Loading...
HomeMy WebLinkAboutSB989 2023DISPENSER SUMP TEST LINE ANNULAR TEST SPILL BUCKET TEST STP SUMP TEST TANK ANNULAR TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 6/6/2023 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR KRIS KARNS 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 5/31/2023 Order Number: 3462731 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN 37942/59987 3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD, CA 93301 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting 10134880 05/31/2023 7-ELEVEN 37942/59987 3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301 Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, TX 78759 Franscico Castro 743160 8026747-UT 07/22/2023 07/22/2023 02/07/2026 ICC:CA UST Service Technician Tanknology Certification:Level III Secondary Containment Testing Certification Exam vplt sumps, udcs pressure gauge secondary lines vacuum gauge annulars 05/31/2023 5 vacuum gauge dw steel dw steel dw steel 15k 10k 20k 08:40 08:40 11:00 10hg 10hg 10hg 09:40 09:40 13:00 5hg 10hg 10hg 5hg 0 0 0 0 0 T-1(REGULAR)T-2(PREMIUM)T-4(Diesel) pressure gauge dw fiber 2.5x150 dw fiber 2.5x150 dw fiber 3.5x400 08:30 08:30 not tested 5pis 5psi 09:30 09:30 5pis 1psi 0 4 0 0 TT-1 L1 (REGULAR) STP Containment 1 to 1/2 TT-2 L1 (PREMIUM)Product Pipe for diesel to UDC 87 stp fiber 54 19 09:00 0.1816 09:15 0.1810 0.0006 0.0020 91 stp fiber 49 16 09:00 0.5689 09:15 0.5685 0.0004 0.0020 91 fill fiber 48 12 09:20 0.4610 09:35 0.4605 0.0005 0.0020 87 fill fiber 48 12 09:20 0.0629 09:35 0.0621 0.0008 0.0020 dsl stp fiber 70 22not tested dsl transition sump fiber 46 22 not tested dsl fill sump fiber 68 14 11:35 0.0415 11:50 0.0400 0.0015 0.0020 vplt unl 1/2 bravo box 10 2 09:40 0.1696 09:55 0.1686 0.0010 0.0020 unl 3/4 bravo box 10 2 09:40 0.0667 09:55 0.0663 0.0004 0.0020 unl 5/6 bravo box 10 2 09:40 0.6620 09:55 0.6618 0.0002 0.0020 unl 7/8 bravo box 10 2 09:40 0.1821 09:55 0.1817 0.0004 0.0020 dsl #9 udc bravo box 10 2 12:20 0.3126 12:35 0.3123 0.0003 0.0020 dsl# 9/10 udc bravo box 10 2 12:20 0.4488 12:35 0.4481 0.0007 0.0020 dsl# 10/11 udc bravo box 10 2 12:20 0.4728 12:35 0.4721 0.0007 0.0020 dsl 11/12 udc bravo box 10 2 12:00 0.2858 12:15 0.2854 0.0004 0.0020 vplt vplt dsl#12/13 udc bravo box 10 2 12:00 0.3710 12:15 0.3708 0.0002 0.0020 dsl# 13 udc 10 2 12:00 0.4327 12:15 0.4323 0.0004 0.0020 bravo box sb 989 not full completed. 91 product secondary failed pressure test at udc bravo box 87 annular failed vacuum test dsl stp not test dsl product sec not tested missing test boot dsl transition sump not test 10134880 05/31/2023 7-ELEVEN 37942/59987 3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301 Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, TX 78759 Franscico Castro 743160 8026747-UT 07/22/2023 07/22/2023 04/17/2025 lake test spill buckets 05/31/2023 2 ICC:CA UST Service Technician Franklin Fueling:Phil-Tite EVR Ph 1 Systems 87 fill dsl fill philtite philtite SWRCB, January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-ELEVEN 37942/59987 Date of Testing: 5/31/2023 Facility Address: 3225 BUCK OWENS BLVD., HWY 99/HWY 58 , BAKERSFIELD, CA 93301 Facility Contact: Joel Phone: 661-229-9416 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Franscico Castro Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify) License Number(s): 743160 / 8026747 3. SPILL BUCKET TESTING INFORMATION Test Method Used By: Hydrostatic Vacuum Other Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Identify Spill Bucket (By Tank Number, Stored Product, etc.) Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test Test Start Time (TI): Initial Reading (RI): Test End Time(TF): Final Reading (RF): Test Duration(TF–TI): Change in Reading (RF–RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T-1 REGULAR - Vapor 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 11.00 12.50 15 min 09:30:00 12.00 in. 10:30:00 12.00 in. 1 hr 0.00 in. +/- 0.00 Pass Spill Box # Tank T-4 Diesel - Fill 1 - Direct - Grade level in containment sump Direct Bury Contained in Sump 11.00 12.50 15 min 11:00:00 12.00 in. 12:00:00 12.00 in. 1 hr 0.00 in. +/- 0.00 Pass Spill Box # Direct Bury Contained in Sump min +/- Spill Box # Direct Bury Contained in Sump min +/- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:Date:5/31/2023 1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. WO: 3462731 Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3462731 Site ID / Name:37942/59987 / 7-ELEVEN 37942/59987 Address:3225 BUCK OWENS BLVD., HWY 99/HWY 58 City:BAKERSFIELD State:CA Zip:93301 Test Duration Test Pressure P/F Threshold Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test Line Annular - Pressure 1 hr 5 psi 0 loss STP Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test UDC Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test Spill Bucket - SW Vac 1 min 30" wc no greater than 4" wc vaccum decay - bucket must be dry Spill Bucket - SW Hydro 1 hr within 1.5" of top of the bucket less than 1/8" over hour, settle time of 5 minutest minimum prior to starting the test Spill Bucket - DW Vac 1 min 15" wc no greater than 3" wc vaccum decay - int must be dry