HomeMy WebLinkAboutBakersfield Foods Co Final ELD UST System Post Installation Test Report
ELD Test Date:
Customer:
Location:
Tested By: CGRS, Inc.
5444 Dry Creek Road
Sacramento, CA 95838
Project No:61-27429
B&T Service Station Contractors
Bakersfield Foods Co
630 South Frontage Rd.
Nipomo, CA 93444
1901 White Ln Bakersfield
Bakersfield, CA 93304
10/10/2023 & 10/23/23
®
Final Test Date:IOTA Technicians:
Site Information CGRS Project No :61-27429 Installation Contractor Information
Facility:Customer Name:
Address:Address:
City, State, Zip:City, State, Zip:
County:Contact:
CUPA Contact:Phone/Email:
CUPA Email:
Tank No.Capacity (gal.)Product Type Manufacturer Brine Test Result
Tank 1 20,000 87 Octane DW Fiberglass Xerxes Yes PASS
Tank 2 8,000 91 Octane DW Fiberglass Xerxes Yes PASS
Tank 3 10,000 Diesel DW Fiberglass Xerxes Yes PASS
Tank Top Sumps Diameter (in.)Depth (in.)Volume (gal.)Description Test Result
S1 48 72 564.02 87 TS PASS
S2 42 72 431.83 87 FS PASS
S3 48 72 564.02 91 TS PASS
S4 42 72 431.83 91 FS PASS
S5 48 72 564.02 DSL TS PASS
S6 42 72 431.83 DSL FS PASS
Junction Boxes with Tank Connection Description Test Result
S1 Tank Probe and Turbine J-Box Open During Test PASS
S3 Tank Probe and Turbine J-Box Open During Test PASS
S5 Tank Probe and Turbine J-Box Open During Test PASS
UDCs Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
UDC1 42 22 32 128.00 Bravo PASS
UDC2 42 22 32 128.00 Bravo PASS
UDC3 42 22 32 128.00 Bravo PASS
UDC4 42 22 32 128.00 Bravo PASS
UDC5 42 22 32 128.00 Bravo PASS
UDC6 42 22 32 128.00 Bravo PASS
UDC7 42 22 32 128.00 Bravo PASS
Transition Sump Length (in.)Width (in.)Depth (in.)Volume (gal.)Description Test Result
TS1 24 22 32 73.14 Bravo PASS
Product Piping Manufacturer Type Size (in.)Length (ft.) Test Result
87 PL NOV DW Fiberglass 2 340 PASS
91 PL NOV DW Fiberglass 2 330 PASS
DSL PL NOV DW Fiberglass 2 280 PASS
Vent Piping Manufacturer Type Size (in.)Length (ft.)Test Result
87 Vent NOV DW Fiberglass 2 30 PASS
91 Vent NOV DW Fiberglass 2 50 PASS
DSL Vent NOV DW Fiberglass 2 50 PASS
Vapor Piping Manufacturer Type Size (in.)Length (ft.)Test Result
VR NOV DW Fiberglass 3 380 PASS
Reviewed By Date IOTA Tech Signature Date
Final ELD Test Project Worksheet
10/10/2023 & 10/23/23
Bakersfield Foods Co B&T Service Station Contractors
Sergio L. Nunez
lpreece@bakersfieldfire.us; nwmoore@bakersfieldfire.us; parmagost@bakersfieldfire.us
PIPING
TANKS
1901 White Ln Bakersfield 630 South Frontage Rd.
Nipomo, CA 93444
COMPONENTS IN CONTAINMENT
Kern Les Henderson
Bakersfield FD 805-431-8839/les@btssc.com
Leak Logs / Repair
Bakersfield, CA 93304
10/10/2023 & 10/23/2023
CA License No.
10/24/2023 06-1727
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
Test Certification
Post Installation Enhanced Leak Detection (ELD)
61-27429
Bakersfield Foods Co 10/10/2023 & 10/23/23
1901 White Ln Bakersfield Sergio L. Nunez
Bakersfield, CA 93304
Post Installation ELD Test Results
87 Octane Primary Containment System PASS
91 Octane Primary Containment System PASS
Diesel Primary Containment System PASS
10/24/2023
Date
10/10/2023 & 10/23/2023
Date
This document certifies that the UST systems listed below at the above referenced location have been tested
and passed the iota® VaporTite V005 tightness test and iotaVision™ L005. CGRS further certifies that the
iota® VaporTite V005 and iotaVision™ L005 meets the post installation testing requirements for post
installation testing for newly installed underground storage tank systems as per the California Health and
Safety Code, Chapter 6.7, section 25290.1(j)(1).
Location:CGRS Project No :
Test Date:
CGRS Techs:
IOTA Tech Signature:
Sergio L. Nunez CA Tank Tester #06-1727
Reviewed by:
Chris Murphy Director of CA Services
PASS
91 Vent PASS
10/24/2023
Date
DSL PL PASS
10/10/2023
Date
VR PASS
DSL Vent PASS
87 Vent
87 PL PASS
91 PL PASS
COMPONENTS RESULTS
Piping Secondary Communication Confirmation
1901 White Ln Bakersfield Sergio L. Nunez
Bakersfield, CA 93304
Secondary Flow Communication Test Certification
61-27429
Bakersfield Foods Co 10/10/2023 & 10/23/23
CGRS certifies that at the time the final ELD testing was performed, air flow communication was confirmed
throughout the secondary piping components listed below.