Loading...
HomeMy WebLinkAboutRes. No. 01-24 (CUP 23-0179)RESOLUTION NO. 01-24 RESOLUTION OF THE BAKERSFIELD PLANNING COMMISSION APPROVING A CONDITIONAL USE PERMIT TO ALLOW MULTI-FAMILY HOUSING (B.M.C. 17.24.040.A.3) IN A C-2 (REGIONAL COMMERCIAL) ZONE DISTRICT, LOCATED AT 505 UNION AVENUE. (CUP 23-0179) WHEREAS, Ethosphere Studio filed an application with the City of Bakersfield Development Services Department for a conditional use permit to allow multi-family housing (B.M.C.17.24.040.A.3) in a C-2 (Regional Commercial) zone district, located at 505 Union Avenue (the "Project"); and WHEREAS, the Secretary of the Planning Commission set Thursday, January 18, 2024, at 5:30 p.m. in City Council Chambers, City Hall South, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before the Planning Commission to consider the proposed conditional use permit and notice of the public hearing was given in the manner provided in Title 1 7 of the Bakersfield Municipal Code; and WHEREAS, at the public hearing no testimony was received either in support or opposition of the Project; and WHEREAS, the laws and regulations relating to the California Environmental Quality Act (CEQA) and the City of Bakersfield's CEQA Implementation Procedures have been duly followed by city staff and the Planning Commission; and WHEREAS, the above described project is exempt from the requirements of CEQA in accordance with Section 15194; and WHEREAS, the City of Bakersfield Development Services Department ( 1715 Chester Avenue, Bakersfield, California) is the custodian of all documents and other materials upon which the environmental determination is based; and WHEREAS, the facts presented in the staff report and evidence received both in writing and by verbal testimony at the above referenced public hearing support the following findings: 1. All required public notices have been given. Hearing notices regarding the Project were mailed to property owners within 300 feet of the Project area and published in The Bakersfield Californian, a local newspaper of general circulation, 10 days prior to the hearing. 2. The provisions of CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposal is a project that is exempt from CEQA pursuant to Section 15194 because the project is affordable housing. 3. The proposed use is essential and desirable to the public convenience and welfare. Tw:S\04_current planning\02_CUP\0l_active\2023\23-0179505 Union Ave\0l_PC\final prep\Resolution.docx 4. The proposed use is in harmony with the various elements and objectives of the Metropolitan Bakersfield General Plan. 5. The project would result in a development that is consistent with the intent of both the Metropolitan Bakersfield General Plan and the Bakersfield Municipal Code. NOW, THEREFORE, BE IT RESOLVED by the Bakersfield Planning Commission as follows: 1. The above recitals, incorporated herein, are true and correct. 2. This project is exempt from the requirements of CEQA. 3. Conditional Use Permit No. 23-0179 as described in this resolution, is hereby approved subject to the conditions of approval in Exhibit A and as shown in Exhibits B and C. I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Planning Commission of the City of Bakersfield at a regular meeting held on the 18th day of January 18, 2024, on a motion by Vice-Chair Cater, seconded by Commissioner Neal the following vote: AYES: NOES: Exhibits: Bashirtash, Cater, Bittle, Kaur, Koman, Neal, Strickland None A. B. C. APPROVED Conditions of Approval Location Map Site Plan Y BASHIRTASH, CHAIR f Bakersfield Planning Commission 2 EXHIBIT A CONDITIONS OF APPROVAL Conditional Use Permit No. 23-0179 I. The applicant's rights granted by this approval are subject to the following provisions: • The project shall be in accordance with all approved plans, conditions of approval, and other required permits and approvals. All construction shall comply with applicable building codes. • All conditions imposed shall be diligently complied with at all times and all construction authorized or required shall be diligently prosecuted to completion before the premises shall be used for the purposes applied for under this approval. • This approval will not be effective until ten (10) days after the date upon which it is granted by the Planning Commission to allow for appeal to the City Council. Any permit or license for any approval granted shall not be issued until that effective date. • This approval shall automatically be null and void two (2) years after the effective date unless the applicant or successor has commenced the rights granted, or if the rights granted are discontinued for a continuous period of one (1) year or more. This time can be extended for up to one (1) additional year by the approving body. • The Planning Commission may initiate revocation of the rights granted if there is good cause, including but not limited to, failure to comply with conditions of approval, complete construction or exercise the rights granted, or violation by the owner or tenant of any provision of the Bakersfield Municipal Code pertaining to the premises for which the approval was granted. The Planning Commission may also consider adding or modifying conditions to ensure the use complies with ttie intent of City ordinances. • Unless otherwise conditioned, this approval runs with the land and may continue under successive owners provided all the above-mentioned provisions are satisfied. II. The following conditions shall be satisfied as part ofthe approval of this project: 1. In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners and boards ("City" herein) against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for CITV's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. Tw:S\04_current planning\02_CUP\0l_active\2023\23-0179505 Union Ave\0l_PC\final prep\Exhibits.docx CUP 23-0179 Page I 2 of 4 The City will promptly notify Applicant of any such claim, action, or proceeding, falling under this condition within thirty (30) days of receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party. 2. This conditional use permit allows the conversion of a motel to a 2-story multi-tenant housing for 36 studio units, one 1-bedroom unit, one 2-bedroom unit (caretaker's quarters), and a 230 square-foot office on a 1.12-acre lot in the C-2 (Regional Commercial) zone. 3. Prior to occupancy, the applicant shall post a 2' x 2' signage display of emergency contact information outside the manager's office. 4. The applicant is required to provide a full-time on-site manager, cameras, and an electronic security gate. Ill. The following are specific items that you need to resolve before you can obtain a building permit or be allowed occupancy. These items include conditions and/or mitigation required by previous site entitlement approvals (these will be specifically noted), changes or additions that need to be shown on the final building plans, alert you to specific fees, and other conditions for your project to satisfy the City's development standards. The items listed below will usually need to be shown on the final building plans or completed before a building permit is issued. A. DEVELOPMENT SERVICES -PLANNING (1715 Chester Avenue) (Staff contact -Taniya Wright; 661-326-3616 or twright@bakersfieldcity.us) 1. The minimum parking required for this project has been computed based on use and shall be as follows: Proposed Area (SF) Use or No. of Units 36-unit studios 36 studios One -1 bedroom One -1 bedroom One -2 bedroom One -2 bedroom Office 230 (SF) Guest Parking 17.58.110 Parking Reduction Parking Ratio 1 space/1 unit 1 space/1 unit 2 spaces/1 unit 1 space/250 SF 10% guest Parking 25% Low-Income housing Total Required Parking: Parking Provided: Tw:S\04_current planning\02_CUP\01_active\2023\23-0179505 Union Ave\0l_PC\final prep\Exhibits.docx Required Parking 36 spaces 1 space 2 spaces 1 space 4 spaces 11 spaces 33 spaces 32 spaces CUP 23-0179 Page I 3 of 4 2. The applicant shall submit a Declaration or Covenant to the Planning Director prior to Tenant Improvement being issued. 3. The operation shall remain in contact with the Housing Authority of Kern County to offer subsidized apartment rentals for individuals and families who are eligible for the Housing Choice Voucher Program. B. WATER RESOURCES (1000 Buena Vista Road) C. (Staff contact -Tylor Hester; 661-326-3715 or THester@bakersfieldcity.us) 1. Prior to the issuance of Building permits, the developer shall submit two (2) sets of utility plans signed by a California Registered Civil Engineer to the Water Resources Department showing all offsite and onsite improvements, including connections to the existing water main and underground fire waterlines and related apparatuses. Include any nearby on or off-site hydrants on the plans. Plans shall be submitted along with applicable plan check fees and any other associated fees per the current fee schedule. Plans shall comply with current City Standards and Specifications, California Fire Code, and the City of Bakersfield Municipal Code. City Standards and Specifications and the current Fee Schedule are available for download from the City's website at www.bakersfieldcity.us/379/water_resources. PUBLIC WORKS -TRAFFIC (1501 Truxtun Avenue) (Staff contact -Susanna Kormendi; 661-326-3997 or skormendi@bakersfieldcity.us) 1. The developer shall dedicate any sidewalk extending out of the right of way to the City of Bakersfield for the pedestrian way along all arterial streets. This must be conducted with a separate instrument or final map. 2. Prior to the issuance of building permits, a grading plan must be approved by both the Public Works Department and the Building Division. 3. Any proposed or future perimeter fence and/or wall shall be placed outside of existing public road right of way or future ultimate public right of way. 4. For Building Permit, Plan will need to show all existing connection(s) to the public sewer system. 5. Show the installation of a full-sized manhole in each sewer line except residential development before it connects to the sewer main. This manhole is to be located within the property being developed and must be easily accessible by City workers. 6. At the time of building permit issuance, a sewer connection fee shall be paid. This fee is based on the rate that is in effect at the time a building permit is issued. 7. Prior to grading permit approval, the developer shall form a new Maintenance District, or update existing Maintenance District Documents. Updated documents, including Proposition 218 Ballot and Covenant, shall be signed and notarized. Contact Subdivisions at (661) 326-3588. Tw:S\04_current planning\02_CUP\01_active\2023\23-0179505 Union Ave\0l_PC\final prep\Exhibits.docx CUP 23-0179 Page I 4of4 8. Prior to the issuance of each building permit, the developer/owner shall pay a Transportation Impact Fee (TIF) for regional facilities. This fee will be based on the rate in effect at the time the applicable approval is issued. The Public Works Department will calculate an estimate of the total fee upon submittal of construction plans for the project. 9. A street permit from the Public Works Department shall be obtained before any work can be done within the public right-of-way (streets, alleys, easements). Please include a copy of this site plan review decision to the department at the time you apply for this permit. D. Recreation & Parks (4101 Truxtun Avenue) (Staff Contact -Fidel Gonzalez; 661-326-3268 or fgonzalez@bakersfieldcity.us) 1. At the time of building permit issuance, park development fees shall be paid per BMC Chapter 15.82. ACKNOWLEDGEMENT BY PROJECT APPLICANT: I agree to the project's conditions of approval and acknowledge that failure to comply with any and all conditions shall constitute grounds for potential revocation of the permit approval. Signature Date Print Name Tw:S\04_current planning\02_CUP\01_active\2023\23-0179505 Union Ave\0l_PC\final prep\Exhibits.docx 23-0179 EBTHIT LEGEND 505 Union Ave n R-2 (ZONE DISTRICTS) E h .b. B C-2 X l lt R-1 One Family Dwelling C-2 ~====================::I 6,000 sq.fl. min lol size CITY OF BAKERSFIELD R-1-4.SOneFomilyOwelling R-2 4,500 sq.ft. min lot size 7TH IT I ,_ ___ ..J '-----------------------1 E Estate I I j W i 10,000sq.fl.minlotsize I ---, . E 7TH IT I R-S Residential Suburban N n 24,000 sq.ft./dwelling unit R-2 I I R·2 R-l/P.U.D. ' R-S·( ) Residential S_uburbon R-2 l,2.5,5ar10mmlolme R· I I R-2 limited Multiple Family Dwelling 3 I I I I I I '"====================::J 4,500 sq.ft. min lot size(single family) C-2 I"' 6,000 sq.fl. min lot size (mullifomily) 2,500 sq.fl. lot area/dwelling unil R R-3 Mulliple family Dwelling I __.J ·2 I 6,000 sq.fl. min lot size I I I I I , I I 1,250 sq.fl. lot area/dwelling unit 6TH IT I R-4 High Densily Multiple Family Dwelling I ----E 6TH IT 6,000 sq.fl. min lol size --, > I I I I I I I r----600 sq.ft. lot area/dwelling unit I I I R-H Residential Holding 10ocre min lot size j 23-0179I I I I 11 I I I ~ A t~~~ltsu:~t min lot size ~ R-2 R A-20A Agmullure ·2 R-2 R·2 20 acre min lot size LJ LJ PUD Planned Unit Development R-2 I I R-2 LJ LJ LJ TTTrovellrailer Park MH Mobilehome R·l I _ I ~ :::; _ C-0 Professional ond Administrative Office I I :z :,f :;; C · I Neighborhood Commercial ~ ----..-----i E 5TH IT ~ C-2 Regional Commercial = I I I I Pl Pl N ~:~):~,:~1 ;;: 1i~:::" \ M-1 PCD Planned Commercial Development \ M-1 Light Manufacturing '\ M-2 General Manufacturing C-2 M•1 R-2 M-3 Heavy Industrial P Automobile Parking R-2 RE Recreation I --1--J .__ _________________ _) .__ ________ ...1-________ __J Ch Church Overlay 1 1 OSOpen Space 4TH ST ~---' ._ __ __. L HOSP Hospilal Overlay E 4TH ST ,--------1 AD Architectural Design Overlay r I \ ,----r---------~ FP-P Floodplain Primary FP-S Floodplain Secondary R·4 C-2 AA Airport Approach 01 Drilling Island I ~::::::::::::::::::::::::::::::::::::~-PE Petroleum Extroction Combining \ \ .__________ M SC Senior Citizen Overlay I \ ·1 HO Hillside Development Combining . R-4 WM-West Ming Specific Pion ~ / _____ ___, C•2 r----~ ~ M-2 !!I~ ,~ J)-Bill AVE ~---~ C-2 ~ ~ i~ --~ BAKERSFIELD ,~ R-2 M·2 N ~ -= A / !;! R·1 R•1 i R·1 R-1 ._,----L----,-tc-,---EJ-RO_I_T __ .J ._ _____ _. 0 ~:e; 250 C·2 ~ R•i I I R·i BaseEditor · MC Exhihit C PROJECT DATA C....,"'[<. ... ,...,,.,v,.,-·, ·v v,_,,._,.,....,....,-: ..,.,. ..r~ ... •hJ:: ..... ,1,--:; .. ,.,,-:•w:cn·,1-,·,'!.I,;.,._~....._.,. TITLE SHEET ethosphere studio A•CMIHCTUll f PLANNING I COMMUN ITT DllteN ,~. , ... , ..... ,, .......... ( .... ... , .•. , .... 1_, _____ ,., PROJECT DIRECTORY OWNER .,,;;_£,'V!".W~f ,._ .. l ... ,.,.., '½.A;_!• -~--,-,• (V ... i4.o•.,.,• ... ..<7 .. ARCHITECT EA<!ljFl(LJ:..; ... •., fY..._ ...... i.,s.-.,.,_,.,._,'" .._ .... , ... E,llA!!ET .. ,E_~, .. ,,::u .. ~_...-r .. - SHEET INDEX ARCHTECTURAl. CUP-I TITLE SHEET CUP-2 SHE PLAN CUP-<! Ei!ITERIOR ElEV,\TIONS eup.5 EM.AAGEO ElEVATION DEFERRED SUBMITTALS ['[O[AAU)\.;fYfIT4..l••-'1E.OE'lMtA.l",-.V:OJ;.•r.A> J•""t[,r.,_,-...c,.A.\!,_T\.,lf...-,T[[.U,._,f,..< J•"'•v;yr,_,...r___.-,_,.,.,;c,.....:,."'l!'<'il """"-"U'lcT-tE~•-usi::;J•OO...Wlhlf\Avtal'O. i,,.1.Y1nALt<.·~ v;;,,s,..,,c1•o;;u Wi.\llTIA1.n.,, ;...a.HS.E.,llTl(r,.T ... AAC ... fC'.,.fVIEf<.S r..I: .. U._ _,.'"-l<.£\\.. ... ,,.,EYA.'6;~;1,,',•\l.•t ... _., •~f..ii"-lUN",-PJ..IA.LWI'~"-" '"'1 ... 1"1:IC!,_,, '""'""l[fFl<•ft•S-.'1.-"ltU,1.t C...V.iM:S..,..WU!-. •NEIOOCA."1;1,.. .... r,,.A·IEt!.£,;Fl'<,tl:IU" ·.c.,-ru..,x, ..... -............. ( ... m,! .. f(t .. , .. ~,M.! 1·'1"""'lT"!<tl•I\S.U\.~Yl'!AI.FE_.i........_,,c111 H;""'-'Lt <1,;r~ ,.__c,t"'ll',"-"'1 _,.,,.._ r,·c "~~T\,,A"i!:RP•---"'-=t-·"•!fUN"", GREENVIEW PLACE 505 UNION AVE. BAKERSFIELD, CA 93307 APPLICABLE CODES ,.,nnE.1• ,..,,, i",)trtl)• • .._,, r;11r1Er' ,._., l'.Al.l'<..•-•JU.1"1J:_« CA..t«-•-UK'll::"'-~-« CAI.IF<..'--..... ~ ..... "1".'."'-:..ct u.u,~•-"'-~VS....:;:_« OJ'<,"O-U,(','!_~,•~-"C£ C""'->''Uo~IJILCov::; i'A..C..,,t-i~~H VICINITY MAP SHm 1 OF5 Exhibit C ,-------,,,,.,-."~,m~, __________ L __ _ C-2 tAPNc009-'12,02) ;, .. ,. !REGIONAL CO.V.Y.fRCIAtJ F::'-(RESTAURANTSJ ----------------------------------------------------------------------------~ R-2tAPN 009•412•1b) (Ut./lTEOMut.Tl?lf- FAV,ILYOW!:LUNG) (';'AU.NT) Ul$_,.r.,;·11n•-•D1cE---+--t---+-~ R-2(APN:009.o172-15) (U.YlTEOMIJI.Tl?LE- FAV.llYDWELLNOJ (VACA"fl] I I \I ', I I ~-- I I I I I I PROJECT DATA SITE PLAN CA"'l•l"-'U!!;',-a:,"'<.TI.I"'. Y.l.•1-F•YIO.>•.co;IV-lC:.o,,...,._, • .......... ,c......_>1-'-lA::.E'c•r.cTl.-..~ ... VW,,--;•.._•;U..Y ethosphere studio ,HCHIHCTUHI PLANNING I COMMUlflTT nu,a"' ·•• 1•-••·•nH"'·•••~,r • · ... , .. 1•1-•-... --· PARKING CALCULATIONS: •~N:.u,,r;,uc61 a:.i ,..,.,.,,f.,.,..., >•ttt: ··l'l ..... ,Q ...... btt "'' ._ "f!oL.., .. ,,,,.,,,,.i:.,,,.,;,.-.,'(,.!:l .. l•>-'••-lOl""-'-fSt••t· Y .. CUA.Tf..t~W "-'1: v< .... t .. W"'-...N.i: -..,..e~<•WI"• ~ .. ~ y~ .,...,., AM; n ... , .!_Jl.:tr; ......... !Y u, .... \A.,A.,.. L->'!_., ... ,-,.....,, •• ,~wr-~ ·..i: .... ,c w,• ~~.__ <-RE.C --•cc!P<.,lf!.....-V -...u,c,vn:• ,,, ... , ,;o ...... ,~. (~ '-~"""""T(_SYflCY.lf•.o,«·""--:, 11:--t..f•A••"•...-..-c«I ... ~u,,wt~,,,....,...,,... ,~,•;ftW fF..-<.£• .. <;o,,.-, GENERAL NOTES {MARKET} ~J..,.;~1_...-:...,H.11.c,v;,t<.YJT. ,~a ., •• m,-::;[--"' Wll\. . ....,._~.,u,.,, "''C' :_ul,l .._,, ............... lr"-'-'\[l'i•<i::TNFA:••H\ f<.IU.l"-.,;_s;;•lilJCT,'1.tS .......... '-!..,_ "''A..c'-"'Tl.,."'"'A..JT..NJ.Tr:, ... ESl"'iNCl.£~ >'>"EY-oi;.~t~•:.,..~,.,c..., __ La(IV.:.Cc.U'A..-.1: ::iT' .'IC ..... ,~! """'~",n;:'l...,"f~W:l'i<.f.-""'ll ' -(U[s.Yi,_, ........ •c,s.11!:'>"'.SA.'<!."[UU ..,.,v,.,;:,;-,.,_,,,, ..... t ..... i.•uN< ... ~~ ,.1:n,.::A...A-.:, • .,,_....,_,r:..,_c·u ......... "M"J'Ul.>H••·u,;...e •!<"-' .,·,: M O'o:;"·"T;tt(WH-"tS ~•A.•fH!a'IE-.tSU WA.Tt•tt~··•o,:u•Rt Sl."'1:IIMH''.Tl""''HSA..,;tH f.11/fA." l.'\:">l'L:W,<tf.:;U! •-~y•· ... ,..,~ Sit'.U~•"1::•r<!"WA.Tt~iA.'1'f-t[" A.TT-ti"""' -, 0 t,.01"'~ "l<Yfl "' '-V[.Oo."' O[V!.-~"1''-l'Hil......,_U:•AIC•Ul-Y" _,,n.,.-.,_.,_,~"f,,.ort•<....,...•o.v. ,, .. -,:cu.qc ... ,, ...... _ ... ., LANDSCAPE SCHEDULE <O <fi,___.,..,,t . .t,.'<'A..,l'<UI : .... OSI.••-• c"""'-Y_c ... .,,..__.._.:,,..,,...M ,'-!t LEGEND l)TII ::::.;;-•" ~ ~---· m--=-- □ =·"oc=•• , .. w,·~ GREENVIEW PLACE 505 UNION AVE. BAKERSFIELD, CA 93307 ~~~~~~~:.:""-' I FIRE ACCESS SITE PLAN ,~,,,-4--- LUSBIQNIUCSIDEW•<O..WIII ·,.,,,.,,,m• 'l;!WtAIIE-.. ot•~ .... •·a.,-c;o.oo-· .. v~ .. , N ""W"lCA"l[l(l< .... -,,n !)IXTfV,,....,.--~l<!a~~•-"1.l",WW•"l<'•" t....,_ f'. ~•<;u! MW"""..C<.!"£-IDEW"'-" -.i,4-.r,",ITTE• ot•~P~•A.,1:A«D 1. w ;;i z 0 z ::, ' I ' I ' I ' ! I i ' I ' I ' ! ! I uii ::i [ z , 0 1 zi ::,, I ' I ' I EB SHEET 2 OF 5 r-------------------, o I I I I I I I I I 0: I I I I I I I 0: I I I I I I o I I I I I I I L __________________________________________________________________________________________________________________________________________ J: ______ .J UNITA1 UNITA1 UNITA1 UHITA1 UNtTB1 UNITA1 UNITB1 UNITA1 UNITA1 UNITA1 STAIR1 UNITA1 UNITA1 UNtTA1 UNITA1 UNITA1 LEVEL 1 CEO Cill:J [EJ L!!IJ L!!D C!!!:J DJD ~ ~ ~ DE] ~ ~ ~ DE] 0£0 '------------------------------------------------------------------------------------------------ I L ____________________ 11ti!Ul __ ..vlfti.n.. ___ J1ti.lI.A2 ___ .J1HJW _____ __1uniAt.. ___ !,I.N!T.A1. _____ .JJ.Hd:.a1-___ Wfil'.R _____ uMi.at.. ___ .JJ.Hd:.-61 _____ .J1.Hd:.a1-__ .JJBJi.61 _____ ua,a.1.~--------------------------~ [EJ~ ~~~~DE] DE]~~~~ DE] FLOOR PLAN LEVEL 2 BUILDING AREA LEGEND □ COMMON AREA □oFFICE □ RESIDENTIAL ethosphere studio AIICHITICTUII I Pl.ANNINO I CONMUNITI DllteN .... , .. , .. ',.,' i,....,~.... ~ . ..... .,,.-,·1-•-....... , •. GROSS BUILDING AREA UNIT MATRIX GREENVIEW PLACE 505 UNION AVE. BAKERSFIELD, CA 93307 EB SHEET 3 OF 5 1 ~ ! ' !\I• ' ~ ~ i i h ~-,. I i (D--------j L . w u :5 CL s w > z w w ~ t9 0 :.c; :::, ti ~ Cl) ..r::. a. U) 0 ..r::. a, Exhibit C ENLARGED ELEVATION ethosphere studio AICMIHCTUH I PLUOflNO I cor.u,,u,,un DHI.N , •• ,, •• , -,,, f• ........ ~,! • ,,., ..... ,.,_, __ ,..,, GREENVIEW PLACE 505 UNION AVE. BAKERSFIELD, CA 93307 LEGEND E ...... -... J-.u• □ ····-~--" ■"-""' □, .. ._._, ■··-· [m ,.,c-v.-. SHEET 5 OF 5 !.C-'lE 11,·-1•-0· ,,.. .. ,,._,. -l'l ExhibitC .3ljASlt ethosphere studio AJtCHIHCTUH I PlANHIKG J COMUUHIT'f' DISIGN 1~•llif'>t>lttEU~1t.::-.,~1 w.•1~,,.~'!.I-•"-""'"""''.- @ f,;~W,OSWSEI.EVATION ®~,, .. ~w GREENVIEW PLACE 505 UNION AVE. BAKERSFIELD, CA 93307 \'11fi'Af;;ICAT£1)NHAi. ~-F-Tf;)MAto< Mav:.REW~ ~" WT'-1.C!WV!i! tft:-..' 'V , 0 Wt-~1f!.9-0StJRE PLAN @1i~W-OSURESE£DON @ ~~'&ja~S-9StJRE JAMB -,--, , \ ~ \ , '-.!!!.. Z'~f£EIN:~ WALI.C-.AP.il'n.£l,::0Us&(l;l'Ee "W,,.'TISE!!~,'U,W'C:: •t~"T-r:FWAU. 6"..!"~!!•GIAYCONcUOOI. AAl!1AU.J:llNT~t;;Ja!fAU.,reu ~_,._...-=e~'=;~ '-,T~R."-'st"Q~'$ ~ll:')-:.'i'"9ITT::""-Uli SHEEr, 1 OF S