Loading...
HomeMy WebLinkAboutOPI 2023 RESULTSAppendix IX Underground Storage Tank Overfill Prevention Equipment Inspection Report Form CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council, OPE = Overfill Prevention Equipment Page 1 of 2 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 36 Month 1. FACILITY INFORMATION CERS ID Inspection Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Inspection Phone Mailing Address Service Technician Performing Inspection Contractor/Tank Tester License Number ICC Number Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. INSPECTION PROCEDURES INFORMATION Inspection Procedures Used Components Inspected 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING INSPECTION I hereby certify that the OPE was inspected in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.2; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 10134208 01/10/2024 Jaco #3351 Howards #4 3200 Panama Lane Bakersfield 93313 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Brandon Nunez 1073967 10226373 09/06/2024 VeederRoot TLS-3XX Technician - C32655 10/11/2024 Industry Standard ATG Probes 01/10/2024 Total # of Pages 4 Underground Storage Tank Overfill Prevention Equipment Inspection Report Additional copies of this page may be attached. Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) Page 2 of 2 6. OVERFILL PREVENTION EQUIPMENT DETAILS Tank ID (one OPE per column) Are both vent and tank riser piping secondarily contained? ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No OPE Model What is the OPE response when activated? (Check all that apply.) ܆܆ Shut off Flow ܆܆Restricts Flow ܆܆ Audible Alarm ܆܆ Visual Alarm ܆܆ Shut off Flow ܆܆Restricts Flow ܆܆ Audible Alarm ܆܆ Visual Alarm ܆܆ Shut off Flow ܆܆Restricts Flow ܆܆ Audible Alarm ܆܆ Visual Alarm ܆܆ Shut off Flow ܆܆Restricts Flow ܆܆ Audible Alarm ܆܆ Visual Alarm Are flow restrictors installed on vent piping that may interfere with the OPE operation? ܆܆ Yes* ܆܆ No ܆܆ Yes* ܆܆ No ܆܆ Yes* ܆܆ No ܆܆ Yes* ܆܆ No At what level in the tank is the OPE set to activate? (Inches from bottom of tank) What is the percent capacity of the tank at which the OPE activates? Is the OPE in proper operating condition to respond when the stored substance reaches the designated regulatory level? ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No ܆܆ Yes ܆܆ No 7. SUMMARY OF TESTING RESULTS OPE Inspection Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail 1 8. COMMENTS Describe all results marked “Fail” and each proposed remedy. * Mark here if: ܆܆ Flow restrictors interfere with overfill prevention and equipment repairs required. 87-1 UNL VeederRoot VeederRoot VeederRoot VeederRoot 80.6" 80.6" 80.6" 80.6" 89% 89% 89% 89% 87-2 UNL 91 PNL DSL