Test Date: 8/24/2023
Order Number: 3467974
Dear Regulator,
Enclosed are the results of recent testing performed at the following facility:
7-ELEVEN 37942/59987
3225 BUCK OWENS BLVD., HWY 99/HWY 58
BAKERSFIELD, CA 93301
In an effort to keep all our record keeping and reporting requirements as current as possible,
Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com
when your CUPA requires all records to be submitted electronically via the CERS database. Your
assistance in this endeavor is greatly appreciated.
Testing performed:
Sincerely,
Dawn Kohlmeyer
Manager, Field Reporting
10134880 08/24/2023
7-ELEVEN 37942/59987
3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301
Tanknology, Inc.800-964-1250
11000 N Mopac Expy #500 Austin, TX 78759
Jeffrey Crisostomo
743160
8199847 05/02/2025
05/02/2025
01/31/2025
ICC:CA UST Service Technician
Veeder Root:ATG Technician
VMI:TLDT-5000 Tester 01/03/2025
VACUUM TANK ANNULARS
PRESSURE SECONDARY LINES
VPLT SUMPS
08/24/2023 6
VACUUM
STEEL
15,000
14:00
-10 HG
15:00
-10 HG
0
0
T-1(REGULAR)
PRESSURE GAUGE
FRG FRG FRG FRG
13:00 14:00 14:00 14:00
5 PSI 5 PSI 5 PSI 5 PSI
14:00 15:00 15:00 15:00
0 PSI 4.9PSI 0 0
5 .1 5 5
0 0 0 0
TT-2 L1 (PREMIUM) STP
Containment 1 to 1/2
Product Pipe for DIESEL STP
to FILTER
Product Pipe for DIESEL
FILTER to TRANSITION SUMP
Product Pipe for TRANSITION
SUMP to UDCS
DIESEL STP
FRG
70
27
13:12
0.1467 H20
13:27
0.1459 H20
0.0008
0.0020
TRANSITION SUMP
FRG
46
22
VPLT
ONLY 87 ANNULAR AND DIESEL STP SUMP PASSED.
FAILED:-91 product line due to udc 3/4 and 7/8.
-diesel product line suspected a tiny leak at the filter sec boot(needs new boot)
-filter secondary to transition sump not tested inspector only gave us till 3pm to test(both end needs new boot)
-transition sump to udc line failed needs new boot.
-transition sump hydrostatic test failed due to damaged boots.
-eso was not tested all UL udc has no power upon arrival and per Lc services it was tested with inspector already.
Site Diagram
(This site diagram is for reference only and is not drawn to scale)
Work Order:3467974
Site ID / Name:37942/59987 / 7-ELEVEN 37942/59987
Address:3225 BUCK OWENS BLVD., HWY 99/HWY 58
City:BAKERSFIELD State:CA Zip:93301
Test Duration Test Pressure P/F Threshold
Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test
Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test
Line Annular - Pressure 1 hr 5 psi 0 loss
STP Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
UDC Sump - Hydro 1 hr
4" above highest penetration
or sidewall seam
less than 1/8" over hour, settle time
of 15 minutes minimum prior to
starting the test
Spill Bucket - SW Vac 1 min 30" wc
no greater than 4" wc vaccum decay -
bucket must be dry
Spill Bucket - SW Hydro 1 hr
within 1.5" of top of the
bucket
less than 1/8" over hour, settle time
of 5 minutest minimum prior to
starting the test
Spill Bucket - DW Vac 1 min 15" wc
no greater than 3" wc vaccum decay -
int must be dry