HomeMy WebLinkAboutCUPA Report 10-3-2023FDDW – v3.0
Inspector: Date:
Business Owner:
Facility ID#: EPA ID#:
BOE # CERS ID#
Inspection Type: Routine Report: Final
DW-Tank-1- DW-Tank-2-
DW-Tank-3- DW-Tank-4-
Violation # Program Requirement V Comments
Facility Tank Information
2030021 Facility has a valid permit to
operate from the CUPA- 23 CCR 16.2711 (d)
HSC 6.7 25284
☐
2010010 UST Operating Permit application
for Facility and Tank Information
Submitted / Maintained 23 CCR
16 2711; HSC 6.7 25284,25286
☐
2030046 A complete and accurate response plan has been submitted, approved and
maintained 23 CCR 16 2632 (d),
2634 (e) 2641 (h) 2712 (i)
☐
2030041 A complete and accurate plot
plan has been submitted, approved and maintained
23CCR 16 2632 (d)(1)(C) 2641(h)
☐
2010006 Owner/Operator has not made
false statements or
representation of any required
document. HSC 6.7 2599 (a)(8)
☐
2010003 Failure to submit the “Designated Underground Storage Tank
Operator Identification Form”
within 30 days of installing a UST
system or within 30 days of a change in DO. 23 CCR 16
2715(a)(1)(B) 2715(a)(3)
☐
Bakersfield Fire Department
Prevention Services Division
2101 H Street
Bakersfield, CA 93301
Phone: 661-326-3979 / Fax: 661-852-2171
Underground Storage Tank Program
DW-Inspection Report
FDDW – v3.0
Testing V
2030002 Failure to have a properly
qualified service technician test
leak detection equipment as
required every 12 months
(vacuum, pressure, hydrostatic
(VPH) system, sensors, line-leak detectors (LLD), automatic tank
gauge (ATG), etc.). 23 CCR 16
2638(a) 2638(b) 2641(j) 2715(f)
☐
2030048 Failure to conduct secondary
containment testing or meet one or more of the following
requirements:
1) Within six months of installation
and every 36 months thereafter. installation.
2) Using applicable
manufacturer guidelines, industry codes, engineering standards, or professional engineer approval.
3) Performed by a certified
service technician.
23 CCR 16 2637(a)-(d) 2712
(b)(1)(F)
☐
2010009 Failure to submit a copy of the
secondary containment test
results on the “Secondary
Containment Testing Report Form” to the UPA within 30 days
after the test. 23 CCR 16
2637(e)(f)
☐
2030064 Failure to notify the UPA 48 hours prior to testing 23 CCR 2637(g)
2637.1(f) 2637.2(f) 2638(e)
2643(g) 2644.1(a)(4)
☐
General Monitoring V
2030003 Failure of the leak detection
equipment to have an audible and visual alarm as required 23
CCR 16 2632(c)(2)(B)
2634(d)(1)(A) 2636(f)(1)
☐
2030016 Failure to continuously monitor
the interstitial space of a double-
walled tank with an audible and
visual alarm system. 23 CCR
162631(g) 2632(c)(2)(A)&(B)
☐
2030017 1) The system shuts down the
pump or stops flow when a leak
is detected in the UDC (UDC).23CCR 16 2636 (f)(4)
☐
FDDW – v3.0
2030018 Failure of the double-walled pressurized piping to be
continuously monitored with a
system that activates an audible
and visual alarm or stops flow at the dispenser when a leak is
detected. 23 CCR 16 2636(f)(1)
2666(b)(2)
☐
2030043 Failure of the leak detection
equipment to be installed, calibrated, operated, and/or
maintained in accordance with
manufacturer's instructions. 23
CCR 16 2638(a) 2641(j)
☐
2060005 Failure of the UST system to be
designed and constructed with a monitoring system capable of
detecting the entry of the
hazardous substance into the secondary containment. 23 CCR
16 25291(b) 2636(a)(1)
☐
2060015 Failure of leak detection equipment to be installed,
maintained and located such
that the equipment is capable of detecting a leak at the earliest
possible opportunity. 23 CCR 16
2630(d) 2641(a)
☐
2030062 Leak detection equipment
disabled or tampered with in a
manner that would prevent the monitoring system from
detecting and/or alerting the
owner/operator of a leak. HSC
6.7 2599(a)(9)
☐
2060022 Failure of a UST system installed
on or after July 1, 2003, and before July 1, 2004, to be
designed and constructed with a
monitoring system capable of detecting the entry of the hazardous substance stored in
the primary containment into the
secondary containment and
capable of detecting water
intrusion into the secondary
containment. HSC 6.7 25290.2(d)
☐
2030034 Failure to properly affix
tag/sticker on each monitoring
equipment being certified, repaired, or replaced. 23 CCR 16
2638(f) 2641(j)
☐
FDDW – v3.0
VPH Monitoring V
2030065 Failure to maintain the interstitial
space such that a breach in the
primary or secondary containment is detected before
the liquid or vapor phase of the
hazardous substance stored in the UST tank is released into the
environment, i.e., vacuum,
pressure, hydrostatic HSC
Chapter 6.7, Section 25290.1(e)
☐
2060023 Failure of a UST system installed on or after July 1, 2004, to be
designed and constructed with a
monitoring system capable of
detecting the entry of the liquid
or vapor-phase of the hazardous
substance stored in the primary
containment into the secondary containment and capable of
detecting water intrusion into the
secondary containment. HSC
Chapter 6.7, Section 25290.1(d)
☐
Line Leak Detector V
2060012 Failure to install a line leak detector (LLD). CCR Title 23,
Chapter 16, Section 2636(f)(2)
2636(f)(5)(B) 2643(c)(1) 2666(f)
HSC Chapter 6.7, Section 25290.1(h) 25290.2(g) 25291(f)
25292(e)
☐
2030027 Failure of the line leak detector
(LLD) monitoring single-walled
pressurized piping to meet the
following requirements:1) Monitored at least hourly with
the capability of detecting a
release of 3.0 gallons per hour
leak at 10 pounds per square inch.2) Shut down the pump
when a leak is detected or when
the LLD fails or is disconnected. CCR Title 23, Chapter 16, Section 2666(c) 2643(c)(1)
☐
2030025 Failure of the functional line leak
detector (LLD) 1) to have the
capability of detecting a release
of 3.0 gallons per hour2) Restrict or shut off the flow of product
through the piping when a leak is
detected. CCR Title 23, Chapter
16, Section 2636(f)(2)
☐
FDDW – v3.0
Secondary Containment V
2030008 Failure to keep water & debris
out of the secondary containment, HSC Chapter
6.7, Section 25290.1(c)(3),25290.2(c)(3)
☐
2030040 Failure to maintain
secondarily contained piping to allow liquid to flow into the
sump in the event of a leak CCR Title 23, Chapter 16,
Section 2630(d) 2641(a)
☐
2030047 Failure to maintain secondary containment HSC Chapter
6.7, Section 25290.1(e) 25290.1(c) 25290.2(c) CCR
Title 19, Chapter 6.7, Section 25291(a)(2)
☐
2060020 Spill bucket is installed and
has a functional drain valve.
23 CCR 16 2635 (b), 2665
☐
Overfill V
2030035 Failure to operate the UST
system to prevent unauthorized releases
including leaks, spills, and/or overfills. HSC Chapter 6.7,
Section 25292.1(a)
☐
2030036 Overfill prevention system has not been overridden and
meets the overfill requirements. 23 CCR 16 2635,
2637.2, 2665, 2712
☐
Certifications V
2010007 Failure to submit and maintain
complete and current
Certification of Financial Responsibility or other
mechanism of financial assurance. 23 CCR Chapter
16, Section 2711(a)(11), Chapter 18, Section 2809-
2809.2, 2808.1, HSC Chapter 6.7, Section 25292.2(a),
Chapter 6.75, Section 25299.30-25299.34
☐
FDDW – v3.0
Designated Operator V
2010004 Failure to maintain on-site, or
off-site at a readily available
location if approved by the UPA, copies of the
"Designated Underground Storage Tank Operator Visual
Inspection Report" and all attachments for 36 months.
California Code of Regulations, Title 23, Chapter
16, Section 2716(f)
☐
2030013 Failure to comply with one or
more of the following Designated Operator (DO)
inspection requirements
California Code of
Regulations, Title 23, Chapter
16, Section
2716(a)(b)(c)(d)(e)
☐
2030012 Do employee training is
current for at least one
employee on site and a
training logbook is kept
California Code of
Regulations, Title 23, Chapter
16, Section 2715(c) (c)(1)
(c)(2)
☐
Logs V
2030001 Failure to maintain monitoring records for 36 months and/or
failure to maintain
maintenance
records(including written
performance claims and
calibration records) for the
release detection system for
60 months. California Code of
Regulations, Title 23, Chapter
16, Section 2712(b)(1)/ (b)(2)
☐
FDDW – v3.0
Maintenance / Tests V
2010008 Failure to maintain records of
repairs. linings, and upgrades
on site, or off site if approved
by the UPA, for the life of the
UST California Code of
Regulations, Title 23, Chapter
16, Section 2712(b)(6)
☐
Documentation V
2030033 Failure to submit and have
current UST Monitoring Plan
readily accessible at the
facility. California Code of
Regulations, Title 23, Chapter
16, Section 2712(i)
☐
2030037 Failure to implement or
maintain a written agreement
between the UST owner and
operator. California Code of
Regulations, Title 23, Chapter
16, Section 2620(b) California
Health and Safety Code,
Chapter 6.7, Section 25284(a)(3)(A)&(B)
☐
2030061 Failure to record any
unauthorized release from the primary containment.
California Code of Regulations, Title 23, Chapter
16, Section 2651 California Health and Safety
Code, Chapter 6.7, Section 25294
☐
Permit Condition / Approval V
2030039 Failure to comply with any of
the applicable requirements
of the permit issued for the
operation of the UST system.
California Code of
Regulations, Title 23, Chapter
16, Section 2712
☐
FDDW – v3.0
Permit Condition / Approval V
2030015 Failure to demonstrate to the
UPA that the equipment and
methods used to monitor the
UST system are certified by an
independent third-party as
complying with the standards
set forth in 23 CCR 2643(f).
California Code of
Regulations, Title 23, Chapter
16, Section 2630(d),
2632(c)(2)(A), 2643(f),
2644.1(a)(2)
☐
Red Tag V
2030045 Red Tag has been removed,
defaced, altered, or
otherwise tampered with so
that the information on the
tag is not legible. California
Code of Regulations, Title 23,
Chapter 16, Section 2717.1(g)
☐
2030044 Owner/operator deposited or
allowed deposit of petroleum
or a hazardous substance into
a UST that has a red tag
affixed to the fill pipe.
California Code of Regulations, Title 23, Chapter
16, Section 2717.1(f)California Health and Safety Code,
Chapter 6.7, Section 25292.3(c)
☐
☐ THERE WERE NO VIOLATIONS NOTED DURING THIS INSPECTION.
☐ THIS REPORT SHALL SERVE AS A “NOTICE TO COMPLY” FOR VIOLATIONS FOUND
DURING INSPECTION. VIOLATIONS ARE TO BE CORRECTED WITHIN 30 DAYS OF RECEIVING
THIS NOTICE. FAILURE TO COMPLY WILL RESULT IN VIOLATIONS BEING ELEVATED AS WELL
AS FORMAL ENFORCEMENTS BEING INNITIATED.
INSPECTORS SIGNATURE: DATE:
Site Representative: DATE: