HomeMy WebLinkAbout2023 SB989DISPENSER SUMP TEST
LINE ANNULAR TEST
STP SUMP TEST
11000 N. MoPac Expressway, Suite 500
Austin, Texas 78759
Phone: (512) 451-6334
Fax: (512) 459-1459 Date Printed and Mailed: 7/6/2023
BAKERSFIELD FIRE DEPARTMENT
OFFICE OF ENVIRONMENTAL SERVICES
INSPECTOR KRIS KARNS
1501 TRUXTUN AVE.
BAKERSFIELD, CA 93301
Test Date: 6/29/2023
Order Number: 3462737
Dear Regulator,
Enclosed are the results of recent testing performed at the following facility:
7-ELEVEN 38837
3698 MING AVE
BAKERSFIELD, CA 93309
In an effort to keep all our record keeping and reporting requirements as current as possible,
Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com
when your CUPA requires all records to be submitted electronically via the CERS database. Your
assistance in this endeavor is greatly appreciated.
Testing performed:
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
10131046 06/29/2023
7-ELEVEN 38837
3698 MING AVE BAKERSFIELD 93309
Tanknology, Inc.800-964-1250
11000 N Mopac Expy #500 Austin, TX 78759
Francisco Castro
743160
8026747-UT 07/22/2023
07/22/2023
02/07/2026
ICC:CA UST Service Technician
Tanknology Certification:Level III Secondary Containment Testing Certification Exam
vplt sumps, udc
pressure gauge secondary lines
06/29/2023 6
pressure gauge
dw fiber 2.5x60 dw fiber 2.5x70 dw fiber 2.5x50 dw fiber 2.5x40
09:00 09:00 09:00 09:00
5psi 5psi 5psi 5psi
10:00 10:00 10:00 10:00
5psi 5psi 5psi 5psi
0 0 0 0
0 0 0 0
dw fiber 2.5x200 dw fiber 2.5x10 dw fiber 2.5x200 dw fiber 2.5x200
09:00 09:00 09:00 09:00
5psi 5psi 5psi 5psi
10:00 10:00 10:00 10:00
5psi 5psi 5psi 5psi
0 0 0 0
0 0 0 0
Vent Pipe for 91 FILL to VENT
RISER
Vent Pipe for DIESEL FILL to
VENT RISER
Vent Pipe for 87 main to vent
riser
Vent Pipe for 87 syphon to
vent riser
Product Pipe for 87 STP to
UDC
Product Pipe for 87 STP to 87
stp
Product Pipe for 91 STP to
UDC
Product Pipe for DIESEL STP
to UDC
pressure gague
dw fiber 3.5x300
09:00
5psi
10:00
5psi
0
0
Vapor Pipe for UNLEADED
FILL to UDC
dsl fill sump
fiber
60
16
09:30
0.3341
09:45
0.3331
0.0010
0.0020
91 fill sump
fiber
60
16
09:30
0.6525
09:45
0.6518
0.0007
0.0020
87 main fill sump
fiber
60
16
09:30
0.3298
09:45
0.3291
0.0007
0.0020
87 aux fill sump
fiber
60
16
09:30
0.0657
09:45
0.0652
0.0005
0.0020
dsl stp sump
fiber
60
16
10:15
0.0112
10:30
0.0110
0.0002
0.0020
91 stp sump
fiber
60
16
10:15
0.6933
10:30
0.6930
0.0003
0.0020
87 main stp sump
fiber
60
16
10:15
0.0368
10:30
0.0362
0.0006
0.0020
87 aux stp sump
fiber
60
16
10:15
0.4964
10:30
0.4961
0.0003
0.0020
vplt
udc 1/2
fiber
30
14
10:55
0.1182
11:10
0.1172
0.0010
0.0020
udc 3/4
fiber
30
14
10:55
0.1040
11:10
0.1028
0.0012
0.0020
udc 5/6
fiber
30
14
10:55
0.0520
11:10
0.0503
0.0017
0.0020
udc 7/8
fiber
30
14
10:55
0.2291
11:10
0.2287
0.0004
0.0020
vplt
sb 989 test completed and passed.
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:3462737
Site ID / Name:38837 / 7-ELEVEN 38837
Address:3698 MING AVE
City:BAKERSFIELD State:CA Zip:93309
Test Duration Test Pressure P/F Threshold
Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test
Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test
Line Annular - Pressure 1 hr 5 psi 0 loss
STP Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
UDC Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
Spill Bucket - SW Vac 1 min 30" wc
no greater than 4" wc vaccum decay -
bucket must be dry
Spill Bucket - SW Hydro 1 hr
within 1.5" of top of the
bucket
less than 1/8" over hour, settle time
of 5 minutest minimum prior to
starting the test
Spill Bucket - DW Vac 1 min 15" wc
no greater than 3" wc vaccum decay -
int must be dry