Loading...
HomeMy WebLinkAboutSB989 2023 REPAIR #1LINE ANNULAR TEST STP SUMP TEST TANK ANNULAR TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 8/28/2023 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR KRIS KARNS 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 8/24/2023 Order Number: 3467974 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-ELEVEN 37942/59987 3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD, CA 93301 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting 10134880 08/24/2023 7-ELEVEN 37942/59987 3225 BUCK OWENS BLVD., HWY 99/HWY 58 BAKERSFIELD 93301 Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, TX 78759 Jeffrey Crisostomo 743160 8199847 05/02/2025 05/02/2025 01/31/2025 ICC:CA UST Service Technician Veeder Root:ATG Technician VMI:TLDT-5000 Tester 01/03/2025 VACUUM TANK ANNULARS PRESSURE SECONDARY LINES VPLT SUMPS 08/24/2023 6 VACUUM STEEL 15,000 14:00 -10 HG 15:00 -10 HG 0 0 T-1(REGULAR) PRESSURE GAUGE FRG FRG FRG FRG 13:00 14:00 14:00 14:00 5 PSI 5 PSI 5 PSI 5 PSI 14:00 15:00 15:00 15:00 0 PSI 4.9PSI 0 0 5 .1 5 5 0 0 0 0 TT-2 L1 (PREMIUM) STP Containment 1 to 1/2 Product Pipe for DIESEL STP to FILTER Product Pipe for DIESEL FILTER to TRANSITION SUMP Product Pipe for TRANSITION SUMP to UDCS DIESEL STP FRG 70 27 13:12 0.1467 H20 13:27 0.1459 H20 0.0008 0.0020 TRANSITION SUMP FRG 46 22 VPLT ONLY 87 ANNULAR AND DIESEL STP SUMP PASSED. FAILED:-91 product line due to udc 3/4 and 7/8. -diesel product line suspected a tiny leak at the filter sec boot(needs new boot) -filter secondary to transition sump not tested inspector only gave us till 3pm to test(both end needs new boot) -transition sump to udc line failed needs new boot. -transition sump hydrostatic test failed due to damaged boots. -eso was not tested all UL udc has no power upon arrival and per Lc services it was tested with inspector already. Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3467974 Site ID / Name:37942/59987 / 7-ELEVEN 37942/59987 Address:3225 BUCK OWENS BLVD., HWY 99/HWY 58 City:BAKERSFIELD State:CA Zip:93301 Test Duration Test Pressure P/F Threshold Tank Annular - Vacuum 1 hr, 20k or less tank 10" hg 0 loss, int dry before and after test Tank Annular - Vacuum 2 hr, >20k tank 10" hg 0 loss, int dry before and after test Line Annular - Pressure 1 hr 5 psi 0 loss STP Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test UDC Sump - Hydro 1 hr 4" above highest penetration or sidewall seam less than 1/8" over hour, settle time of 15 minutes minimum prior to starting the test Spill Bucket - SW Vac 1 min 30" wc no greater than 4" wc vaccum decay - bucket must be dry Spill Bucket - SW Hydro 1 hr within 1.5" of top of the bucket less than 1/8" over hour, settle time of 5 minutest minimum prior to starting the test Spill Bucket - DW Vac 1 min 15" wc no greater than 3" wc vaccum decay - int must be dry