Loading...
HomeMy WebLinkAboutJBI Oaks - WorkplanWorkplan for Jeffries Bros. Brookside at the Oaks Facility: Jeffries Bros. Brookside at the Oaks 8803 Camino Media Bakersfield, CA. 93311 Contractor: Cal Valley Equipment 7608 Fruitvale Avenue Bakersfield, CA. 93308 License: 998733 A, Haz Contact: Jerry Rangel Office: (661) 327-9341 Cell: (661) 979-0953 Email: jerryr@calvalley.com Scope of work: Remove and replace all dispensers, UDCs, product piping, vapor return piping, and conduit from dispensing area under canopy to UST piping sumps. Replace the existing Veeder Root TLS-350 with a new TLS-450. Permit number: Bakersfield Fire Department: 23-10000909 Proposed timeline: *Depending on dispenser shipping date, 8-12 week estimate from manufacturer May 1st: Close site, remove fuel island equipment, and blow back lines to the USTs. May 6th – 10th: Sawcut, breakout, and remove concrete. May 13th – 17th: Excavate and remove existing UDCs and piping. Conduct soil sampling as required. May 20th -24th: Set UDCs, run conduit, and install TLS. May 27th – June 7th: Install UDC fittings, run Brugg piping, connect to existing turbines. Perform primary and secondary backfill inspections and testing. June 10th – 21st: Backfill, concrete, and concrete cure time. June 24th – 28th: Set dispensers, purge, and calibrate. July 1st – 5th: Perform final testing with BFD and SJVAPCD Sign: _____________________________________ Date: ______________ 02/07/24