HomeMy WebLinkAboutSB989 2023DISPENSER SUMP TEST
LINE ANNULAR TEST
SPILL BUCKET TEST
STP SUMP TEST
TANK ANNULAR TEST
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451-6334
Fax: (512) 459-1459 Date Printed and Mailed: 6/6/2023
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR KRIS KARNS
1501 TRUXTUN AVE.
BAKERSFIELD, CA 93301
Test Date: 5/31/2023
Order Number: 3462731
Dear Regulator,
Enclosed are the results of recent testing performed at the following facility:
7-ELEVEN 37942/59987
3225 BUCK OWENS BLVD., HWY 99/HWY 58
BAKERSFIELD, CA 93301
In an effort to keep all our record keeping and reporting requirements as current as possible,
Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com
when your CUPA requires all records to be submitted electronically via the CERS database. Your
assistance in this endeavor is greatly appreciated.
Testing performed:
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
10134880 05/31/2023
7-ELEVEN 37942/59987
3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301
Tanknology, Inc.800-964-1250
11000 N Mopac Expy #500 Austin, TX 78759
Franscico Castro
743160
8026747-UT 07/22/2023
07/22/2023
02/07/2026
ICC:CA UST Service Technician
Tanknology Certification:Level III Secondary Containment Testing Certification Exam
vplt sumps, udcs
pressure gauge secondary lines
vacuum gauge annulars
05/31/2023 5
vacuum gauge
dw steel dw steel dw steel
15k 10k 20k
08:40 08:40 11:00
10hg 10hg 10hg
09:40 09:40 13:00
5hg 10hg 10hg
5hg 0 0
0 0 0
T-1(REGULAR)T-2(PREMIUM)T-4(Diesel)
pressure gauge
dw fiber 2.5x150 dw fiber 2.5x150 dw fiber 3.5x400
08:30 08:30 not tested
5pis 5psi
09:30 09:30
5pis 1psi
0 4
0 0
TT-1 L1 (REGULAR) STP
Containment 1 to 1/2
TT-2 L1 (PREMIUM)Product Pipe for diesel to UDC
87 stp
fiber
54
19
09:00
0.1816
09:15
0.1810
0.0006
0.0020
91 stp
fiber
49
16
09:00
0.5689
09:15
0.5685
0.0004
0.0020
91 fill
fiber
48
12
09:20
0.4610
09:35
0.4605
0.0005
0.0020
87 fill
fiber
48
12
09:20
0.0629
09:35
0.0621
0.0008
0.0020
dsl stp
fiber
70
22not tested
dsl transition sump
fiber
46
22 not tested
dsl fill sump
fiber
68
14
11:35
0.0415
11:50
0.0400
0.0015
0.0020
vplt
unl 1/2
bravo box
10
2
09:40
0.1696
09:55
0.1686
0.0010
0.0020
unl 3/4
bravo box
10
2
09:40
0.0667
09:55
0.0663
0.0004
0.0020
unl 5/6
bravo box
10
2
09:40
0.6620
09:55
0.6618
0.0002
0.0020
unl 7/8
bravo box
10
2
09:40
0.1821
09:55
0.1817
0.0004
0.0020
dsl #9 udc
bravo box
10
2
12:20
0.3126
12:35
0.3123
0.0003
0.0020
dsl# 9/10 udc
bravo box
10
2
12:20
0.4488
12:35
0.4481
0.0007
0.0020
dsl# 10/11 udc
bravo box
10
2
12:20
0.4728
12:35
0.4721
0.0007
0.0020
dsl 11/12 udc
bravo box
10
2
12:00
0.2858
12:15
0.2854
0.0004
0.0020
vplt
vplt
dsl#12/13 udc
bravo box
10
2
12:00
0.3710
12:15
0.3708
0.0002
0.0020
dsl# 13 udc
10
2
12:00
0.4327
12:15
0.4323
0.0004
0.0020
bravo box
sb 989 not full completed.
91 product secondary failed pressure test at udc bravo box
87 annular failed vacuum test
dsl stp not test
dsl product sec not tested missing test boot
dsl transition sump not test
10134880 05/31/2023
7-ELEVEN 37942/59987
3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301
Tanknology, Inc.800-964-1250
11000 N Mopac Expy #500 Austin, TX 78759
Franscico Castro
743160
8026747-UT 07/22/2023
07/22/2023
04/17/2025
lake test spill buckets
05/31/2023 2
ICC:CA UST Service Technician
Franklin Fueling:Phil-Tite EVR Ph 1 Systems
87 fill dsl fill
philtite philtite
SWRCB, January 2006
Spill Bucket Testing Report Form
This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and
printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency.
1. FACILITY INFORMATION
Facility Name: 7-ELEVEN 37942/59987 Date of Testing: 5/31/2023
Facility Address: 3225 BUCK OWENS BLVD., HWY 99/HWY 58 , BAKERSFIELD, CA 93301
Facility Contact: Joel Phone: 661-229-9416
Date Local Agency Was Notified of Testing:
Name of Local Agency Inspector (if present during testing):
2. TESTING CONTRACTOR INFORMATION
Company Name: TANKNOLOGY INC.
Technician Conducting Test: Franscico Castro
Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify)
License Number(s): 743160 / 8026747
3. SPILL BUCKET TESTING INFORMATION
Test Method Used By: Hydrostatic Vacuum Other
Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in.
Identify Spill Bucket (By Tank
Number, Stored Product, etc.)
Bucket Installation Type:
Bucket Diameter:
Bucket Depth:
Wait time between applying
vacuum/water and start of test
Test Start Time (TI):
Initial Reading (RI):
Test End Time(TF):
Final Reading (RF):
Test Duration(TF–TI):
Change in Reading (RF–RI) :
Pass/Fail Threshold or Criteria:
Test Result:
Spill Box # Tank T-1
REGULAR - Vapor 1 -
Direct - Grade level in
containment sump
Direct Bury
Contained in Sump
11.00
12.50
15 min
09:30:00
12.00 in.
10:30:00
12.00 in.
1 hr
0.00 in.
+/- 0.00
Pass
Spill Box # Tank T-4 Diesel
- Fill 1 - Direct - Grade level
in containment sump
Direct Bury
Contained in Sump
11.00
12.50
15 min
11:00:00
12.00 in.
12:00:00
12.00 in.
1 hr
0.00 in.
+/- 0.00
Pass
Spill Box #
Direct Bury
Contained in Sump
min
+/-
Spill Box #
Direct Bury
Contained in Sump
min
+/-
Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests)
CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING
I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements.
Technician's Signature:Date:5/31/2023
1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent.
WO: 3462731
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:3462731
Site ID / Name:37942/59987 / 7-ELEVEN 37942/59987
Address:3225 BUCK OWENS BLVD., HWY 99/HWY 58
City:BAKERSFIELD State:CA Zip:93301
Test Duration Test Pressure P/F Threshold
Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test
Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test
Line Annular - Pressure 1 hr 5 psi 0 loss
STP Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
UDC Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
Spill Bucket - SW Vac 1 min 30" wc
no greater than 4" wc vaccum decay -
bucket must be dry
Spill Bucket - SW Hydro 1 hr
within 1.5" of top of the
bucket
less than 1/8" over hour, settle time
of 5 minutest minimum prior to
starting the test
Spill Bucket - DW Vac 1 min 15" wc
no greater than 3" wc vaccum decay -
int must be dry