Loading...
HomeMy WebLinkAboutROI NO 2169RESOLUTION OF INTENTION NO.2169 A RESOLUTION DECLARING INTENTION TO ESTABLISH THE GOSFORD ROAD PLANNED SEWER AREA AND PRELIMINARILY APPROVING THE COST AND FEE SCHEDULE AND THE BOUNDARIES OF THE AREA. WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal Code and Section 66483 of the California Government Code, provides for a procedure by which the City Council may assess and collect fees for the purpose of defraying the cost of constructing sewer facilities for local and neighborhood sewer areas, and; WHEREAS, The City of Bakersfield desires to provide sewer facilities for a rapidly developing area as shown on the map entitled "Gosford Road Planned Sewer Area" attached hereto as Exhibit "A", and incorporated by reference, and; WHEREAS, the parcels within the "Gosford Road Planned Sewer Area" will receive a benefit from the sewer system shown in Exhibit "A". WHEREAS, the developer of Tract 6859 will construct a portion of the sewer system shown in Exhibit "A"; WHEREAS, the remaining parcels shall construct the sewer system along their parcel frontage and/or fund their proportionate fair share of the sewer system shown in Exhibit "A"; WHEREAS, the City desires to recoup the cost of constructing said sewer line; WHEREAS, the City has notified all affected property owners and is proposing the formation of the Gosford Road Planned Sewer Area to reimburse the cost of the improvements upon subdivision or development of property within the Gosford Road Planned Sewer Area; and WHEREAS, the fees and charges set forth in Exhibits "B" and "C" attached hereto and incorporated by reference, are based on the actual cost of providing the services for which the fees are charged. WHEREAS, parcels which construct more than their proportionate fair share of the sewer system shown in Exhibit "A" shall be reimbursed through credits towards sewer fees of the corresponding project or fees collected as shown on Exhibit "C." o0PQ,9 m - Page 1 of 3 Pages - NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: The foregoing recitals are true and correct and are incorporated herein. 2. The Council hereby preliminarily approves the cost and fee schedule attached hereto as Exhibits "B" and "C", and the boundary of the "Gosford Planned Sewer Area" area of benefit and limits of improvements as described on the map attached hereto as Exhibit "A". Subdivision or development of property within such area will require payment of fees per the attached schedule. 3. The City Council hereby fixes Wednesday, June 28, 2023, at 5:15 PM, or as soon as thereafter as may be heard, at the Council Chambers of the City Council, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for hearing protests on the following matters: BENEFITTED AREA COST ESTIMATE FEE SCHEDULE HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on JUN 1 4 2023 by the following vote: fYE COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, KAUR ES: COUNCILMEMBER: ABSTAIN: COUNCILMEMBER: ABSENT: COUNCILMEMBER: 4/�� �� /� 1 ■\I1N� - �RNJ J LIE DRIMAKIS, CPMC, MMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: UN i 4 2023 By: %— KAREN GOH MAYOR ePKF9s [Additional Signatures on Following Page] p „� r m F- Page 2 of 3 Pages - 3ORIGINO APPROVED as to form: VIRGINIA GENNARO City Attorney By: FE U VIRIDIANA ALLARDO-KING Deputy City Attorney VGKag Attachments: Exhibit "A" Boundary Map and Limits of Improvements Exhibit "B" Cost Estimate Exhibit "C" Fee Schedule S:\C0UNCIL\Resos\22-23\R0I - Gosford Road (M331.doc O gAKF,9`I'T > rn Page 3 of 3 Pages - � ` 0RIGINAL� EXHIBIT A - GOSFORD ROAD PLANNED SEWER AREA 0 Elf N fn W K K� �3Hy 35100NA 322.9] INV 14 35O TNOvN 22961NV 2'N2]2296 N4S INV INV xV xV xV TE3liATIY£ TflACT Blilli $ BOTTL!!O FACY_Tt�j32�A APMRI T y 1049,22].91NV2NB.DO T.DM..]1 INV I J2V 05 I.119"N J2485 INV. 18"5 / NDISiPNL AiEA em AO® a maremF�m10 - .. •_ .... ma.. _.. :� .NHyS 345 o0 TOM.. - ]26.21 INV. 10'N - R6.211NV. 1B5 m MHO 4 34550T0 �] 326BI INV. 18"N 32681 INV. 19'S TBNel1VF Ytrnrr ®BO saGp Acla® �gyl, t s8 e -- MHy 2 WAY 119 345.00 TO M. 3 761 INV. 16'N 328.14 INV. 10 5 MHy I ]u oo TO. Y^'b1 12910 INV 10 N 32910 INV 10"S 05/16/2023 MM�o}CIWOSH o n µ K11.... o EYGIYFEGIY4 GGGYY ... � 2001 NHEELAN CT BMERSOEN, CA 93309(661I 8N,814 T.O.M INV 1 T.O.M. V1 McCUTCHEN ROAD FJl6Tlq E3PCHT9 PPiK (NOT A PARK LEGEND � ^ -- - -- CENTERLINE OF STREET ------ WWTP BOUNDARY ■EEMEMEME■ PEA BOUNDARY —— SEWER LINE 0 SEWER MANHOLE WWTP /J OR PLANT y3 NTs. 0PKF9 o sT > m ~ O ORIGINAL EXHIBIT B Contraction Cost Estimate for Gosford Reed Planned Sewer Ana Bursar Improvments from McCutchen Road to Taft Hig" EDU 2452.00 Date: 05/16/2023 Job No: 21014 Prepared By. my Item No. them Description ON Unit Unit $ Item S TOTALS Sawerlmprovelrwnis 1. K Sewer Stub and Plug 80 If 150,00 12,000 2. 10' Sewer Line 600 If 185.00 111,000 2. WSewer Line 3592 I 325.00 1,167,400 3. 24"Sewer Line 1200 If 31500 450,000 4. 24" Road Bore across Taft Highway 220 If 90000 198,000 5. 48" PVC Lined Manhole 11 ea 25000.00 275,000 6. 84' Manhole (Tie-in to Exerting Sewer Stub) 1 as 60000,00 60,000 * Video Sewer 1 Ia 7500.00 7,500 Subtotal 2,280,900 Subtotal, All of above: 2,280,900 Contingency 20% 456,180 SUBTOTAL, CONSTRUCTION COSTS: 2,737,M City of Sai esfsld Fan 8. Plan Ched Fees: 33.605 9. Inspection Fees'. 50,943 10. Document Imaging Fee: 6 sheet 1.60 10 11. Improvement Bonds: 41056 Subtotal 125,614 Design Engineering 12. Congo Engineering d Flow Monthonng', 6% 164225 Subtotal 164,225 Traffic Control 13. Maintain Traffic Control 5% 136,854 Subtotal 136,854 Construction Administration 14. Construction Inspection'. 2% 54,742 15. Construction Staking: 4% 109453 Subtotal 164,225 TOTAL ESTIMATED COST OF PROJECT: 3,3P,98B EST WATED COST PER EDU: S 1,357.26 05/15/2023 epKF9 o sT MCINTOSH Br/4S500IATE5, Grvil Eigin¢ersd Land Surveyors, 2001 WTeeWn Gout, Bakersfield CalRornia9J309 r m 21014_Gartand Road PSA Construction Estimate Page 1 of 2 Goal Eatimat - p ORIGINAL EXHIBIT C Gosford Road Planned Sewer Area Fee Schedule' Note 1: This fee will increase each year based on the Los Angeles Construdion Cost Index. Note 2: The Commercial and Industrial Properties will be based on 6 edWacre Note 3: The holding plant will be based on 1.111 Ertl 05/16/2023 o�`0pKF9s r T t00P.IGINAL�