Loading...
HomeMy WebLinkAboutSB989 2024Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 6 Month ܆ 36 Month CERS ID Test Date Facility Name Facility Address City ZIP Code Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date Manufacturer and Test Equipment Training Certifications Expiration Date Test Procedures Used Components Tested I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST 10134247 4/9/2024 Jaco #7785 Fastrip #32 3701 Ming Ave Bakersfield 93309 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Aaron Perrigo 1073967 8485827 8/8/2024 Veeder Root ATG B47853 7/30/2024 FFS Incon 1010993708 4/8/2026 Incon Sumps and UDC’s Precision mechanical test gauge Tank annular’s and line secondaries 4/9/2024 6 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Tank ID Tank Manufacturer Tank Capacity Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Precision mechanical test gauge 87 prod Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 DSL prod Smith 12:00 5 psi 1:00 5 psi 0.00 0.00 87 vent Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 91 prod Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 91 vent Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 DSL vent Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 Vapor return Smith 10:00 5 psi 11:00 5 psi 0.00 0.00 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Incon 87 stp Unknown 66.00” 30.00” 10:19 3.0311 10:34 3.0306 0.0005 0.002 91 fill Unknown 62.00” 12.00” 11:39 3.3024 11:54 3.3027 0.0003 0.002 91 stp Unknown 66.00” 30.00” 14:08 4.0031 14:23 4.0023 0.0008 0.002 DSL stp Unknown 66.00” 30.00” 12:43 4.0102 12:58 4.0096 0.0006 0.002 87 fill Unknown 62.00” 12.00” 11:39 3.8673 11:54 3.8675 0.0002 0.002 DSL fill Unknown 62.00” 12.00” 11:39 2.3165 11:54 2.3157 0.0018 0.002 UDC 1-2 Unknown 34.00” 12.00” 15:17 4.0855 15:33 4.0859 0.0004 0.002 UDC 3-4 Unknown 34.00” 12.00” 15:17 3.3457 15:33 3.3459 0.0002 0.002 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) ܆ Pass ܆ Fail Incon UDC 5-6 Unknown 34.00” 12.00” 15:17 4.3800 15:33 4.3818 0.0018 0.002 UDC 7-8 Unknown 34.00” 12.00” 15:17 3.7369 15:33 3.7367 0.0002 0.002 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 9. COMMENTS Replaced boot 3.5x3.5a 91 vapor line STP Replaced boot 3.5x2.4 DSL prod Disp 7-8