HomeMy WebLinkAboutRES NO 100-2023RESOLUTION NO. 10 2 02 3
A RESOLUTION ADOPTING THE GOSFORD
ROAD PLANNED SEWER AREA AND MAKING
FINDINGS RELATIVE THERETO.
WHEREAS, the City Council by Resolution of Intention No. 2169, adopted
June 14, 2023, in the Council chambers in the City Hall, 1501 Truxtun Avenue,
Bakersfield, California, identified the amended fee schedule and boundary of
the Gosford Road Planned Sewer Area; and
WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal Code
and Section 66483 of the California Government Code, provides for a
procedure by which the City Council may assess and collect fees for the
purpose of defraying the cost of constructing sewer facilities for local and
neighborhood sewer areas, and;
WHEREAS, The City of Bakersfield desires to provide sewer facilities for a
rapidly developing area as shown on the map entitled "Gosford Road Planned
Sewer Area" attached hereto as Exhibit "A", and incorporated by reference,
and;
WHEREAS, the parcels within the "Gosford Road Planned Sewer Area" will
receive a benefit from the sewer system shown in Exhibit "A".
WHEREAS, the developer of Tract 6859 will construct a portion of the sewer
system shown in Exhibit "A";
WHEREAS, the remaining parcels shall construct the sewer system along
their parcel frontage and/or fund their proportionate fair share of the sewer
system shown in Exhibit "A";
WHEREAS, the City desires to recoup the cost of constructing said sewer
line;
WHEREAS, the City has notified all affected property owners and is
proposing the formation of the Gosford Road Planned Sewer Area to reimburse
the cost of the improvements upon subdivision or development of property.
within the Gosford Road Planned Sewer Area; and
WHEREAS, the fees and charges set forth in Exhibits "B" and "C" attached
hereto and incorporated by reference, are based on the actual cost of
providing the services for which the fees are charged.
WHEREAS, parcels which construct more than their proportionate fair share,eaK,4-,'
of the sewer system shown in Exhibit "A" shall be reimbursed through cred@ %�
- Pa e 1 of 3 Pa es - — m
9 9 'ORIGINP,L�
towards sewer fees of the corresponding project or fees collected as shown on
Exhibit "C."
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield
as follows:
1. The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby finds that, as to the Gosford Road sewer, as
described in the fee schedules attached hereto and incorporated herein by
reference, subdivision and development of property within such area will benefit
from the construction of said sewer facilities, and that the fees provided are
fairly apportioned either on the basis of benefits conferred on property for
subdivision or on the need for such facilities created by the proposedsubdivision
and development of other property within such area.
3. The Gosford Road Planned Sewer Area is hereby adopted.
HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
JUN 2 8 2023 , by the following vote:
1-1 .11 V,
AYES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, KAUR
NOES: COUNCILMEMBER:
ABSTAIN: COUNCILMEMBER:
ABSENT: COUNCILMEMBER:
a I�i
J LIE DRIMAKIS, , AMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED: UN 2 8 2023
By:
KAREN GOH
MAYOR
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
[Additional Signatures on Following Page]
> m
- Page 2 of 3 Pages - Q
ORIGINAL
By:
VIRIDIANA GAL RDO-KING
Deputy City Attorney
VGKag
Attachments: Exhibit "A" Boundary Map and Limits of Improvements
Exhibit "B" Cost Estimate
Exhibit "C" Fee Schedule
S:\COUNCIL\Resos\22-23\Resolution - Gosford Road.doc
- Page 3 of 3 Pages -
� o
�pp!Cl�1R!
EXHIBIT A - GOSFORD ROAD PLANNED SEWER AREA
0
Q
0
Ir
cn
(n
r
0 MH# 15 MH# 14
0 351.00 T.O.M. 351.00 T.O.M.
n322.93 INV. 24'S 322.96 INV. 24'N
320.53 INV. 60"N 322.96 INV. 24'S
MHjt 13
sk 351.00 T.O.M.
MH# 11 N 323.18 INV. 24"N
349.50 T.O.M. N 323.10 INV. 24'S
323.54 INV. 24"N
323.54 INV. 24" S MH/ 12
350.00 T.O.M.
PARCEL MAP tO573 , 323.51 INV. 24"N
(NOT A PART) "' 323.51 INV. 24"S
a
N
TENTATIVE TRACT 6M BOTTL 401 FACILITY
(NOT A PART) 3000 AC N-=B MH# 10
1,m EDU 348.90 T.O.M.
323.91 INV. 24-N
348.00 T.O.M. m 324.31 INV. 18"S
324.85 INV. 18"N
324.85 INV. 18"S
327.33 INV. 8"W
MH# 8
347.50 T.O.M.
INDUSTRIAL AREA 325.37 INV. 18"N
16.05 ACRES 325.37 INV. 18"S
96 EDU
MH# 7
346.00 T.O.M. MH# 6
325.65 INV. 18'N 345.50 T.O.M.
= \ 325.65 INV. 18"S 325.96 INV. 18'N
328.05 INV. 8"SW 325.96 INV. 18"S
TENTATIVE TRACT 6839
6C)12 A 4
7 EHX MH# 5
-� �j �r 345.00 T.O.M.
1 ' 1 326.27 INV. 18"N
r 326.27INV. 18"S V)
/ -- MH# 4 O COMRCI MEAL
345.50 T.O.M. V) 43Z7 ACFiE9
ffHE L' 326.81 INV. 18"N 0 � �
- 326.81 INV. 18"S
Q 346.00 T.O.M.
TENTATIVE TRACT 6860 0 m
8920 ACRES w 327.25 INV. 18"N
258 EDu --- g 327.25 INV. 18"S
- ; m 329.75 INV. 8"E-W
- Ua
I.
MH# 2
WAY 11 9 345.00 T.O.M. o
327.61 INV. 18"N
328.14 INV. 10"S
�LfESSIq„_ S
'Y m
McCUTCHEN R
A
■
■
344.00 M O.M. LEGEND
No. 551 329.10 INV. 10"N Q W
* 329.10 INV. 10"S Q IL � CENTERLINE OF STREET
crv1�- `t- Q J ----- WWTP BOUNDARY
05/16/2023 00� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ PSA BOUNDARY
s SEWER LINE
MMCIWOSH i m SEWER MANHOLE
o
® WWTP jE3 OR PLANT3
&
0 N.T.S. } m
MEN GEN ENGINEERING GROUP 7
2001 BHEELAN CT. BAKERSFIELD, CA 93309 (661) 834-4814 I pRIGINAL
P:\PMU.[CTS\0014.0D-TNE0.%\SWM\F5 \E MTS\M EX�&T.D
EXHIBIT B
Construction Cost Estimate for Gosford Road Planned Sewer Area
Date:05/16/2023
Sewer Improvments from McCutchen Road to Taft Highway
Job No: 21014
Prepared By: mjt
EDU 2452.00
Item No. Item Description
Qty
Unit
Unit $
Item $
TOTALS
Sewer Improvements
1. 8" Sewer Stub and Plug
80
If
150.00
12,000
2. 10" Sewer Line
600
If
185.00
111,000
2. 18" Sewer Line
3592
If
325.00
1,167,400
3. 24" Sewer Line
1200
If
375.00
450,000
4. 24" Road Bore across Taft Highway
220
If
900.00
198,000
5. 48" PVC Lined Manhole
11
ea
25000.00
275,000
6. 84" Manhole (Tie-in to Existing Sewer Stub)
1
ea
60000.00
60,000
7. Video Sewer
1
Is
7500.00
7,500
Subtotal
2,280,900
Subtotal, All of above:
2,280,900
Contingency:
20%
456,180
SUBTOTAL, CONSTRUCTION COSTS:
2,737,080
City of Bakersfield Fees
8. Plan Check Fees:
9. Inspection Fees:
10. Document Imaging Fee:
11. Improvement Bonds:
Design Engineering
12. Design Engineering & Flow Monitoring:
Traffic Control
13. Maintain Traffic Control
Construction Administration
14. Construction Inspection:
15. Construction Staking:
33,605
50,943
6 sheet 1.60 10
41,056
Subtotal 125,614
6% 164,225
Subtotal
164,225
5% 136,854
Subtotal
136,854
2% 54,742
4% 109,483
Subtotal
164,225
TOTAL ESTIMATED COST OF PROJECT:
3,327,998
ESTIMTATED COST PER EDU: $
1,357.26
No.
`pT,4t
�C!A-\��
05/16/2023
MCINTOSH $ ASSOCIATES, Civil Engineers & Land Surveyors, 2001 Wheelan Court, Bakersfield, California 93309 O��AKF���'
21014 Gosford Road PSA Construction Estimate Page 1 of 2 Cost Estimate r
`�ORIGINALQ
EXHIBIT C
Gosford Road Planned Sewer Area
Fee Schedule'
Note 1: This fee will increase each year based on the Los Angeles Construction Cost Index.
Note 2: The Commercial and Industrial Properties will be based on 6 edu/acre
Note 3: The bottling plant will be based on 1,111 EDU
/e0ESS/
No. 551
CIVI\- �P