HomeMy WebLinkAbout2022 SB989
Appendix VII
Underground Storage Tank
Secondary Containment Testing Report Form
CERS = California Environmental Reporting System, ICC = International Code Council,
ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment,
Page 1 of 5
TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month
CERS ID
10130596
Test Date
9/26/2022
Facility Name
Wilson Mobil
Facility Address
3620 Wilson Rd
City
Bakersfield
ZIP Code
93309
Company Performing the Test
Advanced Compliance
Phone
6617064321
Mailing Address
4007 Brae Burn Dr Bakersfield Ca 93306
Service Technician Performing Test
Bradley Hinsley
Contractor/Tank Tester License Number
971259 ICC Number
8373948
ICC Expiration Date
8/9/2023
Manufacturer and Test Equipment Training Certifications Expiration Date
ICC Service Techican 8/9/2023
INCON STS 10/5/2023
Test Procedures Used Components Tested
PEI/RP1200-19 Sect. 4. Tank Annular
PEI/RP1200-19 Sect. 5. Line Secondary
PEI/RP1200-19 Sect. 6. Containment Sump
I hereby certify that the secondary containment was tested in accordance with California
Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
9/26/2022
Total # of Pages
1. FACILITY INFORMATION
2. SERVICE TECHNICIAN INFORMATION
3. TRAINING AND CERTIFICATIONS
4. TEST PROCEDURE INFORMATION
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 2 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer
Test Type ☐ Pressure X Vacuum ☐ Hydrostatic
Test Equipment Used: Tank Annular Testing Setup
Tank ID 87 91/Diesel
Tank Manufacturer Unknown Unknown
Tank Capacity 15,023 15,111
Test Start Time 08:10 08:40
Initial Reading -10.00 InHg -10.00 InHg
Test End Time 09:10 09:40
Final Reading -10.00 InHg -10.00 InHg
Change in Reading 0.0 InHg 0.0 InHg
Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg
Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer
Test Type X Pressure ☐ Vacuum ☐ Hydrostatic
Test Equipment Used: Piping Secondary Testing Setup
Pipe Run ID 87-1/2,3/4 87-5/6,7/8 91-1/2,3/4 91-5/6,7/8
Pipe Manufacturer Unknown Unknown Unknown Unknown
Test Start Time 08:00 08:05 08:10 08:10
Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI
Test End Time 09:00 09:05 09:10 09:10
Final Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI
Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI 0.0 PSI
Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI
Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail
Pipe Run ID Diesel-7/8
Pipe Manufacturer Unknown
Test Start Time 08:20
Initial Reading 5.0 PSI
Test End Time 09:20
Final Reading 5.0 PSI
Change in Reading 0.0 PSI
Pass/Fail Criteria +/- 0.0 PSI
Tightness Test Results X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Additional copies of this page may be attached.
6. TANK SECONDARY CONTAINMENT TEST
7. PIPE SECONDARY CONTAINMENT TEST
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 3 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer
Test Type ☐ Pressure ☐ Vacuum X Hydrostatic
Test Equipment Used: Incon STS
Sump/UDC ID 87 FS 87 STP 91 FS 91 STP
Sump Manufacturer Unknown Unknown Unknown Unknown
Sump Depth (inches) 40 40 40 40
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
10 18 10 18
Test Start Time 11:51 10:32 09:44 12:44
Initial Reading 5.8208 4.7398 3.4779 4.4689
Test End Time 12:06 10:48 10:00 12:59
Final Reading 5.8207 4.7390 3.4776 3.9886
Change in Reading 0.0001 0.0002 0.0003 0.4803
Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020
Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail
Sump/UDC ID Diesel FS Diesel STP UDC 1/2 UDC 3/4
Sump Manufacturer Unknown Unknown Unknown Unknown
Sump Depth (inches) 40 40 25 25
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
10 18 11 11
Test Start Time 10:09 11:51 13:46 Dispenser
Initial Reading 4.0036 4.7177 1.6794 Was
Test End Time 10:24 12:06 14:01 A
Final Reading 4.0028 4.7174 0.0000 Visual
Change in Reading 0.0008 0.0003 1.6794 Failure
Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020
Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail ☐ Pass X Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 4 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer
Test Type ☐ Pressure ☐ Vacuum X Hydrostatic
Test Equipment Used: Incon STS
Sump/UDC ID UDC 5/6 UDC 7/8
Sump Manufacturer Unknown Unknown
Sump Depth (inches) 25 25
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
11 11
Test Start Time Dispenser 13:46
Initial Reading Was 3.2691
Test End Time A 14:01
Final Reading Visual 2.4906
Change in Reading Failure 0.7785
Pass/Fail Criteria +/- 0.0020 +/- 0.0020
Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST (continued)
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 5 of 5
91 STP and All UDCs failed, must have penetration boots replaced and retested.
9. COMMENTS