Loading...
HomeMy WebLinkAbout1.8-7350 PH 1-2 Record Drawings523169 22 23 24 25 21 20 19 18 1734 33 32 31 30 29 28 27 26 87 96 105 114321 12 14 13 15 16 17 18 19 20 29 28 27 26 25 24 23 21 1 2 3 4 5 6 7 8 9 10 11 T62490 T762230 T217675 T386836 T665850 T79416 T638072 T741473 T523843 Know what's below.Call before you dig. VEGETATION REMOVALENCROACHMENT PERMITTRAFFIC CONTROL PLAN / FLAGGINGWORK REQUIREMENTS CONSTRUCTION NOTE VEGETATION REMOVALENCROACHMENT PERMITTRAFFIC CONTROL PLAN / FLAGGINGWORK REQUIREMENTS CONSTRUCTION NOTE AVERAGE SQUARE FEET: MAIN SIZE: MAX AC TONNAGE: TYPICAL SERVICE SETBACK LENGTH: JOB DETAILS 200A 5 TON | 170A S.C. 25'/39' 2,200 FT²CIRCLED LOT NUMBERS INDICATE THE FOLLOWING:- CONFLICTS -STORM DRAIN CONFLICT WITH ELECTRIC SERVICE AT LOT LINE:CONFLICT LOTS: N/AWATER SERVICE CONFLICT WITH ELECTRIC SERVICE AT LOT LINE:CONFLICT LOTS: N/AWATER SERVICE CONFLICT WITH ELECTRIC EQUIPMENT AT LOT LINE:CONFLICT LOTS: 23THE CONFLICTS NOTED BELOW HAVE BEEN COMMUNICATED TO THEAPPLICANT OR THEIR AGENT ON 04/07/2021 (DATE). THE APPLICANT ISRESPONSIBLE TO MAKE MODIFICATIONS TO THE PROPOSED FACILITIESNOTED IN CONFLICT TO ESTABLISH THE REQUIRED PROPER CLEARANCEFROM PG&E'S PROPOSED FACILITIES AS STIPULATED IN PG&E'S STANDARDS. ELECTRIC VEHICLE LOAD NOTES:09-18-1314.APPLICANT TO PROVIDE ADEQUATE P.U.E'S AND/OR ROW'S FOR PG&E FACILITIES. ANY ADDITIONAL REQUIREDRIGHTS OF WAY ARE TO BE SURVEYED AND DOCUMENTED BY PG&E AT THE APPLICANT'S EXPENSE.CONDUIT, TRENCHING, AND BACKFILL:1.ALL DIMENSIONS AND LOCATIONS ARE ESTIMATED, APPROXIMATE AND MAY BE SUPERSEDED BY A JOINTTRENCH DRAWING. REFER TO THE JOINT TRENCH COMPOSITE DRAWING FOR EXACT TRENCH LOCATION2.MAINTAIN MAXIMUM PRACTICABLE HORIZONTAL CLEARANCE BETWEEN PG&E FACILITIES AND "WET" UTILITIES(WATER, SEWER, STORM DRAIN, ETC.). THE MIN. ALLOWABLE SEPARATION BETWEEN PG&E FACILITIES ANDANY PARALLEL "WET" UTILITY IS 3/FT. WITH A PRESENCE OF 1/FT. OF UNDISTURBED EARTH OR THEINSTALLATION OF A SUITABLE BARRIER. THIS MEASUREMENT IS BETWEEN THE OUTER EDGE OF THE PG&EFACILITY AND THE OUTER EDGE OF THE PARALLEL "WET" FACILITY. IF 3/FT. CANNOT BE MAINTAINED, AFORMAL VARIANCE MUST BE OBTAINED FROM PG&E WORK WITH THE PG&E INSPECTOR (REFERENCE PG&EUO STANDARD S5453).3.BOX, PAD, AND CONDUIT SIZES AND LOCATIONS SHALL CONFORM TO THE PG&E ELECTRIC CONSTRUCTIONDRAWING.4.PROVIDE LONG CONDUIT SWEEPS WHERE INDICATED. RECOMMENDED SWEEP RADIUS (10' OF RADIUS PERINCH OF CONDUIT DIAMETER) EXAMPLE: 4" CONDUIT = 40' RADIUS5.DO NOT EXCEED 300 DEGREES OF BENDS IN ANY CONDUIT RUN (INCLUDING FEED LOCATION). NOTE:SECONDARY AND SERVICE RUNS OF 200 FEET OR LESS MAY HAVE UP TO 315 DEGREES OF BENDS (REFERENCEPG&E DOCUMENT 038193, REV. 7, DATED 6-28-13).6.MANUFACTURED BENDS OR APPLICATION OF HEAT SHALL NOT BE USED TO OBTAIN LONG CONDUIT SWEEPS.7.ALL CONDUITS SHALL BE PROVEN AND A POLYESTER PULLING TAPE INSTALLED.8.MANUFACTURED BENDS ARE NOT TO BE CUT, SHORTENED, OR ALTERED IN ANY WAY.9.IDENTIFY ENDS OF BURIED CONDUIT WITH AN ELECTRONIC MARKER AND A VERTICAL CONDUIT SCRAPINSTALLED FROM RIGID CAP TO GROUND LEVEL.10.CONDUITS ENTERING PRIMARY BOXES SHALL BE AT A RIGHT ANGLE TO THE WINDOW OR WALL.11.STUB CONDUITS AT RISER POLES IN QUADRANTS AS SHOWN. AT IDENTIFIED POLE LOCATIONS, THE TRENCHINGAGENT IS TO EXCAVATE TO TRENCH DEPTH AND INSTALL A 30" DIAMETER CARDBOARD TUBE. THE RISERCONDUIT BEND IS TO BE PLACED OUTSIDE AND ADJACENT TO THE TUBE AT THE POLE QUADRANT INDICATED.BACKFILL AROUND AND INSIDE TUBE WITH CLEAN NATIVE FILL.12.LS2 STREET LIGHT CONDUIT GOING TO PG&E BOXES OR PEDESTALS NOT DESIGNATED AS P.O.S. (INCLUDINGTRANSFORMERS) WILL NOT BE ACCEPTED OR CONNECTED.13.ONLY ONE LS2 STREET LIGHT (P.O.S.) CONNECTION PER BOX OR PEDESTAL.15.CALL 811 (UNDERGROUND SERVICE ALERT) 48 HOURS PRIOR TO EXCAVATION FOR UNDERGROUND UTILITYLOCATIONMARKING.16.48 HOUR NOTICE REQUIRED FOR UNDERGROUND INSPECTION.17.MATERIALS AND WORKMANSHIP SHALL BE FIRST QUALITY IN EVERY RESPECT, PLUMB AND TRUE, ANDACCORDING TO THE SPECIFIC REQUIREMENTS OF THE DRAWINGS AND THE ABOVE APPLICABLE NOTES ANDSPECIFICATIONS.18.THE APPLICANT IS TO VERIFY ALL PROPOSED INSTALLATIONS, CONDITIONS & SPECIFICATIONS PRIOR TOCOMMENCING WITH ANY PORTION OF WORK. ANY DISCREPANCIES, DELETIONS OR INCONSISTENCIES ARE TOBE REPORTED TO THE PG&E REPRESENTATIVE IMMEDIATELY. THE APPLICANT SHALL COMPLY WITH ALLAPPLICABLE SPECIFICATIONS. ANY VARIATIONS FROM PLANS OR SPECIFICATIONS RELIEVES PG&E OF ALLRESPONSIBILITY FOR THE SUBSTRUCTURE OR DESIGN.REFER TO ELECTRIC & GAS SERVICE REQUIREMENTS (GREEN BOOK) OR SEPARATE PG&E STANDARD DRAWINGS.CONTACT YOUR PG&E REPRESENTATIVE FOR COPIES, OR ACCESS. WWW.PGE.COM/GREENBOOKLAND RIGHTS AND EASEMENTS:SAFETY AND WORKMANSHIP:LARGEST SQUARE FEET:2,800 FT²WORK AGENT RESPONSIBILITIES TO INSTALL ELECTRIC DISTRIBUTION FACILITIES TO INSTALL DISTRIBUTION CONDUIT & SUBSTRUCTURES TO INSTALL ELECTRIC SERVICE FACILITIES TO INSTALL SERVICE CONDUITS & SUBSTRUCTURES TO PERFORM ALL TRENCHING AND EXCAVATION TO PERFORM JOINT TRENCH COMPOSITE | FORM B TO PERFORM ALL POLE WORK TO PERFORM ALL TIE-IN WORK SOLAR GENERATION:5kW 5kW VEGETATION REMOVALENCROACHMENT PERMITTRAFFIC CONTROL PLAN / FLAGGINGWORK REQUIREMENTS CONSTRUCTION NOTE APPLICANTPG&EAPPLICANTPG&EPG&EAPPLICANTPG&EPG&E MATCHLINE A THIS JOB IS TO BE WORKED IN CONJUNCTION WITH WRO PROJECT PM:35239680 PRIMARY CABLE: 1-1/0AL EPR 25KV IN 1-2" CONDUITLEGENDEXISTINGDESCRIPTIONINSTALLLOCPRIMARY CABLE: 3-1/0AL EPR 25KV IN 1-4" CONDUITSECONDARY CABLE: 1-4/0AL TPX 600V IN 1-3" CONDUITSECONDARY CABLE: 1-350AL TPX 600V IN 1-4" CONDUIT17" x 30" x 26" SECONDARY BOX17" x 30" x 18" SECONDARY BOX24" x 36" x 18" SECONDARY BOXRES SERVICE CABLE: 1-4/0AL TPX 600V IN 1-3" CONDUITLS1E STREETLIGHT CABLE: 1-6A DPX IN 1-2" CONDUITLS1E STREETLIGHT, 16' HEIGHT , 71W LEDPM TRANSFORMER, DF-LB, W/BOX PADSOLELY OWNED POLE - SIZE AS SHOWNFUSED CUTOUTS | DISCONNECTSLS2 APPLICANT INSTALLED STREETLIGHT CABLELS2 STREETLIGHT POINT OF SERVICELS2 STREETLIGHT 1734163536371538394014 7121113 TO SSD978417 T645255680777T124920993721517217 1635 5 5 16 32 31 4 3 Know what's below.Call before you dig. LOCATION 3 - SPLICE BOX DETAIL SCALE: 1" = 8' TYPICAL INTERIOR STREET PATTERN SCALE: 1" = 5'SIDE STREET INTERIOR PATTERN SCALE: 1" = 5' MATCHLINE A LOCATION 7 - T645255 DETAIL SCALE: 1" = 8' LOCATION 5 | TYPICAL EXTERIOR STREET TRANSFORMER CLEARANCES SCALE: 1" = 8' LOCATION 14 | TRANSFORMER CLEARANCES SCALE: 1" = 8' STREETLIGHT CLEARANCES SCALE: 1" = 5' LOCATION 1 DEPICTED 646397454076-MF437943 87 96 105 114 3 21 12 523169 2223242521 20 19 18 1734 33 32 31 3029282726 1635 36 37 15 38 39 40 14 87 TO SSD978417 LEGEND EXISTING DESCRIPTIONINSTALL SOLELY OWNED POLE - SIZE AS SHOWN 1 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN3 PHASE PRIMARY CABLE/CONDUCTOR - SIZE AS SHOWN 1 PHASE SECONDARY CABLE/CONDUCTOR - SIZE AS SHOWN OVERHEAD TRANSFORMER - SIZE AS SHOWN FUSED CUTOUTS | DISCONNECTS SOLELY OWNED ANCHOR - SIZE AS SHOWN VEGETATION REMOVAL ENCROACHMENT PERMIT TRAFFIC CONTROL PLAN / FLAGGING WORK REQUIREMENTS CITY COUNTY CALTRANS CONSTRUCTION NOTE VEGETATION REMOVAL ENCROACHMENT PERMIT TRAFFIC CONTROL PLAN / FLAGGING WORK REQUIREMENTS CITY COUNTY CALTRANS CONSTRUCTION NOTE WORK AGENT RESPONSIBILITIES TO INSTALL ELECTRIC DISTRIBUTION FACILITIES TO INSTALL DISTRIBUTION CONDUIT & SUBSTRUCTURES TO INSTALL ELECTRIC SERVICE FACILITIES TO INSTALL SERVICE CONDUITS & SUBSTRUCTURES TO PERFORM ALL TRENCHING AND EXCAVATION TO PERFORM JOINT TRENCH COMPOSITE | FORM B TO PERFORM ALL POLE WORK TO PERFORM ALL TIE-IN WORK VEGETATION REMOVAL ENCROACHMENT PERMIT TRAFFIC CONTROL PLAN / FLAGGING WORK REQUIREMENTS CITY COUNTY CALTRANS THIS JOB IS TO BE WORKED IN CONJUNCTION WITH PM:35235518 CONSTRUCTION NOTE PG&E N/A N/A N/A N/A N/A N/A N/A MATCHLINE A MATCHLINE A 18 1734 33 1635 36 37 15 38 39 40 14 12 11 13 REQUIRED PERMITS PRELIMINARY DRAWINGNOT FOR CONSTRUCTION PRELIMINARY DRAWINGNOT FOR CONSTRUCTION 14602 14602 14509 14504 14504 14516 14525 14510 14514 14502 0 14604 14601 14512 14501 14514 14526 14501 14603 14507 14521 14515 14524 14512 14503 14502 14528 14520 14513 14500 14513 14600 14603 14527 14508 CLCLCL C L C L C L C L CLCLCLC LCL CL C L CLCLCLCLCLCL CL CLCLCL CL CL CL CL CL C L C L C L C L C L CL CL CL CL CL CL CL CL RENFRO S A N T A F E EDGEFIELD S H A D Y CLCLCL L N RENFRO EVADELL PAMS GLOVER NORIEGA ASHVILLE WAYNE LEE 60'6'60' 4'5'60'60' 60'106'6'60'60'4' 60'61'4'4'60'4'L 29 RD WA Y CLOV E R D A L E WAY CT CT CT RD AVE T R E E CTSTRD80'5' 5' 5'DE5'5'5'1 1 0 '10'10'10'10'10'5'5' 5' 7'100'1 2 3 4 5 6 7 8 9 10 11 12 13 C1 X C2 • C3 I A5 • A2 • A1 X A2 • A3 I TIED TIED TIED TIED TIED D I - 832' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I- EMS BALL I - 2" PE CAP I - 2" PE TEE (10' CURB)14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PH2 - 1 PH2 - 2 PH2 - 12 PH2 - 3 PH2 - 4 PH2 - 11 PH2 - 5 PH2 - 10 PH2 - 6 PH2 - 9 PH2 - 7 PH2 - 8 PH2 - 13 PH2 - 14 PH2 - 15 PH2 - 16 PH2 - 17 PH2 - 18 PH2 - 19 PH2 - 20 PH2 - 21 PH2 - 22 PH2 - 29 PH2 - 28 PH2 - 27 PH2 - 26 PH2 - 25 PH2 - 24 PH2 - 23 5'(12' CURB)( 1 2 ' C U R B ) ( 8 ' CU R B )(12' CURB)(10' CURB)I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC F I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 660' OF 2" P_M I - 5# ANODE I - EMS BALL I - 2" PE CAP E I - 280' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 2" PE TEE I - 5# ANODE I - EMS BALL I - 2" PE CAP I - 455' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 465' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 180' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 405' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 4" PE TEE I - 2" X 4" PE REDUCER H I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC J I I - 5# ANODE I - EMS BALL I - 4" PE CAP I - 1600' OF 4" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I - EMS BALL I - 4" PE CAPI - 2" PE CPLG I - 4" PE TEE I - 2" X 4" PE REDUCER I - 6' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I - EMS BALL I - 2" PE CAP I - 380' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 2" PE CPLGC I - 5' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 565' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC A 2'2' G 10' I - 2" PE TEE EC EC B H1 X H2 • N 1" = 120' C ABCDEFGHIJKL1234567891 1 1 1 1 1 1 T S 1 A B U T _ C D D R E R R R D C A A C C D T T P L L P P D S O P T C 1 1 11WORK CENTER #NBMS #DREAMS #DESIGN #DESIGN NAME:PARCEL/CASE #PLAN FILE #RER #R/W #CAD FILE:NOTIFICATION #TAX #NOTIF. #ORDER OP.#SHEET OF WBS #CREW FOREMAN: ___________________________COMPANY: _________________________________DATE MOVED ON JOB:DATE OFOPERATION:DATE MOVED OFF JOB:TOTAL FEETINSTALLED:TOTAL FEETRETIRED:INSTALL MAIN WITH AT LEAST: _______________COVER BELOW: ____________________________RETIREMENTREASON: _________REVIEWED:REGION ENG.TSSLPACPM & R SUP.PA / FPARPPMFOS / FSPRINT NAME:DATE:REVIEWED:LSPSLPADISTRICTINSPECTORPRINT NAME:DATE:PRE CONSTRUCTION MEETING:YESNO(REQUIRED WITH A GAS COMPANY REPRESENTATIVE)PRESSURE DISTRICT #DIST. PRESS. / MAOP:CLASS LOCATION AFFECTED FACILITIES1234ISO MAP #SUPPLY LINE #SUPPLY LINE PRESS.S.M.Y.S. 20% OR OVERSET / MOP:YESNOREG. STATION ID #N/A PCB FREE AREA HOT SPOTHOT DISTRICTPCB - MEGARULEANNUAL / BUSINESS LEAK SURVEY AREA:(POST LIMITS ON SKETCH IF APPLICABLE)YESNOPLANNINGCATHODICALLY PROTECTED:CP AREA #DATE:PHONE #YESNOBRIDGE OR SPAN INVOLVED:WILL ANY PIPE BE LEFT EXPOSED:(IF YES ROUTE AS-BUILT COPY TO SP SUPERVISOR)YESNOYESNOENVIRONMENTAL CLEARANCE REQUIRED:ISSUED BY:DATE:STORM WATER:BMPS ONLYSCG SWPPPAPPLICANT SWPPPSPECIAL ENVIRONMENTAL CONSIDERATIONS:(IF YES SEE REGION ENVIRONMENTAL ADVISOR)YESNOYESNOMISCELLANEOUS PLANNINGSTAKED:STAKING REQUIRED:VALVE(S) REQUIRED:PIPELINE MARKERS REQUIRED:(IF YES DISPLAY LOCATION)JOINT TRENCH:YESNOYESNOYESNOYESNOPERMITTINGPERMIT #ISSUED BY:PERMIT #ISSUED BY:LOCATION INFORMATIONTHOMAS GUIDE PAGE #TRACT #CITY OF:COUNTY OF:REGION NAME:DISTRICT NAME:ATLAS SHEET (S) / LEAK SURVEY AREA (S):NUMBER OF LATERALS CLEARED: __________METHOD(S) USED TO VERIFY LOCATION(S):OPEN TRENCHCAMERAPOTHOLEEXPOSED BY EXCAVATIONOTHERIF A POSITIVE LOCATION COULD NOT BE DETERMINED INDICATE THE ADDRESS/LOCATIONAND REASON WHY ON THIS SKETCH.LCT: DATE:FOS / FS: DATE:(GAS STD #184.0170)METHOD: _______________________________YESNOCROSSING SEWER LATERALS:DESIGN CHANGESWERE CHANGES MADE TO THEDESIGNED PIPE OR COMPONENT:(IF YES TECHNICAL SERVICES APPROVAL IS REQUIRED)REGION ENG: _____________________DATE: __________UPDATED TO RER # ____________________TSS: _____________________________LPA / PA / FPA:YESNODATE:DATE: __________BACKFILL TYPEUSED MECHANICAL COMPACTION:YESNOGAS HANDLINGREVIEWED AND PERFORMED ASPLANNED PER GAS STD #184.06 :(IF NO PLEASE PROVIDE EXPLANATION ON SKETCH)SIGN: _________________________PRINT NAME / TITLE:YESNODATE: _________(PER GAS STANDARD 104.0042)BY: ________________________ DATE: ___________(CHANGE LABOR TO MWO# 99300.000)YESNOABANDON PIPELINE SAMPLING REQUIREDPLANNING & SKETCHINGPLANNEDCONSTRUCTIONBASECOMPLETIONBY: DATE:BY: DATE:BY: DATE:BY: DATE:CURRENT OWNER & DATESHEET OF AREA MGR.TICKET # ___________AS-BUILT / CONSTRUCTION REVIEWWO#RS#FIELD CONSTRUCTION11j 1 2 7 B 0 S B C - # 0 S 0 C 0 # 0 0 11- T 1 S S S E T D E D L D ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( T N D P H D P T N F P L P ( W D T D T M T D S P S T D N R F D T P N ( D T P H E L E R G E D T P L N D D T P P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M I P I P I P I P I P I P I P P S B P B C B B B C B W S C C I C R R S R P P R D M D O D O D O T R T I S S S S N L T C R D A P P I P I Y C Y W N D D O N W R D C W P T D O S N 1 P O S 2 R F 3 T 4 " B 5 T D I M A S D T E C E L D H T S D E C S G 1 ( E f r 1 c i ( T o m t ( T ( T ( T ( P r ( E s ( L d D H T S D E R R ( I I I ( D I ( I A T * H 11j 1 C 0 # 0 C 0 0 110 - S T R B D C E S P W C S S A R N F A BI I S F M ( F S I S T G M S S T M M M M P P P P E C J P P P C P P P P H P L R W L D W A S C C S Y Y Y Y M N N S P B W S j 1 0 X Y 0 X X A - STEAM/AIRCH - CHEMICALE - ELECTRICF - FUELFC - FLOOD CONTROL CHANNELFO - FIBER OPTICSG - GASLPG - LIGUEFIED PETROLEUM GASOTH - OTHERPP - PETROLEUM PRODUCTSRR - RAILROAD SIGNALS - SEWERSL - STREET LIGHTINGSP - SLURRY SYSTEMSS - STORM SEWERSTM - STREAMTEL - TELEPHONETS - TRAFFIC SIGNALTV - CABLE TVUKN - UNKNOWNW - RECLAIMED WATERW - WATERUSAC.O.A.ConflictBoreTrenchR/R ACR/R PCCPaving repairs per C.O.A. Standards 132-C and/or 110-B, All Substructuresprotected in place, all minimum clearance will be maintained.WATER NOTES1) All existing water facilities shall be protected in place. The Contractor performing this workshall be responsible for all cost as a result of any damage or repairs to existing waterfacilities.2) In case of emergency contact Anaheim Water Field/Ops. 714 765 4560 and WaterEngineering 714 765 5796.3) Smaller water service laterals (i.e. 2" and smaller are typically shown on plans but must beprotected in place). The normal depth of cover of water laterals is 30".4) Unless otherwise approved, the following clearances shall be maintained between existingwater facilities and metallic gas pipe:a. A minimum separation of 24" for vertical crossings, where 24" of separation cannot bemaintained between gas and water, install 1/8" thick butyl insulating blanket perSTD-2-610. Gas service shall be installed beneath all water lateral crossings.b. A minimum separation of 5' horizontal/parallel installation.c. A minimum of 2' a round any above ground water facility.d. The proposed utility lines shall have a minimum vertical clearance of 18" from stormdrains and sewer lines and 12" water lines.5) Contractor should contact City of Anaheim Water inspection at 714 765 4591 prior tobeginning work. All excavations a round existing public water facilities shall be observed byCity Water Inspector.ADA NoteADA compliant pedestrian access must be maintained at all times during construction.City of Anaheim Monument Preservation NoticePrior to Construction, all survey monuments that may be disturbed shall be tied out and a cornerrecord of each monument shall be submitted to the City of the surveyor for approval, prior to beingfiled with the county surveyor.Following construction all survey monuments that were disturbed shall be reset in their originalpositions and a corner record of each monument shall be submitted to the city of surveyor forapproval, prior to being filed with the county surveyor. Pursuant to the professional land surveyorsact section 8771 (d ).ELECTRICAL NOTES1) Show and protect in place all existing underground electrical structures and maintainproper working clearance per GO128. It is the developer responsibility to ascertain ALLexisting underground facilities including underground secondary cable and conduits,primary lines, street lights, vaults, and protect in place or relocate per APU electricalengineering construction standards at the developer's expense. If relocation or removal ofexisting facilities is required, the developer must contact Electrical Engineering 714 7654211 for assistance.2) Contractor shall contact City of Anaheim Electrical Inspection 714 765 6864 two businessdays prior to beginning work. All excavations around existing public utilities facilities shall beobserved by City Electrical Inspector. In case of emergency the contractor shall immediatelycontact Electric Field Ops. 714 765 5108 and Electrical Engineering 714 765 4211.3) Maintain a minimum vertical clearance of 12" from electrical lines.CONSTRUCTION NOTES1) Trench restoration per C.O.A 132-C and/or 110-B for sidewalk replacement from expansionjoint to expansion joint.2) Sidewalk, curb and gutter, drive approach and A.D.A. ramp restoration must be constructedper current C.O.A Standards.3) Vaults/pull boxes etc. must be installed flushed with existing area.4) Traffic lane closures allowed only between the hours of 8:30am to 3:30pm.5) Posting of construction, NO parking signs must have time and dates of restriction posted noless than 72 hours in advance.6) Sidewalk may be closed during working hours with pedestrian detour posted per CAW.A.T.C.H. manual. Sidewalk must be restored and open at the end of each workday.7) Alley detours during construction must be coordinated in advance with sanitation pick upscheduled: Residential and Business.8) Underground markings must be removed prior to permit being closed (contractor mayutilize power washing) no black out on asphalt.9) One sack slurry backfill when tunneling under curb and Gutter.LEGENDWB - water box, WL - water valve lid, LP - light pole, PB - power box, SL - sewer lid , MH - man hole cover, StLB - street lighting box, TrlB - Traffic light box, CL - Center line, PL - Property line, RW -Right of Way, PLA - Plastic, ABDN - Abandon, CSG - Casing/Conduit, FH – Fire Hydrant.SCG NOTIFICATION#:RCP #Description of Job:BY:BY:PERMIT SKETCHCONSTRUCTION QUANTITIESSQ. FT.FOOTAGECONSTRUCTIONDESIGN SUBSTRUCTURESVICINITY MAPDEVELOPER POCSCG POCSHEET OFACHEFFCFOGLPGOTHPPRRSSLSPSSSTMTELTSTVUKNWWX Y 0 N1 xN1 W WORK CENTER # NBMS # DREAMS # DESIGN #DESIGN NAME: PARCEL/CASE # PLAN FILE # RER # R/W # CAD FILE: NOTIFICATION #TAX #NOTIF. #ORDER OP.#SHEET OF WBS # CREW FOREMAN: ___________________________ COMPANY: _________________________________ DATE MOVED ON JOB: DATE OF OPERATION: DATE MOVED OFF JOB: TOTAL FEET INSTALLED: TOTAL FEET RETIRED:INSTALL MAIN WITH AT LEAST: _______________ COVER BELOW: ____________________________ RETIREMENT REASON: _________ REVIEWED: REGION ENG. TSS LPA CP M & R SUP. PA / FPA RPPM FOS / FS PRINT NAME:DATE: REVIEWED: LSPS LPA DISTRICT INSPECTOR PRINT NAME:DATE: PRE CONSTRUCTION MEETING: YES NO (REQUIRED WITH A GAS COMPANY REPRESENTATIVE) PRESSURE DISTRICT # DIST. PRESS. / MAOP: CLASS LOCATION AFFECTED FACILITIES 1 2 3 4 ISO MAP # SUPPLY LINE # SUPPLY LINE PRESS. S.M.Y.S. 20% OR OVER SET / MOP: YES NO REG. STATION ID # N/A PCB FREE AREA HOT SPOT HOT DISTRICT PCB - MEGARULE ANNUAL / BUSINESS LEAK SURVEY AREA: (POST LIMITS ON SKETCH IF APPLICABLE)YES NO PLANNINGCATHODICALLY PROTECTED: CP AREA # DATE:PHONE # YES NO BRIDGE OR SPAN INVOLVED: WILL ANY PIPE BE LEFT EXPOSED: (IF YES ROUTE AS-BUILT COPY TO SP SUPERVISOR) YES NO YES NO ENVIRONMENTAL CLEARANCE REQUIRED: ISSUED BY:DATE: STORM WATER:BMPS ONLY SCG SWPPP APPLICANT SWPPP SPECIAL ENVIRONMENTAL CONSIDERATIONS: (IF YES SEE REGION ENVIRONMENTAL ADVISOR) YES NO YES NO MISCELLANEOUS PLANNING STAKED:STAKING REQUIRED: VALVE(S) REQUIRED: PIPELINE MARKERS REQUIRED: (IF YES DISPLAY LOCATION) JOINT TRENCH: YES NO YES NO YES NO YES NO PERMITTING PERMIT # ISSUED BY: PERMIT # ISSUED BY: LOCATION INFORMATION THOMAS GUIDE PAGE # TRACT # CITY OF: COUNTY OF: REGION NAME: DISTRICT NAME: ATLAS SHEET (S) / LEAK SURVEY AREA (S): NUMBER OF LATERALS CLEARED: __________ METHOD(S) USED TO VERIFY LOCATION(S): OPEN TRENCH CAMERA POTHOLE EXPOSED BY EXCAVATION OTHER IF A POSITIVE LOCATION COULD NOT BE DETERMINED INDICATE THE ADDRESS/LOCATION AND REASON WHY ON THIS SKETCH. LCT: DATE: FOS / FS: DATE: (GAS STD #184.0170) METHOD: _______________________________ YES NOCROSSING SEWER LATERALS: DESIGN CHANGES WERE CHANGES MADE TO THE DESIGNED PIPE OR COMPONENT: (IF YES TECHNICAL SERVICES APPROVAL IS REQUIRED) REGION ENG: _____________________DATE: __________ UPDATED TO RER # ____________________ TSS: _____________________________ LPA / PA / FPA: YES NO DATE: DATE: __________ BACKFILL TYPE USED MECHANICAL COMPACTION:YES NO GAS HANDLING REVIEWED AND PERFORMED AS PLANNED PER GAS STD #184.06 : (IF NO PLEASE PROVIDE EXPLANATION ON SKETCH) SIGN: _________________________ PRINT NAME / TITLE: YES NO DATE: _________ (PER GAS STANDARD 104.0042) BY: ________________________ DATE: ___________ (CHANGE LABOR TO MWO# 99300.000) YES NO ABANDON PIPELINE SAMPLING REQUIRED PLANNING & SKETCHING PLANNED CONSTRUCTION BASE COMPLETION BY: DATE: BY: DATE:BY: DATE: BY: DATE: CURRENT OWNER & DATE SHEET OF AREA MGR. TICKET # ___________AS-BUILT / CONSTRUCTION REVIEWWO# RS#FIELD CONSTRUCTION1 1J. GUZMAN 9/9/2021 J. PADILLA 10/25/2021 J. PADILLA 10/25/2021 jpadill3 10/27/2021 2400-H7 7350-1 BAKERSFIELD 0015 SCG NORTHERN - GD BAKERSFIELD C2 1010 14 34447-306 55 50 ---- #### JACOB GUZMAN 9/9/2021 PAT O'BRIEN 9/14/2021 DAN PETERS CONSTRUCTION SKETCH 0000250544 CGD_BKR 00000000 196986 ####30493555 000030493555.dwg 000030493555 11000030493555---- __' PRINT NAME: DURATION:_______ HRS. AND/OR_______MIN. MEDIUM HIGH AIR SIGN: GAS STD#184.0150 GAS STD #182.0170 ACTUAL MINIMUM TEST PRESSURE:_______PSIG MINIMUM:________ PSIG / MAXIMUM:________PSIG PRINT TITLE: DATE: LOCATION "_________"TO LOCATION "_________" NITROGEN:OTHER:________________ PIPE PRESSURE TEST TEST PRESSURE: PLANNED INFORMATION ABOVE THIS LINE ACTUAL FIELD INFORMATION BELOW THIS LINE TEST MEDIUM: PRESSURE GAUGE SERIAL#:_________________________ I J 100 140 44443-182 2" PU 04-14 34447-308 2" PU 12-07 34447-308 2" PU 12-07 34447-306 2" PU 12-07 34447-306 2" PU 12-07 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER ANTICIPATED PRESSURE:_______PSIG AS FOUND PRESSURE:_______PSIG PIPE PRESSURE 50 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER ANTICIPATED PRESSURE:_______PSIG AS FOUND PRESSURE:_______PSIG PIPE PRESSURE 50 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER 14602 14602 14509 14504 14504 14516 14525 14510 14514 14502 0 14604 14601 14512 14501 14514 14526 14501 14603 14507 14521 14515 14524 14512 14503 14502 14528 14520 14513 14500 14513 14600 14603 14527 14508 CLCLCL C L C L C L C L CLCLCLC LCL CL C L CLCLCLCLCLCL CL CLCLCL CL CL CL CL CL C L C L C L C L C L CL CL CL CL CL CL CL CL RENFRO S A N T A F E EDGEFIELD S H A D Y CLCLCL L N RENFRO EVADELL PAMS GLOVER NORIEGA ASHVILLE WAYNE LEE 60'6'60' 4'5'60'60' 60'106'6'60'60'4' 60'61'4'4'60'4'L 29 RD WA Y CLOV E R D A L E WAY CT CT CT RD AVE T R E E CTSTRD80'5' 5' 5'DE5'5'5'1 1 0 '10'10'10'10'10'5'5' 5' 7'100'1 2 3 4 5 6 7 8 9 10 11 12 13 C1 X C2 • C3 I A5 • A2 • A1 X A2 • A3 I TIED TIED TIED TIED TIED D I - 832' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I- EMS BALL I - 2" PE CAP I - 2" PE TEE (10' CURB)14 15 16 17 18 19 20 21 22 23 24 2526 27 28 29 30 31 32 33 34 35 36 37 38 39 40 PH2 - 1 PH2 - 2 PH2 - 12 PH2 - 3 PH2 - 4 PH2 - 11 PH2 - 5 PH2 - 10 PH2 - 6 PH2 - 9 PH2 - 7 PH2 - 8 PH2 - 13 PH2 - 14 PH2 - 15 PH2 - 16 PH2 - 17 PH2 - 18 PH2 - 19 PH2 - 20 PH2 - 21 PH2 - 22 PH2 - 29 PH2 - 28 PH2 - 27 PH2 - 26 PH2 - 25 PH2 - 24 PH2 - 23 5'(12' CURB)( 1 2 ' C U R B ) ( 8 ' CU R B )(12' CURB)(10' CURB)I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC F I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 660' OF 2" P_M I - 5# ANODE I - EMS BALL I - 2" PE CAP E I - 280' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 2" PE TEE I - 5# ANODE I - EMS BALL I - 2" PE CAP I - 455' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 465' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 180' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 405' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 4" PE TEE I - 2" X 4" PE REDUCER H I - 265' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC J I I - 5# ANODE I - EMS BALL I - 4" PE CAP I - 1600' OF 4" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I - EMS BALL I - 4" PE CAPI - 2" PE CPLG I - 4" PE TEE I - 2" X 4" PE REDUCER I - 6' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 5# ANODE I - EMS BALL I - 2" PE CAP I - 380' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 2" PE CPLGC I - 5' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC I - 2" PE TEE I - 565' OF 2" P_M DEVELOPER PROVIDED JOINT TRENCH / PUBLIC PROPERTY - PTC A 2'2' G 10' I - 2" PE TEE EC EC B H1 X H2 • N 1" = 120' C ABCDEFGHIJKL1234567891 1 1 1 1 1 1 T S 1 A B U T _ C D D R E R R R D C A A C C D T T P L L P P D S O P T C 1 1 11WORK CENTER #NBMS #DREAMS #DESIGN #DESIGN NAME:PARCEL/CASE #PLAN FILE #RER #R/W #CAD FILE:NOTIFICATION #TAX #NOTIF. #ORDER OP.#SHEET OF WBS #CREW FOREMAN: ___________________________COMPANY: _________________________________DATE MOVED ON JOB:DATE OFOPERATION:DATE MOVED OFF JOB:TOTAL FEETINSTALLED:TOTAL FEETRETIRED:INSTALL MAIN WITH AT LEAST: _______________COVER BELOW: ____________________________RETIREMENTREASON: _________REVIEWED:REGION ENG.TSSLPACPM & R SUP.PA / FPARPPMFOS / FSPRINT NAME:DATE:REVIEWED:LSPSLPADISTRICTINSPECTORPRINT NAME:DATE:PRE CONSTRUCTION MEETING:YESNO(REQUIRED WITH A GAS COMPANY REPRESENTATIVE)PRESSURE DISTRICT #DIST. PRESS. / MAOP:CLASS LOCATION AFFECTED FACILITIES1234ISO MAP #SUPPLY LINE #SUPPLY LINE PRESS.S.M.Y.S. 20% OR OVERSET / MOP:YESNOREG. STATION ID #N/A PCB FREE AREA HOT SPOTHOT DISTRICTPCB - MEGARULEANNUAL / BUSINESS LEAK SURVEY AREA:(POST LIMITS ON SKETCH IF APPLICABLE)YESNOPLANNINGCATHODICALLY PROTECTED:CP AREA #DATE:PHONE #YESNOBRIDGE OR SPAN INVOLVED:WILL ANY PIPE BE LEFT EXPOSED:(IF YES ROUTE AS-BUILT COPY TO SP SUPERVISOR)YESNOYESNOENVIRONMENTAL CLEARANCE REQUIRED:ISSUED BY:DATE:STORM WATER:BMPS ONLYSCG SWPPPAPPLICANT SWPPPSPECIAL ENVIRONMENTAL CONSIDERATIONS:(IF YES SEE REGION ENVIRONMENTAL ADVISOR)YESNOYESNOMISCELLANEOUS PLANNINGSTAKED:STAKING REQUIRED:VALVE(S) REQUIRED:PIPELINE MARKERS REQUIRED:(IF YES DISPLAY LOCATION)JOINT TRENCH:YESNOYESNOYESNOYESNOPERMITTINGPERMIT #ISSUED BY:PERMIT #ISSUED BY:LOCATION INFORMATIONTHOMAS GUIDE PAGE #TRACT #CITY OF:COUNTY OF:REGION NAME:DISTRICT NAME:ATLAS SHEET (S) / LEAK SURVEY AREA (S):NUMBER OF LATERALS CLEARED: __________METHOD(S) USED TO VERIFY LOCATION(S):OPEN TRENCHCAMERAPOTHOLEEXPOSED BY EXCAVATIONOTHERIF A POSITIVE LOCATION COULD NOT BE DETERMINED INDICATE THE ADDRESS/LOCATIONAND REASON WHY ON THIS SKETCH.LCT: DATE:FOS / FS: DATE:(GAS STD #184.0170)METHOD: _______________________________YESNOCROSSING SEWER LATERALS:DESIGN CHANGESWERE CHANGES MADE TO THEDESIGNED PIPE OR COMPONENT:(IF YES TECHNICAL SERVICES APPROVAL IS REQUIRED)REGION ENG: _____________________DATE: __________UPDATED TO RER # ____________________TSS: _____________________________LPA / PA / FPA:YESNODATE:DATE: __________BACKFILL TYPEUSED MECHANICAL COMPACTION:YESNOGAS HANDLINGREVIEWED AND PERFORMED ASPLANNED PER GAS STD #184.06 :(IF NO PLEASE PROVIDE EXPLANATION ON SKETCH)SIGN: _________________________PRINT NAME / TITLE:YESNODATE: _________(PER GAS STANDARD 104.0042)BY: ________________________ DATE: ___________(CHANGE LABOR TO MWO# 99300.000)YESNOABANDON PIPELINE SAMPLING REQUIREDPLANNING & SKETCHINGPLANNEDCONSTRUCTIONBASECOMPLETIONBY: DATE:BY: DATE:BY: DATE:BY: DATE:CURRENT OWNER & DATESHEET OF AREA MGR.TICKET # ___________AS-BUILT / CONSTRUCTION REVIEWWO#RS#FIELD CONSTRUCTION11j 1 2 7 B 0 S B C - # 0 S 0 C 0 # 0 0 11- T 1 S S S E T D E D L D ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( ( T N D P H D P T N F P L P ( W D T D T M T D S P S T D N R F D T P N ( D T P H E L E R G E D T P L N D D T P P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M P H M H M I P I P I P I P I P I P I P P S B P B C B B B C B W S C C I C R R S R P P R D M D O D O D O T R T I S S S S N L T C R D A P P I P I Y C Y W N D D O N W R D C W P T D O S N 1 P O S 2 R F 3 T 4 " B 5 T D I M A S D T E C E L D H T S D E C S G 1 ( E f r 1 c i ( T o m t ( T ( T ( T ( P r ( E s ( L d D H T S D E R R ( I I I ( D I ( I A T * H 11j 1 C 0 # 0 C 0 0 110 - S T R B D C E S P W C S S A R N F A BI I S F M ( F S I S T G M S S T M M M M P P P P E C J P P P C P P P P H P L R W L D W A S C C S Y Y Y Y M N N S P B W S j 1 0 X Y 0 X X A - STEAM/AIRCH - CHEMICALE - ELECTRICF - FUELFC - FLOOD CONTROL CHANNELFO - FIBER OPTICSG - GASLPG - LIGUEFIED PETROLEUM GASOTH - OTHERPP - PETROLEUM PRODUCTSRR - RAILROAD SIGNALS - SEWERSL - STREET LIGHTINGSP - SLURRY SYSTEMSS - STORM SEWERSTM - STREAMTEL - TELEPHONETS - TRAFFIC SIGNALTV - CABLE TVUKN - UNKNOWNW - RECLAIMED WATERW - WATERUSAC.O.A.ConflictBoreTrenchR/R ACR/R PCCPaving repairs per C.O.A. Standards 132-C and/or 110-B, All Substructuresprotected in place, all minimum clearance will be maintained.WATER NOTES1) All existing water facilities shall be protected in place. The Contractor performing this workshall be responsible for all cost as a result of any damage or repairs to existing waterfacilities.2) In case of emergency contact Anaheim Water Field/Ops. 714 765 4560 and WaterEngineering 714 765 5796.3) Smaller water service laterals (i.e. 2" and smaller are typically shown on plans but must beprotected in place). The normal depth of cover of water laterals is 30".4) Unless otherwise approved, the following clearances shall be maintained between existingwater facilities and metallic gas pipe:a. A minimum separation of 24" for vertical crossings, where 24" of separation cannot bemaintained between gas and water, install 1/8" thick butyl insulating blanket perSTD-2-610. Gas service shall be installed beneath all water lateral crossings.b. A minimum separation of 5' horizontal/parallel installation.c. A minimum of 2' a round any above ground water facility.d. The proposed utility lines shall have a minimum vertical clearance of 18" from stormdrains and sewer lines and 12" water lines.5) Contractor should contact City of Anaheim Water inspection at 714 765 4591 prior tobeginning work. All excavations a round existing public water facilities shall be observed byCity Water Inspector.ADA NoteADA compliant pedestrian access must be maintained at all times during construction.City of Anaheim Monument Preservation NoticePrior to Construction, all survey monuments that may be disturbed shall be tied out and a cornerrecord of each monument shall be submitted to the City of the surveyor for approval, prior to beingfiled with the county surveyor.Following construction all survey monuments that were disturbed shall be reset in their originalpositions and a corner record of each monument shall be submitted to the city of surveyor forapproval, prior to being filed with the county surveyor. Pursuant to the professional land surveyorsact section 8771 (d ).ELECTRICAL NOTES1) Show and protect in place all existing underground electrical structures and maintainproper working clearance per GO128. It is the developer responsibility to ascertain ALLexisting underground facilities including underground secondary cable and conduits,primary lines, street lights, vaults, and protect in place or relocate per APU electricalengineering construction standards at the developer's expense. If relocation or removal ofexisting facilities is required, the developer must contact Electrical Engineering 714 7654211 for assistance.2) Contractor shall contact City of Anaheim Electrical Inspection 714 765 6864 two businessdays prior to beginning work. All excavations around existing public utilities facilities shall beobserved by City Electrical Inspector. In case of emergency the contractor shall immediatelycontact Electric Field Ops. 714 765 5108 and Electrical Engineering 714 765 4211.3) Maintain a minimum vertical clearance of 12" from electrical lines.CONSTRUCTION NOTES1) Trench restoration per C.O.A 132-C and/or 110-B for sidewalk replacement from expansionjoint to expansion joint.2) Sidewalk, curb and gutter, drive approach and A.D.A. ramp restoration must be constructedper current C.O.A Standards.3) Vaults/pull boxes etc. must be installed flushed with existing area.4) Traffic lane closures allowed only between the hours of 8:30am to 3:30pm.5) Posting of construction, NO parking signs must have time and dates of restriction posted noless than 72 hours in advance.6) Sidewalk may be closed during working hours with pedestrian detour posted per CAW.A.T.C.H. manual. Sidewalk must be restored and open at the end of each workday.7) Alley detours during construction must be coordinated in advance with sanitation pick upscheduled: Residential and Business.8) Underground markings must be removed prior to permit being closed (contractor mayutilize power washing) no black out on asphalt.9) One sack slurry backfill when tunneling under curb and Gutter.LEGENDWB - water box, WL - water valve lid, LP - light pole, PB - power box, SL - sewer lid , MH - man hole cover, StLB - street lighting box, TrlB - Traffic light box, CL - Center line, PL - Property line, RW -Right of Way, PLA - Plastic, ABDN - Abandon, CSG - Casing/Conduit, FH – Fire Hydrant.SCG NOTIFICATION#:RCP #Description of Job:BY:BY:PERMIT SKETCHCONSTRUCTION QUANTITIESSQ. FT.FOOTAGECONSTRUCTIONDESIGN SUBSTRUCTURESVICINITY MAPDEVELOPER POCSCG POCSHEET OFACHEFFCFOGLPGOTHPPRRSSLSPSSSTMTELTSTVUKNWWX Y 0 N1 xN1 W WORK CENTER # NBMS # DREAMS # DESIGN #DESIGN NAME: PARCEL/CASE # PLAN FILE # RER # R/W # CAD FILE: NOTIFICATION #TAX #NOTIF. #ORDER OP.#SHEET OF WBS # CREW FOREMAN: ___________________________ COMPANY: _________________________________ DATE MOVED ON JOB: DATE OF OPERATION: DATE MOVED OFF JOB: TOTAL FEET INSTALLED: TOTAL FEET RETIRED:INSTALL MAIN WITH AT LEAST: _______________ COVER BELOW: ____________________________ RETIREMENT REASON: _________ REVIEWED: REGION ENG. TSS LPA CP M & R SUP. PA / FPA RPPM FOS / FS PRINT NAME:DATE: REVIEWED: LSPS LPA DISTRICT INSPECTOR PRINT NAME:DATE: PRE CONSTRUCTION MEETING: YES NO (REQUIRED WITH A GAS COMPANY REPRESENTATIVE) PRESSURE DISTRICT # DIST. PRESS. / MAOP: CLASS LOCATION AFFECTED FACILITIES 1 2 3 4 ISO MAP # SUPPLY LINE # SUPPLY LINE PRESS. S.M.Y.S. 20% OR OVER SET / MOP: YES NO REG. STATION ID # N/A PCB FREE AREA HOT SPOT HOT DISTRICT PCB - MEGARULE ANNUAL / BUSINESS LEAK SURVEY AREA: (POST LIMITS ON SKETCH IF APPLICABLE)YES NO PLANNINGCATHODICALLY PROTECTED: CP AREA # DATE:PHONE # YES NO BRIDGE OR SPAN INVOLVED: WILL ANY PIPE BE LEFT EXPOSED: (IF YES ROUTE AS-BUILT COPY TO SP SUPERVISOR) YES NO YES NO ENVIRONMENTAL CLEARANCE REQUIRED: ISSUED BY:DATE: STORM WATER:BMPS ONLY SCG SWPPP APPLICANT SWPPP SPECIAL ENVIRONMENTAL CONSIDERATIONS: (IF YES SEE REGION ENVIRONMENTAL ADVISOR) YES NO YES NO MISCELLANEOUS PLANNING STAKED:STAKING REQUIRED: VALVE(S) REQUIRED: PIPELINE MARKERS REQUIRED: (IF YES DISPLAY LOCATION) JOINT TRENCH: YES NO YES NO YES NO YES NO PERMITTING PERMIT # ISSUED BY: PERMIT # ISSUED BY: LOCATION INFORMATION THOMAS GUIDE PAGE # TRACT # CITY OF: COUNTY OF: REGION NAME: DISTRICT NAME: ATLAS SHEET (S) / LEAK SURVEY AREA (S): NUMBER OF LATERALS CLEARED: __________ METHOD(S) USED TO VERIFY LOCATION(S): OPEN TRENCH CAMERA POTHOLE EXPOSED BY EXCAVATION OTHER IF A POSITIVE LOCATION COULD NOT BE DETERMINED INDICATE THE ADDRESS/LOCATION AND REASON WHY ON THIS SKETCH. LCT: DATE: FOS / FS: DATE: (GAS STD #184.0170) METHOD: _______________________________ YES NOCROSSING SEWER LATERALS: DESIGN CHANGES WERE CHANGES MADE TO THE DESIGNED PIPE OR COMPONENT: (IF YES TECHNICAL SERVICES APPROVAL IS REQUIRED) REGION ENG: _____________________DATE: __________ UPDATED TO RER # ____________________ TSS: _____________________________ LPA / PA / FPA: YES NO DATE: DATE: __________ BACKFILL TYPE USED MECHANICAL COMPACTION:YES NO GAS HANDLING REVIEWED AND PERFORMED AS PLANNED PER GAS STD #184.06 : (IF NO PLEASE PROVIDE EXPLANATION ON SKETCH) SIGN: _________________________ PRINT NAME / TITLE: YES NO DATE: _________ (PER GAS STANDARD 104.0042) BY: ________________________ DATE: ___________ (CHANGE LABOR TO MWO# 99300.000) YES NO ABANDON PIPELINE SAMPLING REQUIRED PLANNING & SKETCHING PLANNED CONSTRUCTION BASE COMPLETION BY: DATE: BY: DATE:BY: DATE: BY: DATE: CURRENT OWNER & DATE SHEET OF AREA MGR. TICKET # ___________AS-BUILT / CONSTRUCTION REVIEWWO# RS#FIELD CONSTRUCTION1 1J. GUZMAN 9/9/2021 J. PADILLA 10/25/2021 J. PADILLA 10/25/2021 jpadill3 10/27/2021 2400-H7 7350-1 BAKERSFIELD 0015 SCG NORTHERN - GD BAKERSFIELD C2 1010 14 34447-306 55 50 ---- #### JACOB GUZMAN 9/9/2021 PAT O'BRIEN 9/14/2021 DAN PETERS CONSTRUCTION SKETCH 0000250544 CGD_BKR 00000000 196986 ####30493555 000030493555.dwg 000030493555 11000030493555---- __' PRINT NAME: DURATION:_______ HRS. AND/OR_______MIN. MEDIUM HIGH AIR SIGN: GAS STD#184.0150 GAS STD #182.0170 ACTUAL MINIMUM TEST PRESSURE:_______PSIG MINIMUM:________ PSIG / MAXIMUM:________PSIG PRINT TITLE: DATE: LOCATION "_________"TO LOCATION "_________" NITROGEN:OTHER:________________ PIPE PRESSURE TEST TEST PRESSURE: PLANNED INFORMATION ABOVE THIS LINE ACTUAL FIELD INFORMATION BELOW THIS LINE TEST MEDIUM: PRESSURE GAUGE SERIAL#:_________________________ I J 100 140 44443-182 2" PU 04-14 34447-308 2" PU 12-07 34447-308 2" PU 12-07 34447-306 2" PU 12-07 34447-306 2" PU 12-07 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER ANTICIPATED PRESSURE:_______PSIG AS FOUND PRESSURE:_______PSIG PIPE PRESSURE 50 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER ANTICIPATED PRESSURE:_______PSIG AS FOUND PRESSURE:_______PSIG PIPE PRESSURE 50 EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER EXIST INST ABAND BY: PE TYPE:LOT #: PLASTIC PIPE LOT NUMBER exxST:: CONSTRUCTION SKETCH TRACT 7350 PHASES 1 (c 2 LEONARD ALVARADO ROAD | RENFRO RD BAKERSFIELD. CA PKre WS k Plena: ________ REVISIONS PRWARt \TM.V££:21 IV >aTAC£ AREA: 1 SOURCE SOC OEVCE; SWITCH 97M17 OSGN SAC: LT RURAL LOAONG AREA: UGHT RWTOR ZO&TES ARRESTER DST: 2 non «/*IfKtfUlM-TDM ENGINEERING AND PIANNING DEPT. B RIVERPARK PUCE EAST FRESNO, CA 93720 SUPy.BStKM ELRCH REPiMW.W CORWCJO PUTItAWJ CASmiOmmssmNO EMffiONVHMTAl CAS COSTirT:KO |OB LOON/A 1pw.3523551B IsHEH:! QfZ |«g.O wane «s * QXCTsc cowpaw R E V 1 S 1 0 M S PR.UWT VOLTAGE; 21 W VOLTAGE AREA: 1kUwnDCSCPPTDMLATTIUOE; i5_407767 LDNGnUDE: -119.16317SOURCE SIDE DEVICE: SWUCH 97B4I7 SUB t ORCUTT: RENFRO 21 7 mwi au’ML- t/k | ns «£A Utk-TDi 1 ENGINERING AND PLANNING DET. 8 RIVERPARK PLACE EAST FRESNO, CA 93720 CAS COKnXT:HO E5T:N!CK DENNSON (559) 3473152 ADE: RAMON CHAVEZ 1 (559) 3473236 SUPW BRENDA ELRCH (559) 347305C REP:AVWR> CORNEJO (661) 3983755 PLHR:JUAN CASTILLO (661) 39839B7NOTTF: 120578516 JPA^N/A SCALE: 1 ■■=50’MTE: 05/19/2021|pvl3523551B SHEET: 2 0E2 |SV.O PRELIMINARY DRAWINGNOT FOR CONSTRUCTION !"#$%&$#’ ()*+,-$(-$#.+ /! - ( ,! - ( ) ( PRELIMINARY DRAWINGNOT FOR CONSTRUCTION "#%&0 . ) 12 !.3"4!*53"