Loading...
HomeMy WebLinkAboutRES NO 100-2023RESOLUTION NO. 10 2 02 3 A RESOLUTION ADOPTING THE GOSFORD ROAD PLANNED SEWER AREA AND MAKING FINDINGS RELATIVE THERETO. WHEREAS, the City Council by Resolution of Intention No. 2169, adopted June 14, 2023, in the Council chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, identified the amended fee schedule and boundary of the Gosford Road Planned Sewer Area; and WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal Code and Section 66483 of the California Government Code, provides for a procedure by which the City Council may assess and collect fees for the purpose of defraying the cost of constructing sewer facilities for local and neighborhood sewer areas, and; WHEREAS, The City of Bakersfield desires to provide sewer facilities for a rapidly developing area as shown on the map entitled "Gosford Road Planned Sewer Area" attached hereto as Exhibit "A", and incorporated by reference, and; WHEREAS, the parcels within the "Gosford Road Planned Sewer Area" will receive a benefit from the sewer system shown in Exhibit "A". WHEREAS, the developer of Tract 6859 will construct a portion of the sewer system shown in Exhibit "A"; WHEREAS, the remaining parcels shall construct the sewer system along their parcel frontage and/or fund their proportionate fair share of the sewer system shown in Exhibit "A"; WHEREAS, the City desires to recoup the cost of constructing said sewer line; WHEREAS, the City has notified all affected property owners and is proposing the formation of the Gosford Road Planned Sewer Area to reimburse the cost of the improvements upon subdivision or development of property. within the Gosford Road Planned Sewer Area; and WHEREAS, the fees and charges set forth in Exhibits "B" and "C" attached hereto and incorporated by reference, are based on the actual cost of providing the services for which the fees are charged. WHEREAS, parcels which construct more than their proportionate fair share,eaK,4-,' of the sewer system shown in Exhibit "A" shall be reimbursed through cred@ %� - Pa e 1 of 3 Pa es - — m 9 9 'ORIGINP,L� towards sewer fees of the corresponding project or fees collected as shown on Exhibit "C." NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The foregoing recitals are true and correct and are incorporated herein. 2. The Council hereby finds that, as to the Gosford Road sewer, as described in the fee schedules attached hereto and incorporated herein by reference, subdivision and development of property within such area will benefit from the construction of said sewer facilities, and that the fees provided are fairly apportioned either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposedsubdivision and development of other property within such area. 3. The Gosford Road Planned Sewer Area is hereby adopted. HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on JUN 2 8 2023 , by the following vote: 1-1 .11 V, AYES: COUNCILMEMBER: ARIAS, GONZALES, WEIR, SMITH, FREEMAN, GRAY, KAUR NOES: COUNCILMEMBER: ABSTAIN: COUNCILMEMBER: ABSENT: COUNCILMEMBER: a I�i J LIE DRIMAKIS, , AMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: UN 2 8 2023 By: KAREN GOH MAYOR APPROVED as to form: VIRGINIA GENNARO City Attorney [Additional Signatures on Following Page] > m - Page 2 of 3 Pages - Q ORIGINAL By: VIRIDIANA GAL RDO-KING Deputy City Attorney VGKag Attachments: Exhibit "A" Boundary Map and Limits of Improvements Exhibit "B" Cost Estimate Exhibit "C" Fee Schedule S:\COUNCIL\Resos\22-23\Resolution - Gosford Road.doc - Page 3 of 3 Pages - � o �pp!Cl�1R! EXHIBIT A - GOSFORD ROAD PLANNED SEWER AREA 0 Q 0 Ir cn (n r 0 MH# 15 MH# 14 0 351.00 T.O.M. 351.00 T.O.M. n322.93 INV. 24'S 322.96 INV. 24'N 320.53 INV. 60"N 322.96 INV. 24'S MHjt 13 sk 351.00 T.O.M. MH# 11 N 323.18 INV. 24"N 349.50 T.O.M. N 323.10 INV. 24'S 323.54 INV. 24"N 323.54 INV. 24" S MH/ 12 350.00 T.O.M. PARCEL MAP tO573 , 323.51 INV. 24"N (NOT A PART) "' 323.51 INV. 24"S a N TENTATIVE TRACT 6M BOTTL 401 FACILITY (NOT A PART) 3000 AC N-=B MH# 10 1,m EDU 348.90 T.O.M. 323.91 INV. 24-N 348.00 T.O.M. m 324.31 INV. 18"S 324.85 INV. 18"N 324.85 INV. 18"S 327.33 INV. 8"W MH# 8 347.50 T.O.M. INDUSTRIAL AREA 325.37 INV. 18"N 16.05 ACRES 325.37 INV. 18"S 96 EDU MH# 7 346.00 T.O.M. MH# 6 325.65 INV. 18'N 345.50 T.O.M. = \ 325.65 INV. 18"S 325.96 INV. 18'N 328.05 INV. 8"SW 325.96 INV. 18"S TENTATIVE TRACT 6839 6C)12 A 4 7 EHX MH# 5 -� �j �r 345.00 T.O.M. 1 ' 1 326.27 INV. 18"N r 326.27INV. 18"S V) / -- MH# 4 O COMRCI MEAL 345.50 T.O.M. V) 43Z7 ACFiE9 ffHE L' 326.81 INV. 18"N 0 � � - 326.81 INV. 18"S Q 346.00 T.O.M. TENTATIVE TRACT 6860 0 m 8920 ACRES w 327.25 INV. 18"N 258 EDu --- g 327.25 INV. 18"S - ; m 329.75 INV. 8"E-W - Ua I. MH# 2 WAY 11 9 345.00 T.O.M. o 327.61 INV. 18"N 328.14 INV. 10"S �LfESSIq„_ S 'Y m McCUTCHEN R A ■ ■ 344.00 M O.M. LEGEND No. 551 329.10 INV. 10"N Q W * 329.10 INV. 10"S Q IL � CENTERLINE OF STREET crv1�- `t- Q J ----- WWTP BOUNDARY 05/16/2023 00� ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ PSA BOUNDARY s SEWER LINE MMCIWOSH i m SEWER MANHOLE o ® WWTP jE3 OR PLANT3 & 0 N.T.S. } m MEN GEN ENGINEERING GROUP 7 2001 BHEELAN CT. BAKERSFIELD, CA 93309 (661) 834-4814 I pRIGINAL P:\PMU.[CTS\0014.0D-TNE0.%\SWM\F5 \E MTS\M EX�&T.D EXHIBIT B Construction Cost Estimate for Gosford Road Planned Sewer Area Date:05/16/2023 Sewer Improvments from McCutchen Road to Taft Highway Job No: 21014 Prepared By: mjt EDU 2452.00 Item No. Item Description Qty Unit Unit $ Item $ TOTALS Sewer Improvements 1. 8" Sewer Stub and Plug 80 If 150.00 12,000 2. 10" Sewer Line 600 If 185.00 111,000 2. 18" Sewer Line 3592 If 325.00 1,167,400 3. 24" Sewer Line 1200 If 375.00 450,000 4. 24" Road Bore across Taft Highway 220 If 900.00 198,000 5. 48" PVC Lined Manhole 11 ea 25000.00 275,000 6. 84" Manhole (Tie-in to Existing Sewer Stub) 1 ea 60000.00 60,000 7. Video Sewer 1 Is 7500.00 7,500 Subtotal 2,280,900 Subtotal, All of above: 2,280,900 Contingency: 20% 456,180 SUBTOTAL, CONSTRUCTION COSTS: 2,737,080 City of Bakersfield Fees 8. Plan Check Fees: 9. Inspection Fees: 10. Document Imaging Fee: 11. Improvement Bonds: Design Engineering 12. Design Engineering & Flow Monitoring: Traffic Control 13. Maintain Traffic Control Construction Administration 14. Construction Inspection: 15. Construction Staking: 33,605 50,943 6 sheet 1.60 10 41,056 Subtotal 125,614 6% 164,225 Subtotal 164,225 5% 136,854 Subtotal 136,854 2% 54,742 4% 109,483 Subtotal 164,225 TOTAL ESTIMATED COST OF PROJECT: 3,327,998 ESTIMTATED COST PER EDU: $ 1,357.26 No. `pT,4t �C!A-\�� 05/16/2023 MCINTOSH $ ASSOCIATES, Civil Engineers & Land Surveyors, 2001 Wheelan Court, Bakersfield, California 93309 O��AKF���' 21014 Gosford Road PSA Construction Estimate Page 1 of 2 Cost Estimate r `�ORIGINALQ EXHIBIT C Gosford Road Planned Sewer Area Fee Schedule' Note 1: This fee will increase each year based on the Los Angeles Construction Cost Index. Note 2: The Commercial and Industrial Properties will be based on 6 edu/acre Note 3: The bottling plant will be based on 1,111 EDU /e0ESS/ No. 551 CIVI\- �P 05/16/2023