HomeMy WebLinkAbout2023 FMC REPAIRAppendix VI
Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
10901998 12/28/2023
Skyway Liquors
4199 Union Avenue Bakersfield 93305
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Aaron Perrigo
1073967
8485827 8/8/2024
VR ATG B47853 7/30/2024
12/28/2023 4
Underground Storage Tank
Monitoring System Certification Form
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆
Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆
Are the audible and visual alarms operational? ܆܆܆܆
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment? ܆܆܆܆܆܆
The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆
Was the monitoring control panel’s backup battery visually inspected, functionally
tested, and confirmed operational? ܆܆܆܆܆܆
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) ܆ Sump ܆ UDC
܆܆܆܆܆܆
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational? ܆܆܆܆܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Veeder-Root TLS-350
336-02
Underground Storage Tank
Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
S7 464 91 Vac Vent
S8 464 91 Vac Annular
S11 464 87 Vac Vapor
Underground Storage Tank
Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
܆܆ Check this box if tank gauging is used only for inventory control.
܆܆ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆
Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆
Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆
Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Probe ID Probe Model Tanks Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
܆܆
Installed new Liquid Sensor cup on 87 Vapor, to get a High Liquid Alarm.
Rewired and tested both S7 91 Vac Ann and S8 91 Vent and tested proper function w/ no issues.
Left site w/ All Functions Normal.