Clerk of the APPROVED APR 2 S 2023 Council of the City of Bakersfield By KAREN GOH Mayor APPROVED AS TO FORM: VIRGINIA GENNARO City Attorney By Ashley mbrano Deput City Attorney - Page 2 of 2 Pages -