Loading...
HomeMy WebLinkAboutSB989 2023 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10120489 Test Date 6/8/2023 Facility Name Samco Oak Facility Address 1131 Oak St City Bakersfield ZIP Code 93304 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/9/2023 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/9/2023 INCON STS 10/5/2023 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 6/8/2023 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Testing Setup Tank ID 871 872 91 Diesel Tank Manufacturer Unknown Unknown Unknown Unknown Tank Capacity 9,842 9,842 9,842 9,842 Test Start Time 08:35 09:45 10:50 13:00 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 09:35 10:45 11:50 14:00 Final Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Piping Secondary Testing Setup Pipe Run ID 871 Product 872 Product 91 Product Diesel Prod. Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time Line 08:40 Line 08:40 Initial Reading Would 5.0 PSI Would 5.0 PSI Test End Time Not 09:40 Not 09:40 Final Reading Hold 5.0 PSI Hold 5.0 PSI Change in Reading Pressure 0.0 PSI Pressure 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID 871 Fill 872 Fill 91 Fill Diesel Fill Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 68 68 68 68 Sump Bottom to Top of Highest Pipe Penetration (inches) 34 34 34 34 Test Start Time 09:18 09:55 11:11 12:18 Initial Reading 4.5250 3.8176 5.1638 3.2064 Test End Time 09:33 10:10 11:26 12:33 Final Reading 4.5240 3.8162 5.1630 3.2084 Change in Reading 0.0010 0.0014 0.0008 0.0020 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID 871 STP 872 STP 91 STP Diesel STP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 68 68 68 68 Sump Bottom to Top of Highest Pipe Penetration (inches) 25 25 25 25 Test Start Time 15:28 14:38 13:06 12:00 Initial Reading 3.6016 3.0143 3.9945 4.2861 Test End Time 15:43 14:53 13:21 12:15 Final Reading 3.6001 3.0124 3.9945 4.2848 Change in Reading 0.0015 0.0019 0.0000 0.0013 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID UDC 1/2 UDC 3/4 UDC 5/6 UDC 7/8 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 40 40 40 40 Sump Bottom to Top of Highest Pipe Penetration (inches) 21 21 21 21 Test Start Time 16:09 16:27 17:39 17:39 Initial Reading 3.4530 5.8264 2.6858 4.0664 Test End Time 16:24 16:42 17:54 17:54 Final Reading 3.4537 5.8265 2.6183 4.0666 Change in Reading 0.0007 0.0001 0.0675 0.0002 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail X Pass ☐ Fail Sump/UDC ID UDC 9/10 Sump Manufacturer Unknown Sump Depth (inches) 40 Sump Bottom to Top of Highest Pipe Penetration (inches) 21 Test Start Time 18:07 Initial Reading 5.3775 Test End Time 18:22 Final Reading 5.3759 Change in Reading 0.0016 Pass/Fail Criteria +/- 0.0020 Tightness Test Results X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 91 Line failed due to leaking boot in Disp 9/10. 871 Line failure point could not be found. Disp 5/6 failed, must be repaired and retested. 9. COMMENTS