Loading...
HomeMy WebLinkAboutRES NO 079-2023RESOLUTION NO. 07 9- 2 02 3 RESOLUTION DETERMINING THAT URGENT REPAIRS TO SOLID WASTE LOADER CANNOT BE REASONABLY OBTAINED THROUGH THE USUAL BIDDING PROCEDURES AND AUTHORIZING THE FINANCE DIRECTOR TO DISPENSE WITH BIDDING BECAUSE OF NECESSITY TO INTEGRATE WITH EXISTING EQUIPMENT, NOT TO EXCEED $66,000. WHEREAS, on January 4, 2023, a 2020 Solid Waste loader, equipment number 3650, was found to be malfunctioning resulting in the need for major repairs; and WHEREAS, the loader was sent to Quinn Company for troubleshooting and diagnosis as it is the factory authorized dealer and repair center; and WHEREAS, a work order estimate has been submitted by Quinn Company attached hereto and incorporated by reference herein as Exhibit A for approximately $60,690 based on the initial inspection of the loader, which does not include sales tax on parts; and WHEREAS, the repairs could only be reasonably obtained from one vendor because of the necessity to successfully integrate the repairs, parts, and equipment into the vehicle by the factory authorized vendor; and WHEREAS, the repairs have been determined to be necessary as the unit is integral to providing vital waste collection services to the City; and WHEREAS, the Public Works Director recommends the Council to dispense With bidding requirements, in accordance with subsection D.2 of Section 3.20.060 of the Bakersfield Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The above recitals are true and correct and incorporated herein by reference. 2. Based on the facts included in the above recitals, the work, supplies, equipment, and materials and the necessity to successfully repair the loader, as a whole, to function properly can only be provided by the factory authorized repair facility, Quinn Company. Page 1 6P1<4 t m 0 0ORIGNAL 3. The Finance Director is authorized to dispense with bidding in accordance with subsection D.2 of Section 3.20.060 of the Bakersfield Municipal Code. 4. The expenditure of funds for said work and equipment shall not exceed Sixty -Six Thousand Dollars ($66,000). 5. The City Clerk shall attest and certify to the passage and adoption of this Resolution and it shall become effective immediately upon its approval. HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by the Council of the City of Bakersfield at a regular meeting thereof held on JUN 1 4 2023 by the following vote: AY - COUNCILMEMBER ARIAS, GONZALES, WEIR, SMITH, FREEMAN. GRAY. (AIR ES: COUNCILMEMBER ABSTAIN: COUNCILMEMBER ABSENT: COUNCILMEMBER J LIE DRIMAKIS, CMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: 1UN 1 4 21323 By A EN .• Mayor APPROVED AS TO FORM: VIRGINIA GENNARO, CITY ATTORNEY By 1a•7R.G�-/ LASHLEY ZAMBRANO Deputy City Attorney Page 2 o49PKeq > m 'CR!GINALo Quote No, 116632.1 CITY OF BAKERSFIELD P O E 6555 1501 TRUXTUN AVE e 1,Mn CIo n n"n4 cons V'CUSTOMER NO. V V QUOTE NO. DATE CONTACT 046100 116632 2/2/2023 PHONE NO. FAX NO. EMAIL MODEL MAKE SERIAL NO. 950M AA OJl SO3556 UNIT NO. HOURS WO NO. P.O. NO. 3650 5885 Note BE86364 CITY OF BAKERSFIELD Jl S03556 ENGINE REPLACEMENT. SEGMENT: 01 TRAVEL TO/FROM MACHINE NOTES: Parts Part Number Description Labor Labor Summary Misc Description SEGMENT: 02 CALIBRATE BUCKET NOTES: Parts Part Number Description Labor Labor Summary Qty Unit Price Eat Price Total Estimated Parts: 0.00 Ext Price 380.00 Total Estimated Labor: 380.00 Qty Unit Price Ent Price Total Estimated Misc: 65.00 Total: 445.00 Qty Unit Price Ext Price Total Estimated Parts: 0.00 Ext Price 954.00 Total Estimated Labor: 954.00 �,6AKE-9 o `T CITY OF BAKERSFIELD 116632 - 1 Page 1 'ORIGINAL 02 Total: 954.00 SEGMENT: 03 INSPECT & REPAIR ENGINE COOLANT LEAK(S) NOTES: Parts city Unit Price Ext Price Part Number Description 1 15.39 15.39 4621171 FILTER-LUBE 2228 2228 5153973 CAT DEO-ULS 15W-40 1 Total Estimated Parts: 37.67 Labor Ext Price Total Estimated Labor: 5,445.50 Labor Summary Senment 03 Total: 5,483.17 SEGMENT: 04 REMOVE & INSTALL ENGINE NOTES: Parts lily Unit Price Ext Price Part Number Description 1 42,290.42 42,290.42 5286648 ENGINE AR -PR Total Estimated Parts: 42,290.42 Labor Ext Price 8,745.00 Total Estimated Labor: 8,746.00 Labor Summary Segment 04 Total: 51,035.42 SEGMENT: 05 REMOVE & INSTALL RADIATOR NOTES: Parts city Unit Price Ext Prim Part Number Description0.00 Total Estimated Paris: Labor Ext Price 1,272.00 Total Estimated Labor: 1,272.00 Labor Summary Misc Oty Unit Price Ext Price Description Total Estimated Misc: 1,500.00 Segment 05 Total: 2,772.00 Total Segments: 60,689.59 oepKfgs� m CITY OF BAKERSFIELD 116632 - 1 Page 2 r c 0OPIG4'.0- SUBTOTAL 60,689.59 TE OF THE FEE THIS ESTIMATE IS EFFECTIVE FOR so On ys room m�u•. •••..•�^•---- - ESTIMA DREPAIR TIME: rom start data Thank you for giving QUINN the opportunity to quota your--I-repair options. My Signature below Indicates I have read, understand and agree with the attached terms and conditions. ....._�-.... u..... Please Print Data_/ / (Signature) Prepared b : TommyAllard Phone: Email: Tomm .AIIeM OuinnCom an .com Fan: o�PKf 9s� a m 116632 - t Page 3 CITY OF BAKERSFIELD o NA'- pP.IGI