Loading...
HomeMy WebLinkAbout2023 SB989 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10121548 Test Date 4/17/2023 Facility Name ARCO Brundage & H Facility Address 1701 Brundage Ln City Bakersfield ZIP Code 93304 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/9/2023 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/9/2023 INCON STS 10/5/2023 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 4/17/2023 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Testing Setup Tank ID 87S 87M 87N 91 Tank Manufacturer Unknown Unknown Unknown Unknown Tank Capacity 9,684 9,684 9,684 9,684 Test Start Time 09:00 09:15 10:40 11:05 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 10:00 10:15 11:40 12:05 Final Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Piping Secondary Testing Setup Pipe Run ID 87S Product 87S-87M Tran 87M Product 87M-87N Tran Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time 12:20 09:05 09:10 14:10 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 13:20 10:05 10:10 15:10 Final Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Pipe Run ID 87N Product 91 Product Pipe Manufacturer Unknown Unknown Test Start Time 09:15 09:45 Initial Reading 5.0 PSI 5.0 PSI Test End Time 10:15 10:45 Final Reading 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID 87S STP 87M STP 87N STP 91 STP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 68 68 68 68 Sump Bottom to Top of Highest Pipe Penetration (inches) 41 43 41 41 Test Start Time 10:18 13:55 11:51 13:10 Initial Reading 3.9788 5.5310 5.9131 6.3899 Test End Time 10:33 14:11 12:06 13:25 Final Reading 3.9600 5.5295 5.9148 6.3898 Change in Reading 0.0188 0.0015 0.0017 0.0001 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID 87S Fill 87M Fill 87N Fill 91 Fill Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 68 68 68 68 Sump Bottom to Top of Highest Pipe Penetration (inches) 12 12 12 12 Test Start Time 14:59 14:32 14:32 14:59 Initial Reading 3.4571 1.7850 1.8659 3.7758 Test End Time 15:14 14:47 14:47 15:14 Final Reading 3.4584 1.7858 1.8678 3.7767 Change in Reading 0.0013 0.0008 0.0019 0.0009 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 32 32 32 32 Sump Bottom to Top of Highest Pipe Penetration (inches) 16 16 16 16 Test Start Time 12:33 12:53 12:53 13:19 Initial Reading 4.3852 6.8054 3.9095 3.3621 Test End Time 12:48 13:08 13:08 13:34 Final Reading 4.3835 6.8063 3.9084 3.3621 Change in Reading 0.0017 0.0009 0.0011 0.0000 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID UDC 9/10 UDC 11/12 Sump Manufacturer Unknown Unknown Sump Depth (inches) 32 32 Sump Bottom to Top of Highest Pipe Penetration (inches) 16 16 Test Start Time 15:29 14:59 Initial Reading 4.5872 5.9259 Test End Time 15:44 15:14 Final Reading 4.5866 5.9266 Change in Reading 0.0006 0.0007 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 87S STP Failed, must be repaired and retested. 4/17/2023 tested all Annulars, Lines, STPs and Fill Sumps; and UDC 9/10-11/12. 4/18/2023 tested UDC 1/2-7/8. 9. COMMENTS