Loading...
HomeMy WebLinkAboutRES NO 79-99'_.7 RESOLUTION DETERMINING THAT THE COFFEE ROAD SOUND WALL CANNOT BE CONSTRUCTED THROUGH THE USUAL BIDDING PROCEDURES AND AUTHORIZING THE FINANCE DIRECTOR TO DISPENSE WITH BIDD1NG AND TO NEGOTIATE CONTRACT(S) THEREFORE, NOT TO EXCEED $90,000 WHEREAS, the City of Bakersfield has determined there is a need for a concrete block sound wall along the east side of Coffee Road from Olive Drive south to approximately Weldon Avenue; and WHEREAS, the City has advertised for bids for construction of the Coffee Road sound wall twice; and WHEREAS, only one bid was received on each of the bid opening dates of April 22, '1999, and June 8, 1999; and WHEREAS, both of these bids exceeded the Engineer' s Estimate by a considerable amount and both bids were rejected, and WHEREAS, City desires to complete construction of this project in a timely manner; and WHEREAS, the Finance Director recommends the Council find that the Coffee Road sound wall cannot be reasonably constructed in a timely manner because of the fixed requirements and the schedules required with a formal bid, and recommends that the Council dispense with bidding, in accordance with subsection D.2 of Section 3.20.060 of the Bakersfield Municipal Code. NOW, THEREFORE, BE IT RESOLVED, by the Council of the City of Bakersfield as follows: 1. The above-recitals are true and correct and incorporated herein by reference. , The Coffee Road sound wall has been sent out to bid twice with each yielding only one bid, both of which were significantly higher than the Engineer's Estimate. Readvertising the project for a third time will delay the project's start date and there is no reason to believe that readvertising this project would produce different results. The Finance Director is authorized to dispense with bidding in accordance with subsection D2 of Section 3.20.060 of the Bakersfield Municipal Code and --Page 1 of 2 Pages-- negotiate a contract to complete the Coffee Road sound wall. , The expenditure of funds for said construction of the Coffee Road sound wall shall not exceed $90,000. I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ,11111 ] 6 ~ , by the following vote: AYES: COUNCILMEMBER CARSON DEMOND,MAGGARD,COUCH,ROWLES,SULLIVAN,SALVAGGIO NOES: COUNCILMEMBER t'~~f''4 ~ _ ABSTAIN: COUNCILMEMBER ~...I~5 ~ F- ABSENT: COUNCILMEMBER I,JC~ of the Council of the City of Bakers~eld APPROVED MAYOR APPROVED as to form: BART J. THILTJEN CITY ATTORNEY --Page 2 of 2 Pages-- BID TABULATION (re-bid) Construction of Coffee Road Sound Wall Olive Drive to Weldon Avenue PROJECT NO.: P9K006 BID OPENING DATE: 6-8-99 Prepared by S.J.P. Date Prepared: 6-8-99 Checked by: Approved b~/~ _ Item 1 2 3 4 5 6 Item Modify Masonry Wall Concrete Masonry Sound Wall Paint Walls Remove Exist. Chain Link Fence w/Redwood Slats Tie Existing Wood Fence to Sound Wall Tie Existina Chain Link Fence to Sound Wall Estimated Quantity 1.234 1,099 1 1,099 11 2 Engineer's Serrano &Cone, Estimate 2042 Omega Rd., San Ramon, 925-838-5685 Unit Unit Price Amount Unit Price Measure LF $15.50 $19,127.00 $30.00 $37 LF $44.50 $48,905.50 $130.00 $142 LS $5,100.00 $5,100.00 $25,000.00 $25 LF $4.00 $4,396.00 $9.00 $9 EA $250.00 $2,750.00 $250.00 $2 EA $600.00 $1,200.00 $400.00 SUB-TOTAL 10% CONTINGENCY TOTAL $81,478.50 $8,147.85 $89,626.35 , Inc. Suite F )4583 5 ~ount 7,020.00 2,870.00 5,000.00 ~,891.00 2,750.00 $800.00 TOTAL $218,331.00 TOTAL $0.00