Loading...
HomeMy WebLinkAbout2023 SB989DISPENSER SUMP TEST LINE ANNULAR TEST STP SUMP TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 7/6/2023 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR KRIS KARNS 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 6/29/2023 Order Number: 3462737 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN 38837 3698 MING AVE BAKERSFIELD, CA 93309 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting 10131046 06/29/2023 7-ELEVEN 38837 3698 MING AVE BAKERSFIELD 93309 Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, TX 78759 Francisco Castro 743160 8026747-UT 07/22/2023 07/22/2023 02/07/2026 ICC:CA UST Service Technician Tanknology Certification:Level III Secondary Containment Testing Certification Exam vplt sumps, udc pressure gauge secondary lines 06/29/2023 6 pressure gauge dw fiber 2.5x60 dw fiber 2.5x70 dw fiber 2.5x50 dw fiber 2.5x40 09:00 09:00 09:00 09:00 5psi 5psi 5psi 5psi 10:00 10:00 10:00 10:00 5psi 5psi 5psi 5psi 0 0 0 0 0 0 0 0 dw fiber 2.5x200 dw fiber 2.5x10 dw fiber 2.5x200 dw fiber 2.5x200 09:00 09:00 09:00 09:00 5psi 5psi 5psi 5psi 10:00 10:00 10:00 10:00 5psi 5psi 5psi 5psi 0 0 0 0 0 0 0 0 Vent Pipe for 91 FILL to VENT RISER Vent Pipe for DIESEL FILL to VENT RISER Vent Pipe for 87 main to vent riser Vent Pipe for 87 syphon to vent riser Product Pipe for 87 STP to UDC Product Pipe for 87 STP to 87 stp Product Pipe for 91 STP to UDC Product Pipe for DIESEL STP to UDC pressure gague dw fiber 3.5x300 09:00 5psi 10:00 5psi 0 0 Vapor Pipe for UNLEADED FILL to UDC dsl fill sump fiber 60 16 09:30 0.3341 09:45 0.3331 0.0010 0.0020 91 fill sump fiber 60 16 09:30 0.6525 09:45 0.6518 0.0007 0.0020 87 main fill sump fiber 60 16 09:30 0.3298 09:45 0.3291 0.0007 0.0020 87 aux fill sump fiber 60 16 09:30 0.0657 09:45 0.0652 0.0005 0.0020 dsl stp sump fiber 60 16 10:15 0.0112 10:30 0.0110 0.0002 0.0020 91 stp sump fiber 60 16 10:15 0.6933 10:30 0.6930 0.0003 0.0020 87 main stp sump fiber 60 16 10:15 0.0368 10:30 0.0362 0.0006 0.0020 87 aux stp sump fiber 60 16 10:15 0.4964 10:30 0.4961 0.0003 0.0020 vplt udc 1/2 fiber 30 14 10:55 0.1182 11:10 0.1172 0.0010 0.0020 udc 3/4 fiber 30 14 10:55 0.1040 11:10 0.1028 0.0012 0.0020 udc 5/6 fiber 30 14 10:55 0.0520 11:10 0.0503 0.0017 0.0020 udc 7/8 fiber 30 14 10:55 0.2291 11:10 0.2287 0.0004 0.0020 vplt sb 989 test completed and passed. Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3462737 Site ID / Name:38837 / 7-ELEVEN 38837 Address:3698 MING AVE City:BAKERSFIELD State:CA Zip:93309 Test Duration Test Pressure P/F Threshold Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test Line Annular - Pressure 1 hr 5 psi 0 loss STP Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test UDC Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test Spill Bucket - SW Vac 1 min 30" wc no greater than 4" wc vaccum decay - bucket must be dry Spill Bucket - SW Hydro 1 hr within 1.5" of top of the bucket less than 1/8" over hour, settle time of 5 minutest minimum prior to starting the test Spill Bucket - DW Vac 1 min 15" wc no greater than 3" wc vaccum decay - int must be dry