Loading...
HomeMy WebLinkAbout2023 SB989 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10159413 Test Date 6/1/2023 Facility Name Obie's Downtown Shell (South) Facility Address 2317 L St. (South) City Bakersfield ZIP Code 93301 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/9/2023 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/9/2023 INCON STS 10/5/2023 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 6/1/2023 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Testing Setup Tank ID 87/Diesel 91 Tank Manufacturer Unknown Unknown Tank Capacity 20,153 10,145 Test Start Time 08:50 09:10 Initial Reading -10.00 InHg -10.00 InHg Test End Time 10:50 10:10 Final Reading -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Piping Secondary Testing Setup Pipe Run ID 87 1-10 87 3-12 91 1-10 91 3-12 Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time 08:30 08:35 08:45 08:50 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 09:30 09:35 09:45 09:50 Final Reading 3.0 PSI 5.0 PSI 1.0 PSI 5.0 PSI Change in Reading 2.0 PSI 0.0 PSI 4.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Pipe Run ID Diesel 1-10 Diesel 3-12 Pipe Manufacturer Unknown Unknown Test Start Time 08:15 08:20 Initial Reading 5.0 PSI 5.0 PSI Test End Time 09:15 09:20 Final Reading 1.0 PSI 0.0 PSI Change in Reading 4.0 PSI 5.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID 87 STP 91 STP Diesel STP UDC 1/2 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 38 38 38 30 Sump Bottom to Top of Highest Pipe Penetration (inches) 15 15 15 16 Test Start Time Visual 11:41 Visual 10:07 Initial Reading Failure 5.8942 Failure 2.9049 Test End Time Torn 11:56 Torn 10:22 Final Reading Sump 5.8488 Sump 2.7238 Change in Reading Penetration 0.0454 Penetration 0.1811 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail ☐ Pass X Fail ☐ Pass X Fail Sump/UDC ID UDC 3/4 UDC 5/6 UDC 7/8 UDC 9/10 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 30 30 30 30 Sump Bottom to Top of Highest Pipe Penetration (inches) 16 16 16 16 Test Start Time 10:07 12:32 12:32 13:13 Initial Reading 2.3031 3.9049 4.6414 2.7831 Test End Time 10:22 12:47 12:47 13:28 Final Reading 1.9553 3.5903 4.0007 1.7200 Change in Reading 0.3478 0.3146 0.6344 1.0631 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail ☐ Pass X Fail ☐ Pass X Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID UDC 11/12 Sump Manufacturer Unknown Sump Depth (inches) 30 Sump Bottom to Top of Highest Pipe Penetration (inches) 16 Test Start Time 13:13 Initial Reading 5.8461 Test End Time 13:28 Final Reading 5.1255 Change in Reading 0.7206 Pass/Fail Criteria +/- 0.0020 Tightness Test Results ☐ Pass X Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 9. COMMENTS