Loading...
HomeMy WebLinkAboutSB989 2023 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10133056 Test Date 9/20/2023 Facility Name Rosedale Chevron Facility Address 9700 Rosedale Hwy City BAKERSFIELD ZIP Code 93312 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8373948 ICC Expiration Date 8/8/2025 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/8/2025 INCON STS 10/5/2023 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 9/20/2023 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Tank Annular Testing Setup Tank ID 87 91 Diesel Tank Manufacturer Unknown Unknown Unknown Tank Capacity 11,627 11,627 11,627 Test Start Time 12:00 09:00 08:35 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 13:00 10:00 09:35 Final Reading -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Piping Secondary Testing Setup Pipe Run ID 87 Product 91 Product Diesel Prod 87 Vent Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time 08:50 08:55 12:05 12:15 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 09:50 09:55 13:05 13:15 Final Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Pipe Run ID 91 Vent Diesel Vent Vapor Return Pipe Manufacturer Unknown Unknown Unknown Test Start Time 11:45 08:30 08:35 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 12:45 09:30 09:35 Final Reading 5.0 PSI 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID 87 STP 91 STP Diesel STP 87 Fill Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 60 60 60 60 Sump Bottom to Top of Highest Pipe Penetration (inches) 26 26 26 31 Test Start Time 11:28 11:28 13:15 13:34 Initial Reading 5.6707 5.9030 4.8785 3.9298 Test End Time 11:44 11:44 13:30 13:49 Final Reading 5.6703 5.9021 4.8770 3.9294 Change in Reading 0.0004 0.0009 0.0015 0.0004 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID 91 Fill Diesel Fill UDC 1/2 UDC 3/4 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 60 60 25 25 Sump Bottom to Top of Highest Pipe Penetration (inches) 31 31 16 16 Test Start Time 09:32 09:32 16:53 16:53 Initial Reading 2.7649 4.5324 7.8855 3.8855 Test End Time 09:47 09:47 17:09 17:09 Final Reading 2.7639 4.5318 7.8515 3.7223 Change in Reading 0.0010 0.0006 0.0340 0.1632 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass X Fail ☐ Pass X Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: Incon STS Sump/UDC ID UDC 5/6 UDC 7/8 UDC 9/10 UDC 11/12 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 25 25 25 25 Sump Bottom to Top of Highest Pipe Penetration (inches) 16 16 16 16 Test Start Time 15:22 15:22 14:41 14:41 Initial Reading 6.7120 6.6123 1.1284 4.5269 Test End Time 15:37 15:37 14:56 14:56 Final Reading 6.5182 6.5788 1.1285 4.5275 Change in Reading 0.1938 0.0335 0.0001 0.0006 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail ☐ Pass X Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 UDC 1/2, 3/4, 5/6 and 7/8 failed, must be repaired and retested. All else passed. 9. COMMENTS